Fact-checked by Grok 2 weeks ago

Highland Main Line

The Highland Main Line is a 118-mile (190 km) railway route in that connects to , traversing the central and providing access to picturesque landscapes, including the and the highest point on the British mainline network at Druimuachdar Summit (1,484 feet or 452 meters). Operated primarily by , it facilitates both passenger and freight services, with journeys typically taking around three hours on average, though improvements aim to reduce the fastest time to 2 hours 45 minutes between and Scotland's . The line originated with the Inverness and Perth Junction Railway, authorized by in and constructed under engineer Joseph Mitchell, with sections opening progressively: to on 1 June , to on 3 August , and to on 9 September , completing the initial 104-mile route via Dava Moor and the Grampians. In 1898, the introduced a shorter "Direct Route" from to via Slochd Summit, bypassing the longer section, which was later closed in 1965 amid the and is now partially operated as the heritage Strathspey Railway. Originally managed by the , the line passed to the London, Midland and Scottish Railway in 1923 and British Railways in 1948, evolving into its current form as a key north-south corridor. Key stations along the route include Dunkeld & Birnam, , , , , , , and , with six of these eight stations located within the , offering connections to outdoor attractions, hiking trails, and tourist destinations. At , it links to the and services to , while at , it connects to routes toward and ; provides up to 11 daily passenger trains in each direction, emphasizing the line's role in regional tourism and economic connectivity. Enhancements, prioritized by the , included £57 million in Phase Two investments (completed in March 2019) for signaling upgrades, extended passing loops at , and platform reconfigurations at to boost capacity, reduce delays, and support as part of broader decarbonization efforts; as of 2025, further dualling and are under advocacy to address ongoing reliability issues. Much of the line remains single-track and diesel-powered, but these upgrades have already cut average journey times by around 10 minutes end-to-end, enhancing reliability for both commuters and visitors exploring the Highlands.

Route and Geography

Overview

The Highland Main Line is a 118-mile (190 km) railway route in running from in the south to in the north, traversing the central . It forms a key link in 's rail network, connecting at to southern routes toward and , which in turn provide access to the , and at to the extending northward to and . Owned and maintained by , the line supports both passenger and freight services, with as the primary operator for daytime regional trains, alongside (LNER) for longer-distance services to London and for overnight connections. The route is predominantly single-track with several passing loops to facilitate train crossings, reflecting its rural and challenging . It reaches significant elevations, including the Drumochter Pass at 1,484 feet (452 m), the highest point on the British mainland rail network, and the Slochd Summit at 1,315 feet (401 m). Typical journey times from to or are 3 hours 30 minutes to 4 hours 30 minutes, depending on stops and service type. Renowned for its scenic beauty, the line offers passengers views of the , , and expansive moorlands, making it a popular choice for tourists exploring the Highlands.

Detailed Route Description

The Highland Main Line commences at in the flat lowlands of Strathearn Valley, crossing the River Almond and ascending gently through wooded farmland into the foothills of the . The route then snakes alongside the River Tay, passing through birch woodlands and pine forests near and Birnam, where old-growth trees and river valleys provide a lush environmental backdrop. Continuing northward, the line curves into the dramatic Pass of , characterized by steep cliffs and the gorge of the River Garry, crossed by the Killiecrankie Viaduct—a 19th-century structure built in to span the challenging terrain. From , the railway transitions to patchy , offering views of peaks such as Beinn a’ Ghlo, before reaching amid open scenery. The ascent intensifies northward, following the River Garry and then Glen Truim, culminating at the Drumochter Pass—the highest point on the rail network at 452 meters (1,484 feet) above —where exposed , , and pools dominate the stark, weather-exposed landscape prone to severe conditions like snow and high winds. This summit marks the transition into the , a serving as vital wildlife corridors for species such as and golden eagles, though sections like Dalguise remain flood-prone due to proximity to rivers. Descending from , the line enters the broader Strathspey Valley, tracking the River Spey through pasturelands and woodlands near and , with views of the Monadhliath Mountains and remnants of historic sites like . Approaching , the route weaves beside the ancient Rothiemurchus Forest within the , showcasing Caledonian pinewoods and glimpses of , enhancing its appeal as a scenic corridor for tourists. North of , the terrain rises again through thickening forests along the River Dulnain to , before climbing to Slochd Summit at 401 meters (1,315 feet), the second-highest point, via the Allt Slochd Mhuic Viaduct over rugged . The final descent to flattens through Strathnairn, crossing the Culloden Viaduct—a 549-meter, 29-arch structure—and skirting the with distant views of Ben Wyvis, integrating into the more settled valley landscapes. The single-track sections throughout, particularly in remote areas, contribute to moderated speeds amid the varied topography.

History

Construction and Early Operations

The construction of the Highland Main Line originated with the Inverness and Perth Junction Railway, authorized by an on 22 July 1861 (24 & 25 Vict. c. clxxxvi), which empowered the company to build a 104-mile route from to , linking existing lines to create a direct connection between and . This legislation followed an earlier failed proposal in 1845, rejected due to concerns over locomotive braking on steep gradients. An additional Act in 1863 (26 & 27 Vict. c. lviii) facilitated the amalgamation of the Inverness and Perth Junction Railway with the Perth and Dunkeld Railway, extending access to and forming the core of what became the in 1865. Construction commenced on 17 October 1861 under the direction of engineer Joseph Mitchell, who had surveyed the challenging terrain based on his prior experience with Thomas Telford's road projects across the Highlands. The project faced significant obstacles from the rugged and Dava Moor, requiring extensive earthworks, viaducts, and tunnels using manual labor and early steam-powered machinery; the line was built as a single track with passing loops to manage costs and gradients up to 1 in 60. Sections opened progressively: Dunkeld to on 1 June 1863, Forres to on 3 August 1863, and the full route from Forres to (completing the Perth-Inverness link via existing segments) on 9 September 1863, achieved in just 23 months at a cost exceeding £500,000. Initial operations emphasized of timber, whisky, and agricultural goods from the Highlands to southern markets, alongside services with basic timetables offering one or two daily trains each way, fostering economic integration between and for trade. The line's single-track configuration led to operational constraints, while early weather disruptions, such as heavy snow on Dava Moor, caused frequent delays and required ongoing maintenance from the outset. Queen Victoria's journey on the new line to on 15 September 1863 highlighted its immediate significance, though services remained modest until further amalgamations stabilized the network.

