Deutsche Bank Building

The Deutsche Bank Building, originally known as Bankers Trust Plaza, was a 40-story office skyscraper located at 130 Liberty Street in Lower Manhattan, New York City, adjacent to the World Trade Center site. Constructed in 1974 by the architectural firm Shreve, Lamb & Harmon, it stood approximately 517 feet (158 meters) tall and initially housed the U.S. operations of Bankers Trust, which Deutsche Bank acquired in 1998, leading to its renaming. On September 11, 2001, the building sustained severe structural damage when debris from the collapsing South Tower of the inflicted a 15-story gash in its north facade and dispersed massive quantities of toxic dust—including , lead, mercury, and polychlorinated biphenyls (PCBs)—throughout its interior, rendering it uninhabitable. Despite stabilization efforts, the structure remained a contaminated for years, with deconstruction delayed by legal disputes over , cleanup responsibilities, and environmental hazards, costing hundreds of millions in abatement and demolition. Deconstruction commenced in March 2007 but was tragically interrupted by a fire on August 18, 2007, ignited during cutting operations on contaminated materials, which killed two firefighters and exposed ongoing safety deficiencies in the process. The project, overseen by the after acquiring the site in 2004, finally concluded in early 2011, clearing the way for redevelopment into the Vehicular Security Center and future commercial structures.

Pre-9/11 History and Design

Construction and Architectural Features

The Bankers Trust Plaza was constructed from 1973 to 1974 at 130 Liberty Street in Lower Manhattan, directly adjacent to the World Trade Center site, as a purpose-built headquarters for Bankers Trust Company. The project utilized conventional steel-frame construction methods prevalent in mid-1970s high-rise development, featuring a rectilinear tower form with a flat roof and exterior curtain wall system of glass and metal panels for enclosure. Overall dimensions above the base approximated 183 feet by 183 feet in plan, supporting expansive open floor plates optimized for office and financial operations. The building stood 39 stories tall, reaching a structural height of 517 feet (158 meters), with a total gross floor area of approximately 1.4 million square feet. Architectural design by emphasized functional modernism in the , incorporating minimal ornamentation and a focus on verticality to integrate with the surrounding Financial District skyline. Lower levels included specialized banking infrastructure, such as secure vaults and transaction areas, reflecting the era's emphasis on accommodating high-volume financial activities within urban towers. Structurally, the tower relied on a steel moment-resisting frame for lateral load resistance against wind and seismic forces, with perimeter columns and interior beams fireproofed via spray-applied material to meet contemporary building codes. This system enabled column-free interiors on typical floors, enhancing flexibility for tenant layouts while distributing gravity loads through a grid of wide-flange steel members. Insulation and protective coatings on steel elements followed standard practices, prioritizing durability and fire resistance over later environmental considerations.

Ownership and Pre-Attack Operations

The Deutsche Bank Building, originally constructed as Plaza and completed in 1974, served as the headquarters for Company, a major U.S. investment bank specializing in and . Located at 130 Liberty Street adjacent to the , it provided for back-office and trading functions central to the firm's operations in New York City's financial district. In November 1998, Deutsche Bank AG announced its acquisition of Corporation for approximately $10 billion, a deal completed in June 1999 that marked the German bank's largest U.S. expansion to date. As part of this merger, assumed ownership of the 130 Liberty Street property, planning to repurpose it as its primary U.S. headquarters to consolidate activities. Prior to September 11, 2001, the building supported Deutsche Bank's global operations, housing divisions focused on securities processing, risk management, and administrative support amid the post-merger integration. Its location underscored Lower Manhattan's prominence as a hub for , where proximity to the facilitated high-volume transactions and client interactions in a dense cluster of banking institutions. The structure operated under standard commercial tenancy protocols, with routine upkeep aligned to municipal codes for office high-rises in the district.

Damage from September 11 Attacks

Immediate Structural Impact

At 9:59 a.m. on , 2001, the collapse of the South Tower (WTC 2) generated a debris field that impacted the Bankers Trust Building at 130 Liberty Street, penetrating its facade and inflicting localized structural damage across multiple floors. The debris sliced through the exterior, fracturing spandrel beam connections and damaging columns over approximately 15 stories, specifically between floors 8 and 23. One critical element, column D-8, was fully severed below the 16th floor, accompanied by failed splices at the 16th and 18th floors, which compromised vertical load paths in the affected zone. This penetration triggered partial floor collapses within the damaged bays, initially limited to one bay but extending to two or three bays at lower levels as redistributed loads. The building's and perimeter framing redundancy halted above the 8th floor, preventing total failure despite the transfer from the tower's falling mass—estimated in broader NIST analyses of trajectories to exceed hundreds of megajoules in impacting fragments. No fires were ignited within the structure by this , distinguishing it from impacts on other nearby buildings where combustibles contributed to ignition. The building's location, approximately 600 feet north of WTC 2's southeast corner, positioned it within the primary ejection zone, where high-velocity sections and fragments amplified facade breach depth compared to more distant structures. Initial post-collapse inspections confirmed the as severe but contained, with the overall retaining sufficient to stand unsupported immediately after .

