Alex Fraser Bridge

The Alex Fraser Bridge is a cable-stayed bridge in the Lower Mainland of British Columbia, Canada, that spans the Fraser River, connecting Richmond to Delta via Annacis Island and forming a vital segment of Highway 91. Opened on September 22, 1986, it measures 2,525 metres in total length with a main span of 465 metres and was the longest cable-stayed bridge in the world and North America at the time of its completion, holding the world record until 1991 and the North American record until 2005. The bridge is supported by two 154-metre-high pylons anchored by steel piles driven 90 metres into the riverbed and features 192 steel cables ranging from 50 to 237 metres in length, originally imported from the United Kingdom. Named in honor of Alexander Vaughan "Alex" Fraser, a former British Columbia Minister of Transportation and Highways who oversaw the project's early planning in the 1970s, the bridge—originally known as the Annacis Bridge after nearby Annacis Island—was constructed between 1983 and 1986 at a cost of $58 million by a joint venture of Klohn Crippen Berger and Buckland & Taylor for the British Columbia Ministry of Transportation. Planning for the crossing began in the 1970s amid growing traffic demands in the region, with right-of-way acquisition secured in 1973 to alleviate congestion on older Fraser River crossings like the George Massey Tunnel. Construction involved significant engineering challenges, including deep pile foundations due to the sandy riverbed soil, with considerations for seismic activity. As a key artery for commuters, freight, and access to the U.S. border via the adjacent Highway 99, the Alex Fraser Bridge originally accommodated six lanes of traffic, which were expanded to seven in 2019 with the addition of a counterflow lane to manage daily traffic volumes exceeding 120,000 vehicles. Its design provides 55 metres of vertical navigation clearance for river traffic and incorporates prestressed concrete elements for durability in the region's wet climate. The bridge remains a cornerstone of British Columbia's transportation infrastructure, supporting economic links between Vancouver's suburbs and international trade routes while highlighting advancements in modern bridge engineering.

History

Planning and Development

By the 1970s, rapid population and economic growth in British Columbia's Lower Mainland had significantly increased traffic volumes across the Fraser River, particularly between Richmond and Delta, overwhelming existing crossings like the George Massey Tunnel and necessitating a new route to alleviate congestion. The provincial government recognized the need for enhanced connectivity as part of broader highway expansions to support regional development. Planning for the bridge commenced in the early 1970s, with the acquisition of right-of-way land on the north side near Annacis Island—a sandbar in the Fraser River—from landowner Grosvenor in 1973. The site was selected for its strategic position to link Highway 91 between Richmond and Delta, optimizing traffic flow in the corridor. Originally known as the Annacis Bridge after the nearby island, in the early 1980s, as part of the Fraser River Crossing and Connectors Project, the British Columbia government announced plans for a new cable-stayed bridge to address these demands. The project was primarily funded by the provincial government through the British Columbia Ministry of Transportation and Highways, with a total construction cost of $58 million; while federal contributions supported some infrastructure initiatives in the era, the bridge's financing was predominantly provincial. Groundbreaking followed approval in 1983, marking the transition from planning to construction. The bridge was named in honor of Alexander Vaughan Fraser, who served as British Columbia's Minister of Transportation and Highways from 1975 to 1986 and strongly advocated for key infrastructure projects, including this crossing, to bolster regional connectivity during a period of expansion.

Construction and Opening

Construction of the Alex Fraser Bridge began in June 1983, led by a joint venture between Buckland & Taylor for design and Klohn Crippen Berger (formerly Klohn Leonoff) for geotechnical engineering. Early work focused on foundation preparation for the piers amid challenging conditions in the Fraser River delta, where weak alluvial soils and seismic risks posed significant hurdles; these were addressed through deep pile foundations driven into stable strata to mitigate liquefaction and ensure stability. By 1984, pier foundations were substantially complete, allowing progression to the erection of the main towers in 1985, which reached a height of 154 meters. The installation of the stay cables followed in 1986, supporting the 465-meter main span as construction advanced toward completion. The project faced environmental controversies, including the 1984 demolition of the historic St. Mungo Cannery site, an important archaeological midden, and a 1985 incident where a ruptured sewer line spilled millions of litres of raw sewage into the Fraser River. The bridge opened to traffic on September 22, 1986, initially with four lanes to accommodate immediate use while the remaining structure was finalized. Due to unexpectedly high demand, all six lanes were opened in 1987. The opening ceremony featured British Columbia Premier Bill Vander Zalm and the bridge's namesake, former Transportation Minister Alex Fraser, cutting a ceremonial ribbon with oversized hedge shears. In its first full year of operation in 1987, the bridge handled a typical daily volume of approximately 42,000 vehicles, surpassing projections and underscoring its rapid integration into the regional transportation network. At the time of opening, it held the record as the world's longest cable-stayed bridge.

