Fact-checked by Grok 2 weeks ago

Harvard Bridge

The Harvard Bridge is a haunched girder bridge that spans the , carrying Massachusetts Avenue (Massachusetts Route 2A) between the Back Bay neighborhood of and the city of , directly adjacent to the (MIT) campus. Completed on September 1, 1891, after construction began in 1887, it measures 659.82 meters (2,164 feet) in length and 21.13 meters (69 feet) in width, making it the longest bridge over the and a critical artery for commuters, pedestrians, cyclists, and public transit between the two cities. Authorized by the legislature in 1885 as part of broader efforts by the Embankment Company to reclaim and develop the river basin into a grand esplanade mirroring 's Back Bay, the bridge connected West Chester Park (now Avenue) in to in 's Lafayette Square, facilitating urban growth on both sides of the river. Named in honor of John Harvard, the 17th-century benefactor of located nearby in , the bridge's title has sparked controversy since relocated from to its current site in 1916; multiple proposals to rename it the "MIT Bridge" in 1924, 1949, and 1986 were rejected, preserving its original designation despite its stronger association with . The bridge gained worldwide fame in October 1958 through a prank by MIT's fraternity, which measured its length using freshman pledge Oliver R. Smoot Jr.—then 5 feet 7 inches tall—as the unit of measurement, laying him end-to-end across the pedestrian sidewalk and marking intervals with paint; the resulting "official" length of 364.4 plus "one ear" (to reach ) has been maintained ever since, with successive pledge classes repainting the markers (typically red handprints every Smoot and numbers every 10 Smoots) biannually, even during renovations. This whimsical tradition, now embedded in local culture, led to the Smoot being recognized as a unit in the American Heritage Dictionary and even incorporated into accident reports for precise location referencing. The structure received subsequent work in 1898 and 1905, major renovations in 1924 and 1949, and a full replacement with substructure between 1988 and 1989 to address and seismic concerns while retaining its characteristic haunched design; safety enhancements implemented in 2021–2023, including separated bicycle lanes achieved by reducing the number of vehicular lanes from four to two, have improved safety for cyclists on this heavily trafficked bridge.

Conception

Planning and Funding

In the 1880s, the rapid growth of Boston's Back Bay neighborhood and Cambridge's expanding population created a pressing need for improved transportation infrastructure across the , as existing bridges like the West Boston Bridge were congested and inadequate for increasing vehicular and pedestrian traffic. The proposed Harvard Bridge aimed to link Back Bay directly to Cambridge's Square area, facilitating commerce and daily commutes in the burgeoning metropolitan region. This project was part of broader efforts by the Charles River Embankment Company, chartered in 1881, to reclaim tidelands and develop a public along , mirroring Boston's Back Bay; in 1883, the company received a to build a and , contingent on constructing the bridge between West Chester Park and Square. The Massachusetts General Court addressed this demand through legislative action, passing "An Act to Authorize the Cities of Boston and Cambridge to Construct and Maintain a Bridge over Charles River" in 1885, which empowered the two cities to jointly plan and build the structure. Key proponents included Boston Mayor Hugh O'Brien and Cambridge Mayor William E. Russell, who appointed a three-member bridge commission—comprising one representative from each city and an independent engineer, Leander Greeley—to oversee the project. This commission coordinated site surveys, design approvals by the Board of Harbor and Land Commissioners, and land acquisitions, resolving prior disputes between the cities that had delayed progress since initial authorizations in the 1870s. Funding for the bridge was secured through bonds issued by and , with the total estimated cost of approximately $500,000 apportioned equally between the two municipalities at $250,000 each; these bonds carried interest rates not exceeding 6% annually and were repayable over 10 to 30 years. The planning phase spanned from 1885 to 1887, during which the commission finalized specifications and solicited bids, ultimately awarding the construction contract to the Boston Bridge Works in 1887. This marked the transition from conceptualization to execution, setting the stage for groundbreaking later that year.