20th and 21st Century Developments

In the early , the undertook significant doubling of track sections along the line to enhance capacity and accommodate growing traffic. Between 1901 and 1909, engineer Alexander Newlands oversaw the widening of approximately 23 miles over the , including key segments from to and further north, which improved operational efficiency amid increasing passenger and freight demands. In 1884, Parliament authorized the Inverness and Aviemore Direct Railway to provide a shorter route from to , avoiding the circuitous path via and Dava Moor. The line opened in stages: to on 8 July 1892, and the full route to on 1 November 1898, reducing the distance by about 15 miles and becoming the preferred path for mainline services. The of the 1960s profoundly impacted the network, leading to rationalization measures on the Highland Main Line, including the singling of certain double-track sections to cut maintenance costs on underutilized routes. For instance, the 4¼-mile stretch between Culloden and Daviot, previously doubled, was reduced to single track as part of broader economies, while associated branches like the to route were fully closed in , forcing rerouting via the direct Inverness- line. Efforts to restore capacity began in the mid-1970s, with British Railways redoubling the 23-mile section from to in 1976, addressing bottlenecks created by earlier singling and enabling more reliable timetables for passenger services through the challenging terrain. During the and , operations modernized with the widespread adoption of Class 47 diesel for hauling passenger trains, which became the backbone of services on the line due to their versatility in mixed-traffic duties. Concurrently, push-pull configurations were introduced, utilizing converted Class 47/7 s paired with (DBSO) coaches, allowing more efficient workings without the need for locomotive detachment at terminals and improving turnaround times at and . A major £57 million upgrade program, delivered by between 2017 and 2019, focused on enhancing reliability and speed potential along the 118-mile route from to . Key works included extending passing loops at and to support longer trains, introducing improved signaling systems to enhance reliability and capacity, and track renewals that reduced journey times by up to four minutes while increasing capacity for hourly services. Following rail privatization in 1996, the introduced operational changes to the Highland Main Line, including revised timetables that prioritized peak-hour services but reduced flexibility in off-peak slots, such as eliminating certain early morning and late evening departures to optimize costs under agreements. Subsequent renewals, notably in and 2015, emphasized fleet modernization and minor infrastructure tweaks, though capacity constraints persisted due to limited investment in dualling.

Infrastructure

Track Layout and Structures

The Highland Main Line is constructed to the standard gauge of 1,435 mm (4 ft 8½ in) throughout its 118-mile (190 km) length from to . The route is predominantly single track to navigate the challenging Highland terrain, with double-track sections at to Stanley (approximately 10 miles), to (23 miles), and Culloden Moor to (about 8 miles); the remaining sections rely on multiple passing loops at stations such as , , , , and to enable train overtaking and maintain service frequency. Gradient profiles are among the most demanding on the network, with the line ascending to the Drumochter Summit at 1,484 ft (452 m) above —the highest point on any British main line—resulting in a total rise and fall exceeding 2,000 ft over the route. The northbound climb to Drumochter features a sustained of 1 in 70 over 18 miles, while the southbound ascent to Slochd Summit reaches 1 in 60, imposing balance speeds as low as 56 for heavy formations and requiring powerful locomotives for uphill hauls, while southbound descents are generally milder but still necessitate speed controls. Major engineering structures include more than 20 to span glens and rivers, such as the 161-year-old Garry Viaduct—a structure carrying the line over the River Garry near Struan—which underwent an initial £1.25 million refurbishment in 2025 to replace corroded components and enhance load capacity, as part of a larger £4.3 million project set to complete in 2028/29. The route also features ten tunnels totaling several miles, exemplified by the Slochd Tunnel (approximately 1,400 yd or 1,280 m long), bored through the Slochd Summit to ease the climb from and maintained to good condition despite its exposure to harsh weather. Track formation uses ballast for stability on the undulating and often rocky , with ongoing permanent way cycles including regular tamping and renewal to address wear from freight traffic and gradients. Drainage improvements, such as enhanced culverts and embankment stabilization at flood-prone sites like Dalguise, have been prioritized since to bolster resilience against heavy rainfall and landslips, reducing disruption from climate-related events. Line speeds are generally 75–80 , with post-2019 upgrades enabling 90 operation over a 2.8-mile section between and through curve realignments and structure strengthening; however, permanent speed restrictions persist at 30–50 over older viaducts and tunnels like due to gauge constraints and curvature. Weather protections include snow fences erected along exposed summits such as Drumochter and Slochd to prevent drifting snow accumulation, mitigating closure risks from blizzards and in the region, where the line's elevation exposes it to severe winter conditions.

Signalling and Safety Systems

The Highland Main Line primarily operates under principles, ensuring that only one can occupy a given section of track at any time to prevent collisions. On single-track sections, which comprise much of the route, this is implemented through a token system where physical or electric tokens are exchanged between drivers and signalmen to authorize movements, a practice rooted in traditional safety protocols adapted for remote Highland terrain. Since 2019, signalling upgrades including re-signalling to colour light signals have been implemented at key locations like and as part of improvement projects, aiming to modernize operations while maintaining compatibility with existing . The route is controlled by approximately eight operational signal boxes between and , with additional boxes extending north, most featuring mechanical lever frames and signals that date back to Victorian-era designs. These boxes manage train paths manually, but ongoing plans for centralization into fewer control centers seek to streamline operations and cut maintenance costs across Scotland's rural lines. Safety is augmented by standard UK railway systems including the Automatic Warning System (AWS), which provides audible and visual alerts to drivers approaching cautionary or stop signals, and the Train Protection and Warning System (TPWS), which automatically applies brakes to prevent signals passed at danger (SPADs) or excessive speed through junctions. monitors are deployed along exposed sections, triggering speed restrictions during gales exceeding safe thresholds, informed by historical protocols developed after events like the 1989 Scottish windstorm that disrupted Highland services. The line features more than 20 user-worked level crossings, where road users manually operate gates or barriers after contacting the signal box via telephone, alongside automatic half-barrier crossings at higher-traffic points equipped with flashing lights and descending barriers to halt vehicles. These crossings demand vigilant coordination to mitigate collision risks in rural settings with limited visibility. risks are heightened on the line's steep gradients, such as the 1-in-70 ascent to Drumochter and 1-in-60 to Slochd , where snow, ice, or wheel slip can reduce adhesion, as evidenced by the 2010 at during wintry conditions. Recent upgrades incorporate remote at high-risk geotechnical sites, using sensors to track earth movements, drainage, and structural integrity in real-time, enabling proactive interventions during adverse weather. To enhance capacity on the predominantly single-track route, passing loops at stations like , , and allow opposing trains to cross efficiently, with 2019 extensions at increasing loop length to handle longer freight and passenger formations without delaying schedules.