Design and Engineering

Structural Design

The Alex Fraser Bridge is a cable-stayed structure featuring a single plane of stay cables arranged in a semi-fan configuration, which provides efficient load distribution while enhancing the bridge's visual appeal through its streamlined form. This design was selected over a suspension bridge alternative primarily for its economic advantages in construction and materials for the span length, as well as its aesthetic integration with the urban landscape of Greater Vancouver. The main span measures 465 meters, establishing it as the longest cable-stayed span in the world upon its opening in 1986 and maintaining that global record until 1991, when it was surpassed by the Skarnsund Bridge in Norway; it remained the longest such span in North America until 2005. The bridge's two H-shaped towers rise 154 meters above the ground, with the horizontal crossbeam allowing cables to fan out from multiple anchor points on each arm, improving stability against wind loads by distributing aerodynamic forces across a broader structural profile. The deck consists of a continuous composite steel-concrete box-girder system, supported by stay cables that anchor directly to the deck edges, enabling a slender profile that accommodates six lanes of traffic plus pedestrian paths. This configuration minimizes material use while ensuring rigidity under live loads. In total, the stays comprise multiple pairs fanning from the towers to support the 930-meter cable-supported portion of the deck. Given its location in a seismically active region near the Fraser River's deltaic soils, the bridge incorporates geotechnical measures to address liquefaction risks and site-specific fault influences, including deep pile foundations designed to mitigate differential settlements during earthquakes. Flexible connections and the inherent ductility of the cable-stayed system further enhance resilience, allowing the structure to accommodate ground motions without catastrophic failure.

Engineering Innovations

The Alex Fraser Bridge employs a semi-fan arrangement for its stay cables, which provides structural efficiency by maximizing eccentricity from the deck while minimizing moments on the pylons, contributing to the bridge's stability across its main span. This configuration, consisting of 96 cables per tower, helps mitigate wind-induced vibrations, a common challenge in cable-stayed designs. Geotechnical engineering for the bridge addressed the challenges of soft deltaic and alluvial sediments in the Fraser River by pioneering the assessment of seismic liquefaction risks and implementing ground improvement techniques for pier foundations. Drilled shafts were utilized to achieve stability, extending into firmer layers to support the towers amid the region's weak soils, marking an early advancement in foundation design for seismically active areas. Wind tunnel testing, conducted in 1984 by Rowan Williams Davies & Irwin Inc., played a key role in optimizing the deck's aerodynamic shape to prevent aeroelastic instabilities such as flutter. These tests informed refinements that enhanced the bridge's resistance to dynamic wind loads, ensuring safe performance in the local gusty conditions. Environmental considerations during planning focused on minimizing disruption to the Fraser River's salmon migration, with pier placements designed to avoid critical tidal zones used by adult fish, thereby reducing potential barriers to upstream spawning routes.

Physical Characteristics

Dimensions and Components

The Alex Fraser Bridge measures 2,525 meters in total length, encompassing the main crossing and its approach viaducts. Its central cable-stayed section features a main span of 465 meters flanked by side spans of two 50-meter sections and two approximately 183-meter sections, making it one of the longest cable-stayed bridges of its era upon completion. The bridge deck spans 32 meters in width, originally providing space for six traffic lanes, shoulders serving as emergency lanes, and separate pedestrian walkways on both sides; following modifications in 2019, it accommodates seven lanes with narrowed lane widths and eliminated shoulders. The structure offers a vertical clearance of 57 meters above the Fraser River at high water level (as of 2025), allowing passage for large marine vessels while supporting highway traffic at an elevated height. Key components include two H-shaped concrete towers rising 154 meters above the water, which anchor the cable-stayed system and were the tallest structures in the region at the time of construction. Supporting the deck are 192 stay cables arranged in a semi-fan configuration across two planes, with the longest cables extending over the 465-meter main span to distribute loads efficiently. The bridge is founded on 14 piers in total, including the two primary towers and additional supports for the approaches, distributed across the Fraser River and adjacent land.
ComponentSpecification
Total Length (including approaches)2,525 m
Main Span465 m
Side Spans2 × 50 m, 2 × 183 m
Deck Width32 m
Vertical Clearance (above high water, as of 2025)57 m
Tower Height154 m (2 towers)
Stay Cables192 (semi-fan arrangement)
Piers14 total
Originally designed to handle up to 120,000 vehicles per day, the bridge incorporates robust shoulders for emergency access and maintenance (prior to 2019 modifications), reflecting its role as a critical arterial route in Greater Vancouver's transportation network.

