The Meguro Line (目黒線, Meguro-sen) is an 11.9-kilometer commuter railway line in the Greater Tokyo Area, operated by the private Tokyu Corporation, that connects Meguro Station in Shinagawa, Tokyo, with Hiyoshi Station in Kohoku Ward, Yokohama, Kanagawa Prefecture, and serves 13 stations en route.[1] It utilizes standard Japanese narrow-gauge track of 1,067 mm and is electrified at 1,500 V DC via overhead catenary, enabling efficient urban and suburban transport.[2] The line primarily caters to residential commuters in upscale neighborhoods, offering local, semi-express, and express services that facilitate quick access to central Tokyo.[1]Originally opened on March 11, 1923, as the initial segment of the Meguro-Kamata Electric Railway between Meguro and Maruko (present-day Tamagawa area), the line formed part of a longer route that extended to Kamata until its reconfiguration.[1] In 2000, the former Mekama Line was split, with the Meguro Line designated from Meguro to Musashi-Kosugi, while the remainder became the Tokyu Tamagawa Line; this restructuring coincided with the start of through-running services to the Tokyo Metro Namboku Line northward and the Toei Mita Line, extending reach to areas like Akabane and Nishi-Nippori without transfers.[3] A significant expansion occurred on March 18, 2023, with the opening of the 2.3 km Tokyu Shin-Yokohama Line branch from Hiyoshi to Shin-Yokohama Station, enabling direct connections to the Sotetsu (Sōtetsu) Line and further integration into the regional network for travel toward central Yokohama and beyond.[1][4]The Meguro Line's integration with Tokyo's subway system underscores its role in alleviating congestion on parallel routes like the Yamanote Line at Meguro Station, where it interchanges with JR East, Tokyo Metro, and Toei lines.[5] It operates modern stainless-steel EMUs, including the 3000 and 5080 series, with all stations featuring platform screen doors for safety, and daily ridership exceeding 200,000 passengers as of recent years, reflecting its importance in daily urban mobility.[1] The line's path through quiet, affluent districts like Jiyugaoka and Okusawa contrasts with its vital links to bustling hubs, making it a key artery for work, education, and leisure in the Tokyo-Yokohama corridor.[1]
Overview
General Description
The Meguro Line is a commuter railway line operated by Tokyu Corporation, a major private railway company in the Greater Tokyo Area. It runs between Meguro Station in Shinagawa Ward, Tokyo, and Hiyoshi Station in Kōhoku Ward, Yokohama, Kanagawa Prefecture, forming a vital link in the Tokyo-Yokohama transportation corridor.[6][3]Spanning 11.9 kilometers with 13 stations, the line primarily serves densely populated residential neighborhoods, offering reliable access to urban centers.[3][7]Through-running services enhance its connectivity, allowing seamless transfers without changing trains to the Tokyo Metro Namboku Line (extending northward to Akabane-Iwabuchi Station), the Toei Mita Line (to Nishi-Takashimadaira Station), and the Saitama Rapid Railway Line.[8][9] Additionally, since March 2023, direct operations have extended to the Sōtetsu Shin-Yokohama Line, improving links to Yokohama's Shinkansen hub and beyond.[10]Depicted in sky blue (#009bd8) on system maps, the Meguro Line plays a crucial role in daily commuting, transporting residents from southern Tokyo and northern Yokohama suburbs to key business districts in central Tokyo.[11]
Technical Features
The Meguro Line utilizes a track gauge of 1,067 mm (3 ft 6 in), known as Cape gauge, which is the standard narrow gauge for most Japanese private railways, enabling compatibility with connected subway and commuter lines.[12] The line is electrified with a 1,500 V DC overhead catenary system, providing consistent power supply for operations across its urban and suburban segments.[13]The maximum operating speed on the line is 110 km/h (68 mph), balancing efficiency with the dense urban environment and frequent stops.[12]Safety is enhanced by an Automatic Train Control (ATC) system, specifically the CS-ATC variant, which automatically regulates train speeds to prevent collisions and overspeeding, supplemented by Automatic Train Stop (ATS) as a secondary safeguard.[14]Since 2022, all platforms along the Meguro Line have been extended to accommodate 8-car train formations, supporting increased capacity for through-services with partner networks like the Tokyo Metro Namboku Line and Sōtetsu Shin-yokohama Line.[15] The infrastructure features mostly elevated or at-grade alignments to navigate Tokyo's topography, with short tunnel sections near Meguro Station facilitating seamless integration with underground subway lines.[12]
Historical Development
Origins and Early Operations
