Fact-checked by Grok 2 weeks ago

Bath Spa railway station

Bath Spa railway station is the principal railway station serving the city of in , , located on Dorchester Street (BA1 1SU) near the city centre and major attractions such as the Baths. Opened on 31 August 1840 as Bath station and designed by the engineer for the Great Western Railway, it was renamed Bath Spa in 1949 to distinguish it from the nearby Bath Green Park station (closed 1966). The station is a Grade II listed building*, recognised for its historical and architectural significance, including Gothic Revival elements in its and overall structure reflective of Brunel's era. Managed by Great Western Railway (GWR), the station handles frequent services operated by GWR, CrossCountry, and South Western Railway, connecting Bath to destinations including London Paddington, Bristol Temple Meads, Cardiff Central, Portsmouth Harbour, and northern England via Birmingham. It features modern facilities including step-free access and parking. As Bath's busiest station, it supported over 6 million passenger journeys in 2023/24, serving as a vital link in the Great Western Main Line network.

Overview and location

Site and layout

Bath Spa railway station is situated on the , positioned between to the west and to the east, approximately 106 miles from the latter. The station features a simple layout with two through platforms serving bidirectional main line tracks. Platform 1 handles westbound services toward , while Platform 2 accommodates eastbound trains to ; both platforms are connected by a subway and lifts for step-free access. A third bay platform, located at the eastern end of Platform 2, was historically used for terminating services but is now disused. The track configuration consists of two parallel main lines without sidings or additional running lines, optimized for high-speed through services on the route. The station itself lies within a deep cutting, with approaches from the west crossing the River Avon via the Skew Bridge—a skew-arched structure rebuilt in 1878—and continuing over the St James Viaduct, a multi-arched opened in that carries the line toward . From the east, the line approaches via bridges over the Avon before entering the cutting. Integrated closely with Bath's urban fabric, the station fronts directly onto Dorchester Street in the city center, providing immediate pedestrian access via nearby St James's Parade and facilitating connectivity to key attractions like the Roman Baths and within a short walk.

Facilities and accessibility

Bath Spa railway station provides a range of amenities for passengers, including a ticket office open Monday to Friday 06:00–20:00, Saturday 06:00–20:00, and Sunday 07:45–20:00 for reservations and ticket purchases. Ticket machines are also available throughout the station. Waiting rooms are located on Platforms 1 and 2, open Monday to Friday and Saturday from 05:30 to 20:30, and Sunday from 07:45 to 20:00, offering sheltered seating areas. Refreshment kiosks and retail outlets, such as coffee shops and a flower shop in the subway, provide options for food and drink, while public toilets, including accessible facilities and a toilet with baby changing, are available on the platforms. Accessibility features at the station include step-free access to both platforms via lifts installed in 2012 as part of a major redevelopment, supplemented by the 2017 platform widening that improved passenger flow and reduced the gap between trains and platforms for easier boarding. Tactile paving is present on all platforms to assist visually impaired passengers, and help points with audio announcements operate Monday to Friday and Saturday from 06:00 to 20:00, and Sunday from 07:45 to 20:00. Staff assistance for disabled passengers is available through the Great Western Railway Passenger Assist scheme, with induction loops at the ticket office and wheelchair availability upon request. The station offers 78 car parking spaces, including 4 accessible spaces managed by APCOA, along with cycle storage and bicycle hire facilities. A rank is located at the main entrance, and drop-off/pick-up points are provided at both the front and rear of the station, with improvements to these areas implemented during the revamp. Bus connections to city center are accessible via nearby stops on Dorchester Street, including services from operators like First Bus. Recent enhancements include the approval in 2021 for two new lighting columns on Platform 1 to improve visibility and safety. In November 2024, community artwork themed 'Our Home,' created by local artists led by Kurda Yar through workshops supported by Bath Welcomes Refugees and funded by Great Western Railway, was unveiled on Platform 2 to enhance the passenger experience.