Naming

The Harvard Bridge derives its name from John Harvard, the 17th-century English clergyman and philanthropist who bequeathed his library and half his estate to the fledgling college in in 1638, leading to the institution being named in his honor. The naming choice was influenced by the bridge's close proximity to along the side of the , symbolizing a connection to one of the region's most prominent educational landmarks, even though the bridge's planning, funding, and construction involved no direct involvement or support from the university or its founder. During the bridge's development, local authorities considered various naming options reflective of its role in linking and , including proposals to honor the city of itself or other notable figures, but ultimately selected "Harvard Bridge" to evoke the cultural significance of the nearby university. This decision was formalized by the Boston board of aldermen in , coinciding with the start of construction, as part of the joint agreement between the two cities to build the structure. The bridge was officially opened to the public on September 1, 1891, marking its formal dedication and the beginning of its service as a vital transportation link, with contemporary accounts noting the event as a straightforward public unveiling without elaborate ceremonies.

Construction and Design

Building Process

The construction of the Harvard Bridge commenced in 1887, following legislative authorization by the Commonwealth of to connect West Chester Park in with Massachusetts Avenue in . The project was undertaken by the Boston Bridge Works, an engineering firm specializing in structures, which fabricated the bridge's components off-site before assembly to streamline the erection process over the . Site preparation began with dredging operations in the basin to accommodate the installation of piers for the 21 fixed spans and the central swing span, creating a stable foundation that would span the waterway's widest point. These piers were strategically placed to minimize disruption to river traffic while ensuring structural integrity, reflecting the demands of building across a navigable . The haunched design, selected for its efficiency in distributing loads over varying spans, guided the assembly of the once the piers were in place. progressed steadily despite the logistical complexities of working in a flowing environment, with girders transported and erected sequentially from the abutments outward. The , comprising skilled ironworkers and laborers under the direction of engineer William Jackson, coordinated the off-site fabrication with on-site riveting and bolting to meet the project's timeline. The bridge reached completion after four years of effort and was formally opened to vehicular and traffic on September 1, 1891, marking a significant advancement in cross-river connectivity for the region.

Engineering Specifications

The Harvard Bridge is a haunched spanning the and carrying Massachusetts Avenue (Route 2A) between Back Bay in and . Its total length measures 2,164.8 feet (659.82 meters), with a width of 69.3 feet (21.13 meters). The structure consists of 25 spans, designed to provide stable support across the waterway while accommodating vehicular and traffic. The original configuration included a movable swing span of approximately 135 feet, positioned in the center of the structure to allow passage of river traffic, supported by a pivot pier. This swing span was operated by and integrated into the overall plate framework, which varied in span lengths from 75 to 105 feet for the fixed sections. The bridge's steel components were fabricated by Boston Bridge Works, the primary contractor responsible for the superstructure's . Designed by engineer William Jackson, serving as Chief Engineer for the Harvard Bridge Commissioners, the bridge emphasized durability through its haunched girder form, which provided varying depth for efficient load distribution and resistance to the stresses of early 20th-century traffic. The initial load capacity was approximately 86.4 short tons per span, sufficient for horse-drawn carriages, early automobiles, and pedestrian loads at the time of completion in 1891. This engineering approach ensured the bridge's longevity as a vital crossing, balancing functionality with the river's navigational needs.

Maintenance History

Early Repairs

In the initial decades following its opening, the Harvard Bridge required targeted repairs to counteract environmental degradation and structural stresses from the Charles River's currents and growing vehicular load. Corrosion from salt exposure, particularly during winter de-icing, began to affect the steel components, while early user complaints highlighted excessive vibrations under traffic, prompting assessments of the bridge's stability. A key early intervention occurred in 1909, when the bridge was declared unsafe, requiring the replacement of all iron and steel components along with reinforcement of the piers to combat scour erosion caused by the river's currents, which threatened the foundations supporting the structure. This work involved temporary closure of the bridge for approximately two weeks to ensure safe implementation without disrupting navigation on the original swing span. By 1924, increased traffic volumes necessitated an upgrade that included widening the roadway to accommodate more vehicles and partial resurfacing to improve surface durability. The Metropolitan District Commission oversaw these modifications, which addressed congestion and wear from daily use while maintaining the bridge's overall configuration. Following the surge in post-World War II traffic, a major rehabilitation took place in 1949, focusing on strengthening the girders to handle heavier loads and mitigate ongoing vibration issues. The closure during this period allowed for comprehensive reinforcement, reflecting the bridge's adaptation to modern transportation demands.