Initial Safety and Evacuation Response

Following the impact of the first aircraft on the North Tower at 8:46 a.m. and the second on the South Tower at 9:03 a.m. on , 2001, security personnel in the Deutsche Bank Building at 130 Liberty Street initiated evacuation procedures using loudspeakers to direct occupants downward via stairwells. The process proceeded orderly, with assistance provided to elderly and mobility-impaired individuals, allowing thousands of occupants—primarily employees—to exit prior to the South Tower's collapse at 9:59 a.m., which inflicted catastrophic structural damage including a 24-story gash in the north facade. This timely response reflected effective coordination by building management and adherence to established emergency protocols, minimizing entrapment risks despite the building's proximity to the complex. The evacuation resulted in zero fatalities among occupants of the 41-story structure, a outcome attributed to the absence of direct aircraft impact and the rapid dispersal before debris from the South Tower's fall compromised the building's integrity. Minor injuries occurred, primarily eye irritation and respiratory discomfort from airborne debris and smoke encountered during egress or upon exiting onto adjacent streets. New York Fire Department (FDNY) units, responding amid the wider site chaos, conducted initial assessments of the building's stability post-evacuation and implemented hazard mitigation steps, such as isolating electrical systems to avert fires or electrocution risks in the damaged structure. These actions aligned with empirical timelines from emergency response analyses, underscoring the localized success in averting further casualties despite the unprecedented scale of the attacks.

Post-Attack Assessment and Contamination

Toxicological Analysis and Health Risks

The collapse of the South Tower on September 11, 2001, inflicted a 25-story gash in the southeastern facade of the Deutsche Bank Building at 130 Liberty Street, allowing an influx of debris laden with hazardous substances such as , polychlorinated biphenyls (PCBs), lead, mercury, and alkaline composed of pulverized , , and glass fibers. These materials originated from the disintegrated towers, aircraft components, and office contents, with fibers particularly prevalent due to the buildings' fireproofing. Bulk samples from the structure revealed mercury concentrations in some areas, alongside other , contributing to an interior environment where settled in thick layers across floors and HVAC systems. Initial Environmental Protection Agency (EPA) monitoring in the weeks following the attacks emphasized that outdoor air quality in posed minimal risks to the general public, enabling rapid reopening of surrounding areas; however, these assessments relied on limited sampling and did not adequately account for indoor accumulation in damaged structures like the . Subsequent independent evaluations, including a 2003 engineering report commissioned by and EPA bulk dust analyses from 2002, identified contaminant levels exceeding (OSHA) permissible exposure limits, with asbestos and concentrations in settled prompting classifications as . Critics, including congressional inquiries, argued that the EPA's early assurances—issued under pressure to restore economic activity—overstated safety by neglecting comprehensive indoor air modeling and dispersal patterns of fine , thereby delaying site-specific remediation and mandates for entrants. Exposure during abatement and monitoring activities in the building correlated with acute and chronic respiratory conditions among cleanup personnel, including persistent cough, reduced lung function, and diseases such as reactive airways dysfunction syndrome, driven by the caustic nature of the dust's high pH (over 10 in some samples) irritating mucous membranes. Long-term cohort studies of responders and cleanup workers, encompassing those involved at adjacent sites like 130 Liberty Street, document elevated incidences of cancers—including a 25% increased risk for and doubled rates for —causally linked to polycyclic aromatic hydrocarbons, dioxins, and in the exposure mixture. Mount Sinai's Health Program data, tracking over 20,000 participants as of 2021, substantiate these outcomes through standardized incidence ratios adjusted for age and smoking, with latency periods aligning to observed diagnoses a post-event.

Engineering Evaluations and Repair Feasibility

Following the September 11, 2001 attacks, assessments conducted in late 2001 and 2002 identified severe damage to the 39-story building at 130 Liberty Street from debris ejected during the collapse of Building 2. A large section of the South Tower's perimeter columns and spandrels struck the southwest corner of the building between approximately floors 22 and 40, excising a 15-story gash that severed multiple columns and perimeter framing elements. This damage compromised the 's load-bearing integrity and lateral bracing systems, which relied on the intact interaction of core and perimeter elements for stiffness against and loads. Engineers from firms including those retained by evaluated the feasibility of repairs, concluding that restoring structural soundness would necessitate replacing large portions of the damaged and facade, effectively amounting to a partial rebuild. The extent of the core column losses created vulnerabilities to progressive failure under dynamic loads, rendering conventional and insufficient without addressing underlying stability deficits. Initial cost projections for such repairs exceeded $1 billion when factoring in full to meet modern codes, far surpassing the building's pre-attack insured . In contrast, conventional was estimated at around $100 million, though later protocols inflated this figure due to mandated precautions. Deutsche Bank declared the structure a total loss by the end of 2002, prioritizing over piecemeal fixes that could invite latent failures. The bank initiated litigation against primary insurers and in August 2003, seeking a total-loss declaration to fund razing and replacement estimated at $1.9 billion under policy terms. Partial settlements with other carriers followed, but unresolved disputes prompted the (LMDC) to acquire the property for $90 million in October 2004, enabling coordinated site clearance. This shift underscored the engineering consensus that incremental repairs risked compromising long-term safety, as damaged high-rise cores defy reliable partial remediation without risking disproportionate vulnerabilities in future events.

