Fact-checked by Grok 2 weeks ago

Eiger Express

The Eiger Express is a tricable system in the of , linking the Terminal at 937 meters elevation to the gletscher station at 2,328 meters, which it serves as a key access point to the Jungfrau region's areas and the observatory. Opened on December 5, 2020, as part of the V-Cableway infrastructure project, the system covers 6.5 kilometers with a vertical rise of 1,391 meters, achieving the ascent in 15 minutes at speeds up to 8 meters per second. Equipped with 44 cabins each accommodating up to 30 passengers, it boasts a transport capacity of 2,200 people per hour, powered by four 500 kW electric motors and offering panoramic views of the Eiger's en route. This feat, constructed by Doppelmayr, reduces travel time to by 47 minutes compared to prior routes, enhancing accessibility for tourists and skiers while minimizing environmental impact through efficient design.

Overview

Route and Specifications

The Eiger Express is a tricable (3S system) that connects the Terminal valley station, located at 937 meters above , to the Eigergletscher mountain station at 2,328 meters above , facilitating rapid access to the via an underground railway continuation from Eigergletscher. The route spans a length of 6,483 meters horizontally, achieving an elevation gain of 1,391 meters while employing just seven support towers to reduce visual and in the alpine terrain. Travel time along the route is 15 minutes, with cabins operating at a maximum speed of 8 meters per second (approximately 29 km/h), enabling passengers to traverse the Eiger's proximity efficiently. The system features 44 cabins, each designed to carry up to 26 passengers in a 2+2+2 seating configuration with standing options, yielding a one-way transport capacity of 2,200 persons per hour. This configuration supports high-volume seasonal tourism while adhering to standards for and resilience in the high Alps.

Purpose and Innovation

The Eiger Express was developed to enhance accessibility to the , reducing the transit time from Terminal to Eigergletscher from 36 minutes via the traditional cogwheel to just 15 minutes by , thereby alleviating bottlenecks in the Jungfrau region's transport network and accommodating growing tourist volumes. This upgrade addresses the limitations of the century-old railway infrastructure, which had struggled with capacity constraints amid annual visitor numbers exceeding one million, by providing a more efficient feeder system that integrates seamlessly with the existing Jungfraubahn for the final ascent. As part of the broader V-Cableway project initiated by Railways, the system's purpose extends to boosting overall regional competitiveness, with projections indicating a potential increase in daily passenger throughput to over 8,000 by streamlining intermodal connections from Ost station to the "Top of Europe." The innovation lies in its tricable () gondola , utilizing two fixed ropes and one detachable haul , which enables spans of up to 2,500 meters between just seven support towers—minimizing environmental footprint in the sensitive terrain while achieving speeds of 8 meters per second and a capacity of 1,800 passengers per hour across 44 panoramic cabins. Further technical advancements include the world's first integration of fully automated passenger and on a single , allowing simultaneous handling of tourists and such as food supplies and waste removal, which enhances operational and by reducing road traffic in the valley. The design's wind stability, derived from the tricable setup, ensures reliable service in high-altitude conditions up to 37 degrees incline, representing a leap in that prioritizes efficiency and ecological preservation over expansive infrastructure.

History

Planning and Development

The planning for the Eiger Express originated within the broader V-Cableway project spearheaded by Railways to modernize access to the summit, addressing capacity constraints from increasing tourist volumes and outdated infrastructure like the 1978-era Grindelwald-Männlichen . A master plan laid groundwork in 2008/2009, culminating in the public announcement of the V-Cableway on December 19, 2012, which encompassed the tricable Eiger Express from Terminal to Eigergletscher station, a new shared terminal, and related upgrades for faster, more reliable transport. Development proceeded with a general planner overseeing elaboration from 2013 to 2015, integrating eight components including links and eco-friendly features to reduce and travel time by 47 minutes total to via direct rail-gondola connections. Local referendums secured initial buy-in: voters approved the project on October 24, 2014, with over 1,476 participants, while the neighboring Wärgistal mountain community rejected it on October 15, 2014, but endorsed a revised proposal on October 21, 2015, after negotiations. The structural plan gained cantonal approval on September 25, 2015, advancing despite environmental opposition focused on visual impacts to the and alpine landscape preservation, echoing the abandonment of a prior "Y-project" in 2011 due to similar resistance. Seventeen formal objections from stakeholders, including conservation groups, were addressed through settlements by April 11, 2018, prioritizing empirical assessments of tourism benefits over unverified ecological doomsday claims. Federal-level from the Office of Transport was finalized on May 31, 2018, confirming the tricable system's technical feasibility for high-capacity, weather-resilient operation spanning 6.2 kilometers with spans up to 2,500 meters. This cleared the path for a 470 million investment, grounded in data-driven projections for sustained regional economic viability rather than deferring to activist narratives on pristine wilderness.