Materials and Construction Methods

The Alex Fraser Bridge utilizes weathering steel for its deck girders, providing corrosion resistance without the need for painting, with approximately 5,500 metric tonnes fabricated for the structure. The towers and piers are constructed from reinforced concrete, forming the primary vertical supports in a cable-stayed configuration. The stay cables consist of high-tensile galvanized steel strands, each cable comprising 283 strands with a typical tensile strength around 1,860 MPa to ensure structural integrity under load. Cable fabrication involved shop-prefabrication of 23-tonne segments, which were then installed on-site. The main span was erected using a balanced cantilever method, progressing in increments from the towers with purpose-built form travelers to maintain stability during assembly. Foundations for the piers incorporated large-diameter steel pipe piles driven up to 90 meters deep into the riverbed to support the concrete elements. Quality control measures included stringent welding inspections for fracture-critical components and non-destructive testing methods, such as ultrasonic evaluation, applied to welds and cables to verify material integrity. The superstructure features a composite design with a reinforced concrete deck attached to longitudinal steel girders, enhancing overall bending resistance.

Operation and Impact

Traffic and Usage

The Alex Fraser Bridge carries Highway 99 across the Fraser River, connecting Richmond in the southwest—near Vancouver International Airport—to Delta and Surrey in the northeast, serving as a vital link for regional travel and access to U.S. border crossings via Highway 99. This positioning makes it a key artery for commuters, commercial traffic, and goods movement between the Lower Mainland's urban core and southern suburbs. Average daily traffic on the bridge exceeds 119,000 vehicles, with volumes peaking during morning and evening rush hours as well as summer travel periods when recreational and cross-border trips increase. To manage these peaks, the bridge employs a contraflow lane system, providing four lanes northbound from 4:30 a.m. to 11:30 a.m. and southbound otherwise, which has improved overall flow by 7.4% and reduced travel times by 31.8%. Unlike tolled crossings in the region, the Alex Fraser Bridge has operated without tolls since its 1986 opening, with maintenance and operations funded through general provincial taxes. The bridge plays a crucial role in the regional economy by handling a substantial share of Lower Mainland freight, including approximately 36% of northbound container trucks departing from the nearby Deltaport terminal, thereby diverting heavy vehicles from the parallel Deas Island Tunnel and easing congestion on that narrower route. This freight facilitation supports broader goods movement, contributing an estimated annual economic benefit of $12.7 million in time savings on the bridge alone. A dedicated multi-use pathway for pedestrians and cyclists, added in the post-opening years, enhances non-motorized access across the river, integrating the bridge into regional active transportation networks. As a seven-lane structure, the bridge forms an essential alternative to the Trans-Canada Highway (Highway 1) for south Fraser Valley travel and aligns with Metro Vancouver's transit plans, accommodating bus routes operated by TransLink to improve public mobility options.

Maintenance and Upgrades

The British Columbia Ministry of Transportation and Infrastructure oversees routine maintenance of the Alex Fraser Bridge, which includes regular inspections of structural components such as stay cables, deck, and crossbeams to identify and address potential issues like corrosion or wear. These inspections encompass up to 41 distinct elements of the bridge, ensuring ongoing safety and functionality, with specific attention to cable snow and ice management equipment as part of winter preparations. A notable incident occurred in December 2016, when heavy snowfall led to the accumulation of ice on the bridge's stay cables, resulting in multiple closures and "ice bomb" falls that damaged vehicle windshields and hoods on both the Alex Fraser and nearby Port Mann bridges. In response, maintenance crews implemented enhanced de-icing protocols, applying agents to crossbeams prior to anticipated winter storms to prevent buildup. Additionally, a cable collar system was installed in 2017 to facilitate the safe removal of snow and ice from the cables, reducing the risk of future falls and improving winter operations. Major upgrades have focused on enhancing capacity and resilience. Between 2018 and 2019, the bridge underwent improvements including the addition of a seventh lane, resurfacing of approaches, and installation of a movable barrier system with a zipper truck to enable counter-flow lanes during peak hours, thereby reducing congestion and improving traffic flow. These enhancements, part of a broader $70 million project, also strengthened the structure and added supporting signage and electrical infrastructure.