History

Construction and early years

Bath Spa railway station was designed by the engineer for the Great Western Railway (GWR), as part of the ambitious to line authorized by in 1835. Construction began in 1836 amid challenging terrain, with the to section of the route completed and the station opening to passengers on 31 August 1840, initially named simply Bath station. This marked it as the city's principal rail hub from inception, integrating seamlessly into Brunel's vision for a high-speed network emphasizing straight alignments and minimal gradients where possible. To accommodate Bath's hilly and layout, the station was engineered within a deep cutting, a notable feature of the line between and that allowed the railway to thread through the landscape without excessive elevation changes. The full to connection was achieved on 30 June 1841 with the opening of the Chippenham to segment, including the monumental ; by this point, the approach tracks had been configured for double-track operation to support bidirectional traffic on Brunel's signature 7-foot broad system, which prioritized stability and speed over the standard used elsewhere. Original platform features included a timber spanning the tracks, providing shelter in a reminiscent of medieval halls but adapted for industrial use, though this structure was later removed during 19th-century modifications. From its early operations, the station functioned as a vital intermediate stop on the London-Bristol main line, handling both services and freight amid growing demand. Early traffic emphasized journeys, with the railway's arrival catalyzing a surge in visitors to Bath's renowned facilities and boosting the local in the 1840s by offering faster, more reliable access from major cities. Freight initially supported regional commerce, though volumes quickly dominated due to the station's role in connecting affluent travelers to the city's therapeutic attractions.

Later developments

The station and line were converted from Brunel's broad gauge to standard gauge on 21–22 May 1892, as part of the GWR-wide abandonment of the broad gauge system. In 1897, the station underwent significant remodelling that included the removal of its original to provide greater height clearance for passing locomotives and to facilitate longer platforms, a change necessitated by evolving railway technology and operational demands. The station, originally known as Bath, was renamed Bath Spa in 1949 to distinguish it from the nearby Bath Green Park station and to evoke the city's historic spa heritage. On 11 August 1972, it received Grade II* listed status from , recognizing its architectural and historical importance as a work of , with protections extended to preserve key Brunel-era features such as the curving gables and rear elevation. In the 20th and 21st centuries, infrastructural upgrades addressed growing passenger needs and modernization efforts. Platform widening occurred in 2017 to improve circulation space and reduce the gap between trains and platforms, originally in preparation for the electrification programme, which was deferred in November 2016 due to cost overruns. More recently, essential track renewal works through St Anne's Tunnel disrupted services between 27 and 30 October 2025, with replacement buses operating between Bath Spa and Meads to maintain connectivity during the closures. Preservation initiatives by continue to safeguard the station's Brunel-designed elements against modern alterations, ensuring its role as a amid ongoing operational enhancements. Capacity constraints, including platform crowding and uneven passenger distribution during peak times, have prompted discussions on potential expansions to better handle increasing usage.

Architecture and engineering

Station building

The station building at Bath Spa railway station, constructed around 1840, exemplifies the Tudorbethan architectural style pioneered by for the Great Western Railway (GWR). The facade features a symmetrical frontage on Manvers Street with limestone ashlar construction, Flemish gables, and a prominent central , creating a dignified approach that integrates with Bath's historic townscape as envisioned in the 1835 Railway Act. This design draws on Elizabethan and Jacobean influences, presenting the building as a high-level through station elevated on a viaduct, with the main north-side entrance leading to pedestrian and vehicle underpasses below. Key interior features include a spacious booking hall serving as the primary , originally equipped with facilities for ticket sales and passenger flow, flanked by columns that support the structure. Platform-level access from the connects to divided platforms via arched openings, while later additions such as cantilevered canopies with lighting were installed over the platforms in 1897, replacing the original to accommodate expanded operations without compromising the building's core aesthetic. These elements highlight the station's functional layout, blending Brunel's engineering precision with architectural ornamentation typical of early GWR terminals. The building holds Grade II* listed status, granted on 11 August 1972 and amended on 15 October 2010, due to its special architectural and historic interest as a prime surviving example of Brunel's innovative station designs on the GWR main line. Listing criteria emphasize the intact limestone elevations, slate roofs, and overall contribution to Bath's architectural heritage, including fixed structures predating 1948 such as the and gabled facades. A later yellow brick wing extends the original structure, maintaining symmetry while adapting to increased passenger needs. Modern adaptations have focused on enhancing and while preserving the historic fabric, including the addition of new entrances to the west and south sides in , which improved passenger flow without altering the neo-Elizabethan frontage. Further improvements included platform widening as part of the 2017 electrification project, along with canopy reinforcements using durable composites to repair weathered timber elements, ensuring the building's longevity as a functional heritage asset. These interventions, overseen by bodies like , prioritize reversible modifications to uphold the Grade II* designation.