The Meguro Line traces its origins to the founding of the Meguro-Kamata Electric Railway Company on September 2, 1922, established to develop local transportation infrastructure serving the emerging suburban neighborhoods in Tokyo's Setagaya area. This initiative was part of broader efforts by private railway operators to connect growing residential zones on the city's periphery, facilitating commuter access amid rapid urbanization. The company's formation reflected the era's emphasis on electric railways as catalysts for real estate development and urban expansion in southwest Tokyo.[16][17]Construction progressed swiftly, with the line's inaugural section opening on March 11, 1923, between Meguro Station and Maruko Station (now Numabe Station on the Tokyu Tamagawa Line). This stretch marked the beginning of operations under the name Meguro Line, initially focused on short-haul passenger services. Later that year, on November 1, 1923, the line extended southeastward to Kamata Station, completing the core route (approximately 14.4 km total) and prompting a rename to the Meguro-Kamata Line, commonly abbreviated as the Mekama Line.[16] The timing of the extension aligned closely with the Great Kantō Earthquake of September 1, 1923, which devastated central Tokyo and accelerated population shifts to safer suburban areas like Setagaya; the line thus played a key role in supporting this exodus by providing reliable transport for workers and residents rebuilding their lives.[18]During World War II, the Meguro-Kamata Line, like much of Tokyo's rail network, suffered significant operational challenges due to severe resource rationing and infrastructure damage from Allied air raids. Fuel and material shortages limited train frequencies and maintenance, while bombings in 1944–1945 targeted industrial and transport hubs, causing temporary suspensions and repairs along the route. These disruptions reflected the broader wartime strain on private railways, which were requisitioned for military logistics under government oversight.In the post-war period, the line underwent rebuilding under the newly reorganized Tokyu Corporation, formed through wartime mergers including the 1939 integration of the Meguro-Kamata Electric Railway into the Tokyo-Yokohama Electric Railway and subsequent consolidations in 1942–1944. By the late 1940s and into the 1950s, Tokyu prioritized infrastructure restoration and electrification upgrades to restore full service, contributing to Japan's economic recovery by reconnecting suburban commuters to urban centers. This era saw the line stabilize as a vital artery for Setagaya's residential growth, with operations resuming normal patterns amid the high-growth economy.
Expansions and Integrations
During the 1960s to 1990s, the Meguro Line, originally part of the broader Mekama Line, underwent gradual modernization efforts, including electrification enhancements and station upgrades to accommodate increasing urban commuter traffic and prepare for subway interconnections. These improvements focused on elevating infrastructure reliability and capacity amid Tokyo's rapid postwar growth.A significant restructuring occurred on August 6, 2000, when the Mekama Line was divided into the Meguro Line (from Meguro to Musashi-Kosugi) and the Tokyu Tamagawa Line (from Tamagawa to Kamata), with the Meguro Line officially renamed as the Tokyu Meguro Line to reflect its distinct commuter orientation.[19] Concurrently, through-service operations with the Tokyo Metro Namboku Line and Toei Mita Line commenced on September 26, 2000, allowing seamless passenger transfers northward from Meguro Station and expanding the line's reach into central Tokyo.[20]Further expansion took place on June 22, 2008, with a 2.8 km extension from Musashi-Kosugi to Hiyoshi Station, integrating the Meguro Line more closely with the parallel Tokyu Toyoko Line via a quadruple-track section and improving connectivity in southern Tokyo.[20] This development enhanced interline efficiency and supported higher service frequencies.In April 2022, platform lengths along the line were extended to accommodate 8-car train operations, implemented in stages to boost capacity amid rising ridership.[10]Most recently, on March 18, 2023, through-service began with the Sotetsu Shin-Yokohama Line, linking the Meguro Line directly to Yokohama's Shinkansen hub at Shin-Yokohama Station and further integrating it into the wider regional network for improved access to southwestern destinations.[8]
Route and Operations
Route Alignment
