The Crescent City Connection is a pair of parallel cantilever truss bridges spanning the Mississippi River in New Orleans, Louisiana, serving as the city's principal vehicular crossing between the east bank Central Business District and the west bank Algiers neighborhood while carrying U.S. Highway 90 Business. Each features a main span of ,575 feet, with a total structure length of approximately ,400 feet and a vertical clearance of 150 feet above the river to accommodate . The original eastbound span opened to in 1958 as the Greater New Orleans Bridge, designed by the engineering firm Modjeski and Masters, and was paralleled by a westbound span completed in 1988, after which the complex was renamed the Crescent City Connection. For decades, the bridges collected tolls to fund maintenance and operations, but these were eliminated in 2013 following a voter-approved referendum, leading to the subsequent demolition of the toll plaza in 2016 and an annual revenue shortfall estimated at $20 million that shifted funding burdens to state general resources. As Louisiana's busiest river crossing, the Crescent City Connection handles heavy commuter and commercial traffic, underscoring its critical role in regional connectivity, though it has faced ongoing maintenance challenges and recent upgrades including a $23 million LED decorative lighting system installed in 2025.

Physical Description and Specifications

Structural Design and Engineering

The Crescent City Connection consists of two parallel cantilever through-truss bridges spanning the Mississippi River, designed by the engineering firm Modjeski and Masters. The original eastbound span, constructed from 1955 and opened on April 15, 1958, features a main span measuring 1,575 feet (480 meters), establishing it as the world's longest cantilever highway bridge at the time. This structure employs a rivet-connected Warren truss configuration with 32 panels in the cantilever sections, utilizing eyebars and pin connections near the towers for rigidity. Approach spans incorporate 10-panel Warren deck trusses, all fabricated from steel and supported by concrete piers, achieving a vertical navigational clearance of 150 feet. The cantilever erection method involved building spans outward from the piers, culminating in a mid-river connection on January 3, 1958, by builder Bethlehem Steel Company. The westbound span, built from 1981 to 1988, replicates the original's cantilever truss design in steel with concrete piers, ensuring structural symmetry and capacity for directional traffic flows. This parallel engineering approach addressed escalating vehicular demands while leveraging the proven cantilever methodology suited to the river's deep, swift currents, as analyzed for economic efficiency.

Dimensions and Capacity

The Crescent City Connection comprises twin steel cantilever truss bridges crossing the Mississippi River in New Orleans, Louisiana. Each span features a main cantilever length of 1,575 feet, with the total structure length, including approaches, measuring 13,428 feet. The bridges provide a vertical clearance of 150 feet above the navigation channel and a horizontal channel width of 750 feet to accommodate river traffic. The original eastbound span, constructed in 1958, has a roadway width of 52 feet supporting four lanes. The parallel westbound span, added in 1981, accommodates six lanes total: four general-purpose lanes plus two reversible high-occupancy vehicle (HOV) lanes that adjust direction based on peak traffic flows, enhancing capacity during rush hours. This design yields a typical peak capacity of approximately 10,000 vehicles per hour per direction when reversible lanes favor outbound traffic, though actual throughput varies with congestion and vehicle mix.

Historical Development

Planning and Construction of the Original Span

The need for a direct vehicular crossing of the Mississippi River between downtown New Orleans and the west bank suburbs, such as Algiers, emerged in the post-World War II era amid rapid suburban growth and increasing traffic volumes that overwhelmed ferry services and the more distant Huey P. Long Bridge upstream. The Mississippi River Bridge Authority, established to manage the project, initiated planning in the early 1950s to construct a fixed-span bridge at the site's narrowest river width for optimal efficiency. Construction of the original span, initially named the Greater New Orleans Bridge, commenced in November 1954 under the design leadership of the engineering firm Modjeski and Masters, which specified a steel cantilever truss structure to span the 2,000-foot-wide river channel with a main span of 900 feet. The project employed conventional cantilever erection methods, with piers founded on deep-driven steel piles to withstand the river's scour and seismic risks, and incorporated four traffic lanes to accommodate projected demand. The bridge reached completion after approximately three years of work, opening to bidirectional traffic at 12:01 a.m. , , at a of $ million; upon opening, it held the distinction of the world's longest by . This immediately alleviated on routes and ferries, facilitating between the river's banks.

