Hulett

The Hulett ore unloader is a massive, steam- or electrically powered machine designed for rapidly unloading from lake freighters on the of . Invented in 1898 by Cleveland engineer George H. Hulett, it featured a 100-foot-tall structure weighing approximately 800 tons, equipped with a clamshell bucket capable of scooping up to 17 tons of ore per lift. Widely adopted in ports such as , , and , the Hulett unloader transformed the iron ore handling process by reducing unloading times from days to just 5–10 hours and cutting costs to as low as 5 cents per ton, compared to previous manual methods that required hundreds of laborers. This efficiency boost was pivotal for the steel industry, enabling faster vessel turnarounds and supporting the economic growth of Midwestern steel production hubs during the early . The machines operated by straddling a ship's hold, using a traveling trolley and hoist to position the bucket precisely, and were tailored for bulk carriers on the . Over 75 Huletts were built between 1898 and the 1930s, primarily by the Wellman-Seaver-Morgan Company, but their use declined post-World War II due to the rise of self-unloading vessels and shifts in ore transportation. The last operational Huletts in ceased service in the early 1990s, and by 2024, the remaining four on Whiskey Island—designated as historic landmarks—were dismantled and sold for scrap amid failed preservation efforts.

Invention and Development

Origins and Patent

George H. Hulett, born on September 26, 1846, in , to Erastus and Amanda Norton Hulett, developed an early interest in after his family relocated to when he was twelve years old. After graduating from the Humiston Institute in 1864, Hulett worked for over two decades in general machine manufacturing and , gaining expertise in mechanical systems that later informed his inventions. His motivation for creating the ore unloader stemmed from firsthand observations of the labor-intensive and time-consuming process of manually unloading from freighters, which relied on crews using shovels, hoists, and buckets—a method prone to delays, especially with frozen cargo. In the late , the experienced a shipping boom fueled by surging demand for to supply burgeoning mills in cities like and , with shipments reaching over 5 million gross tons by 1888 alone. The opening of the Mesabi in 1892 further intensified this traffic, but traditional unloading techniques limited efficiency, often requiring 50 workers to handle just 3,000 tons in 24 hours under optimal conditions, or extending to several days when ore stuck in holds. Hulett conceived the unloader as a mechanical solution to accelerate this process from days to hours, reducing labor needs and turnaround times for vessels critical to the regional economy. Hulett secured a U.S. for his "Ore Unloader" in 1898 while employed by the Webster, Camp & Lane Company in , detailing innovative claims for a large-capacity and a walking beam mechanism to maneuver it efficiently over ship holds and rail cars. The included diagrams illustrating the cantilevered arm and pivoting systems designed to penetrate deep into holds without excessive manual intervention. To bring the to fruition, Webster, Camp & Lane funded and constructed the first prototype at their own expense on the Conneaut Harbor docks, where it entered service in 1899 as a steam-powered model capable of unloading at 275 tons per hour. This initial implementation marked the transition from concept to practical steam-powered prototypes that would refine the design in subsequent years.

Early Prototypes and Improvements

The first Hulett ore unloader was constructed in 1899 at Conneaut Harbor, , by the Webster, Camp & Lane Company as a steam-powered equipped with a 10-ton grab capable of unloading at a rate of 275 tons per hour. Initial testing of this machine proved successful under a performance-based that withheld payment if it failed to meet expectations, validating its potential for commercial ore handling on the . Engineer Samuel T. Wellman collaborated with George H. Hulett to refine the prototype's design, introducing substantial enhancements that improved overall stability and operational smoothness, particularly in the walking beam and leg mechanisms essential for precise positioning and extraction. These modifications addressed early limitations in the steam-powered system, paving the way for more reliable machines; by the early , operational Hulett unloaders had reduced typical ship unloading times from a full week—previously required by manual labor crews—to about half a day for a standard 600-foot . A key advancement came with the transition from steam to electric power in subsequent models, which offered greater efficiency and control through DC motors integrated for hoisting, trolley movement, and bucket operations, typically rated between 75 and 300 horsepower depending on the function. This electrification, along with iterative bucket and structural tweaks, enabled the machines to achieve unloading rates exceeding 600 tons per hour in refined versions by the 1910s, solidifying their role in industrial ore processing.

