Bruce Nuclear Generating Station

The Bruce Nuclear Generating Station is a commercial nuclear power plant located in the municipality of Kincardine on the eastern shore of Lake Huron in Ontario, Canada, operated by the private-sector entity Bruce Power under licence from the Canadian Nuclear Safety Commission. It consists of eight pressurized heavy-water CANDU reactors divided between the adjacent Bruce A and Bruce B facilities, with a combined installed electrical generating capacity of 6,232 megawatts. The station produces approximately 30 percent of Ontario's electricity, contributing significantly to the province's baseload power supply with low-carbon output. Commissioned between 1977 and 1987, the facility initially faced operational challenges leading to the shutdown of four Bruce A units in the for safety and maintenance upgrades, but refurbishments completed in the early restored full operation, establishing it as the world's largest nuclear generating station by total reactor count and among the highest by output capacity. Ongoing major component replacement and life-extension projects on Units 3 through 8, initiated in the , aim to sustain operations beyond 2020 licence expiry dates while potentially increasing capacity to over 6,500 megawatts. These efforts underscore the station's role in reliable energy production, with regulatory oversight confirming compliance amid routine reportable events such as minor worker injuries or transport incidents, none of which have compromised overall performance. The station's operations also support medical isotope production for global health applications and are part of proposed expansions like the Bruce C Project for additional capacity up to 4,800 megawatts, reflecting its strategic importance in Canada's transition to emissions-free electricity generation.

Site Overview

Location and Infrastructure

The Bruce Nuclear Generating Station is situated on the eastern shore of Lake Huron in the Municipality of Kincardine, Ontario, Canada. The facility lies within Bruce County, between the towns of Kincardine and Port Elgin, approximately 250 kilometres northwest of Toronto. The site encompasses 932 hectares of fenced and secured land, providing space for the generating stations, support facilities, and approximately 8 kilometres of lake frontage used for operational purposes including cooling water intake and discharge. Infrastructure includes two main complexes: Bruce A and Bruce B, each containing four pressurized heavy-water CANDU reactor units housed in reinforced concrete containment buildings. Associated structures comprise turbine halls, spent fuel bays, and auxiliary systems for steam generation and electricity production. Cooling infrastructure draws seawater from via intake structures and returns it through discharge channels, supporting the once-through cooling system for the reactors. On-site facilities also include waste storage areas for used and low-level radioactive materials, administrative buildings, and maintenance workshops. The layout is designed for seismic stability and emergency response, with the overall site integrated into the regional via high-voltage transmission lines.

Reactor Configuration and Capacity

The Bruce Nuclear Generating Station consists of eight CANDU pressurized heavy-water reactors (PHWRs), configured in two parallel facilities: Bruce A (Units 1–4) and Bruce B (Units 5–8), located on the eastern shore of Lake Huron in Ontario, Canada. Each reactor operates on natural uranium oxide fuel bundles arranged in horizontal pressure tubes, with heavy water serving as both moderator and primary coolant, enabling online refueling without shutdown. The design emphasizes inherent safety features, such as a large inventory of coolant and passive shutdown systems via poison injection and mechanical control rods. Bruce A units, commissioned between 1977 and 1979, feature two CANDU-791 reactors (Units 1 and 2) and two CANDU-750 reactors (Units 3 and 4), with gross electrical capacities of approximately 791 MWe and 750 MWe per unit, respectively, following upgrades during their restart in the early 2000s after a period of layup. Bruce B units, brought online from 1984 to 1987, each have a gross capacity of around 750 MWe under the CANDU-6 design, though operational uprates have increased effective output. The station's total installed gross capacity stands at approximately 6,400 MWe, making it the largest operating nuclear facility by reactor count globally, with recent power uprates approved by the Canadian Nuclear Safety Commission contributing to this figure.
UnitStationReactor TypeGross Capacity (MWe)Commission Year
1Bruce ACANDU-791~7911977
2Bruce ACANDU-791~7911977
3Bruce ACANDU-750~7501978
4Bruce ACANDU-750~7501979
5Bruce BCANDU-6~7501984
6Bruce BCANDU-6~7501985
7Bruce BCANDU-6~7501986
8Bruce BCANDU-6~7501987
As of mid-2025, seven units remain operational, with one undergoing major component replacement as part of phased life-extension refurbishments aimed at sustaining output beyond original design lives; these efforts include pressure tube replacement and feeder pipe upgrades to maintain or enhance capacities amid ongoing demand for baseload power.

Transmission and Grid Integration

The Bruce Nuclear Generating Station connects to Ontario's bulk electricity system through two on-site 500 kV switchyards owned and operated by , the province's primary transmission provider, which step up reactor output from generator transformers for high-voltage export. This infrastructure enables the station's approximately 6,232 MW capacity to supply baseload power directly to the Independent Electricity System Operator (IESO)-controlled grid, supporting dispatch to load centers via multiple 500 kV circuits. The IESO integrates Bruce's output into real-time provincial balancing, where it accounts for about 30% of Ontario's , prioritizing nuclear for its low-variable-cost reliability over intermittent renewables. A critical component of grid integration is the Bruce-to-Milton transmission corridor, featuring a 176 km, 500 kV double-circuit line with 3,000 MW transfer capability, representing Hydro One's largest expansion in two decades to reinforce export from the Bruce site amid growing demand. Construction on this $600 million reinforcement project, linking the station to the Milton switching station, advanced past its midpoint by 2018, enhancing redundancy and reducing congestion for nuclear flows to the Greater Toronto Area. Additional 230 kV lines provide local reinforcement, while planned upgrades, such as those proposed in 2006 for $200–600 million, underscore ongoing efforts to match transmission capacity to the station's full operational potential. Operational synchronization exemplifies grid integration: individual units sync to the IESO grid post-refurbishment, as with Unit 6 in September 2023 and Unit 1 in September 2012, ensuring seamless contribution without voltage instability. Bruce Power maintains close coordination with Hydro One and the IESO for outages, such as the April 2024 Bruce B vacuum building maintenance, which minimized supply disruptions through pre-planned grid adjustments. This framework supports causal reliability in Ontario's energy mix, where nuclear's dispatchable nature counters grid volatility from variable sources, though future expansions like the proposed Bruce C project may necessitate further transmission reinforcements estimated at $10 billion for 5 GW additional capacity.

Historical Development

Initial Construction and Commissioning (1960s–1980s)

The Bruce Nuclear Generating Station site originated with the construction of the Douglas Point Nuclear Generating Station, a 200 MW prototype CANDU reactor, which began in February 1960 and achieved first criticality in 1967, serving as Canada's first commercial-scale nuclear power demonstration. This facility laid the groundwork for subsequent developments at the site on the eastern shore of Lake Huron in Ontario, Canada, under the auspices of Ontario Hydro. Plans for the Bruce A station, comprising four CANDU-6 pressurized heavy-water reactors each rated at approximately 750 MW, were announced in the mid-1960s, with site preparation and construction commencing in 1969 alongside an associated heavy water production plant. Unit 1 construction started in June 1971, followed by staggered builds for Units 2 through 4 in the early 1970s; the units achieved commercial operation sequentially from September 1977 to 1979, marking the initial phase of large-scale power generation at the site. Construction of the adjacent Bruce B station, also featuring four similar CANDU-6 units, began in 1978 to expand capacity, with the first unit (Unit 6) entering service in 1984 and the remainder following through 1987. These commissioning milestones established the Bruce site as the world's largest nuclear generating station by total capacity, totaling over 6,000 MW from the eight units. The heavy water plant for Bruce B was declared in service in 1981 to support moderator and coolant needs.

Early Operational Challenges and Shutdowns

The Bruce A units, which entered commercial operation between September 1977 and October 1979, initially achieved high capacity factors, with Unit 1 reaching 97% in 1981, but encountered recurring issues with tube integrity that led to unplanned outages. Leaking tubes, primarily caused by vibration-induced fretting wear combined with under-deposit in the secondary side, compromised the barrier and necessitated shutdowns for inspections and repairs across multiple units. These failures stemmed from design and material sensitivities in the CANDU s, where tube-to-support plate interactions accelerated under operational conditions. Pressure tube performance also presented early challenges, including a documented in Unit 2 in 1982 that prompted a temporary shutdown for assessment and remediation. Such incidents highlighted vulnerabilities in the Zr-2.5Nb alloy tubes to deuterium ingress and cracking, though widespread deterioration became more evident later. Outlet feeder pipes exhibited accelerated thinning in the initial meters exposed to high velocities and temperatures, contributing to and demands from the outset. from impurities further exacerbated inefficiencies, forcing derates or outages to mitigate in boilers. These problems, while not halting overall station output—evidenced by Unit 3's world-record 494 days of continuous operation ending in 1982—imposed cumulative costs and reliability strains, prompting iterative design modifications and enhanced chemistry controls by . By the late 1980s, corrosion-related degradation had escalated operational impacts at Bruce A, foreshadowing more extensive interventions. Regulatory oversight by the Atomic Energy Control Board (predecessor to the CNSC) enforced rigorous event reporting, ensuring causal analyses focused on empirical tube examinations rather than speculative mitigations.

Closure of Auxiliary Facilities

The Bruce Heavy Water Plant (BHWP), a key auxiliary facility supporting production for CANDU reactors at the Bruce Nuclear Generating Station site, ceased all operations in 1997 following a decision by to permanently shut down heavy water manufacturing due to sufficient domestic stockpiles and shifting production economics. The plant had supplied deuterium oxide essential for moderator and coolant functions in Canada's pressurized reactors, with sub-plant A commencing production in 1973 and sub-plant B in 1979; sub-plant A halted operations in 1984 amid operational inefficiencies, while sub-plant B underwent partial shutdown in 1993 before full closure. Decommissioning commenced post-shutdown, including the safe removal and storage of approximately 2,000 tonnes of sulphide gas by 1998, followed by dismantling activities that rendered the site radiologically and chemically safe without major incidents. Regulatory oversight by the Canadian Nuclear Safety Commission (CNSC) guided the process, culminating in the revocation of the operating license on February 14, 2014, after verification of complete decommissioning, soil remediation, and facility demolition, with no residual radiological hazards exceeding natural background levels. The closure aligned with broader CANDU program adjustments, as Canada transitioned from on-site synthesis to imports and recycling, avoiding ongoing maintenance costs estimated in the tens of millions annually. Other minor auxiliary structures, such as ancillary chemical processing units tied to the BHWP, were concurrently decommissioned, though the represented the primary non-generating infrastructure retired at the during this period.

