Fact-checked by Grok 2 weeks ago

Pressurized Mating Adapter

A Pressurized Mating Adapter (PMA) is a conical docking interface component integral to the International Space Station (ISS), designed to convert the 1.3-meter U.S. Common Berthing Mechanism (CBM) for module berthing into the 0.7-meter Russian Androgynous Peripheral Attachment System (APAS) for spacecraft docking, enabling seamless connections between American and Russian-built elements while supporting environmental control and life support functions such as air, oxygen, nitrogen, and water transfer. Developed by Boeing for NASA, the three PMAs—PMA-1, PMA-2, and PMA-3—were launched aboard Space Shuttle missions: PMA-1 and PMA-2 on STS-88 in December 1998 to initially link the U.S. Node 1 (Unity) to the Russian Zarya module, and PMA-3 on STS-92 in October 2000 to serve as an additional docking port. Each PMA features a mass ranging from 1,200 to 1,600 kg, lacks independent propulsion, and relies on ISS power, with PMA-1 lacking a hatch while PMA-2 and PMA-3 include APAS hatches for direct spacecraft access. Their slanted, cone-shaped design provides clearance for large payloads during extravehicular activities and accommodates the Space Shuttle's docking geometry. Over time, PMA-2 and PMA-3 have been relocated multiple times by robotic arms and spacewalks to adapt to evolving ISS configurations, such as moving PMA-2 from Node 1 to the Destiny laboratory's forward hatch in 2001 and PMA-3 to Node 3's nadir port by 2010. In the post-Shuttle era, they support commercial crew vehicles through the addition of International Docking Adapters (IDAs); IDA-2 was installed on PMA-2 at the Harmony module's forward port in 2016, and IDA-3 on PMA-3 at the zenith port in 2019, adhering to the International Docking System Standard for compatibility with spacecraft like SpaceX Crew Dragon and Boeing Starliner. The PMAs' environmental systems, including temperature-controlled ventilation (65–85°F at 120–148 cfm flow rates) and high-pressure gas lines with quick-disconnect fittings, ensure crew safety by maintaining atmospheric integrity and facilitating resource distribution across the station. As of 2025, all three remain operational, underscoring their enduring role in ISS assembly, maintenance, and future deep-space transition efforts.

Overview

Purpose and Role in ISS

The Pressurized Mating Adapter (PMA) serves as a short, pressurized conical tunnel designed to convert the U.S. Common Berthing Mechanism (CBM) interface—used for berthing larger modules to the International Space Station (ISS)—to the Russian Androgynous Peripheral Attach System (APAS-95) docking port, which accommodates smaller docking spacecraft. This adaptation allows compatibility between the differing docking standards of the U.S. Orbital Segment and the Russian Orbital Segment, enabling seamless connections without altering the core infrastructure of either side. In its role within the ISS, the PMA maintains a sealed, pressurized environment to ensure crew safety and operational continuity during module integrations or spacecraft dockings, while also incorporating subsystems for temperature and humidity control to regulate thermal conditions within the adapter. It further contributes to structural integrity by providing a robust mechanical interface that distributes loads across connected elements, preventing stress concentrations during orbital maneuvers or dynamic events. These functions collectively support the station's habitability and reliability as a long-duration outpost. The PMA's primary importance lies in facilitating the modular assembly of the ISS, which integrated diverse international contributions by bridging incompatible docking architectures and avoiding costly redesigns of existing hardware. By enabling direct connections between U.S. nodes and Russian modules, it streamlined construction phases and enhanced interoperability. Moreover, PMAs support essential utility transfers, including power, data, and fluids—such as scavenging excess water and air from docked vehicles like the Space Shuttle—between the station and visiting elements, thereby optimizing resource management.