Civil structures

The civil structures integral to the approaches of Bath Spa railway station demonstrate the engineering ingenuity required to navigate the challenging topography of the River Avon valley. Foremost among these is St James's Railway Bridge, a wide elliptical arch constructed around 1840 by for the Great Western Railway. Crafted from ashlar with later repairs in red and blue brick, the bridge spans approximately 27 meters across the River Avon at a 45-degree angle, providing an elegant solution to the oblique crossing necessitated by the terrain. It is Grade II listed, recognizing its architectural and engineering merit within the GWR main line. Immediately west of the station lies the Skew Bridge, originally built in to Brunel's designs as a laminated timber structure to expedite amid tight timelines. This bridge features two spans, each 24.38 meters long and skewed at 28 degrees, to accommodate the angled rail alignment over local roads and paths. It was substantially rebuilt in 1878 by district engineer Simpson, incorporating , , and wrought-iron lattice girders supported by brick walling for enhanced stability, with further strengthening in the using a . A cantilevered iron , 31.5 meters in length with semi-circular railings, runs beneath the western arch, originally serving pedestrian access. Supporting the western approach tracks is St James' Viaduct, also dating to and engineered by Brunel as an early example of GWR infrastructure. The structure comprises limestone ashlar piers in English bond with blue arches, totaling six arches on the eastern section and eleven on the western, alongside a central portion featuring pedestrian arches and skewed openings over roadways. Grade II* listed for its rarity and intact condition, the viaduct exemplifies Brunel's adaptation of materials to span uneven valley ground while integrating with urban surroundings. These structures collectively highlight Brunel's pioneering approach to in , where he innovatively combined stone for durability in riverine settings with transitional uses of timber and iron to address the steep gradients and oblique alignments of the valley. His designs prioritized structural efficiency and aesthetic harmony, overcoming the era's material limitations to create enduring viaducts and bridges that facilitated the GWR's expansion through complex terrain.

Services

Current passenger services

Bath Spa railway station is managed by Great Western Railway (GWR), which operates the majority of passenger services calling at the station. GWR runs two trains per hour in each direction to and from London Paddington, with a typical journey time of 1 hour 15 minutes. Services to and from also operate at a frequency of two per hour, covering the 12-mile route in approximately 15 minutes. In addition, GWR provides hourly services to Westbury, with extensions to via the and to via and . operates a limited number of services through Bath Spa, offering connections to Birmingham New Street and further north to destinations such as and , though most require a change at . The station handles no regular freight operations, focusing exclusively on passenger traffic. Services can be subject to disruptions due to works; for example, track renewal between Bath Spa and Bristol Temple Meads in late October 2025 resulted in reduced frequencies and rail replacement bus services from 27 to 30 October.

Passenger usage

Bath Spa railway station recorded an estimated 6,118,136 passenger entries and exits in the financial year 2023/24, marking it as one of the busiest stations in the South West of England. This figure represents a recovery from lows, with usage increasing from 1,198,504 in 2020/21, to 4,085,704 in 2021/22, and 5,468,466 in 2022/23, approaching but not yet surpassing the pre- peak of 6,538,056 in 2018/19. These estimates, produced by the Office of Rail and Road (ORR), are derived primarily from ticket sales data, supplemented by surveys and modeling to account for unticketed journeys and adjustments for seasonal variations.
YearEntries and Exits
2018/196,538,056
2019/206,432,812
2020/211,198,504
2021/224,085,704
2022/235,468,466
2023/246,118,136
The station's ridership growth is fueled by commuter flows to major hubs like London Paddington and Bristol Temple Meads, alongside significant tourism demand. Usage peaks during the summer months, coinciding with Bath's high season for visitors drawn to its UNESCO World Heritage sites. As a primary rail gateway, the station supports Bath's tourism economy, valued at around £350 million annually, by facilitating access to attractions such as the Roman Baths and historic spa facilities for both day-trippers and overnight stays.