Operational Performance

Electrical Output and Reliability Metrics

The Bruce Nuclear Generating Station operates eight CANDU pressurized heavy-water reactors with a combined installed of 6,232 MW. Each unit is rated at up to 826 MW, yielding a site total approaching 6,600 MW under optimal conditions following power uprates. In 2024, the station produced approximately 47 of electricity, accounting for nearly 30% of Ontario's total generation and powering about one in three homes, businesses, and institutions in the province. This output reflects periods of full operation interspersed with planned major component replacement outages, such as Unit 3's refurbishment, which reduced contributions from specific units. Annual generation varies with maintenance schedules; for instance, 2023 output totaled around 42 due to extended outages on Units 3 and 6. Reliability metrics demonstrate strong performance, with site-wide capacity factors exceeding 90% in both 2023 and 2024, including a record high in the latter year despite ongoing refurbishments. Forced loss rates remained below 2% in 2024, indicating minimal unplanned downtime. Individual units have achieved exceptional uptime, such as Unit 7's site record for continuous operation in 2023.
YearApproximate Annual Output (TWh)Capacity Factor
202342>90%
202447Record high >90%

Medical Isotope Production

Bruce Power, the operator of the Bruce Nuclear Generating Station, produces lutetium-177 (Lu-177), a radioisotope used in targeted radionuclide therapies for cancers such as prostate cancer and other tumors. Lu-177, often formulated as Pluvicto, emits beta particles to destroy cancer cells while minimizing damage to healthy tissue. Production occurs through irradiation of ytterbium-176 targets within the neutron flux of the station's CANDU reactors, leveraging the reactors' inherent capability to generate isotopes without dedicated research facilities. Commercial production of Lu-177 began in 2022 at Unit 7, marking the first instance of a commercial nuclear power reactor worldwide achieving this milestone using an innovative Isotope Production System (IPS). The IPS enables on-site irradiation and initial processing, with irradiated targets currently shipped to Germany for final decannulation and purification due to lack of domestic hot cell capacity. On-site decannulation is targeted for 2026 pending regulatory approval. To address growing global demand—projected to reach a US$33 billion market by 2031—a second IPS is being installed at Unit 6, supported by partnerships with Kinectrics Inc., Framatome Canada's Isogen joint venture, and the Saugeen Ojibway Nation. This expansion, funded in part by $13 million from Canada's Strategic Innovation Fund under the 2023 Canadian Medical Isotope Ecosystem initiative, aims to double Lu-177 output by 2030 and enable 24/7 production, ensuring supply continuity during Unit 7's planned 2028 outage. In November 2024, Bruce Power committed to constructing a dedicated hot cell facility in Bruce County to further enhance processing capabilities. This production integrates with the station's primary electricity generation role, utilizing spare neutron capacity in operating reactors to supply isotopes for diagnostic and therapeutic applications without compromising power output reliability. Canada's efforts position it as a leader in commercial-scale isotope innovation, reducing reliance on aging research reactors and supporting exports to meet international shortages.

Role in Ontario's Energy Mix

The Bruce Nuclear Generating Station, operated by Bruce Power under lease from Ontario Power Generation, has a total nameplate capacity of approximately 6,400 MW across eight CANDU-6 reactors, enabling it to produce around one-third of Ontario's electricity supply. This output supports baseload demand in a province where total annual electricity generation averages 140-150 TWh, with the station's contribution exceeding 40 TWh in peak operational years prior to major refurbishments. As the province's largest single power source, Bruce underpins grid reliability by delivering continuous, dispatchable power with capacity factors routinely above 80-90%, far surpassing intermittent sources like wind (capacity factor ~30%) and solar (~15%). In Ontario's overall energy mix, nuclear power—including output from Bruce, Darlington, and formerly Pickering—accounted for 48.5% of total generation in 2024, displacing fossil fuels and enabling the province's coal phase-out completed in 2014. Bruce's role is particularly critical for emission reductions, as its low-carbon generation (near-zero CO2 per kWh) contrasts with natural gas/oil contributions of 16.6% in the same year, which serve peaking needs but increase variability and emissions during high demand. The station's flexible operation, including up to 2,400 MW of adjustable output, facilitates integration of renewables (wind at 9%, hydro at 23.4%), stabilizing the grid against supply fluctuations from weather-dependent sources. Without such firm nuclear capacity, Ontario's reliance on imports or gas peakers would rise, potentially elevating costs and emissions, as evidenced by periods of nuclear outages correlating with higher gas dispatch. Ongoing refurbishments and planned life extensions to the 2050s, alongside potential new builds adding up to 4,800 MW at the site, aim to sustain or expand Bruce's share amid growing demand from electrification and data centers. These efforts align with Ontario's Integrated Energy Plan, emphasizing nuclear's foundational role in achieving net-zero goals without over-dependence on unsubsidized renewables, which currently contribute less than 15% combined despite incentives. By prioritizing high-output, reliable nuclear over variable alternatives, Bruce mitigates risks of supply shortfalls, as demonstrated during 2022 energy crunches in other jurisdictions lacking similar baseload infrastructure.

Refurbishment and Life Extension

Units 1–2 Refurbishment (1995–2012)

Units 1 and 2 of the Bruce A Nuclear Generating Station, CANDU-6 reactors that entered commercial operation in 1977, faced early operational challenges leading to their shutdowns. Unit 2 was taken offline on April 21, 1995, following a incident where lead from a shielding blanket contaminated the steam generators, causing that necessitated their replacement. Unit 1 continued operating until 1997, when it was also shut down and placed in due to broader economic and issues at the , including surplus in at the time. Both units remained in safe storage during a period of deferred planning, with initial retubing proposals from 1992 postponed amid Ontario Hydro's excess power supply. In 2005, Bruce Power, the private operator under lease from Ontario Power Generation, signed the Bruce Power Refurbishment Implementation Agreement with the Ontario Power Authority to restart and refurbish Units 1 and 2, aiming to extend their operational life beyond 2015 and add capacity to Ontario's grid. The project scope focused on major component replacements essential for CANDU reactors, including new steam generators for both units (with all four delivered by early 2008), retubing of pressure tubes and calandria tubes, replacement of feeder piping, and upgrades to balance-of-plant systems for improved safety and efficiency. These works addressed aging infrastructure and incorporated design enhancements to mitigate corrosion and enhance reliability, drawing on lessons from prior CANDU refurbishments. Refurbishment activities commenced in earnest around 2006, with detailed engineering and procurement advancing through 2008, when capital costs were estimated at $3.1–4.0 billion CAD, reflecting the complexity of restarting laid-up units. Execution involved phased outages, with steam generator installations and pressure tube replacements completed progressively; Unit 2 achieved first synchronization to the grid in late 2012, followed by Unit 1 shortly thereafter. Unit 2 returned to commercial service on October 18, 2012, after 17 years offline, while Unit 1 followed on September 20, 2012, enabling full eight-unit operation at Bruce. TransCanada Corporation, a key partner, reported its share of costs at approximately $2.4 billion CAD. Post-refurbishment, Units 1 and 2 demonstrated high reliability, with Unit 2 setting a post-refurb record of 570 continuous days of operation by 2013, contributing to Ontario's coal phase-out and low-carbon electricity supply. The project validated CANDU refurbishment feasibility under regulatory oversight from the Canadian Nuclear Safety Commission, which approved returns to service after verifying safety hold points, though it exceeded initial timelines due to supply chain and technical complexities inherent to first-of-a-kind restarts.

Units 3–8 Refurbishment (2016–Present)

The Life-Extension Program for Units 3–8 at Bruce Nuclear Generating Station commenced in 2016, encompassing the phased replacement of aging systems and components during routine maintenance outages to extend operational life by approximately 30–35 years per unit, targeting service through at least 2064. This initiative, valued at CAD 13 billion, represents the largest private-sector investment in Canadian history and focuses on six CANDU reactors to enhance reliability, increase net output, and support Ontario's clean energy needs without public funding. Major Component Replacement (MCR) forms the core of the program for Units 3–8, involving the removal and substitution of critical elements such as pressure tubes, calandria tubes, feeders, and steam generators to address material degradation from decades of service. Unit 6 initiated MCR in January 2020 and achieved restart on September 8, 2023, nine months ahead of the original schedule and within budget, marking the first full-cycle refurbishment completion and validating the sequential approach. Unit 3 entered MCR outage in March 2023, with return-to-service projected for 2026 following extensive pressure tube and feeder replacements. Progress advanced to Unit 4 in 2025, reaching a key milestone in September with the transition to core removal and replacement phases, while preparations for Units 5, 7, and 8 proceed in overlapping outages through 2033 to minimize . Unit 5 received (IESO) approval in April 2025 for its outage, scheduled as the fourth in the sequence starting in 2026, emphasizing cost verification and performance incentives tied to energy production post-refurbishment. The program's structure includes IESO oversight for cost estimates submitted 12 months pre-outage, ensuring alignment with contracted power prices of 7–8 Canadian cents per kWh from refurbished units. As of October 2025, the refurbishment has sustained high fleet performance, with Units 3–8 contributing to Bruce Power's overall capacity factor exceeding 80% amid ongoing work, displacing fossil fuel generation and bolstering grid stability without reported major delays.

Major Component Replacements

The Major Component Replacement (MCR) phase of the refurbishment program at the Bruce Nuclear Generating Station targets the removal and replacement of essential CANDU reactor components in Units 3 through 8, enabling life extension from approximately 30-40 years to an additional 25-30 years of operation. This process addresses age-related degradation in materials exposed to neutron flux, corrosion, and thermal stress, such as hydride cracking in zirconium alloy components, ensuring structural integrity and safety under Canadian Nuclear Safety Commission oversight. Each unit's MCR involves coordinated outages lasting 2-3 years, with components fabricated to modern standards incorporating improved alloys and manufacturing precision for enhanced performance. Central to MCR are the fuel channels, numbering 480 per reactor, which consist of pressure tubes housing uranium fuel bundles under high pressure and temperature. Pressure tubes, made of Zr-2.5Nb alloy, are replaced due to dimensional changes and embrittlement from hydrogen absorption over decades of service; new tubes feature optimized metallurgy to mitigate these effects and support higher power output post-refurbishment. Associated feeder tubes, totaling 960 per unit, connect fuel channels to inlet and outlet headers and are replaced to eliminate flow restrictions and erosion damage accumulated from coolant circulation. Steam generators, eight per unit, transfer heat from heavy-water coolant to light-water steam for turbine drive and represent one of the largest components handled, each weighing hundreds of tons. Replacement addresses tube degradation from flow-accelerated corrosion and fouling, with new units designed for improved thermal efficiency and reduced maintenance; for instance, Unit 3's steam generators were fully replaced by February 2025. Calandria tubes, concentric with pressure tubes and serving as heavy-water moderators, are also systematically replaced across the reactor's 480 channels to restore neutron moderation efficiency and prevent leaks from cracking or deformation. Innovations include automated removal and installation tools, achieving records such as Unit 3's calandria tube extraction completed 11 days ahead of schedule in July 2024, enhancing precision and reducing radiation exposure to workers. These replacements, performed under strict quality controls, collectively boost unit capacity by 1-2% and underpin the station's projected output increase to over 7,000 MW.