Mid-Century Study and Issues

In 1971, the Metropolitan District Commission (MDC) commissioned an engineering of the Harvard Bridge due to concerns over observed and cracking in the , which had been in service for over 80 years. The revealed structural deficiencies, including issues with the haunched girders and from decades of heavy use, , and cyclic loading. These problems were attributed to the original design's limitations in accommodating increased traffic and de-icing practices. In response, the MDC implemented temporary load restrictions on the bridge to mitigate stress on the weakened elements while long-term planning proceeded. These measures remained in place until subsequent overhauls addressed the underlying problems.

Superstructure Replacement

Following the collapse of the in in 1983, which highlighted vulnerabilities in similar haunched girder designs, the Harvard Bridge was inspected and temporarily closed to heavy truck and bus traffic due to concerns over structural integrity, including ongoing issues identified in earlier studies. Planning for a comprehensive superstructure replacement began that year under the oversight of the Department of Public Works. Construction commenced in and was completed in , with the bridge fully reopening to traffic in 1989. The project focused on replacing the aging while preserving piers and substructures to maintain historical integrity. Specifically, haunched plate girders were removed and substituted with a new that replicated the aesthetic and structural form of the 1891 design, including cantilevered fixed spans and suspended spans. The central swing span, which had allowed for river , was entirely replaced with fixed spans to eliminate maintenance needs associated with movable mechanisms. The replacement was documented in an environmental assessment prepared by the and the Massachusetts Department of Public Works. During the construction period, the bridge experienced partial closures, requiring detours for vehicles and significantly affecting cross-river traffic between Boston's Back Bay and , particularly for commuters relying on Massachusetts Avenue.

Recent Upgrades

In the and , the Harvard Bridge underwent routine maintenance efforts to preserve its condition. A notable non-structural occurred in with the installation of energy-efficient LED street lighting along . This project replaced older fixtures to boost nighttime visibility for vehicles and pedestrians while reducing by up to 50% compared to traditional lighting. The design incorporated fixtures spaced approximately every 30 Smoots to accentuate the bridge's cultural markings, selected through a public competition, and was supported by a multimillion-dollar from an anonymous benefactor. Following the foundational stability provided by the 1980s superstructure replacement, post-2020 activities have emphasized preventive care, with minor inspections conducted in 2022–2024 confirming the bridge's structural integrity and absence of significant deterioration. No major incidents or closures due to structural failure have occurred as of 2025. MassDOT continues ongoing monitoring through biannual inspections focused on detection in components and verification of load-carrying capacity, ensuring compliance with federal requirements.

Transportation Features

Bicycle Lanes History

Bicycle accommodations on the Harvard Bridge originated in 1898, when 3-foot-wide lanes were added adjacent to the curbs as shared paths for and pedestrians, reflecting the era's burgeoning interest in . These initial facilities were integrated into the bridge's 70-foot overall width, which supported parallel vehicular and pedestrian traffic from its original design. By the 2000s, cyclist usage had surged, with Boston's commuting by bicycle increasing 82 percent between 2008 and 2011 amid broader urban cycling trends. This growth elevated the Harvard Bridge to one of New England's busiest cycling routes, averaging over 1,200 bicyclists daily and prompting advocacy for safety improvements to mitigate conflicts with vehicles and pedestrians. Prior to 2021, however, the setup featured only painted markings without physical barriers, exacerbating tensions among users due to narrow shoulders and high volumes, as noted in early safety analyses.

