Talgo AVRIL

The Talgo AVRIL is a family of advanced, lightweight, single-deck high-speed trains developed by the Spanish rolling stock manufacturer Talgo, featuring variable track gauge capability, natural tilting technology, and multi-voltage electrification for seamless operation across diverse rail networks in Europe. Designed for maximum passenger capacity and efficiency, it accommodates over 600 passengers in customizable seating configurations (such as 3+2, 2+2, or 2+1 layouts) and reaches operational speeds of up to 330 km/h, while being the widest very high-speed train available in the European market. Its construction emphasizes sustainability, with the lowest energy consumption among comparable high-speed trains—30% less than similar models—due to lighter materials like aluminum and a superior power-to-weight ratio that reduces CO₂ emissions and operating costs. Development of the AVRIL began in 2008 as a major innovation in Talgo's portfolio, involving eight years of engineering and an investment exceeding €50 million, culminating in a prototype unveiled in spring 2014. The train's acronym stands for Alta Velocidad Rueda Independiente Ligero (High-Speed Lightweight Independent Wheel), reflecting its articulated design and passive tilting system that enhances stability on curved tracks without active mechanisms. Key technical advancements include the world's first implementation of variable-gauge technology at speeds over 300 km/h, allowing automatic switching between Iberian (1,668 mm) and standard (1,435 mm) gauges, as well as compatibility with 1.5/3 kV DC and 25 kV AC power systems, plus integration of the European Rail Traffic Management System (ERTMS). Full-scale testing commenced in 2014, covering nearly 300,000 km across Spanish lines in regions like Galicia, Asturias, Catalonia, and Valencia, including over 700 gauge changes and data from approximately 500 journeys to validate 102 interoperability features. In November 2016, Talgo secured its landmark contract from Spanish operator Renfe for 30 AVRIL trainsets valued at €787 million, including 30-year maintenance, with options for an additional 15 units and extended service—marking Europe's largest high-speed tender at the time and positioning the AVRIL for operations on routes connecting Spain and France. In 2023, a contract was signed with French operator Le Train for 10 trainsets and 30 years of maintenance. Preliminary certification was achieved in 2016 following two years of on-track evaluations, but full homologation and driver training extended into 2024, when the first units were delivered to Renfe on April 12 after rigorous compatibility tests; commercial service began on May 21, 2024. The AVRIL holds the global speed record for Iberian-gauge tracks at 360 km/h, set on September 7, 2022, during trials on the Ourense-Santiago de Compostela line. The contract guarantees 99.09% availability. Notable for its full accessibility—featuring step-free entry at platform level, low-floor design, and rapid passenger flow—the AVRIL weighs about 100 tons less than competitors, enhancing its environmental profile and making it the lightest high-speed train in the world. While primarily deployed in Spain, where it has faced operational challenges including service disruptions in 2025 (see Technical Challenges), its adaptability supports international expansion, underscoring Talgo's focus on sustainable, high-capacity rail solutions amid Europe's push for decarbonized transport.

Design and Technology

Technical Specifications

The Talgo AVRIL is a high-speed trainset measuring 201.8 meters in length and 3.2 meters in width, with a total weight of approximately 327 tonnes, enabling efficient operation and reduced energy consumption. It incorporates a power output of 8.8 MW distributed across two power cars, each rated at 4.4 MW. The train is designed for a maximum speed of 380 km/h, with commercial service speeds up to 330 km/h and operational speeds of 300 km/h on mixed networks. Electrically, the AVRIL features tri-voltage capability, supporting 25 kV 50 Hz AC, 1.5 kV DC, and 3 kV DC systems for seamless multi-network compatibility across Europe. The trainset formation consists of 12 passenger cars flanked by 2 end power cars, providing standard seating capacity for 507 passengers in premium configurations. The Avlo low-cost variant increases this to 581 passengers through optimized economy-class layouts. Construction emphasizes lightweight design, utilizing aluminum profiles for the coach bodies and carbon fiber composites for critical components like the front ends and running gear frames, which reduce the weight of those components by up to 50% compared to traditional steel equivalents. Gauge adaptability is achieved via Talgo's automatic variable system, enabling transitions between 1,435 mm standard gauge and 1,668 mm Iberian gauge, alongside fixed-gauge variants for specific routes. For safety, the AVRIL integrates ETCS Level 2, the Spanish ASFA digital protection system, and the French TVM signaling, ensuring compliance with international high-speed standards. These systems support push-pull operations and articulated single-axle bogies for enhanced stability at high speeds.