Design and Components

Main Structure

The Hulett unloader's main structure was a towering, bridge-like framework designed to span the gap between docked ships and storage areas, providing a stable platform for efficient bulk on the . Constructed primarily from riveted girders, the formed parallel beams secured to front and rear legs, creating a rigid, cantilevered assembly that projected over the water and rearward toward storage troughs. This tower-like configuration, often reaching heights of approximately , ensured stability against the rolling motion of lake freighters while minimizing stress on the dock infrastructure. The base of the structure rested on heavy-duty carriages equipped with track wheels, allowing the entire machine to traverse parallel rails embedded along the dock's length. These rails, typically reinforced with 85-pound steel sections and supported by a superstructure on driven piles, extended up to 1,000 feet to service large carriers, enabling multiple Hulett units to operate side-by-side without interference. The base was mounted on a pivoting mechanism for precise alignment with varying ship positions, with the overall footprint measuring about 108 feet in length, 19 feet in width, and weighing between 550 and 800 tons depending on the model and era. This design was optimized for the relatively calm waters of the , lacking adaptations for significant tidal fluctuations found in ocean ports. Static support elements included a receiving positioned between the main girders to buffer incoming loads, as well as piles—often in double rows up to 40 feet long—anchoring the dock against the machines' substantial mass. The framework incorporated an upwardly projecting rigid tower at the rear for balance, with the forward extension designed to reach into ship holds. Later models incorporated systems for enhanced reliability, building on early designs. Overall, this architecture allowed for dense deployment of up to four units per dock, facilitating high-volume operations across facilities like those in and .

Key Mechanisms

The walking beam system in the Hulett ore unloader consists of a pivoting arm mounted on a trolley at the top of the tower structure, which lowers a clamshell grab into the ship's hold. This beam, pivoted off-center, is rocked by cables connected to a or, in later electric models, by motor-driven winches, enabling precise depth adjustment for the attached leg and bucket assembly. The system allows the bucket to reach varying depths within the hold, depending on ship design. The leg and bucket retrieval mechanism employs a single hollow leg extending from the walking beam, which carries the clamshell bucket and lifts it vertically using a network of steel cables and drums to simulate a controlled walking motion. This leg, often rotating on trunnions, carries the bucket at its lower end and minimizes ore spillage through gradual rotation and cable tensioning via drums at the beam's pivot. The bucket, a 10- to 17-ton capacity clamshell design, opens and closes via hydraulic rams in early versions or electric hoists in subsequent models, ensuring efficient scooping and secure transport back to the discharge point. Power transmission in the Hulett relies on electric motors—typically series or compound-wound units operating on 220-volt —driving winches, , and sheaves for all major motions, including beam tilting, leg hoisting, and operation. Control cables link master switches in the operator's to magnetic controllers and solenoids, allowing precise regulation of opening, closing, and retrieval speeds without excessive current draw. This electric setup, an evolution from the original hydraulic systems powered by accumulators and pumps, provided reliable for handling loads up to 17 tons per scoop. Safety features incorporate geared limit switches and cut-outs on each motion to prevent over-travel, derailments, or structural overload by gradually introducing and applying band brakes as endpoints are approached. Overload protections include , where motors convert to generators to dissipate excess energy during sudden stops, alongside emergency switches that halt operations if structural strain is detected. These mechanisms ensured operational stability across the unloader's components, reducing risks during high-capacity handling.

Operation

Unloading Process

The Hulett unloader begins the unloading process by positioning itself along the dockside rails that span multiple trackways, allowing the gantry structure to travel and align precisely over a ship's hatch; the tower then pivots to center the vertical leg above the pile in the hold. Once aligned, the 10-ton clamshell bucket, attached to the lower end of the vertical leg, lowers into the hold to scoop the . In the extraction cycle, the bucket closes to grab approximately 10 tons of ore, after which the walking beam mechanism lifts it clear of the hold while the operator-controlled carriage oscillates and traverses the leg to swing the load over the discharge point. The loaded bucket is then transported laterally by the machine's legs to a point above a , , or conveyor on the , where it opens to dump the ; this full cycle typically takes 1-2 minutes, enabling rates of up to 600 tons per hour per machine. For a complete ship unload, the process repeats across multiple hatches and passes, with the unloader repositioning as needed to access at varying depths in the hold, 10,000 to 20,000 tons in 5 to 10 hours depending on vessel size and cargo distribution. Later models with 17-ton buckets achieved up to 1,000 tons per hour, further enhancing workflow efficiency on the . The design includes adaptations for different hold shapes, such as an 18-foot bucket spread and telescopic adjustments to reach between hatches or navigate irregular ore piles, though the system was optimized for non-tidal ports like those on the where water levels remain stable.