Safety and Regulatory Compliance

Safety Record and Performance Indicators

The Bruce Nuclear Generating Station has maintained a strong safety record since its inception in 1977, with no major radiological releases or accidents resulting in off-site impacts, as verified through ongoing Canadian Nuclear Safety Commission (CNSC) oversight and probabilistic safety assessments (PSAs). CNSC regulatory oversight reports (RORs) for 2022 and 2023 rated the station's performance as "Satisfactory" or "Fully Satisfactory" across most of the 14 safety and control areas (SCAs), including radiation protection, conventional health and safety, and emergency management, based on inspections confirming compliance with licence conditions. In these areas, findings were minimal, with no ratings below "Satisfactory," reflecting effective implementation of fitness-for-service requirements and cyber security measures under CNSC REGDOC-2.4.2. Worker safety indicators demonstrate low incident rates, with Bruce Power adopting Severe Injury Rate (SIR) as its primary metric in 2023, showing year-over-year improvements in utility operations and construction activities. The station's accident frequency remained low in recent assessments, with lost-time injuries rare and aligned with industry benchmarks for CANDU reactors. Radiation exposure to workers and the public stays well below regulatory limits, with CNSC monitoring confirming no observable adverse health effects from current levels near the site. Performance indicators include high capacity factors, often exceeding 90% for non-refurbishing units, contributing to reliable output without elevated forced outage rates. For instance, pre-refurbishment units have achieved top global rankings, such as Unit 1 at 97% capacity factor in operational periods. Unplanned outages are minimized through predictive maintenance, supporting overall plant availability above 80% lifetime averages, as corroborated by PSA metrics ensuring core damage frequencies remain below CNSC safety goals of 10^-5 per reactor-year. CNSC staff inspections, including full-time on-site presence, validate these outcomes through continuous verification of operational and environmental compliance.

Notable Incidents and Regulatory Responses

In 2002, during channel maintenance at Unit 6 of Bruce B, damage occurred to a pressure tube and calandria tube, classified as a reportable event under Canadian Nuclear Safety Commission (CNSC) requirements, though no radiological release resulted and repairs were completed without broader operational impact. On April 4, 2017, a worker sustained an electrical shock while performing planned maintenance on the non-nuclear side of Unit 5, leading to hospitalization but no lasting injuries; the incident prompted an internal investigation and enhanced electrical safety protocols by Bruce Power. A similar worker safety event took place on October 15, 2018, when an employee received an electrical shock during welding activities on Unit 8, resulting in no serious harm but triggering CNSC notification and verification of mitigation measures to prevent recurrence. In July 2021, Bruce Power identified and self-reported that Units 3 and 6 had operated with certain pressure tubes exhibiting hydrogen equivalent concentrations exceeding 120 parts per million, violating licence conditions related to material degradation limits; the CNSC initiated an investigation, confirmed no immediate safety risks, and required enhanced inspection and dispositioning protocols, culminating in a licence amendment on October 16, 2023, to incorporate updated fitness-for-service guidelines for pressure tube management. On September 1, 2022, the CNSC imposed an administrative monetary penalty of $24,760 on Bruce Power for failing to properly quarantine contaminated equipment, a procedural lapse in radiation protection controls that posed no actual exposure risk but necessitated corrective actions to strengthen inventory management. In January 2022, a moderator spill occurred at Unit 1, prompting a radiation alert declaration and safe shutdown; no personnel injuries or off-site impacts were reported, and Bruce Power implemented containment and cleanup, with CNSC oversight confirming effective response. On June 13, 2024, CNSC records noted potential unaccounted neutron radiation exposure to workers from refurbishment waste containers, leading to dosimetry reassessments; while doses remained below regulatory limits, the event underscored ongoing scrutiny of waste handling and prompted procedural refinements. CNSC annual regulatory oversight reports, such as the 2022 edition, have consistently rated Bruce's performance as compliant across safety areas, with incidents addressed through verification activities, licence conditions, and penalties where warranted, reflecting a framework emphasizing proactive disclosure and iterative improvements without evidence of systemic safety deficiencies.

Security Measures

The security measures at the Bruce Nuclear Generating Station are governed by the Canadian Nuclear Safety Commission (CNSC) under the Nuclear Security Regulations (SOR/2000-209), which mandate comprehensive physical protection systems, including barriers for protected and inner areas, surveillance equipment, and response procedures to counter sabotage or unauthorized access to nuclear materials. Licensees like Bruce Power must detail site plans, security personnel structures, communication systems, and intervention strategies in their licensing applications, ensuring effective deterrence and response aligned with International Atomic Energy Agency standards. The CNSC conducts ongoing compliance verification, including drills and exercises, to protect facilities against threats from adversaries capable of coordinated attacks. Physical security features include multi-layered barriers such as vehicle denial systems, high-security fencing, and intrusion detection around critical areas, supplemented by 24-hour monitoring and patrols to prevent unauthorized entry. Access controls require all personnel to hold valid security clearances and identification, with visitors subject to prior approval, background checks, and escorted entry; these measures extend to contractors and deliveries to minimize insider threats. Bruce Power maintains an on-site nuclear response force of trained security officers equipped with firearms, authorized under regulations for high-security sites. Following the September 11, 2001 attacks, the CNSC required all Canadian nuclear generating facilities, including Bruce, to deploy armed response teams; Bruce Power's Nuclear Response Team (NRT) became fully operational in March 2003, specializing in tactical interventions for high-risk incidents involving nuclear materials or threats to life. The NRT operates armored vehicles and coordinates with the under a , shifting from pre-2001 unarmed protocols to robust deterrence capabilities. These enhancements emphasize rapid assessment, containment, and neutralization of threats, with regular training to maintain proficiency. CNSC staff are permanently stationed at the site to oversee implementation.

Environmental and Waste Management

Radioactive Waste Storage and Handling

The Bruce Nuclear Generating Station produces three main categories of radioactive waste: used nuclear fuel (high-level waste), low-level waste (LLW) such as contaminated tools and clothing, and intermediate-level waste (ILW) including resins and filters with higher radioactivity. Used nuclear fuel bundles, removed from CANDU reactors after generating energy, initially undergo wet storage in on-site fuel bays submerged in water for approximately 10 years to allow decay heat dissipation and radiation shielding. Following this period, the bundles are transferred to modular dry storage containers—large, concrete-lined steel vessels designed for passive air cooling and long-term interim containment—and placed in an on-site dry storage facility managed in partnership with Ontario Power Generation (OPG). LLW and ILW from Bruce operations are transported to OPG's Western Waste Management Facility (WWMF), located adjacent to the Bruce site on the Bruce Nuclear Power Development property, where they have been processed since the 1970s. At WWMF, LLW undergoes compaction, incineration, or direct storage in engineered vaults to reduce volume and immobilize contaminants, while ILW is segregated and stored in shielded containers pending further conditioning. Specific handling includes retubing waste from reactor refurbishments, where radioactive components are sealed in shielded steel vessels for safe transport and storage. In October 2025, the Canadian Nuclear Safety Commission (CNSC) authorized OPG to operate a new encapsulation building at WWMF for storing used steam generators from Bruce refurbishments, which contain activated metals and potential tritium contamination. All waste management activities comply with CNSC licensing requirements under the Nuclear Safety and Control Act, emphasizing containment, radiation monitoring, and environmental protection to prevent releases exceeding regulatory limits. Bruce Power funds all costs for used fuel management per the Nuclear Fuel Waste Act, with long-term disposal responsibilities assigned to the Nuclear Waste Management Organization (NWMO), though no permanent deep geological repository is operational as of 2025; interim dry storage is projected to suffice for decades. Local proposals for near-surface ILW repositories, such as in South Bruce, were abandoned in 2020 following community opposition, redirecting focus to centralized solutions.

Emissions Profile and Carbon Displacement Benefits

The Bruce Nuclear Generating Station maintains a low greenhouse gas (GHG) emissions profile, as nuclear fission produces no direct CO₂ during electricity generation. In 2022, Scope 1 emissions from on-site sources such as fuel combustion totaled 8,087 tonnes of CO₂ equivalent (tCO₂e), while Scope 2 emissions from purchased electricity reached 15,808 tCO₂e. Combined Scope 1 and 2 emissions amounted to 19,535 tCO₂e, achieving a 12.5% reduction from the 2019 baseline of 22,327 tCO₂e through measures including fleet electrification and energy efficiency upgrades. Scope 3 emissions from upstream supply chain activities were 0.83 million tCO₂e in 2022. Bruce Power, the station's operator, pledged net-zero Scope 1 and 2 GHG emissions by 2027—the first North American nuclear facility to do so—supported by 4,360 tCO₂e of retired offsets in 2022 and ongoing reductions in auxiliary operations. The station delivers substantial carbon displacement benefits by providing baseload, low-emission power that offsets fossil fuel generation in Ontario's grid. In 2022, its output avoided roughly 18 million tCO₂e, calculated by substituting natural gas-fired electricity at a factor of 406 gCO₂e per kWh. This equates to the annual emissions of approximately 3.9 million passenger vehicles. Refurbishments under Project 2030 are forecast to boost capacity to 6,750 MW initially, avoiding an additional 450,000 tCO₂e yearly, with full output reaching 37.1 terawatt-hours (TWh) by 2034 and yielding about 15 million tCO₂e in further annual avoidance relative to natural gas baselines. Displacement calculations account for Ontario's increasing natural gas reliance, projected to emit 11.9 million tCO₂e grid-wide by 2030 following the Pickering Nuclear Generating Station's closure in 2024, with serving as a zero-emission at roughly 30 gCO₂e per kWh lifecycle intensity.

Biodiversity and Site-Specific Environmental Initiatives

The Bruce Nuclear Generating Station occupies approximately 932 hectares along the eastern shore of Lake Huron, encompassing six kilometers of shoreline that supports a naturally diverse ecosystem with more than 464 plant species and 275 wildlife species, including birds, mammals, and aquatic life. Environmental monitoring data from Bruce Power's programs, corroborated by independent assessments from the Canadian Nuclear Safety Commission (CNSC), demonstrate no measurable adverse effects on local biota or human health from radiological or thermal discharges, with radionuclide concentrations in nearby sediments, water, and biota remaining below regulatory limits and natural background levels. Studies on operational impacts, such as fish impingement at cooling water intakes, quantify minimal ecological disruption, estimating that losses represent less than 0.1% of annual Lake Huron fish biomass production, offset by site-specific restoration measures. Bruce Power's Biodiversity Policy, integrated into its broader Environment and Sustainability framework, mandates the protection and enhancement of biodiversity through on-site habitat management, pollution prevention, and off-site conservation partnerships, with annual reporting confirming compliance via metrics like species inventories and habitat metrics. Site-specific initiatives include habitat restoration projects at the adjacent Nuclear Waste Management facility, which earned gold certification from Wildlife Habitat Canada in 2021 for efforts such as constructing turtle nesting sites, wetland enhancements for waterfowl like ducks and meadowlarks, and pollinator-friendly plantings that have increased local species abundance. The operator's Environmental Best Practices document guides these activities, emphasizing riparian buffer zones and invasive species control to maintain ecological connectivity along the shoreline. Collaborative programs further bolster biodiversity, including a three-year partnership with ALUS Grey Bruce completed in 2025, which funded wetland restorations and cover cropping on regional farmlands to sequester carbon, improve water filtration into Lake Huron tributaries, and create habitats for amphibians and birds, benefiting over 200 hectares off-site. The "Grow Me Instead" initiative promotes native plant propagation and distribution to employees and communities, reducing reliance on non-native species and enhancing pollinator corridors within the site's 930-hectare footprint. Bruce Power's Environment and Sustainability Fund supports additional local projects, such as shoreline stabilization and species-at-risk monitoring, ensuring that operations align with provincial biodiversity strategies without documented net habitat loss.