Addition of the Second Span

The original single-span Greater New Orleans Bridge, opened in 1958, experienced severe congestion by the late 1970s due to surging vehicular traffic across the Mississippi River, prompting state officials to plan a parallel second span to double capacity and alleviate bottlenecks. A 1977 federal Environmental Impact Statement endorsed the project, citing the need for expanded infrastructure to support regional growth without relying on ferries or alternative routes. Construction commenced in March 1981 under the direction of the Louisiana Department of Highways, with engineering by Modjeski and Masters, replicating the original's cantilever truss design to ensure structural consistency and navigational clearance for river traffic. The $500 million project involved erecting substructures, main spans, and approaches amid urban constraints, including coordination with ongoing port operations. Progress included completion of the main span in August 1985, but the full structure faced delays from construction complexities and funding issues, missing its targeted opening for the 1984 Louisiana World Exposition. The second span opened to traffic in September 1988, carrying westbound I-10 lanes and enabling bidirectional flow without the prior single-bridge limitations. Upon , tolls were reinstated at $1 per crossing to repay bonds, a measure tied directly to financing the rather than alone. The dual-span was officially renamed the Crescent City Connection in 1989, reflecting its in to the .

Post-Opening and Modifications

Following the completion and opening of the second span on September 30, 1988, the twin bridges were reconfigured into a one-way couplet to accommodate increased , with the newer parallel dedicated to eastbound U.S. 90 and the original 1958 to westbound . This operational modification effectively doubled the directional without structural alterations to the existing spans. The name "Crescent City Connection" was formally adopted shortly after the second span's completion, selected through a public contest to evoke the crescent bend of the Mississippi River and the enhanced regional linkage provided by the paired bridges. In 1989, toll collection commenced with the activation of a 12-lane toll plaza on the west bank approaches, establishing a revenue stream managed by the Greater New Orleans Bridge Commission for bridge maintenance, debt service on the second span's construction bonds, and related infrastructure. Routine annual inspections and minor general repairs were conducted thereafter by engineering firm Modjeski and Masters, focusing on structural integrity without major capital upgrades until subsequent decades.

Impact of Hurricane Katrina

The Crescent City Connection sustained no significant structural damage from Hurricane Katrina, which made landfall on August 29, 2005, as a Category 3 hurricane with sustained winds of 125 mph near New Orleans. Engineering inspections conducted shortly after the storm by the bridge's longtime designers, Modjeski and Masters, confirmed that both spans and their approaches remained in good condition, attributing this resilience to the bridge's elevated cantilever design over the Mississippi River, which avoided the storm surge impacts that destroyed lower-lying structures like the I-10 Twin Spans Bridge. This integrity allowed the bridge to serve as a vital link between the heavily flooded East Bank of Orleans Parish and the relatively spared West Bank, where flooding was minimal due to higher elevation and intact levees. In the storm's immediate aftermath, the bridge became a focal point for evacuation efforts amid widespread road inundation on the East Bank, with officials directing some residents to cross on foot toward drier areas and outbound highways. However, on September 1, 2005, groups of predominantly African American evacuees attempting to walk across the spans were confronted by a blockade of law enforcement officers from Gretna, Plaquemines Parish, and other jurisdictions, who fired warning shots and turned them back, citing resource strains and fears of unrest on the West Bank. This incident, which stranded hundreds in rising floodwaters and heat without food or water, drew allegations of racial discrimination and drew federal scrutiny, though a U.S. Department of Justice investigation concluded in 2011 that evidence was insufficient for civil rights prosecutions. The bridge's operational facilitated eventual supply convoys and movements into the , contributing to despite the . By early 2005, full vehicular was restored after debris clearance and minor approach repairs, underscoring the structure's role in maintaining regional connectivity during a when over 80% of New Orleans was flooded and highways remained compromised.

Recent Maintenance and Upgrades

In February 2025, the Louisiana Department of Transportation and Development (DOTD) completed the $23 million Crescent City Connection Decorative Lighting Project, installing a new LED system to outline and illuminate the trusses of both US 90 Business spans. This upgrade replaced high-pressure sodium fixtures installed over 30 years prior, providing improved energy efficiency, color-changing capabilities, and a projected lifespan of at least 30 years. Design work commenced in March 2023, with construction starting later that year and full operational handover to the City of New Orleans for ongoing maintenance by early 2025. The project addressed aging infrastructure while enhancing the bridges' aesthetic role as a New Orleans landmark, with the LED array enabling programmable displays synchronized to events and holidays. Routine post-completion maintenance began promptly, including lane closures on July 7, 2025, to inspect and service the new system without disrupting peak traffic flows. Ongoing structural inspections and minor repairs, such as those documented by engineering firms under DOTD contracts, continue to ensure load-bearing capacity and corrosion resistance, though no major deck resurfacing or truss rehabilitation has been reported since the lighting upgrade. DOTD maintains the bridges through annual evaluations funded via the state Transportation Trust Fund, prioritizing safety amid high daily volumes exceeding 120,000 vehicles.

