Combustion Engineering

Combustion Engineering, Inc. (C-E) was an American multinational engineering firm founded in 1912 through the merger of the American Stoker Company and the Grieve Grate Company, initially focused on fuel-burning equipment and later expanding into boilers and power generation systems. The company pioneered advancements in boiler design, including the adoption of to replace riveted construction, and became a leader in utilization technologies with numerous patented improvements. In the mid-20th century, C-E entered the sector, developing supply systems starting in the 1950s, including the first commercial system sold to Consumers Power Company in , which powered early pressurized water reactors. Acquired by ABB Asea Brown Boveri in 1990 for $1.6 billion, the firm contributed to global energy infrastructure but faced significant controversies over asbestos-containing products used in insulation and gaskets, leading to thousands of lawsuits, bankruptcy filing in 2003, and establishment of a $1.43 billion trust fund for claims. Legacy sites, such as in , also required remediation under federal programs for radiological contamination from research activities.

History

Founding and Early Innovations

Combustion Engineering was established on January 25, 1912, through the merger of the Grieve Grate Company and the American Stoker Company, two established manufacturers of fuel-burning equipment, with headquarters in . The Grieve Grate Company had specialized in grate designs for , while the American Stoker Company focused on mechanical stokers that automated the feeding of into boilers, addressing inefficiencies in manual firing methods prevalent in early 20th-century industrial steam generation. This consolidation enabled the production of integrated systems for more reliable and efficient burning of in stationary boilers used for power and heating applications. In its initial years, the company prioritized innovations in combustion efficiency, developing stokers and grates that minimized fuel waste and improved heat transfer in industrial boilers. By refining mechanical feeding mechanisms, Combustion Engineering reduced labor requirements and enhanced control over air-fuel mixtures, which was critical for scaling steam production in factories and early electric utilities amid rising demand for reliable energy sources. These advancements stemmed from practical engineering solutions to the challenges of incomplete combustion and ash accumulation in lump coal firing, drawing on empirical testing to optimize grate designs and draft systems. A key early expansion occurred in 1923 when Combustion Engineering acquired the Raymond Brothers Impact Pulverizer Company, integrating pulverized coal technology into its offerings. This allowed the company to provide complete systems for grinding coal into fine particles, enabling more uniform combustion and higher efficiencies compared to traditional methods—pulverized could achieve burnout rates exceeding 99% under controlled conditions, as demonstrated in subsequent tests. Such developments positioned the firm as a leader in transitioning industrial power from hand-fired to mechanized systems, supporting the growth of coal-fired steam plants in the .

Mergers and Expansions in Fossil Fuel Technology

In the late , Combustion Engineering acquired the Heine Boiler Company and the manufacturing facilities of the Hedges-Walsh and Weidner Company in , enhancing its capabilities in production for -fired systems. These acquisitions integrated specialized designs and expanded production capacity, allowing the company to scale up fabrication of stoker-fired and early pulverized units critical for industrial and utility applications. By 1929, the company had advanced its boiler technology through the erection of the first capable of producing 1 million pounds of steam per hour, installed for Edison's East River station, marking a milestone in high-capacity steam generation. This expansion coincided with innovations like the development of radiant boilers, such as the VU40 and VU50 vertical units, which improved efficiency in and combustion processes. A pivotal merger occurred in 1948 with the Superheater Company, proposed in November and completed on December 31, forming Combustion Engineering-Superheater, Inc. The Superheater Company, established in 1910, specialized in superheater elements that increased steam temperature and efficiency in locomotive and stationary boilers, directly complementing Combustion Engineering's fossil fuel combustion systems. Post-merger, the combined entity reported earnings of $7.25 per share for the period, reflecting synergies in power plant equipment for fossil-fired generation. By 1953, the company rebranded as Combustion Engineering, Inc., solidifying its dominance in boiler and superheater technologies for coal and oil power plants before shifting focus toward nuclear applications.

Entry into Nuclear Power Systems

Combustion Engineering's entry into began with internal feasibility studies on generating from nuclear fuels initiated in 1946, reflecting a strategic pivot toward atomic energy in the post-World War II era. This decision positioned the company to leverage its expertise in high-pressure boilers and steam systems for emerging nuclear applications, particularly under U.S. government contracts. By 1955, Combustion Engineering secured its first major nuclear contract with the U.S. Navy to manufacture enriched uranium fuel assemblies, initiating production for the "Nuclear Navy" program. That same year, the company acquired land in Windsor, Connecticut, to establish dedicated nuclear facilities, including a critical assembly building and a prototype reactor site, which eventually supported up to 3,000 employees focused on nuclear research and fabrication. Under the leadership of Arthur Santry Jr., these efforts expanded to designing and building complete nuclear steam supply systems (NSSS), starting with naval prototypes like the S1C reactor core, the first self-sustaining nuclear reactor for submarine propulsion. Through the late 1950s and early , Combustion Engineering supplied elements for over 20 U.S. submarines and surface vessels, while developing (PWR) technology integral to NSSS designs. This military foundation enabled transition to commercial , with the company fabricating vessels, generators, and control systems certified for utility-scale plants. Operations at emphasized fuel fabrication and testing under strict Atomic Energy Commission oversight, though later addressed legacy handling.

