Fact-checked by Grok 2 weeks ago

Moomba

Moomba is a remote industrial settlement in northeastern South Australia, established as a company town to support natural gas extraction and processing operations in the Cooper Basin. The Moomba gas field was discovered in March 1966 by Delhi Australian Petroleum Ltd. and Santos Limited, marking a significant onshore find that enabled the development of the region's vast reserves. Construction of the gas processing plant and an 800 km pipeline to Adelaide began in 1968, with commercial gas delivery commencing in 1969, transforming Moomba into a key hub for supplying eastern Australia's energy needs. The Moomba Gas Plant, operated by Santos Limited, processes raw gas, condensate, and liquids from the Cooper and Eromanga Basins, producing sales gas for domestic markets via interconnected pipelines like the Moomba to Adelaide Pipeline System. Designed to handle up to 25.4 million cubic meters of raw gas daily, the facility uses approximately 8% of output as plant fuel and supports compression for long-distance transmission. In recent developments, Santos has implemented a carbon capture and storage (CCS) project at Moomba, achieving first CO2 injection in 2024 with a capacity of 1.7 million tonnes per annum, utilizing depleted reservoirs for permanent storage. This infrastructure underscores Moomba's enduring role in Australia's energy security, evolving from initial field production to integrated processing and emissions management amid ongoing basin exploration.

History

Discovery and Initial Exploration

Exploration in the Cooper Basin, where the Moomba gas field is located, began in the mid-1950s following the acquisition of licenses by Santos in 1954, with initial efforts focused on seismic surveys and stratigraphic drilling to assess hydrocarbon potential in the remote arid region of northeastern South Australia. The first dedicated petroleum exploration well in the basin, Innamincka 1, was drilled in 1960, though it encountered no commercial hydrocarbons, prompting continued geophysical work and deeper testing starting around 1959. In 1958, Delhi Australian Petroleum Ltd. earned a 50% interest in the key permit area (PPL-1) and assumed operatorship of the Santos-Delhi joint venture, accelerating drilling campaigns amid growing interest in Permian-age formations. The breakthrough came with the Gidgealpa-2 well in December 1963, which marked the first commercial natural gas discovery in the Cooper Basin at depths exceeding 3,000 meters in the Patchawarra Formation, confirming the presence of substantial Permian sandstone reservoirs. This find, with initial flow rates indicating viable reserves, spurred immediate appraisal and nearby drilling to delineate the extent of the accumulation, though reserves estimates at the time were insufficient alone for large-scale commercialization. Building on Gidgealpa's success, the Moomba-1 well discovered the adjacent Moomba gas field in March 1966, drilled by the Delhi-Santos partnership approximately 15 kilometers southeast of Gidgealpa-1 and penetrating similar Permian Toolachee and Patchawarra sandstones at around 2,500-3,000 meters depth. The discovery well flowed gas at rates exceeding 10 million cubic feet per day during testing, revealing a giant accumulation with initial reserve estimates far surpassing Gidgealpa and validating the basin's stratigraphic trap model. Subsequent appraisal wells in 1966-1967, including Moomba-2 and -3, confirmed the field's lateral extent over roughly 100 square kilometers and high deliverability, with non-associated gas of high methane content (over 80%) and minimal impurities, enabling plans for processing infrastructure. These efforts established Moomba as the basin's premier field, shifting focus from exploratory wildcats to development amid logistical challenges in the outback terrain.

Development and First Production

The Moomba gas field, located in the Cooper Basin of South Australia, was discovered in March 1966 by the joint venture of Delhi Australian Petroleum Ltd. and Santos Ltd. through the Moomba-1 exploration well, which encountered significant reserves in Permian formations. Following the discovery, appraisal drilling confirmed the field's commercial viability, building on the earlier Gidgealpa gas find in 1963 within the same basin, and prompted rapid infrastructure planning to enable monetization. Santos, which had acquired exploration licenses in the area since 1954, partnered with Delhi for funding, technical expertise, and operatorship, leveraging Delhi's experience to accelerate delineation. Development commenced with the construction of a gas processing facility at the remote Moomba site in 1968, designed to handle raw gas separation, condensate recovery, and sales gas preparation for pipeline transport. Concurrently, engineering for the 750-kilometer Moomba-Adelaide natural gas pipeline advanced, with the project addressing logistical challenges in the arid Cooper Basin, including water supply and workforce mobilization for the isolated location. In 1969, petroleum production licenses were formally issued to the Delhi-Santos consortium, formalizing operational rights and enabling full-scale field development. First production occurred in 1969 upon completion of the Moomba-Adelaide pipeline, with raw gas from Cooper Basin fields, including Moomba, entering the sales stream and flowing to Adelaide markets. On 10 November 1969, the initial delivery of processed gas reached Adelaide, marking the commencement of commercial supply and establishing Moomba as a foundational asset for South Australia's energy infrastructure. This milestone followed intensive drilling of production wells and facility commissioning, transitioning the field from exploration to sustained output without major delays attributable to technical or regulatory hurdles.

Expansion and Technological Advances

Following the commencement of gas production in 1969, the Moomba facilities underwent expansions to handle increased liquids output, including the Cooper Basin Liquids Project initiated between 1980 and 1984, which processed and marketed natural gas liquids and crude oil extracted from the Cooper and Eromanga Basins at the central Moomba plant. As conventional reserves declined in the 2000s, Santos launched an unconventional gas exploration program in 2004 targeting tight gas, shale, and coal seam gas in Permian formations, marking a shift to access previously uneconomic resources through advanced extraction techniques. A pivotal technological advance occurred with the drilling of Moomba 191 in December 2011, Australia's first dedicated vertical shale gas well, located 9 km northeast of the Moomba plant; after multi-stage hydraulic fracture stimulation completed in early 2012, it commenced commercial production on October 19, 2012, initially flowing at a stabilized rate of 2.7 million standard cubic feet per day from the Roseneath, Epsilon, and Murteree shales. This success demonstrated the viability of hydraulic fracturing in the Cooper Basin's deep, overpressured reservoirs, enabling Santos to scale up unconventional development with subsequent wells incorporating horizontal drilling to improve recovery from low-permeability formations. To support expanded unconventional output, the Cooper Infrastructure Expansion Project (CIEP) was initiated in 2013, involving an $800 million gross investment in stage 1 through 2017 for upgrades to drilling pads, gathering lines, and compression facilities at Moomba, which increased processing capacity and connected additional remote wells to the central plant. These enhancements, combined with ongoing infill drilling—exceeding 2,500 wells across the basin by the mid-2010s—sustained gas supply to domestic markets, offsetting conventional declines and contributing to cumulative basin production surpassing 6 trillion cubic feet by 2017. Further optimizations in fracturing fluids and proppants refined extraction efficiency in the basin's heterogeneous reservoirs, prioritizing economic viability over conventional vertical completions.

Operations and Production

Gas Processing Facilities

The Moomba Gas Plant, operated by Santos as the central hub of the South Australian Cooper Basin joint venture, receives and processes raw natural gas, condensate, and crude oil from approximately 115 gas fields and 28 oil fields across the Cooper and Eromanga Basins via an extensive gathering pipeline network. The facility handles high-CO2 content raw gas, employing multi-stage separation and treatment to produce sales-quality gas suitable for domestic and export pipelines, alongside natural gas liquids (NGLs) such as ethane, propane, butane, and stabilized condensate. Approximately 8% of the processed sales gas is utilized as fuel for plant operations. Core processing components include inlet separators for initial phase separation of gas, water, and hydrocarbons; acid gas removal units utilizing amine absorption to strip CO2 and hydrogen sulfide (H2S); glycol dehydration systems to remove water vapor; and cryogenic turbo-expander plants for NGL recovery and fractionation. Liquids processing involves stabilization towers and distillation columns to yield exportable crude oil and condensate, with capacities supporting up to 6,000 kL (42,000 barrels) of combined condensate and crude per day. The plant features multiple parallel processing trains, enabling redundancy and phased maintenance, with raw gas throughput designed for 25.4 million cubic meters (902 million cubic feet) per day. Sales gas compression stations, equipped with high-pressure reciprocating and centrifugal compressors, deliver processed gas at pipeline specifications to interconnected transmission systems like the Moomba-Sydney and Moomba-Adelaide pipelines. As of April 2025, operational capacity has been temporarily constrained to approximately 205 terajoules per day due to maintenance and infrastructure repairs, down from a nominal pre-incident level exceeding 250 TJ/day, reflecting ongoing efforts to restore full output amid aging infrastructure challenges. Expansions since initial commissioning in 1972 have incrementally boosted throughput, incorporating advanced dehydration and compression technologies to handle variable feed gas compositions from 536 producing gas wells and 177 oil wells. The facilities integrate safety systems, including flare stacks for excess gas disposal and monitoring for hazardous emissions, underscoring their role as a major hazardous industrial site in remote arid conditions.