Operations and Management

Traffic Patterns and Usage Statistics

The Crescent City Connection accommodates approximately 180,000 vehicles per day, serving as the primary vehicular crossing of the Mississippi River for the New Orleans metropolitan area. This volume equates to over 63 million vehicles annually, reflecting its role in handling both commuter and commercial traffic between the West Bank suburbs and the Central Business District. Traffic patterns exhibit pronounced bidirectional peaks driven by commuting flows, with eastbound volumes surging toward downtown New Orleans during morning rush hours, typically from 7:00 a.m. to 9:00 a.m., and westbound returns dominating evenings from 4:00 p.m. to 6:00 p.m. These periods often result in severe congestion across the twin spans, exacerbated by the bridge's status as the dominant route absent viable alternatives for most users, though high-occupancy vehicle (HOV) lanes—requiring at least two occupants—operate in the peak direction to alleviate some pressure. Usage has remained robust post-Hurricane Katrina, with no significant long-term decline despite temporary disruptions; the bridge's daily throughput underscores sustained regional dependence, including a mix of passenger cars, trucks, and transit vehicles along U.S. Route 90 Business. Congestion metrics from state monitoring indicate average speeds dropping below 30 mph during peaks, prompting ongoing management via reversible lanes and signal timing on approaches like the Westbank Expressway.

Tolling System and Revenue Management

Tolls were initially imposed on the Greater New Orleans Bridge, later renamed the , upon its opening on , , at a rate of 35 cents for automobiles and small trucks, with higher rates for larger . These tolls funded repayment and operations until their removal on , , by as part of a to eliminate bridge tolls statewide. Tolls were reintroduced on January 1, 1989, at $1 per crossing for passenger vehicles to finance the of the second parallel span, which opened in 1988, and to support ongoing maintenance. The tolling system, managed by the Louisiana Department of Transportation and Development's Crescent City Connection Division, initially relied on cash collections at a plaza on the West Bank approach but pioneered electronic tolling with the introduction of toll tags on January 4, 1989, marking the first such implementation in the United States. Prepaid scrip and toll tags allowed for faster processing, with revenue recorded upon receipt for cash and tags, and deferred for prepaid uses. Annual traffic volumes exceeded 63 million vehicles during the tolling period, generating approximately $20 million in yearly revenue by the early 2010s. This revenue supported not only bridge operations and maintenance but also ferry services across the Mississippi River, policing, and various regional capital projects. The division's budget, bolstered by tolls, reached about $27 million annually, funding enhancements like lighting and structural inspections. A November 2012 referendum narrowly extended tolls through 2033 by a 36-vote margin in Jefferson Parish, but a subsequent May 4, 2013, vote rejected renewal, with approximately 76,000 votes against and 22,000 in favor, leading to the permanent cessation of collections effective immediately thereafter. Toll booths were dismantled starting June 13, 2013, with full plaza demolition completed by October 2016 at a cost of $2.2 million. Post-toll elimination reduced the operational budget to roughly $5 million, shifting reliance to state general funds and necessitating cuts in non-essential services while prioritizing core maintenance. As of 2025, no tolls are collected, with revenue management now integrated into broader Louisiana DOTD funding mechanisms for the bridge's upkeep.