References

  1. [1]
    The Alex Fraser Bridge: A critical link in British Columbia's highway ...
    Sep 16, 2022 · The Alex Fraser Bridge is a cable-stayed bridge, which at the time of completion was the longest of this type in the world, a record it held for 19 years.Missing: facts | Show results with:facts
  2. [2]
    Alex Fraser Bridge (Annacis Island/Delta, 1986) - Structurae
    ... bridge and prestressed concrete bridge that was built from 1983 until 1986. The project is located in Annacis Island and Delta, British Columbia, Canada, .Missing: history | Show results with:history
  3. [3]
    British Columbia Gets a New Bridge - Transportation History
    Sep 22, 2020 · The Alex Fraser Bridge was officially opened in Canada. This cable-stayed bridge carries British Columbia Highway 91 over the Fraser River.
  4. [4]
    Delta throwback: New bridge to ease tunnel congestion
    Sep 15, 2019 · The Alex Fraser Bridge opened in 1986, Delta MLA Walter Davidson said traffic patterns at the George Massey Tunnel showed a 'tremendous decrease'.Missing: 1970s 1980s
  5. [5]
    construction of two new interchanges on the fraser river - News
    The Fraser River Crossing and Connectors Project, announced in the early 1980s, is a multi-year, multi-million dollar project to enhance traffic flow between ...Missing: 1982 | Show results with:1982
  6. [6]
    The History Of Alex Fraser Bridge - 604 Now
    Nov 26, 2015 · The Alex Fraser Bridge is 3,051 feet long and it cost $58 million to build, in total. Construction began in 1984 and when it was completed on ...Missing: facts | Show results with:facts
  7. [7]
    [PDF] Alex Fraser Bridge Geotechnical Investigation and Design
    The Alex Fraser Bridge, opened in 1986, connects Richmond, New Westminster, and Delta. It was the longest cable-stayed bridge at the time, founded on weak ...
  8. [8]
    [PDF] A Reasonable Approach - City of New Westminster
    Mar 5, 2014 · traffic effect from new capacity. The typical daily volume on the Alex Fraser Bridge during the opening year of 1987 was 41,900 vehicles ...<|control11|><|separator|>
  9. [9]
    [PDF] Cable-Stayed Bridges (Schrägseilbrücken) - Concrete - ETH Zürich
    May 7, 2025 · Alex Fraser Bridge, BC, Canada, 1986, Buckland & Taylor. Tatara ... • One cable plane. • Single tower. Sidney Lanier Bridge, Brunswick ...
  10. [10]
    Alex Fraser Bridge - Spatial Precision
    The Alex Fraser Bridge carries six lanes of traffic, and was the longest cable-stayed bridge in the world from 1986, when it opened, until 1991.Missing: milestones piers 1983 1984 1985
  11. [11]
    Cable-Stayed Bridges - Alex Fraser Bridge (3) - Bridge of the Week
    Jun 28, 2010 · The Alex Fraser (Annacis) Bridge was the world's longest cable-stayed bridge when it was completed (with a main span of 1525 ft).
  12. [12]
    [PDF] site seismicity and pile design for the alex fraser bridge north ...
    1982. Report to Province of British Columbia Ministry of. Transportation and Highways on Seismic Evaluation, Annacis Island bridge site. Golder Associates ...Missing: environmental 1982-1983
  13. [13]
    [PDF] Structural Health Monitoring of Bridges in British Columbia
    Dec 30, 2015 · ABSTRACT. This paper presents a Structural Health Monitoring (SHM) network in British Columbia (BC), Canada that involves 14 bridges,.
  14. [14]
    ANNACIS CROSSING PROJECT (ALEX FRASER BRIDGE)
    This paper describes how, after 15 years, the habitat compensation has more than achieved "no net loss".Missing: selection Island 1982-1983
  15. [15]
    Alex Fraser Bridge - Bridgeinfo.net
    Planning for a bridge started in the 70s. Construction of the bridge started in 1983 and the bridge opened in 1986.Missing: joint venture Buckland Taylor Klohn Leonoff<|control11|><|separator|>
  16. [16]
    [PDF] Notices to Mariners - Western Monthly Edition 06-19
    Jun 28, 2019 · As of May 9, 2019, the vertical clearance of the Alex Fraser Bridge has been reduced by 3.5 metres - from 57 metres charted vertical clearance ...
  17. [17]
    Seventh lane taking shape on Alex Fraser Bridge - BC Gov News
