Fact-checked by Grok 2 weeks ago

U.S. Route 8

U.S. Route 8 (US 8) is an east–west Numbered Highway that extends approximately 280 miles (450 km) across the northern Midwestern , primarily through rural and forested regions of , , and . The route begins at a junction with (I-35) in Forest Lake, Minnesota, and terminates at an intersection with (US 2) in downtown Norway, Michigan. Designated in 1926 as part of the initial U.S. Numbered Highway , US 8 originally connected the metropolitan area to Michigan's Upper Peninsula, evolving over time with minor realignments but retaining its role as a principal arterial for regional mobility, tourism, and freight transport. In , the 22-mile (35 km) segment functions as a rural principal arterial, starting at I-35 and heading eastward through the communities of Chisago City, Lindstrom, Center City, Shafer, and Taylors Falls before crossing into near the St. Croix River; this portion includes a short freeway section near Forest Lake and supports commuter, recreational, and farm-to-market traffic toward the . The highway's predominant 256-mile (412 km) traversal of begins at the state line in St. Croix Falls and proceeds eastward as a mostly two-lane , passing through key northern communities such as Barron, Cameron, Ladysmith, Medford, , Rhinelander, Antigo, Crandon, and Laona, while intersecting major routes like Wisconsin Highway 35 (WIS 35), U.S. Route 53 (US 53), Wisconsin Highway 13 (WIS 13), and U.S. Route 45 (US 45). In this state, US 8 serves as a vital connector on the National Highway System, facilitating access to forests, lakes, and small towns amid increasing traffic volumes projected to rise over 60% by 2030 in some corridors. The brief 2.3-mile (3.7 km) portion crosses the from into the Upper , linking directly to US 2 in without any freeway segments and providing essential connectivity for local and cross-state travel. Throughout its length, US 8 remains largely undivided and rural, with notable challenges including higher crash rates in urbanized segments like Turtle Lake and Barron, ongoing resurfacing projects, and environmental studies for capacity improvements. Historically rooted in Wisconsin's pre-1926 State Trunk Highway system (as former STH ), the route has seen limited major changes since its establishment, underscoring its enduring importance as a scenic and functional east-west lifeline in the region.

Route description

Minnesota portion

U.S. Route 8 begins its Minnesota segment at an interchange with in Forest Lake, Washington County, marking its western terminus. The route initially follows a brief freeway configuration before transitioning to a surface road designated as Lake Boulevard, providing access to local residential and commercial areas in the suburban exurbs. This western portion serves as a key connector for commuters traveling to and from the metropolitan area, facilitating daily traffic flows amid growing residential development. The highway extends approximately 22 miles eastward through Chisago County, transitioning from urban fringes to rural landscapes while passing through the communities of Stacy, Chisago City, Lindstrom, Center City, Shafer, and Taylors Falls. Notable intersections include U.S. Route 61 in Wyoming Township, which links to northern suburbs, and Minnesota Highway 95 near Taylors Falls, offering connections to Interstate 35 and regional destinations. The route features a four-lane divided section in Wyoming Township to accommodate higher volumes near the urban edge, gradually narrowing to two lanes as it enters more rural terrain lined with lakes and heritage sites, such as the Moberg Trail commemorating Swedish immigration. Under the jurisdiction of the (MnDOT), U.S. Route 8 maintains its role as a principal arterial for both local and interregional travel, with average daily traffic volumes ranging from 10,000 to 18,600 vehicles per day based on mid-1990s counts, concentrated higher near Forest Lake and decreasing eastward. The segment culminates at the St. Croix River, where it crosses a bridge into , supporting freight, recreational, and commuter movements across the state line.