Innovative Features

The Talgo AVRIL incorporates an articulated train design featuring single-axle bogies, which enables each wheel on an axle to rotate independently at different speeds, facilitating natural curve negotiation and significantly reducing wheel and track wear compared to conventional bogie systems. This configuration, a hallmark of Talgo's engineering, also contributes to a lighter structure by minimizing the number of axles per coach—typically halving them relative to traditional designs—resulting in approximately 25% weight reduction overall. A key innovation is the low-floor configuration achieved through independent wheelsets, allowing the entire train to maintain a continuous floor height at platform level without steps or barriers. This design enhances accessibility for passengers with reduced mobility, enabling level boarding and up to 20% faster passenger loading and unloading times. Energy efficiency is optimized via an aerodynamic wide-bodied structure and extensive use of lightweight materials, such as aluminum profiles for coach bodies, achieving up to 30% lower energy consumption per kilometer than comparable high-speed trains. These elements, combined with the reduced weight, lower the energy required per passenger while supporting operations at speeds up to 380 km/h. The modular construction employs standardized car modules that permit rapid customization of interior layouts, such as varying seating arrangements, to meet specific operator requirements while simplifying maintenance and upgrades. This adaptability extends to environmental features, including the integration of recyclable materials—achieving 93.8% recyclability and 96.9% recoverability—and natural ventilation systems that promote sustainability by reducing reliance on mechanical cooling. Passenger comfort is elevated through wider coaches measuring 3,100 mm in interior width, providing approximately 25% more space than standard high-speed configurations and allowing for flexible seating without internal barriers. Every seat includes power sockets, enhancing amenities for modern travelers.

Development and Orders

Prototyping and Testing

The development of the Talgo AVRIL began with the presentation of its concept as a technology demonstrator at the InnoTrans trade fair in Berlin in September 2010, showcasing innovative lightweight design principles for high-speed rail. This initial reveal highlighted the train's potential for variable gauge operation and capacities exceeding 500 passengers, drawing interest from European operators for its adaptability to diverse track systems. Following the concept stage, Talgo constructed the first prototype, exhibited at InnoTrans 2012, which incorporated a power head and two passenger coaches to demonstrate core aerodynamic and articulation technologies. Static tests on this prototype, including checks for axle loads, braking protocols, and gauge compatibility, were conducted prior to dynamic trials, verifying structural integrity under simulated operational stresses. These foundational validations paved the way for on-track evaluations, emphasizing the train's single-axle bogie system for reduced weight and enhanced stability. Dynamic testing commenced in September 2014 on the Spanish high-speed network, with the prototype exceeding 200 km/h in initial runs to assess acceleration, braking, and ride quality. Over the subsequent two years, the testing program covered more than 76,000 kilometers, incorporating variable gauge changes at speeds up to 330 km/h—a first for high-speed trains—performed at fixed installations without halting motion, thus confirming seamless transitions between Iberian (1,668 mm) and standard (1,435 mm) gauges. In 2021, the prototype achieved a speed of 363 km/h during these trials, establishing key performance benchmarks for certification. Homologation efforts culminated in May 2016 with Spanish regulatory approval for the prototype, following extensive interoperability assessments aligned with Technical Specifications for Interoperability (TSI 2008). This milestone included over 100 validation tests across structural, electrical, and safety domains, enabling progression to production unit integration. Later phases in 2021 involved dynamic testing of pre-series units on lines such as Madrid-Galicia, accumulating data on pantograph-catenary interaction and noise levels to refine full system synchronization. In 2022, a production unit set a new Iberian gauge speed record of 360 km/h between Ourense and Santiago de Compostela, underscoring the platform's maturation for operational deployment. Throughout prototyping and testing, Talgo collaborated closely with Renfe for access to operational scenarios and driver training simulations, while Adif provided track infrastructure and modeling support to simulate real-world conditions on Spain's mixed-gauge network. These partnerships, extended to over a dozen Spanish railway firms and universities for specialized analyses like vibration modeling, ensured comprehensive validation prior to commercial readiness. By 2024, cumulative testing exceeded 300,000 kilometers across variants, integrating feedback to optimize energy efficiency and passenger comfort.