Key Components and Compatibility

The Pressurized Mating Adapter (PMA) consists of a conical pressure vessel approximately 1.8 meters in length, tapering from 1.3 meters in diameter at the Common Berthing Mechanism (CBM) end to 0.8 meters at the Androgynous Peripheral Attach System (APAS-95) end, which maintains structural integrity and pressurization within the International Space Station (ISS) environment. This vessel is integrated with conical end sections that incorporate the Common Berthing Mechanism (CBM) port on one end for attachment to ISS modules and the Androgynous Peripheral Attach System (APAS-95) port on the other for docking with visiting vehicles. An internal tunnel spans the adapter, providing a passageway for crew transfer between connected elements while supporting environmental control and life support functions such as ventilation. PMA-2 and PMA-3 are identical in design and construction, having been manufactured by McDonnell Douglas Aerospace (now Boeing) to ensure uniformity in interfacing capabilities, while PMA-1 shares a similar overall design but lacks an APAS hatch. The adapters operate as passive components, devoid of independent active docking or attachment mechanisms, which places the responsibility for alignment, capture, and soft docking on the approaching spacecraft or module. This design simplifies the PMA's role to that of a structural and pressurized bridge, minimizing complexity and mass while facilitating reliable connections. In terms of compatibility, the APAS-95 port on the PMA enables docking with Space Shuttle Orbiters equipped with compatible systems, allowing for pressurized crew and cargo transfer. The CBM port interfaces seamlessly with U.S. and international ISS modules, such as nodes and laboratories, supporting berthing operations. To accommodate modern commercial crew vehicles, PMAs have been adapted for the International Docking System Standard (IDSS) through the attachment of International Docking Adapters (IDAs), which provide standardized ports for spacecraft like Boeing's Starliner and SpaceX's Crew Dragon, including provisions for power, data, and communication transfer.

Design and Specifications

Structural and Material Features

The Pressurized Mating Adapter (PMA) is engineered as a truncated conical aluminum pressure vessel to ensure structural integrity while providing a sealed, pressurized pathway between incompatible docking interfaces on the International Space Station (ISS). This design accommodates the axial offset of 28 inches (71 cm) between its end rings, allowing alignment with both the U.S. Common Berthing Mechanism (CBM) at the wider end and the Russian Androgynous Peripheral Attach System (APAS) at the narrower end. Key dimensions include a length of 1.86 m (6.1 ft), a diameter of 1.9 m (6.25 ft) at the wide end, and 1.37 m (4.5 ft) at the narrow end, with masses varying by unit: PMA-1 at 1,589 kg (3,504 lb), PMA-2 at 1,376 kg (3,033 lb), and PMA-3 at 1,183 kg (2,607 lb). The aluminum construction, combined with multi-layer insulation (MLI) thermal blankets on the exterior, offers protection against micrometeoroids and orbital debris (MMOD) impacts while regulating surface temperatures across the ISS external operating range of approximately -150°C to +120°C. These blankets also mitigate thermal extremes from solar exposure and deep space cold, contributing to the overall durability in low Earth orbit. The PMA's structure is qualified to withstand launch vibrations through protoflight testing protocols, orbital dynamic stresses, and internal pressure differentials of up to 1 atm, ensuring reliability over the ISS's baseline 15-year design life, which has since been extended. Internal heating elements maintain habitable conditions to prevent condensation on surfaces during operations, while external features include handrails for extravehicular activity (EVA) mobility and berthing guides to facilitate robotic arm capture and alignment during installation or relocation. The design supports multiple docking and undocking cycles, as demonstrated by PMA-2's repeated use for Space Shuttle missions.