Wisconsin portion

U.S. Route 8 enters from at St. Croix Falls in Polk County, where it begins a predominantly rural traversal eastward across northern , covering 255.55 miles through Polk, Barron, , , , Oneida, , and Counties before reaching the state line near Pembine. The highway serves as a vital connector in the region's sparse population centers, facilitating travel between small towns and supporting local commerce in , , and . Throughout its path, US 8 maintains a mostly two-lane configuration, with occasional multilane sections in urban areas, emphasizing its role as a scenic byway through rolling and woodlands rather than a high-capacity corridor. Upon entering the state, US 8 briefly concurs with WIS 35 in St. Croix Falls, providing access to the St. Croix National Scenic Riverway before diverging eastward through Polk County. The route then enters Barron County, passing through the city of Barron and skirting the northern edge of Rice Lake, a key community for lake-based recreation and industry. Continuing into Rusk County, US 8 traverses Ladysmith and Glen Flora, where it intersects WIS 46 in Cameron to the west and WIS 27 in Ladysmith to the north, linking to regional routes serving the broader northwoods area. In Price County, the highway goes through Glidden, intersecting WIS 13, and crosses the , a tributary known for its whitewater paddling opportunities. Further east, US 8 enters the forested heartland, passing near the Chequamegon-Nicolet National Forest, which spans over 1.5 million acres and offers extensive trails, lakes, and wildlife viewing that draw tourists year-round. The route supports northern Wisconsin's logging industry by connecting timberlands to processing facilities and aids tourism through access to outdoor pursuits like , , and snowmobiling on adjacent state trails. In and Oneida Counties, US 8 intersects US 51 near and features a bypass around Rhinelander, avoiding the city's downtown while providing efficient passage for through traffic. The highway continues through Forest County, intersecting WIS 32 in Laona, a hub for county services and outdoor outfitters. Approaching the eastern end, US 8 overlaps with US 141 near , forming a brief concurrency that aids heading to the Upper Peninsula before terminating at the state line. This segment underscores US 8's function as an economic lifeline, linking remote communities to larger markets while preserving the natural character of the Northwoods.

Michigan portion

U.S. Route 8 enters the state of at the Wisconsin state line in Dickinson County, approximately 2.3 miles south of downtown , marking the beginning of its brief 2.322-mile (3.737 km) eastern terminus segment in the Upper Peninsula. This portion of the highway heads northeast through rural, wooded terrain, providing a direct connector from the national highway network to local communities in the region. Upon crossing the state line, US 8 becomes concurrent with U.S. Route 141, which approaches from the south, as the routes share alignment northward toward . The concurrency continues briefly before US 141 splits off, while US 8 proceeds past the Dickinson County fairgrounds and Norway Speedway, traversing sparsely developed areas with limited commercial or residential infrastructure. The highway terminates at an at-grade intersection with US 2 (Brown Street at 7th Avenue) in downtown , a key north-south corridor facilitating regional travel. This short segment holds local significance as a vital link to historic iron mining communities in Dickinson County, including , which was established amid the late-19th-century boom and supported operations like the Penn Iron Mining Company's Norway Mine. It also connects travelers from Wisconsin's adjacent areas, such as Marinette County near Pembine, to Upper Peninsula destinations, though it experiences minimal development and relatively low traffic volumes characteristic of rural connectors.

History

Establishment and early years (1926–1950)

U.S. Route 8 was commissioned on November 11, 1926, as one of the original U.S. Highways by the American Association of State Highway Officials, spanning from near Wyoming, Minnesota, eastward through to the state line at Pembine, with plans for an extension into to Powers near the Wisconsin border. The route was designed to facilitate cross-state travel through the densely forested North Woods region, connecting rural communities and supporting key economic activities such as the logging industry and emerging to area lakes and forests. In its early years, the highway followed pre-existing state roads, including Minnesota's State Route 46 and Wisconsin's STH 14, promoting accessibility in a characterized by hills, curves, and terrain that limited average travel speeds to around 40–50 mph. Significant early modifications occurred in 1930–1931, when the western terminus was extended southwest from to downtown along U.S. 61 and State Route 63 through Forest Lake, enhancing connectivity to Minnesota's largest city and improving links for and . This extension utilized newly paved segments, such as the 27-foot-wide roadway on Route 63 completed between and , though the full route remained a mix of and in its initial configuration. In , sections were largely replaced with by 1930, achieving full paving that year; The portion, being brief and aligned with existing state trunklines, saw comparable improvements, ensuring the route's viability for freight hauling in operations and passenger travel to recreational sites. Paving efforts progressed steadily during the late and , driven by state initiatives under the Federal Aid Highway Act framework, which provided funding but left maintenance responsibilities to state departments of transportation in , , and . In , the highway's implementation lagged slightly; it was officially designated in along a short segment from the line at Niagara via present-day U.S. 141 to U.S. 2 east of Iron Mountain, with the planned routing to Powers deferred until later adjustments in the .