Post-War Growth and Organizational Changes

Following the end of , Combustion Engineering capitalized on the economic expansion and rising demand for power generation infrastructure, broadening its operations beyond traditional boiler and stoker systems into emerging fields such as and petrochemical processing. In 1946, the company initiated feasibility studies for applications, positioning itself for contracts with the U.S. Atomic Energy Commission (AEC). This strategic pivot was driven by the anticipated growth in for both military and civilian uses, reflecting the company's recognition of nuclear technology's potential to complement combustion systems. A key organizational milestone occurred on December 31, 1948, when Combustion Engineering merged with the Superheater Company, a longtime collaborator in generation technology, forming Combustion Engineering-Superheater, Inc. Stockholders had approved the consolidation earlier that month, integrating Superheater's expertise in high-pressure equipment to enhance the company's capabilities in utility and industrial boilers. By 1953, the entity adopted the name Combustion Engineering, Inc. (C-E), streamlining its corporate identity amid post-war diversification. This merger not only consolidated manufacturing assets but also supported expansion into marine and locomotive applications, aligning with the era's industrial rebound. In the mid-1950s, C-E pursued further growth through the acquisition of The Lummus Company, which extended its engineering scope into oil and gas exploration, refining, and petrochemical facilities. This move diversified revenue streams beyond combustion equipment, capitalizing on the post-war surge in energy demands from and . Concurrently, in 1955, the company purchased a 530-acre site in , to establish a new corporate campus, marking a significant organizational relocation and investment in research infrastructure; construction of facilities began that year, with over 400 employees and families relocated by July 1960, eventually peaking at approximately 3,000 workers. The Windsor complex, comprising over 30 buildings by the 1970s, housed research and prototype operations, including the S1C Prototype Reactor facility established in 1960 for U.S. training—sold to the that year but operated by C-E until 1970. From 1955 to the mid-1960s, C-E supplied fuel under contracts for submarines and commercial reactors, underscoring its rapid ascent in nuclear steam supply systems. Under CEO Arthur J. Santry, Jr., starting in 1963, C-E formalized a diversification that emphasized balanced growth across fossil fuels, systems, and ancillary services like municipal incineration and . This period saw the company evolve from a boiler-focused manufacturer into a multinational firm, with organizational adaptations including decentralized divisions for and operations to manage increasing complexity and regulatory demands. Such changes enabled C-E to navigate the competitive landscape of utility-scale projects, though they also introduced challenges in integrating diverse technologies amid evolving federal oversight of . ![Welders constructing ship boilers at Combustion Engineering's Chattanooga facility][float-right] The post-war era's emphasis on verifiable technological advancements, supported by government contracts and private sector demand, propelled C-E's workforce and output; for instance, its divisions contributed to large-scale pulverized-coal , exemplifying the company's role in scaling efficient for baseload power. These developments laid the groundwork for later international expansions, though domestic growth was tempered by the need for sustained investment in R&D to address efficiency and safety in high-pressure systems.

Technologies and Products

Boiler and Combustion Systems

![Welders constructing boilers for maritime applications at Combustion Engineering's Chattanooga facility]float-right Combustion Engineering pioneered advancements in boiler design and combustion technologies for steam generation, focusing on fossil fuel applications such as coal. The company entered the boiler market in the early 20th century, introducing innovations that became industry standards, including early steam generators developed prior to 1925. These systems facilitated efficient heat transfer from combustion to water, enabling large-scale steam production for industrial and power generation purposes. Initial products included underfeed stokers, mechanical devices that supplied to the firebox from below, promoting controlled and improved boiler efficiency by maintaining consistent fuel feed into the furnace. Combustion Engineering expanded its offerings to encompass a range of fuel-burning equipment, such as industrial , traveling grate stokers, and pulverizers, which ground into fine particles for more complete burning and higher . These systems were integral to early power plants, where converted from fuels into for turbines. In the mid-20th century, developed radiant designs, including the VU-40 and VU-50 models (vertical units with radiant and radiant-reheat configurations), optimized for utility-scale and operations. These featured vertical arrangements that enhanced heat absorption through , reducing reliance on and allowing for higher pressures and capacities, often exceeding 500,000 pounds of per hour. systems incorporated advanced burners and controls to minimize excess air and emissions while maximizing utilization. Founded in , Combustion Engineering's technologies emphasized durability and scalability, with manufacturing facilities producing components like pressure vessels under massive hydraulic presses capable of exerting thousands of tons of force for forging heavy plates. The integration of such systems supported the of coal-fired infrastructure, though later adaptations addressed evolving efficiency and environmental demands.