Contracts and Manufacturing

The first major contract for Talgo AVRIL trains was awarded in November 2016 by Spanish operator Renfe for 15 fixed-gauge units, valued at €786 million including 30 years of maintenance. In May 2017, Renfe placed a follow-on order for 15 variable-gauge units at €495 million, also encompassing long-term maintenance services. These orders, totaling 30 units, marked the initial commercialization phase following the 2010 prototype development. In October 2019, Spanish infrastructure manager Adif contracted Talgo for one variable-gauge diagnostic train at €39 million, including five years of maintenance and equipping for track inspection purposes. In January 2023, French operator Le Train signed a €300 million agreement for 10 units adapted for French networks, with options for additional trains over 10 years and 30 years of maintenance. Talgo assembles AVRIL units at its Rivabellosa plant in northern Spain, with production involving articulated lightweight construction and integration of power cars and passenger modules. As of early 2025, 27 of the 30 units for Renfe had been delivered, with the remaining completed by year-end; the Adif diagnostic vehicle was delivered in 2025. No units for Le Train had entered production as of November 2025, ahead of their planned 2027-2028 launch. The produced variants include standard AVE configurations for premium services, low-cost Avlo setups with higher seating density for budget operations, and international adaptations such as those for Le Train featuring compatibility with French signaling systems. Deliveries commenced with the first series-built unit in 2020 for testing, with the full Renfe fleet targeted for completion by 2025 despite delays from certification and supply issues.

Operations

Deployment in Spain

The Talgo AVRIL trains, designated as Renfe Class 106, entered commercial service on May 21, 2024, marking their debut on the high-speed AVE routes from Madrid to A Coruña in Galicia. On the same day, services expanded to the Madrid-Oviedo line in Asturias, utilizing the trains' variable-gauge capability to seamlessly transition between standard and Iberian gauges. These initial deployments focused on northern Spain's high-speed network, providing up to 11 daily connections on the Madrid-Galicia corridor by mid-2025, with journey times reduced by approximately 20 minutes compared to previous services. Renfe operates the AVRIL fleet primarily on AVE premium services and Avlo low-cost high-speed lines, including northern routes such as Madrid to Galicia and Asturias. The trains were initially integrated on the Madrid-Barcelona route but were withdrawn from this corridor in September 2025 due to technical issues. Daily schedules typically feature multiple departures, such as four to six trains per direction on key northern lines, enhancing connectivity for passengers traveling between central Spain and the northwest regions. In 2025, the fleet experienced operational challenges, including a nationwide halt on January 1 due to a software issue related to the calendar change, and subsequent withdrawals in August following bogie frame cracks, with repairs ongoing under warranty to restore full availability. The introduction of these trains has supported Renfe's overall ridership growth, contributing to a record 277.4 million passengers carried in the first half of 2025 across all services, with high-speed operations seeing a notable uptick in demand on AVRIL-served routes. In terms of operational performance, the AVRIL trains achieved an average on-time reliability exceeding 90% during their initial deployment phase through late 2024, prior to subsequent technical adjustments. Passenger feedback has highlighted the comfort provided by the trains' ergonomic seating and quiet interiors, with capacities ranging from 507 to 581 passengers per unit accommodating higher volumes efficiently. The full fleet of 30 units was delivered by the end of 2024. However, following the detection of bogie frame cracks in August 2025, several units were temporarily withdrawn for repairs, with five units returned to service by November 2025, allowing continued operations on northern routes with some limitations and positioning them for potential cross-border extensions to Portugal via shared Iberian gauge lines.