Other stations in Bath

Operating stations

Bath's railway network currently features two operating stations: Bath Spa, the primary hub, and Oldfield Park, a smaller facility serving the southern residential areas. Oldfield Park railway station, located approximately 1 mile south of Bath Spa along the , was opened on 18 February 1929 by the Great Western Railway to provide local access for suburban passengers. Services at Oldfield Park are operated exclusively by Great Western Railway (GWR), with regular local trains primarily to Bristol Temple Meads, running approximately every 30 minutes during peak periods and hourly off-peak, alongside northbound services to Bath Spa. The station offers basic facilities, including ticket machines, cycle storage, and step-free access via ramps, but lacks amenities such as toilets or . Passenger usage remains modest, with around 298,000 entries and exits recorded in the 2022–2023 financial year and 344,132 in 2023–2024. In contrast to Bath Spa's role as the principal interchange for long-distance and regional services, Oldfield Park primarily caters to local commuters traveling to or within , handling a fraction of the overall traffic. Both stations share the same main line infrastructure, enabling through services, though there are no direct interchange facilities between them due to the distance.

Closed stations

Bath has seen several railway stations close over the decades, primarily due to post-war rationalization efforts, declining freight traffic, and the consolidation of services around the central Bath Spa station. These closures reflect broader trends in the British rail network during the mid-20th century, particularly under the Beeching Report of , which recommended eliminating unprofitable lines and stations to streamline operations. One prominent closure was station, which opened in 1870 as a joint Great Western Railway (GWR) and facility serving both passenger and goods traffic. It handled significant freight from local industries but saw passenger services diminish as Bath Spa became the preferred hub. The station closed to passengers on 7 March 1966 following the Beeching-era cuts, with its site later redeveloped into residential housing and commercial spaces. Weston (Bath) station, operational from 1869 to 1953, was part of the Somerset & Dorset Joint Railway line connecting to Bournemouth via the scenic Somerset coast. It primarily served local passengers and freight but was closed early in the rationalization process due to low usage and competition from GWR routes. The closure contributed to the eventual dismantling of the S&D line, underscoring the impact of duplicative services in the region. Twerton-on-Avon station, which opened in 1840 on the GWR's main line west of , catered to the growing suburb of Twerton. It closed to all traffic on 2 July 1917 as a economy measure and was never reopened; the site now forms part of the active railway corridor but without a stop. Bathampton station, established in 1857 on the Great Western Railway main line from to , served rural areas to the east and was located near the . Passenger services ended on 3 October 1966 under Beeching recommendations, driven by minimal traffic. The line's closure facilitated 's rail focus on its main line infrastructure, though remnants like the trackbed have been repurposed for walking paths. These closures collectively reduced 's rail footprint from over a dozen stations in the to just a few today, emphasizing 's role as the enduring central terminus and highlighting the long-term shift toward integrated transport hubs.