Reservoir Characteristics and Extraction Methods

The Moomba gas field, located in the southwestern portion of the Cooper Basin in South Australia, features primary reservoirs in Permian-age sandstones of the Patchawarra, Toolachee, and Epsilon Formations, characterized by fluvial, deltaic, and shoreface depositional environments that yield heterogeneous sandstone bodies interbedded with shales and coals. These reservoirs form structural traps in a broad anticlinal feature with faulting, at depths ranging from 1250 to 3670 meters. Porosities average 10.5% in the Patchawarra Formation (up to 23.8%) and 12.4% in the Toolachee Formation (up to 25.3%), while permeabilities reach up to 2500 millidarcies (mD) in the Patchawarra and 1995 mD in the Toolachee, supporting conventional gas accumulation primarily as dry gas with low liquids content. Secondary reservoirs include tight sandstones and shales such as the Roseneath, Epsilon, and Murteree (REM) sequence, exhibiting lower permeabilities in the microdarcy to low millidarcy range and porosities averaging around 6%, which classify them as unconventional plays requiring stimulation for economic production. Gas composition across these reservoirs is dominated by methane (typically over 80%), with variable CO2 content up to 20-30% in some zones, necessitating removal during processing. Extraction from conventional sandstone reservoirs relies on vertical or deviated wells drilled to intersect pay zones, followed by perforation and natural flow or artificial lift via compression to maintain reservoir pressure during depletion, with over 500 wells contributing to field production since initial development in the 1960s. For unconventional tight gas and shale intervals, methods evolved to include horizontal drilling and multi-stage hydraulic fracturing, as demonstrated by Santos' Moomba-191 well in 2012, Australia's first commercial shale gas producer, which achieved initial flow rates of 1.7 million cubic feet per day through fracture stimulation of the REM shales. These techniques involve proppant-supported fractures to enhance permeability, with subsequent wells optimizing lateral lengths and frac stages to reduce costs by up to 50% compared to early efforts. Production from all reservoirs feeds into the central Moomba processing facilities via gathering pipelines, with ongoing monitoring for pressure decline and water influx in mature zones.

Production Output and Reserves

The Moomba gas , a key component of the Cooper Basin in , commenced commercial in following its discovery in 1966. Cumulative sales gas from the South Australian segment of the Cooper Basin, where Moomba serves as the primary processing hub, totaled 5.77 trillion cubic feet (TCF) as of 2022–23. This output has supplied significant volumes to eastern Australia's domestic market via pipelines from the Moomba facilities. Peak production at the Moomba conventional gas field was achieved in 2023, reflecting ongoing efforts to sustain output through infill drilling amid natural reservoir decline. To date, the field has recovered 17.74% of its estimated total recoverable reserves, with economic projections indicating continued production until approximately 2066. Reserve estimates for Moomba specifically are integrated within broader Cooper Basin figures, which are characterized as mature for conventional gas, with remaining proven and probable resources supplemented by contingent unconventional resources of 2,177 petajoules (approximately 1.94 TCF). Santos, the operator, maintains production through activities such as connecting new wells, including 18 gas wells brought online in the Cooper Basin during the third quarter of 2025, despite disruptions like flooding in the region.

Infrastructure

On-Site Facilities

The Moomba processing facility serves as the central hub for treating raw natural gas, condensate, and crude oil extracted from the Cooper Basin fields. It receives production from approximately 1,000 wells across 115 gas fields and 28 oil fields, including 536 producing gas wells and 177 oil wells, via field compression systems that deliver hydrocarbon feed to the plant. Core gas processing units encompass initial oil-gas separation, acid gas removal via Benfield units to extract CO2 and H2S, gas dehydration, and sales gas compression, enabling a capacity of 550 TJ/d (equivalent to about 519 MMscf/d) of treated sales gas. Natural gas liquids (NGLs) recovery occurs through a refrigeration-based process, including demethanization and de-ethanization steps, followed by an ethane recovery plant commissioned in the 1990s to support downstream petrochemical applications. Crude oil undergoes stabilization to remove light ends and prepare it for transport. Additional on-site infrastructure includes absorber towers for enhanced gas sweetening—such as a 220-tonne replacement unit installed in recent upgrades—and a dedicated cold box for cryogenic processing of aluminum-based equipment. The APA-operated Moomba Compression Facility (MCF) provides further pressure boosting to facilitate gas flow into export pipelines, integrating with the plant's output for efficient transmission. The overall plant footprint spans 50 hectares within a secured perimeter, supporting continuous operations since initial commissioning in 1969.

Pipeline Networks

The Moomba gas processing plant in the Cooper Basin functions as a central export hub, interconnected with a network of transmission pipelines that deliver processed natural gas and liquids to domestic markets across South Australia, New South Wales, Queensland, and beyond. These pipelines, developed progressively since the late 1960s, enable the transport of sales-quality gas from Moomba's facilities, with capacities designed to handle peak production volumes while supporting bi-directional flows for market flexibility and maintenance. Ownership and operation are distributed among multiple entities, including Santos for upstream integration and third-party infrastructure providers like APA Group and Epic Energy, reflecting the separation of production from midstream transport in Australia's energy sector. Key gas transmission pipelines in the network include the Moomba-Adelaide Pipeline System (MAPS), a 1,184 km system extending from Moomba through eastern South Australia to Adelaide, with spur lines to regional centers like Angaston. Constructed in 1969 as one of Australia's earliest major gas pipelines, MAPS has a forward capacity of 249 terajoules per day (TJ/day) and supports South Australia's domestic supply, including power generation and industrial use. The South West Queensland Pipeline (SWQP), operated by APA Group, provides a bi-directional link between Moomba and Wallumbilla in Queensland, originally built in 1996 and extended in 2008 to facilitate gas trading and supply to eastern markets. This 438 km pipeline integrates with Queensland's gas infrastructure, allowing reverse flows from surplus Queensland production to southern states during periods of high demand in the Cooper Basin. Liquids pipelines complement the gas network, transporting natural gas liquids (NGLs) and condensate from Moomba. The Moomba to Port Bonython pipeline delivers NGLs approximately 700 km westward to the Port Bonython fractionation facility for processing into propane, butane, and ethane, supporting petrochemical and export markets. Additionally, the Moomba-Botany NGL pipeline extends liquids transport eastward toward Sydney-area refineries and users, forming part of a broader 12,000 km pipeline portfolio managed by infrastructure operators. These lines handle condensate volumes tied to Moomba's gas output, with flows optimized via compression stations like APA's Moomba Compression Facility, which boosts pressure to maintain efficient long-haul delivery across varying terrain.
Pipeline SystemTypeLength (km)Capacity/NotesOperatorCommissioned
Moomba-Adelaide (MAPS)Gas1,184249 TJ/day forwardEpic Energy1969
South West Queensland (SWQP)Gas (bi-directional)438Supports Queensland-SA flowsAPA Group1996 (extended 2008)
Moomba-Port BonythonNGLs~700Tied to fractionation outputSantos/Epic Energy1980s
The network's design incorporates regulatory oversight by the Australian Energy Regulator (AER) for tariffs and reliability, ensuring resilience against disruptions through parallel routing and compressor upgrades. Recent developments include studies for carbon capture and storage (CCS) integration, such as potential new lines from Moomba to depleted reservoirs, but these remain in planning phases without altering core hydrocarbon transport capacities as of 2025.

Moomba to Sydney Pipeline

The Moomba to Sydney Pipeline (MSP) transports natural gas from the Moomba gas processing facilities in South Australia's Cooper Basin to distribution networks serving New South Wales, including the Sydney metropolitan area. Spanning 2,081 kilometers, the pipeline connects production hubs in remote arid regions to urban demand centers, facilitating the delivery of baseload energy supplies since its commissioning. Owned and operated by APA Group, it forms a critical artery in Australia's eastern gas transmission network, with a forward haul capacity of 489 terajoules per day and a backhaul capacity of 120 terajoules per day. Planning for the MSP originated in the early 1970s amid rising gas demand in New South Wales, with construction commencing in 1974 and facing environmental and logistical hurdles including floods, extreme temperatures exceeding 50°C, dust storms, and labor disputes. The pipeline entered service in 1976, initially comprising a mainline from Moomba through inland New South Wales to Wilton near Sydney, supplemented by laterals for regional distribution. Extensions and reinforcements occurred through 1993, expanding the network to approximately 2,029 kilometers of primary transmission lines, enabling annual throughput of up to 152 petajoules. The route traverses predominantly rural and semi-arid terrain, minimizing urban disruption while requiring multiple compressor stations to maintain pressure over the long distance. Technical specifications include high-pressure steel piping designed for bi-directional flow, supporting both forward delivery from Moomba and reverse haul for market balancing. Capacity enhancements have been incremental, with APA Group implementing off-peak expansions to address seasonal variability in demand. Complementing the MSP is the parallel Moomba Sydney Ethane Pipeline (MSEP), a 1,375-kilometer line originally built in 1995 for ethane transport to petrochemical facilities at Botany Bay; APA is repurposing it for natural gas (methane) service, adding up to 25 terajoules per day and potentially elevating total southern haul capacity to 590 terajoules per day. This conversion received key regulatory approval from the New South Wales government in September 2025, aiming to bolster supply reliability amid tightening eastern Australian gas markets. The MSP's operations are regulated under Australia's National Gas Law, with APA maintaining coverage for third-party access to ensure competitive market dynamics. It has underpinned New South Wales' gas consumption for nearly five decades, transporting gas primarily from Cooper Basin fields while integrating supplies from interconnected Queensland networks via the Queensland-South Australia interconnector since 2009. Ongoing projects, including the MSEP repurposing, reflect adaptations to declining basin production and rising infrastructure demands, though capacity constraints during peak periods have prompted discussions on further expansions or alternative sourcing.