International Prospects

In 2023, French open-access operator Le Train signed a contract with Talgo valued at approximately €300 million for the supply of 10 AVRIL high-speed trainsets, including 30 years of maintenance support. These fixed-gauge units, designated as Avril S106, are adapted for operations on France's standard 1,435 mm network and are scheduled to enter service in 2028 on the Paris-Lyon-Marseille route, competing directly with SNCF services. The agreement marks Talgo's first major export success for the AVRIL platform outside Spain, with the trains featuring a maximum speed of 330 km/h and incorporating French-specific signaling systems. Talgo has developed fixed-gauge variants of the AVRIL specifically for standard 1,435 mm networks prevalent in international markets, enabling seamless integration without the variable-gauge mechanism used in Iberian operations. These adaptations include quadri-voltage capability for compatibility with diverse electrification systems, such as the 25 kV 50 Hz AC standard in France. Ongoing certification efforts for French deployment involve equipping the trains with TVM (Transmission Voie-Machine) signaling for high-speed line control and ETCS (European Train Control System) Level 2 for interoperability across Europe. As of August 2025, a prototype AVRIL unit successfully completed compatibility tests at SNCF's Technicentre Est Européen facility, advancing toward full homologation. Talgo's export strategy emphasizes the AVRIL's lightweight aluminum construction, which reduces energy consumption by up to 30% compared to conventional high-speed trains, positioning it as an efficient solution for emerging high-speed networks in regions seeking cost-effective, sustainable mobility. The platform's modular design allows customization for local requirements, supporting Talgo's goal of expanding into international markets beyond Europe, building on prior successes like the Talgo 350 deployment in Saudi Arabia. This approach reinforces Talgo's role as a global technology provider, with the AVRIL certified under EU Technical Specifications for Interoperability (TSI) to facilitate cross-border adoption. Exporting the AVRIL involves navigating regulatory hurdles, including stringent homologation processes in target markets like France, where compatibility with national infrastructure and safety standards requires extensive dynamic testing and modifications. These challenges, including integration of region-specific signaling and power systems, can extend timelines and increase adaptation expenses, though Talgo's flexible platform mitigates some costs through shared components.

Technical Challenges

Initial Delays and Testing Issues

The development of the Talgo AVRIL encountered significant timeline delays, with the original service entry target of 2021 postponed to 2024 primarily due to extended homologation processes and the impacts of the COVID-19 pandemic. Testing setbacks during the 2018-2020 period included challenges in dynamic trials, with homologation tests revealing persistent issues such as electrical system errors affecting 75% of trial trips and excessive vibrations attributed to suspension design limitations. Certification obstacles arose from prolonged reviews by regulatory bodies between 2019 and 2021, focusing on safety simulations and compliance with interoperability standards, which delayed final approvals and contributed to the overall timeline slippage. Production efforts faced disruptions in 2020 due to supply chain issues exacerbated by the pandemic, impacting assembly operations at Talgo's facilities. These challenges resulted in substantial cost implications, with additional overruns estimated at €50-100 million stemming from required fixes, testing iterations, and related penalties imposed by Renfe.