Nuclear Steam Supply Components

Combustion Engineering () specialized in steam supply systems (NSSS) for pressurized water reactors (PWRs), providing integrated components that generated from heat while maintaining primary coolant isolation. These systems featured a two-loop primary , distinguishing CE from multi-loop configurations by competitors like . Key components included the , which contained the fuel core and directed heated primary coolant flow under , typically around 2,250 , to prevent . CE vessels were fabricated from forged to endure irradiation, stresses, and seismic loads, with capacities supporting up to 3,800 MWt power in later designs. Steam generators formed the heat exchange boundary, employing inverted bundles with approximately 8,400 tubes per unit, yielding 86,000 square feet of heat transfer area to produce saturated at 550-600°F for drive. The egg-crate tube sheet design minimized impurity accumulation and flow stagnation, enhancing operational reliability. The pressurizer regulated primary system pressure via electric heaters and spray mechanisms, ensuring subcooled conditions during normal operation. Four reactor coolant pumps, two per loop, circulated the primary fluid at rates exceeding 80,000 gpm total, with canned motor configurations for containment integrity. Control element assemblies (CEAs) managed reactivity through cluster-type rods inserted via top-mounted drive mechanisms. CE's NSSS evolved with the design introduced in the 1970s, incorporating standardized modules for improved constructability and safety features like enhanced emergency core cooling. This culminated in the + variant, a 1,400 MWe advanced PWR certified by the U.S. NRC in 1997, emphasizing probabilistic risk assessment-derived redundancies. CE's nuclear division, active from the mid-1950s, supplied components for naval and plants, leveraging prior expertise for scaling.

Other Engineering Contributions

Combustion Engineering advanced pressure vessel fabrication through innovative manufacturing techniques, including the operation of the world's largest cold in 1942 at its plant, which shaped plates up to 15 inches thick for high-pressure applications. This 6,000-ton press facilitated the production of large-scale components essential for steam power equipment and later systems. In 1930, the company conducted tests on the first fusion-welded boiler drum, a milestone that demonstrated the viability of all-welded and led to widespread industrial adoption of welded vessels, replacing riveted designs for improved strength and reliability. Beyond core steam and nuclear technologies, Combustion Engineering designed and manufactured control equipment, heavy vessels, and machinery to support energy-related systems and environmental . These contributions extended the company's expertise into ancillary engineering fields, enabling integrated solutions for operations.

Corporate Structure and Leadership

Organizational Evolution

Combustion Engineering, Inc. (CE) was established in 1912 through the merger of the American Stoker Company and the Grieve Grate Company, initially concentrating on stoker-fired boilers and related fuel-burning equipment for industrial applications. The company expanded its capabilities in 1923 by acquiring the Raymond Brothers Impact Pulverizer Company, which allowed it to offer integrated coal pulverizing and combustion systems. Further consolidation occurred on December 31, 1948, when the Superheater Company fully merged into Combustion, enhancing its steam generation technologies; by 1953, the entity formalized its name as Combustion Engineering, Inc. This period marked the transition from a specialized boiler manufacturer to a diversified engineering firm with operating divisions, including Combustion Engineering-Superheater, Ltd. for Canadian operations and National Tank Company for pressure vessels. In the post-World War II era, CE underwent significant internal reorganization to support growth in power generation and technologies, relocating its headquarters from to , in 1960, which facilitated expansion to over 3,000 employees at the site. Under CEO Arthur J. Santry, Jr., starting in 1963, the company diversified into municipal boilers, equipment, and systems, evolving its structure to include specialized groups for these sectors alongside core and emerging divisions. By the 1980s, CE had developed a multi-division framework encompassing power systems, components, and , reflecting adaptations to market demands for integrated energy solutions. A pivotal shift occurred in 1983 when CE acquired Taylor Instrument Company from Sybron Corporation, integrating it into an Instrumentation & Controls group that bolstered process and capabilities. This acquisition expanded CE's organizational scope beyond heavy engineering into precision measurement and control systems. In 1990, ABB Asea Brown Boveri Ltd. purchased CE in a $1.6 billion , transforming it from an independent into a focused on power technologies; between 1990 and 1995, CE divested 32 underperforming businesses to streamline operations and mitigate financial losses amid industry downturns. Facing mounting asbestos-related liabilities, CE filed for Chapter 11 bankruptcy protection in 2003, leading to a court-confirmed reorganization plan in December 2005 that established a $1.43 billion trust fund for claimant resolutions while channeling future liabilities away from ongoing operations under ABB oversight. This restructuring preserved core engineering assets but dismantled legacy sites like , marking the culmination of CE's evolution from a standalone innovator to an integrated component of a multinational .

Key Executives and Management Decisions

Arthur J. Santry Jr. assumed the role of of Combustion Engineering in 1963, succeeding prior leadership and implementing a strategic diversification program aimed at transforming the company into a multifaceted corporation beyond its core and equipment manufacturing. This shift involved expanding into diverse end-use markets, including acquisitions such as the proposed purchase of National Tank Co. in 1965 for an undisclosed sum to bolster storage and capabilities. Under Santry's tenure as and later chairman, the company also made pivotal decisions, such as acquiring a 530-acre tract in , in 1955 for a new corporate campus and relocating over 400 scientific, technical, and managerial staff there by 1960 to accommodate post-war growth. These moves supported expansion into nuclear and other sectors, positioning Combustion Engineering as a leading manufacturer of power generation equipment by the late . Charles E. Hugel became president and chief executive officer in 1984, adding the chairman title in 1988 amid efforts to address declining core markets in and plants, oil, gas, and . Hugel's management emphasized international expansion, including a 1988 joint venture agreement with Soviet entities for and site preparation in and other cities to support energy projects, reflecting a push for overseas amid domestic challenges. He also revamped structures without altering core incentive programs and brokered significant agreements, such as a multibillion-dollar deal contributing to the company's eventual acquisition trajectory. These decisions occurred during a period of broader 1980s restructuring, which involved cost-cutting and portfolio adjustments in response to market contractions. Following the 1990 acquisition by Asea Brown Boveri (ABB), George S. Kimmel was appointed president and chief executive of the rebranded Asea Brown Boveri Inc., overseeing the integration of Combustion Engineering's operations into the larger conglomerate and managing the subsequent dismantling of the campus. Earlier leadership, including George Leamard, who formed the corporation in 1914 through the acquisition of grate and boiler manufacturers, laid foundational management focused on fuel-burning equipment production.