References

  1. [1]
    Bath Spa Station | National Rail
    Discover Bath Spa railway station. Getting to & from, buying & collecting train tickets, staffing, facilities, accessibility, & mobility access.
  2. [2]
    Bath Spa railway station | Transport for Wales - TfW
    Originally opening in 1840, Bath Spa railway station is a grade II listed building and highlights the architecture style of engineer, Isambard Kingdom Brunel.Missing: history | Show results with:history
  3. [3]
    Great Western Railway - Bath Station | Network Rail Corporate Archive
    Bath Station was designed by Isambard Kingdom Brunel, built in 1840 and opened 31 August 1840. It was renamed Bath Spa in 1949.
  4. [4]
    A spotlight on Bath's railway heritage
    Jul 23, 2025 · Bath Spa Station. Built in 1840 by Brunel for the Great Western Railway, Bath Spa Station is a Grade II* listed building, and serves as Bath's ...
  5. [5]
    Bath Spa train station | Departures, arrivals and tickets | GWR
    Getting to and from the station. Bicycle parking. Yes · Ticket Buying and Collection. Ticket Office · Staffing and General Services. Staff help available opening ...
  6. [6]
    Bath Spa Train Station - South Western Railway
    Find information on Bath Spa train station. View live departures and arrivals, station facilities, accessibility information and book cheap train tickets.
  7. [7]
    LONDON TO BATH BY TRAIN from £25 | What to see on ... - Seat 61
    A Great Western high-speed train links London & Bath every 30 minutes through the day, 106 miles in around 1h22, city centre to city centre at up to 125 mph.
  8. [8]
    Using the railway station in Bath | ShowMeTheJourney
    Bath Spa station only has two platforms (tracks): Platform 1 is where the trains heading west to Bristol, Cardiff, Gloucester and beyond depart from.
  9. [9]
    Modernisation of Bath Spa station - Rail Engineer
    Jul 3, 2017 · Extensive upgrade work has been focused on Bath Spa Station, with the core of the work being carried out during a possession from 8 to 23 April ...Missing: bay | Show results with:bay
  10. [10]
    skew bridge and associated cantilevered walkway immediately to ...
    List entry 1395344. Grade II Listed Building: Skew Bridge And Associated Cantilevered Walkway Immediately To The West Of Bath Spa Station.
  11. [11]
    St James' Viaduct (MLN110705), Non Civil Parish - Historic England
    St James' Viaduct opened to traffic on 21 August 1840. It carries the route west towards Bristol from Bath Spa Station and the Skew Bridge over the River ...
  12. [12]
    Stannah adds two new passenger lifts in Bath Spa Station
    Apr 10, 2012 · Type of works: installed two passenger lifts. February 2012 has seen the completion of a 12-month project by lift experts, Stannah, in the ...Missing: date | Show results with:date
  13. [13]
    Passenger Assist and accessibility - Great Western Railway
    Need help with your journey? If you require wheelchair accessibility or assisted travel with our trains or at stations let us know at Great Western Railway.<|separator|>
  14. [14]
    Bath Spa Train Station - Southeastern
    Step free Category A station - step free access available to both platforms via lifts from the main station entrance. Impaired Mobility Set Down, Yes. Set- Down ...
  15. [15]
    Public Transport - Visit Bath
    Here's all the information on Bath's public transport network, including bus, train, Park & Ride, taxi and even e-scooter!
  16. [16]
    Planning Application Reference - Bath & North East Somerset Council
    To undertake Passenger Awareness Monitor works at Bath Spa Railway station. Date Application Received. 04/11/2021. Status. Consent. Reference. 21/03809/TCA.
  17. [17]
    Community Artwork Creates a Warm Welcome at Bath Spa Station
    New artwork created by artist Kurda Yar and the local refugee community was unveiled on Saturday 23 rd November 2024 at Bath Spa Railway Station.Missing: enhancements 2021 lighting
  18. [18]
    Isambard Kingdom Brunel (1806–1859) - Network Rail
    The Great Western Railway Act was approved by Parliament in 1835, and work on the 116-mile line began in 1836. The construction was more difficult and expensive ...
  19. [19]
    Great Western Railway Stations
    Apr 16, 2013 · ... station. Track layout, Signal box diagram. Bath Spa Origin: Great Western Railway Opened: 31st August 1840, Bath Station, Downside Entrance. It ...
  20. [20]
    history of the railways | Great Western Railway
    A new site was opened in 1852 with the original finally closing in 1872 after operating as a goods station. The current station was completely rebuilt in 1970, ...Missing: operator | Show results with:operator