Challenges and Criticisms

Financial Irregularities and Mismanagement

A 2009 audit by the Louisiana Legislative Auditor revealed significant financial mismanagement at the Crescent City Connection Division (CCCD), including a $25 million operating deficit accumulated from fiscal years 2004 to 2008, during which the agency's reserve fund dwindled from $61 million to $36 million. The audit highlighted inadequate record-keeping, rendering it impossible to fully trace expenditures, with many vendor contracts missing entirely and 82% of the 79 reviewed contracts lacking essential terms such as costs, due dates, or performance verification requirements. Board oversight was deficient, as nearly half of required quarterly meetings went unheld over the prior decade, with no written minutes until early 2009, violating public meetings laws. Further irregularities involved the diversion of CCC toll revenues to unrelated projects, such as $59,600 paid since 2004 from CCC funds to cover attorney fees for toll collection on the separate Louisiana Highway 1 bridge in Leeville, in violation of state law restricting tolls to CCC maintenance and improvements. State Transportation Secretary Sherri LeBas acknowledged the impropriety in a December 2010 letter and committed to reimbursing CCC from the general transportation trust fund, while State Representative Patrick Connick criticized the incident as emblematic of broader mismanagement diverting funds intended for West Bank infrastructure. In response, the Louisiana House in June 2011 authorized Legislative Auditor Daryl Purpera to investigate potential improper uses of CCC toll revenues and associated contracts. Operational audits uncovered additional deficiencies in toll handling, including failures to timely reconcile approximately $1.7 million in toll revenues to traffic counts during September and October 1998, as well as persistent issues with violation enforcement and collections managed by the CCCD. A 2014 amnesty program for unpaid tolls, intended to recover outstanding debts, resulted in costs exceeding collected revenues, per a state audit, exacerbating fiscal strains amid ongoing deficits like the $1.3 million shortfall reported for fiscal year 2007. These findings contributed to legislative scrutiny and calls for operational reforms, underscoring systemic weaknesses in financial controls and revenue stewardship despite annual toll collections averaging $30 million.

Infrastructure Deficiencies and Congestion

The Crescent City Connection bridges have been rated 6 out of 10 by the Louisiana Department of Transportation and Development (LaDOTD), indicating fair overall condition on their 1-to-10 scale where 10 represents excellent. This assessment encompasses deck, superstructure, and substructure elements, with no recent reports of imminent structural failure but ongoing needs for preservation such as repainting the 1988 span, estimated at $30 million as of 2010 planning data. The original 1958 span and its parallel replacement utilize a cantilever truss design, which, while robust, requires periodic inspections for fatigue in steel components and corrosion from the humid, saline Mississippi River environment; routine evaluations by firms like TRC Companies have confirmed general serviceability without major defects as of recent mandated checks. A notable vulnerability stems from the bridges' position over a high-traffic navigation channel, prompting a 2025 National Transportation Safety Board (NTSB) recommendation for critical risk assessments on the Crescent City Connection alongside seven other Louisiana spans, due to potential ship collision hazards amid rising vessel sizes and volumes post-Baltimore Key Bridge incident. LaDOTD has addressed ancillary infrastructure gaps, including a $23 million LED lighting overhaul completed in February 2025 to replace systems damaged by Hurricane Ida in 2021, enhancing visibility and reducing long-term maintenance burdens. Congestion on the Crescent City Connection arises primarily from its role as the dominant Mississippi River crossing for Greater New Orleans, handling approximately 138,000 vehicles daily as of 2010 data, with historical annual volumes exceeding 63 million—ranking it among the nation's busiest toll bridges. Each span provides three general-purpose lanes per direction plus a reversible high-occupancy vehicle (HOV) lane, but peak-hour demand often surpasses capacity, exacerbated by frequent incidents such as crashes blocking lanes and causing backups extending to downtown interchanges like I-10/Claiborne. Maintenance-related lane closures, including those for the 2024-2025 lighting project, have periodically reduced throughput, leading to gridlock on approaches like the Westbank Expressway and Tchoupitoulas Street merges with port traffic. Limited alternatives, such as ferries carrying under 1 million vehicles annually, amplify bottlenecks during rush hours and events, with weather events like ice storms in January 2025 further slowing flows. LaDOTD mitigates this through HOV lane operations and incident management, but capacity constraints persist without expansion.

Economic and Strategic Importance

Role in Regional Connectivity

The Crescent City Connection functions as the principal fixed vehicular link across the Mississippi River within New Orleans, directly uniting the East Bank—encompassing the city's central business district and densely populated urban core—with West Bank locales including Algiers in Orleans Parish and adjacent areas in Jefferson and Plaquemines Parishes. This crossing addresses the river's inherent role as a formidable geographic divide, channeling the majority of inter-bank vehicular movement where supplementary options such as ferries accommodate only marginal volumes insufficient for peak demands or commercial hauls. As the southernmost bridge on the Mississippi, it stands as the furthest downriver fixed span, bolstering access for maritime and terrestrial traffic navigating the port-centric lower river corridor. By enabling seamless daily commutes, the bridge underpins the socioeconomic integration of the greater New Orleans metropolitan area, where West Bank suburbs have expanded rapidly since the original span's 1958 opening and the parallel structure's 1988 addition, fostering cross-river employment flows toward East Bank job centers in finance, tourism, and logistics. The infrastructure supports regional cohesion by linking to the Westbank and Pontchartrain Expressways, forming a conduit for broader intrastate travel, including alignments toward the prospective Interstate 49 extension that would amplify north-south linkages through Louisiana's southern parishes. This connectivity proves indispensable during routine operations, accommodating high-volume flows essential to urban functionality, and in exigencies like evacuations, where it serves as a primary escape artery absent viable tunneling alternatives due to alluvial soil and flood risks. Economically, the Crescent City Connection reinforces New Orleans' status as a pivotal node in Gulf Coast trade by facilitating efficient movement of goods and personnel between riverine ports on both banks and upstream/downstream highways, thereby mitigating isolation costs for West Bank industries and residential zones otherwise constrained by the Mississippi's navigational demands. Its operational primacy—handling the region's heaviest cross-river load—underscores causal dependencies in local development patterns, with historical data indicating accelerated commercial growth on the West Bank post-duplication, attributable to reduced transit barriers rather than ancillary factors like policy incentives alone. Sustained maintenance ensures this artery's reliability, preventing disruptions that could cascade into supply chain bottlenecks given the paucity of redundant Mississippi crossings within 20 miles upriver or down.