Ownership and Acquisitions

Pre-1990 Developments

was established in via the merger of the Grieve Grate Company and the American Stoker Company, both prominent manufacturers of fuel-burning equipment for steam generation. This consolidation created a unified entity focused on advancing technologies for industrial applications, initially headquartered in . In the mid-1920s, the company expanded its manufacturing base by acquiring production facilities in , including operations linked to the Heine Boiler Company and the consolidated Hedges-Walsh-Weidner entity, which had formed in 1928 from earlier firms dating back to 1888. These acquisitions, occurring around 1925–1929, augmented Combustion Engineering's capacity for steam production and integrated regional expertise in design, supporting growth in systems amid rising demand for power generation equipment. A significant restructuring occurred in 1948 when Combustion Engineering merged with the Superheater Company, a longtime collaborator in , forming Combustion Engineering-Superheater, Inc. The merger, approved by shareholders on December 31, 1948, combined complementary strengths in and combustion processes, enhancing the firm's position in and supply markets. By 1953, the company reverted to the name Combustion Engineering, Inc., operating as an independent, publicly traded entity through the ensuing decades without further major ownership shifts until the close of the period.

Acquisition by ABB and Subsequent Divestitures

In November 1989, ABB Asea Brown Boveri Ltd., a Swiss-Swedish multinational , agreed to acquire Combustion Engineering Inc. for $1.6 billion in cash, equivalent to $40 per share, providing ABB with a significant foothold in the U.S. power generation market. The transaction, announced on November 14, 1989, positioned Combustion Engineering as a wholly owned of ABB upon completion in 1990, integrating its boiler manufacturing, nuclear components, and engineering services into ABB's broader portfolio of electrical and automation technologies. This acquisition expanded ABB's capabilities in and systems, leveraging Combustion Engineering's established expertise amid global demand for energy infrastructure. Following the acquisition, ABB restructured Combustion Engineering's operations through a series of divestitures, driven by strategic shifts in the sector, including declining demand for new and mounting asbestos-related liabilities inherited from Combustion Engineering's historical operations. In 2000, ABB sold its 50% stake in the ABB joint venture—which encompassed much of Combustion Engineering's conventional generation assets, including boiler and systems—to for €1.25 billion (approximately $1.1 billion at the time), effectively transferring those core activities out of ABB's direct control. Separately, ABB divested its and services business, which included elements derived from Combustion Engineering, to British Nuclear Fuels Limited (BNFL) for $485 million in 2000, focusing ABB's remaining portfolio away from supply components. Further divestitures targeted Combustion Engineering's process engineering segments; in August 2007, ABB sold ABB Lummus Global Inc.—a downstream oil, gas, and unit tracing roots to Combustion Engineering's acquisitions—to CB&I for an undisclosed amount, streamlining ABB's holdings amid a pivot toward and . These transactions left Combustion Engineering primarily as a liability-holding entity, culminating in its Chapter 11 filing in February 2003 to manage over 111,000 claims, with ABB contributing reserves exceeding $900 million while having offloaded operational assets years prior. The divestitures reflected ABB's pragmatic response to Combustion Engineering's underperforming segments and legal exposures, preserving ABB's financial stability without fully absorbing the subsidiary's legacy burdens.

Asbestos Exposure and Litigation

Combustion Engineering incorporated into numerous products, including boilers and materials, beginning prominently during for manufacturing asbestos-lined boilers. Workers at company facilities, such as the plant, faced exposure during production processes involving , pressing, and assembly of these components. End-users and installers also encountered asbestos fibers from the company's supply systems and related equipment. The first asbestos-related lawsuits against Combustion Engineering emerged in the , targeting the company for worker illnesses linked to product exposure. By 2002, the firm confronted approximately 111,000 pending claims from individuals alleging asbestos-induced diseases, including and . Notable early litigation included settlements, such as an 1988 case involving a deceased worker who contracted asbestos-related cancer. The company defended against these claims for nearly four decades, with cumulative liabilities escalating due to mounting verdicts and settlements. Overwhelmed by obligations, Combustion Engineering filed for Chapter 11 on February 17, 2003, following its acquisition by ABB, which had assumed certain liabilities. The filing addressed an estimated $1 billion in claims and prompted a pre-packaged reorganization plan negotiated with claimants and creditors. Upon emerging from in 2006, the company established the Combustion Engineering 524(g) Personal Injury Trust, funded initially at around $1.44 billion to compensate verified claimants, channeling future payouts through the trust to resolve ongoing and prospective litigation. This structure, under Section 524(g) of the Code, aimed to provide equitable distribution while protecting the reorganized entity from further suits.