Docking and Interface Mechanisms

The Pressurized Mating Adapter (PMA) serves as a critical interface on the International Space Station (ISS), enabling the connection of modules via the Common Berthing Mechanism (CBM) on one side and active docking with visiting vehicles, such as the Space Shuttle, via the Androgynous Peripheral Attachment System (APAS-95) on the other. The docking process with APAS-95 begins with coarse alignment as the incoming vehicle approaches the PMA, utilizing guide petals and a probe-drogue configuration for initial contact. Soft capture occurs when the vehicle's probe engages the PMA's drogue receptacle, followed by the extension of a guide ring to attenuate any residual misalignment and secure initial attachment. This phase transitions to hard mate, where 12 powered hooks and latches engage to provide structural rigidity, aligning the vehicles to within millimeters for a stable connection. Once hard mate is achieved, the PMA supports pressurization of the interconnecting volume through dedicated umbilical lines and quick-disconnect fittings, allowing the transfer of high-pressure oxygen and nitrogen gases while equalizing cabin pressures between the ISS and the docked vehicle. Hatch opening follows leak checks, enabling crew transfer and resource sharing. The CBM side, in contrast, supports berthing operations for passive module attachment using 16 powered bolts for structural fixation after robotic positioning, but the PMA's dual-interface design uniquely converts this berthing-only mechanism into an active docking port capable of independent vehicle approach and capture. Redundancy in the system includes multiple alignment guides and latch mechanisms to ensure reliable capture under varying orbital conditions. The PMA incorporates standardized electrical and data interfaces to facilitate power and command/telemetry exchange between the ISS and docked elements. Electrical connectors provide 120 V DC power distribution, capable of transferring up to 3 kW to support vehicle systems and payloads during mating. Data interfaces employ the MIL-STD-1553 multiplexed serial bus for real-time command, control, and telemetry, ensuring compatibility across U.S. and international segments, while Ethernet links handle higher-bandwidth video and payload data. These interfaces activate automatically during hard mate via retractable connectors, with umbilicals providing continuous connectivity for utilities like thermal control and propulsion propellant transfer. Seals around the APAS hatch and CBM ports maintain airtight integrity, preventing pressure loss during operations.

Development History

Origins in Early Space Station Concepts

The Pressurized Mating Adapter (PMA) originated in the design efforts for the United States' Space Station Freedom (SSF) program during the late 1980s. In 1987, NASA developed the concept of the Pressurized Docking Mast (PDM) as a core element of the SSF architecture, specifically to enable connections between the Space Shuttle Orbiter and station modules for crew transfer, resupply, and assembly operations. The PDM was engineered as a pressurized crew transfer tunnel integrated into the Orbiter Attachment System, featuring a slide track capture device to align the Orbiter with the forward berthing ports on Resource Nodes 3 and 4, thereby maintaining a continuous pressurized environment between the vehicles. Initial contracts for SSF's pressurized elements, encompassing early docking system designs like the PDM, were awarded to Rockwell International and McDonnell Douglas Corporation in 1985 under NASA's Phase B studies, positioning both companies as lead contractors for the station's manned modules and structural framework. Their contributions focused on integrating Shuttle-compatible interfaces to support modular station growth and logistics delivery. Prototypes of the evolving PMA components underwent qualification testing for pressure containment, thermal vacuum cycling, and structural integrity under launch and orbital conditions to ensure operational reliability. By 1991, escalating costs prompted a comprehensive redesign of the SSF program, emphasizing modularity and efficiency, which incorporated the Common Berthing Mechanism (CBM) to standardize attachments for growth modules and vehicles. This redesign transformed the PDM into the foundational PMA configuration, shifting to a male/female active-passive berthing system with internal alignment guides, elastomeric seals, capture latches, and powered bolts on 2.0-meter structural rings to facilitate robotic berthing without extensive extravehicular activity. The Boeing Company led the detailed CBM development under NASA oversight, building on prior neutral buoyancy simulations and component tests. The post-1992 Shuttle-Mir program further shaped the PMA by necessitating compatibility with Russian hardware, leading to the integration of the Androgynous Peripheral Attachment System (APAS) as a docking interface to accommodate Soyuz and Progress vehicles alongside Shuttle operations. This adaptation, evaluated by NASA engineering teams, enhanced cross-system interoperability and informed subsequent international station designs.