Approval Process and Challenges

The V-Bahn project, encompassing the Eiger Express, underwent a multi-year approval process involving federal, cantonal, and local authorities in , beginning with conceptual planning in the early . Initial proposals evolved from a Y-shaped configuration to the final V-shaped layout, with community support formalized by the municipalities of and in March 2013. The Amt für Gemeinden und Raumordnung (AGR) issued a positive overall decision on February 26, 2016, advancing the planning approval procedure. However, this faced appeals from environmental organizations and private individuals, focusing on landscape impacts, leading the Canton of Bern's Jungfrau-Gentiana-Kommission (JGK) to partially uphold complaints in June 2017, necessitating revisions. Final building permits and concessions for the tricable gondola were granted by late May 2018, following project modifications to address aesthetic and environmental objections, such as route adjustments and reduced mast heights to minimize visual intrusion on the . Construction commenced in July 2018 despite ongoing protests from conservation groups concerned about habitat disruption and exacerbating alpine erosion. A total of 17 formal objections were filed during the planning phase, contributing to delays but ultimately resolved through compromises that preserved core infrastructure while mitigating landscape alterations. These challenges highlighted tensions between economic development—aimed at enhancing accessibility to the —and preservation of the UNESCO-recognized Jungfrau-Aletsch site's natural integrity, with critics arguing that increased capacity (up to 7,500 passengers per hour) could accelerate from higher visitor volumes. Proponents, including Jungfraubahnen, emphasized measures like energy-efficient operations and no net habitat loss, securing approval without federal intervention. The process underscored Switzerland's rigorous permitting framework, balancing input against tourism-driven imperatives.

Construction Timeline

Construction of the Eiger Express officially began on 3 July 2018 with ground-breaking at the Grindelwald Terminal, marking the start of site preparation and foundational work for the 6.5-kilometer tricable gondola line. The project required the erection of 24 support towers, cable installation across varied alpine terrain rising 1,200 meters in elevation, and integration with the existing Eigergletscher station, all executed by Doppelmayr/Garaventa under Jungfrau Railways' oversight. Key progress included the completion of the connecting tunnel breakthrough at the Eigergletscher summit station on 15 March 2019, which facilitated access for further infrastructure development. By December 2018, initial heavy transports had delivered components for the transformer station, and the first three supports were installed, advancing structural foundations amid seasonal constraints. Gondola assembly commenced in May 2020, enabling the mounting of the 44 specialized 26-passenger cabins designed for high-wind stability. Test operations followed in September 2020 with initial runs of cabins to verify integrity, speed, and safety protocols before full commissioning. The construction phase totaled exactly 908 days, concluding with the 's inauguration on 5 December 2020, after which it entered as the heaviest tricable installation worldwide. This compressed timeline minimized disruptions to regional tourism while adhering to federal environmental and transport approvals secured in May 2018.

Technical Design

Cable and Gondola System

The Eiger Express utilizes a tricable system, designated as a (three-cable) detachable gondola, developed and manufactured by the Doppelmayr/Garaventa Group. This configuration employs two stationary track cables for structural support and precise guidance of the cabins, complemented by a single moving haul rope that detaches at terminals for efficient loading and unloading. The design merges the high-capacity propulsion of detachable gondolas with the stability of aerial tramways, facilitating long spans between towers and operation in challenging alpine weather, including winds up to 72 km/h. Key technical specifications include a total route length of 6,483 meters, a vertical rise of 1,385 meters, and just seven support towers, which reduces landscape intrusion and construction footprint. The system features 44 cabins, each with 26 seats, operating at a maximum speed of 8 meters per second to achieve a journey time of 15 minutes from Terminal to Glacier station. Transport capacity reaches 2,200 passengers per hour in one direction, supported by a double tandem system for and reliability. The cabins, model 26-TGD, incorporate panoramic glazing for unobstructed views and advanced suspension for smooth rides over extended distances without intermediate stops. is enhanced through and low-friction materials, while the system's wind stability—derived from the dual track cables—allows consistent operation in the exposed environment. This setup not only optimizes throughput for tourism but also exemplifies advancements in ropeway engineering for high-altitude, variable-weather applications.