Operator Role

The operation of each Hulett ore unloader required a dedicated of three men: the Hulett operator, the larryman, and an oiler, who coordinated from a glassed-in cab to manage the machine's precise movements during unloading. The lead operator, commonly known among Great Lakes workers as an "Ore Hog," occupied a small cab positioned in the vertical leg just above the massive 17-ton bucket, from which they controlled the bucket's digging into the ship's hold, elevation, swing, and dumping of ore onto waiting rail cars below. This role demanded constant vigilance to align the bucket accurately, compensating for the freighter's sway caused by lake conditions, and ensuring smooth cycles that could achieve rates of up to 1,000 tons per hour per machine. Supporting crew members assisted with positioning the tower along the , monitoring the transfer to cars, and performing routine checks on cables and electrical systems to maintain operational amid the harsh . Operators faced inherent workplace hazards, including potential falls from the elevated structure and exposure to dust, though the enclosed provided some protection from airborne particles. A strong sense of pride characterized the operator culture, with crews celebrating the Hulett's transformative impact on ore handling and competing for speed records, such as the 1940 achievement of unloading 13,856 tons from the freighter William A. Irvin in just 2 hours and 55 minutes using multiple machines.

Deployment and Usage

Locations and Numbers

Over 75 Hulett ore unloaders were constructed between 1898 and 1960, primarily by the Wellman-Seaver-Morgan Company in , . By 1913, approximately 54 units were in service across the . At their peak, around 77 machines operated simultaneously, supporting the trade essential to North American steel production. The vast majority of Huletts were deployed along the shores of , where non-tidal conditions and high-volume ore traffic from made them ideal. , , hosted the largest concentration with 14 units at its peak, facilitating rapid unloading at docks operated by major railroads and steel firms. Other key ports included , with eight Huletts by 1908, and , with six, where the first commercial prototype entered service in 1899. Smaller numbers appeared at ports like Lorain, , and . Installations extended to Lake Michigan at Indiana Harbor in Gary, Indiana, where U.S. Steel operated five to six units to supply its massive Gary Works mill. On Lake Superior, deployment was limited, with only two machines noted for unloading coal at unspecified docks near Duluth and Two Harbors, Minnesota, as the region's focus remained on loading outbound ore rather than unloading. Clusters were common at steel company facilities, including those of U.S. Steel and Bethlehem Steel, whose Lackawanna plant in New York featured four Huletts until the 1980s. Beyond standard ore handling, one Hulett was adapted for non-ore use in during the to unload garbage from scows at waterfront facilities. International adoption was minimal, with limited trials in proving unsuccessful due to the machines' design incompatibility with tidal fluctuations and varying water levels in ocean ports. Usage peaked from the through the , coinciding with the height of steel production, before self-unloading vessels began displacing them in the late 20th century.

Economic Impact

The introduction of the Hulett ore unloader dramatically reduced the cost of unloading on the , dropping from approximately 30–50 cents per ton under manual methods or 18 cents per ton with earlier mechanical hoists to less than 5 cents per ton by the early 1900s. This efficiency gain, achieved through mechanized direct transfer from ship to or , lowered overall expenses and enhanced the competitiveness of U.S. industry against rivals. By 1901, further refinements had stabilized costs at around 6 cents per ton, enabling manufacturers to pass savings to consumers and fuel industrial expansion. The Hulett's high throughput capacity transformed shipping operations, increasing unloading rates from about 1,000 tons per day with manual labor to 10,000–20,000 tons per ship in 4–5 hours using multiple machines. Early models achieved 275 tons per hour, while later versions with 17-ton buckets reached up to 1,000 tons per hour per unloader, allowing docks like the Pennsylvania Railway Ore Dock to process 3,000 tons per hour collectively. This capability supported the surge in transport, which averaged over 65 million tons annually from mines by the late 1920s, underpinning the era's peak commerce volumes. Beyond direct efficiencies, the Hulett accelerated the growth of mills in the Midwest by ensuring reliable, low-cost supply to hubs like , the continent's largest terminus, supporting the , which accounted for 78% of North American production. Labor requirements shifted dramatically, from crews of 50–100 manual workers per ship to just 3 operators per machine plus minimal cleanup staff, reducing workforce needs by over 90% and altering employment patterns in port cities. These changes influenced labor dynamics, as mechanization diminished demand for unskilled dockworkers while emphasizing skilled operators. Over the long term, the Hulett contributed to U.S. dominance in global output, sustaining high-volume flows that powered industrial leadership through the until post-World War II technological and economic shifts overseas eroded the advantage.