Contributions to Commerce and Urban Development

The Crescent City Connection, comprising twin cantilever bridges spanning the Mississippi River, has served as a vital artery for commercial transport since the first span opened on April 15, 1958, replacing inefficient ferry services and enabling efficient movement of goods between the east and west banks of New Orleans. This connectivity supported industrial activities in areas like Algiers, Harvey, and Westwego, where trucking and logistics operations benefited from direct highway links to downtown warehouses, the Port of New Orleans, and regional supply chains, fostering economic integration across the river. By the 1960s, daily traffic volumes had climbed to over 52,000 vehicles following the elimination of tolls in May 1964, reflecting heightened commercial reliance on the bridge for freight haulage tied to the port's international trade, which handles commodities essential to Louisiana's economy. The addition of the second span on September 30, 1988, doubled capacity and further amplified commerce by accommodating annual traffic exceeding 63 million , positioning the bridge as one of the nation's busiest corridors for traffic serving petrochemical, manufacturing, and export sectors. This expansion reduced bottlenecks for goods transiting to and from the , a hub generating substantial regional economic activity through cargo handling and related logistics, though the bridge's fixed height has constrained upriver access, prompting downstream terminal developments to sustain trade growth. In terms of urban development, the bridge catalyzed west bank expansion by linking Algiers and Gretna to the central business district, spurring residential and infrastructural projects such as elevated expressways that accommodated suburban population shifts starting in the late 1950s. Initial crossing volumes of 17,584 vehicles on opening day escalated rapidly, signaling immediate demand that drove land use changes from underdeveloped to economically viable zones, with state legislators in 1988 describing the parallel span as ushering a "new era" of west bank growth. These enhancements integrated previously isolated areas into the metro fabric, supporting workforce commuting to east bank jobs and enabling commercial real estate development, though sustained maintenance has been required to preserve this developmental momentum amid rising usage.