Stations and Supporting Infrastructure

The Eiger Express operates between two key stations: the Terminal at the base and the Eigergletscher station at the upper end. The Terminal, situated at an altitude of 937 meters above , functions as a comprehensive hub integrating rail, road, and cableway access. It accommodates 1,032 spaces for vehicles, eight retail shops featuring international brands, Swiss specialties, and sports gear, along with dining options including the Grindelwald Terminal, e-tron energy bar, and King Noodle Bar. Further amenities comprise a VIP lounge, two dedicated ski storage facilities, lockers, and restrooms, all designed to streamline passenger movement toward the Eiger Express and the adjacent Grindelwald-Männlichen . The Eigergletscher station, located at 2,328 meters above , serves as the arrival point for the and provides direct interconnection to the Jungfrau rack railway tunnel en route to . This station facilitates access to the Eiger Glacier ski area and acts as a gateway for regional and activities. Supporting infrastructure for the Eiger Express consists of seven towers distributed across the 6,483-meter route, a configuration made possible by the tricable (3S) system's capacity for extended spans and enhanced stability in high winds. The cable arrangement includes two stationary track s measuring 58 mm in diameter and a moving haul of 56 mm diameter, with a total length of 188,000 meters. The propulsion system, featuring a 1,450 kW drive at the upper station, along with noise-optimized bullwheels of 5,400 mm diameter, minimizes environmental disturbance while ensuring operational reliability.

Operation

Daily Functioning and Capacity

The Eiger Express provides year-round daily service connecting Grindelwald Terminal to Eigergletscher station, with gondolas departing every minute to accommodate continuous passenger flow. The system operates from approximately 7:45 AM to 5:45 PM, with the last descent typically around 6:20 PM, though exact timings adjust seasonally to align with daylight, weather, and demand—such as extended up to 6:20 PM or shortened winter schedules starting at 8:00 AM. This frequency ensures minimal wait times, even during peak periods, as passengers board detachable cabins that automatically detach and reattach at terminals for efficient turnaround. The system's capacity stands at 2,200 passengers per hour, supported by 44 cabins circulating on the 6,483-meter route. Each cabin accommodates 26 seated passengers, enabling high-volume transport over the 15-minute journey at speeds reaching 29 km/h, which prioritizes rapid throughput to the Glacier station for onward connections to via cogwheel train. This design handles daily visitor loads exceeding 10,000 in high season, reducing congestion compared to prior rail-only routes and integrating seamlessly with regional trains at Terminal for direct access from or .

Safety and Maintenance Features

The Eiger Express employs a system designed for enhanced stability in conditions, utilizing two carrier s and one traction to minimize sway from wind gusts, which is critical in the exposed Glacier route. This configuration, supplied by Doppelmayr and CWA Constructions, adheres to stringent European ropeway safety directives, including EN 12929 standards for detachable lifts, ensuring redundancy in support and automatic detachment mechanisms in fault scenarios. Drive is achieved through a double tandem motor setup with four ABB motors coupled to a single gearbox, providing backup propulsion and fault-tolerant operation to prevent single-point failures during ascent or descent. Cabins feature ATRIA models with integrated window heating to eliminate fogging and icing, maintaining visibility, alongside heated seating and automated boarding for passenger comfort and reduced manual intervention risks. The system's 44 cabins operate at speeds up to 7.5 m/s, with protocols aligned with Swiss Federal Office of Transport (BAV) guidelines, including onboard communication and rapid-response ground teams. Maintenance protocols incorporate a specialized carrier equipped with a lifting platform for accessing and supports without disrupting operations, facilitating routine inspections of the 2,100-meter span and seven intermediate towers. Annual closures, typically in and autumn, allow for comprehensive overhauls, including tension checks and component replacements, as mandated by BAV cycles for high-capacity ropeways. Night shifts handle using sensor data from the automated , minimizing daytime downtime and ensuring compliance with operational uptime targets exceeding 99%. These measures reflect the system's emphasis on longevity in harsh weather, with no major incidents reported since its December 2020 inauguration.