Economic Analysis

Construction and Refurbishment Costs

The Bruce A units' construction commenced in 1969 with an initial budget of CAD 900 million, but actual costs reached CAD 1.8 billion by completion in 1977–1979, reflecting a 100% overrun attributable to delays, regulatory changes, and supply chain issues common in early CANDU projects. Bruce B units, starting construction in 1979 and entering service from 1984 to 1987, had a projected cost of CAD 3.9 billion, though final expenditures exceeded estimates due to similar factors including labor shortages and technical refinements, with total capital outlays for the station's initial build estimated at around CAD 8 billion in nominal terms across both A and B sites. Following the 1997 shutdown of Bruce A units amid economic and performance challenges, Bruce Power, assuming operations in 2000, undertook refurbishments to restart units 3 and 4, with total project costs rising from an initial CAD 4.25 billion estimate to CAD 5.25 billion by 2004, driven by extensive feeder replacements, steam generator overhauls, and safety upgrades. This investment enabled the units' return to service, producing over 1,400 MW combined, though units 1 and 2 remain in safe storage without full refurbishment due to cost-benefit assessments. The ongoing major component replacement program for Bruce B units 3 through 8, announced in December 2015, involves a total investment of CAD 13 billion to extend each unit's life by over 30 years through steam generator and feeder tube replacements, alongside and balance-of-plant upgrades, with work phased from 2020 to 2033. Independent verification by the Independent Electricity System Operator (IESO) has confirmed per-unit fixed costs, such as CAD 1.9 billion for Unit 3's refurbishment completed in 2023, with the program funded privately by but recovered via long-term power purchase agreements adjusted for inflation and performance. These refurbishments aim to sustain 4,200 MW capacity, averting higher replacement costs from new builds estimated at double per MW.

Operating Economics and Levelized Cost of Electricity

The operating economics of the Bruce Nuclear Generating Station benefit from nuclear power's inherently low variable costs, which are dominated by uranium fuel procurement and minimal consumables, typically amounting to less than 20% of total generation expenses for pressurized heavy-water reactors like those at Bruce. Fuel costs for CANDU designs, which use unenriched natural uranium, remain stable and low at approximately 0.5-1 Canadian cent per kilowatt-hour due to long refueling cycles (annually or less frequently per unit) and efficient on-site fuel fabrication. Routine operations emphasize high-capacity-factor performance, with Bruce Power consistently achieving over 90% availability in recent years, minimizing downtime and maximizing output from its approximately 6,400 MW net capacity across six active units. This efficiency offsets fixed costs such as staffing for over 4,000 employees and specialized maintenance, positioning Bruce as Ontario's lowest-cost nuclear electricity provider under its regulated power purchase agreement with the Independent Electricity System Operator (IESO). Major operating expenditures include planned outages for inspections and minor component replacements, which Bruce Power has executed on or ahead of budget, as demonstrated by the Unit 6 major component replacement completed in 2024, saving $50 million through performance optimizations. Under its agreement structure, Bruce Power bears risks for expenses and shares 50% of savings (upside from efficiencies) with the IESO, incentivizing cost controls while shielding ratepayers from overruns via regulatory oversight. Overall, non-capital operating and maintenance costs align with global benchmarks, where and O&M constitute about 20-30% of levelized expenses for mature plants, far below alternatives reliant on volatile commodity prices. The levelized cost of electricity (LCOE) for Bruce Power's output, which amortizes lifetime capital, operations, fuel, and decommissioning over expected generation, is estimated at around $75 per megawatt-hour under verified IESO models for extended operations post-refurbishment. This figure reflects the station's high capacity factors (e.g., 92.5% in projections) and low marginal costs, making it competitive for baseload supply in Ontario's mix, where nuclear avoids intermittency premiums associated with renewables. For life-extension programs covering six units at a total refurbishment cost of $13 billion over 30-35 years, the incremental LCOE remains below emerging low-carbon alternatives when financed at current rates, as lower capital costs and proven reliability reduce the discount rate sensitivity inherent to nuclear economics. These costs exclude system-level benefits like grid stability, which further enhance nuclear's value in integrated resource planning.

Regional Economic Impacts and Job Creation

The Bruce Nuclear Generating Station, operated by Bruce Power, employs over 4,200 permanent staff, with approximately 70% residing within 35 kilometers of the site and 30% across the broader region encompassing Bruce, Grey, and Huron Counties. These positions span skilled trades, engineering, operations, and support roles, contributing to stable, high-wage employment in a region with a combined population of about 235,667. Indirect job creation arises primarily through an expanded supply chain, which grew from 13 major suppliers in 2016 to over 60 by 2024, distributed across 14 communities in the three counties and one Indigenous community. This network supports procurement of materials, services, and specialized nuclear components, generating additional employment in manufacturing, logistics, and professional services locally and provincially. Overall, Bruce Power's operations sustain 22,000 direct and indirect jobs annually across Ontario, with significant regional multipliers enhancing economic resilience in southwestern Ontario. During refurbishment and life-extension projects, such as the ongoing Major Component Replacement program extending operations through 2064, on-site employment surges to 1,500–2,500 workers annually, alongside broader provincial job creation exceeding 5,000 indirect positions. These initiatives drive temporary economic booms, including heightened demand for housing, services, and infrastructure in host communities like Tiverton and Kincardine. Annual operational spending by Bruce Power boosts provincial GDP by an estimated $3.5 billion, with induced effects from worker expenditures amplifying local retail, hospitality, and real estate sectors. The station's economic footprint includes substantial tax revenues and community investments, funding municipal services, education, and infrastructure in Bruce County. For instance, the Life-Extension Program is projected to generate $4 billion in annual economic benefits to Ontario, including labor income and fiscal contributions that support regional diversification beyond nuclear dependency. Public-private partnerships, such as those with the Nuclear Innovation Institute, further foster workforce training and innovation clusters, positioning the region as a hub for clean energy expertise.

Controversies and Public Debates

Criticisms of Cost Overruns and Technical Issues

The refurbishment of Bruce A Units 1 and 2, completed between 2005 and 2012, incurred substantial cost overruns, rising from an initial estimate of $2.75 billion to $4.8 billion, a 74% increase attributed to scope expansions and unforeseen technical challenges in restarting the long-mothballed reactors. An earlier assessment in 2010 identified a $2 billion overrun for these units, though the private operator, Bruce Power, absorbed the additional costs rather than passing them to ratepayers. Critics, including fiscal watchdogs like the Financial Accountability Office of Ontario, have highlighted such historical patterns across Ontario's nuclear projects—evident also in Pickering Units 1 and 4, where costs doubled or more—as indicative of inherent risks in nuclear refurbishments, including underestimation of labor, supply chain disruptions, and regulatory hurdles. These precedents fuel skepticism toward the ongoing $13 billion life-extension program for Bruce B Units 3 through 8, announced in December 2015, with analysts warning that a 30% cost escalation could elevate the average nuclear electricity price by 5.4%, potentially burdening ratepayers despite contractual safeguards transferring overrun risks to Bruce Power 12 months prior to each unit's refurbishment start. Technical challenges have compounded these financial pressures in past efforts, notably delaying the 2012 restart of Unit 2 by months due to a generator stator fault identified during testing, which required extensive repairs and contributed to broader schedule slippages without triggering penalties for the operator. Similar issues, such as variations in alarm response times and unplanned reactor power changes, have been logged as reportable events at the station, though most remain within regulatory norms and do not indicate systemic failures. In the CANDU reactor design employed at Bruce, recurring problems like pressure tube degradation and feeder tube cracking—stemming from corrosion and material fatigue—have historically necessitated prolonged outages for inspections and replacements, as seen in earlier life-extension projects where repair scopes expanded unexpectedly. Opponents, including anti-nuclear advocates, argue these technical vulnerabilities underscore nuclear power's unreliability compared to alternatives, citing instances like a February 2025 intake screen blockage from fish debris that temporarily idled a unit, though such events are mitigated by redundant safety systems and do not elevate core risk profiles. Despite recent milestones, such as the Unit 3 calandria tube removal in July 2024 finishing 11 days ahead of schedule, skeptics maintain that the unprecedented scale of overlapping major component replacements through 2033 amplifies the potential for emergent issues, drawing parallels to international CANDU refurbishments like New Brunswick's Point Lepreau, where costs ballooned from $1.4 billion to $2.4 billion amid delays.

Anti-Nuclear Concerns on Risk and Waste

Opponents of nuclear power at the Bruce Nuclear Generating Station have raised alarms over operational safety risks, citing incidents such as a nearly half-tonne steel load falling 20 meters from a crane in 2005, which narrowly missed workers and prompted union claims of inadequate safety protocols. The Canadian Environmental Law Association (CELA) has criticized the station's relationship with the Canadian Nuclear Safety Commission (CNSC), arguing in 2015 that rising accident risks and incomplete emergency planning are inadequately addressed due to perceived regulatory self-oversight by the operator. Greenpeace has faulted Bruce Power's risk assessments for new reactors, contending in 2008 that they fail to account for design-specific vulnerabilities to accidents and terrorism, potentially underestimating catastrophic scenarios. Radioactive waste management at the site has drawn significant opposition, particularly regarding the Western Waste Management Facility (WWMF), which stores low- and intermediate-level waste from Bruce's reactors alongside retrievable used fuel in above-ground dry storage. Environmental groups like Nuclear Information and Resource Service (NIRS) have highlighted the site's concentration of waste—equivalent to output from multiple reactors—as creating a "radioactive bull's eye" near the Great Lakes, amplifying risks from terrorism or accidents, especially post-9/11 threats against nuclear facilities. Proposals for a deep geological repository (DGR) for Canada's nuclear waste near the Bruce site, advanced by the Nuclear Waste Management Organization (NWMO), have fueled protests and referendums in Bruce County communities like South Bruce and Arran-Elderslie. In 2020, residents voted narrowly against hosting a permanent used fuel repository, citing groundwater contamination risks to Lake Huron and long-term geological uncertainties. The Saugeen Ojibway Nation rejected a low- and intermediate-level waste DGR in 2015 after consultations, emphasizing treaty rights and potential irreversible harm to ancestral waters. Critics, including local citizen groups, argue that surface and near-surface storage at Bruce exposes waste to seismic events or human error, with over 3 million spent fuel bundles nationwide lacking a finalized disposal solution as of 2021. These concerns persist despite CNSC reports of no observed public health impacts from current emissions, as opponents demand independent verification of long-term isolation efficacy.

Pro-Nuclear Arguments on Reliability and Necessity

Proponents of nuclear energy emphasize the Bruce Nuclear Generating Station's exceptional reliability, demonstrated by its high capacity factors that surpass global averages for nuclear facilities. In 2023, Bruce Power achieved a fleet-wide capacity factor exceeding 90%, reflecting minimal unplanned outages and efficient operation across its eight CANDU reactors, which collectively provide approximately 6,500 MW of capacity. This performance aligns with broader nuclear trends, where the global average capacity factor reached 81.5% in 2023, underscoring nuclear's ability to deliver consistent baseload power without the intermittency issues plaguing wind and solar sources. Individual units at Bruce have recorded even higher marks, such as Unit 1's 97% capability factor in historical assessments, enabling the station to power roughly 4 million homes reliably year-round. The necessity of facilities like Bruce stems from their role in providing dispatchable, low-carbon baseload generation essential for grid stability in Ontario, where nuclear accounts for over 50% of electricity production. Bruce specifically contributes about 30% of the province's supply, supporting a grid that is 94% emissions-free and preventing reliance on fossil fuel peaker plants during peak demand. Without such nuclear capacity, Ontario would face increased vulnerability to natural gas price volatility and supply disruptions, as baseload nuclear enables the integration of variable renewables while maintaining energy security through domestically sourced uranium and extended fuel cycles. Pro-nuclear advocates argue this infrastructure is indispensable for meeting rising electricity demands from electrification and industrial growth, as evidenced by Ontario's strategy to expand nuclear at Bruce to sustain economic development and decarbonization goals. In causal terms, nuclear's high energy density and operational predictability at Bruce displace coal and gas, yielding verifiable reductions in greenhouse gas emissions—equivalent to removing millions of vehicles from roads annually—while ensuring supply chain resilience absent in imported fuels. This reliability has proven critical during refurbishments, where returning units online restores gigawatts of clean power ahead of schedule, averting potential shortages. Ontario's integrated energy plans position nuclear expansions at Bruce as foundational for a net-zero future, countering anti-nuclear narratives by highlighting empirical data on safety records and economic viability over intermittent alternatives that require costly backups.