References

  1. [1]
    Crescent City Connection - Modjeski and Masters
    Today it is the 5th-longest cantilever bridge in the world, at 1,575 feet long.The project also included over 2 miles of approach structures and complex ...
  2. [2]
    Business US-90 Crescent City Connection Bridges, New Orleans, LA
    Daily Traffic Count: 64,612 (2003). • Width: 52 Feet, 4 Lanes. • Date Built ... Length: 13,428 Feet Overall, 1,575 Foot Longest Span. • Navigation ...Missing: specifications | Show results with:specifications
  3. [3]
    Crescent City Connection Bridge #1 - Waterway Guide
    Bridge Type: Fixed; Vertical Clearance (Closed): 150.00 ft. Horizontal Clearance: 750.00 ft. DISCLAIMER: Bridge heights and clearances are published from ...Missing: length traffic
  4. [4]
    Crescent City Connection Bridge (Original/Eastbound Span)
    The name Crescent City Connection Bridge applies to both bridges. The name Greater New Orleans Bridge applied to the original bridge when it was built.
  5. [5]
    How the Crescent City got connected - NOLA.com
    Mar 12, 2017 · The Greater New Orleans Bridge opened to traffic in 1958, spanning the Mississippi River and connecting downtown New Orleans to the West Bank.
  6. [6]
    How the Huey P. Long and Crescent City Connection bridges ...
    Mar 1, 2022 · While the first span of today's Crescent City Connection opened in 1958 and the second in 1988, the idea behind them was a long time coming. ...
  7. [7]
    Bridge tolls were killed on Crescent City Connection five years ago
    May 11, 2018 · Five years ago this week, tolls were eliminated for good on the Crescent City Connection. As a result, motorists are saving about $20 million a year.
  8. [8]
    Crews begin removal of CCC toll booths - New Orleans - WDSU
    Jun 13, 2013 · Overnight, DOTD crews began removing the final sign of the now-defunct tolls on the Crescent City Connection.
  9. [9]
    New Orleans - La DOTD
    Feb 6, 2025 · “The Crescent City Connection is more than just a bridge - it's a symbol of New Orleans' strength, culture, and connectivity,” said Louisiana ...
  10. [10]
    Louisiana DOTD Finishes $23M Bridge Lighting Project
    Feb 14, 2025 · The Louisiana Department of Transportation and Development recently wrapped up the $23 million Crescent City Connection or CCC Decorative Lighting Project.
  11. [11]
    Crescent City Connection (New Orleans, 1988) - Structurae
    Crescent City Connection is a cantilever truss bridge, road bridge, steel bridge, through truss bridge and concrete pier that was built from 1981 until 1988 ...Missing: specifications | Show results with:specifications<|separator|>
  12. [12]
    NOAA updates bridge clearances crossing one of the most important ...
    Dec 18, 2024 · Updating Bridge Clearances ; Crescent City Connection (95.7/95.8), 150, 166 ; Huey P. Long (106.1), 132, 150 ; Hale Boggs (121.5), 133, 155 ...Missing: length | Show results with:length
  13. [13]
    Blake Pontchartrain: The Crescent City Connection - NOLA.com
    Jun 13, 2016 · Originally called the Greater New Orleans Bridge, the first span opened to traffic on April 15, 1958. Prior to that, drivers used the Huey P.
  14. [14]
    Crescent City Connection | American Bridge Wiki - Fandom
    They are tied as the fifth-longest cantilever bridges in the world. Each span carries four general-use automobile lanes; additionally the westbound span has two ...Missing: dimensions height width capacity
  15. [15]
    Crescent City Connection (New Orleans, 1958) - Structurae
    Crescent City Connection is a cantilever truss bridge, road bridge, steel ... main span, 480.4 m. total length, 4 093 m. Cost. cost of construction, United ...Missing: details | Show results with:details
  16. [16]
    Blakeview: The Crescent City Connection turns 65 this week
    Apr 9, 2023 · The first span of the bridge was built over the course of three years, at a cost of $65 million. It opened to traffic at 12:01 a.m. on Tuesday, ...Missing: facts | Show results with:facts<|control11|><|separator|>
  17. [17]
    Crescent City Connection (New Orleans, LA) - Gribblenation
    Apr 15, 2024 · When completed, it was among the largest steel cantilever truss bridges in the world. Its center span is 1,575 ft long, still among the longest ...Missing: details | Show results with:details
  18. [18]
    The Greater New Orleans Bridge Number 2
    The second bridge was completed in 1988, and the city of New Orleans renamed it the Crescent City Connection in 1989. A 1977 Federal Environmental Impact Study ...Missing: facts | Show results with:facts
  19. [19]
    Bridge exposes racial divide in New Orleans after Katrina
    Aug 27, 2025 · Exhausted, frustrated and dehydrated dozens of refugees from the city of New Orleans walked across the Crescent City Connection spanning the ...
  20. [20]
    Evacuees Were Turned Away at Gretna, La. - NPR
    Sep 20, 2005 · Some Katrina survivors in New Orleans say they tried to evacuate the city but the primary route out was blocked. Evacuees say police officers in ...
  21. [21]
    The Bridge To Gretna - CBS News