Carbon Capture and Storage Initiatives

Project Overview and Implementation

The Santos Moomba Carbon Capture and Storage (CCS) project, located in the Cooper Basin of South Australia adjacent to the Moomba gas processing plant, represents Australia's inaugural large-scale commercial hub for capturing and geologically sequestering carbon dioxide emissions from industrial operations. The initiative primarily targets CO2 vented during gas processing at Moomba, compressing and injecting it into depleted Permian-age hydrocarbon reservoirs, such as the Strzelecki and Marabooka fields, which offer proven containment due to their geological structure including impermeable cap rocks. With a nameplate injection capacity of 1.7 million tonnes of CO2 annually—equivalent to roughly 10% of South Australia's yearly emissions—the project aims to demonstrate scalable, low-cost storage in mature basins while supporting emissions reduction from Santos' operations. Implementation commenced with a final investment decision in November 2021 for Phase 1, focusing on repurposing existing infrastructure for an initial capture rate scaling to full capacity. Key engineering involved constructing a four-stage compression train to pressurize CO2 streams from plant vents, a dedicated gathering system, and drilling five injection wells into saline aquifers and residual gas zones within the Toolachee Formation. The $220 million Phase 1a reached 75% completion by late 2023, enabling first CO2 injection in October 2024 via the Moomba-4 well, with operations achieving 340,000 tonnes stored by year-end despite initial injectivity challenges resolved through fluid displacement. A comprehensive monitoring and verification plan, approved by South Australia's Department for Energy and Mining, incorporates seismic surveys, pressure monitoring, and geochemical analysis to ensure plume containment and well integrity, with regular reviews to adapt to operational data. Future phases, including Phase 2 collaborations with partners like JX and ENEOS, envision expansion to 20 million tonnes annual capacity across the basin by integrating third-party CO2 sources via pipelines, though these remain in planning as of 2025. The project's phased approach leverages the basin's 1.7 billion tonne certified storage resource, prioritizing reservoirs with historical production data for risk mitigation.

Technical Achievements and Capacity

The Moomba Carbon Capture and Storage (CCS) project, operated by Santos in the Cooper Basin of South Australia, features an injection capacity of 1.7 million tonnes of CO₂ per annum, positioning it as the third-largest operating CCS facility globally without enhanced oil recovery (EOR). This capacity is supported by a dedicated infrastructure including a four-stage compressor station, CO₂ dehydration units, associated pipelines, and five injection wells targeting depleted Permian-age gas reservoirs at depths exceeding 2,000 meters. The system's design enables full injection rates of up to 84 million cubic feet per day (approximately 2.38 million cubic meters per day) of CO₂, with operations commencing on September 30, 2024, and rapidly scaling to maximum throughput within weeks, surpassing initial commissioning expectations. Technical achievements include the project's successful demonstration of saline aquifer storage in a non-EOR context, leveraging existing geological formations with proven sealing capacity from prior hydrocarbon production. By early 2025, cumulative injections exceeded 685,000 tonnes of CO₂-equivalent, with 340,000 tonnes stored in 2024 alone despite partial-year operations, validating the reservoir's integrity through real-time monitoring via seismic surveys and pressure gauges integrated into the Strzelecki and Marabooka fields' verification programs. The broader Cooper and Eromanga basins offer expansion potential for up to 20 million tonnes per annum of CO₂ injection over 50 years, supported by extensive subsurface data from decades of gas extraction. Source rock analysis and geomechanical modeling have confirmed minimal risk of or leakage, with the project's four-day injection volume equivalent to the annual emissions offset by 10,000 electric vehicles, highlighting efficient scale-up from pilot testing. Ongoing enhancements focus on optimizing compression efficiency and well injectivity, with all five wells operational at full rates by October 2024.

Integration with Ongoing Operations

The Moomba CCS project integrates with the Moomba Gas Plant's ongoing operations by intercepting CO2 separated from raw natural gas streams during acid gas removal processes, where Cooper Basin gas typically contains high CO2 concentrations that must be extracted to meet pipeline specifications. This captured stream, previously vented to the atmosphere, is diverted to an on-site CO2 processing facility for dehydration to remove water content and compression into a supercritical fluid state optimized for pipeline transport and subsurface injection. Transport occurs via a dedicated 50-kilometer pipeline connecting the processing plant to injection wells in the nearby depleted Strzelecki and Marabooka gas fields, selected for their proven sealing capacity demonstrated by decades of hydrocarbon retention. The design accounts for the CO2 stream's variable composition, including impurities like residual hydrocarbons or hydrogen sulfide, ensuring compatibility with existing gas plant handling systems while addressing phase behavior challenges under low-pressure reservoir conditions. This setup leverages the plant's established infrastructure, such as access to characterized depleted reservoirs and processing know-how from hydrocarbon operations, to avoid significant modifications to core gas production workflows. Injection activities occur in parallel with gas extraction and processing, with monitoring systems verifying containment integrity without curtailing output capacities that supply domestic markets and exports. Operational since October 2024, the integration enables storage of up to 1.7 million tonnes of CO2 annually—equivalent to the plant's vented emissions—while supporting potential future expansions, such as capturing CO2 from third-party sources or integrating with low-carbon fuel production using the same reservoirs. Complementary initiatives, like the plant's electrification project, further align CCS with emission-reduction efforts by replacing gas-driven equipment with renewables, enhancing overall efficiency without halting hydrocarbon processing.

Economic and Strategic Importance

Contribution to Australian Energy Supply

The Moomba gas processing facility in South Australia's Cooper Basin processes raw natural gas extracted from conventional reservoirs, supplying treated sales gas primarily to eastern Australian markets via interconnected pipeline networks. Since commercial production began in 1969, the Cooper Basin has delivered cumulative sales gas output exceeding 5.77 trillion cubic feet (approximately 6,100 PJ), establishing Moomba as a foundational hub for domestic energy needs including power generation, manufacturing, and residential heating. Annual production from the basin averaged around 59.65 billion cubic feet (roughly 63 PJ) in fiscal year 2021-2022, with South Australia's total marketable gas output reaching 61.19 PJ over the preceding 12 months, underscoring Moomba's dominance in state-level supply. In the broader eastern gas market, Moomba's output forms a core component of southern regional production, projected at 364 PJ for 2025 before a forecasted decline to 226 PJ by 2029 due to maturing fields. This equates to nearly 18% of the total eastern consumption gas market (ECGM) production of 1,973 PJ in 2025, providing baseload supply to states like New South Wales, Victoria, and South Australia where it supports approximately 10-15% of overall gas demand through pipelines such as the 152 PJ/year-capacity Moomba-Sydney line. The facility's gas underpins reliable electricity dispatch in regions with high renewable penetration, offsetting intermittency by enabling flexible peaking plants and industrial processes that rely on consistent, high-calorific fuel. Operators Santos and Beach Energy, holding joint interests in Cooper Basin assets, maintain Moomba's viability through ongoing field developments, including extensions from southwest Queensland adding up to 30 PJ annually via the Queensland-South Australia-New South Wales interconnector. Despite competition from Queensland's coal seam gas fields—which now dominate over two-thirds of east coast supply—Moomba's conventional gas offers lower processing demands and proven reserves, contributing to national energy security by diversifying sources away from export-pressured LNG hubs. Production forecasts indicate sustained output into the 2030s with contingent resource development, potentially delaying supply shortfalls until 2034 if investments materialize, thereby sustaining Australia's transition to lower-emission operations without abrupt disruptions.