Nuclear Safety and Regulatory Issues

Combustion Engineering operated the Nuclear Fuel Fabrication Plant in under NRC License No. SNM-1067, where it produced fuel assemblies for commercial reactors, subjecting it to strict safeguards and safety regulations. In 1978, an NRC identified two violations: to post required criticality alarm limits at fuel loading workstations and storage areas, contravening Amendment No. 17 to the license's Section 8.2; and non-compliance with 10 CFR 71.12(b) for shipping containers, including missing referenced drawings and use of incorrect bolts (eight instead of ten with washers and nuts) on Model 927A1 containers certified under Compliance No. 6078. Subsequent inspections at revealed ongoing compliance lapses. A 1995 NRC review cited a Level IV violation for untimely cleanup of contaminated areas exceeding action levels (5,000–11,996 dpm/100 cm²), violating Safety Condition S-1 and Procedure 307 due to poor communication between and operations; non-cited violations included workers entering airborne radioactivity zones without respirators and unauthorized removal of radios from restricted areas without surveys. These incidents highlighted deficiencies in procedural adherence and , prompting NRC demands for reinforced and 30-day corrective responses under 10 CFR 70.9, though no escalated occurred. In reactor applications, Combustion Engineering's steam generators experienced recurrent tube degradation, including fretting wear from vibration and outer-diameter , affecting like San Onofre and Palisades. By 1993, over 1,400 replacement steam generator tubes across 41 (including four CE designs) required plugging due to such issues, per industry assessments. The NRC responded with enhanced regulatory frameworks, such as 10 CFR 50.55a updates and Generic Letter 95-03, mandating performance-based tube integrity programs with eddy-current inspections and leakage limits to prevent tube ruptures (SGTRs), which could challenge during accidents. Consequential SGTR analyses for CE confirmed vulnerability in severe accidents but affirmed adequacy of emergency core cooling under revised high-pressure safety injection systems. Additional component-specific concerns included failures of mercury-wetted matrix relays in CE-designed control systems, with 31 incidents reported by 1980, prompting NRC Bulletin 80-19 requiring verification and replacement to mitigate spurious actuations risking safety functions. Post-Three Mile Island (1979), CE incorporated safety function analyses into emergency procedures and instrumentation upgrades, though initial designs lacked some redundant features exposed by the accident. Overall, while no CE-supplied systems contributed to major radiological releases, these issues underscored the need for rigorous in fabrication and component design, influencing NRC's evolution toward risk-informed oversight without compromising deterministic safety margins.

Legacy and Impact

Contributions to Energy Infrastructure

Combustion Engineering played a pivotal role in developing technologies that underpinned coal-fired generation infrastructure during the . Formed in through the merger of fuel combustion firms, the company manufactured industrial , stokers, and pulverizers that enhanced production efficiency for electricity utilities. These systems supported the expansion of centralized plants by enabling reliable, high-capacity generation from and other solid fuels. Key innovations included early advancements in pulverized firing, with pioneering installations in the that improved combustion control and fuel utilization in utility boilers. By 1923, Combustion Engineering integrated complete pulverizing systems, facilitating the design of larger, more efficient units for grid-scale power output. The company also developed the tangential firing process, which became standard for modern pulverized boilers by optimizing flame stability and reducing emissions through even fuel distribution. Additionally, a 1939 steam design using pumps for circulation evolved into controlled circulation boilers, with the first major U.S. installation in at the Somerset Station in , allowing operation at higher pressures and temperatures for increased . Beyond systems, Combustion Engineering contributed to diversified energy infrastructure through specialized boilers such as chemical recovery units for pulp mills, designs, and later involvement in (IGCC) repowering projects, exemplified by the 1992 Combustion Engineering IGCC initiative aimed at enhancing coal plant efficiency and reducing environmental impact. These technologies supplied numerous power plants, facilities, and even naval vessels during , bolstering national energy capacity and reliability. The company's boilers, including models like VU-40 and Tower types, underwent upgrades in global projects, such as low-NOx retrofits in the U.S. and pollution controls in , extending the lifespan of legacy infrastructure.

Economic and Technological Influence

Combustion Engineering exerted substantial technological influence through advancements in and systems critical to power generation. Formed in 1914 from mergers focused on fuel-burning equipment, the company developed early designs that enhanced in industrial s, stokers, and dryers, laying groundwork for scalable steam production. By the mid-20th century, CE pioneered pulverized-coal-fired technologies, including a 325 MW plant in 1960 that advanced steam-electric parameters such as higher temperatures and pressures for improved . These innovations enabled utilities to generate at larger scales, supporting the post-World War II expansion of electrified infrastructure. In the nuclear domain, CE contributed steam generators and systems, fabricating assemblies from the late 1960s onward, which facilitated early commercial deployment. The company's boilers also adapted to alternative fuels, including municipal waste, integrating with waste processing to promote in power plants and refineries. Such developments influenced industry standards, with CE's designs powering a significant share of conventional and emerging energy facilities until its 1990 acquisition by ABB. Economically, CE's technological leadership drove job creation and , employing thousands in , , and R&D across sites like , and , where specialized facilities produced components for global power projects. As a key supplier to the sector, CE supported the growth of a multi-billion-dollar industry by enabling reliable, high-capacity supply that underpinned U.S. and from the through the . Its innovations reduced fuel consumption per unit of output, yielding cost savings for utilities and indirect economic benefits through lower prices that fueled and consumer sectors.