Passenger Services

Operators and Timetables

The primary operator of daytime passenger services on the Highland Main Line is , which provides up to 14 trains per day between and on weekdays, approximately hourly, with fewer on weekends. Some of these services extend every two hours to Waverley or Queen Street, connecting the Highlands to major cities. London North Eastern Railway (LNER) operates the daily service from to London King's Cross, departing around 07:55 on weekdays and Saturdays (09:40 on Sundays) and taking approximately 8 hours. The northbound service runs daily from London King's Cross at around 12:00, arriving in after about 8 hours. The provides overnight services on the Highland route from to Euston, running Sunday to Friday with departures around 20:45 (20:25 on Sundays) and arrivals between 07:15 and 08:00, for a journey of 10.5 to 11.5 hours. It stops at key Highland Main Line stations including , , , and before continuing south via and . Timetables feature higher frequencies during peak hours (morning and evening commutes) with up to 14 daily services in each direction between and , reducing to off-peak intervals of 1-2 hours; seasonal enhancements occur in summer months to accommodate tourist demand, adding extra trains on popular routes. Typical journey durations include an average of approximately 2 hours 45 minutes from to and up to 11.5 hours for the full to via the . Ticketing across all operators follows standards, offering Advance fares for savings when booked early (up to 12 weeks ahead), with discounts via railcards providing one-third off eligible tickets; services integrate seamlessly through the network for combined journeys.

Stations

The Highland Main Line features ten principal stations serving passengers between and , each offering basic facilities suited to the rural and scenic nature of the route. Most stations have one or two platforms with waiting shelters, and improvements since the have provided step-free access at major stops like , , and several others through lifts or ramps. Amenities typically include ticket machines, bicycle storage, and parking, with cafes available at the termini stations of and . No major closures have occurred on the main line itself, though nearby minor halts were rationalized during the 1960s as part of broader network streamlining. Perth serves as the southern terminus and a key interchange point, with four platforms, step-free access to all areas, and extensive facilities including a staffed ticket open daily, accessible toilets, showers, a cafe, and an . Parking accommodates 160 vehicles with charges applying, alongside 31 spaces. As a busy hub, it sees an estimated 2,800 daily entries and exits (2023/24). Dunkeld & Birnam, the first intermediate stop, has a single platform with partial step-free access and basic shelters. Facilities include a ticket machine and help point, with ample available nearby. It attracts around 300 daily entries and exits (2023/24), primarily tourists drawn to the nearby and river walks. is renowned for its heritage Victorian-era building, a Grade A listed structure with Scottish Tudor-style architecture, ornamental gables, and a historic . The station features two platforms, a volunteer-run bookshop, waiting rooms with photographic exhibitions, and step-free access under ongoing improvements. Amenities include shelters and parking, serving approximately 410 daily entries and exits (2023/24) who use it as a gateway to local theaters and hikes. Blair Atholl offers a single platform with shelters and basic facilities like a ticket machine and bicycle storage. Accessibility is limited but includes ramps at the main entrance, with parking available. It handles about 170 daily entries and exits (2023/24), many connecting to nearby castles and outdoor pursuits. Dalwhinnie, located in the , has one platform with a waiting shelter and help point. Facilities are minimal, focusing on passenger information displays, with step-free access via a . Daily is around 40 entries and exits (2023/24), reflecting its remote position near whisky distilleries. Newtonmore features two platforms with shelters and a small car park. Accessibility includes step-free entry, and amenities comprise bicycle racks. It sees roughly 80 daily entries and exits (2023/24), serving the local community and park visitors. Kingussie, another Cairngorms station, has two platforms with partial step-free access under improvement plans, including waiting areas and parking. Facilities include a ticket machine and information boards, with an estimated 170 daily entries and exits (2023/24) utilizing links to Highland wildlife parks. stands out as a with connections to the Strathspey Steam Railway and ski resorts like Cairngorm, featuring an , Grade A listed timber building from , and views of the Northern . Facilities include a ticket office, bicycle storage, ample parking, and step-free access; it records about 640 daily entries and exits (2023/24). Carrbridge has a single platform with a , PA system, and help point, plus step-free access. Amenities are basic with parking nearby, attracting around 150 daily entries and exits (2023/24) as the northern gateway to the for woodland trails. Inverness, the northern terminus and major interchange, boasts seven platforms in a triangular , full step-free access via lifts and ramps, and comprehensive amenities like a staffed ticket office, accessible toilets with showers, cafes, shops, an , and free . Parking offers 60 spaces with charges, plus 40 bicycle spots and bus links; it handles over 5,500 daily entries and exits (2023/24) as a key hub for regional travel.

Rolling Stock

Current Fleet

The Highland Main Line is primarily served by diesel multiple units (DMUs) and high-speed trains operated by ScotRail for regional and intercity passenger services. ScotRail's fleet includes Class 158 Express Sprinter and Class 170 Turbostar DMUs, typically configured in 2- or 3-car formations with maximum speeds of 90 mph (145 km/h) and seating capacities ranging from 70 to 100 passengers per unit. These DMUs are well-suited to the line's frequent stops and rural sections, offering accessibility features such as dedicated wheelchair spaces, priority seating, and ramp deployment for step-free access at major stations. Additionally, ScotRail deploys its Inter7City fleet of refurbished High Speed Trains (HSTs), consisting of Class 43 power cars paired with 4- or 5-car Mark 3 trailer sets, achieving a top speed of 125 mph (201 km/h) but operationally limited to around 90-100 mph on the route due to track curvature and gradients. These HSTs provide enhanced capacity with approximately 200-250 seats per set, including first-class accommodation, improved luggage space, and onboard catering, making them ideal for longer journeys between Inverness and the central belt cities like Edinburgh and Glasgow. London North Eastern Railway (LNER) operates daily long-distance services from London King's Cross to via the and Highland Main Line, utilizing Class 800 Azuma bi-mode multiple units in 9-car formations. These trains, with a maximum speed of 125 mph (201 km/h), switch to diesel power for the non-electrified Highland section, accommodating up to 526 standard-class seats and featuring modern amenities like free , power sockets, and accessible toilets with radar locks. The Azuma's hybrid capability ensures reliable performance over the route's challenging terrain, including the steep ascent to Drumochter Summit. The provides overnight services to , employing Mark 5 sleeping cars hauled by Class 73/9 electro-diesel locomotives for the Highland Main Line portion. This fleet comprises 75 coaches built by , including twin-berth cabins, accessible rooms, and a with lounge seating, offering a maximum of around 16 cars per formation for the Highlander route. The Class 73/9 locos, with a top speed of 90 mph (145 km/h), deliver efficient traction on the diesel-only sections, supported by third-rail capability for southern electrified lines. Accessibility includes priority booking for wheelchair users and adapted cabins with en-suite facilities.
OperatorTrain TypeConfigurationMax SpeedKey Features
Class 158/170 DMU2-3 cars90 mphAccessibility ramps, 70-100 seats
Inter7City HST (Class 43 + Mk3)2 power cars + 4-5 coaches125 mph200-250 seats, onboard catering, luggage space
Class 800 Azuma9 cars125 mphBi-mode, 526 seats,
Mk5 coaches + Class 73/9 locoUp to 16 cars90 mphSleeping cabins, lounge car, accessible rooms
The diesel-powered fleets, particularly the HSTs and Class 73/9 locos, demonstrate strong on the line's gradients, such as the 1-in-70 climb to Drumochter, where bi-mode units like the Azuma maintain consistent performance in diesel mode without excessive power draw. All current complies with standards, including the Rail Vehicle Accessibility Regulations (RVAR), with features like audio-visual announcements and staff-assisted boarding via portable ramps. for ScotRail's HSTs and DMUs occurs primarily at Polmadie Depot in , with lighter servicing at Inverness TMD, while Caledonian Sleeper stock is based at Polmadie and Millerhill. LNER Azumas undergo scheduled at Bounds Green Depot near London. Recent developments include ScotRail's full rollout of the Inter7City HSTs to the Highland Main Line by 2021, retained amid ongoing procurement for a replacement intercity fleet announced in September 2024, following trials that highlighted the HSTs' suitability for the route's demanding over alternatives like bi-mode units.