Demolition Process and Associated Tragedies

Decision-Making and Bureaucratic Delays

The (LMDC) acquired the severely damaged Deutsche Bank Building at 130 Liberty Street in August 2004 for $90 million, with the intent to facilitate its deconstruction to clear the site for redevelopment. Initial plans for floor-by-floor dismantling, submitted in February 2005, were rejected by the Environmental Protection Agency (EPA) due to inadequate addressing of asbestos and other contaminants from the , necessitating revisions and extending the review process. EPA coordination of multi-agency input, including under protocols akin to requirements for hazardous materials, delayed final approval until September 2006, pushing the start of deconstruction from anticipated early timelines to March 2007. New York City Department of Buildings (DOB) approvals were further protracted by mandatory asbestos abatement protocols under local and federal regulations, which prohibited simultaneous demolition and abatement activities and required negative-pressure containment systems to prevent airborne release of toxins. These measures, while aimed at mitigating health risks, contrasted with swifter private-sector demolitions of comparable structures elsewhere, where less stringent oversight allowed for phased or mechanical methods without equivalent multi-year regulatory hurdles. Additional EPA interventions, such as halting rooftop cleanup in May 2006 over containment concerns, compounded the timeline, with deconstruction originally projected for 12-16 months but extending far beyond due to iterative compliance demands. Project costs ballooned from an initial $135 million estimate to over $247 million by mid-2007, with ultimate expenses exceeding $300 million exclusive of the purchase price, funded primarily through public allocations and limited recoveries of about $100 million. Critics, including officials, contended that LMDC and EPA oversight emphasized procedural rigor over practical urgency, as evidenced by ignored warnings to governors about the agency's capacity for efficient management, thereby sustaining the building as an unmitigated eyesore and potential hazard while escalating taxpayer burdens. Proponents of the delays, aligned with environmental and advocates, prioritized exhaustive contamination controls to avert broader exposure risks, though empirical data on prolonged on-site presence suggested net safety trade-offs. Pragmatists urged accelerated removal to unblock adjacent progress, highlighting causal inefficiencies in government-led processes versus market-driven alternatives.

2007 Fire and Firefighter Fatalities

On August 18, 2007, a fire broke out at approximately 3:40 p.m. on the 17th floor of the former Deutsche Bank building at 130 Liberty Street in Lower Manhattan, escalating to a seven-alarm blaze that injured over 100 firefighters and required extensive resources to contain. The fire originated from smoldering construction debris in an area undergoing asbestos abatement and deconstruction preparation, with initial ignition likely from hot work or spontaneous combustion, though acetylene torches were not in use that day. The building's gutted interior, featuring exposed structural elements and minimal contents due to pre-demolition stripping, facilitated rapid smoke propagation and disorientation for interior responders. Two FDNY firefighters, Robert Beddia of Engine Company 24 (age 53, from ) and Joseph Graffagnino of Ladder Company 132 (age 33, from ), perished after becoming trapped on the 14th floor due to extreme visibility limitations from dense smoke and structural alterations that hindered egress. Beddia and Graffagnino succumbed to and thermal injuries after their air supplies depleted during prolonged search efforts in unfamiliar, modified stairwells and floors. Contributing factors included the standpipe system's disconnection during abatement work, which prevented reliable water delivery to upper-floor hoselines, forcing reliance on external pumping and limited handlines. Additionally, locked stairwell doors—installed for security during deconstruction—and temporary asbestos partitions obstructed access and ventilation, exacerbating confusion in the smoke-obscured environment. Contractor Bovis Lend Lease LMB, Inc., overseeing the abatement, faced scrutiny for inadequate site safety protocols, including failure to notify of standpipe severance and insufficient pre-fire planning for the compromised structure. A 2009 New York City Department of Investigation report highlighted multi-agency failures, such as lax FDNY inspections and Department of Buildings oversight, that permitted hazardous conditions to persist amid delayed demolition efforts. The National Institute for Occupational Safety and Health (NIOSH) investigation recommended enhanced high-rise fire tactics in under-construction buildings, noting that the fire's spread was somewhat contained by prior water main disruptions from 9/11 damage but ultimately overwhelmed due to these systemic lapses. Manhattan District Attorney Cyrus Vance, Jr., indicted Bovis and three supervisors on manslaughter and criminally negligent homicide charges in 2008, citing negligence in safety management, but a 2011 jury acquitted all defendants after trials revealed contested evidence on foreseeability. No criminal convictions resulted, though civil lawsuits by the firefighters' families against Deutsche Bank, Bovis, and the Lower Manhattan Development Corporation underscored ongoing accountability disputes, with settlements emphasizing contractor negligence without admitting liability. These probes collectively attributed the fatalities to compounded errors in a structure long slated for removal, where pre-demolition modifications amplified inherent risks without corresponding safeguards.