Future Prospects

Ongoing Upgrades and Capacity Enhancements

Bruce Power's Major Component Replacement (MCR) project, part of its broader Life-Extension Program, involves refurbishing six reactors (Units 3 through 8) at the Bruce Nuclear Generating Station to extend operational life by over 30 years while enhancing electrical output. The initiative replaces critical components such as pressure tubes, calandria tubes, and steam generators, enabling higher efficiency and capacity uprates for each unit upon return to service. Overall, these upgrades aim to increase the station's total generating capacity from 6,550 MW to more than 7,000 MW, supporting Ontario's electricity needs amid rising demand. The MCR sequence commenced with Unit 6 in January 2020, followed by Unit 3 in March 2023, where reactor removal was completed ahead of schedule in August 2024. Unit 4 entered the removal and replacement phase in September 2025, marking a key milestone with safe progression on schedule. In April 2025, the Independent Electricity System Operator (IESO) approved Unit 5's MCR under an amended refurbishment agreement executed in 2023, verifying compliance with terms for proceeding. Units 7 and 8 are scheduled next, with each refurbishment designed to achieve unit-specific output increases of approximately 50-100 MW through optimized fuel and component performance. Complementing MCR efforts, Project 2030 focuses on targeted improvements to existing assets, including and enhancements, to elevate site-wide net peak capacity without full outages. These optimizations, advanced in 2024, contribute to incremental capacity gains equivalent to optimizing operational margins and reducing consumption. The combined upgrades underscore Bruce Power's strategy to maintain reliability and output growth, with progress monitored through IESO agreements ensuring cost controls and performance benchmarks.

Bruce C Nuclear Project Proposal

The Bruce C Nuclear Project is a proposal by Bruce Power to construct up to 4,800 megawatts electric (MWe) of new nuclear generating capacity at the existing Bruce Nuclear Generating Station site in Kincardine, Ontario, within a secured 932-hectare area on the Territory of the Saugeen Ojibway Nation. The project would involve site preparation, construction, operation for 60 to 100 years, and eventual decommissioning of four to five new reactors, complementing the adjacent Bruce A and B units that currently supply about 30% of Ontario's electricity. Reactor technology has not been finalized, but the initiative aligns with Ontario's emphasis on large-scale nuclear for reliable, zero-emission baseload power to meet growing demand. The proposal builds on earlier concepts from the late 2000s but gained renewed momentum in 2023 amid Ontario's energy security priorities. On July 5, 2023, Bruce Power received federal approval to initiate planning, including submission of an Initial Project Description to the Impact Assessment Agency of Canada (IAAC). The federal integrated Impact Assessment planning phase concluded on August 22, 2025, advancing the project toward detailed environmental and regulatory reviews. Bruce Power is also pursuing a Licence to Prepare Site from the Canadian Nuclear Safety Commission (CNSC) to enable early site works. Ontario's government has integrated the project into its "Energy for Generations" plan, launched June 12, 2025, which identifies Bruce C as essential for adding capacity under high-demand scenarios, with pre-development funding to support nuclear expansion. The province anticipates construction could begin in the late 2020s or early 2030s if approved, positioning it to address projected electricity needs from electrification and industrial growth. Bruce Power has committed to a final investment decision by late 2026, contingent on regulatory, Indigenous consultation, and economic viability assessments. Community engagement sessions occurred in November 2025 in nearby towns like Goderich, Owen Sound, and Walkerton to discuss potential impacts. Proponents highlight the project's potential to leverage existing , minimizing new needs and enhancing reliability, while critics in public debates have raised concerns over costs and timelines, though official assessments emphasize rigorous safety and environmental protocols under CNSC oversight. The proposal remains in pre-licensing stages, with no construction authorized as of October 2025.

Additional Site Features

Historical and Decommissioned Facilities

The Bruce Nuclear site originated with the Douglas Point Nuclear Generating Station, Canada's first full-scale prototype CANDU reactor, constructed between 1963 and 1967 by Atomic Energy of Canada Limited (AECL) and placed into commercial service on November 4, 1968. This 200-megawatt pressurized heavy-water reactor served as a demonstration facility for the CANDU design, generating electricity until its permanent shutdown on May 13, 1984, after accumulating over 100,000 megawatt-days of operation and validating key technologies later applied to larger Bruce A and B units. Decommissioning commenced in 1984, transitioning the site to a safe storage state with ongoing monitoring of low-level waste and structures, though full dismantling remains deferred pending broader waste management strategies; as of 2021, progress has been described as minimal compared to international standards. Construction of the main Bruce A Nuclear Generating Station followed, beginning in 1969 under (now part of Ontario Power Generation's legacy), with its four 750-megawatt CANDU-6 reactors achieving full operation by 1979 after sequential criticality: Unit 1 in 1977, Unit 2 in 1977, Unit 3 in 1978, and Unit 4 in 1979. These units operated until the late , when Units 1 and 2 were laid up in 1997 and Unit 3 in 1998 due to economic pressures and maintenance challenges, including pressure tube issues identified in the 1980s and ; Units 1 and 2 underwent extensive refurbishment starting in 2006 and restarted in 2012 under Bruce Power's lease, while Units 3 and 4 continue operations with periodic major component replacements. Plans for expansion included Bruce C and D stations, each envisioned with four additional reactors south of existing facilities, but Bruce C was never initiated, and Bruce D reached approximately 70% completion by the early 1980s before cancellation in 1983 amid shifting energy demands and fiscal constraints, with partial structures demolished by 1995 to repurpose the land. These unbuilt or aborted facilities highlight early ambitions for the site to exceed 8,000 megawatts capacity, constrained by regulatory, economic, and technological factors rather than safety concerns.

Community and Recreational Elements

The Bruce Power Visitors' Centre, located adjacent to the generating station, serves as a primary hub for public education and engagement, attracting over 15,000 visitors annually to explore exhibits on nuclear energy production and medical isotope manufacturing. Open year-round from 9 a.m. to 4 p.m. Monday through Friday, the centre features interactive displays, informative presentations tailored for all ages, and free guided bus tours of the 2,100-acre site, which highlight safe operations and environmental monitoring. These tours, available to individuals, families, and school groups, emphasize the station's role in providing carbon-free electricity while addressing public inquiries on safety protocols. Bruce Power supports broader community initiatives through targeted programs that foster local involvement, including annual donations exceeding $2 million to charities and non-profits, a $75,000 scholarship fund, and dedicated funds for Indigenous relations and environmental sustainability. Educational outreach extends to student programs, such as co-operative placements and site visits that integrate hands-on learning about energy systems, as seen in events like Take Our Kids to Work Day hosting 160 students in 2024 for demonstrations at the Visitors' Centre and related facilities. Additionally, partnerships like the Bruce County Spark Mentorship and Grants Program, launched in 2025 with Grey Bruce Simcoe Regional Tourism, promote tourism development in the region, indirectly enhancing recreational opportunities tied to the station's economic presence. While the generating station's secure perimeter limits direct recreational access to operational areas, the Visitors' Centre and surrounding community programs contribute to public appreciation of the site's contributions to regional stability, with emergency preparedness exercises involving local residents to build trust and awareness. These elements underscore Bruce Power's commitment to transparent engagement, verified through ongoing environmental monitoring data showing no adverse impacts on nearby communities.