Mid- to late-20th century changes (1951–2000)

In the postwar era, U.S. Route 8 saw adjustments to its western extent as interstate highway development reshaped regional connectivity. By 1978, the route had been truncated from downtown to the I-35W/New Brighton Boulevard interchange amid ongoing interstate construction. This was followed by a further in 1981 to its current western terminus at , where it intersects I-35, allowing the route to better serve as a connector to the interstate system while eliminating urban routing through the area. During the 1960s and 1970s, the route received safety-focused improvements, including realignments to straighten hazardous curves, particularly in rural sections like those near county lines. These updates were part of broader state efforts to enhance alignments amid rising vehicle use, though US 8 remained a surface road rather than being incorporated into the interstate network. A major infrastructure upgrade occurred in the with the construction of the Rhinelander bypass by the Wisconsin Department of Transportation (WisDOT). Completed in the mid-, the bypass rerouted US 8 around the southern and eastern edges of Rhinelander, alleviating downtown congestion from through traffic. The former alignment through the city center was redesignated as US 8 Business, providing local access while preserving the historic path for commercial purposes. Other notable developments included bridge replacements to address aging structures and growing loads. over the St. Croix River at Taylors Falls, carrying US 8 between and , underwent evaluation and maintenance in line with federal bridge programs established in the , ensuring continued safe crossings. Similarly, the Flambeau River bridge in Rusk County was replaced in the to improve structural capacity. Traffic volumes along portions of US 8 rose steadily due to increased recreational and tourism travel to northern forests and lakes, with some segments recording (AADT) exceeding 4,000 vehicles by the late 1990s.

21st-century developments (2001–present)

In the early 2000s, the Department of Transportation (WisDOT) completed a major widening project on US 8 near Rhinelander, expanding the highway from two to four lanes with a grass between North Road and WIS 47. This 2002–2003 initiative enhanced traffic flow and safety, particularly at the nearby with US 51, by reducing congestion in a growing urban area. Following the completion of a around Rhinelander in the , the associated business through the city's central was decommissioned in 2005. The route, previously signed as Business US 8, was reverted to local control as County Trunk Highway P to better accommodate urban access needs after the mainline reduced through-traffic pressures on downtown streets. This change streamlined signage and maintenance responsibilities while preserving local connectivity. Throughout the 2010s, maintenance efforts on US 8 addressed aging infrastructure amid rising freight traffic from logging and regional commerce. In Barron County, resurfacing and intersection improvements, including roundabouts at US 8 and US 63 in Turtle Lake, were implemented around 2015 to enhance and pavement condition. Bridge rehabilitation projects, such as those in and surrounding counties, also occurred during this period to support increased heavy vehicle loads. Recent developments have emphasized multimodal enhancements and upgrades. In , a three-mile multi-use path was added adjacent to US 8 between Fire Keeper Road and Love Knot Road, providing pedestrian and bicycle access linking Crandon to the Stone Lake Campground. The project, which included milling, resurfacing, drainage improvements, and lane reconfiguration, culminated in a ribbon-cutting on October 16, 2025, with the fully reopening on October 18, 2025, after five months of construction. In , reconstruction planning for US 8 in Chisago County was initiated with a 2023 appropriation, extended in 2025, to address safety concerns along the corridor from I-35 to Chisago City. The effort, funded through state appropriations, focuses on converting segments to a four-lane divided roadway with medians or barriers, incorporating predesign and engineering for anticipated 2032 implementation.