The Meguro Line commences at Meguro Station in Shinagawa Ward, Tokyo, operating underground at this integrated terminus shared with the JR East Yamanote Line, Tokyo Metro Namboku Line, and Toei Mita Line.[21]From Meguro, the line transitions to elevated tracks, traversing the residential districts of Setagaya Ward, including areas near Okusawa and affluent suburbs such as Den-en-chofu, known for their upscale garden-style developments and tree-lined streets.[21][22][23]The route crosses the Tama River via a dedicated bridge, marking entry into Kanagawa Prefecture and connecting to the Yokohama metropolitan area.[24]In Kanagawa Prefecture, the line passes through Musashi-Kosugi Station in Nakahara Ward, Kawasaki City—a key interchange hub with JR East's Nambu, Yokosuka, and Shōnan-Shinjuku Lines, alongside the Tokyu Toyoko Line—before terminating at Hiyoshi Station in Kohoku Ward, Yokohama City, where it junctions directly with the Toyoko Line for further connectivity.[25][21][24]Throughout its 11.9 km length, the line predominantly utilizes elevated viaducts to navigate dense urban zones, with short underground segments near the Meguro terminus; the terrain remains largely flat, resulting in negligible overall elevation changes while paralleling the Tama River in sections.[24][26]
Service Patterns and Frequency
The Meguro Line operates three main train types: local trains that stop at all stations, express trains that skip minor stations to provide faster service, and semi-express trains that make intermediate stops between local and express patterns. These service patterns allow for a mix of accessibility and efficiency along the route.[6]During peak hours, particularly the morning rush from 6 to 9 a.m. inbound toward central Tokyo, trains run at high frequency, departing every 3 to 5 minutes to accommodate commuter demand. Off-peak frequencies are every 5 to 10 minutes throughout the day, with reduced service on weekends and holidays to reflect lower ridership. The line's timetable is coordinated with the connected Tokyo Metro Namboku Line and Toei Mita Line for seamless through-running and transfers.[27]Most trains on the Meguro Line provide through service beyond Meguro Station, continuing onto the Namboku Line northward or the Mita Line, while a portion terminate at Meguro or Hiyoshi to balance operations. Since March 2023, select trains continue from Hiyoshi via the 2.3 km Shin-Yokohama Line branch to Shin-Yokohama Station, providing through service to the Sotetsu Line toward central Yokohama and beyond.[28] This interline arrangement enhances connectivity across Tokyo's subway network. The line's high frequencies are supported by advanced signaling systems that enable safe close-headway operations.[27][6]Service operates daily from the first train around 5 a.m. to the last around midnight, providing nearly 19 hours of availability for passengers. Special adjustments to schedules occur on holidays for events or seasonal demand, ensuring integration with broader transit patterns.[27]
Stations and Infrastructure
List of Stations
The Meguro Line operates 13 stations over a distance of 11.9 km, connecting Meguro Station in Tokyo to Hiyoshi Station in Kanagawa Prefecture. Of these, nine stations are situated within Tokyo (across Meguro, Shinagawa, Setagaya, and Ota wards), while the remaining four are in Kanagawa Prefecture (in Kawasaki and Yokohama cities).[29]The stations are listed below in order from the northern terminus at Meguro, with details on station codes, cumulative distances from Meguro, administrative locations, opening years, and key transfer lines where applicable. Most stations opened as part of the line's initial construction in 1923, with later additions and extensions noted.[29][11]
Code
Station Name
Distance (km)
Location
Opening Year
Key Transfers
MG01
Meguro
0.0
Shinagawa Ward, Tokyo
1923
JR Yamanote Line, JR Saikyō Line, Tokyo Metro Namboku Line, Toei Mita Line [29]
MG02
Fudomae
1.0
Shinagawa Ward, Tokyo
1923
None
MG03
Musashi-Koyama
1.9
Shinagawa Ward, Tokyo
1923
None
MG04
Nishi-Koyama
2.6
Shinagawa Ward, Tokyo
1928
None
MG05
Senzoku
3.3
Meguro Ward, Tokyo
1923
None
MG06
Ookayama
4.3
Ota Ward, Tokyo
1923
Tokyu Ōimachi Line
MG07
Okusawa
5.5
Setagaya Ward, Tokyo
1923
None
MG08
Den-en-chōfu
6.5
Ota Ward, Tokyo
1923
Tokyu Tōyoko Line
MG09
Tamagawa
7.3
Ota Ward, Tokyo
1923
Tokyu Tamagawa Line
MG10
Shin-Maruko
8.6
Nakahara Ward, Kawasaki City, Kanagawa
1926
Tokyu Tōyoko Line
MG11
Musashi-Kosugi
9.1
Nakahara Ward, Kawasaki City, Kanagawa
1927
JR Nambu Line, JR Yokosuka Line, JR Shōnan-Shinjuku Line, Tokyu Tōyoko Line
MG12
Motosumiyoshi
10.4
Nakahara Ward, Kawasaki City, Kanagawa
1926
Tokyu Tōyoko Line
MG13
Hiyoshi
11.9
Kōhoku Ward, Yokohama City, Kanagawa
2008
Tokyu Tōyoko Line, Sōtetsu Shin-Yokohama Line, Yokohama Municipal Subway Green Line [30]
Den-en-chōfu Station (MG08) serves an affluent residential neighborhood known for its upscale housing and garden suburb design, attracting executives and celebrities.[31]
Facilities and Signaling