Adaptation for International Space Station

Following the 1993 reconfiguration of the International Space Station (ISS) program, which incorporated Russian contributions to create a U.S.-Russian hybrid architecture, the Pressurized Mating Adapter (PMA) underwent significant redesign between 1993 and 1995 to shift from an initial mast-based docking concept in early Space Station Freedom plans to a dedicated conical adapter for seamless integration with both U.S. Common Berthing Mechanism (CBM) ports and Russian docking systems. This adaptation ensured compatibility with the Russian Functional Cargo Block (FGB) module and orbiter docking requirements, addressing structural loads up to 1,200 pounds from the Russian system while maintaining the original 400-pound U.S. design limit through modifications to power systems and berthing interfaces. The redesign emphasized modular connectivity across ISS nodes, with PMAs positioned on axial and radial ports to facilitate pressurized module attachments without the need for intermediate masts. Fabrication of the PMAs was completed by McDonnell Douglas Aerospace (acquired by Boeing in 1997) in Huntington Beach, California, in 1995, utilizing four circumferentially welded Aluminum 2219 forgings for the primary structure, along with thermal insulation blankets and 52 electrical fittings to support environmental control and life support systems. A production readiness review conducted on March 14, 1995, confirmed the manufacturing processes, including variable polarity plasma arc (VPPA) welding refinements after initial development unit discrepancies. Three units—PMA-1, PMA-2, and PMA-3—were produced to outfit key ISS locations, providing redundant docking ports for assembly and operations. Qualification testing occurred from 1996 to 1997 at NASA's Marshall Space Flight Center, encompassing vibration, acoustic, thermal vacuum, and proof pressure evaluations to 1.5 times the maximum design pressure of 16.0 psia, verifying structural integrity under on-orbit dynamic loads and microgravity conditions. These tests, detailed in the May 1996 structural integrity report (MDC 95H0336), also included integrated mating simulations with Node structural test articles to ensure berthing reliability. The adaptation culminated in the finalization of APAS-95 integration on the PMA forward end, a modified Androgynous Peripheral Attach System derived from Apollo-Soyuz heritage, compatible with the Space Shuttle's Orbiter Docking System to enable hybrid U.S.-Russian pressurization and crew transfer. This adaptation supported the international integration of the ISS, including the berthing of PMA-1 between Node 1 and the FGB (Zarya) during STS-88, establishing protocols for U.S.-Russian module connectivity.

Operational Deployment

PMA-1 Configuration and Missions

The Pressurized Mating Adapter-1 (PMA-1) was launched on December 4, 1998, aboard Space Shuttle Endeavour during mission STS-88 as part of the Unity (Node 1) module payload. PMA-1 was pre-integrated to Unity's aft Common Berthing Mechanism (CBM) port prior to launch, serving as the interface for connecting the U.S.-built Unity to the Russian Zarya module already in orbit. During the mission, the shuttle's remote manipulator system (SRMS) grappled Zarya on December 6, 1998, and maneuvered it for structural mating to PMA-1 at 9:48 p.m. EST, marking the initial assembly of the International Space Station (ISS). Following structural engagement, PMA-1 achieved full pressurized mating between the U.S. and Russian segments on December 7, 1998, when the internal pressure was equalized to 13.03 psia and subsequently repressurized to 15.0 psia, enabling a continuous pressurized pathway through the adapter. This configuration permanently affixed PMA-1 to Unity's aft CBM port, with its Androgynous Peripheral Docking System (APDS) end docked to Zarya's forward port, forming the foundational link of the ISS core structure. The adapter has remained in this fixed position since installation, oriented along the station's longitudinal axis without any relocations. PMA-1 played a critical role in early ISS assembly missions by providing the essential pressurized tunnel for crew transfer and operations between Zarya and Unity, supporting subsequent dockings such as those of the Zvezda module in 2000 and early logistics flights. Its static placement ensured reliable connectivity for power, data, and environmental control systems across the nascent station, facilitating the integration of additional elements without interruption. Unlike other PMAs, PMA-1's permanent role precluded any need for repositioning, underscoring its foundational status in the ISS architecture.