Execution of Deconstruction (2007–2011)

The deconstruction of the former Deutsche Bank Building proceeded in distinct phases following the 2007 fire, beginning with comprehensive abatement of hazardous materials such as asbestos, lead, and other contaminants from the September 11 attacks. This top-down abatement process involved floor-by-floor removal under enclosed scaffolds to minimize dust dispersion and ensure worker safety, adhering to strict protocols coordinated by the Environmental Protection Agency (EPA) and other regulators. Once abatement was sufficiently advanced, mechanical demolition commenced in early 2008, utilizing remote-controlled Brokk robots equipped with hydraulic hammers, mini-excavators, skid steers, and deck cranes to systematically dismantle the structure floor by floor. Contractor teams, including LVI Group and Northstar Group, employed approximately 300 workers across multiple shifts operating six days per week, focusing on controlled fragmentation and lowering via tower cranes to ground level for sorting and removal. Innovations included the use of temporary enclosed "caps" resembling the building's facade to operations and prevent airborne contaminants, alongside air monitoring to comply with abatement standards. While specific monitoring details for this phase are not extensively documented in primary reports, the overall process prioritized to avoid environmental spread, with processed on-site where feasible. The project culminated in the removal of the final structural elements on January 20, 2011, with above-ground demolition complete by that date and foundation work finalized in February 2011, clearing approximately 15,750 tons of and 11,000 tons of without reported major additional incidents beyond initial challenges. costs reached around $300 million, exceeding initial estimates due to enhanced measures, , and decoupled phasing that extended timelines but mitigated risks. Insurance settlements, including $102 million from and , offset some taxpayer burdens, though overruns stemmed from the labor-intensive hazardous material handling.

Site Redevelopment and Future Plans

Proposals for 5 World Trade Center

Following the completion of demolition at the site in 2011, early redevelopment concepts for envisioned a commercial office tower as part of the broader master plan, aligning with the site's original designation for Class A to support financial district activities. However, market conditions, including reduced demand for after the , prompted a shift toward mixed-use proposals emphasizing residential components. In February 2021, the of and selected a led by and —along with partners Omni New York LLC and Dabar Development Partners—to advance development plans, marking a departure from pure office use in favor of residential overrides to address housing needs in . The selected proposal, designed by , features an 80-story tower rising approximately 910 feet (280 meters), comprising about 1,200 residential apartments across roughly 1.2 million square feet, with 400 units designated as permanently , including 80 reserved for residents affected by the . The design incorporates sustainable elements targeting Gold certification, such as a high-performance with minimized thermal bridging, enhanced insulation, low air infiltration, and energy-efficient systems to reduce operational demands. Security features integrate vehicular barriers, perimeter protection, and site-specific measures compliant with campus standards, enhancing resilience without compromising urban integration. This residential focus contrasts with the site's prior use by for banking and back-office operations, prioritizing housing over amid evolving district needs. Stakeholder perspectives diverged, with commercial developers like Silverstein and Brookfield advocating for a balanced mixed-use approach to maximize economic viability, while advocates and community groups, such as those in , pressed for fuller residential conversion and higher affordability quotas to counter pressures. The final proposal reflects compromises, including 30% and community space, though critics argued it insufficiently prioritized lower-income housing over market-rate rentals.

Financing Challenges and Status as of 2025

As of October 2025, construction on has not commenced, with continuing to secure financing for the mixed-use tower planned on the former Deutsche Bank Building site. The project, approved in July 2023 by the state's Public Authorities Control Board, envisions a 920-foot structure with approximately 1.3 million square feet, including 190,000 square feet of , community facilities, and primarily residential units, but persistent market headwinds have delayed . High rates and subdued demand for downtown , exacerbated by trends, have reduced leasing prospects for the commercial component, mirroring delays in nearby where anchor tenants are prerequisites for funding. Manhattan's office vacancy rate stood at 22.0% in the third quarter of 2025, reflecting oversupply and structural shifts away from traditional workspaces, which complicates tenant acquisition for 5 WTC's office floors amid broader financing constraints for developers like Silverstein, who cited similar issues in abandoning unrelated projects. The pivot toward residential use, with 30% of units (around 400) designated as under a state agreement, aims to address housing shortages but introduces viability risks without full private-market validation, as subsidized set-asides can distort pricing signals and deter unsubsidized investment. Community coalitions have pushed for even higher affordability quotas, such as 100% low-income units, potentially escalating costs and further postponing development, as evidenced by prior threats to jeopardize the project over unmet demands. Scale models of the redesigned tower were unveiled in September 2024, showcasing updates to integrate residential focus while retaining some commercial elements, yet these visualizations have not accelerated funding amid debates over public subsidies versus market-driven feasibility. Political pressures for expanded , often backed by government incentives, risk prolonging stasis by prioritizing non-market criteria over empirical demand assessments, akin to how bureaucratic overlays delayed other phases; true progress hinges on demonstrating self-sustaining economics without perpetual state intervention.