Decline and Legacy

Replacement Technologies

The Hulett ore unloader became obsolete primarily due to the development of self-unloading bulk carriers, which integrated internal conveyor-belt systems to discharge cargo directly from the vessel to dockside storage, eliminating the need for specialized dockside machinery like the Hulett. These ships, designed for efficiency on the , began emerging in significant numbers during the late 1960s and 1970s as vessel sizes increased following the completion of the Poe Lock in 1968, which accommodated larger freighters up to 1,000 feet in length. A seminal example is the MV Stewart J. Cort, the first 1,000-foot self-unloader, launched in 1971 and entering service in 1972 for ; its system used a series of belts and an elevator to unload at rates comparable to or exceeding Huletts, while reducing labor and dependencies. In parallel, dockside alternatives such as continuous ship unloaders with mechanical grabs or conveyor belts supplanted remaining Hulett operations where self-unloading vessels were not yet dominant. These modern unloaders, often electrically powered and computer-controlled, offered higher throughput—up to 10,000 tons per hour—and greater adaptability to varying ship sizes and cargo types, including the larger lakers common by the . Companies like have produced such systems, featuring enclosed grabs for reduced dust emissions and belt conveyors for seamless transfer to rail or storage, addressing limitations of the Hulett's fixed-bridge design that struggled with ships over 600 feet. By the , these technologies were widely adopted at key ports, further accelerating the Hulett's phase-out. The timeline of Hulett decline aligned closely with these innovations and broader industry shifts, with operational numbers dropping sharply after the 1960s as self-unloaders captured over 80% of ore traffic by the mid-1980s. The last active Huletts, four units at 's Bulk Terminal built in 1912, ceased operations in December 1992 after unloading the final cargo from the freighter LeMoyne, marking the end of nearly a century of service. The remaining disassembled units lingered in storage until June 2024, when the Port of Cleveland contracted their final scrapping to clear space for modern facilities. Contributing factors to included escalating costs for the aging, electrically intensive Huletts, which required frequent repairs on their massive 800-ton structures and posed risks in harsh lakeside conditions. Stricter environmental regulations, particularly on emissions from handling, favored enclosed self-unloading and conveyor systems over the open-bucket Huletts, which generated significant airborne particulates during operation. Additionally, a decline in shipments—down over 50% from peak levels by the —stemmed from rising foreign imports and the U.S. industry's shift toward scrap-based furnaces, reducing demand for pellets transported via the lakes.

Preservation Efforts

Efforts to preserve Hulett ore unloaders as historical artifacts have focused on landmark designations, partial salvages, and advocacy campaigns, though challenges related to size, cost, and urban redevelopment have limited successes. In 1997, the Pennsylvania Railway Ore Dock on Whiskey Island in , , which included four original Hulett unloaders built in 1912, was listed on the , recognizing their engineering significance in shipping. Despite this status, two of the machines were dismantled and scrapped in 2000 to facilitate port redevelopment, while the remaining two were disassembled and stored by the in hopes of future preservation. Surviving examples of Hulett components are limited to partial remnants displayed or stored at various sites. In , a grab and operator's booth from one of the eight Huletts that operated there until the early 1980s have been preserved as a static exhibit, representing approximately 18 feet of the original structure. These parts, relocated after the machines were scrapped, serve as educational displays highlighting the unloaders' role in regional handling. No complete Huletts remain intact, and other potential artifacts, such as those from , docks, were largely lost to scrapping by the 1990s. Advocacy for Hulett preservation has been led by organizations like the , which documented the machines' history and supported their designation as an Historic Mechanical Engineering Landmark in 1998. Local historical societies, including those in , have pushed for public exhibits and opposed demolitions, but full reconstructions have not materialized due to the machines' immense scale—each weighing around 800 tons—and high estimated costs of $10 million or more per unit. These efforts emphasize educational value over operational revival, citing prohibitive and funding barriers. Recent developments underscore ongoing struggles and innovative alternatives. In 2024, the Port of contracted for the removal and recycling of the last two disassembled Whiskey Island Huletts after 24 years of storage, sparking renewed calls from preservationists for stronger protections against industrial scrap. While most parts were scrapped, select components like a 60-foot bucket arm and were retained for potential display at sites such as Wendy Park. By May 2025, the issued a request for qualifications for an art project to commemorate the Huletts' legacy at the Port of , suggesting virtual models, interpretive exhibits, or scaled installations in maritime museums as feasible preservation strategies.