Operational Incidents

In August 2024, shortly after the Avlo low-cost service began operations using Talgo AVRIL trains in May, a power failure occurred on a Valencia to Madrid-Chamartín Avlo train, stranding 494 passengers for over two hours inside the Chamartín-Atocha tunnel. The incident left the train without air conditioning during high temperatures, with interior conditions reaching around 40°C, prompting passengers to break emergency windows for ventilation. Renfe subsequently removed the affected train from service for inspection. On January 1, 2025, a software bug related to the calendar year change caused a communications failure between the train control system and onboard batteries, halting the entire Talgo AVRIL fleet and leading to widespread delays across AVE high-speed lines. The issue affected over 14,000 passengers and paralyzed operations for nearly 24 hours, requiring manual overrides and emergency substitutions with other rolling stock. In July 2025, routine inspections revealed cracks in the motor bogie frames of Avlo trains on the Madrid-Barcelona route, leading Renfe to ground the entire five-unit fleet and impose speed restrictions of 250 km/h on affected sections to ensure safety. The defects, identified in late July, prompted immediate withdrawal and intensified maintenance checks across the series 106 units. Renfe implemented emergency maintenance protocols, including fleet-wide inspections and substitutions with AVE trains from other manufacturers, while Talgo conducted warranty repairs on the affected bogies, returning all five units to service by early November 2025, after which they were cleared for operation on less demanding routes. These incidents resulted in temporary cancellations of Avlo routes, such as the full suspension of Madrid-Barcelona services in September 2025, and generated numerous passenger compensation claims due to delays and discomfort.