Planning and future

Ongoing construction projects

In , the (WisDOT) completed a major resurfacing and safety improvement project on U.S. Route 8 from WIS 55 south to WIS 32 south in November 2025. This $18.6 million initiative, which began construction in April 2025 following real estate negotiations in 2023–2024 and final plan approval in November 2024, involved milling the existing pavement, resurfacing with new asphalt over approximately 11 miles, removing a for better alignment, enhancing drainage systems, reconfiguring lanes for improved , and integrating a new multi-use path for pedestrians and cyclists. The multi-use path was completed and opened to the public in October 2025, with full project completion in November 2025. In Chisago County, Minnesota, Chisago County Public Works, in collaboration with the Minnesota Department of Transportation (MnDOT), is advancing reconstruction efforts on Trunk Highway 8 from Interstate 35 in Forest Lake to Karmel Avenue, with project updates continuing through late 2025 including public comment periods starting November 18, 2025. This work focuses on applying a bituminous overlay for pavement preservation, installing ADA-compliant ramps at key intersections, and upgrading signal systems to enhance safety and accessibility, as part of a broader corridor study identifying long-term mobility solutions scheduled for full implementation between 2025 and 2028. Near St. Croix Falls in , WisDOT plans shoulder rehabilitation and drainage improvements along U.S. Route 8, with construction scheduled for 2026 or 2027 to address run-off-the-road risks. These enhancements include widening paved shoulders from 3 to 5 feet and installing rumble strips, designed to minimize traffic disruptions while improving overall safety in the area. In the Michigan portion near Norway, the Michigan Department of Transportation (MDOT) completed routine bridge inspections and minor paving work on U.S. Route 8 in 2024 as part of its annual maintenance program, ensuring structural integrity without major interruptions to traffic. These efforts build on prior widenings from 2002–2003 and support ongoing preservation under MDOT's 2024–2028 Five-Year Transportation Program.

Long-term corridor studies and proposals

The U.S. Route 8 Corridor Study in , covering a 40-mile segment from WIS 35 near St. Croix Falls to US 53 near Rice Lake in Polk and Barron counties, was initiated by legislative mandate to assess long-term transportation needs. The study evaluates capacity constraints, with traffic projected to increase over 60% by 2030, leading to congestion and delays, alongside safety issues such as higher-than-average crash rates in Turtle Lake and Barron. It also considers options to enhance regional . Recommendations include potential bypasses around Barron and Cameron communities, with the Barron bypass proposed as a freeway featuring interchange access, though Tier II studies and final design remain unscheduled pending legislative funding approval as of 2025. In , the 2022 US 8 Crandon to Laona Corridor Study, conducted by the Department of Transportation (WisDOT) and the Forest County Potawatomi Community, analyzes an 11.4-mile segment between WIS 55 south of Crandon and WIS 32 south of Laona. Key findings highlight traffic volumes of 3,500–4,100 vehicles per day in , forecasted to reach 4,500–5,300 by 2035, with safety concerns including 31 deficient vertical curves, 12 substandard grades, and a crash hotspot at WIS 32. The report proposes alignments such as widening shoulders to 10 feet, adding passing lanes, and an off-alignment connection between Kwe Da Kik Lane and Everybody’s Road to improve freight efficiency for long-haul trucks. For , it recommends enhancing trails for snowmobiles, ATVs, and bicycles to link community assets. This corridor is classified as part of the North Country Corridor under WisDOT's Connections 2030 plan, prioritizing it as a principal arterial and National Highway System connector for federal funding consideration. The Minnesota Highway 8 Study, ongoing from 2024 to 2025, focuses on the corridor from Karmel Avenue in Chisago City to Hwy 95 in Taylors Falls, spanning Chisago County and involving local stakeholders including Chisago City, Lindstrom, Center City, Shafer, and Taylors Falls. It assesses opportunities for vehicle safety and mobility improvements, access management, and enhanced connectivity for pedestrians, bicyclists, and other non-motorized users, such as potential widening and bike path additions. Integrated with regional planning efforts, the study incorporates public feedback from fall 2024 meetings and surveys to identify needs and evaluate alternatives, with a project development plan guiding future implementations like pavement resurfacing scheduled for 2032. As of November 2025, the analysis of existing conditions is complete, and the team is advancing to needs assessment and improvement evaluation, including a public comment period starting November 18, 2025. In , where US 8 terminates at its concurrency with US 2 near , the Michigan Department of Transportation () has discussed minor enhancements to this overlap in its planning documents. These proposals aim to address maintenance needs but lack active funding allocation in the 2025–2029 Five-Year Transportation Program as of 2025. No corridor studies or extensions for US 8 are currently programmed.