References

  1. [1]
    HULETT ORE UNLOADERS | Encyclopedia of Cleveland History
    Hulett ore unloaders were 100-foot, 800-ton machines invented in 1898 to quickly unload lake ore carriers, capable of shoveling up to 17 tons of material.
  2. [2]
    HULETT, GEORGE H. | Encyclopedia of Cleveland History
    George H. Hulett was an inventor of ore-unloading machinery, including the Hulett car dumper and unloader, which significantly increased efficiency.
  3. [3]
    Hulett Unloader - Ashtabula Downtown Development Association
    Unloading with Huletts cost only 5¢/ton. Unloading only took 5–10 hours, as opposed to days for previous methods. Lake boats changed to accommodate the Hulett ...<|control11|><|separator|>
  4. [4]
    The Huletts | Cleveland Historical
    The Hulett Ore-Unloader, invented by George Hulett, was vital for processing iron ore into steel, and helped Cleveland become a major steel producer.
  5. [5]
    It's the end for Cleveland's historic Hulett Ore Unloaders
    Feb 6, 2024 · After a decades-long effort to save Cleveland's massive Hulett Ore Unloaders, which have sat unused on Whiskey Island since the 90s, they are being dismantled ...
  6. [6]
    NIHF Inductee George Hulett Invented Automatic Loading Systems
    Hulett was born in the Lake Erie port city of Conneaut, Ohio. After completing his schooling at age 18, he spent over twenty-five years in the general ...Missing: engineer background
  7. [7]
    The Nearly Forgotten Legacy of the George Hulett Unloaders
    Dec 1, 2021 · Hulett, working for Webster, Camp and Lane in Akron, came up with a patent for the unloader, and had them build one on the lakefront in his ...Missing: engineer background
  8. [8]
    History of the Iron Ore Trade - The Cleveland Memory Project
    It was not until 1888 that iron ore became the leading article of freight on the Great Lakes. During that year, 5,063,877 gross tons were moved. The growth in ...Missing: boom | Show results with:boom
  9. [9]
    [PDF] The Hulett Ore Unloader - Duluth Seaway Port Authority
    A quick and efficient method of unloading the bulk freighters at Lower Lakes ports eluded the industry until a Clevelander by the name of George Hulett.Missing: 599940 details
  10. [10]
    Hulett Unloader - History's Forgotten Machines
    Mar 3, 2020 · The Hulett Ore Unloader—an ugly, ungainly contraption—revolutionized iron ore shipment in the 20th century. Then it disappeared.
  11. [11]
    Harboring Huletts
    George Hulett was born on September 26, 1846 in Conneaut, Ohio. His family moved to Cleveland when he was twelve years old, and he graduated from the Humiston ...Missing: background | Show results with:background
  12. [12]
    Hulett Ore Unloaders - ASME
    The first, steam-powered, with a 10-ton-capacity grab bucket, went into service at Conneaut, Ohio, in 1899. It could unload an ore boat at the rate of 275 ...
  13. [13]
    None
    ### Summary of Hulett Iron-Ore Unloaders
  14. [14]
    US652313A - Apparatus for handling ore. - Google Patents
    Be it known that I; GEORGE H. HULETT, of Akron, in the county of Summit and State of Ohio, have invented certain new and useful Improvements in Apparatus ...Missing: 599940 | Show results with:599940
  15. [15]
    [PDF] The Pennsylvania Railway Ore Dock -mI,..,18 - On Lake Erie at ... - Loc
    The Hulett unloader, invented and developed by. Clevelander George H. Hulett during the 1890s, revolutionized the handling of iron ore by reducing labor ...
  16. [16]
    The Hulett Automatic Ore Unloaders Online
    These ponderous machines, whose primary object is to enable rapid and cheap unloading of large ore steamers, are operated in all their motions by electric ...
  17. [17]
    The History of William A. Irvin –The Flagship of Canal Park