Historical Rolling Stock

The Highland Main Line, opened in stages from the 1860s, initially relied on steam locomotives from the , with the Jones Goods 4-6-0 emerging as a pioneering design in 1894. Built by Sharp Stewart & Co., these fifteen locomotives, numbered 89 to 103, featured 5 ft 3½ in driving wheels and a of 24,362 lbf, making them the first British 4-6-0s suitable for main line passenger and freight duties. They primarily operated over the route from southward, handling increased traffic after the line's completion, and remained in service into the LMS era, with No. 103 preserved at the Keith and Dufftown Railway. Under ownership from 1923, the line saw the introduction of which became the dominant motive power for passenger services through the 1930s to the 1950s. These versatile mixed-traffic locomotives, with over 800 built between 1934 and 1951, were allocated to depots like and , powering expresses such as the "Highlandman" and freight trains amid growing post-war demands. British Railways continued their use into the early 1960s, with examples like No. 45212 hauling services until dieselisation advanced. Early diesel adoption began in the late 1950s with Class 26 and 27 Bo-Bo locomotives, Sulzer-powered Type 2s built by Birmingham Railway Carriage and Wagon from 1958 to 1962, which took over secondary passenger and freight workings on the line by the mid-1960s. Steam traction on the Highland Main Line ended in 1965, with the final scheduled services hauled by and similar classes amid the broader modernisation drive. The marked a shift to diesel-electric operations, including push-pull configurations using Class 47 Co-Co locomotives paired with coaches and (DBSO) vehicles, introduced from 1971 to enhance efficiency on routes like Inverness to . These sets, often with refurbished maroon-liveried coaches, operated key daytime services until the late , improving journey times on the undulating terrain. Notably, high-speed Deltic Class 55 locomotives from the were loaned for the "Royal Highlander" sleeper service to until 1975, providing powerful haulage for the overnight portion over the Highland route before handover to Class 47s. Limited trials of High Speed Trains () occurred in the , primarily testing speeds on the Edinburgh-Inverness section, but their adoption was constrained by the line's gradients and curvature. The late 1980s and 1990s brought diesel multiple units to replace loco-hauled trains, with Super-Sprinter two-car units entering service in 1989 on shorter Highland routes, followed by more spacious Class 158 Express Sprinter three-car sets from 1990 for longer journeys like Inverness to . These Sprinter-series DMUs, built by , offered accelerated schedules and greater capacity, addressing post-Beeching pressures for viable rural services after branch closures reduced overall network traffic. The evolution toward these units was driven by needs for higher speeds—up to 90 mph—and improved reliability to sustain passenger numbers on the retained main line.

Usage and Economics

Passenger Statistics

Passenger ridership on the Highland Main Line showed substantial growth in the early , driven by improved services and rising interest in scenic rail travel through the . Prior to the , the line saw steady demand from both local commuters and tourists attracted to the route's dramatic landscapes. The onset of the led to a drastic decline in ridership in 2020, as travel restrictions severely curtailed both local and journeys, with many stations recording usage drops of over 80%. has been gradual, with passenger numbers as of 2023-24 still below pre- levels amid ongoing economic pressures and shifts in travel patterns. Seasonal peaks occur in summer, boosted by tourism to areas like the , where visitor numbers can double during peak months compared to winter lows. Ridership includes both local usage for and regional , as well as long-distance and tourist trips, the latter heavily influenced by to major cities like and . Key influencing factors include competition from the parallel A9 road, which offers faster car for some routes, and the lingering effects of restrictions that reduced overall mobility. Projections suggest steady growth in the coming years, supported by remote work trends enabling more flexible leisure travel and potential service enhancements. As of 2025, passenger numbers continue to recover, with ongoing enhancements contributing to improved reliability.

Economic Impact

The Highland Main Line significantly boosts in the by providing essential access to key destinations such as the and , where the sector generates approximately £419 million annually for the local economy (as of 2023) and supports over 40% of employment in the region. Improved rail services along the line are recognized as a vital enabler for this , facilitating visitor arrivals and contributing to broader tourism revenues estimated at around £1.7 billion in direct spend across the Highlands (as of 2023). The line's scenic route further enhances its appeal, promoting sustainable travel and integrating with local heritage initiatives to drive economic activity in hospitality and related sectors. In terms of the local , the Highland Main Line sustains over 20,000 jobs in and across the Highlands, with rail operations directly supporting in maintenance, operations, and services. Freight services on the line handle commodities such as whisky and timber, bolstering regional industries and enabling efficient transport from remote production areas to markets. By enhancing connectivity, the line reduces reliance on private vehicles, promoting shift from and yielding , including lower carbon emissions per passenger compared to car travel through reduced road congestion and fuel use. Despite these contributions, the line faces challenges, including the need for ongoing subsidies to maintain rural services, as Scottish operations receive substantial public funding to offset lower passenger revenues in remote areas. from the A9 road dualling project exacerbates this, as upgraded highway infrastructure favors road freight and passenger travel, potentially undermining 's modal shift potential. A 2015 report highlights the benefits of line enhancements for encouraging passenger and freight shifts to , estimating wider economic gains from improved capacity and speed. Socially, the line aids in combating depopulation in remote communities by providing reliable access to , opportunities, and centers, thereby supporting retention efforts.