References

  1. [1]
    High-Speed – Talgo
    Talgo AVRIL is the widest very high-speed train available on the European market today, and it offers various seating arrangements: · Customised layout offering ...
  2. [2]
    Talgo completes the certification of its new high-speed train avril
    Due to its construction with lighter materials, the AVRIL is the train that has the best power-to-weight ratio, lower CO2emissions, better sliding and lowers ...
  3. [3]
    Talgo wins the most important high-speed tender in Europe with its ...
    Nov 28, 2016 · The most advanced, sustainable and adaptable train ... Avril is the result of 8 full years of engineering and a total investment of over €50 ...
  4. [4]
    Talgo delivers first Avril trains
    Apr 12, 2024 · Talgo Avril holds the world speed record on Iberian track-gauge: 360 km/h, reached on 7 September 2022 on the Ourense-Santiago de Compostela ...Missing: specifications | Show results with:specifications
  5. [5]
    Talgo Avril Very High Speed Train - Railway Technology
    Sep 25, 2013 · The single-floor high-capacity train will have a width of 3,200mm, a length of 201.9m, and a height of 3.33m. The maximum weight of the train ...
  6. [6]
    [PDF] talgo avril- environmental product declaration
    Talgo single coach length is about 13,3 m (almost half of conventional coach, in 26 m Talgo has 2 axless, while conventional technology has 4 axles). This ...
  7. [7]
    [ES] Talgo is the winner! Spanish manufacturer to build 30 high ...
    Nov 29, 2016 · Each of the Avril trains will have a maximum commercial speed of 330 km/h and a total capacity of 521 seats. We see a 14-car train with the ...Missing: specifications voltage<|control11|><|separator|>
  8. [8]
    Talgo Avril high-speed EMUs have entered service in Spain
    May 21, 2024 · The Avril train is based on the Talgo 350 design and has a length of 201.8 m. Each trainset comprises 12 passenger single-axle cars with unique ...Missing: width voltage
  9. [9]
    [PDF] Avril by Talgo. The new Renfe high-speed train
    Dec 8, 2016 · The Avril train is a 12-car unit with 3 business, 8 tourist, and a cafeteria car, tri-voltage, 330 km/h max speed, and 521 seats.
  10. [10]
    Talgo Avril trainset - The Railway Dictionary of Mediarail.be
    Designed for speeds up to 380 km/h, it represents the latest in lightweight, articulated train technology. The Avril features a wide-bodied design allowing for ...Missing: width weight voltage
  11. [11]
    Talgo turns to composites to reduce frame weight by 50%
    May 6, 2022 · TALGO has turned to new materials for manufacturing the wheelset frames for its Avril high-speed trains, replacing steel with carbon fibre reinforced polymer.Missing: aluminum | Show results with:aluminum
  12. [12]
    Talgo wins the most important high-speed tender in Europe with its ...
    To this end, Avril units manufactured by Talgo will have three different electrification systems (1.5kV and 3 kV DC, plus 25 kV 50 Hz AC) and several signaling ...
  13. [13]
    Passenger Rolling Stock: Avril moves from vision to reality | In depth
    Jun 21, 2021 · In addition to ETCS and the Spanish legacy train protection system ASFA, these trains will be fitted with the two French systems: KVB and TVM.
  14. [14]
    Technological Principles - Talgo
    Talgo is the only manufacturer to use a system in which each of the wheels on an axle, both left and right, can rotate at different speeds. This not only ...Missing: AVRIL negotiation
  15. [15]
    Talgo Avril High-Speed Trains - Railway Technology
    Feb 15, 2021 · The 201.9m-long, 3.2m-wide Avril trains offer a wide bodyshell with a high capacity of more than 600 passengers. The use of design based on ...Missing: width weight
  16. [16]
    The history of the unique Talgo trains dynasty - Rolling Stock
    Jan 6, 2023 · It was first presented in September 2010 at the InnoTrans exhibition in Berlin. In 2016, Renfe ordered 15 of these trains with an option for ...
  17. [17]
    Talgo Avril starts dynamic testing - International Railway Journal
    Sep 9, 2014 · The first prototype of Talgo's new-generation Avril high-speed train has begun dynamic testing on the Spanish high-speed network.Missing: 2011 | Show results with:2011
  18. [18]
    Our History – EN – Talgo
    The new Talgo Avril, a very high speed and high-capacity train, reaches 363km/h in testing. On May 7, Talgo makes its market debut on the Spanish Stock Exchange ...
  19. [19]
    Talgo Begins Rail Tests for its Very High-Speed Train Talgo Avril
    Feb 3, 2021 · Tests have begun on a segment of the Madrid-Galicia railway line. · With up to 581 seats, it is the lightest high-capacity train on the market.
  20. [20]
    Talgo breaks Iberian gauge speed record - RailTech.com