    On August 27, 1940 the William A. Irvin set a record by unloading 13,856 tons of ore in 2 hours and 55 minutes by using Hulett Unloaders. That record still ...
  18. [18]
    Hulett - Abandoned Automatic Ore Unloaders of the Great Lakes of ...
    Jul 20, 2017 · Patented in 1898, the first of his machines was built the following year in 1890 at Conneaut Harbor in Conneaut, Ohio. It was the Webster, Camp ...
  19. [19]
    The Giant Hulett - The Historical Marker Database
    Remember this giant is only "18 feet" of the original machine!! In 1898, George H. Hulett patented his first machine for unloading iron ore from lake freighters ...
  20. [20]
    [PDF] 933-2966 Hulett I sheet - OGR Forum
    Arizona copper mine where one was used to load tailings, and New York City, where a single machine unloaded garbage scows. Many were also installed directly ...
  21. [21]
    [PDF] Why the Hulett Unloader Is One of History's ... - Vince Guerrieri
    Patent No. 652,313A. 2/10. Page 3. Hulett's original patent, "APPARATUS FOR HANDLING ORE," filed November 28, 1899. USPTO/Public Domain. Hulett, a 2006 inductee ...
  22. [22]
    Business: Lake Opening | TIME
    In 1929 the U. S. Bureau of Mines estimated that if ore continued to move out of the Lake Superior region at the rate of 65,204,600 tons a year, all the high- ...
  23. [23]
    M/V Stewart J. Cort - Interlake Steamship
    M/V Stewart J. Cort was the first 1000-foot vessel on the Great Lakes when she entered service for Bethlehem Steel Corporation in 1972.Missing: 1971 replacement
  24. [24]
    Neuero – Grain for the world - Siemens Global
    The "Multiport M600" ship unloader can reach up to 30 meters in height, depending on the respective type, and features a corresponding boom for unloading with ...
  25. [25]
    Update on Hulett Removal Project - Port of Cleveland
    Apr 15, 2024 · The Port has entered into a new contract with Northern Ohio Scrap Service that will allow the port to continue to salvage two of the Huletts most historically ...Missing: dismantlement June
  26. [26]
    Historians Fight to Save Cleveland's Ore Unloaders | Kristin Ohlson
    After the Hulett automated this work, the cost of unloading ore dropped to 6 cents a tone, from 19 cents. More than 80 of the machines were built and most were ...<|separator|>
  27. [27]
    Iron And Steel Plant Open Source Fugitive Emission Control ...
    However, as a requirement of the Bubble Policy, it must be demonstrated that no net gain in emissions occurs from an imaginary bubble surrounding the plant. In ...
  28. [28]
    Shipping on the Great Lakes and St. Lawrence Seaway: An Update
    May 9, 2023 · In 2020, iron ore accounted for 42% of tonnage shipped on the lakes. However, as Figure 2 indicates, total U.S. shipping volumes have continued ...
  29. [29]
    2 dismantled Hulett ore unloaders on Whiskey Island - Cleveland.com
    May 20, 2013 · The two remaining Hulett ore unloaders on Whiskey Island and the plans to restore them? Nothing. The pieces sit where they have been for 13 years.
  30. [30]
    Cleveland Huletts Still Standing Tall - The Cleveland Memory Project
    The Hulett unloaders have been selected for designation as a Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers.Missing: Duluth | Show results with:Duluth
  31. [31]
    Port of Cleveland Seeks Contractor for Hulett Ore Unloaders
    Port of Cleveland seeks contractor to remove, recycle, dismantled historic Hulett ore unloaders. Updated: Jan. 26, 2024, 5:11 p.m.; | Published: ...Missing: June | Show results with:June
  32. [32]
    [PDF] Huletts (Mitigation) History Art Project Request for Qualifications ...
    May 30, 2025 · This art project seeks to honor the historic contributions of the Hulett Ore Unloaders to the. Port of Cleveland and their vital role in shaping ...