Pedestrian and Safety Enhancements

In November 2021, the (MassDOT), in collaboration with the cities of and and the , initiated a pilot program to install temporary separated bike lanes on the Harvard Bridge. The design reduced vehicular travel lanes from four to one in each direction, reallocating space to create wider, buffered bike lanes protected by cones, thereby enhancing separation between cyclists and motor vehicles. This temporary reconfiguration aimed to test improvements in multimodal safety during the winter months, with data collection on crashes, usage, and traffic flow to inform permanent decisions. The pilot, running from late 2021 through 2022, proved highly successful based on MassDOT's evaluation, which highlighted substantial increases in cyclist usage and enhanced overall safety for bikes, pedestrians, and transit users without significant delays to traffic. Independent analysis indicated an 80% rise in bikeshare ridership on routes crossing the bridge, underscoring the lanes' appeal and effectiveness in encouraging active transportation. Official reports confirmed reduced potential for conflicts among road users, attributing this to the physical barriers and lane reallocation. Following the positive outcomes, MassDOT advanced to permanent installation in 2023, replacing temporary cones with flexible-post bollards and rigid barriers to secure the separated against vehicle encroachment. These upgrades built on the bridge's foundational bicycle provisions from 1898 by prioritizing protected infrastructure for non-motorized travel. As of 2025, the Harvard Bridge's enhanced form a key segment of Boston's growing protected network, connecting major routes across the and supporting citywide goals for equitable mobility. MassDOT continues to monitor performance through ongoing on usage patterns, safety incidents, and maintenance needs to refine and sustain these features.

Cultural Significance

The Smoot Measurement

In October 1958, during an initiation ritual for the fraternity at , freshman pledge Oliver R. Smoot, Jr., who measured 5 feet 7 inches in height, was instructed to lie end-to-end repeatedly across the Harvard Bridge to gauge its length as a prankish exercise. The process involved seven fraternity members rolling or positioning Smoot across the approximately 2,164.8-foot span, repeating the action 364 times until reaching the far side. This unconventional measurement defined the "smoot" as a unit equal to Smoot's height, with the bridge's total length recorded as 364.4 smoots plus or minus one ear to account for the final partial segment. To mark the scale, the painted hash marks and numbers every 10 along the bridge's , creating a visible progression from the side (starting at smoot zero) toward in . These original markings, applied with simple paint during the roughly 1.5-hour endeavor, served as both a humorous and a practical guide for students crossing the bridge late at night. The repainting of these smoot indicators has become a longstanding upheld once or twice a year by students, typically the pledge class, who refresh the faded lines and numerals using fresh paint in varying colors to signify the year or group responsible. This ritual ensures the markings remain legible despite weathering and foot traffic, preserving the prank's tangible legacy on the structure. By the 1980s, the smoot measurement achieved informal official status when the bridge underwent reconstruction, with contractors instructed to score the new sidewalk at precise intervals and restore the painted references accordingly. A commemorative sign was later installed on acknowledging the 364.4-smoot length, solidifying the unit's standardization to Oliver Smoot's 1958 height of 5 feet 7 inches as the definitive reference.