Business routes

U.S. Route 8 has had only one designated business route in its history, a loop in . This auxiliary route followed the original alignment of US 8 through the city's downtown district, providing direct access to commercial areas, educational facilities, and the Oneida County Courthouse following the completion of a around Rhinelander in the mid-1990s. Business US 8 in Rhinelander was established as a 7.1-mile (11.4 km) loop in the mid-1990s, coinciding with the shift of the parent route to the new bypass to improve traffic flow and safety. The loop began at the western junction of US 8 and Wisconsin Highway 47 (WIS 47), proceeded east along Kemp Street across the , and continued through the before rejoining the mainline US 8 east of the city. It was locally maintained by Oneida County to support economic activity in the urban core. The business route was decommissioned by the (WisDOT) in 2005, with signage removed and the alignment redesignated as County Trunk Highway P (CTH-P). The decision stemmed from declining traffic volumes on the old alignment after the bypass opened, coupled with ongoing maintenance expenses that outweighed its utility as a signed federal highway. No other business routes have been designated for US 8, reflecting the highway's largely rural trajectory across northern and its brief segments in and Michigan's Upper , where urban development and associated bypass needs are minimal.

Key concurrencies and overlaps

U.S. Route 8 shares a 4-mile (6.4 km) concurrency with Wisconsin Highway 35 (WIS 35) in the vicinity of St. Croix Falls, , where the routes align on a limited-access providing access to the St. Croix River Valley. This overlap facilitates combined traffic flows for regional tourism and local commuting, enhancing connectivity between Polk County communities and the corridor to the west. Further east, U.S. Route 8 overlaps with U.S. Route 141 for approximately 10 miles (16 km) near Pembine and in , extending to the Michigan state line and aiding cross-border travel to the Upper Peninsula. In , US 8 terminates at US 2 after a total state segment of 2.32 miles (3.73 km). The concurrency boosts capacity for freight and recreational traffic in this rural area, with dual signage guiding through movements toward Iron Mountain and beyond. A shorter overlap occurs with Wisconsin Highway 32 (WIS 32) from Laona to Crandon in , spanning about 13 miles (21 km) through forested terrain. This shared path supports local forest industry access and tourism, with maintenance responsibilities divided between state agencies due to the dual designation. These key concurrencies increase overall route efficiency in northern 's low-density regions by pooling resources for signage, pavement upkeep, and , though they require coordinated efforts across jurisdictions to address rural infrastructure challenges.