The Meguro Line's infrastructure includes maintenance and stabling facilities shared with other Tokyu lines, with primary maintenance conducted at the Motosumiyoshi Depot adjacent to Motosumiyoshi Station, where rolling stock for the Meguro Line is inspected and serviced.[32] Secondary stabling occurs at Hiyoshi Station, the line's southern terminus, to support daily operations and through-services.Signaling on the Meguro Line utilizes the ATC-P system for continuous speed supervision and automatic train control, ensuring safe operation at maximum speeds of up to 110 km/h.[33] The line also incorporates ATS-P for emergency braking in critical sections, particularly to coordinate with through-services on the adjacent Sotetsu Shin-Yokohama Line.[34] Elements of CBTC are integrated for enhanced coordination in interline operations, though full implementation is aligned with network-wide upgrades.[35]Platforms along the line consist of a combination of island and side configurations to accommodate bidirectional traffic and through-trains, with all stations equipped with elevators and ramps for full wheelchair accessibility since the early 2010s.[36] Power is supplied via substations distributed along the route to maintain 1,500 V DC overhead catenary electrification, supporting reliable service across the 11.9 km alignment.[37] The Tokyu network's operations, including the Meguro Line, are overseen from a central control center in Shibuya, enabling real-time monitoring and coordination.[38]Safety enhancements post-2000 focused on signaling harmonization with Tokyo Metro's Namboku Line for seamless through-service, adopting compatible CS-ATC protocols to prevent overspeed and ensure interoperability.[39]
Rolling Stock
Current Fleet
The primary rolling stock on the Tokyu-operated section of the Meguro Line is the Tokyu 3020 series, a commuter electric multiple unit introduced in November 2019 and converted to 8-car formations starting in April 2022 to support extended operations, including through-service to the Tokyu Shin-Yokohama Line.[40][41] These trains feature a lightweight stainless steel body construction for durability and reduced weight, along with roof-mounted air conditioning units rated at approximately 58 kW per car to ensure passenger comfort in varying weather conditions.Each 3020 series trainset consists of 8 cars, providing a total passenger capacity of around 1,200 (including standing room), which helps accommodate peak-hour demand on the line's core route from Naka-Meguro to Hiyoshi.[42] Key features include energy-efficient LED interior and exterior lighting for improved visibility and lower power consumption, enhanced accessibility with priority seating, wider doors, and tactile paving for wheelchair users and the visually impaired, as well as compatibility with Automatic Train Control (ATC) and Automatic Train Stop (ATS) systems for safe interoperability across connected networks.[43] As of November 2025, Tokyu operates 26 sets across the 3020, 3000, and 5080 series on the core section, with the 3020 series comprising 3 sets dedicated to high-demand services. In May 2025, Tokyu announced refurbishments for the 3000 series fleet (13 sets), with commercial operations of renovated trains beginning on the Meguro Line in October 2025 to update interiors and improve efficiency.[44][45]Through-services extending beyond the core Tokyu section utilize compatible rolling stock from partner operators. On routes to the Tokyo Metro Namboku Line, Tokyo Metro 9000 series 8-car sets provide seamless continuation, featuring similar ATC/ATS integration and stainless steel construction for consistent performance.[46] Further extensions to the Saitama Rapid Railway Line employ the Saitama Rapid 2000 series 8-car EMUs, which include regenerative braking and LED lighting to maintain efficiency over the full route to Urawa-Misono. For services linking to the Toei Mita Line, Toei 6300 series trains handle through-operations, equipped with universal design elements and advanced signaling for urban congestion management.[47] Platform extensions completed in prior years have enabled these uniform 8-car operations across all operators, enhancing overall line capacity without service disruptions.[44]
Former Rolling Stock
The Meguro Line, originally operated as the Meguro-Kamata Electric Railway, commenced service in 1923 with wooden-bodied electric multiple units, including the Deha 1 form bogie cars measuring 11 meters in length and featuring monitor roofs covered in麻布 fabric. These early vehicles, designed for the initial Meguro to Maruko (now Nambu) segment, represented the line's foundational rolling stock and operated until the early 1950s, when they were withdrawn to facilitate the transition to more durable steel-bodied cars amid post-warreconstruction and modernization efforts.[48]In the mid-20th century, the line incorporated steel-bodied cars such as the Moha 150 series (later redesignated Deha 3300), introduced in 1936 from Japanese National Railways hand-me-downs, which included both powered and unpowered trailers and served the Meguro and Ikegami Lines until their withdrawal between 1975 and 1986 due to advancing age and the need for enhanced reliability.