Legacy and Traditions

The smoot has been informally adopted by the () as a , reflecting its integration into campus culture and humor. This recognition extends beyond MIT, with historically incorporating the smoot as an option for measuring distances on the Harvard Bridge, allowing users to calibrate maps in this nonstandard unit equivalent to 5 feet 7 inches. The unit's enduring status underscores the prank's transformation into a symbol of MIT's inventive traditions, with inclusions in dictionaries such as the American Heritage Dictionary (2011) and the . During major upgrades, the markings have been carefully preserved to maintain this cultural feature. In the 1980s reconstruction of the bridge's superstructure, the advocated for retaining the markings, citing their utility in identifying locations for incident reports, which led to the sidewalks being divided into -length slabs rather than standard 6-foot sections. Similarly, amid early 2020s enhancements including the addition of protected bike lanes through a 2021-2023 project, the markings remained intact, ensuring the tradition's continuity as the bridge adapted to modern transportation needs. Oliver R. Smoot, the namesake of the unit, has reflected on its lasting impact in recent years, emphasizing the prank's evolution into a 65-year-plus legacy of whimsy and irony. In a 2024 interview with , Smoot, who later chaired the and presided over the , highlighted how the measurement persists as a testament to student creativity. A 2025 article in featured further insights from Smoot, now retired in , discussing the annual repainting and the unit's entry into dictionaries like the American Heritage Dictionary in 2011. The smoot tradition is upheld through annual events at , including Smoot Day on October 4, which commemorates the 1958 measurement with gatherings, volunteer activities like river cleanups, and performances. fraternity members continue repainting the faded markings once or twice a year, often in the fraternity's colors of green, yellow, and purple, as seen in the 2023 event following a COVID-related hiatus. No significant alterations, such as the 2016 April Fools' joke proposal to recalibrate the unit based on Smoot's later height, have disrupted this practice, preserving the original 364.4 smoots measurement.