    Dec 15, 2005 · The bridge where the incident took place is called the Crescent City Connection ... It was Wednesday, three days after Katrina had struck ...
  22. [22]
    Justice Department announces completion of review of Gretna ...
    Sep 30, 2011 · On September 1, 2005, just days after Hurricane Katrina struck New Orleans, a number of people attempted to cross the Crescent City Connection ...<|control11|><|separator|>
  23. [23]
    Crescent City Connection Decorative Lighting Project (2024)
    A new, LED lighting system to outline and light up both US 90B Crescent City Connection bridges. The system is designed to have at least a 30 year lifespan.Missing: DOT | Show results with:DOT
  24. [24]
    Construction underway for Crescent City Connection lighting project
    May 14, 2024 · ... bridges. “It was a system that was in place for over 30 years. We had high-pressure sodium fixtures in there,” said DOTD District Two ...
  25. [25]
    2023-03-06_Crescent City Connection Project Selection
    Mar 6, 2023 · Modjeski and Masters will design programmable color changeable LED lights illuminating the top and sides of the trusses of both bridges, along with the main ...Missing: designer | Show results with:designer
  26. [26]
    New decorative lighting on CCC moves forward | News - NOLA.com
    Mar 5, 2023 · Completion of a $16.5 million decorative, LED lighting system on the trusses of the double span is expected by the end of next year.
  27. [27]
    Mayors Office - News - Articles - July 2025 - City of New Orleans
    Jul 7, 2025 · TRAFFIC ADVISORY: Lane Closures Scheduled for Crescent City Connection Decorative Lighting Maintenance. The City of New Orleans today ...Missing: 2020-2025 | Show results with:2020-2025
  28. [28]
    Crescent City Connection Bridges and Facilities - TRC Companies
    Signature New Orleans bridges undergo scrutiny by TRC inspection teams as part of regular mandated inspection program.
  29. [29]
    BGR Analyzes Future of the Crescent City Connection
    State officials are advancing new plans to light up the Crescent City Connection, the distinctive twin bridges connecting downtown New Orleans with the west ...
  30. [30]
    Do you use the Crescent City Connection to commute to and from ...
    Feb 25, 2014 · Crescent City Connection Bridge Cam. The Crescent City Connection averages more than 180,000 cars daily, state transportation officials say.Missing: patterns | Show results with:patterns
  31. [31]
    Crescent City Connection - GVA Lighting
    The Crescent City Connection (CCC) is an iconic twin cantilever bridge spanning the Mississippi River in New Orleans, Louisiana.
  32. [32]
    Westbank Expressway light issues causing problems for drivers
    Crossing the Crescent City Connection bridge in New Orleans in rush hour traffic is not for the faint of heart, especially in recent months.<|separator|>
  33. [33]
    Commute crisis strangles New Orleans neighborhoods - Rolling Out
    Apr 15, 2025 · The Westbank Expressway, connecting Gretna to downtown via the Crescent City Connection bridge, chokes daily with suburban commuters.
  34. [34]
  35. [35]
    [PDF] Wide Area Surveillance Radar and Sequential Gate for Traffic ...
    The average daily traffic (ADT) recorded in the vicinity was 97,600 ... LADOTD's radar unit mounted on top of the Crescent City Connection Bridge. No.
  36. [36]
    Introduction of Toll Tags on Crescent City Connection 35 Years Ago
    Jan 3, 2024 · The Crescent City Connection introduced toll tags on January 4, 1989 35 Years ago, becoming the first toll facility in the United States to use ...The Crescent City Connection introduced toll tags on January 4 ...Crescent City Connection introduced toll tags in 1989 - FacebookMore results from www.facebook.com
  37. [37]
    [PDF] Crescent City Connection Division - Louisiana Legislative Auditor
    Mar 30, 2011 · Tolls paid at the toll booth and all scrip revenue are recorded when received. Prepaid tolls used in conjunction with a toll tag are recorded ...
  38. [38]
    Crescent City Connection toll revenue has been misspent ...
    Feb 1, 2012 · Without the tolls, the bridge's budget would be slashed from $27 million to about $5 million, forcing wholesale cutbacks and a dependence on the ...
  39. [39]
    Tolls on the Crescent City Connection – a tale of “East” versus “West”
    May 6, 2013 · The presence of tolls on the Crescent City Connection Bridge in New Orleans, which had been in place since 1989, has been an emotional issue ...Missing: history | Show results with:history
  40. [40]
    Local leaders react to the end of the Crescent City Connection tolls
    May 5, 2013 · In Saturday's controversial election nearly 76,000 voters said no to renewing the bridge tolls with more than 22,000 voting to renew the tax for ...<|separator|>
  41. [41]
    Finally, Crescent City Connection toll plaza dismantling to begin
    Jun 3, 2016 · Crews are about to start work to demolish the Crescent City Connection toll plaza. Here's what it will look like when the project is done.
  42. [42]
  43. [43]
    Huge deficit, lost contracts among problems detailed in Crescent ...