    Sep 8, 2022 · A Talgo Avril unit hit 360 kilometres per hour between Ourense and Santiago on Wednesday, breaking the speed record on the Iberian gauge.
  21. [21]
    Talgo starts with Avril high-speed trains delivery to Renfe
    Apr 16, 2024 · The comprehensive testing phase also involved collaboration with over a dozen companies within the Spanish railway sector and two universities.Missing: Adif prototyping
  22. [22]
    Talgo To Supply 15 High Speed Trains to Renfe
    The initial contract is worth €786m, including €337m for 15 330km/h Avril trains and €449m for 30 years' maintenance with options for 15 additional trains and a ...Missing: 2017 Adif 2019
  23. [23]
    Renfe orders 15 new high-speed trains from Talgo in €495m deal
    Jun 5, 2017 · In total, the contract is worth €495 million, €242.7 million for the purchase of the variable gauge trains and another €252.3 million for 30 ...
  24. [24]
    Talgo beats record of awarded contracts in 2017
    In this sense, in 2017 Talgo signed contracts such as the very high speed Renfe contract which involves the design and manufacture of 30 Talgo Avril trains, ...<|separator|>
  25. [25]
    A year of progress – Informe Anual 2019 - Talgo
    Talgo's results were satisfactory in 2019 both in operational and financial terms. The most significant milestones include important commercial successes.
  26. [26]
    Le Train signs contract with Talgo for 10 Avril high-speed trains
    Jan 24, 2023 · The contract with Talgo is believed to be worth around €300m and includes 30 years' spares and maintenance. It follows Le Train's failure to ...
  27. [27]
    First series-built Talgo Avril breaks cover ahead of test programme
    Jul 25, 2020 · SPAIN: The first series-produced Avril high speed trainset ordered by RENFE left Talgo's Rivabellosa factory overnight on July 23-24 to be ...Missing: Mexico Reynosa<|control11|><|separator|>
  28. [28]
    Talgo in net loss during Q1 2025 | Latest Railway News
    May 27, 2025 · Status of Avril and Talgo 230 projects. The Talgo Avril platform reached a delivery milestone of 27 out of 30 units. Talgo 230 trains, designed ...Missing: total | Show results with:total
  29. [29]
    Avril high speed trains enter service | News - Railway Gazette
    May 29, 2024 · The 330 km/h Series 106 sets have two driving power cars and 12 articulated coaches. The configuration is similar to that of previous Talgo ...Missing: capacity | Show results with:capacity
  30. [30]
    Renfe's Class 106 AVRILs enter service - Railvolution
    May 23, 2024 · The first variable-gauge Class 106 EMUs carried their first fare-paying passengers on services linking Madrid to Galicia and Asturias on 21 May 2024.
  31. [31]
    More Renfe S106 trains on Madrid to Galicia route
    May 13, 2025 · Renfe will increase S106 and Avlo trains from June 9, 2025, with 90% more seats, 11 daily trains, and 20 min reduced travel times. Ticket sales ...<|control11|><|separator|>
  32. [32]
    RENFE to replace Madrid – Barcelona Avlo service with more AVEs
    Sep 2, 2025 · SPAIN: RENFE has announced that its Avlo-branded low-cost services between Madrid and Barcelona are to be withdrawn indefinitely from ...Missing: variants 2020
  33. [33]
    Renfe Reaches Record Number of Passengers in the First Half
    Jul 16, 2025 · Renfe closed the first half of 2025 with its highest-ever number of passengers for a six-month period: a total of 277.4 million travelers used ...Missing: Talgo AVRIL
  34. [34]
    Renfe's 106 series completes a week in service - Trenvista
    May 28, 2024 · Renfe's 106 series, on the Talgo Avril platform, has been in service for a week with several lights and shadows.
  35. [35]
    Renfe introduces its new high-speed trains - Railway PRO
    May 24, 2024 · The Avlo S106 have a capacity of 581 seats distributed in twelve passenger cars. Equipped with highly comfortable seats with a 3+2 layout, they ...Missing: variant | Show results with:variant
  36. [36]
    RENFE launches 360 km/h 'Bullet Train' in Spain – (and beyond?)
    Jun 3, 2023 · RENFE confirmed that they are receiving thirty units of the Talgo Avril, a train capable of up to 360 km/h on existing rail lines in Spain, Portugal and France.
  37. [37]
    Le Train orders Talgo high-speed trains - Railway PRO
    Jan 26, 2023 · The first trains are expected to be handed over in early 2025. ... fleet of very high-speed trains based on the Talgo Avril train platform.
  38. [38]
    French rail company SNCF to get two new competitors from 2028
    Aug 11, 2025 · The company has ordered ten new-generation Talgo Avril trains ... Paris-Lyon-Marseille route. Le Train has the ambition of offering up ...
  39. [39]
    Le Train selects 330 km/h Talgo trainsets for French open access ...