Impacts and Reception

Economic and Touristic Effects

The Eiger Express, operational since December 2020, has enhanced economic activity in the and regions by improving transport efficiency and passenger capacity to alpine attractions. The tri-cable system reduced travel time from Grindelwald Terminal to Eigergletscher station from approximately 40 minutes via cogwheel train to 15 minutes, enabling higher throughput and revenue generation for the Jungfrau Railway Group. In 2024, it carried 2,107,400 passengers, supporting elevated visitor numbers at – Top of Europe, which reached 1,058,600, a 5.1% increase from the prior year and the second-highest on record. This contributed to the group's operating income of CHF 294.7 million and transport revenue of CHF 205.1 million for 2024, with profits at CHF 76.5 million. Pre-construction assessments projected substantial job creation and from the CHF 210 million . A 2018 analysis estimated it would secure or create between 182 and 592 jobs in , generating annual of CHF 30–67 million through direct and indirect effects on local businesses, including and . Post-opening data from the Group's reports indicate sustained contributions to regional , with the fostering economic via diversified streams, including from Asian markets less prone to seasonal volatility. Transport income rose 8.2% year-over-year to CHF 107.2 million in the first half of 2025, partly attributable to the system's reliability in extending operational seasons. Touristically, the Eiger Express has broadened accessibility, attracting more day-trippers and reducing barriers for less mobile visitors while preserving scenic views of the Eiger North Face. This has amplified the region's appeal as a year-round destination, with operations complementing winter and summer hiking. Visitor growth post-implementation—evident in figures recovering to near pre-pandemic levels by 2023 (1,007,000 guests, up 61.1% from 2022)—reflects improved logistics that minimize wait times and weather disruptions compared to the legacy train system. However, the influx has raised questions about capacity limits in peak seasons, though official metrics emphasize positive multipliers for local tourism-dependent economies without quantifying displacement effects.

Achievements in Efficiency and Accessibility

The Eiger Express, operational since December 2020, achieves significant efficiency gains by reducing the ascent time from Terminal to Eigergletscher station to over a 6,483-meter route with a 1,385-meter vertical rise. This tricable system operates at a maximum speed of 8 meters per second, enabling it to transport up to 2,200 passengers per hour across 44 cabins, each seating 26 individuals, thereby minimizing queues and enhancing throughput compared to the prior cogwheel train segment. For skiers and tourists aiming for , the system cuts overall travel time by approximately 40 minutes versus traditional routes, streamlining access to high-altitude slopes and trails while supporting daily capacities exceeding 18,000 visitors. In terms of accessibility, the Eiger Express incorporates barrier-free design throughout, including wheelchair-compatible stations at Terminal and Eigergletscher, with seamless integration to links and ample parking. The terminal functions as a modern mobility hub with multi-level shops, restaurants, ski storage, and heated cabins featuring panoramic windows, providing comfort for diverse users such as families, elderly visitors, and those with mobility impairments during variable alpine weather. Its stability in high winds and reduced reliance on intermediate transfers further democratize access to the region's attractions, benefiting non-expert hikers and sightseers who previously faced longer, more arduous journeys.

Controversies and Criticisms

Environmental Concerns During Construction

Local opponents raised environmental concerns during the construction of the Eiger Express, a key component of the CHF 470 million V-Bahn project by Railways, citing risks to the pristine ecosystem, including landscape alteration and short-term disruptions from excavation and blasting activities. These included the excavation of a large —larger than a football field—at the Glacier station, which was filled with concrete, and the blasting of two tunnels through the 's western foot over several weeks, generating noise, dust, and machinery-related disturbances during the roughly two-year build phase from 2018 to 2020. Protests emphasized the potential visual degradation of the Eiger North Face and the irreversible loss of untouched terrain, with critics arguing that such projects accelerated the industrialization of sensitive mountain areas despite calls for independent environmental impact studies. The construction's was highlighted as substantial in the short term, stemming from material transport, production, and site preparation in a high-altitude, ecologically fragile zone. In response to initial opposition, planners modified the route to mitigate some aesthetic and environmental effects, such as reducing the number of supports to seven using advanced technology that avoided additional forest pylon needs. However, these adjustments did not fully quell protests, which continued even as construction advanced, marked by the tunnel breakthroughs in March 2019. Proponents countered that temporary construction impacts were outweighed by long-term benefits, including reduced reliance on older systems and lower operational emissions via hydroelectric , though critics maintained that the immediate ecological toll on habitats and soil stability warranted greater scrutiny.