PMA-2 Relocations and Upgrades

PMA-2 launched on December 4, 1998, aboard the Space Shuttle Endeavour during mission STS-88, serving as the first U.S. assembly flight for the International Space Station (ISS). It was initially attached to the forward port of the Unity node (Node 1) to provide a docking interface compatible with the Space Shuttle's orbiter docking system. This placement allowed for subsequent shuttle visits while Unity was connected to the Zarya module via PMA-1 on its aft port. In February 2001, during the STS-98 mission, PMA-2 was relocated from the forward port of Unity—via a temporary position on the Z1 truss—to the forward port of the newly delivered Destiny laboratory module. Astronauts Thomas Jones and Mark Lee, supported by pilot Marsha Ivins using the shuttle's Remote Manipulator System, guided the adapter into place during Extravehicular Activity (EVA) 2, which lasted 6 hours and 50 minutes. This move optimized shuttle docking access to the U.S. segment and supported ongoing station assembly. A further relocation occurred in November 2007 as part of the STS-120 mission, which delivered the Harmony node (Node 3). Expedition 16 crew members Daniel Tani and Peggy Whitson, using the Canadarm2 robotic arm, detached PMA-2 from Destiny's forward port and reattached it to Harmony's forward port after Harmony was temporarily berthed to Unity. This repositioning, completed on November 12, cleared the Destiny forward port for additional modules and positioned PMA-2 to serve as the primary shuttle docking port for the expanded U.S. segment, facilitating Harmony's role in connecting European and Japanese elements. To enable compatibility with next-generation commercial crew vehicles, PMA-2 received significant upgrades starting in 2016. During Expedition 48, on August 19, the first of three spacewalks installed the International Docking Adapter-2 (IDA-2), delivered by SpaceX's CRS-9 mission, onto PMA-2's forward end at Harmony's port. Astronauts Jeffrey Williams and Kathleen Rubins connected power, data, and video cables during EVA-36, marking the first attachment to PMA-2 since the shuttle era. This upgrade converted the adapter from the legacy APAS-95 standard to the International Docking System Standard (IDSS), allowing automated dockings by SpaceX's Crew Dragon and Boeing's Starliner spacecraft. By March 2017, final internal outfitting and testing confirmed full IDSS operational status, with PMA-2 supporting its first Crew Dragon docking in 2019. Throughout its history, PMA-2 has been involved in multiple robotic operations using Canadarm2, underscoring its adaptability in supporting Node 3 expansion and ISS evolution.

PMA-3 Installations and Maintenance

PMA-3 was launched on October 11, 2000, aboard Space Shuttle Discovery during the STS-92 mission and initially attached to the starboard Common Berthing Mechanism (CBM) port of the Unity node module. This installation provided an additional docking port for subsequent shuttle missions, enabling the continued assembly of the International Space Station (ISS). In March 2001, during STS-102, PMA-3 was relocated from Unity's starboard CBM to its port CBM. In August 2007, during Expedition 15, PMA-3 was relocated from Unity's port CBM to Unity's nadir CBM using the Canadarm2 robotic arm. This move cleared the port for Harmony's temporary berthing during STS-120 and supported the addition of international partner laboratories like Columbus. In January 2010, during Expedition 22, PMA-3 was relocated from Unity's nadir to Harmony's zenith port. It was then moved to Node 3's port in February 2010. PMA-3 underwent further relocation in March-April 2017 during Expeditions 50/51, when it was robotically shifted from Node 3's port to Node 2's (Harmony) zenith port, supported by three U.S. extravehicular activities (EVAs) on March 24 (EVA 40), March 30 (EVA 41), and April 6 (EVA 42). These EVAs, involving astronauts Thomas Pesquet and Shane Kimbrough, reconfigured electrical connections, removed covers, and secured the adapter in its new position to prepare the zenith port for commercial crew vehicle operations. In 2019, PMA-3 at Harmony's zenith port was outfitted with the International Docking Adapter-3 (IDA-3), delivered by the SpaceX CRS-18 mission on July 25 and installed during U.S. EVA 55 on August 21 by astronauts Andrew Morgan and Nick Hague. The installation included attaching hemispherical reflectors, multi-layer insulation, and a planar reflector cover, enabling automated docking for future commercial spacecraft such as Boeing's Starliner and SpaceX's Crew Dragon. Maintenance of PMA-3 involves routine inspections during station operations to ensure structural integrity and functionality, given its role in supporting commercial vehicle dockings. Its zenith position on Harmony exposes it to increased risks from orbital debris compared to more sheltered locations, necessitating vigilant monitoring and protective measures. As of November 2025, PMA-3 remains at Harmony's zenith port with IDA-3 installed and operational.