    Jan 24, 2023 · Le Train has selected Talgo to supply 10 Avril S106 high speed trainsets for its planned services from Bordeaux to Angoulême, Nantes, Rennes and Arcachon.<|separator|>
  40. [40]
    Talgo Avril passes tests at Technicentre Est Européen - Trenvista
    Aug 8, 2025 · According to the operator, the estimated date of entry into service is early 2026. Regarding the homologation of the Talgo Avril in France, ...Missing: static | Show results with:static
  41. [41]
    Talgo battles €116m Renfe penalty for delayed train delivery
    Dec 12, 2024 · Spanish train maker Talgo is kicking back against a €116 million penalty being demanded by Renfe for delays in the delivery of its Avril ...Missing: overruns | Show results with:overruns
  42. [42]
    Renfe could claim 50 million more from Talgo for Avril's delays
    Mar 5, 2024 · A new delay in the delivery of Talgo's Avril trains to Renfe makes the operator consider increasing the compensation by 50 million.<|separator|>
  43. [43]
    [PDF] Annual Report 2021 | Talgo
    Due to the pandemic situation, the process of preparing for ISO 45001 certification has been slowed down at some of the facilities, although it has been ...
  44. [44]
    Talgo posts net loss of 108 million euros due to Renfe penalty
    Feb 28, 2025 · Spanish train maker Talgo posted a full-year net loss of 107.9 million euros on Friday, dampened by a 116 million euro penalty imposed by ...Missing: AVRIL cost overruns € 50-100
  45. [45]
    Renfe Class 106 - The Emperor's New Clothes? - Railvolution
    Aug 8, 2024 · The Talgo-built Class 106 high speed trains are posing a headache for Renfe Viajeros, from the very start of commercial services.
  46. [46]
    Renfe to Demand Financial Compensation from Talgo Due to ...
    Aug 6, 2024 · An Avlo ... failure in its electrical power system. More than 494 passengers were left without electricity for two hours on the train.
  47. [47]
    New Year's breakdown: Renfe's Talgo Avril trains halted by battery ...
    Jan 2, 2025 · On the first day of 2025, its entire fleet of Talgo-manufactured Avril high-speed trains was left inoperative due to a major computer communications error.Missing: mechanism dynamic 2018-2020
  48. [48]
    Renfe's Talgo Avril Trains Halted by Battery Failure on New Year's Day
    Jan 2, 2025 · Talgo stated that the battery failure was linked to the 2025 calendar change, triggering communication issues in the system. Engineers ...
  49. [49]
    New Year bug halts Spanish high speed train fleet - Railway Gazette
    Jan 22, 2025 · Drivers entering the cabs of RENFE's Series 106 Avril high speed trainsets on January 1 discovered the entire fleet could not be activated.
  50. [50]
    Renfe train delays hit Madrid routes, plus wildfire and Avril defects
    Jul 28, 2025 · Thousands of passengers were left stranded on Monday, July 28, 2025, as Renfe train services between Madrid, Andalusia and Barcelona faced ...
  51. [51]
    Year 2025 problem paralyzes Spanish high-speed trains | heise online
    Jan 2, 2025 · A computer problem paralyzed the entire fleet of Talgo Avril high-speed trains in Spain at the turn of the year.Missing: 2020 | Show results with:2020
  52. [52]
    Renfe grounds series 106 Avlo fleet - International Railway Journal
    Jul 29, 2025 · The single-class Avlo variant of the series 106 has a total of 581 seats, compared with 316 for the series 102 and 404 for the series 103.Missing: capacity | Show results with:capacity
  53. [53]
    Cracks detected in the bogies of S106s (Talgo Avril) on the Madrid ...
    Jul 25, 2025 · Renfe suspends ticket sales on the Avlo Madrid-Barcelona after a crack was detected in the bogie of a 106 series train.Missing: power Zamora 2024
  54. [54]
    Talgo Avril high-speed trains withdrawn from service in Spain due to ...
    Aug 14, 2025 · Talgo Avril high-speed trains withdrawn from service in Spain due to bogie frame cracks. 14 August 2025. Reading time ~ 2 min.
  55. [55]
    Spain's Renfe bans Talgo Avril trains from Madrid–Barcelona high ...
    Oct 20, 2025 · The amendment effectively revokes the Avrils' approval to operate on the country's main high-speed corridor and has no expiry date, remaining in ...
  56. [56]
  57. [57]
    Renfe weighs redeploying sidelined Talgo Avrils to Catalan high ...
    Oct 24, 2025 · Renfe is considering redeploying its Talgo Avril trains, pulled from Spain's main high-speed line, to shorter Avant routes in Catalonia and ...Missing: international delivery 2020
  58. [58]
  59. [59]
    Renfe withdraws Avlo trains from Barcelona–Madrid high-speed line
    Aug 29, 2025 · The news also follows technical problems detected on an Avlo S106 train at the end of July, and an incident in early August when nearly 500 ...Missing: Talgo AVRIL failure Zamora