Future Developments

Planned Upgrades

The Scottish Government's commitments under the 2023 Rail Strategy, outlined in Scotland's CP7 Strategic Business Plan, allocate significant funding for enhancements to the Highland Main Line, emphasizing capacity, reliability, and resilience through 2030. This includes investments to support more frequent and faster services between and the , focusing on track renewals and infrastructure optimizations. Key near-term projects involve loop lengthening—at minimum 800 meters—and selective tactical redoubling of sections to improve crossing efficiency and journey times, as identified in the Strategic Transport Projects Review 2 (STPR2). For instance, proposals for extended double tracking between and Culloden, debated in ary sessions in 2025, aim to reduce delays from single-line constraints without full dualling. These align with broader calls for partial redoubling along the route to enhance operational paths. Station accessibility improvements are prioritized, with ongoing considerations for upgrades at , , and other stops to better serve passengers with disabilities, building on feasibility studies initiated in 2025. measures, informed by disruptions from 2023 storms, form part of CP7's climate adaptation efforts, including drainage enhancements and flood defenses to protect vulnerable sections of the line. Digital signalling upgrades, transitioning from legacy and mechanical signalling systems, are planned route-wide to increase train paths, though full implementation timelines extend into the late 2020s. In October 2025, MSPs urged acceleration of these upgrades during a debate, though ministers noted potential delays due to budgetary constraints.

Electrification and Long-Term Vision

The Scottish Government originally aimed to remove all diesel-only passenger trains from Scotland's rail network by 2035 as part of its Rail Services Decarbonisation Action Plan, but this target was revised in 2024 to achieve full decarbonisation by 2045 due to logistical and budgetary constraints. For the Highland Main Line, electrification remains a key ambition within this broader strategy, with Transport Scotland emphasizing the need for complementary technologies to address rural and challenging terrains. Currently reliant on diesel traction, the line's transition to zero-emission operations is seen as essential for aligning with Scotland's net-zero emissions goal by 2045. As of November 2025, feasibility studies for Highland Main Line enhancements, including potential , are underway as part of Network Rail's upgrade programmes, but no overhead wires have been installed along the route. The has allocated funding within its £4 billion investment for Scotland's Railway over the current control period (2024-2029), supporting initial planning and related , though specific budgets for Highland are integrated into wider decarbonisation efforts rather than ring-fenced. Benefits include the deployment of battery-electric or trains on non-electrified spurs, enabling zero-emission services, reduced journey times through faster acceleration, and increased capacity for more frequent trains. Electrification faces significant challenges, including high costs driven by the route's rugged terrain and remote locations, with no official estimates yet published but comparisons drawn to the £3.7 billion A9 dualling programme highlighting the scale of investment required. In October 2025, MSPs from multiple parties urged acceleration amid perceived delays, describing the project as a "game-changer" for connectivity and emissions reduction during a debate. The long-term vision encompasses integration with emerging concepts northward and full dualling of the network to enhance reliability and economic links by mid-century. As an if full timelines slip, hydrogen-powered trains are being piloted for rural routes like the Highland Main Line, with studies exploring their viability for decarbonising hard-to-electrify sections. This approach aligns with Scotland's Hydrogen Action Plan and could serve as a bridge technology pending infrastructure upgrades.