References

  1. [1]
    Harvard Bridge (Cambridge/Boston, 1891) - Structurae
    Harvard Bridge is a haunched girder bridge, road bridge and steel bridge that was completed in 1891. The project is located in Cambridge and Boston, ...<|control11|><|separator|>
  2. [2]
    The Harvard Bridge - MIT
    It was named after John Harvard for whom the small red brick college in Cambridge had earlier been named. When the bridge was opened in 1891, MIT was located ...Missing: history | Show results with:history
  3. [3]
    [PDF] memo - CAMBRIDGE HISTORICAL COMMISSION
    Aug 26, 2021 · The Harvard Bridge was authorized in 1885 and completed in 1892, connecting West Chester Park in the Back Bay to Main Street in Lafayette ...
  4. [4]
    Harvard Bridge, Spanning Charles River at Massachusetts Avenue ...
    Building/structure dates: 1887- 1891 Initial Construction; Building/structure dates: 1898 Subsequent Work; Building/structure dates: 1905 Subsequent Work ...Missing: facts | Show results with:facts<|control11|><|separator|>
  5. [5]
    City Council supports improvements to Mass. Ave. Bridge - Boston.gov
    Nov 5, 2021 · The Massachusetts Avenue Bridge, also known as the Harvard Bridge, is one of the state's most heavily-utilized yet most dangerous bicycling ...<|control11|><|separator|>
  6. [6]
    Harvard Bridge
    ### Summary of Acts and Resolves for Harvard Bridge Authorization
  7. [7]
    The Harvard Bridge. | News
    The Harvard bridge was built by special act of legislature at a cost of $500,000, apportioned equally between Boston and Cambridge. It is built of plate ...Missing: funding 1880s Massachusetts 1886 $511000
  8. [8]
    Harvard Bridge: Boston to Cambridge, March 1892 - Google Books
    ... HARVARD BRIDGE Hugh O'Brien land commissioners LEANDER GREELEY LIBRARY ... board of aldermen and the board of railroad commissioners, after such public ...
  9. [9]
    harvard Bridge opens to the public 9/1/1891
    ### Summary of Harvard Bridge Opening (September 1, 1891)
  10. [10]
    [PDF] appendix - Mass.gov
    In 1916 the Massachusetts Institute of Technology moved from the Back Bay to take up the valuable new river frontage near the Harvard Bridge.
  11. [11]
    Innovative Life‐Cycle Inspection Strategy of Civil Infrastructure ...
    Jul 22, 2023 · Matarazzo et al. tested modal frequencies of the Harvard Bridge (660 m long, 25 spans) in Massachusetts, United States, monitored by multiple ...
  12. [12]
    Charles River Bridges | SAH ARCHIPEDIA
    William Jackson also designed the Harvard Bridge (1887–1891, 1924–1925 reconstructed, 1990, NRD), spanning the river at its widest point and carrying ...
  13. [13]
    [PDF] harvard bridge - Dome
    PROPOSED BRIDGE. AT THE BOSTON SHORE. BROKEN LINES SHOW AXIS OF PIERS OF EXISTING BRIDGE. PROPOSED BRIDGE TYPICAL SPANS AT CENTRE. 16. 16. SCALE OF FEET. LIMITS ...
  14. [14]
    Harvard Bridge to Be Closed. — The Cambridge Tribune 17 July 1909
    It Is expected that the work to be accomplished will take two weeks. It will be necessary to strengthen some of the old iron beams, replace some with new ones, ...Missing: early pier reinforcement scour
  15. [15]
    The Cambridge Chronicle, 5 April 1924 — PROPOSITION FOR ...
    PROPOSITION FOR REPAIRING AND FOR NEW APPROACHES TO HARVARD BRIDGE. Metropolitan Planning Board Suggests Peninsulas Be Built Into Basin to Carry New Roadway ...
  16. [16]
    Harvard Bridge - Wikipedia
    It is the longest bridge over the Charles River at 2,164.8 feet (387.72 sm; 659.82 m). Harvard Bridge. Seen from Cambridge (2017).Engineering · Maintenance and events · Engineering study, 1971–1972
  17. [17]
    [PDF] IS- &OST - Manuals.plus
    to name* it Harvard Bridge, in honor of the Kev. John Harvard, fcunder of Harvard College. The general plan and specifications were approved by the Harbor ...
  18. [18]
    AROUND THE NATION; Boston's Harvard Bridge Closed to Heavy ...
    Jul 6, 1983 · The heavily traveled Massachusetts Avenue Bridge, also known as the Harvard Bridge, was closed indefinitely to heavy truck and bus traffic ...
  19. [19]
    Harvard Bridge/Massachusetts Avenue Bridge over the Charles River
    Harvard Bridge/Massachusetts Avenue Bridge over the Charles River : bridge replacement project, Boston/Cambridge, Massachusetts | WorldCat.org.
  20. [20]
    Smoot lighting to set the mood on Harvard Bridge | MIT News
    Oct 28, 2014 · The unofficial length: 364.4 Smoots, plus one ear. (A plaque commemorating the prank was added to the bridge in 2009.) The measurement has long ...
  21. [21]
    Donor Will Bring Light to Massachusetts Avenue Bridge
    Sep 2, 2014 · An anonymous donor has pledged to put down millions of dollars for a new project that will illuminate the span of the Massachusetts Avenue Bridge.
  22. [22]
    The Bridges of Suffolk County - Boston - Patriot-Bridge
    Oct 16, 2014 · Harvard Bridge. Since this is Massachusetts, the bridge ... The design is underway, and lights should be shining before December, 2015.