Landscape and Aesthetic Debates

Opponents of the Eiger Express, part of the V-Cableway project in the , raised significant concerns about its visual intrusion into the pristine Alpine landscape, particularly the iconic north face of the Eiger. Critics argued that the cable lines and supporting structures would mar the unspoiled vistas that define the area's aesthetic appeal, potentially diminishing the dramatic natural beauty that attracts climbers, hikers, and photographers to the . Local residents and environmental groups highlighted the Eiger Express's left-hand branch as especially problematic, citing its route's proximity to the 's rugged terrain, where new masts and gondolas could create a of clutter against the stark rock faces and glaciers. These aesthetic objections contributed to public protests and legal challenges during the planning phase, with some viewing the infrastructure as incompatible with Switzerland's tradition of harmonizing development with in protected mountain zones. In response, project developers modified the design, including adjustments to cable alignments and station placements, to reduce visible impacts and address feedback from opponents. These changes helped secure regulatory approval in June 2018 from the , despite ongoing debates about whether such mitigations sufficiently preserved the landscape's integrity. Post-construction assessments have varied, with some observers noting that the system's sleek, gondolas blend more seamlessly than anticipated due to their and from key viewpoints, while others maintain that the added elements subtly alter the sense of wilderness around and the Glacier station at 2,320 meters. The debates underscore broader tensions in Alpine tourism between accessibility gains and safeguarding aesthetic values, where empirical analyses could further quantify impacts but remain limited in public discourse.

Long-Term Sustainability Assessments

The Eiger Express, operational since December 5, 2020, as part of the Group's V-Cableway project, relies on 100% renewable electricity sourced primarily from plants, including the refurbished Lütschental hydroelectric station dating to 1908, supplemented by braking energy recuperation from the system itself. In 2024, the group's total electricity consumption reached 30.7 million kWh, with 3.9 million kWh recuperated through and other efficiencies, marking an 8.7% increase in recuperated energy from the prior year. This design minimizes operational energy demands compared to traditional transport alternatives, though long-term viability depends on sustained availability amid variability. Carbon emissions from Eiger Express operations contribute to the group's Scope 1 and 2 totals, which stood at 1,976 t CO2e in 2024 (up 17% from 2023 due to increased activity), but remain low given the renewable energy base. The Jungfrau Railway Group has committed to a 75% reduction in these scopes by 2040 and net-zero emissions by 2050, aligned with Swiss national targets, incorporating measures like fuel oil reductions (50% by 2030 from 2023 baseline of 514 t CO2e) and electrification of equipment. Supplementary initiatives, such as the V-Cableway Sustainability Fund allocating CHF 200,000 annually through 2030 for local environmental projects in Grindelwald and Lauterbrunnen valleys, aim to offset indirect impacts like habitat disruption. Long-term assessments, guided by Task Force on Climate-related Financial Disclosures (TCFD) recommendations adopted in 2024, identify physical risks such as glacier retreat—exacerbating infrastructure erosion—and transition risks from regulatory shifts, with scenario analyses planned for 2025 to model 1.5°C and 4°C warming pathways. Post-construction monitoring from 2019–2023 indicates effective visitor management, with no rise in ecological conflicts despite capacity increases, suggesting sustained biodiversity compatibility if maintenance protocols under ISO 14001 certification are upheld. However, ongoing glacier thaw, as highlighted in regional comparisons of 1850 versus current extents, poses challenges to the system's foundational ice-dependent terrain, potentially necessitating adaptive reinforcements. Economic sustainability projections tie to , with the Eiger Express enabling a 47-minute reduction in transit time from Ost to , fostering year-round access that could extend seasons amid warming trends, though dependency on stable visitor numbers amid global emission-driven policy changes remains a vulnerability. The group's "Top of Tomorrow" , launched in , integrates these elements through materiality analyses prioritizing climate protection, with annual risk evaluations ensuring alignment with empirical data on environmental shifts.