References

  1. [1]
  2. [2]
    History | Highland Main Line CRP
    In 1898 the 'Direct Route' from Aviemore to Inverness, thereby shortening the journey, was opened by the Highland Railway. That company became part of the LMS ...Missing: Scotland | Show results with:Scotland
  3. [3]
    Highland Main Line [8 photos] :: Geograph Britain and Ireland
    May 3, 2023 · The route is 118 miles (190 km) long. It includes the highest point on Britain's main line railway network, at Druimuachdar Summit, 1,484 feet ...
  4. [4]
  5. [5]
    Rail improvements in the Highlands | ScotRail
    A total of £57 million is being invested in improving the Highland Mainline, which will allow more and faster journeys between Inverness and the Central Belt.
  6. [6]
    Stations | Highland Main Line CRP
    There are eight station members of the Highland Main Line Community Rail Partnership. Of these, six are within the Cairngorms National Park.
  7. [7]
    Highland Main Line - Scenic Rail Britain
    Stations on this line: Dunkeld & Birnam; Pitlochry; Blair Atholl; Dalwhinnie; Newtonmore; Kingussie; Aviemore; Carrbridge.Missing: length | Show results with:length
  8. [8]
    The Highland Main Line - Byway Travel
    Jul 30, 2025 · The Highland Main Line runs between Perth and Inverness, covering 118 miles in around 2 hours 30 minutes. Stops along the line include ...Missing: length source
  9. [9]
    [PDF] Highland Rail Room for Growth Study Final Report - HIE Timeline
    Mar 24, 2006 · The routes are: • Highland Main Line: Perth to Inverness;. • Far North Line: Inverness to Thurso and Wick;. • Kyle Line: Dingwall to Kyle of ...
  10. [10]
    Scotland route - Network Rail
    Over 2,500 passenger and freight services every day. We manage and maintain 4,715 bridges, 591 level crossings and 4,326 signals. On average, 250 freight ...
  11. [11]
    Home | Caledonian Sleeper |
    A unique way to travel between Scotland & London. Enjoy your own private room. Save money on a hotel night. Save time, travel while you sleep.Travel Updates · Caledonian Sleeper Limited... · Sleeper Experience · Destinations
  12. [12]
    Existing Conditions | Transport Scotland - The Scottish Government
    The Highland Main Line railway, which is approximately 190 kilometres (118 miles) long, and travels through the Scottish Highlands. The route is predominantly ...
  13. [13]
    THE HIGHLAND MAIN LINE - Key Model World
    Apr 28, 2024 · Stretching across 118 spectacular miles, the Highland Main Line is a vital artery linking the Far North for more than 150 years.
  14. [14]
    Trains from Inverness to Edinburgh (Waverley) | Train Times - ScotRail
    The average journey time from Inverness to Edinburgh (Waverley) is 4 hours 25 minutes. Journey times might be slightly longer on weekends and Bank Holidays.
  15. [15]
    Sustainable holidays on offer on the Highland Main Line | The Herald
    May 14, 2019 · It is one of Scotland's most scenic railway lines, taking in the Grampian Mountains, Cairngorms National Park, Blair Castle and some of the ...
  16. [16]
    Overview of Killiecrankie Viaduct - Gazetteer for Scotland
    ... Inverness and Perth Junction Railway, which became the Highland Railway Company in 1865 and continues as the main-line north from Perth. Constructed in the ...Missing: route | Show results with:route
  17. [17]
    Geal-charn (Drumochter pass) : Climbing, Hiking & Mountaineering
    The A9 road is routed through here, as is the Highland Main Line, the railway link between Inverness and the south of Scotland. The pass is the only gap in ...
  18. [18]
    [PDF] Scotland Route Strategic Plan | Network Rail
    Mar 19, 2019 · With Criticality band 5 (Mainly Highland Main Line and Aberdeen to Inverness) experiencing some of the biggest increases in traffic, these ...
  19. [19]
  20. [20]
    Aberdeen to Inverness - Phase one delivered - Rail Engineer
    Nov 23, 2017 · The Inverness and Perth Junction Railway opened in 1863 to give Inverness a route to the South. Due to the difficult terrain immediately ...
  21. [21]
    [DOC] recommendation-15-highland-main-line-rail-corridor-enhancements ...
    ... Highland Main Line rail corridor, which also runs through the Cairngorms National Park. The Highland Main Line route between Inverness and Perth passes ...Missing: features - | Show results with:features -
  22. [22]
    Chronological Tables - Local Acts - Legislation.gov.uk
    Chronological Tables of Local Acts. Acts of the Parliaments of the United Kingdom Part 50 (1861) 1861 (24 & 25 Vict.).Missing: construction timeline<|control11|><|separator|>
  23. [23]
    Chronological Tables - Local Acts - Legislation.gov.uk
    36. c.lviii Inverness and Perth Junction and Perth and Dunkeld Railways. Amalgamation. r.(saving)( ...<|control11|><|separator|>
  24. [24]
    Railway History – The Dava Way
    The Inverness & Perth Junction Railway routed via Forres and over Dava Moor finally opened on 9th September, 1863.Background · Building The Railway · Winter ChallengesMissing: geography | Show results with:geography<|control11|><|separator|>
  25. [25]
    Whisky by rail – a Scottish history lesson | RailFreight.com
    Apr 12, 2017 · The opening up those early transport routes resulted, naturally, in the growth of the region. Additional and alternative means of transportation ...Missing: timber military
  26. [26]
    Inverness and Perth Junction Railway - RAILSCOT
    Act obtained for a line between Dunkeld and Forres, and Ballinluig to Aberfeldy. ... 28/02/1864, Perth and Dunkeld RailwayInverness and Perth Junction Railway
  27. [27]
    Highland Mainline Single Track Sections Operation - RMweb
    Jan 12, 2014 · The only section of the Highland Main Line (Perth/Inverness) which was once double but is now single is the 4 1/4 miles between Culloden and Daviot.Modern single track mainlines - UK Prototype Questions - RMwebA beginner's DCC layout, not so accurate Highland Main line!More results from www.rmweb.co.uk
  28. [28]
    Whisky Nine Six: LNER's Highland Lifeline | The Railway Magazine
    Jan 27, 2020 · ... 1976 when the 23-mile section from Blair Atholl to Dalwhinnie was redoubled. For many years, Inverness and the Highland Main Line were also ...
  29. [29]
    Highland main line upgrade work complete
    Mar 26, 2019 · Network Rail has completed a £57 million programme of upgrades on the Highland main line between Perth and Inverness.Missing: 2017-2019 | Show results with:2017-2019
  30. [30]
    Project details | Transport Scotland
    ### Summary of Highland Main Line Project
  31. [31]
    The new Highland Main Line Timetable and the Future
    Privatisation sadly reduced the flexibility to travel at some of the most popular times: 8 a.m. southbound and 16:30 northbound. This has been a big problem on ...
  32. [32]
    Scotland: Setting priorities for a new era - Railway Gazette
    Jun 6, 2022 · Following the end of Abellio's seven-year contract, ScotRail is now operated by ScotRail Trains Ltd, a wholly owned subsidiary of Scottish Rail ...
  33. [33]
    [PDF] Highland Rail Room for Growth Study Final Report - HIE Timeline
    Mar 24, 2006 · Highland Main Line would necessitate a detailed assessment of the route. In all cases this would consider the line curvature and the impact ...
  34. [34]
    [PDF] Route specification Scotland 2021 - Network Rail
    Welsh's Bridge Junction links with the Highland Main Line from. Perth. Geographic Map. Aberdeen. Inverness. Dyce. Nairn. Keith. Insch. Elgin. Huntly. Forres.
  35. [35]
    Azuma's HIGHEST challenge - Rail Engineer
    Feb 4, 2020 · The Highland main line (HML) between Inverness and Perth is the most severely graded line on the UK railway network.Missing: Druimuachter rise 2000
  36. [36]
    Garry viaduct - Highland Main Line - January 2025
    Jan 7, 2025 · Bridges, tunnels and viaducts · Our fleet: machines and vehicles · Earthworks: cutting slopes and embankments · Asset management · Asset ...Missing: Slochd Tunnel 1400 yd