  23. [23]
    Bridges | MassDOT Open Data Portal
    Sep 2, 2022 · This map service contains bridge data from the Massachusetts Department of Transportation Highway Division (MassDOT) Bridge Inspection ...Missing: Avenue Harvard
  24. [24]
    Harvard Bridge - Cambridge Historical Tours
    The Harvard Bridge, popularly known as MIT Bridge or Mass Ave Bridge, is the longest bridge over the Charles River connecting Boston and Cambridge.
  25. [25]
    [PDF] NON-MOTORIZED BRIDGE & PATHWAY USER COUNTS
    The bridge with the heaviest traffic was the Harvard Bridge, where nearly 1,700 users were recorded. The path with the heaviest volume was the Charles Street ...
  26. [26]
    Harvard Bridge Facts for Kids
    Oct 17, 2025 · This bridge is the longest one over the Charles River, stretching about 660 meters (2,165 feet). It's made of steel and was built between 1887 ...
  27. [27]
    the harvard bridge (massachusetts avenue at mit) and memorial drive
    The reconstruction of the Harvard Bridge widened both the roadway and the sidewalks somewhat.Missing: 1924 resurfacing
  28. [28]
    MassDOT Launches Bicycle-Safety Pilot on the Mass. Ave. Bridge
    Nov 24, 2021 · The pilot will reduce the number of vehicular travel lanes to one lane in each direction and increase the available width of the bicycle lane to ...
  29. [29]
    MassDOT is reducing the number of car lanes on the Harvard Bridge ...
    Nov 23, 2021 · When the Boston Cyclist Union launched a petition to bring protected bike lanes to the bridge, about 2,000 people signed it in less than a week, ...Missing: growth | Show results with:growth
  30. [30]
    None
    Nothing is retrieved...<|separator|>
  31. [31]
    MassDOT Calls Harvard Bridge Road Diet 'Extremely Effective ...
    Oct 24, 2022 · MassDOT has deemed a pilot road configuration that reduced the number of car lanes and widened bike lanes on the Massachusetts Avenue bridge a success.
  32. [32]
    The Bike Lane Effect on Harvard Bridge | Cameron Dougal
    The project began with a pilot in November 2021, when cones were temporarily installed to define the new lanes. These lanes were then painted in mid-2022 and ...Missing: history | Show results with:history
  33. [33]
  34. [34]
    Eyes On the Street: Posts Replace Cones on Mass. Ave. Bridge
    Oct 26, 2023 · It's been almost two years since MassDOT widened the busy bike lanes on the Harvard Bridge (also known as the Massachusetts Avenue Bridge) ...Missing: history | Show results with:history
  35. [35]
    Making Roads Safer for Pedestrians and Cyclists | Harvard Magazine
    Feb 11, 2025 · On an unseasonably cool day this past August, a two-year-old ... Harvard Bridge from four lanes to two, which added separated bike lanes.
  36. [36]
    Better Bike Lanes | Boston.gov
    Oct 30, 2025 · We're working to build a network of safe, connected, and comfortable bike lanes throughout Boston. Page Sections. Section Nav.Missing: integration | Show results with:integration
  37. [37]
    The Mysterious Markings on the Bridge to MIT
    Apr 13, 2018 · The marks still exist to perplex uninitiated bridge crossers today because Lambda Chi Alpha brothers faithfully repaint them every year.
  38. [38]
    Smoot's Legacy - MIT Technology Review
    Jun 23, 2008 · Every year since 1958, the Smoot marks have been repainted by LCA brothers, and when the Harvard Bridge was rebuilt in the late 1980s, the ...
  39. [39]
    Smoot reflects on his measurement feat as 50th anniversary nears
    Sep 24, 2008 · Smoot '62 recalled memories recently about the night his name became a unit of measurement as MIT prepares to celebrate the 50th anniversary of the quirky hack.
  40. [40]
    Plaque Shows Off Alum Smoot's Contribution to Measurement
    Jun 5, 2009 · When bridge was undergoing construction in the 1980s, the Boston Police requested that the Smoot markings be preserved (for their aid in ...Missing: replacement | Show results with:replacement
  41. [41]
    Hacking Harvard Bridge with Oliver R. Smoot | Magazine
    Feb 17, 2024 · The men of Lambda Chi Alpha hatched a plan to measure the Harvard Bridge, which stretches across the Charles River between Cambridge and Boston, ...
  42. [42]
    The Smoot – How an MIT prank became a lasting unit of measurement
    Jul 18, 2025 · As part of his initiation, he was tasked with measuring the Harvard Bridge using his own height. The resulting unit, the "smoot," remains ...
  43. [43]
    Repainting the Smoots - MIT Admissions
    Oct 27, 2023 · Soon enough, the Harvard bridge had been measured at 364.4 Smoots ± 1 ear, and bright yellow, purple, and green (the fraternity's colors) tick ...Missing: reopened | Show results with:reopened
  44. [44]
    MIT to Recalibrate the Smoot | alum.mit.edu
    Apr 1, 2016 · The bridge's measured length: 364.4 smoots, give or take an ear. ... Photographic evidence that clearly indicates Smoot's height has decreased ...