References

  1. [1]
    Eiger Express
    ### Eiger Express Stations and Infrastructure Summary
  2. [2]
    Eiger Express (YOC 2020) - Skiresort.info
    Height/length. Base station 937 m Top station 2328 m 1391 m 6483 m. Speed. 8 metres per second. Transit time. 15:00 minutes. Carrying capacity. 2200 people per ...<|separator|>
  3. [3]
    Eiger Express - cable car of superlatives
    The Eiger Express opened on December 5, 2020 and allows you to travel from Interlaken to the Jungfraujoch in just one and a half hours.
  4. [4]
    [PDF] Eiger Express | Doppelmayr
    The Eiger Express is a tricable gondola lift that takes passengers from Grindelwald Grund to the Eiger Glacier in 15 minutes. It is a 3S lift.
  5. [5]
    Eiger Express — ABB Group
    Key facts: 44 cable cars transport 2,200 people per hour; Operates with 4 electric motors with an output of 500 kW each; travels almost 6.5 kilometers and ...
  6. [6]
    Eiger Express cableway| interlaken.ch
    The Eiger Express is a 15-minute gondola ride from Grindelwald Terminal to Eigergletscher, with views of the Eiger's north face and 44 cabins.
  7. [7]
    The Swiss mountain that's changing forever - National Geographic
    Dec 1, 2020 · To streamline the visitor experience further, the Eiger Express will act as a shortcut, directly connecting passengers from Eigergletscher ...
  8. [8]
  9. [9]
    Join us in Grindelwald this Season and Ride the New Eiger Express
    The first lift in the development, a high-speed 10 person gondola with 144 state-of- the-art cabins, opened in December 2019, runs from the new railway station ...
  10. [10]
  11. [11]
    Milestone Opening Of The Eiger Express - Snow Industry News
    Dec 30, 2020 · The Eiger Express boosts a large number of technical innovations. For the first time ever, a ropeway combines fully automated passenger and ...
  12. [12]
    State-of-the art lift dramatically improves access to the Jungfrau ...
    Sep 28, 2021 · The new Eiger Express V-Cableway is the world's largest of its type, replacing older systems, reducing travel times, and has a capacity of 1800 ...
  13. [13]
    V-Cableway
    ### Summary of V-Cableway Project (Including Eiger Express)
  14. [14]
    Controversial Jungfrau railway project gets greenlight - Swissinfo
    Jun 1, 2018 · The Federal Office of Transport has approved a CHF400 million ($405 million) mountain railway project that will carry tourists faster up to ...
  15. [15]
    The V-Cableway Project: Stunning Swiss Scenery - GoNOMAD Travel
    The 908 days of construction and the 470-million-franc project included the construction of two new cableways, the Eiger Express and Männlichen Gondola. The two ...
  16. [16]
    Der lange Weg vom Y übers V zum Bau - Plattform J
    Jun 15, 2018 · Die Behörden waren vom neuen Projekt rasch überzeugt. Im März 2013 stellten sich die Gemeinden Lauterbrunnen und Grindelwald hinter die V-Bahn.
  17. [17]
    V-Bahn-Projekt: Noch gibt es weitere Hürden zu nehmen - htr.ch
    Oct 22, 2015 · Nächster Schritt auf dem Weg zum Bau der Bahn werde die Publikation des Plangenehmigungsverfahrens sein. Die Jungfraubahn erhofft sich von ...
  18. [18]
    AGR gibt grünes Licht - Plattform J
    Mar 10, 2016 · Das Amt für Gemeinden und Raumordnung (AGR) hat mit Gesamtentscheid vom 26. Februar die Planungen des V-Bahn-Projekts der Gemeinden ...
  19. [19]
    Kanton Bern heisst Beschwerden gegen V-Bahn-Projekt teilweise gut
    Jun 9, 2017 · Gegen diese Genehmigung erhoben die Naturschutzorganisationen und die Privatperson Beschwerde bei der JGK. Mit der V-Bahn wollen die Jungfrau ...<|separator|>
  20. [20]
  21. [21]
    Jungfrau V-bahn railway project gets green light overcoming ...
    Jun 5, 2018 · The project has been modified to appease local opponents who had raised environmental and aesthetic concerns. ... Left the new Männlichenbahn, ...
  22. [22]
    Eiger Express im Fokus: Bedroht die neue Bahn die Bergidylle?
    Apr 30, 2024 · Insgesamt wurden während der Planungsphase 17 Einsprachen erhoben, was zu einer Bauverzögerung führte. Ausserdem wurde die Seilbahn ...<|separator|>
  23. [23]
    V-Cableway: Grindelwald's construction controversy - SWI swissinfo.ch
    Jan 6, 2020 · One will replace the out-dated Männlichenbahn, and a second, the “Eiger Express”, to cart tourists faster than ever before up to the ...
  24. [24]