References

  1. [1]
    [PDF] Trunk highway 8 corridor study - MnDOT Digital Library
    Sep 19, 2024 · The segments shown on Figure 2.5 were defined by Mn/DOT, with each segment representing an area of roadway having similar characteristics such ...<|control11|><|separator|>
  2. [2]
    Highways 1-9 - Wisconsin Highways
    Jan 31, 2009 · Length: 255.59 miles. Maps: Route Map of US-8 · Maps of Proposed US-8 (Pembine-Hermansville). Notes: US-8 is very much a "Wisconsin highway" as ...
  3. [3]
    Route Listings: US-8 - Michigan Highways
    Mar 4, 2024 · US-8 was originally designated to begin at Powers, Michigan and head westerly into Wisconsin. Many early official Michigan Dept of State ...
  4. [4]
  5. [5]
    US 8 and US 141 Resurfacing
    US 8 north-south segment that runs contiguous with US 141 for approximately 8.2 miles. US 8 east-west segments with a length of approximately 2.1 miles. View ...Missing: endpoints | Show results with:endpoints
  6. [6]
  7. [7]
    Trunk Highway 8 Corridor Study | MnDOT Digital Library
    The objective of the study is to establish, and implement in a timely and economical manner, a series of recommendations which improve the safety of the ...
  8. [8]
    US 8 Corridor Study (WIS 35 to US 53), St. Croix Falls to town of ...
    This study, a 40-mile segment of four-lane roadway between St. Croix Falls and US 53, was initiated by legislative mandate to determine how to best meet the ...Missing: endpoints length
  9. [9]
    WIS 27 (Chippewa County line to US 8)
    This project addresses deteriorating pavement by resurfacing WIS 27 from the Chippewa County line to US 8 in the Rusk County town of Willard.
  10. [10]
    US 8 (River Avenue to Prentice Street), Ladysmith to Glen Flora
    A pavement rehabilitation project on US 8 between Prentice Street in Glen Flora and the Rusk-Price County line is planned in 2024. Real Estate. Almost all work ...
  11. [11]
    Monitoring location Flambeau River Near Bruce, WI - USGS-05360500
    Discover water data collected at monitoring location USGS-05360500, located in Wisconsin and find additional nearby monitoring locations.
  12. [12]
  13. [13]
    Chequamegon-Nicolet National Forest - Travel Wisconsin
    The Chequamegon-Nicolet National Forest covers more than 1.5 million acres of Wisconsin's northwoods, managing lands for multiple uses.
  14. [14]
    US 8, from Lustila Road to Tracy Road in Price, Lincoln and Oneida ...
    Jul 1, 2020 · US 8, from Lustila Road to Tracy Road in Price, Lincoln and Oneida Counties · Public Involvement · Contact WisDOT · Forms/Notices · WisDOT Employees.
  15. [15]
    US 8, WIS 55 South to WIS 32 South, Forest County
    The proposed detour route will be WIS 32 to WIS 64 to WIS 55. Access to local residents and emergency responders will be maintained at all times. Single-lane ...
  16. [16]
    Category:U.S. Route 8 in Michigan - Wikimedia Commons
    May 1, 2024 · English: Media related to U.S. Route 8 in Michigan {US 8), a 2.322-mile (3.737 km) section of U.S. Numbered Highway in Dickinson County, ...
  17. [17]
    Norway Mine, Norway, MI - michiganrailroads.com
    Norway Mine was an iron ore mine located at Norway, MI in Dickenson County. It was operated after 1893 by the Penn Iron Mining company.
  18. [18]
    Dickinson County began in 1891
    The Breen and Vulcan mines near Iron Mountain began active operations and shipped their first ore in 1877.
  19. [19]
    Historic U.S. Highway 8, Minnesota
    US Route 8 was the predecessor of I-35 and 35W between Minneapolis and Forest Lake. It provided Minneapolis with a connection to US 61, then the main route to ...Missing: DOT | Show results with:DOT
  20. [20]
    The Origins of the U.S. Numbered Highway System - General ...
    Even in States that adopted numbers, the names often lingered. Iowa began numbering its highways in 1920, but the State continued to register named trails under ...
  21. [21]
    Details of Routes 1-25 - Steve Riner Highways
    Dec 27, 2021 · After completion of I-35W, U.S. 8 was overlaid with the interstate between Forest Lake and New Brighton Blvd., and then it terminated at the ...
  22. [22]
    U.S. Route 8 - Academic Dictionaries and Encyclopedias
    Menominee River. 255.55. 0.000, Wisconsin–Michigan state line. Michigan ... The U.S. Highway 8 Business Route (BUS US 8) in Rhinelander, Wisconsin was a ...
  23. [23]
    U.S. Highway 8
    In 1978, with ongoing construction and completion of I-35W, US 8 was truncated from downtown Minneapolis to this point, the I-35W/New Brighton Blvd interchange, ...