Employment and Regional Development

The Moomba gas processing facility and associated Cooper Basin operations serve as a key employer in remote northeastern South Australia, where the oil and gas extraction sector directly supports 833 jobs statewide as of February 2024, representing 0.1% of total South Australian employment. These positions include skilled roles in gas processing, maintenance, drilling, and logistics, with many filled through fly-in-fly-out (FIFO) rotations due to the site's isolation, approximately 800 kilometers northeast of Adelaide. Santos, holding a 66.7% stake in the Cooper Basin joint venture with Beach Energy, maintains a workforce focused on operational efficiency, though specific onsite numbers fluctuate with production cycles and projects; for instance, recent streamlining efforts led to around 100 redundancies at Moomba and Adelaide offices in 2023 amid cost optimizations. Beyond direct employment, Moomba drives regional development by generating royalties of $106.3 million in 2022-23, which fund state infrastructure and community programs in outback areas, including enhancements to roads, airports, and services near Innamincka and Coober Pedy. The sector's local procurement sustains ancillary businesses in transport, catering, and equipment supply, fostering a multiplier effect in an otherwise sparse economy; Santos reports longstanding partnerships with Indigenous groups, providing training and contracts that integrate local labor into operations. The Moomba CCS initiative, operational since mid-2024, added temporary construction jobs numbering around 230, with ongoing monitoring roles contributing to sustained technical employment. Overall, while the industry's statewide GDP contribution reached $1.7 billion in 2021-22, its regional footprint amplifies development in arid zones by anchoring economic activity against boom-bust cycles, though critics note limited broader diversification due to heavy reliance on fossil fuels and FIFO models that repatriate wages to urban centers. Government subsidies, such as $21 million for related infrastructure, underscore efforts to bolster long-term viability amid energy transitions.

Role in National Energy Security

The Moomba gas processing facility serves as a critical hub for natural gas production from the Cooper Basin, supplying approximately 80-90 petajoules annually across South Australia and Queensland portions, contributing to eastern Australia's overall gas needs despite representing about 5% of total eastern production in recent years. Since its initial gas delivery on November 10, 1969, via the 800 km pipeline to Adelaide, Moomba has provided a reliable domestic source, reducing dependence on imported liquefied natural gas during periods of strained supply from primary basins like Surat-Bowen. Key pipelines originating from Moomba, including the Moomba-Sydney Pipeline and its expansions, transport processed gas to New South Wales, Victoria, and Queensland, acting as a vital interconnect for balancing regional shortages by linking Cooper Basin output to the east coast grid. This infrastructure has historically mitigated supply risks, as evidenced by the 2025 repurposing of the Moomba to Sydney Ethane Pipeline to add natural gas capacity, directly addressing emerging east coast gaps projected amid declining conventional reserves elsewhere. Investments like APA Group's $75 million expansion in 2025 further underscore Moomba's role in enhancing transmission resilience against disruptions, such as weather events impacting Queensland fields. Strategically, Moomba bolsters national energy security by diversifying sources beyond export-oriented LNG hubs, with its central processing enabling flexible allocation to domestic markets during peak demand or export moratoriums, as noted in Australian Energy Market Operator outlooks. Ongoing carbon capture and storage operations at the site, injecting over 685,000 tonnes of CO2 equivalent since startup, extend the viability of basin reserves, supporting sustained production amid regulatory pressures on emissions without curtailing output. This positions Moomba as a bridge for reliable baseload energy, countering vulnerabilities from over-reliance on intermittent renewables or single-basin supplies.

Environmental and Operational Challenges

Historical Incidents and Safety Record

The Moomba to Sydney Pipeline system, operational since the early 1980s, has demonstrated a robust safety profile consistent with broader Australian high-pressure pipeline standards, where major ruptures or leaks remain infrequent relative to the volume of gas transported annually. Incidents have predominantly occurred at the upstream Moomba processing facility rather than along the transmission route itself, with no reported full-scale ruptures on the primary Sydney-bound line in public records up to 2025. A significant event took place on June 16, 2001, when an explosion and subsequent fire erupted in the Liquids Pumping Station at the Santos-operated Moomba Gas Plant, killing maintenance worker Colin Jeremy Sutton and injuring another employee; the incident stemmed from a gas leak during maintenance activities, prompting enhanced safety protocols at the facility. On January 1, 2004, a gas leak at the Moomba plant ignited a fire, forcing a temporary shutdown of operations and disrupting supplies to eastern Australia, including via the Sydney pipeline; no injuries were reported, but the event highlighted vulnerabilities in aging infrastructure and led to contingency measures like releases from underground storage. In June 2004, inspections revealed cracks in pipes at the Moomba facility, necessitating pressure reductions to avert potential ruptures and further supply interruptions along downstream lines like the one to Sydney. More recently, on January 25, 2023, an explosion occurred on a Santos pipeline in the Cooper Basin upstream of Moomba, releasing an undetermined volume of gas but causing no injuries or fires; the incident, initially undisclosed, affected processing inputs to the Sydney pipeline system without broader operational failure. These events, while notable, represent isolated occurrences amid millions of cubic meters of gas delivered safely, underscoring effective regulatory oversight and integrity management, though critics have pointed to deferred maintenance as a recurring risk factor in older assets.

Emissions Management Pre-CCS

Prior to the implementation of carbon capture and storage (CCS) at the Moomba Gas Plant, emissions management focused on regulatory compliance, operational minimization of non-essential releases, and process-specific handling of separated gases from Cooper Basin production. The plant processes sour natural gas containing up to 14% CO2, which is removed during acid gas treating to meet sales gas specifications; this separated CO2 stream, consisting primarily of CO2 with trace H2S and water, was routinely vented to the atmosphere as the standard practice, contributing approximately 1.7 million tonnes of CO2 per annum. Flaring was employed for safety relief, startup/shutdown events, and disposal of hydrocarbon-rich gases when reinjection or sales were not feasible, but activities were actively minimized through process optimization, equipment maintenance, and procedural reviews to reduce volumes and duration. Historical incidents, such as a 2003 flare header failure requiring plant shutdown for repairs, highlighted the need for robust monitoring and response protocols to manage flaring risks. Venting of non-CO2 gases, including methane fugitives from equipment leaks and operational vents, was addressed via leak detection surveys, seal integrity checks, and compression system enhancements, though quantification remained tied to annual regulatory reporting under South Australian petroleum regulations. Other Scope 1 emissions arose from fuel combustion in gas turbines, compressors, and generators powering plant operations, with management emphasizing efficiency improvements like heat recovery and fuel switching where practicable, but without dedicated capture technologies. Santos' approach prioritized material sources—fuel use, flaring, and venting—through site-specific audits and continual operational reviews, aligning with national greenhouse gas inventory requirements and avoiding routine flaring beyond permit limits. Pre-CCS, these measures prevented avoidable releases but did not abate the inherent emissions from gas treating, with total plant GHG outputs dominated by the vented CO2 stream reflective of the basin's geology and processing necessities.

Wildlife and Land Use Impacts

Gas operations in the Cooper Basin, including processing at Moomba, involve infrastructure development on pastoral leases and conservation reserves, resulting in land disturbance across approximately 27 km² directly and up to 7,350 km² in broader development footprints, representing less than 6% of the region. This includes well pads, access roads, seismic lines, and pipelines that fragment habitats, particularly in dunefields, floodplains, and gibber plains, with linear features exacerbating connectivity loss for mobile species. Soil compaction affects 20-23% of dryland and agricultural areas, while overland flow obstruction impacts 6% of floodplains, potentially altering hydrological regimes critical for arid ecosystems. Wildlife impacts stem from habitat degradation and loss, rated as a potential concern for 25-30% of the region, affecting over 2,000 species including 68 protected under Australian legislation. Threatened fauna such as the kowari (Dasyuroides byrnei), greater bilby (Macrotis lagotis), night parrot (Pezoporus occidentalis), grey grasswren (Amytornis barbatus barbatus), and plains-wanderer (Pedionomus torquatus) face risks from vegetation clearing, which reduces cover by 12-41% near wells, though recovery occurs within 5-7 years post-disturbance. Noise, light pollution, and altered fire regimes threaten 25-30% of habitats, while invasive predators like cats and foxes, amplified by infrastructure, prey on small mammals and birds. Aquatic biodiversity in associated Lake Eyre Basin rivers, such as Cooper Creek, is disrupted by 831 wells and 870 km of roads fragmenting floodplains, with 296 wells in the Coongie Lakes Ramsar wetland posing contamination risks from co-produced wastewater to waterbirds, frogs, and native fish. Flora communities, including threatened species like needle wattle (Acacia undulifolia) and desert greenhood (Pterostylis xerophila), experience direct removal and competition from weeds introduced via equipment, though mitigation via weed washes and priority revegetation with natives like river red gum (Eucalyptus camaldulensis) is standard. Mitigation measures, including site avoidance of sensitive areas, fauna escape ramps in trenches, spill containment bunding, and progressive rehabilitation, reduce risks to low levels with high confidence per bioregional modeling, supported by pre- and post-construction surveys and annual audits. Resource pulses from flooding can enhance breeding for species like grey grasswren in lignum swamps, but ongoing threats from feral herbivores and invasives require coordinated management. Despite these controls, critics note insufficient national referrals (only 8 for hundreds of wells), potentially underestimating cumulative floodplain alterations projected over 50 years with 1,000-1,500 additional wells.