    Eiger Express project continues amid protests - SWI swissinfo.ch
    Mar 31, 2019 · The project was modified to appease local opponents who had raised environmental and aesthetic concerns, but it seems they are still not happy ...Missing: opposition | Show results with:opposition
  25. [25]
    Vollendung des Generationenprojekts V-Bahn - ABB
    Jan 28, 2021 · Die Bauzeit für die beiden Bahnen belief sich auf genau 908 Tage. Dabei konnte die Eröffnung des Eiger Express, mit der das Projekt vollendet ...
  26. [26]
    Grindelwald Terminal
    ### Grindelwald Terminal Summary
  27. [27]
    Operating info
    ### Summary of Eiger Express Operating Hours and Notes
  28. [28]
    CWA: Spectacular ATRIA ride to the Eiger Glacier in Switzerland
    Doppelmayr/Garaventa delivered a one-of-a-kind novelty for the combined transport of passengers and goods. For the first time ever on a ropeway, the complete ...Missing: details | Show results with:details
  29. [29]
    Take a trip to the top of Europe with ABB motors and drives
    Mar 16, 2021 · For increased safety and reliability, Eiger Express has a double tandem motor system with four motors coupled to a single gearbox.
  30. [30]
    Cable car, funicular and mountain railway closures in Switzerland ...
    Sep 18, 2025 · Some cableways also close for maintenance prior to the busy winter season commencing and again before the start of the summer season. In the ...Missing: procedures | Show results with:procedures
  31. [31]
    Night-time operations for a smooth railway operation - Jungfraujoch
    Usually, it includes a lot of office work, which is necessary for planning and organising the upcoming maintenance work.
  32. [32]
    Eiger Express | jungfrau.ch
    Take the Eiger Express from Grindelwald Terminal to the Eiger Glacier in just 15 minutes - fast, comfortable and with spectacular panoramic views.Missing: procedures | Show results with:procedures
  33. [33]
    More Than 1 Million Guests Visit Jungfraujoch – Top Of Europe
    Jan 14, 2025 · In 2024, the Eiger Express carried 2,107,400 passengers on the route between Grindelwald Terminal and the Eiger Glacier, the second time ...Missing: revenue | Show results with:revenue
  34. [34]
  35. [35]
  36. [36]
  37. [37]
  38. [38]
    Thinking About Visiting the Top of Europe? The New Eiger Express ...
    Jan 14, 2021 · Now, thanks to the Eiger Express cable car, they can access the same slopes in about 20 minutes. Hikers, too, can now access the trails above ...
  39. [39]
  40. [40]
    Floating or on rails – as long as it's uphill - Jungfrau Region Tourism
    The Eiger Express in Grindelwald is an impressive example of this technology. The state-of-the-art tricable gondola lift connects Grindelwald with the ...
  41. [41]
    All Aboard the Eiger Express - Grindelwald, Switzerland
    Rating 5.0 (128) Feb 8, 2022 · The journey in 26-seat cabins with seat and window heating takes 15 minutes (cutting the previous journey time by 47 minutes) with views along the way of the ...Missing: facts | Show results with:facts
  42. [42]
    «Der Eiger-Express vernichtet in einem ersten Schritt 42 ...
    Sep 25, 2013 · «Der Eiger-Express vernichtet in einem ersten Schritt 42 Arbeitsplätze» · Das V-Projekt.
  43. [43]
    How the Jungfrau Ski Region is leading the way in sustainable ...
    Nov 10, 2021 · With advanced 3-S technology, the Eiger Express cable car only needs seven supports and forest based pylons not required. ... safety, ski ...
  44. [44]
    V-Cableway: Grindelwald's construction controversy - Expatica
    Alpinist Dan Moore writes that a large-scale development project could mean the death of the last vestiges of the untouched landscape surrounding the world ...Missing: planning | Show results with:planning
  45. [45]
    None
    ### Summary of Eiger Express, Sustainability Measures, and Related Topics from Jungfraubahn 2023 Sustainability Report
  46. [46]
    The Jungfrau's New Super-lift Has its Own Green Power Plant
    Nov 12, 2021 · This green power is also used on the new V-Cableway Eiger Express which transports skiers from Grindelwald to the heart of the Wengen- ...
  47. [47]
    None
    Summary of each segment:
  48. [48]
    Can Sustainable Tourism Stop A Thawing Glacier In Switzerland?
    Jul 6, 2024 · The new Eiger Express gondola. Jungfrau Railways has included carbon dioxide reduction and energy efficiency in the lift's specifications.