References

  1. [1]
    Deutsche Bank Building Deconstruction | Thornton Tomasetti
    Jan 1, 2011 · Retained for the planning, engineering and deconstruction for 130 Liberty Street, which was significantly damaged during the September 11, 2001 attacks.
  2. [2]
    130 Liberty Street – Deutsche Bank Building | Wired New York
    130 Liberty Street, Google Maps Height: 565 ft (172 m), floors: 40. Architect Shreve, Lamb & Harmon. Construction completed in 1974
  3. [3]
    Deutsche Bank Building, New York City - SkyscraperPage.com
    Deutsche Bank Building. 130 Liberty Street New York City NY United States. Status: destroyed. Construction Dates. Finished, 1974. Destroyed, 2011. Floor Count ...
  4. [4]
    130 Liberty Street in New York City - SKYDB
    Height, 158 m (517 ft) ; Floors, 39 ; Construction Year, 1974 ; Structural Form, skyscraper ; Main Usage, commercial office.
  5. [5]
    [PDF] U - HUD OIG
    The Deutsche Bank building, a 40-story office building located at 130 Liberty Street in New. York City, was heavily damaged as a result of the terrorist ...Missing: "official | Show results with:"official
  6. [6]
    Extraordinary Contamination in Deutsche Bank Building - Jerry Nadler
    Jul 18, 2004 · Massive quantities of WTC dust penetrated the entire structure. To assess the extent of damage and contamination, $33 million worth of ...Missing: sources | Show results with:sources
  7. [7]
    EPA Accepts LMDC Plan to Deconstruct Former Deutsche Bank ...
    EPA Accepts LMDC Plan to Deconstruct Former Deutsche Bank Building. Release Date: 09/08/2005. Contact Information: (05101) New York, NY - After months of ...Missing: "official | Show results with:"official
  8. [8]
    [PDF] Investigation of Administrative Issues Relating to the Fatal Fire of ...
    Jun 19, 2009 · On March 20, 2007, demolition began at the Deutsche Bank building site at 130. Liberty Street, which falls within the administrative district of ...Missing: "official | Show results with:"official
  9. [9]
    5 World Trade Center
    The site was previously home to the Deutsche Bank Building, which was extensively damaged on September 11, 2001. LMDC purchased the site in 2004 and completed ...Missing: "official | Show results with:"official
  10. [10]
    Demolition Of Deutsche Bank Bldg. Finally Wraps Up - CBS New York
    Jan 20, 2011 · The building was irreparably damaged when the falling south tower of the World Trade Center ripped a 15-story gash into the structure the 41- ...Missing: timeline | Show results with:timeline
  11. [11]
    NEW YORK SCRAPERS - INTERNATIONAL STYLE III
    THE 1 BANKERS TRUST PLAZA (130 Liberty St.) [Shreve, Lamb & Harmon and Peterson & Brickbauer]. was built in 1973-1974 south of the World Trade Center for the ...
  12. [12]
    Chapter 6 - Bankers Trust Building - The WTC Report.
    Above the second floor level, the building is essentially square in plan shape, with overall dimensions (centerline of exterior column lines) of 183 feet square ...
  13. [13]
    A Survivor Faces A Slow Death, Piece by Piece; Building Endured 9 ...
    Apr 16, 2004 · The 1.4 million-square-foot structure, unused since Sept. 11, 2001, is to be cocooned and taken down painstakingly.Missing: frame | Show results with:frame
  14. [14]
    The "Deutsche Bank Building" (also known as Bankers Trust Plaza ...
    Apr 21, 2025 · The demolition was finally finished on 20th January 2011. The Port Authority took over the site to use it for the Vehicular Security Center and ...Missing: timeline | Show results with:timeline
  15. [15]
    History - Deutsche Bank
    Deutsche Bank thus began to look for an American bank it could combine with, found the New York-based Bankers Trust, and acquired it in 1999 old-style bankers.
  16. [16]
    BANK GIANT: THE OVERVIEW; Deutsche Gets Bankers Trust for ...
    Dec 1, 1998 · Deutsche Bank AG formally announces its plan for $10.1 billion takeover of Bankers Trust Corp and says acquisition will result in ...
  17. [17]
  18. [18]
    Deutsche Bank Sues Allianz, AXA on Sept. 11 Building Claim
    Aug 12, 2003 · DB acquired the property, which was built in 1974, when it purchased Bankers Trust in 1999, but the bank had no offices located there when ...
  19. [19]
    Chronicles - Deutsche Bank
    1998: On November 30 Deutsche Bank announces the planned acquisition of Banker's Trust. It is the largest entry a German bank has ever made into the U.S. ...
  20. [20]
    [PDF] FEMA 403 - 6 Bankers Trust Building - 911facts.dk
    The floor numbering used in the building elevator system and referred to in this report omits the 13th floor and includes a mezzanine between the 5th and 6th ...
  21. [21]
    Final Report on the Collapse of World Trade Center Building 7 ...