Controversies and Debates

Criticisms of Fossil Fuel Dependency

Critics contend that Moomba's pivotal role in natural gas processing from the Cooper Basin fosters long-term fossil fuel lock-in, undermining Australia's commitments to reduce emissions under the Paris Agreement and achieve net zero by 2050. Environmental groups argue this dependency diverts resources from scalable renewables like solar and wind, which have demonstrated cost declines and deployment feasibility in Australia, toward infrastructure that sustains combustion-based energy for decades. The Australian Conservation Foundation asserts that gas extraction and use, including at facilities like Moomba, contribute to Australia's outsized global emissions footprint, equivalent to 5% of climate pollution when accounting for exported fuels, despite domestic supply rationales. Santos' expansion ambitions at Moomba, including plans to double production capacity, have intensified scrutiny for amplifying scope 3 emissions from gas combustion downstream, projected to rise with increased output volumes. Analysts from the Institute for Energy Economics and Financial Analysis (IEEFA) highlight that reliance on gas hubs like Moomba exacerbates supply vulnerabilities without addressing root demand through efficiency measures, estimating that enhanced building electrification and efficiency could fully offset projected east coast gas shortfalls by 2030 without new extraction. Such critiques portray natural gas as a false bridge fuel, with lifecycle methane emissions potentially rendering it comparable to or worse than coal in climate impact, per peer-reviewed assessments of LNG pathways. Proponents of rapid decarbonization, including think tanks like the Australia Institute, view Moomba's integration of carbon capture and storage (CCS) as a mechanism to justify prolonged extraction rather than expedite phase-out, labeling it a subsidized extension of fossil dependency amid underperforming capture rates—recent data showing full-year sequestration at just 4.3% of Santos' total emissions despite $15 million in taxpayer funding. The Australia Institute, which advocates for fossil fuel phase-out and draws funding from environmental philanthropies, argues this approach entrenches emissions-intensive pathways, conflicting with empirical evidence that direct electrification yields faster, verifiable reductions without technological risks inherent in CCS scalability. Reuters experts echo that Australia's strategic emphasis on gas expansion, exemplified by Moomba operations, jeopardizes 2030 emissions targets of 43% below 2005 levels by prioritizing export-oriented production over domestic transition imperatives.

CCS Project Scrutiny and Subsidies

The Moomba Carbon Capture and Storage (CCS) project, operated by Santos in partnership with Beach Energy, involves capturing CO₂ emissions from the Moomba gas processing plant in South Australia's Cooper Basin and injecting them into deep geological formations for permanent storage. The project targets up to 1.7 million tonnes per annum (Mtpa) of CO₂ storage capacity, utilizing existing infrastructure to separate CO₂ from gas streams before reinjection into depleted reservoirs. It achieved first injection in October 2024, marking it as Australia's third-largest operational CCS facility at the time. In June 2021, the Australian government awarded the project a A$15 million grant through the Carbon Capture Use and Storage (CCUS) Development Fund, administered under the Department of Industry, Science and Resources, to support front-end engineering and design for low-cost CO₂ capture from Moomba's LNG operations. This funding, part of a broader A$412 million allocation across multiple CCS initiatives, aimed to demonstrate commercial viability and reduce emissions from fossil fuel processing. Critics, including the Australia Institute, have labeled such subsidies as extensions of support for fossil fuel expansion, arguing that the grant subsidizes increased gas extraction rather than genuine emissions abatement, given the project's integration with ongoing LNG production. Scrutiny of the project's effectiveness intensified in 2025 following initial operational data. In the first quarter of 2025, it captured approximately 0.5 million tonnes of CO₂, projecting an annualized rate of around 2 Mtpa if sustained, yet this equates to only about 4.3% of Santos's total Scope 1 and 2 emissions from Cooper Basin operations. The Australia Institute, citing Clean Energy Regulator data, described the output as an "abject failure" relative to taxpayer investment, highlighting that CCS globally has an 88% historical failure rate for meeting targets in flagship projects. Further concerns include the use of CO₂ for enhanced oil recovery (EOR) in some formations, which could boost hydrocarbon yields and undermine net emissions reductions, as EOR typically retrieves 10-20% additional oil while storing only a fraction of injected CO₂ permanently. Proponents, including Beach Energy, counter that early performance exceeds expectations, with injection rates surpassing design thresholds and no detected leaks in monitoring wells, positioning Moomba as a scalable model for industrial CCS amid Australia's net-zero commitments. Independent assessments note favorable geology in the Cooper Basin, with thick sealing formations reducing leakage risks compared to underperforming sites like Chevron's Gorgon project. However, regulatory hurdles, including protracted approvals under the Offshore Petroleum and Greenhouse Gas Storage Act, have delayed full commercialization, contributing to broader skepticism about CCS as a reliable bridge technology given its high costs—estimated at A$50-100 per tonne captured—and dependence on ongoing subsidies for viability.

Alternative Viewpoints on Energy Transition

Some analysts contend that Australia's push toward rapid renewable energy dominance overlooks the intermittency of wind and solar, which cannot reliably provide baseload power without massive overbuild and storage, leading to systemic reliability risks as demonstrated by the 2016 South Australia blackout and subsequent grid instability events where renewable penetration exceeded 70% during peak demand periods. This perspective posits that facilities like Moomba, supplying over 30% of eastern Australia's gas needs, offer dispatchable energy essential for grid stability during renewable shortfalls, with natural gas emissions roughly half those of coal when used for peaking. Industry reports and policy documents highlight natural gas's role as a transition fuel for decades, enabling emissions reductions via technologies like Moomba's CCS project, which stored 340,000 tonnes of CO2-equivalent by late 2024 while supporting continued gas production projected to meet demand through 2050. Critics of accelerated decarbonization argue that ignoring this bridge risks economic fallout, including wholesale electricity prices spiking to AUD 15,000/MWh in 2022 due to coal retirements and renewable variability, far exceeding gas-fired generation costs of around AUD 80-100/MWh. Empirical modeling from independent studies indicates that a gas-inclusive pathway minimizes total social costs of transition failure, such as blackouts costing AUD 3.5 billion annually in lost productivity if reliability dips below 99.998%. Skeptics of net-zero timelines by 2050 emphasize first-principles engineering limits, noting that Australia's grid requires synchronous inertia from gas or coal plants to prevent frequency collapses, as intermittent sources provide near-zero inertia and necessitate costly synchronous condensers or batteries that add 20-50% to system costs without fully replicating baseload dispatchability. In this view, Moomba's integration of CCS—capable of sequestering 1.7 million tonnes of CO2 yearly—exemplifies causal realism in emissions abatement, allowing gas to displace dirtier fuels while renewables scale incrementally, avoiding the scenario where premature fossil fuel phase-outs exacerbate energy poverty, with household bills rising 15-20% post-2020 coal closures. Proponents cite International Energy Agency projections that gas will comprise 14% of Australia's power mix by 2040 under realistic scenarios, underscoring its indispensability for energy security amid export demands and domestic manufacturing revival.