References

  1. [1]
    PMA 1, 2, 3 - Gunter's Space Page
    Jun 3, 2025 · The PMA (Pressurized Mating Adapter) are elements to connect the 1.3 m US CBM (Common Berthing Mechanism) interface to the Russian 0.7 m APAS ( ...
  2. [2]
    [PDF] Verification for the Pressurized Mating Adapters
    The International Space Station (ISS) Pressurized. Mating Adapters (PMAs) Environmental Control and Life. Support (ECLS) System is comprised of three.
  3. [3]
    STS-92 - NASA
    STS-92 installed the Zenith Z1 Truss and the third pressurized mating adapter for use as a docking port for subsequent shuttle missions.
  4. [4]
    Hypervelocity impact testing of the pressurized mating adapters for ...
    The International Space Station (ISS) has three pressurized mating adapters (PMAs) that are uniquely designed with the latest machining and welding technologies ...
  5. [5]
    Robotics Work on Space Station Set Up Thursday Spacewalk - NASA
    Mar 30, 2017 · The Pressurized Mating Adapter-3 (PMA-3) is in the grip of the International Space Station's Canadarm2 robotic arm during its relocation and ...
  6. [6]
    Meet the International Docking Adapter - NASA
    Oct 5, 2015 · An IDA will be placed on each of the station's two open Pressurized Mating Adapters (PMA), both of which will be connected to Harmony module.
  7. [7]
    The forward-end of the International Space Station - NASA
    Jul 17, 2019 · Protruding from the Harmony module is the pressurized mating adapter that will host the International Docking Adapter-3. The PMM is actually ...
  8. [8]
    [PDF] In-space Servicing, Assembly, and Manufacturing (ISAM) State of Play
    Jul 7, 2023 · APAS-95 docking ports. These are comprised of a passive common berthing mechanism port and a passive APAS port. Developer: The Boeing ...
  9. [9]
    [PDF] INTERNATIONAL SPACE STATION - NASA
    Node 1, Pressurized Mating Adapter (PMA) 1, 2. Space Shuttle. STS-88. 1R. July 2000. Service Module (SM). Proton. 3A. October. 2000. Zenith 1 (Z1) Truss, PMA 3.
  10. [10]
    Second U.S. Space Station Component Begins Launch Preparations
    Jul 28, 1997 · ... McDonnell Douglas in Huntington Beach, CA. A pressurized mating adapter is a cone-shaped connector that will be attached to Node-1, the ...
  11. [11]
    [PDF] ISS Interface Mechanisms and their Heritage
    However on the ISS. Pressurized Mating Adapters (PMAs) the station half of the APAS is permanently passive, meaning that it has a fixed guide ring and the ...
  12. [12]
    [PDF] Micro-Meteoroid and Orbital Debris (MMOD) Protection Overview
    – Exclude multi-layer insulation (MLI) thermal blanket. Shield bumper ... – Located on the forward port of the ISS pressurized mating adapter 2. (PMA-2).
  13. [13]
    [PDF] Handbook for Designing MMOD Protection
    Jan 28, 2009 · Pressurized Mating Adapter. PNI. Probability of No Impact. PNP ... rS/D = ratio of rear wall thickness without bumper to rear wall thickness.
  14. [14]
    [PDF] International Space Station Ew_lution Data Book
    Common berthing mechanism. Alignment guides. Capture latch. Figure 3.5-5. Lab ... A (APAS to PMA-1). International. Space Station Program, SSP 42120,. Pt ...
  15. [15]
    [PDF] Space Station Freedom Pressurized Element Interior Design Process
    The process used to develop the on orbit working and living environment of the Space Station. Freedom has some very unique constraints and conditions to ...Missing: 1987 | Show results with:1987
  16. [16]
    2 CONTRACTS AWARDED FOR DESIGNS ON AN ORBITING ...
    Apr 17, 1985 · The contracts awarded Monday call for McDonnell Douglas and Rockwell to design the basic framework of the space station, two manned modules ...Missing: Freedom adapter PMA
  17. [17]
    [PDF] Space Station. Freedom Common Berthing Mechanism
    The two berthing halves, the active and the passive, maintain a pressurized atmosphere to allow astronaut passage, as well as to provide a structural linkage ...Missing: 1987 | Show results with:1987
  18. [18]
    [PDF] Paper Session II-B - Shuttle- MIR a KSC Perspective