    Nov 20, 2008 · This report describes how the fires that followed the impact of debris from the collapse of WTC 1 (the north tower) led to the collapse of WTC 7.Missing: Deutsche Bank damage
  22. [22]
    Evaluation of Building with Severe Impact Damage: The Banker's ...
    Apr 26, 2012 · This paper illustrates the process undertaken to evaluate the safety of the Bankers Trust Building after the events of September, 2001.
  23. [23]
    9/11: David Bell’s Story of Survival
    ### Summary of Evacuation Process, Timeline, Alarms, Injuries, and First Responder Actions from David Bell’s Experience on 9/11 at Deutsche Bank Building
  24. [24]
    [PDF] Community Focus - Fall/Winter 2001 - Deutsche Bank
    All the other employees working in lower Manhattan buildings were safely evacuated, but the. Bank's 130 Liberty Street building suffered severe damage when the ...
  25. [25]
    The Deutsche Bank fire: Tragedy in the shadow of 9/11 - FireRescue1
    Aug 18, 2025 · The building's standpipe was disconnected, and asbestos abatement partitions blocked water access to the fire. After an hour on the scene, fire ...Missing: maintenance 1990s
  26. [26]
    [PDF] The Emergency response operations
    Sep 12, 2005 · The approach taken was to conduct a comprehensive search for data related to the emergency response on. September 1 1, 2001, ...
  27. [27]
    - EPA'S RESPONSE TO 9/11 AND LESSONS LEARNED FOR ...
    The program allows residents and building owners in Lower Manhattan to have the air and dust in their units tested for four contaminants associated with dust ...
  28. [28]
    [PDF] Health Consultation
    Mar 29, 2005 · A separate study of the Deutsche Bank Building reported finding mercury in ... Agency for Toxic Substances and Disease Registry. World Trade ...Missing: PCBs | Show results with:PCBs<|separator|>
  29. [29]
    [PDF] The 9-11 World Trade Center Collapse Asbestos Risk Assessment A ...
    Nov 1, 2004 · Deutsche Bank felt the building was too contaminated, so they hired RJL to ... 24 “Toxic Health Profile for Asbestos - Public Health Statement ...
  30. [30]
    The toxic fallout of 9/11 - Salon.com
    one of the most toxic and dangerous ...
  31. [31]
    Final Report on the World Trade Center (WTC) Dust Screening ...
    Twenty-one 'impacted' samples were taken by the EPA at two buildings that were part of the Deutsche Bank complex located at 130 Liberty Street and 4 Albany ...Missing: risks | Show results with:risks
  32. [32]
    Health effects of World Trade Center (WTC) Dust - PubMed Central
    The numerous health effects in these people were not those associated with the monitored PM2.5 toxicants, which were present at low concentrations, that is, ...Missing: Deutsche Bank
  33. [33]
    Cancer Incidence in World Trade Center Rescue and Recovery ...
    Sep 9, 2021 · Statistically significantly increased cancer incidence has been reported from 3 cohorts of World Trade Center (WTC) disaster rescue and recovery workers.Missing: Deutsche Bank
  34. [34]
    Mount Sinai Study Reveals How Combined Exposures Impacted ...
    Dec 11, 2024 · Harmful substances, contaminated environments, and hazardous materials contributed to conditions such as PTSD and chronic diseases WTC.Missing: Deutsche Bank
  35. [35]
    [PDF] Overview of Damage to Buildings Near Ground Zero Overview of ...
    The Banker's Trust Building at 130 Liberty Street was badly damaged by falling debris from the collapse of World Trade Center 2 (Figure 3.24). A large piece of ...
  36. [36]
    Deutsche Bank Sues Allianz - Forbes
    Aug 11, 2003 · Deutsche Bank maintains that Allianz and AXA, which provided 50% of the building's insurance coverage, must cover the costs for demolishing and ...
  37. [37]
    DEUTSCHE BANK FILES LAWSUIT - New York Post
    Aug 12, 2003 · Deutsche expects it will cost $1.9 billion to raze and replace the building. The insurance companies, Allianz of Germany and AXA of France ...
  38. [38]
    Deutsche Bank tower near Ground Zero to be demolished | Business
    Jun 20, 2003 · Steel falling from the south tower tore a 24-story gash in the facade. Worse damage was done by an infestation with mould - sprinkler ...
  39. [39]
    [PDF] reports - Independent Budget Office
    Bank building that was damaged beyond repair on 9/11,. 130 Liberty Street is the primary parcel in this area. LMDC acquired 130 Liberty Street for $90 million ...
  40. [40]
    Plan Approved to Dismantle Deutsche Bank Building
    Sep 25, 2006 · Environmental Protection Agency and other governmental regulators approve methodical, floor-by-floor strategy for dismantling ground zero ...Missing: escalations Superfund
  41. [41]
    Citing changes, E.P.A. withholds O.K. on Deutsche demo
    Apr 13, 2006 · Last September, the Lower Manhattan Development Corp. finally won approval from the E.P.A. to clean the 40-story tower floor by floor and ...