References

  1. [1]
    moomba — a south australian gas field - CSIRO Publishing
    South Australia's Moomba gas field was discovered by Delhi Australian Petroleum Ltd. and Santos Limited during March, 1966.
  2. [2]
    Moomba Gas Field - Leigh Creek - Old Town Project
    Construction of a gas processing plant at Moomba and an 800km pipeline connecting the gas fields to Adelaide commenced in 1968.
  3. [3]
    Celebrating 50 years of natural gas from Moomba - Santos
    Nov 10, 2019 · Santos is celebrating 50 years of safely and sustainably delivering natural gas from its foundation asset, the Moomba processing plant in South Australia's ...
  4. [4]
    Oil & gas field profile: Moomba Conventional Gas Field, Australia
    Aug 20, 2024 · Moomba is a producing conventional gas field located onshore Australia and is operated by Santos. According to GlobalData, who tracks more ...
  5. [5]
    SA: Moomba to Adelaide Pipeline System - AEMC
    The Moomba to Adelaide Pipeline System (MAPS) is a system of transmission pipelines operating across eastern South Australia.
  6. [6]
    Petroleum infrastructure | Energy & Mining
    ~8% of the sales gas is used as plant fuel at Moomba. The plant has been designed to process 25.4 x 106 m3 (902 mmcf) of raw gas, and 6000 kL (42 000 bbl) of ...
  7. [7]
    Moomba Carbon Capture and Storage - Santos
    The Santos Moomba Carbon Capture and Storage project is Australia's first large-scale hub for the capture and geological storage of carbon dioxide (CO2).
  8. [8]
    Moomba CCS - Beach Energy
    Moomba CCS achieved first CO2 injection in 2024 and is capable of safely storing up to 1.7 million tonnes per annum of carbon emissions in the depleted ...
  9. [9]
    [PDF] History of Petroleum Exploration and Development in the Cooper ...
    Dec 14, 2015 · Licenses covering the Cooper and Eromanga basins were first acquired by Santos in 1954 with the first gas discovery, Gidgealpa-2, being made.Missing: initial | Show results with:initial
  10. [10]
    Historical highlights | Energy & Mining
    Gas discovered in the Cooper Basin (Gidgealpa 2). 1966, Giant natural gas field discovered (Moomba, Cooper Basin). 1967, First offshore well drilled (Crayfish ...
  11. [11]
    Pipelining in South Australia - Where it all started: The Moomba ...
    Mar 16, 2016 · The first deep test well began in February 1959 and the big break came in December 1963 when natural gas was discovered at Gidgealpa. ... The gas ...
  12. [12]
    The Cooper Basin - Australia's central gas hub - Energy Today
    Dec 6, 2019 · The Moomba discovery in 1966 confirmed the region as a major petroleum province and gas supplies to Adelaide commenced in 1969 via the 790 ...
  13. [13]
    Production and statistics | Energy & Mining
    Major gas discoveries were made at Gidgealpa in 1963 and at Moomba in 1966. These fields were estimated at the time to contain sufficient reserves to satisfy ...
  14. [14]
    Cooper Basin – Discovery Energy Corp. Oil and gas explorer Australia
    In the Cooper Basin, a major effort is being focused on the unconventional shale play following 2010-11 exploration success. The first well to test shale gas ...Missing: initial | Show results with:initial
  15. [15]
    [PDF] Santos announces start of Australia's first commercial shale gas ...
    Oct 19, 2012 · ... Moomba-191 shale well was another milestone for Santos' Cooper Basin unconventional gas program, which began in 2004. “The connection of the ...
  16. [16]
    Santos initiates shale gas production in Australia - Enerdata
    Oct 24, 2012 · The Moomba-191 shale well is flowing natural gas at a stabilised rate of 2.7 mcf/d (27.8 bcm/year) from the Roseneath, Epsilon and Murteree ...
  17. [17]
    THE COOPER UNCONVENTIONAL STORY - 20 YEARS IN THE ...
    Permian age sequence contains four unconventional target lithotypes. • Regional distribution varies across the basin from single target to all.Missing: timeline | Show results with:timeline
  18. [18]
    [PDF] Moomba 191 and Beyond | Santos
    Basin unconventional reservoir team formed. Santos in the Cooper Basin. Page 5. 5. ▫ 50+ years ... Santos operated Moomba gas processing plant, Cooper Basin.
  19. [19]
    Cooper/Eromanga Basins - Vintage Energy, Australia
    Over 2,500 exploration and development wells have been drilled in the Cooper/Eromanga Basins to date with estimated cumulative production of over 6.2 Tcf of gas ...<|control11|><|separator|>
  20. [20]
    A new concept for the extraction of gas from Permian ultra-deep coal ...
    Abstract. An alternative geomechanical reservoir boundary condition is proposed for ultra-deep coal seams of the Cooper Basin in central Australia.
  21. [21]
    Santos Moomba Gas and Liquid Processing Facility - EHS Support
    The Moomba Gas Hub is a major hazardous facility receiving and processing gas, condensate and oil from the Cooper Basin. The facility includes gas treatment ...
  22. [22]
    Total Waste Management for gas plant - Veolia Africa
    Santos's Moomba facility accepts production from 115 gas fields and 28 oil fields containing 536 producing gas wells and 177 producing oil wells. Santos ...Missing: processing | Show results with:processing
  23. [23]
    Moomba to Cross Border CCS Pipeline Project - Vertech Group
    One processing step at Moomba is removing the CO2 from the natural gas, which is then vented. The objective of the Moomba CCS project was to capture this vented ...
  24. [24]
    [PDF] Moomba Environmental Impact Report: Carbon Storage March 2021
    Mar 11, 2021 · plant and equipment to receive and process raw gas ... from the production wells to the Moomba Gas Plant via satellite facilities.
  25. [25]
    Midstream and Energy Solutions - Santos
    The joint venture has recently invested in upgrades to the Moomba plant to ensure capture of CO2 emissions from processed oil and gas. This CO2 is then ...Missing: advances | Show results with:advances
  26. [26]
    [PDF] Gas supply adequacy and reliability conference minutes 24 April 2025.
    Apr 24, 2025 · infrastructure as follows: • Moomba Gas Plant has reduced capacity from approx. 250 TJ/d to 205 TJ/d currently. • A section ...
  27. [27]
    Cooper Basin | Energy & Mining
    Since late 2011, and more recently exploration for potentially very large unconventional gas plays in unconventional reservoirs has been a new focus of ...Missing: timeline | Show results with:timeline
  28. [28]
    Hydrocarbon prospectivity of the Cooper Basin, Australia
    Jan 15, 2019 · This study used petroleum systems analysis to investigate the maturity and generation potential of 10 Permian source rocks in the Cooper Basin.<|separator|>
  29. [29]
    Gas | Geoscience Australia
    Jul 15, 2024 · Significant unconventional 2C contingent gas resources have also been identified in the Cooper Basin (2,177 PJ; 1.94 Tcf; Table 2.3), Canning ...
  30. [30]
    [PDF] Third Quarter Report | Santos
    Oct 16, 2025 · Production increased in the third quarter, with GLNG upstream gas production averaging 711 TJ per day (up from 705. TJ per day in the second ...
  31. [31]
  32. [32]
    [PDF] PACE Magazine 2008 Zenith Award Submission - “Moomba Gas ...
    The gas processing side of the Moomba operation essentially consists of: ▫ Field Compression to deliver hydrocarbon feed to the plant;. ▫ Oil / gas separation ...
  33. [33]
    Moomba Carbon Capture & Sequestration - Equinox Engineering Ltd.
    Feb 1, 2022 · The new CCS facility will capture a volume of 1.7 mpta of CO2 for carbon dioxide sequestration. Utilizing large centrifugal compression for wet ...
  34. [34]
    Crane Hire Moomba - Servicing the Oil & Gas fields
    The Moomba gas processing facility accepts production from surrounding oil and gas fields. Natural gas liquids are recovered via a refrigeration process in the ...
  35. [35]
    Moomba Absorber Tower Installation - FYFE
    Santos' new 220-tonne tower was procured to replace an older model. Manufactured in Korea, the vessel had been shipped to South Australia to await installation ...
  36. [36]
    Moomba Plant update - Santos
    As detailed in the Santos release of 23 February, the Moomba Plant is on track for restoration of full production. As well as currently meeting full market ...
  37. [37]
    Moomba Compression Facility (MCF) - APA Group
    The MCF provides essential compression services to facilitate gas flow across major pipelines connecting northern and southern markets.
  38. [38]
    Moomba Reset
    + Moomba region is much more extensive than the process plant itself. + Plant footprint is 50ha with perimeter of 3km. + Total town area is 2000ha with ...
  39. [39]
    Moomba to Adelaide Pipeline System (MAPS)
    The Moomba to Adelaide Pipeline System (MAPS) is a 1184km system of gas transmission pipelines operating across eastern South Australia.
  40. [40]
    Moomba to Adelaide Pipeline | Australian Energy Regulator (AER)
    The 1185 kilometre pipeline system constructed in 1969, which extends from Adelaide to Moomba in the Cooper Basin, is used to transport gas for use in South ...
  41. [41]
    South West Queensland Pipeline (SWQP) - APA Group
    SWQP is a bi-directional gas pipeline connecting Wallumbilla and Moomba. Built in 1996 and extended in 2008, it supports economic growth in Queensland.
  42. [42]
    Moomba–Botany NGL pipeline, Australia - Offshore Technology
    Oct 8, 2021 · It has an interest in over 12,000 km of pipelines and 23,000 km of distribution networks, and transports natural gas used in Australia.
  43. [43]
    MAPS - Epic Energy
    The MAPS is one of Australia's oldest and longest pipelines. It was developed by the Pipelines Authority of South Australia (a Government owned utility)
  44. [44]
    Santos and APA sign MoU to collaborate on transforming Moomba ...
    Nov 22, 2023 · Santos will work with leading energy infrastructure business APA Group through a Memorandum of Understanding (MOU) to collaborate on the potential development ...