    Apr 24, 2017 · In 1992, NASA had a team of engineers, led by Arnie Aldrich, look at using the Russian APDS on Space Station. Freedom, and they found that it ...
  19. [19]
    [PDF] Space Station Redesign Team Final Report to the Advisory Committee
    Jun 16, 1993 · Our report supports America's goal to provide future generations with a safe, affordable, and robust future in space while ensuring the greatest ...
  20. [20]
    [PDF] 1 Structural Verification of the First Orbital Wonder of the World - CORE
    The Pressurized Mating Adapter was a transition structure originally designed to provide the interface between the Space Shuttle Orbiter and the Space Station ...<|control11|><|separator|>
  21. [21]
    STS-88 - NASA
    Significant dates and times of the mission: Unity and Zarya were successfully engaged at 9:48 p.m., Dec. 6, and Unity came to life at 10:49 p.m., Dec. 7. At ...
  22. [22]
    None
    Summary of each segment:
  23. [23]
    20 Years Ago, STS-88 Adds Unity to ISS - NASA
    Dec 4, 2018 · Middle: Currie operating the robot arm captures Zarya for mating with Unity. ... Right: The STS-88 crew pose in the Unity hatch leading to Zarya.
  24. [24]
    [PDF] 1 Structural Verification of the First Orbital Wonder of the World
    PMA-1 and PMA-2, mounted on the aft and forward endcones of Node 1, were launched on STS-88 and the PMA-3 was launched attached to a modified Spacelab ...
  25. [25]
    STS-98 - NASA
    EVA 2: 6 hours, 50 minutes—At 10:40 a.m. EST Feb. 12, 2001, Jones and Curbeam exited Atlantis' airlock and moved to the Pressurized Mating Adapter (PMA) 2, or ...Missing: relocation | Show results with:relocation
  26. [26]
    STS-98 Delivers Destiny to the International Space Station - NASA
    Feb 11, 2021 · ... relocating and securing the PMA-2 in that location. Ivins then grappled Destiny, lifted it out of the payload bay, rotated it 180 degrees ...
  27. [27]
    STS-120 - NASA
    STS-120 launched October 23, 2007 with the main objectives of installing the U.S. Node 2, Harmony, and the relocation and deployment of the P6 truss to its ...
  28. [28]
    PMA-3 relocation to aid Harmony on Station - NASASpaceFlight.com -
    Aug 26, 2007 · The International Space Station (ISS) has a busy week ahead, with the process of relocating the PMA-3 (Pressurized Mating Adapter) beginning on ...
  29. [29]
    ISS Daily Summary Report – 3/27/2017 - NASA
    Mar 27, 2017 · Pressurized Mating Adapter (PMA)3 Relocation: Yesterday, Robotics Ground Controllers utilized the Space Station Remote Manipulator System ...
  30. [30]
    NASA Plans PMA-3 Relocation for Commercial Crew, Three Record ...
    Mar 22, 2017 · Designated U.S. EVAs 40, 41 and 42, the three 6.5-hour spacewalks will occur on Friday, 24 March, Thursday, 30 March, and Thursday, 6 April.
  31. [31]
    SpaceX Dragon en Route to Space Station with NASA Science, Cargo
    Jul 25, 2019 · A SpaceX Dragon cargo spacecraft is on its way to deliver the second commercial crew docking port and about 5000 pounds of science ...
  32. [32]
    ISS Daily Summary Report – 8/21/2019 - NASA
    Aug 21, 2019 · IDA3 outfitting. Install Hemispherical (HEMI) reflectors (2); Install H-Fixture MLI; Install PMA3 planar reflector cover. Connect second Truss ...Missing: CRS- 19
  33. [33]
    [PDF] The International Space Station: Operating an Outpost in the ... - NASA
    ... Common Berthing Mechanism. (CBM) is a complex collection of latches, bolts, Ready to Latch (RTL) indicators (reference the “Finding. Ready to Latch” section ...
  34. [34]
    Spacewalks resume from U.S. segment of ISS after six month hiatus
    Jan 24, 2025 · Suni Williams' next task was to replace a navigational reflector on Pressurized Mating Adapter-3 (PMA-3) on the Harmony node module's zenith ...
  35. [35]
    Two Astronauts Start Spacewalk for Astrophysics Hardware Work
    Jan 16, 2025 · The duo will remove and replace a rate gyro assembly that helps provide orientation control for the station, install patches to cover damaged ...Missing: 24 Harmony