  21. [21]
    The Project Gutenberg eBook of The Life of Isambard Kingdom ...
    RAILWAY WORKS. A.D. 1835—1859. ÆTATIS 30—54. Construction of the Great Western Railway—The Box Tunnel—The Bath and Bristol Stations—The Paddington Station—The ...
  22. [22]
    More room at Bath Spa station when the power lines go through.
    Nov 5, 2016 · 'Due to the large distance between tracks there is an option to move the tracks closer together to avoid cutting back the canopy. In order ...Missing: configuration sidings
  23. [23]
    BATH SPA STATION, Non Civil Parish - 1395629 | Historic England
    ... roof similar type to one at Bristol, Temple Meads. Illustrated in Bourne's "Description of the Great Western Railway", but it was removed in 1897. Rear wall ...
  24. [24]
    61752: Bath Spa Station, Manvers Street, Bath - Somerset HER
    The Bristol to Bath section of the railway opened in 1840, and the Bath to London section in 1841. The station is on a twenty arch viaduct between two river ...Missing: configuration | Show results with:configuration
  25. [25]
  26. [26]
    Changes to Bath Spa trains as Network Rail upgrades track near ...
    Jun 19, 2017 · Work took place in April to widen Bath Spa stations' platform to accommodate longer and electrified train services (Image: Paul Gillis).Missing: deferred | Show results with:deferred
  27. [27]
    Great Western line electrification 'deferred' amid cost overruns
    Nov 8, 2016 · Work to electrify key branch lines on rail routes to Oxford and Bristol has been suspended, the government has announced.Missing: platform widening 2017
  28. [28]
    Autumn track work to affect trains between Bath, Bristol and Weston ...
    Oct 10, 2025 · Network Rail will complete essential engineering work over six days on the Great Western Mainline this month, affecting passengers between ...
  29. [29]
    Rail Engineering works: Bristol Temple Meads and Bath Spa
    Track renewal work: Buses will replace trains between Bristol Temple Meads and Bath Spa from Monday 27 to Thursday 30 October. ... Starts Monday 27 October 2025 to Thursday 30 October 2025. Playing in picture-in-picture.
  30. [30]
    Brunel in Bath - The ship that changed the world!
    Feb 6, 2024 · Tim Bryan, Director of the Brunel Institute explores surviving railway heritage and discovers some engineering treasures of Brunel in Bath.<|separator|>
  31. [31]
    [PDF] TRANSPORT DELIVERY ACTION PLAN FOR BATH
    and platform alignments at Bath Spa station itself. For the sections that have been officially deferred, timing for their eventual recommencement or ...
  32. [32]
    Bath Spa Station - Heritage Locations - National Transport Trust
    Directions. By road: In the southern part of the centre of Bath at the junction of Dorchester Street and Manvers Street.
  33. [33]
    Bath Spa Train Station - National Trails
    The station's two platforms are connected by subway, and both platforms have toilets. You can grab a cuppa at the coffee shop on platform 1, and get a taxi from ...
  34. [34]
    New entrances at Bath Spa railway station due to open - BBC News
    Aug 24, 2011 · Other improvements planned at the station include new toilets and outside there will be improved drop-off points and additional parking spaces.
  35. [35]
    Bath Spa Rail Station Daggerboard Canopies, UK - Dura Composites
    Project Overview. The existing timber station canopies at Bath Spa were badly in need of repair due to extensive weathering and rotting.Missing: additions | Show results with:additions
  36. [36]
    Enhanced Customer Experience - Projects - Oxford Architects
    Working within Grade II* Listed Building · Improved staff and customers facilities · Modern and welcoming entrance hall · Provision of new retail space.<|control11|><|separator|>
  37. [37]
    ST JAMES'S RAILWAY BRIDGE, Non Civil Parish - Historic England
    List entry 1395151. Grade II Listed Building: St James's Railway Bridge. May include summary, reasons for designation and history.Missing: Viaduct iron girder 1840s
  38. [38]
    Isambard Kingdom Brunel: the world's greatest engineer?
    Jan 24, 2022 · The railway cut through rivers, valleys and hills using innovative viaducts, bridges and tunnels and was considered the best railway of its time ...Missing: Bath materials
  39. [39]
    Trains from London to Bath | Book online - Great Western Railway
    Our fastest service takes just 1 hour 19 minutes. How often do trains run from London Paddington to Bath Spa? On an average weekday, around 72 trains run ...
  40. [40]
    Great Western Railway JourneyCheck for journeys from Bath Spa to ...