    The Crescent City Connection ran up a $25 million deficit during the past five years and kept such poor financial records that it's impossible to know how all ...
  44. [44]
    Official: CCC tolls used improperly to pay attorneys fees for Leeville ...
    Jan 5, 2011 · State Rep. Patrick Connick, R-Harvey, called the payments "yet another example of the mismanagement of the Crescent City Connection.".
  45. [45]
    House authorizes auditor to examine uses of CCC toll revenue ...
    Jun 23, 2011 · The Louisiana House has authorized Legislative Auditor Darryl Purpera to look into possible improper uses of Crescent City Connection toll<|separator|>
  46. [46]
    Crescent City Connection Toll Amnesty Costs Outweigh Revenues
    Apr 8, 2014 · A state audit finds an amnesty program aimed at getting motorists to cough up the cash they owed for Crescent City Connection toll ...Missing: scandal | Show results with:scandal
  47. [47]
    How safe are New Orleans-area bridges? Crescent City ... - WWL-TV
    Mar 26, 2024 · DOTD says the Crescent City Connection is one of the most traveled bridges in the state and was last inspected in the summer of 2022 with an ...<|separator|>
  48. [48]
    New Orleans bridges inspection for safety - WDSU
    May 2, 2024 · An update on the Chef Menteur Bridge: DOTD said that after inspections and repairs, the bridge could be back open on May 15. Weather Team Logo.Missing: post- | Show results with:post-
  49. [49]
    [PDF] The Future of the Crescent City Connection Bridge and Ferries
    In this report, BGR explores the implications of elimi- nating tolls and options for funding the bridge and fer- ries in the future. This exploration proceeds ...<|control11|><|separator|>
  50. [50]
    Louisiana bridges identified as risk for collision in new report - WDSU
    Mar 21, 2025 · A National Transportation Safety Board report reveals that eight major bridges in Louisiana, including the Crescent City Connection, need critical assessments ...Missing: condition | Show results with:condition
  51. [51]
    NTSB Flags 6 Louisiana Bridges for Collapse Risk - WWL-TV
    Mar 21, 2025 · A new NTSB report warns that 68 bridges nationwide, including six in Louisiana, may be at risk due to increased ship traffic and structural vulnerabilities.<|control11|><|separator|>
  52. [52]
    Crescent City Connection - Wikipedia
    The Crescent City Connection (CCC), formerly the Greater New Orleans (GNO) Bridge, is a pair of cantilever bridges that carry US Highway 90 Business (US 90 Bus ...History · Original span · Construction of second span · Later history
  53. [53]
    Vehicle crash causes delays on Crescent City Connection | wwltv.com
    A vehicle crash on the Crescent City Connection Bridge caused major delays for drivers heading to the Westbank Friday morning.Missing: statistics | Show results with:statistics
  54. [54]
    DRIVER ALERT: Heavy delays on US-90 West after crash on CCC
    Aug 22, 2025 · Drivers are facing heavy backups on US-90-BR West after a crash on the Crescent City Connection Bridge. As of 6:45 a.m., three right lanes ...
  55. [55]
    New Orleans road projects cause widespread traffic gridlock - WDSU
    Aug 21, 2024 · The lighting project on the Crescent City Connection is moving along on schedule. However, traffic impacts from this project, as well as ...
  56. [56]
    State testing new Crescent City Connection lighting system, says ...
    Aug 24, 2024 · The lane closures on the Crescent City Connection during peak hours are expected to end next week. Still, closures during nighttime hours will ...Missing: patterns | Show results with:patterns
  57. [57]
    Slow moving traffic on Crescent City Connection due to icy roads in ...
    Jan 24, 2025 · Traffic congestion picks up on the bridge as drivers navigate icy road conditions. Author: wwltv.com. Published: 6:33 AM CST January 24, 2025.Missing: statistics | Show results with:statistics
  58. [58]
    HOV lanes open, construction soon ends on New Orleans CCC
    Aug 19, 2024 · Monthslong traffic headaches caused by lane closures on the Crescent City Connection as part of a project to replace the bridge's decorative ...
  59. [59]
    [PDF] West Bank - StopTheTolls.org
    Sep 30, 1988 · The Mississippi River Bridge was rechristened the Crescent City Connection shortly after the second span opened. Tolls were instituted on the ...
  60. [60]
    Crescent City Connection, USA - darc awards
    Initially constructed as a single span, the first bridge opened in 1958 under the design direction of Modjeski and Masters, Inc., a renowned bridge engineering ...
  61. [61]
    Cooperative Effort, Collective Benefits - Biz New Orleans
    Jun 30, 2025 · “The increasing size of modern vessels, coupled with the limitations imposed by the Crescent City Connection on the Port of New Orleans' current ...
  62. [62]
    Port NOLA Drives Local, State and National Economy, Creates Jobs ...
    Nov 1, 2022 · “The Port plays a fundamental role in generating economic activity for the New Orleans region and our State, supporting jobs and generating ...