References

  1. [1]
    Combustion Engineering - Graces Guide
    May 22, 2018 · 1912 Company formed through the merger of the Grieve Grate Company and the American Stoker Company, two well-known manufacturers of fuel burning ...
  2. [2]
    Combustion Engineering | Asbestos Products, Lawsuits, Trust Fund
    Sep 15, 2025 · Combustion Engineering was founded in 1912 when the American Stoker Company merged with the Grieve Grate Company. The newly merged company ...
  3. [3]
    Combustion engineering's Chattanooga history dates back to 1888
    Feb 12, 2019 · C-E was a leader in the industry when fusion welding began to replace riveted construction of boilers and pressure vessels. The Chattanooga C-E ...
  4. [4]
    [PDF] Combustion Engineering, Inc. Windsor, Connecticut Building # 3
    The Superheater Company was fully merged into Combustion on December 31, 1948. By 1953 the company took the name Combustion Engineering, Inc. (C-E).
  5. [5]
    Combustion Engineering: A Windsor Landmark
    Apr 30, 2018 · Combustion Engineering began construction of the first corporate campus in Windsor's new business district in 1955 and employed thousands of workers.
  6. [6]
    Combustion To Merge With ABB - The New York Times
    Nov 14, 1989 · Combustion Engineering Inc. and ABB Asea Brown Boveri Ltd. agreed yesterday that ABB would buy Combustion Engineering for $1.6 billion in cash.
  7. [7]
    Combustion Engineering: Asbestos Trust Fund, Products & Lawsuits
    Combustion Engineering manufactured asbestos products. Facing litigation, it filed for bankruptcy and established a $1.43 billion trust for future claims.
  8. [8]
    [PDF] Windsor, Connecticut, Site Fact Sheet - Department of Energy
    The Windsor, Connecticut, Site, formerly known as the. Combustion Engineering (CE) Site, is owned by ABB, Inc. ... For more information on FUSRAP site history or.<|separator|>
  9. [9]
  10. [10]
  11. [11]
    Combustion Engineering & Asbestos | ELG Law
    The company started in 1912 following the merger between American Stoker Company and Grieve Gate Company. The initial products manufactured by Combustion ...
  12. [12]
    [PDF] Combustion Engineering, Inc. Collection - Windsor Historical Society
    Combustion Engineering, Inc. (CE) was a leader in steam and energy generation technologies for over 75 years. The company remained committed to its energy-based ...
  13. [13]
    Centennial special: Boilers - Power Engineering
    Feb 1, 1996 · In 1929, Combustion Engineering erected the first steam generator unit to produce steam at 1 million pounds per hour for New York Edison`s East ...
  14. [14]
    The History of the Steam-Generating Boiler and Industry
    Combustion Engineering developed their radiant and radiant reheat boilers called the VU40 and VU50 (VU for vertical units) for both the utility and industrial ...
  15. [15]
    MERGER PROPOSED OF 2 BIG CONCERNS; Superheater and ...
    MERGER PROPOSED OF 2 BIG CONCERNS; Superheater and Combustion Engineering Directors Vote to Form One Company Elected to Directorate Of the Crucible Steel Co.
  16. [16]
    MERGED CONCERNS EARN $7.25 A SHARE; Combustion ...
    The company is the result of a merger effected on Dec. 31, 1948, of the Combustion Engineering Company, Inc., and the Superheater Company. View Full Article ...
  17. [17]
    [PDF] Critical Facilities Building No. 1 Critical Assembly Building ... - LM Sites
    The oldest component of the company that ultimately became Combustion Engineering, Inc. was the Heine Boiler Company starting its operation in 1882.' However, ...
  18. [18]
    Combustion Engineering - Cold War CT
    Combustion Engineering in Windsor began working with nuclear materials in 1955. Nuclear operations reportedly ceased around 2000 and an extensive remediation ...
  19. [19]
    In focus: Combustion Engineering - Boilers - GE Vernova
    Formed in 1914, Combustion Engineering was one of the few companies that advanced the technology of boilers for steam energy. With the acquisition of Combustion ...
  20. [20]
    [PDF] ASLB - G114 - PWR - 03 - Combustion Engineering Plant Description.
    The Combustion Engineering plant includes mechanical systems like Reactor Coolant, Steam Generator, Emergency Core Cooling, and Control Element Assembly, plus ...
  21. [21]
    Difference(s) between B&W type OTSG and Westinghouse/CE SG's?
    Apr 23, 2012 · Combustion Engineering PWRs, unlike Westinghouse, all have two reactor coolant pumps per loop and only two SGs. Like the Westinghouse design ...
  22. [22]
    [PDF] Part 2 of 5 - Combustion Engineering Crosstraining Course (R-325C ...
    Each containment structure houses a nuclear steam supply system (NSSS), consisting of a reactor, steam generators, reactor coolant pumps. (RCPs), a pressurizer, ...
  23. [23]
    Control Element Assemblies (CEAs) for CE-NSSS Reactors