  45. [45]
    NSW: Moomba to Sydney Pipeline (MSP) - AEMC
    The MSP was constructed in 1976 to service the NSW gas market. It comprises a mainline from the Moomba processing plant to Wilton near Sydney and four lateral ...Missing: expansions timeline
  46. [46]
    Moomba to Sydney Pipeline
    The Moomba to Sydney Pipeline (MSP) system is a 2081km bi-directional transmission pipeline system that operates across NSW. It links the Cooper basin gas ...Information Categories · Capacity Outlook (aemo Gas... · Weighted Average Price...
  47. [47]
    Moomba to Sydney Pipeline | Australian Energy Regulator (AER)
    The Moomba to Sydney Pipeline constructed between 1974-1993, consists of approximately 2029 kilometres of gas transmission network in the state of New South ...Missing: field | Show results with:field
  48. [48]
    The Moomba to Sydney Pipeline: 1971 to 1976
    Dec 4, 2010 · It was 28 November 1973 when Saipem Australia was awarded the construction contract for section one. It was mainly desert country that Saipem ...
  49. [49]
    Moomba Sydney Pipeline and MSEP - APA Group
    Pipeline capacity. The MSEP has planned capacity of up to 25 TJ/d available ... This would provide total southern haul capacity of up to 590 TJ/d from Moomba.
  50. [50]
    APA Group secures key approval for Moomba to Sydney pipeline
    Sep 22, 2025 · APA Group has reached a key milestone in its Moomba to Sydney Ethane Pipeline conversion project, with the New South Wales Government ...
  51. [51]
    [PDF] 4 Gas markets in eastern Australia - Australian Energy Regulator
    Aug 23, 2025 · From July 2023, the. AER began reporting more information on the export, reserve, storage, and domestic sale and swaps of gas. In May 2024, new ...
  52. [52]
    [PDF] MOOMBA TO SYDNEY PIPELINE SYSTEM: - AEMC
    June 2000, the Gippsland Basin produced 202.2 PJ of natural gas. (AGA 2001, p.59) ... competition in the gas production market if the Kipper field proceeds.<|separator|>
  53. [53]
    [PDF] Moomba CCS phase 1a monitoring and verification plan
    This is the monitoring and verification plan for the Moomba CCS project, specifically for Strzelecki and Marabooka Toolachee, by Santos Ltd.
  54. [54]
    Moomba CCS a decisive step in Australia's journey to becoming a ...
    Jan 31, 2025 · Santos' Moomba CCS in the Cooper Basin started up in October 2024 and at year end had already stored 340000 tonnes of CO2-equivalent (CO2e).
  55. [55]
    Santos Carbon Capture and Storage Project in Moomba, South ...
    Mar 3, 2025 · The project is designed to store up to 1.7 million tonnes of CO2 per year, which is equivalent to 10% of South Australia's annual CO2 emissions.
  56. [56]
    Start-up of giant gas development remains on track as flagship ...
    Oct 17, 2024 · The Australian energy giant has confirmed that the project is over 82% complete and remains on track for production in the third quarter of 2025.Missing: expansion | Show results with:expansion
  57. [57]
    Santos Reports Carbon Storage Is Underway at Moomba Facility in ...
    Oct 17, 2024 · The $220-million carbon capture and storage project is one of the world's largest, with a nameplate injection capacity of 1.7 mtpa.
  58. [58]
    Santos, JX and ENEOS collaborate to support Moomba CCS Phase 2
    Dec 20, 2023 · Santos' plans to expand the Moomba carbon capture and storage (CCS) project and transform the Cooper Basin into a decarbonisation and low-carbon fuels hub
  59. [59]
    [PDF] Santos Moomba CCS Project - Department for Energy and Mining
    The project targets the capture of Moomba vented CO2 and establishment of suitable storage reservoirs. Moomba CCS Project: Facilities. Vent (H2O). CO2 Source.
  60. [60]
    Australia starts up Moomba, the world's third largest CCS project ...
    Oct 22, 2024 · The Moomba carbon capture and storage project in Australia has become the world's third largest project to begin burying emissions without enhanced oil ...Missing: advances | Show results with:advances
  61. [61]
    Moomba milestone highlights key role for CCS 2025 - CO2CRC
    Oct 17, 2024 · The Moomba CCS project will have capacity to store up to 1.7 million tonnes of CO 2 per year (with actual volumes only limited by the availability of CO 2 for ...
  62. [62]
    Australia's Santos commissions Moomba CCS facility - Argus Media
    Oct 18, 2024 · Australia's Santos has commissioned its 1.7mn t/yr Moomba carbon capture and storage (CCS) project in the onshore Cooper basin of South Australia state.Missing: plant components
  63. [63]
    Santos Moomba CCS Project: Progress, Challenges and Future ...
    Apr 17, 2025 · At its core, the Moomba CCS project employs sophisticated technology to separate, capture, and store carbon dioxide. The process begins with CO2 ...Missing: advances | Show results with:advances
  64. [64]
    Moomba CCS in Australia on Track to Achieve Declared Work Rate ...
    Feb 5, 2025 · “The technology and reservoir is [sic] performing as expected, putting Moomba CCS on track to safely and permanently sequester up to 1.7 million ...Missing: field advances
  65. [65]
    Santos and Beach Energy on track to help decarbonise industry
    At full injection rates Moomba CCS avoids more CO2 in four days than 10,000 electric vehicles save in one year. And in just one year, Moomba CCS will achieve ...
  66. [66]
    [PDF] Moomba-CCS-project-Strzelecki-and-Marabooka-Monitoring-and ...
    Jul 25, 2025 · This established process will form the basis of the methodology for Santos measuring, generating and reporting ACCUs. The M&V plan meets the ...Missing: extraction | Show results with:extraction
  67. [67]
    Integrated system design for the Moomba CCS Project
    May 11, 2023 · This paper discusses some of the key considerations in the design and integration of the capture, processing, transport and storage systems for ...
  68. [68]
    Decarbonisation in action - Santos
    The Moomba Electrification Project is a $350 million (gross) three-phase project aimed at simplifying operations and reducing emissions from our Cooper Basin ...
  69. [69]
    [PDF] 2025 Gas Statement of Opportunities
    Mar 14, 2025 · The 2025 Gas Statement of Opportunities forecasts gas supply adequacy in central and eastern Australia to 2044, and provides information for ...<|separator|>
  70. [70]
    [PDF] The oil and gas industry in South Australia
    The oil and gas industry in South Australia is centred on the Cooper Basin in the northeast of the state. This is where almost all production occurs ...Missing: impact | Show results with:impact
  71. [71]
    Santos Cuts 100 Jobs from South Australia, Despite $11 | 231871
    The job cuts are focused on office workers at the Adelaide corporate office and at the Moomba Central Processing Facility in the Cooper Basin. Login to Read ...
  72. [72]
    [PDF] Annual Report 2023 | Santos
    Feb 20, 2024 · This Annual Report 2023 is a summary of Santos' operations, activities and financial position as at 31 December 2023.
  73. [73]
    Santos Sustainability Report 2022 - Santos Limited (ASX:STO)
    Nov 7, 2022 · Developing an Indigenous workforce strategy + Developing early career ... The initial Moomba CCS project is expected to support around 230 ...
  74. [74]
    [PDF] Cooper-Eromanga Basin Outlook | 2035
    Production from the first Cooper Basin shale gas well (Moomba 191) was announced by Santos in August 2012. On 24 February 2014 – it was announced that Senex ...
  75. [75]
    [PDF] 4 GAS MARKETS IN EASTERN AUSTRALIA
    Jun 30, 2020 · The Cooper Basin in central Australia accounted for 5 per cent of eastern Australian gas production in 2019. The basin plays an important role ...
  76. [76]
  77. [77]
    APA Group to invest $75 million in gas pipeline expansion amid east ...
    Feb 24, 2025 · APA Group, Australia's largest listed gas infrastructure operator, will invest $75 million to expand its pipeline capacity as the country's east coast faces a ...
  78. [78]
    [PDF] 2025 AEMO Winter Gas Outlook
    May 8, 2025 · Major flooding has impacted large areas of central Australia. • Capacity of the Moomba Gas Plant and the Moomba to Adelaide Pipeline are ...
  79. [79]
    [PDF] Natural Gas batteries are key to preventing East Coast energy ...
    By the end of the year, our Moomba CCS plant, through a joint venture with Santos, will begin capturing and storing CO2 under the ground in depleted natural ...
  80. [80]
    [PDF] Moomba to Port Bonython Liquids Pipeline - NET
    The Australian high pressure pipeline industry has an excellent record in safety and environmental performance and has worked with government to develop ...
  81. [81]
    Review of pipeline incident data to 2004
    Mar 16, 2016 · The database currently contains about 120 Australian incidents which have been recorded since 1965. Incidents reported comprise coating damage, steel damage, ...
  82. [82]
    Incident At Moomba | Santos
    On 16 June 2001 an explosion and fire occurred in the Liquids Pumping Station at the Moomba Gas Plant operated by Santos Ltd.
  83. [83]
    Explosion threatens gas supplies to two Australian states - WSWS
    Jan 21, 2004 · The most serious incident at Moomba occurred in June 2001, when maintenance worker Colin Jeremy Sutton was killed and another worker received ...
  84. [84]
    Gas supplies secured after Moomba shutdown - ABC News
    Jan 2, 2004 · Santos's Moomba plant was severely damaged by an explosion and fire on Thursday morning after a gas leak. Power company AGL has said ...
  85. [85]
    SA gas plant closed after blast - The Sydney Morning Herald
    Jan 1, 2004 · Investigations have begun into the gas leak and fire which shut down South Australia's major gas supplier: the Santos plant at Moomba on ...
  86. [86]
    Cracks in Moomba pipe - The Age