References

  1. [1]
    Bruce A and B Nuclear Generating Stations
    Jun 16, 2025 · Installed capacity: 6,232 MW (Bruce ... September 1, 2023: Third regulatory hold point lifted for Bruce Nuclear Generating Station B Unit 6 ...Missing: operator | Show results with:operator
  2. [2]
    About Us - Bruce Power
    Established in 2001, Bruce Power is Canada's only private sector nuclear generator, annually producing 30 per cent of Ontario's power.History · Guide to Bruce Power · Our Leadership Team · Our Partners
  3. [3]
    [PDF] Bruce Power New Nuclear Initial Project Description_20240730
    Nov 15, 2023 · Nuclear Generating Station A (Bruce A) and Bruce Nuclear Generating Station B (Bruce B), each comprised of four CANDU reactors, as well as ...
  4. [4]
    Bruce Power - TC Energy
    With a history of safe nuclear generation dating to 1967, Bruce Power currently supplies roughly 30% of Ontario's electricity.Missing: controversies | Show results with:controversies
  5. [5]
    Bruce Nuclear Generating Station, Kincardine, Ontario, Canada
    Nov 1, 2013 · Bringing four units back online and extending the life of four sister units has made the Bruce Nuclear Generating Station the largest operating nuclear plant ...
  6. [6]
    Bruce Power Refurbishment Project, Ontario, Canada - NS Energy
    Apr 9, 2020 · Bruce power refurbishment project will overhaul all the units of the 6.2GW Bruce nuclear generating station, which is the largest nuclear power plant in Canada.
  7. [7]
    Life-Extension Program & MCR Project - Bruce Power
    The MCR Project began in January 2020 and focuses on the replacement of key reactor components in Units 3-8, including steam generators, pressure tubes, ...
  8. [8]
    Canada's Bruce Power Begins Major Refurbishment At Ontario ...
    Feb 3, 2025 · The company aims to refurbish six of the nuclear stations' reactors – Units 3 through 8 – to boost generating capacity from 6,550 MW to more ...
  9. [9]
    Events Reporting: Nuclear Power Plants
    The CNSC was informed by Bruce Power, in accordance with its licence conditions, that a worker was injured at the Bruce B Nuclear Generating Station.
  10. [10]
    Bruce Power
    At Bruce Power, we generate clean, reliable electricity while producing life-saving medical isotopes. Together, we power Ontario's future.Careers · About Us · The Bruce C Project · Visitors' Centre
  11. [11]
    The Bruce C Project
    The project aims to create an option to build up to 4,800 megawatts of nuclear capacity at the Bruce Power site, located within the Territory of the Saugeen ...
  12. [12]
    [PDF] Bruce Power Sustainability Report 2024
    fenced and secured 932-hectare Bruce Power site . During the Pre-Planning ... bruce-nuclear-generating-station. 27 https://www .brucepower .com/become-a ...
  13. [13]
    [PDF] 2021 ENVIRONMENTAL PROTECTION REPORT B-REP-07000 ...
    May 1, 2022 · The Site includes Bruce Nuclear. Generating Station A (Bruce A) and Bruce Nuclear Generating Station B (Bruce B), which each comprise four ...
  14. [14]
    Nuclear Power in Canada
    From 2001 to 2015, Bruce Power spent about C$10 billion on the whole plant. Bruce Power has contracted with BWXT Canada to design and manufacture 32 ...Missing: achievements | Show results with:achievements
  15. [15]
    [PDF] Bruce Power 2023 Annual Review and Energy Report
    Each of Bruce Power's eight units produces up to 826 megawatts of clean energy. Power travels from the generator companies to the high-voltage transmission ...<|separator|>
  16. [16]
    [PDF] A guide to - Bruce Power
    Construction begins on Douglas Point, Canada's first commercial nuclear reactor. Plans announced for four nuclear reactors at Bruce B. Bruce Units 3, 4, 6 and 7.
  17. [17]
    [PDF] The Bruce C Project: Planning for the Next Generation
    The Bruce C project is a proposed federal Impact Assessment for up to 4,800 MW of new nuclear capacity at the Bruce Power site, complementing existing stations.
  18. [18]
    Transmission-Connected Generation
    Transmission-connected generation refers to facilities that are connected to the high-voltage IESO-Controlled Grid, which include all lines over 50 kilovolts ( ...Missing: integration | Show results with:integration
  19. [19]
    The Line - B2M Limited Partnership
    The Line is a 176km, 500kV transmission line between Bruce Nuclear and Milton, with 3,000 MW capacity, and is the largest expansion in 20 years.Missing: connection | Show results with:connection
  20. [20]
    Construction on Hydro One's New Bruce to Milton Transmission Line ...
    Hydro One announced that the Bruce to Milton Transmission Reinforcement Project has passed the mid-point of construction.
  21. [21]
    Hydro One Announces 600 Million Dollar Transmission Line
    Hydro One said it will spend $600 million to expand the transmission system between the Bruce power plant and a switching station in Milton. Energy Minister ...<|separator|>
  22. [22]
    Bruce-6 connected to grid after refurbishment
    Sep 15, 2023 · Bruce Power operations staff synchronizes Unit 6 to the Ontario electrical grid ... The ongoing major component replacement (MCR) project at ...
  23. [23]
    Unit 1 - first sync to grid - YouTube
    Sep 28, 2012 · Fifteen years after it was taken offline, Bruce Power's Unit 1 resynchronized with Ontario's electricity grid on Sept. 19.Missing: connection | Show results with:connection
  24. [24]
    Bruce B planned Vacuum Building Outage begins in close ...
    Apr 24, 2024 · Bruce B planned Vacuum Building Outage begins in close collaboration and co-ordination with system operator, Hydro One. 2024-04-24. With all ...Missing: connection | Show results with:connection
  25. [25]
    Bruce Power: New Nuclear Generation Capacity - Urban Toronto
    Jul 6, 2023 · That makes more sense. The power-grid upgrades needed for 5GW transmission between Bruce and the western GTA adds $10B to the price. Darlington ...<|separator|>
  26. [26]
    ARCHIVED - CNSC Presidents
    1960-02-01​​ Construction begins on Canada's first commercial-sized (200 MW) CANDU nuclear power plant, located in Douglas Point, Ontario.
  27. [27]
    History - Bruce Power
    The story of the Bruce Power site begins in the 1960s when Douglas Point, Canada's first commerical reactor, was built and placed into service.
  28. [28]
    Bruce Nuclear Power Development - 109 - Online Collections
    In 1978, the construction of four additional units in "Bruce B" Nuclear Generating Station began, situated on the south side of Douglas Point. ... All four units ...Missing: 1980s | Show results with:1980s
  29. [29]
    Bruce A Proves There Are Second Acts in Nuclear Power
    Aug 1, 2010 · Bruce A reactors (Units 1 through 4) entered commercial service during 1977–79 and were followed by Bruce B reactors (Units 5 through 8) ...Missing: differences | Show results with:differences
  30. [30]
    Chronology - Friends of Bruce
    1978 – Construction starts on Bruce “B” generating station. 1981 – Bruce Heavy Water Plant “B” is declared in service. 1984 – Douglas Point prototype reactor is ...
  31. [31]
    The Canadian Nuclear Power Industry (BP365e)
    All the power reactors in Canada are Canadian-designed and built CANDU reactors. ... Bruce B reactors were subsequently allowed to increase to 80% of full power.Missing: differences | Show results with:differences
  32. [32]
    [PDF] the accelerated corrosion of candu outlet feeders - OSTI.GOV
    CANDU outlet feeders are corroding at higher rates than predicted, with excessive thinning of the first few meters, and thinning rates correlated with coolant ...
  33. [33]
    [PDF] STEAM GENERATOR AGING IN CANDUs - Canadian Nuclear Society
    By the late 1980's and early 1990's fouling and corrosion-related degradation, particularly at. Bruce A, had had a major operational impact on reactor operation ...<|control11|><|separator|>
  34. [34]
    [PDF] BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
    Mar 31, 2003 · In 1997, Ontario Hydro (now OPG) decided to permanently shut-down the heavy water producing facilities. All of the hydrogen sulphide was removed ...<|separator|>
  35. [35]
    Licence revoked for heavy water plant site - World Nuclear News
    Feb 17, 2014 · Canadian regulators have agreed to issue a licence to abandon the Bruce Heavy Water Plant, formally marking the completion of decommissioning.
  36. [36]
    Annex 7 - Decommissioning Activities
    In 1997, AECL decided to discontinue research programs and operations at the facility, and the Canadian federal government concurred with the decision in 1998.
  37. [37]
    [PDF] 2024 Bruce Power Annual Review: The future is nuclear
    Jan 4, 2024 · The Life-Extension Program involves the replacement of older systems in the company's eight reactor units during regularly scheduled maintenance ...Missing: configuration | Show results with:configuration
  38. [38]
    Fitch Rates Bruce Power's Senior Unsecured Notes 'BBB+'
    Dec 9, 2024 · The average capacity factor over the past four years was just below 90%. This was lower than some U.S. peers, but Fitch expects capacity factors ...Missing: outage | Show results with:outage
  39. [39]
    Fitch Affirms Bruce Power at 'BBB+'; Outlook Stable
    Apr 7, 2025 · Solid Performance: BPLP delivered strong relative performance during 2024, including an over 90% capacity factor and a forced loss rate below 2% ...Missing: outage | Show results with:outage
  40. [40]
    Bruce 6 to get new isotope production system - World Nuclear News
    Aug 20, 2025 · The new isotope production system in Canada's Bruce unit 6 will increase the supply of the cancer-tackling lutetium-177 medical isotope.
  41. [41]
    Feds partner with Bruce Power to expand production of cancer ...
    Aug 19, 2025 · Bruce Power first began commercially producing Lutetium-177 in 2022, following the construction of an isotope production system at the plant's ...Missing: Generating Station
  42. [42]
    Canada strengthens global leadership in medical isotope production
    Aug 19, 2025 · With its innovative IPS technology, Bruce Power is the first commercial nuclear reactor in the world to produce lutetium-177, supplying large ...
  43. [43]
    New facility to enhance isotope production
    Nov 13, 2024 · Canada's Bruce Power and its partners in the production of medical isotopes have committed to building a hot cell facility in Bruce County ...<|separator|>
  44. [44]
    [PDF] The ONTARIO ENERGY REPORT | Bruce Power
    Of the 6,400 MW of capacity from the Bruce Power site, there is the capability, which has been significantly utilized by the province, for 2,400 MW of flexible ...Missing: configuration | Show results with:configuration
  45. [45]
    Bruce Power proud of its role in newly released Integrated Energy ...
    Jun 12, 2025 · “Bruce Power will continue to contribute one-third of the province's electricity to Ontario's clean grid well into the future, and the resulting ...
  46. [46]
    [PDF] Ontario's System-Wide Electricity Supply Mix: 2024 Data
    May 14, 2025 · Nuclear Energy. 48.5 %. Waterpower. 23.4 %. Natural Gas*/Oil/Other. 16.6 ... * Includes Lennox, dual fuel (natural gas/bioenergy) and non- ...
  47. [47]
    CER – Provincial and Territorial Energy Profiles – Ontario
    Jul 29, 2025 · Bruce Power on the east shore of Lake Huron is the largest, with eight generation units and an installed capacity of about 6,232 MW. It is one ...<|separator|>
  48. [48]
    Supply Mix and Generation - Independent Electricity System Operator
    Nuclear. Nuclear has a foundational role in Ontario's electricity system, accounting for over 30 per cent of the province's total generation capacity, but ...
  49. [49]
    Restart of Bruce reactor delayed - World Nuclear News
    May 21, 2012 · Units 1 and 2 at the four-unit Bruce A plant started up in 1977, but unit 2 was shut down in 1995 because a steam generator suffered corrosion ...
  50. [50]
    Welcome Back, Bruce! - Power Engineering
    Jan 1, 2013 · In 1995, for example, Unit 2 was shut down because its steam generators suffered corrosion after a lead shielding blanket was left inside. ...
  51. [51]
    Bruce Power's Ontario Bruce 3 reactor shut | Reuters
    Jul 26, 2007 · Ontario Hydro, the former province-owned power company, shut Units 1 and 2 in 1997 and 1995, respectively, because they needed extensive ...
  52. [52]
    Proposed Bruce A refurbishment for life extension and continued ...