    ... Combustion Engineering Nuclear Steam Supply System (CENSSS) plants, including those based on System 80 design technology. Westinghouse supplies all of the ...
  24. [24]
    [PDF] Combustion Engineering Pressurized Water Reactors - INIS-IAEA
    In this document, a methodology is presented in which generic risk-based information has been extracted from probabilistic risk assessments (PRAs) for ...
  25. [25]
    System 80+[trademark] PWR safety design (Journal Article) - OSTI.gov
    Since 1985, ABB Combustion Engineering Nuclear Power (CENP) and Duke Engineering Services, Inc. have been developing the next generation of ...
  26. [26]
    Maintenance man at the Combustion Engineering Co. working at the ...
    Maintenance man at the Combustion Engineering Co. working at the largest cold steel hydraulic press in the world, Chattanooga, Tenn. This press can shape steel ...
  27. [27]
    [PDF] Environmental Impact Information, Combustion engineering, Inc ...
    Jun 2, 1975 · The group designs and manufactures fossil and nuclear fueled steam supply systems, nuclear fuel and components, heavy pressure vessels, air ...
  28. [28]
    Taylor – Heritage brand — ABB Group
    In 1983 Taylor merged with Combustion Engineering, becoming one of the largest process instrumentation companies in the United States. Combustion Engineering ...
  29. [29]
    In re Combustion Engineering, Inc. (3d Cir. 2004) - Justia Law
    In re Combustion Eng'g, 295 B.R. at 464. U.S. ABB acquired Combustion Engineering in 1990 in a leveraged buyout for $1.6 billion as part of a global acquisition ...
  30. [30]
    [PDF] Combustion Engineering, Inc.
    Nov 22, 2002 · The acquisition was by way of a leveraged buyout for $1.6 billion. Between 1990 and. 1995 CE sold 32 businesses to abate losses but during the ...Missing: mergers | Show results with:mergers
  31. [31]
    U.S. Bankruptcy Court confirms plan of reorganization for ... - ABB
    Dec 20, 2005 · U.S. Bankruptcy Court confirms plan of reorganization for Combustion Engineering ... The plan's channelling injunction, which will protect ABB and ...Missing: Inc | Show results with:Inc
  32. [32]
    Combustion Engineering Plans To Acquire National Tank Co.
    Arthur J. Santry Jr., president of Combustion Engineering, said an offer would be made to the 2.500 other stockholders at the same price. This offer will expire ...
  33. [33]
    Arthur J. Santry Jr., 74, Is Dead; Headed Combustion Engineering
    Feb 26, 1993 · Mr. Santry was the president and later chairman of Combustion Engineering Inc. The company expanded to become a leading national manufacturer of ...
  34. [34]
    BUSINESS PEOPLE; Chief of Combustion Is Now Chairman, Too
    Jun 30, 1988 · The C.E.O. Who Spends All Day Thinking About Sleep ... Kimmel, a graduate of Clarkson University, joined Combustion Engineering as vice president ...
  35. [35]
    Combustion Engineering Plans Soviet Venture - Los Angeles Times
    Jun 2, 1988 · Charles Hugel, president and chief executive of Combustion Engineering, said engineering and site preparation in the cities of Tobolsk and ...Missing: CEOs | Show results with:CEOs
  36. [36]
    Remembering Charles Hugel '51 - News - Lafayette College
    Dec 19, 2016 · Hugel's dealings with “Mike” were related to a historic multibillion-dollar agreement he had brokered as CEO of Combustion Engineering to help ...
  37. [37]
    BUSINESS PEOPLE; New Chief Executive Named By Combustion
    Jan 31, 1990 · The new name is Asea Brown Boveri Inc.; the new boss, with the titles of president and chief executive, is George S. Kimmel.Missing: history | Show results with:history
  38. [38]
  39. [39]
    European Firm Buying Combustion Engineering - Los Angeles Times
    Nov 14, 1989 · ABB Asea Brown Boveri Ltd., a Swiss-Swedish supplier of technical equipment and services, will pay $40 each for all of Combustion Engineering's ...
  40. [40]
    The ABC's of ABB | Institutional Investor
    During his tenure as CEO of Asea and then ABB, from ... Barnevik and Combustion Engineering CEO Charles Hugel reasoned that this would limit the liability.Missing: decisions | Show results with:decisions
  41. [41]
    ABB's US unit files for bankruptcy - SWI swissinfo.ch
    Feb 18, 2003 · ABB transferred the activities of Combustion Engineering to Alstom in 2000 when it sold its stake in a power joint venture for €1.25 billion.
  42. [42]
    BNFL buys ABB's nuclear business
    Jan 28, 2000 · BNFL has bought ABB's nuclear business for $485 million. The deal follows the recently announced merger between Siemens and Framatome.Missing: date | Show results with:date<|separator|>
  43. [43]
    History of ABB – Alvand sanat
    Dec 15, 2022 · ... Combustion Engineering and ABB Lummus Global, Inc. In August 2007, ABB Lummus Global, ABB's downstream oil and gas business, was sold to CB&I.
  44. [44]