  24. [24]
    U.S. Highway 8
    May 1, 2006 · US 8 originally ended at US 61 in Forest Lake. In 1931, it was extended into downtown Minneapolis, to end here at 3rd Ave and Washington Ave.
  25. [25]
    The Greatest Decade 1956-1966 - Interstate System - Highway History
    Jun 27, 2017 · During the Interstate System's greatest decade, with much of the construction on new right-of-way, controversies related to impacts on ...
  26. [26]
    Master List 1917-Present - Wisconsin Highways
    Oct 23, 2016 · The Wisconsin Highways Master List is a complete list of every state trunk highway designation ever used in Wisconsin, from 1917 to today.<|control11|><|separator|>
  27. [27]
    Gov. Evers, Dept. of Transportation: Join Forest County Potawatomi ...
    Oct 16, 2025 · The multi-use path is adjacent to WisDOT's reconstruction project on U.S. Highway 8 between WIS 55 in Crandon and WIS 32 South near Laona.
  28. [28]
    Trunk Highway 8 Reconstruction Project | Chisago County, MN
    We're working to improve Highway 8. Chisago County is leading a project to identity a long-term solution to improve safety and mobility along U.S. Highway 8 ...Missing: Route | Show results with:Route
  29. [29]
    HF 2223 as introduced - 94th Legislature (2025 - 2026)
    Mar 12, 2025 · This appropriation is for predesign, design, engineering, and reconstruction of marked U.S. Highway 8 from Karmel Avenue in. Chisago City to ...
  30. [30]
    New multi-use path and Highway 8 now open in Forest County
    Oct 20, 2025 · The $18.6 million project repaved about 11 miles of highway, removed part of a hill and improved stormwater drainage in the area. Copyright 2025 ...Missing: resurfacing improvements
  31. [31]
    Schedule and Traffic Impacts – US 8, WIS 55 to Otter Creek Road
    Page last updated: Nov. 7, 2025. Schedule: April 14 to Nov. 18, 2025. Anticipated work scheduled: Crews will: Install erosion control and landscaping ...Missing: multi- use
  32. [32]
    Hwy 8 study – Chisago City to Taylors Falls - Let's Talk Transportation
    Hwy 8 is an important route for campers, large vehicles and freight. · Longer wait times at side streets in the future due to anticipated traffic increases.
  33. [33]
    US 8 (WIS 35 North to WIS 46 South), town of St. Croix Falls to town ...
    Location. US 8 from the north junction of WIS 35 east of St. Croix Falls to the south junction of WIS 46 in the town of Apple River, all in Polk County.Missing: traversed | Show results with:traversed
  34. [34]
  35. [35]
  36. [36]
    [PDF] 2024-2028 Five Year Transportation Program - State of Michigan
    Nov 9, 2023 · This document provides information on investments for the five-year period spanning 2024-2028. The 5YTP covers all components of the ...
  37. [37]
    [PDF] US 8 Crandon to Laona Forest County Corridor Study Report
    US 8 is a NHS Route and is on the federal long truck route system. US 8 is an important route in Wisconsin as it is included as a connector in WisDOT's ...
  38. [38]
    [PDF] North Country Corridor – Saint Croix Falls to Niagara
    The corridor includes the urban areas of Rice Lake, Rhinelander and Niagara. It serves the St. Croix Indian Reservation, the Sokaogon Chippewa Community and the ...
  39. [39]
  40. [40]
    What's New? - Wisconsin Highways
    Also added information on the proposed US-8 alignment and links to the maps to the US-8 route listing. ... Added the links to the Wisconsin State Trunk Highway ...<|control11|><|separator|>
  41. [41]
    In Depth: Business Route Specifications - Wisconsin Highways
    Elimination in Urbanized Areas. In 2004, WisDOT apparently conducted a program of eliminating signed business connections in urbanized areas around the state.Missing: Rhinelander 8 2005<|control11|><|separator|>
  42. [42]
    Highways 30-39 - Wisconsin Highways
    Oct 21, 2016 · The new highway will run from 150th Avenue, east of Houlton, to 145th Street, east of New Richmond. It will run south of Somerset and north of New Richmond.<|control11|><|separator|>
  43. [43]
    U.S. 141 Wisconsin - AARoads
    Feb 19, 2016 · U.S. 141 travels 116.7 miles through northeast Wisconsin and nearly 169 miles overall between Interstate 41 in Ledgeview and U.S. 41 near ...<|separator|>
  44. [44]
    [PDF] Public Involvement Meeting Handout: US 8, WIS 55 South to WIS 32 ...
    Sep 4, 2022 · The proposed detour route will be WIS 32 to WIS 64 to. WIS 55. Access to local residents and emergency responders will be maintained at all ...<|separator|>