    Jul 26, 2019 · 119,000 vehicles cross the Alex Fraser Bridge every day. Media Contacts. Ministry of Transportation and Infrastructure. Media RelationsMissing: per | Show results with:per
  18. [18]
    Alex Fraser Bridge - Supreme Steel
    Supreme (formerly known as Canron) commenced fabrication of the Alex Fraser Bridge (originally called the Annacis Bridge) to span over the Fraser River in 1985.
  19. [19]
    [PDF] NCHRP Synthesis 353 – Inspection and Maintenance of Bridge Stay ...
    In Canada, the 465-m Alex Fraser Bridge (1986) in- cluded long-lay ... occurred in 1986 and the cables were replaced in 1996. Reinholdt et al. (1999) ...Missing: 1983 | Show results with:1983
  20. [20]
    Alex Fraser Bridge - Somerset Engineering
    Jul 27, 2025 · The Alex Fraser Bridge, built in 1986, was the longest cable-stayed bridge at 465 meters. Somerset designed and supervised its erection using a ...Missing: span until<|separator|>
  21. [21]
    Vancouver's Bridges: Alex Fraser Bridge (2) - Bridge of the Week
    Oct 5, 2009 · The Alex Fraser Bridge has a composite superstructure made up of a reinforced concrete deck securely attached to longitudinal girders that ...Missing: materials methods details
  22. [22]
    New lane on Alex Fraser Bridge to reduce traffic congestion
    Jan 19, 2017 · This project will help cut congestion on the Alex Fraser Bridge, which is important for commuters, for local businesses and for our trucking industry.
  23. [23]
    Reimagining roadway traffic management - Intertraffic
    Apr 7, 2025 · The second project is the moveable median on Alex Fraser Bridge in Vancouver, Canada. ... average daily traffic of more than 119,000 vehicles.
  24. [24]
    [PDF] Roberts Bank Terminal 2 Public Hearing Undertaking #3 | Page 1 ...
    2,024 ... traffic is 1,404 out of the total 2,024, or approximately 69% of container truck traffic or 1.6% of all average daily traffic. ... utilized at 39% ...
  25. [25]
    Highway 91 Alex Fraser Bridge, Richmond, British Columbia
    The Alex Fraser Bridge was the largest cable stayed bridge in the world when it was opened in 1986. It is still near the top ten.Missing: facts history
  26. [26]
    Keeping You Safe: A Closer Look at Bridge Inspections - TranBC
    Sep 6, 2013 · During an inspection, inspectors carefully assess up to 41 different components of the bridge and identify any maintenance work that needs to be ...Missing: repainting | Show results with:repainting
  27. [27]
    [PDF] Table of Contents - Gov.bc.ca
    To provide a safe, efficient and smooth operation of the Bridge Traveller at the Alex. Fraser Bridge and Port Mann Bridge. 1.05.2 Routine Maintenance Services.Missing: dimensions | Show results with:dimensions
  28. [28]
    Windshields shattered after ice bombs fall from Metro Vancouver ...
    Dec 5, 2016 · At least four different vehicles had their windshields smashed from falling ice on both the Alex Fraser and Port Mann Bridge. READ MORE: Snow ...
  29. [29]
    Ministry appreciates the hard work of bridge and highway crews
    Dec 23, 2016 · On the Alex Fraser Bridge, crews applied a de-icing agent to the crossbeams of the Alex Fraser Bridge, to ensure no buildup of ice on the beams ...
  30. [30]
    Metro Vancouver suspension bridges being prepared for possible ...
    Dec 3, 2021 · In 2017, a similar system to remove snow and ice was installed on the cables of the Alex Fraser Bridge, following a disruptive winter season ...Missing: 2016 | Show results with:2016
  31. [31]
    Nordel Way upgrade complete as part of Alex Fraser improvements
    Jun 18, 2018 · strengthening the bridge and resurfacing the bridge approaches; · building sign and electrical infrastructure, to support counter-flow traffic; ...
  32. [32]
    Alex Fraser Bridge Capacity Improvements Project - YouTube
    Dec 8, 2021 · The Alex Fraser Bridge Improvement Project provided safety and efficiency for all road users through sustainable infrastructure development, ...
  33. [33]
    [PDF] Ministry of Transportation and Transit 2025/26 - 2027/28 Service Plan
    Mar 4, 2025 · They also complement the completed 72nd Avenue Interchange Project and the Alex Fraser Bridge. Improvements. The scope of this project ...