    ABB and Combustion Engineering reach asbestos agreement
    Jan 17, 2003 · ABB and subsidiary Combustion Engineering have agreed on a pre-packaged bankruptcy plan for CE with representatives of asbestos plaintiffs, ...Missing: divestiture assets
  45. [45]
    How Asbestos Burned ABB - Bloomberg.com
    Mar 3, 2002 · ABB reported that it had to set aside an additional $470 million to cover future asbestos claims, raising its total reserves to $940 million.
  46. [46]
    Combustion Engineering | Asbestos Use & Trust Fund
    Jul 14, 2025 · Combustion Engineering History of Asbestos Use. For more ... In 1989, Combustion Engineering became a subsidiary of Swiss company ABB Ltd.Missing: evolution | Show results with:evolution<|separator|>
  47. [47]
    Combustion Engineering | Asbestos Products, Exposure, Lawsuits
    Dec 31, 2024 · Combustion Engineering (CE) manufactured many asbestos-containing products, resulting in thousands of mesothelioma lawsuits.Missing: achievements controversies
  48. [48]
    ABB and Combustion Engineering reach asbestos agreement
    Jan 17, 2003 · ABB and its US subsidiary Combustion Engineering (CE) today announced they had agreed a pre -packaged bankruptcy plan for CE with representatives of asbestos ...
  49. [49]
    Combustion Engineering Asbestos Trust | Compensation for Victims
    After emerging from restructuring, a trust of $1.44 billion was created to compensate the victims of Combustion Engineering's use of asbestos. If you or a loved ...
  50. [50]
    Combustion Engineering Can a Pre-packaged Bankruptcy Plan ...
    Jun 1, 2004 · The Combustion Engineering Pre-packaged Plan. Section 524(g) was enacted in 1994 to codify the manner in which asbestos personal-injury claims ...
  51. [51]
    [PDF] Notice of Violation from insp on 781024-27.
    NOTICE'0F VIOLATION. Combustion Engineering, Incorporated. Docket No. 70-1100. Based on the :esult of an NRC inspection conducted on October 24-27,. 1978, it ...
  52. [52]
    [PDF] abb combustion engineering, hematite, mo (nrc inspection
    Nov 27, 1995 · A violation of this regulation may also lead to criminal prosecution. The NRC expects no less than full compliance with all applicable ...
  53. [53]
    [PDF] 1-7-25-Palisades-Steam-Generator-Backgrounder ... - Beyond Nuclear
    Jan 7, 2025 · Six other Combustion Engineering (CE) steam generators experienced substantial internal vibration obstacles during their operational years.
  54. [54]
    [PDF] Steam Generator Tube Failures - OSTI
    As of December 1993,. 1,471 RSG tubes at 41 plants (4 Combustion. Engineering and 37 Westinghouse-type plants) had been plugged because of tubesheet and sludge ...
  55. [55]
    [PDF] Overview of Steam Generator Tube Degradation and Integrity Issues
    Combustion Engineering plants use an explosive tube sheet expansion process ... "performance-based" rule and regulatory guide for steam generator tube integrity.
  56. [56]
    [PDF] Consequential SGTR Analysis for Westinghouse and Combustion ...
    This report summarizes severe accident-induced consequential steam generator tube rupture. (C-SGTR) analyses recently performed by the U.S. Nuclear ...
  57. [57]
    Bulletin 80-19: Failures of Mercury-Wetted Matrix Relays in Reactor ...
    OPERATING EXPERIENCES AND EVALUATION: To date, operating nuclear power plants designed by C-E have reported thirty-one (31) failures of mercury-wetted relays ...
  58. [58]
    Impact of TMI on combustion engineering technical activities
    The paper describes significant features of the C-E Nuclear Steam Supply System relative to the Three Mile Island accident and highlights studies of plant ...<|control11|><|separator|>
  59. [59]
    Baffle-Former Bolts | Nuclear Regulatory Commission
    The NRC's risk-informed assessment of the issue determined that degraded baffle-former bolts do not warrant the immediate shutdown of any plant. The issue does ...
  60. [60]
    Power for the Industrial Age: a brief history of boilers. - Gale
    According to Combustion Engineering, the company's pioneering work on pulverized-coal firing at Milwaukee was followed in 1927 by the introduction of ...
  61. [61]
    Model of a Controlled Forced Circulation Boiler, 1942
    This model represents the first major controlled circulation boiler in the United States. It was installed at the Somerset, Massachusetts Station of the ...
  62. [62]
    Combustion Engineering IGCC Repowering Project - OSTI.GOV
    Jan 1, 1992 · Title: Combustion Engineering IGCC Repowering Project ; Authors: Andrus, H.E. ; Thibeault, P.R. ; Gibson, C.R. ; Publication Date: 1992-01-01.
  63. [63]
    Combustion Engineering Inc. | Invention & Technology Magazine
    A 325 MW pulverized-coal-fired plant that pushed the technology of steam-electric generating plants. When built in 1960, engineers sought to make a more ...Missing: expansion 1945-1970