    12:43 Bath Spa to London Paddington · 12:43 · 14:05 ; 13:13 Bath Spa to London Paddington · 13:13 · 14:35 ; 13:43 Bath Spa to London Paddington · 13:43 · 15:07 ...
  41. [41]
    Trains from Bristol to Bath | Book online - Great Western Railway
    How often do trains run from Bristol Temple Meads to Bath Spa? Trains from Bristol Temple Meads to Bath Spa run fairly frequently with around 4 services an ...
  42. [42]
    Bath Spa Station to Bristol Temple Meads - 5 ways to travel via train ...
    Yes, there is a direct train departing from Bath Spa and arriving at Bristol Temple Meads. Services depart every 20 minutes, and operate every day. The journey ...
  43. [43]
    Check Train Times and Timetables - Great Western Railway
    Train times · Timetables for travel from 18 May to 13 December 2025. Our train timetables and routes are available in PDF format for travel from 18 May to 13 ...
  44. [44]
    Bath Spa Train Station | Stations & Destinations - CrossCountry Trains
    Bath Spa train station has been serving the Somerset city of Bath since it first opened in 1840 and has subsequently been a prominent transport connection ...Bath Spa Train Station · Ticket Office Opening Hours · Station Overview
  45. [45]
    Trains Bath Spa to Birmingham International from £32.20 | Trainline
    Starting from £32.20Frequency. 91 trains per day. Changes. 2 changes. Price. From £32.20. Train operators. Avanti West Coast, CrossCountry, Great Western Railway, Transport for ...
  46. [46]
    RailwayData | Bath Spa Station - The Railway Data Centre
    Data derived from Network Rail timetable planning rules 2025 (Jan 2024). Service Patterns. Current Timetables. Table, Description, Timetable. 009, Swansea, ...
  47. [47]
    Planned Engineering Work and Disruption - Great Western Railway
    Bristol Temple Meads to Bath Spa – Monday 27 to Thursday 30 October. Track renewal work will affect all train services between Bristol and Bath. Hourly ...
  48. [48]
    Autumn track work in Bristol and Bath - Network Rail
    Over six days in October we are replacing track and points affecting train services between Bristol, Bath and Weston-super-Mare.
  49. [49]
    Estimates of station usage - ORR Data Portal
    Annual estimates of the number of entries/exits and interchanges at each station in Great Britain. These estimates are based primarily on ticket sales.Missing: Bath Spa
  50. [50]
    Bath Spa Station - RailStats.co.uk
    Passenger numbers for Bath Spa peaked during 2018-19 with 6,538,056 estimated passengers. Passenger Numbers. Usage dropped to 19% during the 2020-21 travel ...Missing: ORR | Show results with:ORR
  51. [51]
    [PDF] Estimates of station usage April 2023 to March 2024
    Apr 1, 2023 · These statistics on station usage are estimates based primarily on ticket sales. The data sources and methodology used is the best approach ...
  52. [52]
    Station Usage Figures 2019-2020 - Bristol Rail Campaign (FoSBR)
    Dec 3, 2020 · Bristol Temple Meads was the busiest in the South West, with 11,619,360 passengers, whilst Bath Spa was runner-up with 6,432,812. New stations ...
  53. [53]
    Summer In Bath - VisitBath.co.uk
    Plan your #SummerInBath and enjoy a soothing but adventurous holiday in our beautiful World Heritage city and its picturesque surrounding countryside.
  54. [54]
    [PDF] Bath Economic Regeneration Delivery Plan
    Tourism is worth approximately £350m to the local economy and helps to support the city's extensive retail offer and role as a regional retail destination. Bath ...
  55. [55]
    Plan Your Visit
    ### Summary of Bath Spa Railway Station's Role in Tourism and Access to Attractions
  56. [56]
    Oldfield Park Station - National Rail
    Oldfield Park (OLF). Oldfield Park station, Brook Road, Bath Spa, Somerset, BA2 3RS ... Station facilities and services. CCTV,Available. Public Wi-Fi,Unavailable.
  57. [57]
    Oldfield Park Station © John Attfield cc-by-sa/2.0 - Geograph
    Dec 24, 2007 · ... looking towards Bath from the Brook Road overbridge, Oldfield Park station was opened by the Great Western Railway on 18 February 1929.Missing: source | Show results with:source
  58. [58]
    Oldfield Park train station | Departures, arrivals and tickets | GWR
    Oldfield Park station, Brook Road Bath Spa Somerset BA2 3RS. Get directions, print station details. At a glance: Ticket Office, Ticket Machines, Collection of ...
  59. [59]
    Trains Oldfield Park to Bristol Temple Meads from £9.80 | Trainline
    Starting from £9.80With around 69 trains running each day, you'll be there in no time - the fastest ones will get you to Bristol Temple Meads in 15 minutes! Check our Journey ...