  42. [42]
    Metro Briefing | New York: Manhattan: Deutsche Bank Cleanup Halted
    May 2, 2006 · The rooftop cleanup at the former Deutsche Bank building opposite ground zero has been suspended by the federal Environmental Protection ...Missing: deconstruction delays
  43. [43]
    Two Contaminated Buildings Waiting to Come Down at Ground Zero
    Sep 6, 2006 · The 14 story academic building owned by the City University of New York was badly damaged. Fiterman Hall and Deutsche Bank are supposed to be ...
  44. [44]
    Workers begin shaving off the top of Deutsche | amNewYork
    Mar 29, 2007 · buys the building from Deutsche for $90 million and estimates it will cost $45 million to clean and demolish, under the agreement mediated by ...
  45. [45]
    As Deutsche Bank Tower Shrinks, Dispute Rages on Costs
    Jul 5, 2010 · Regulators imposed a complicated protocol for cleaning the tower, which they suspected had been contaminated by asbestos and other toxic ...<|separator|>
  46. [46]
    2 GOVS IGNORED DEUTSCHE WARN
    Sep 26, 2007 · George Pataki were warned by a senior downtown redevelopment official that his agency could not “safely or efficiently” manage the demolition of ...
  47. [47]
    The Tombstone at Ground Zero (Fortune, 2008)
    Mar 31, 2008 · The Deutsche Bank building is now scheduled to be demolished by the end of 2008, a date that should be viewed with skepticism given the failure ...Missing: timeline | Show results with:timeline<|separator|>
  48. [48]
    NIOSH Releases Report on FDNY Deutsche Bank LODDs
    Aug 16, 2010 · As the report notes in the summary of the August 18, 2007 incident, Firefighters Joseph Graffagnino and Robert Beddia “became trapped in the ...
  49. [49]
    2 Firefighters Are Killed in Blaze at Ground Zero - The New York Times
    Aug 19, 2007 · The cause of the fire was under investigation, though officials ruled out acetylene torches, which were not in use Saturday by workers ...Missing: FDNY | Show results with:FDNY
  50. [50]
    Fatal Deutsche Bank Building Fire Investigated: Standpipes May ...
    The Fire Department is investigating whether standpipes failed to bring firefighters water to help fight a seven-alarm fire that broke out on the 17th floor ...Missing: severed locked doors<|separator|>
  51. [51]
    Prosecutor Charges Safety Manager, Two Others in Fatal Fire | ENR
    Dec 22, 2008 · A New York City prosecutor charged the site safety manager for Bovis Lend Lease LLC with manslaughter and criminally negligent homicide.Missing: severed doors
  52. [52]
    Report: FDNY, DOB Failings Before Fatal Deutsche Bank Fire
    ... Deutsche Bank building in the months leading up to the August 2007 seven-alarm fire that claimed two firefighters' lives. For instance, a DOB inspector told ...Missing: DOJ | Show results with:DOJ
  53. [53]
    Company partially responsible for deadly 2007 Deutsche Bank ...
    Aug 16, 2017 · Ten years after the tragic fire that killed FDNY firefighters Joe Graffagnino and Robert Beddia, the company partially responsible for the ...
  54. [54]
    Abatement Lessons Learned From Deutsche Bank Tragedy
    Lack of fire extinguishers, emergency alarm procedures, and fire cutoffs; Failing to develop and follow a fire protection program; Smoking permitted in work ...Missing: 1990s | Show results with:1990s
  55. [55]
    [PDF] 130 Liberty Street, deutsche bank building | New York, NY - Northstar
    After sitting derelict for five years following 9/11, the building was deemed unsal- vageable. Another contractor began abatement and deconstruction of the ...Missing: timeline | Show results with:timeline
  56. [56]
    10 Years After 9/11, Deutsche Bank Tower Vanishes
    Jan 12, 2011 · It has taken LMDC almost 7 years to finish the deconstruction. The May of 2006 protest by community and labor in a rally for safe demolition at ...Missing: timeline | Show results with:timeline
  57. [57]
    Deutsche Bank building demolition to restart - KHL Group
    Oct 19, 2009 · Demolition crews from LVI/Mazzocchi will use three Brokk demolition robots mounted with hydraulic hammers to work floor by floor, systematically ...Missing: mechanical | Show results with:mechanical
  58. [58]
    The Future of High Rise Demolition in NYC - R. Baker & Son
    With the top-down demolition method, an enclosed scaffold “cap” that resembles the building's façade is constructed over the roof on temporary columns supported ...
  59. [59]
    Demolition of Ex-Deutsche Bank Building to Resume at Ground Zero
    Oct 6, 2009 · “We believe we have developed a plan utilizing the latest techniques and best practices to safely and efficiently deconstruct 130 Liberty Street ...Missing: repair | Show results with:repair
  60. [60]
    Deal on Payment for Removal of Deutsche Bank Building