    The proposal is to return Units 1 and 2 of Bruce A to service (operational status) and extend their life through the end of a potential Bruce Power lease in ...
  53. [53]
    Refurbishment Agreement - Bruce Power
    Bruce Power entered into the Bruce Power Refurbishment Implementation Agreement (BPRIA) in 2005 to enable the restart of Bruce Units 1 and 2.Missing: details | Show results with:details
  54. [54]
    Bruce refurb and uprate project progresses - World Nuclear News
    Jan 11, 2008 · All the replacement steam generators have now been delivered for units 1 and 2, while three of the units have now been uprated. Bruce Power ...Missing: Generating timeline outcomes
  55. [55]
    TransCanada Provides Update on Bruce A Units 1 and 2 Restart ...
    Apr 17, 2008 · Based on the assessment the capital cost for the restart and refurbishment of Bruce A Units 1 and 2 is expected to be in the range of $3.1 to ...
  56. [56]
    Refurbishment and life extension
    Dec 1, 2015 · Units 1 and 2 at the Bruce A Nuclear Generating Station were returned to service in 2013 and 2012 respectively, following their refurbishment.Missing: 1995-2012 costs
  57. [57]
    Bruce Power celebrates a decade of eight-unit operation since ...
    Oct 19, 2022 · When Bruce Power was formed in 2001, it committed to restart Units 3 and 4, which it did by 2004, paving the way for the Units 1 and 2 Restart ...Missing: details | Show results with:details
  58. [58]
    Bruce Power nuclear unit to restart after 17 years | CBC News
    Mar 16, 2012 · TransCanada said it expects its share of the capital cost of the Bruce refurbishment to be $2.4-billion. Bruce Power, on the shores of Lake ...Missing: Units timeline<|separator|>
  59. [59]
    [PDF] Bruce Power Facts - Major Component Replacement
    Units 1 and 2 completed their MCRs in 2012 and have been operating to the world's highest standard in the decade since, reinforcing the fact that CANDU ...
  60. [60]
    Third Bruce unit begins refurbishment - World Nuclear News
    Feb 4, 2025 · Unit 3 is currently undergoing MCR. Units 5, 7 and 8 are also be refurbished, with units in overlapping MCR outages until 2033. The CAD13 ...
  61. [61]
    Bruce Power's Unit 4 Major Component Replacement hits key ...
    Sep 2, 2025 · Bruce Power's multi-year Life-Extension Program, scheduled to be completed in 2033, represents the largest private-sector investment in Canada's ...Missing: OPG | Show results with:OPG<|separator|>
  62. [62]
    TC Energy announces completion of Bruce Power's Major ...
    Sep 15, 2023 · Bruce Power's Life-Extension Program will see Units 3-8 refurbished over the next decade to power Ontario extending the units' operation ...Missing: Station | Show results with:Station
  63. [63]
    Canada / Bruce-3 Removed From Service As Major Nuclear Life ...
    Mar 6, 2023 · Unit 3 at Bruce Power's eight-unit nuclear power station has been removed from service to begin its major component replacement outage.
  64. [64]
    Bruce unit 5 refurbishment gets IESO go-ahead - World Nuclear News
    Apr 8, 2025 · Units 3 and 4 are currently undergoing their MCR outages, and will be followed by 5, 7 and 8 in overlapping MCR outages until 2033. Each ...Missing: timeline delays
  65. [65]
    Bruce Power Refurbishment Approved
    Apr 10, 2025 · The Unit 5 outage will be Bruce Power's fourth as it renews Units 3-8 over the next eight years. For more information, see Bruce Power's ...Missing: Station 2016
  66. [66]
    Bruce Power refurbishment project ahead of schedule
    Aug 8, 2024 · Bruce Power has announced the completion of its Unit 3 ... project aimed at extending the Bruce plant's operational life through 2064.
  67. [67]
    Canada / Bruce Power Announces 'Major Milestone' In Nuclear ...
    Aug 7, 2024 · ... Units 5, 7 and 8 are also slated for refurbishment over the next 10 years. Two units at the site, Units 1 and 2, are not part of the project.
  68. [68]
    Pressure tubes: The heart of the reactor
    Pressure tubes are the heart of the reactor, designed to contain fuel bundles and primary coolant, and are exposed to high temperatures, pressure and radiation.
  69. [69]
    Bruce Power signs contract for MCR steam generator replacements ...
    Aug 8, 2024 · “We are proud to be part of the team to support Bruce Power's Units 5, 7 and 8 steam generator replacements under the Major Component ...
  70. [70]
    Bruce Power completes steam generator replacement project at unit 3
    Feb 26, 2025 · Bruce Power completes steam generator replacement project at unit 3 ... Bruce Power's CAD13bn refurbishment is Canada's third largest ...
  71. [71]
    Bruce Power completes Unit 3 MCR reactor removal series ahead of ...
    Aug 2, 2024 · Bruce Power completes Unit 3 MCR reactor removal series ahead of ... The calandria tube removal, completed July 26, set a CANDU ...
  72. [72]
    Bruce Power, ATS Industrial Automation set new standard for reactor ...
    Aug 29, 2024 · ... calandria tube installation and semi-automated fuel channel installation tools for Bruce Power's MCR projects in Units 4, 5, 7 and 8. The ...
  73. [73]
    [PDF] Regulatory Oversight Report for Canadian Nuclear Power ...
    Dec 1, 2024 · In 2022, Bruce Power submitted revised Fire Protection Assessment (FPA) reports for Bruce NGS A and B to the CNSC for acceptance. CNSC staff.
  74. [74]
    [PDF] Regulatory Oversight Report for Canadian Nuclear Power ...
    Performance rating: Satisfactory. Number of findings by rating: CNSC staff confirmed through field inspections that Bruce Power complied with the applicable.
  75. [75]
    Bruce A and B Nuclear Generating Stations
    May 17, 2024 · The CNSC acknowledges that the Bruce A and B nuclear generating site is located within the Traditional Territory of the Saugeen Ojibway ...
  76. [76]
    [PDF] Public-Disclosure-PSA-Report-2024.pdf - Bruce Power
    CNSC Regulatory Document REGDOC-2.4.2 “Probabilistic Safety Assessment (PSA) for. Reactor facilities” was written to provide the requirements and guidance for ...
  77. [77]
    Worker hospitalized after electric shock at power plant
    Apr 4, 2017 · The incident took place while the worker was conducting planned electrical maintenance on Unit 5, which is in the “non-nuclear side” of the ...
  78. [78]
    CNSC investigating Bruce Power licence violation
    Jul 20, 2021 · Operating while pressure tubes with hydrogen equivalent (Heq) concentrations in excess of 120 parts per million violated terms of Bruce Power's operating ...Missing: incident | Show results with:incident
  79. [79]
    Commission amends Bruce Power's operating licence ... - Canada.ca
    Oct 16, 2023 · The Commission accepted CNSC staff's recommendation to include a new licence condition 6.2 requiring Bruce Power to implement and maintain an ...
  80. [80]
    Regulatory Action - Bruce Power Inc.
    Sep 1, 2022 · The CNSC has issued an administrative monetary penalty (AMP) of $24,760 to Bruce Power Inc. Following a failure to properly quarantine ...
  81. [81]
    Request pursuant to Subsection 12(2) of the General Nuclear Safety ...
    Jun 13, 2024 · It was determined that some unaccounted worker exposure due to neutron radiation associated with the refurbishment waste containers may have occurred.
  82. [82]
  83. [83]
    Security - Canadian Nuclear Safety Commission
    Sep 7, 2023 · The specific areas of security include: facilities and equipment, security practices, response arrangements, and drills and exercises.
  84. [84]
    Safety | Canadian Nuclear Association
    Canada's nuclear reactors are safe for workers, the public and the environment. Safety is not only built into the design of CANDU reactors, but also into the ...
  85. [85]
    Nuclear safety and emergency preparedness | Nuclear security - OPG
    Physical barriers, including vehicle denial barriers, wire fencing, and additional anti-intrusion measures protect the site. There is around-the-clock ...
  86. [86]
    [PDF] Planning and Responding to a Nuclear Security Incident - WINS
    After 9/11 - the CNSC mandated that all Nuclear Generating. Facilities develop and deploy armed response teams capable of responding to the identified threat. • ...Missing: measures | Show results with:measures
  87. [87]
    [PDF] Bruce Power Facts - Waste Management
    Since the 1970s, OPG has responsibly managed, transported, and processed all radioactive waste from Bruce A and Bruce B. Waste is currently stored by OPG on an ...
  88. [88]
    Managing nuclear waste today - OPG
    The Western Waste Management Facility (WWMF) handles low- and intermediate-level waste from the Darlington, Pickering, and Bruce Power nuclear stations. In ...
  89. [89]
    [PDF] Environmental Emissions Data for Nuclear Waste Management - OPG
    The low level waste is stored as is, compacted or incinerated. The facility also provides used fuel dry storage for the Bruce Power reactors.
  90. [90]
    Bruce Power update
    Jun 20, 2024 · Retube waste containers are large, sealed vessels that are shielded with steel used to move and store potentially radioactive components after ...
  91. [91]
    Regulator approves OPG to operate new waste facility
    Oct 13, 2025 · Canada's nuclear regulator has authorised Ontario Power Generation to begin operating a new building, which will store used steam generators ...
  92. [92]
    Radioactive waste - Canadian Nuclear Safety Commission
    May 5, 2025 · The Canadian Nuclear Safety Commission (CNSC) regulates all steps in the management of radioactive waste in order to protect the health ...
  93. [93]
    Underground radioactive waste storage plan near Lake Huron ...
    Jun 24, 2020 · An Ontario nuclear power generating company has officially dropped its pursuit of a deep underground storage facility for low- to intermediate-level ...Missing: Station | Show results with:Station<|separator|>
  94. [94]
    [PDF] Bruce Power 2023 Sustainability Report
    ... generation in. Ontario to meet their sustainability goals. Bruce Power expects to generate 1.2-1.5 TWh of CECs from incremental clean electricity output in 2023 ...
  95. [95]
    [PDF] Incremental Clean Energy Production and Avoided Emissions
    Most importantly, by 2034, due to the refurbishment process, annual power output of the. Bruce Power nuclear facility is predicted to be 37.1 TWh. As seen in ...
  96. [96]
    Protecting the Environment - Bruce Power
    Our 2,300-acre site is home to six kilometres of Lake Huron shoreline, containing more than 464 species of plants and more than 275 species of wildlife, which ...
  97. [97]
    [PDF] 2023 Environmental Protection Report - Bruce Power
    The Environmental Risk Assessment demonstrates that the operation of the Bruce. Nuclear Facility has not resulted in adverse effects on human health of nearby ...
  98. [98]
    Quantifying Restoration Offsets at a Nuclear Power Plant in Canada
    Oct 19, 2019 · The 28 impinged 12-year-olds account for only a 55 kg reduction in biomass available to the Lake Huron ecosystem.
  99. [99]
    Biodiversity Policy - Bruce Power
    Our 930-hectare site is home to a naturally diverse environment that contains a wide variety of plant and wildlife species.Missing: Nuclear Generating Station
  100. [100]
    Environment and Sustainability - Bruce Power
    Our Biodiversity Policy, an extension of our Environment & Sustainability Policy, outlines a commitment to the protection of biodiversity on and off site ...
  101. [101]
    OPG receives gold certification for biodiversity work at Bruce ...
    OPG receives gold certification for biodiversity work at Bruce Nuclear site · Habitat restoration for turtles and birds, such as ducks and meadow larks. · Helping ...
  102. [102]
    [PDF] 2025 Main Sustainability Report - Bruce Power
    Non-Carbon Emitting Energy Production via Bruce Power Annual Generation (T W ... result from the same power output being provided from natural gas electricity ...
  103. [103]
    Bruce Power and ALUS Celebrate Completion of Three-Year Nature ...
    May 30, 2025 · “These projects not only support carbon sequestration but also enhance biodiversity, improve water quality, and build climate resilience.” Bruce ...
  104. [104]
    Bruce Power's Post - LinkedIn
    Jul 22, 2025 · For more about Bruce Power's environment program, see our 2025 Sustainability Report: #GrowMeInstead #NativePlants #BrucePower #Biodiversity.<|separator|>
  105. [105]
    Environment and Sustainability Fund - Bruce Power