[48]The 2000s brought further evolution tied to interline integrations, particularly the 2000 commencement of through-services with the Tokyo Metro Namboku Line and Toei Mita Line, necessitating fleet standardization for compatible signaling, door configurations, and voltage systems. To address this, the 5080 series—derived from the broader 5000 series family—was introduced in 2003 as 6-car EMUs for the Meguro Line, featuring VVVF inverter control and aluminum bodies for efficiency. In 2022, as part of capacity expansions for 8-car operations and future extensions to the Shin-Yokohama Line, all sets underwent lengthening by inserting intermediate cars (primarily 5080-series based), effectively retiring the original 6-car configurations while retaining the core vehicles; this upgrade was motivated by surging passenger volumes from through-services and alignment with safety standards for longer formations. A limited number of pre-upgrade components and related prototypes have been archived in Tokyu facilities for historical study.[48][30]Additionally, interim types like the 7600 series, converted from older 7200-series control cars in 1986 and equipped with early VVVF inverters, supplemented Meguro Line operations until their complete withdrawal in 2015 owing to cumulative wear and the push for unified, high-capacity fleets compatible with metro interrunning. This series exemplified transitional efforts to bridge analog and digital control systems during the line's integration era.[48]
Ridership
Passenger Statistics
In fiscal year 2018 (FY2018), the Tokyu Meguro Line carried an average of 379,000 passengers daily, totaling 138 million annually.[37]Ridership on the line showed steady growth from FY2015, when annual passengers numbered 127 million, to FY2019 at 142 million, driven by urban development and expanded through-services with the Tokyo Metro Namboku Line.[49] This upward trend reversed sharply in FY2021 due to the COVID-19 pandemic, with annual ridership dropping to 96 million amid reduced commuting and travel.[49]Post-pandemic recovery accelerated from FY2022 onward, supported by rebounding economic activity and integrated operations with Tokyo Metro lines. Annual passengers reached 104 million in FY2022, 115 million in FY2023 (a 11% year-over-year increase), and 132 million in FY2024 (a 14% increase), bringing daily averages to approximately 360,000.[37][49]For FY2025, Tokyu Corporation projects 139 million annual passengers on the Meguro Line, equivalent to about 381,000 daily, reflecting 5-10% year-over-year growth aligned with broader network recovery.[49] Through-services to the Namboku Line, which handled over 500,000 daily passengers in pre-pandemic years, continue to boost overall volume on the integrated route, though specific recent Namboku figures remain aggregated in Tokyo Metro's total of 6.84 million daily passengers across all lines in FY2024.[50]The following table summarizes annual ridership trends for the Tokyu Meguro Line (in millions of passengers):
Fiscal Year
Annual Passengers (millions)
Year-over-Year Change (%)
FY2015
127
-
FY2018
138
+9 (cumulative from 2015)
FY2019
142
+3
FY2021
96
-32
FY2023
115
+11
FY2024
132
+14
FY2025 (proj.)
139
+5
Data sourced from Tokyu Corporation reports; daily averages derived by dividing annual totals by 365.[37][49]
Capacity and Congestion
The Meguro Line experiences moderate to high congestion during peak hours, with a load factor of 129% in 2024, representing a substantial decline from 178% in 2019 as reported in the Ministry of Land, Infrastructure, Transport and Tourism's annual urban railway survey.[51] This improvement aligns with broader post-pandemic trends in Tokyo's rail network, where hybrid work arrangements have dispersed some commuter demand and reduced peak loads by up to 20-30% on select lines.[52] Operators aim to maintain congestion below 150% through ongoing enhancements, including the extension of 8-car formations to boost overall throughput.Each 8-car train on the line accommodates approximately 1,200 passengers at standard capacity, enabling the route to manage around 500,000 passengers in the peak direction during rush hours despite varying demand patterns.[50] High transfer volumes at Musashi-Kosugi Station, where commuters from JR lines and the Tokyu Toyoko Line converge, contribute to localized bottlenecks, often pushing section-specific loads above 140% inbound toward central Tokyo.[53]Mitigation efforts have focused on operational upgrades, such as increased train frequencies following the March 2023 opening of the Sōtetsu–Tokyu Shin-Yokohama Line, which integrates Sōtetsu services and adds capacity for through-running to the Meguro Line.[8] Additionally, full-height platform screen doors have been installed at all major stations along the Tokyu-operated segments, enhancing safety and facilitating smoother boarding amid crowding.[8]Compared to the parallel Tokyu Toyoko Line, the Meguro Line exhibits lower overall congestion levels, serving as a critical artery for the Setagaya-to-Yokohama corridor with fewer extreme peaks but sustained high utilization from residential outflows.[51]