    Feb 24, 2010 · Two insurers agreed to pay a total of $102 million toward the $300 million cost of deconstructing the 41-story tower.
  61. [61]
    5 World Trade Center - Silverstein Properties
    In February 2021, The Lower Manhattan Development Corporation and The Port Authority of New York and New Jersey designated the partnership of Silverstein ...Missing: joint | Show results with:joint
  62. [62]
    Five World Trade Center's 900-Foot-Tall Redesign by Kohn ...
    Feb 13, 2021 · Kohn Pedersen Fox has unveiled the first set of renderings for its proposed 900-foot-tall design for Five World Trade Center, aka 130 Liberty Street.
  63. [63]
    Brookfield and Silverstein Properties Secure Bid for 5 World Trade
    Feb 17, 2021 · February 17, 2021. Fried Frank acted as counsel to a joint venture between Brookfield Properties and Silverstein Properties in connection ...<|separator|>
  64. [64]
    5 World Trade Center - KPF
    Clad with a complementary palette of glass and masonry, 5 WTC mediates between the historic texture of the Financial District and the modern character of ...
  65. [65]
    KPF's 5 World Trade Center will include 400 permanently affordable ...
    Jul 31, 2023 · 400 units will be permanent low- and middle-income housing, 80 of which will be reserved for “individuals living and working in Lower Manhattan during the 9/11 ...
  66. [66]
    [PDF] Site 5 World Trade Center Mixed-Use Design Guidelines November ...
    Nov 18, 2021 · The new development shall be designed and constructed to meet LEED Gold standards for building performance, or an equivalent standard that may ...
  67. [67]
    World Trade Center Site 5 Design Submission by Davis Brody Bond
    Mar 7, 2024 · The design will incorporate wide range of multidisciplinary security features, including: • Design of Site and Perimeter Protection features ...
  68. [68]
    Neighbors rally to make 5 World Trade Center fully affordable
    Sep 13, 2022 · The state chose the developers for the site in February 2021, after an RFP, designating a partnership between Brookfield Properties and ...Missing: joint venture
  69. [69]
    Affordable Housing at 5 World Trade Center is Shaping New York ...
    Apr 10, 2024 · Approved by New York State last fall, 5 World Trade Center will designate 30% of its 1,200 apartments as affordable, with 80 units reserved for ...Missing: proposals | Show results with:proposals
  70. [70]
    Silverstein Properties Unveils Scale Models of 2 and 5 World Trade ...
    Sep 16, 2024 · Five World Trade Center was originally conceived as an office skyscraper, but is now planned for residential use. The 1.3 million square-foot ...
  71. [71]
    Getting a look at the future 5 World Trade Center - Tribeca Citizen
    Mar 22, 2024 · 5WTC is scheduled to have 190,000 square feet of office space, a 12,000-square-foot community facility space, 55,000 square feet of public ...
  72. [72]
    Larry Silverstein looks back, and ahead, on journey to rebuild ...
    Sep 10, 2024 · A top item on Silverstein's to-do list today is lining up an anchor office tenant so he can secure financing to build 2 World Trade Center, ...
  73. [73]
    The unfinished business of 2 World Trade Center | Crain's New York ...
    Oct 17, 2024 · Silverstein Properties has largely been successful in its efforts to redevelop Ground Zero after the 9/11 attacks but has yet to start construction on 2 World ...<|separator|>
  74. [74]
    [PDF] MANHATTAN - Cushman & Wakefield
    As leasing activity continued to outpace new supply, the. Manhattan overall vacancy rate fell by 50 basis points (bps) in Q3 2025 to 22.0%─its lowest level ...
  75. [75]
    $$2B Astoria project with 3,200 units scrapped, scaled-down tower ...
    Sep 3, 2025 · Silverstein Properties has withdrawn from Innovation QNS—a proposed 3,200-unit, $2 billion complex spanning five blocks— citing financing ...
  76. [76]
    Governor Hochul and Local Leaders Reveal Major Housing ...
    Jul 27, 2023 · This agreement adds an additional 100 affordable housing units at 5 WTC without sacrificing availability for very low-income tenants.
  77. [77]
    A demand for more affordability in a new high-rise apartment tower ...
    Jun 21, 2023 · Demands for greater affordability in a new high-rise tower at the last vacant World Trade Center site could put the project at risk.<|separator|>
  78. [78]
    See models of the new World Trade Center buildings that will soon ...
    Sep 16, 2024 · Although originally meant to be an office skyscraper as well, the outlet reports that 5 World Trade Center will now be a residential destination ...
  79. [79]
    5WTC Gets Affordable Housing Boost But Neighbors Demand ...
    May 25, 2023 · Officials give go-ahead for a residential tower with 30% set-aside for below-market rentals, up from previous promise of 25%.