    The Environment & Sustainability Fund seeks opportunities to partner with organizations on projects and initiatives related to environmental conservation and ...
  106. [106]
    [PDF] Environmental Protection Report 2024 B-REP-07000-00017
    May 6, 2025 · It includes Bruce Nuclear Generating Station A (Bruce A) and Bruce. Nuclear Generating Station B (Bruce B), each comprising four CANDU reactors, ...
  107. [107]
    Before moving to 18 years ago I lived in Canada - where the Nuclear ...
    Nov 13, 2024 · ... cost overruns: Bruce A was projected to cost CA$0.9 billion but actually cost CA$1.8 billion; Bruce B was projected to cost CA$3.9 billion but.
  108. [108]
    The Bruce Power Generating Station Project
    Feb 18, 2010 · Each generating station has four nuclear reactors. When fully operated, Bruce Power generates around 6,232MW of power. Refurbishment works being ...
  109. [109]
    Bruce Power to spend $13B to refurbish 6 nuclear units | CBC News
    Dec 3, 2015 · Bruce Power will spend $13 billion to refurbish six of the eight nuclear reactors at its generating station near Kincardine, Ont., and assume all risks for ...<|separator|>
  110. [110]
    Bruce 6 refurbishment begins - World Nuclear News
    Jan 21, 2020 · 185 billion dollars (USD1.652 billion). The total cost of the Bruce refurbishment has been estimated at about CAD8 billion, in addition to CAD5 ...
  111. [111]
    Bruce Power Unit 3 Refurbishment to Proceed
    Mar 17, 2022 · The IESO has verified the final cost estimate for Bruce Power's Unit 3 nuclear refurbishment, which will begin in February 2023.
  112. [112]
    [PDF] The Economics of Nuclear Power
    Note: the above data refer to fuel plus operation and maintenance costs only, they exclude capital, since this varies greatly ... Operating costs include ...
  113. [113]
    Delivering Transparency and Trust - Bruce Power
    The Bruce Power Life-Extension Program is made up of the Major Component Replacement (MCR) project, which began construction in 2020 and will extend over a 13- ...
  114. [114]
    [PDF] Nuclear Refurbishment - Bruce Power
    The Government of Ontario (the Province) has decided to refurbish ten nuclear reactors at the Bruce and Darlington Nuclear Generating Stations (BNGS and. DNGS) ...
  115. [115]
    [PDF] Nuclear Power Economics and Structuring
    In the former edition, the levelized cost of electricity (LCOE) from nuclear was demonstrated to be competitive when compared with all other sources, in.
  116. [116]
    IESO Verifies Bruce Power Cost Estimate
    Nov 22, 2018 · The IESO has verified Bruce Power's final cost estimate of the first ... The final fixed cost of the refurbishment is $2.185 billion ...
  117. [117]
    [PDF] Clean Electricity Standard (CES) Consultation - Bruce Power
    As a reliable source of clean energy, nuclear helps avoid 80 million tonnes of carbon emissions per year in Canada (equal to removing 15 million cars from the ...
  118. [118]
  119. [119]
    [PDF] Bruce Power Case Study on Building a Nuclear Industry Ecosystem
    Aug 15, 2024 · The Clean Energy Frontier region is home to Bruce. Power, one of the world's largest operating nuclear electricity generating station—located on ...
  120. [120]
    [PDF] Ontario ratepayers are top priority for Bruce Power
    Bruce Power ongoing operations support 22,000 direct and indirect jobs annually while also producing $4 billion in annual economic benefit to Ontario through ...
  121. [121]
    [PDF] Affordable Power. Jobs & Growth.
    By securing the future of the Bruce Power site, the long-term, annual economic impact of the facility will result in: 18,000 direct and indirect jobs annually. ...
  122. [122]
    Clean Energy Frontier - Bruce Power
    Bruce Power's annual operational spending boosts provincial gross domestic product (GDP) by an estimated $3.5 billion and adding in induced economic effects, ...Missing: study jobs
  123. [123]
    Cost overruns at Bruce nuclear refurbishment won't hit ratepayers
    Nov 8, 2010 · A $2-billion cost overrun to refurbish two mothballed nuclear reactors at Bruce Power on Lake Huron will be covered by the private energy ...Missing: Station | Show results with:Station<|separator|>
  124. [124]
    [PDF] Nuclear Refurbishment - Financial Accountability Office of Ontario
    Under the Nuclear Refurbishment Plan, Bruce Power and OPG will recover the cost of refurbishing and operating the nuclear reactors by generating and selling.
  125. [125]
    Bruce A Unit 2 Restart Delayed Again by Generator Fault
    May 24, 2012 · The long-awaited restart of Bruce Power's Unit 2 at Bruce A on Friday was delayed again for months after an issue was identified within the ...
  126. [126]
    Reportable Events - Bruce Power
    On a quarterly basis, Bruce Power posts events reported to the Canadian Nuclear Safety Commission as per REGDOC 3.1.1, 'Reporting Requirements for Nuclear ...
  127. [127]
    Fish blockage forces Bruce Power nuclear reactor offline - Reddit
    Feb 14, 2025 · The operators noticed that flow or pressure was down, identified the cause, and safely shut down 1/8 reactors. Procedure was followed and nothing bad has ...Bruce Power restarts refurbished nuclear reactor : r/canada - RedditBruce Nuclear Generating Station. World's largest nuclear plant by ...More results from www.reddit.com
  128. [128]
    Bruce Nuclear Unsafe, Say Workers - EF News - The Electricity Forum
    Nearly half a tonne of steel plummeted 20 metres to the ground from atop a Bruce Power plant crane last month, narrowly missing workers below and raising ...
  129. [129]
    Environmentalists worry about relationship between Bruce Power ...
    Apr 13, 2015 · “The increasing accident risk and incomplete emergency plans aren't being addressed because the CNSC basically allows Bruce Power to regulate ...
  130. [130]
    Greenpeace criticizes nuclear risk assessment - The Globe and Mail
    Jun 26, 2008 · Bruce Power's decision to ignore differences in plant design when assessing the risks of accidents and terrorism at new nuclear stations is ...
  131. [131]
    Growing Concern in US over Bruce Nuclear Waste · NIRS
    There are 8 nuclear reactors at Bruce (plus another that is permanently closed down), all of the “low” and “intermediate” level radioactive waste from 20 ...Missing: ecological | Show results with:ecological<|control11|><|separator|>
  132. [132]
    Bruce County divided over becoming permanent site to store ... - CBC
    Feb 21, 2020 · Bruce County divided over becoming permanent site to store Canada's nuclear waste · Canada has 57K tonnes of highly radioactive spent nuclear ...
  133. [133]
    Saugeen Ojibway Nation vote “no” against the building of nuclear ...
    The Saugeen Ojibway Nation in Ontario Canada successfully stopped the construction of a low to intermediate nuclear waste repository on their territories.
  134. [134]
    The Nuclear Waste Issue in Northern Ontario - NiCHE
    May 31, 2022 · The NWMO reports that as of June 2021 there is close to 3.1 million spent nuclear fuel bundles in either wet or dry storage. The Canadian ...
  135. [135]
    [PDF] World Nuclear Performance Report 2024
    Aug 1, 2024 · The average capacity factor of nuclear reactors increased by 1%, reaching. 81.5% in 2023, highlighting the reliability delivered by nuclear ...
  136. [136]
    Our power generation | Nuclear power - OPG
    Today, more than 50% of Ontario's power needs are met by nuclear. Discover how this powerful energy source has become an important tool in fighting climate ...Pickering Nuclear Station · Nuclear decommissioning · Darlington Nuclear Station
  137. [137]
  138. [138]
    Nuclear: The Core of a Low- Carbon Future
    Jun 16, 2022 · Nuclear provides carbon-free, reliable energy and is an essential part of a clean energy supply mix. • Provides environmental, economic and ...
  139. [139]
    Nuclear at heart of Ontario's integrated energy strategy
    Jun 16, 2025 · The government's newly released energy roadmap brings together electricity, natural gas, hydrogen and other energy sources under a single coordinated strategy.
  140. [140]
    Canada's Bruce Power Gets IESO Approval For Bruce-5 Major ...
    Apr 9, 2025 · IESO said Bruce Power has met the terms and conditions to proceed with another major component replacement (MCR) project at the eight-unit Bruce nuclear power ...
  141. [141]
    IESO green-lights Unit 5 Major Component Replacement project ...
    Apr 7, 2025 · “The refurbishment of Bruce Power's reactors is a vital step in securing a reliable, sustainable energy future and solidifying Ontario's ...
  142. [142]
    Increased isotope production, life extension and potential expansion ...
    Dec 26, 2024 · Bruce Power also progressed its Project 2030 project in 2024 by making improvements to existing assets toward a target site net peak ...
  143. [143]
    The future is nuclear: Bruce Power's 2024 Annual Review highlights ...
    Mar 3, 2025 · In 2024, Bruce Power doubled its capacity to produce lutetium-177 by adding a second production line in Unit 7 and also increased its harvests ...Missing: financial economics
  144. [144]
    Bruce C Nuclear Project - Canada.ca
    The Bruce C Nuclear Project proposes a new nuclear station in Kincardine, Ontario, providing 4,800 megawatts, operating for 60-100 years, and is in progress.
  145. [145]
    [PDF] Bruce Power New Nuclear Initial Project Description Plain ...
    Aug 12, 2024 · In each scenario the potential fenced facility is identified, as well as the area being assessed for supporting infrastructure. The general area ...
  146. [146]
    [PDF] Energy for Generations - Government of Ontario
    Jul 18, 2025 · Today, Ontario's three nuclear sites – Darlington, Bruce and Pickering – have a combined installed capacity of over 12,000 MW. These facilities ...
  147. [147]
  148. [148]
    Key phase completed of impact assessment for Bruce C project
    Aug 22, 2025 · The planning phase of the federal integrated Impact Assessment process for Bruce Power's planned Bruce C project has been completed, ...
  149. [149]
    New reactor facility projects - Canadian Nuclear Safety Commission
    Bruce Power is seeking a licence to prepare site (LTPS) for its Bruce C Nuclear Project, for up to 4,800 MWe nuclear generating capacity at the Bruce Power site ...<|separator|>
  150. [150]
    Ontario Launches Plan to Secure Energy for Generations
    Jun 12, 2025 · ... Ontario nuclear innovation. Our investments in life-extension and pre-development work for Bruce C support the province's growing economy ...
  151. [151]
  152. [152]
    [PDF] Decommissioning of Nuclear Power Facilities in the Great Lakes Basin
    The prime example cited was the Douglas Point Nuclear. Generating Station on the Bruce Nuclear Site that was permanently shut down since 1984, but with minimal ...
  153. [153]
    Visitors' Centre - Bruce Power
    The Visitors' Centre, which offers interactive displays and informative exhibits for all ages, is open year-round, Monday-Friday, from 9 am-4 pm.
  154. [154]
    Tour the Bruce Power site this summer!
    The Visitors' Centre offers fun and educational presentations for students ... Please contact the Visitors' Centre at BNPDVisitorCentre@brucepower.com or ...
  155. [155]
    The Bruce Power Visitors' Centre - Port Elgin
    Over 15,000 people visit us annually to learn more about safe, reliable and carbon-free nuclear energy and cancer-fighting medical isotopes.
  156. [156]
    Corporate Social Responsibility - Bruce Power
    Bruce Power donates over $2 million every year to community charities and non-profit organizations. We are proud to deliver clean, reliable, nuclear power to ...Missing: engagement tourism
  157. [157]
    [PDF] Bruce Power Facts - In the community
    Bruce Power supports communities through partnerships, a $75,000 scholarship, Indigenous and Environment funds, and a visitors' center with exhibits.Missing: recreation tourism
  158. [158]
    Transform Your Tourism Idea into Reality with the Spark Program
    Sep 10, 2025 · The Bruce County Spark Mentorship and Grants Program is a partnership between Bruce County, Bruce Power, Grey Bruce Simcoe Regional Tourism ...Missing: engagement recreation
  159. [159]
    Community Programs - Bruce Power
    Bruce Power's community programs include Indigenous Relations, Emergency Preparedness, Environment and Sustainability, and Physician Recruitment.Missing: recreation tourism