  37. [37]
    Stanley Junction 'N' gauge model railway - Key Model World
    Apr 1, 2021 · ... Highland Main Line. The station at Stanley Junction was closed to ... The track was ballasted with Woodland Scenics fine grade brown ballast.
  38. [38]
    Project protects Highland railway from impacts of unpredictable ...
    Jun 5, 2020 · Work is about to get underway on a final phase of embankment and drainage work at Slochd between Perth and Inverness on the Highland Mainline.
  39. [39]
    Highland Main Line investment not enough – David Spaven
    Apr 17, 2019 · ... Highland Main Line (HML) as the third-top priority among 29 road and ... speed limits on various bridges below the 75 mph line speed.
  40. [40]
    Railways of Caledonia - Railway Wonders of the World
    It covers eighteen acres, and contains nineteen platforms, of which the longest has an overall length of 1, 680 feet. Over 600 trains use it daily. Adjoining ...
  41. [41]
    [PDF] single line signalling and tokenless block - dickthesignals.co.uk
    The token system is thus in effect the absolute block system applied to a single line in a positive way, as only one train is permitted to be in a section ...
  42. [42]
    What's Changed - Scotlands Railway
    6. Highland Main Line. The Highland Mainline Phase 2 project completed successfully in March 2019. This saw signalling improvements made at Aviemore and ...Missing: ETCS | Show results with:ETCS
  43. [43]
    Highland Main Line - Train Pictures
    The main line features stretches of double and single track with semaphore block signalling predominating to Aviemore from the eight operational signal boxes.
  44. [44]
    Scotland's signal boxes still using Victorian-era technology
    May 8, 2024 · Signal boxes dating back 150 years control sections of single track lines - and have been given a further stay of execution under Network Rail Scotland's (NRS) ...<|control11|><|separator|>
  45. [45]
    Train protection and driver aids - Rail Engineer
    Sep 10, 2013 · AWS fitment of passenger lines was not fully completed until a few years into the 21st century. The system consists of two magnets fitted on ...
  46. [46]
    High winds and heavy rain set to affect Highland Line
    Sep 29, 2022 · Speed restrictions will be in place on the Highland Main Line, West Coast Main Line, parts of the Dundee – Aberdeen line and West Highland Line.Missing: AWS TPWS
  47. [47]
    List of Level Crossings in Scotland - Roader's Digest: The SABRE Wiki
    Mar 13, 2025 · This is a list of level crossings in Scotland, including names, road names, locations, counties, and authorities. Examples include Watten and ...
  48. [48]
    Report 03/2011: Derailment of a freight train at Carrbridge - GOV.UK
    Dec 10, 2014 · The front portion of a freight train which was travelling from Inverness towards Perth on the Highland Main Line, derailed at Carrbridge station.
  49. [49]
    [PDF] Route Weather Resilience and Climate Change Adaptation Plans
    Wind affects performance directly in that blanket speed restrictions are imposed when thresholds are reached. Scotland Route has a High Wind Procedure ...Missing: 1989 | Show results with:1989
  50. [50]
    [PDF] Highland Main Line journey time improvements phase 2
    The “perfect” timetable (on paper!) – Minimum journey time between Perth – Edinburgh & Glasgow. – Consistent crossings of trains between Perth and Inverness:.
  51. [51]
    [PDF] Edinburgh & Glasgow – Inverness - ScotRail
    Some services may alter on public holidays. Please check our website before travelling.
  52. [52]
    [PDF] LNER Timetable 15 May to 22 December 2022
    The Highland Chieftain. HC. Inverness to London King's Cross. Departs: 07.55 (Mon - Sat). 09.40 (Sun). London King's Cross to Inverness. Departs: 12.00 every ...<|control11|><|separator|>
  53. [53]
    [PDF] caledonian-sleeper-timetables-may-december-2025.pdf
    Caledonian Sleeper services run from London to Scotland (Mon-Fri) and Scotland to London (Mon-Fri), with Sundays until 15th and from 22nd une.
  54. [54]
    Trains from Perth to Inverness | Train Times - ScotRail
    The average journey time from Perth to Inverness is 3 hours 24 minutes. Journey times might be slightly longer on weekends and Bank Holidays.
  55. [55]
    Trains from Inverness to Perth | Train Times - ScotRail
    The average journey time from Inverness to Perth is 2 hours 48 minutes. Journey times might be slightly longer on weekends and Bank Holidays.
  56. [56]
    Advance Train Tickets | National Rail
    If you have any National Railcard you can get 1/3 off Standard class Advance fares ... National Rail Enquiries - Official source for UK train times and timetables.Advance Tickets Terms and... · Advance Booking Dates · Latest purchase times
  57. [57]
    Railcards | National Rail
    You can use your Railcard for 1/3 off most fares and ticket types. There may be some restrictions on when you can use your Railcard, and a minimum fare may ...
  58. [58]
    Access for disabled people - Transport Scotland
    Access improvements continue to be considered for Aviemore, Pitlochry and Kingussie on the Highland Main Line and for Nairn on the Aberdeen to Inverness route.
  59. [59]
    Perth Station | ScotRail
    Ticket buying and collection · Help and support · Accessibility and support · Toilets and baby changing · Lounges and waiting rooms · Car parking · Shopping, food, ...
  60. [60]
    Estimates of station usage - ORR Data Portal
    Annual estimates of the number of entries/exits and interchanges at each station in Great Britain. These estimates are based primarily on ticket sales.Missing: Highland | Show results with:Highland<|separator|>
  61. [61]
    Dunkeld & Birnam Station - ScotRail
    This station has a degree of step-free access to the platform, which may be in both directions or in one direction only - please check details.
  62. [62]
    Dunkeld Station | Highland Main Line CRP
    The Signal Box is also listed and was built by the Highland Railway Company in 1919, it is located to the east and with the Station buildings adds group ...
  63. [63]
    Pitlochry Station | Highland Main Line CRPp
    ### Pitlochry Station Summary
  64. [64]
    Pitlochry Station | ScotRail
    Ticket buying and collection · Help and support · Accessibility and support · Toilets and baby changing · Lounges and waiting rooms · Car parking · Shopping, food, ...
  65. [65]
    Blair Atholl Station | Highland Main Line CRP
    Annual Passenger Figures. Date, Passenger Figures. 2024/25, 23,244. 2023/24, 18,666. 2022/23, 14,125. 2021/22, 11,870. 2020/21, 3,688. 2019/20, 18,388. Station ...Missing: numbers | Show results with:numbers<|control11|><|separator|>
  66. [66]
  67. [67]
  68. [68]
  69. [69]
    Aviemore Station | Highland Main Line CRP
    ### Aviemore Station Summary
  70. [70]
    Carrbridge Station - Highland Main Line CPR
    About half of the train services stop. Facilities include a PA system, waiting room and a help point. Carrbridge is the northern gateway to the Cairngorms ...
  71. [71]
    Inverness Station - ScotRail
    Inverness (INV) · Relevant timetables · Station features and facilities · Transport links · No booking fees! · Outbound date · Outbound time · Return date.Aberdeen to Inverness · Achnasheen to Inverness · Aberdour to InvernessMissing: frequency | Show results with:frequency
  72. [72]
    Your Essential Guide To Inverness Train Station: What Every Visitor ...
    Aug 25, 2025 · The station has seven platforms in a triangular junction layout. The Highland Main and Aberdeen Lines use Platforms 1-4 from the east. Platforms ...<|control11|><|separator|>
  73. [73]
    First Class Train Tickets: Seating, Benefits & Fares | ScotRail
    Upgrade to First Class for extra space and added comforts on selected routes. Check availability, benefits and how to find the best ScotRail fares.Missing: PDF | Show results with:PDF
  74. [74]
    Final upgraded Inter7City high speed train completes ScotRail's fleet