    Jun 23, 2004 · Pressure is cut to guard against rupturing of the pipeline. An AGL spokeswoman said the contingency supply arrangements with Victoria were only ...
  87. [87]
    Santos confirms Cooper Basin pipeline explosion, as protesters ...
    Apr 6, 2023 · The oil and gas company says it is unaware how much gas was released when a pipeline in South Australia's outback exploded in January.
  88. [88]
    Santos confirms January pipeline explosion - Offshore Technology
    Apr 6, 2023 · Australian oil and gas company Santos has confirmed a previously unannounced pipeline explosion on 25 January in Southern Australia, alongside ...<|control11|><|separator|>
  89. [89]
    The weak link: What went wrong at Moomba - AFR
    Jan 10, 2004 · The fatal accident in 2001 was a wake-up call for Ellice-Flint, who started looking hard at the state of the Moomba plant. Management made ...
  90. [90]
    Carbon capture and storage: can Santos make CCS work?
    Oct 22, 2021 · It's supposed to bury the carbon dioxide it separates from natural gas – up to 14% of the volume – into a siltstone and sandstone formation 2.3 ...Missing: CO2 | Show results with:CO2
  91. [91]
    [PDF] Santos Cooper/Eromanga Basins CCUS
    Santos has a ready supply of reservoir CO2 which is separated and vented at Moomba Gas Plant. The potential for this CO2 to be used for a CCUS project is ...
  92. [92]
    [PDF] PGER00280 Santos Production and Processing EIC - NET
    Mar 13, 2025 · The Cooper Basin dunefields are characterised by parallel dunes of ... workforce, including contactors and/or other appropriate journey management ...
  93. [93]
    [PDF] PGER00278 Santos Production and Processing EIR 2024 - NET
    Dec 19, 2024 · A schematic diagram which provides an overview of oil and gas processing at the Moomba Gas Plant ... These microgrids still require small capacity ...
  94. [94]
    [PDF] Annual Report of South Australian Cooper Basin Operations
    This was an incident on the Moomba Plant flare header which resulted in damage requiring a plant shutdown to effect repairs. This occurred on 24.1.03. During ...
  95. [95]
    [PDF] Climate-Brochure-SAN18972-Final-Web-166-Spreads.pdf - Santos
    Moomba CCS phase 1. Delivering our climate strategy. Moomba CCS is a world-class, commercial-scale project that captures CO2 emissions at the Moomba gas plant.
  96. [96]
    [PDF] Environmental Impact Report: Production and Processing Operations
    Gas Processing. The processing of gas at the Moomba plant involves several stages which are detailed below and include: ▫ inlet Separation. ▫ raw gas ...
  97. [97]
    [PDF] Impact assessment for the Cooper GBA region
    The Cooper GBA region is one of the most prospective sedimentary basins in Australia for development of unconventional gas resources (i.e. gas produced from ...
  98. [98]
    [PDF] Environmental Impact Report - Beach Energy
    Oct 26, 2022 · In March 2021 Beach Energy acquired a number of licence areas across the Cooper Basin previously held and operated by. Senex Energy (Senex).
  99. [99]
    Oil and gas exploration and production threaten great desert river ...
    Oct 4, 2022 · A new study identifies major environmental concerns for the Lake Eyre Basin rivers, among the most pristine in the world.
  100. [100]
    Breeding response of focal threatened species to a resource pulse ...
    A key challenge in the Cooper Basin is to protect and maintain threatened species and their habitats for their continued survival and resilience through ...Missing: effects | Show results with:effects
  101. [101]
    The Conflict Between Australia's Fossil Fuel Dependency and its ...
    Mar 5, 2024 · The perception that Australia is economically dependent on fossil fuel-related income directly affects the implementation of climate mitigation ...
  102. [102]
    Get the facts on gas: A danger to our climate and nature
    With all the coal and gas we dig up and send overseas, Australia is responsible for 5% of global climate pollution. Just like coal, gas is a dangerous fossil ...
  103. [103]
    Can Moomba live up to the hype? Santos' $220m carbon capture ...
    Nov 8, 2021 · Santos claims Moomba will be one of the world's largest CCS projects and will store 1.7m tonnes of CO2-equivalent a year with the potential to scale up to 20m ...<|control11|><|separator|>
  104. [104]
    Australia can and should eradicate its gas supply gap - IEEFA
    Apr 3, 2023 · Our analysis finds that accelerating action to improve energy efficiency and electrification in buildings could eradicate the gas supply gaps ...Missing: criticisms | Show results with:criticisms
  105. [105]
    Gas industry in damage control as landmark study finds LNG 'worse ...
    Oct 18, 2024 · The peer-reviewed study by Robert Howarth, a professor at Cornell University, found American LNG, at least, was worse than coal when it came to emissions.<|separator|>
  106. [106]
    New data reveals the abject failure of a project which cost taxpayers ...
    Aug 29, 2025 · New emissions data reveals the abject failure of an overhyped carbon capture and storage (CCS) project, which cost Australian taxpayers $15 ...Missing: dependency | Show results with:dependency
  107. [107]
    [PDF] Santos' CCS scam - The Australia Institute
    Santos has stated repeatedly that CCS at Moomba is for enhanced oil recovery (EOR), a process that involves injecting carbon dioxide (CO2) into depleted oil ...Missing: techniques | Show results with:techniques
  108. [108]
    Australia's bet on natural gas endangers its climate credentials ...
    May 30, 2025 · Australia projects it will cut emissions to 42.7% below 2005 levels by 2030, on the path to a globally agreed target of net zero greenhouse gas ...
  109. [109]
    Moomba CCS project boosted by A$15 million grant from Carbon ...
    Jun 8, 2021 · Santos and its project partner Beach Energy, has been awarded a A$15 million grant from the Australian Government's Carbon Capture Use and Storage Development ...
  110. [110]
    Santos Fires Up 1.7 MMtpa Moomba Carbon Capture Project
    Oct 18, 2024 · The project has received AUD 15 million (~$10 million) in government funding through the Carbon Capture Use and Storage Development Fund. Kevin ...
  111. [111]
    Understanding CCS in Australia | Burundi - Norton Rose Fulbright
    The Moomba CCS Project, operated by Santos and located in the Cooper Basin in South Australia, is one of the world's largest operating CCS facilities. In its ...<|control11|><|separator|>
  112. [112]
    Carbon Capture Use and Storage Development Fund grant recipients
    Carbon Capture Use and Storage Development Fund grant recipients ; SA, Santos Limited, Moomba Carbon Capture and Storage (CCS) Project, $15,000,000 ; QLD, Energy ...
  113. [113]
    $$412 million of new investment in carbon capture projects
    Jun 8, 2021 · Santos Limited – up to $15 million towards the low-cost capture and storage of CO2 emitted from Santos's Moomba LNG operations for permanent ...Missing: subsidies | Show results with:subsidies
  114. [114]
    Major Developments And Challenges In Carbon Capture & Storage ...
    Jul 3, 2025 · Historical analysis reveals an 88% failure rate for planned CCS projects, with only 3 of 13 flagship projects reviewed achieving their targets.
  115. [115]
    [PDF] Moomba Carbon Capture and Storage exceeding expectations
    Jan 31, 2025 · “Completion of the Moomba CCS project is a landmark moment in Australia's emissions reduction capacity and is making a material impact to ...
  116. [116]
    Regulatory delays limit Australia's carbon capture contribution 2025
    Oct 16, 2023 · Regulatory delay is limiting the critical role Australian carbon capture projects should play in enabling industrial-scale carbon emissions abatement in Asia.
  117. [117]
    Australia is throwing away a $600b carbon capture opportunity - AFR
    Feb 10, 2025 · Australia is rapidly losing ground in carbon capture and storage, putting at risk the net zero emissions by 2050 and forfeiting a $600 ...
  118. [118]
    The six fundamental flaws underpinning the energy transition
    May 2, 2024 · This paper focuses on the question of how Australians have been led to believe two false claims: that renewables are the cheapest and that the cheapest version ...
  119. [119]
    Risk preferences, bill increases and the future reliability of electricity ...
    With the rapid uptake in renewable energy there are emerging risks for countries that rapidly displace baseload generation with intermittent sources.Missing: criticisms | Show results with:criticisms
  120. [120]
    Future Gas Strategy | Department of Industry Science and Resources
    May 9, 2024 · The Future Gas Strategy maps the Australian Government's plan for how gas will support our economy's transition to net zero in partnership with the world.How Australian gas is used... · Where Australia goes from here · Minister's foreword
  121. [121]
    The energy transition and power bills: Why aren't they cheaper?
    Jul 24, 2025 · The assessment highlights that reverting to building coal or natural gas generation would see wholesale costs higher than for the renewable ...
  122. [122]
    [PDF] The Cost of Australia's Energy Transition Plan and the Risk of Failure.
    This is because intermittent renewable energy sources, such as wind and solar, cannot be relied upon to provide baseload power or other system support services.<|separator|>
  123. [123]
    Economists eye costs of a failed energy transition
    Renewables would supply 69% of Australia's power by 2040 (up from 33%) and gas 14% (down from 17%). Coal would generate only 7% of Australia's power, down from ...
  124. [124]
    The long-term role of natural gas in Australia's energy transition
    Jul 22, 2025 · It is now increasingly clear from a policy perspective that natural gas has a long-term role as a transition fuel in the net zero journey, ...