    Apr 8, 2021 · The fleet provided a 33 per cent increase in seating capacity on Scotland's intercity network with more WiFi, leg room, new seats and tables and ...
  75. [75]
    HIGHLANDS BOUNCE BACK - Modern Railways
    Nov 1, 2021 · A passing loop will be provided as part of the work and all trains on the line will stop at the new station, which is pencilled in for opening ...
  76. [76]
    Highland Chieftain welcomes Azuma to the clan - LNER
    Dec 10, 2019 · London North Eastern Railway (LNER) is celebrating the arrival of Azuma services on its Highland Chieftain route between Inverness and London King's Cross.
  77. [77]
    Our Trains - Caledonian Sleeper
    We operate five routes Northbound and Southbound six nights a week. Our Highlander route runs between London and Aberdeen, Inverness and Fort William.
  78. [78]
    Rebuilt '73/9s' take over all Caledonian Sleeper work - Rail Magazine
    Jul 5, 2016 · GBRf will use Class 73s on trains to and from Fort William and Aberdeen, while a Class 66/73 combination will be used on the Inverness train.
  79. [79]
    All ScotRail trains on Scotland's Railway now fully accessible
    Jun 12, 2020 · ScotRail has confirmed that all trains on Scotland's Railway are now fully accessible, following the withdrawal of its Class 68 loco-hauled services.<|control11|><|separator|>
  80. [80]
    ScotRail plans HST replacement - Modern Railways
    Sep 6, 2024 · ScotRail's Inter7City High Speed Train fleet is to be replaced with formal procurement due to start within weeks.Missing: details | Show results with:details
  81. [81]
    REALITY CHECK: The Highland Railway 'Jones Goods' 4-6-0
    Jan 24, 2025 · The first 4-6-0 steam locomotives in fleet service in Britain, the Highland Railway's 'Jones Goods' were years ahead of their time.
  82. [82]
    Highland Railway 'Jones Goods' 4-6-0 - Rapido Trains UK
    The result was a handsome 4-6-0 with 20in by 26in cylinders, 5ft 3 1/2in diameter driving wheels and a tractive effort of 24,362lbs. The HR board authorised ...<|separator|>
  83. [83]
    "Black Fives" in the Highlands - The Friends of the Far North Line
    The Stanier "Black Five" 4-6-0s were the most common type of locomotive on trains on the main lines of the Highlands during the last twenty-five years of steam ...
  84. [84]
    Realirty Check the BRCW Class 26 Bo-Bo diesels - Key Model World
    Nov 21, 2024 · In the early 1980s, Class 37s began to replace the '26s' and their more powerful Class 27 sisters on passenger duties on the Far North and West ...
  85. [85]
    The stars of 1975 – Part One | Steam Railway
    May 21, 2025 · All the main line diesels that hauled the excursion trains have been scrapped (with two exceptions – Class 47s Nos. 47596 and 47727), and most ...
  86. [86]
    BR Scottish Region 1980s short train formations - Key Model World
    Feb 22, 2025 · Many of the formations were short and could range from two to six or seven-coach trains, depending on the route and time of year.
  87. [87]
    Highland Mainline Community Rail Partnership Winter Newsletter
    Statistics. The ORR passenger numbers have just been released for 2020 and it makes a devastating read to see how the Pandemic and Lockdowns affected rail ...
  88. [88]
    [PDF] Scottish Transport Statistics 2024
    The number of passenger stations has increased from 340 in 2003-04 to 362 in. 2022-23. (Table 7.15). The local authorities which had the largest numbers of ...
  89. [89]
    [PDF] Annual Assessment of Network Rail April 2020 to March 2021 - ORR
    Apr 8, 2020 · 2.131 Passenger satisfaction, as measured by Transport Focus' National Rail Passenger Survey. (NRPS), is featured on Network Rail's ...
  90. [90]
    Park Authority's tourism economic impact report reflects emergence ...
    Oct 17, 2024 · Tourism is vital to the Cairngorms National Park, contributing an estimated £419 million to the local economy.Missing: Line | Show results with:Line
  91. [91]
    Meeting of the Parliament: 02/10/2025
    Oct 2, 2025 · For most of its 118 miles, it is still single track, and the trains that use it run on polluting diesel.
  92. [92]
    [PDF] Community rail in Scotland
    Highland Mainline CRP recognises that tourism is the key driver for their line and developed a heritage map and line guide focused on promoting the unique ...
  93. [93]
    Full article: Perceived Impacts of Tourism on Community Identity
    Sep 1, 2024 · In 2019, tourism supported 20,000 jobs in the Highlands, accounting for 18% of employment, almost double the European average of 10% (footnotes ...
  94. [94]
    Rail freight | The Royal Scottish Geographical Society
    Sep 6, 2024 · Ironically, there has been dis-investment in the Highland Main Line since then, with three crossing loops removed, creating even longer ...
  95. [95]
    [PDF] Appendix I: Recommendation Appraisal Summary Tables
    The Highland Main Line route between Inverness and Perth passes through or adjacent to the following significant designated heritage assets: • Two large ...
  96. [96]
    Dualling: The A9 or Highland Mainline? - RailFreight.com
    Sep 5, 2025 · A recent upgrade project, completed in 2019, cost a modest £57 million (65,7 million euros). More extensive upgrades remain only in the pages ...Missing: 2017-2019 | Show results with:2017-2019
  97. [97]
    Highland area has 'fewer people than Lapland' as depopulation ...
    Jun 18, 2025 · Parts of the Highlands are facing an “existential crisis” after they reported their lowest ever population levels with fewer people now found in ...
  98. [98]
    [PDF] Scotland CP7 Strategic Business Plan - Network Rail
    West Coast Main Line and East Coast Main Line. There's currently a combination of fleet restrictions and operational controls implemented and we'll continue ...
  99. [99]
    [PDF] Options Sifted In for Further Consideration through STPR2
    Rail Line (Existing) Upgrade: Highland Main Line (Perth-Inverness) to ... firths on the Far North Line and direct trains to Inverness or even Inverness ...
  100. [100]
    Should the Highland Mainline be electrified / redoubled?
    Jul 29, 2025 · In 2018/19 £57million was spent on loop extensions/improvements at Pitlochry & Aviemore. This was to accommodate an hourly service with ...
  101. [101]
    [PDF] Scotland's Railway Delivery Plan - Network Rail
    In our planning, we prioritised delivering the Scottish Ministers' requirement for 92.5% of trains to reach their destination within five minutes of their ...
  102. [102]
    Scottish decarbonisation deadline moves back a decade
    Dec 17, 2024 · The refreshed plan will show a staged approach to creating a decarbonised rail system by 2045 and increasing from the current 75% of rail ...
  103. [103]
    [PDF] Rail Services Decarbonisation Action Plan - Transport Scotland
    Comparing the previous diesel units (class 170) against the new electric rolling stock (class 385), there has been a reduction of CO2 emissions of 9,972 tonnes.
  104. [104]
    A journey to Net Zero on Scotland's Railway - ScotRail
    As a public entity of the Scottish Government, ScotRail is bound to the Government's legally binding target of achieving carbon net zero by 2045.<|separator|>
  105. [105]
    MSPs call for Highland Main Line enhancement alongside £3.7b
    Oct 16, 2025 · The Scottish Government is dualling the parallel A9 road in stages, at a total estimated cost of £3.7bn. Green MSP Ariane Burgess, who initiated ...
  106. [106]
    "It would be a game changer": calls for Highland Main Line ...
    Oct 15, 2025 · MSPs call for improvements to be made to the Highland Main Line, but ministers have said action will have to wait.
  107. [107]
    A look inside the decarbonisation and sustainability strategy for ...
    Apr 20, 2023 · The Scottish Government's decarbonisation strategy aims to reduce car kilometres by 20% by 2030, promoting modal shift from road to rail.Missing: savings | Show results with:savings
  108. [108]