Interstate 696


Interstate 696 (I-696) is a 28.2-mile-long (45.4 km) east–west auxiliary Interstate Highway that serves as a loop route in the northern suburbs of Detroit, Michigan.
Designated as the Walter P. Reuther Freeway, it functions as a northern bypass of downtown Detroit, connecting the junction of Interstate 96 and Interstate 275 near Novi on the west to Interstate 96 near Warren on the east, while interchanging with major radials such as Interstate 75 and M-10 (Lodge Freeway).
The highway, which is maintained by the Michigan Department of Transportation, features eight lanes for much of its length and handles significant commuter traffic volumes exceeding 100,000 vehicles per day in sections.
Construction on I-696 began in 1961 with the first segments opening in the mid-1960s, but full completion of the route did not occur until December 1989 due to delays in urban areas.
As of 2025, the corridor is undergoing a $250 million reconstruction project known as "Restore the Reuther," which includes full pavement replacement, bridge repairs on over 60 structures, and lane closures to facilitate the work, aimed at improving safety and longevity for the aging infrastructure.

Route Description

Path and Major Interchanges

Interstate 696 extends 28 miles (45 km) eastward as a limited-access freeway from its western terminus at the complex partial interchange with I-96, I-275, and M-5—known locally as the "Spaghetti Bowl"—straddling the Novi–Farmington Hills line in Oakland County. This starting point facilitates connections to northwestern suburbs and beyond via I-96 toward Lansing and I-275 southward around Detroit's western flank. The route then arcs gently southeastward, bypassing Detroit approximately 10 miles (16 km) to the north while linking radial arterials that radiate into the urban core. Progressing through affluent northern suburbs such as Farmington Hills, Southfield, Oak Park, Royal Oak, and Madison Heights, I-696 maintains a predominantly eight-lane configuration from M-5 eastward to the M-10 interchange, narrowing to six lanes between M-10 (Lodge Freeway) and Greenfield Road before expanding again to eight lanes through Warren and into Macomb County. Key interchanges along this segment include the full cloverleaf with US-24 (Telegraph Road) in Farmington Hills and the directional ramps to M-10 in Southfield, enabling access to via the latter's southward extension. The freeway avoids entry into Wayne County entirely, channeling traffic through contiguous Oakland County municipalities. Further east, a symmetrical with I-75 ( Freeway) near the Ferndale–Madison Heights boundary provides critical linkage to northern industrial corridors and points east toward Flint, while partial interchanges with M-53 ( Freeway) in Warren support local suburban distribution. The eastern terminus occurs at a turbine-style interchange with I-94 in St. Clair Shores, integrating with the lakefront corridor and allowing seamless continuation toward Port Huron without traversing Detroit's eastern neighborhoods. This alignment underscores I-696's function in distributing circumferential flows among spokes like I-275, M-10, I-75, and I-94, reducing radial congestion into the city center.

History

Planning and Legislative Framework (1950s-1960s)

Planning for Interstate 696 (I-696) emerged in the 1950s as part of Michigan's response to post-World War II suburban population growth and increasing traffic congestion on legacy routes such as U.S. Highway 16 (Grand River Avenue), which paralleled the proposed corridor through Detroit's northern suburbs. The Michigan State Highway Department incorporated the route into its master plans to create an east-west bypass around central Detroit, connecting existing radials like the proposed I-96 westward and I-75 eastward, thereby facilitating commuter access to emerging suburban industrial and residential areas in Oakland and Macomb counties. The route was designated as part of the original plans approved between 1955 and 1958, initially proposed by state officials as I-98 before federal authorities assigned the I-696 numbering to reflect its auxiliary status to I-96. Federal authorization came via the , which allocated funding for approximately 41,000 miles of interstate highways nationwide, including Michigan's urban loops and bypasses like I-696 to support national defense and . This legislation provided 90% federal financing for approved routes, contingent on state submission of detailed alignments, though local municipalities retained veto power over designs until mid-decade reforms. Prior to 1967, community approval processes sparked debates in affected suburbs such as Oak Park and , where residents contested alignments due to concerns over property acquisition, noise, and disruption to established neighborhoods, delaying route finalization despite economic imperatives for improved freight and passenger transport. These disputes prompted the to enact Act 12 of 1967 (Extra Session), establishing an framework for interstate highway routing conflicts; the statute empowered a state-appointed panel to mediate between municipal objections and departmental plans, overriding local vetoes when necessary to advance projects vital for regional growth. This shift prioritized statewide infrastructure needs over fragmented local opposition, directly addressing impasse in I-696's central segments.

Initial Construction Phases (1961-1963 and 1970s)

Construction of the western segment of Interstate 696 began in 1961, starting at the interchange with (I-96) near Novi and extending eastward through Oakland County toward the existing Lodge Freeway (M-10). The initial 4.5-mile (7.2 km) portion, from I-96 between Novi and Farmington to Orchard Lake Road, opened to traffic on July 29, 1963, marking the first operational section of the highway. This early phase addressed the shift from rural landscapes in western Oakland County to expanding suburban zones, with the full western third—roughly 9 miles (14 km) to the M-10 interchange—completed by late 1963 or early 1964. Engineering followed federal Interstate standards, featuring controlled-access design, four divided lanes with concrete pavement, and grade-separated interchanges to accommodate Michigan's high reliance on personal vehicles for commuting and commerce. The eastern segment, spanning from the Chrysler Expressway (I-75) in Madison Heights to (I-94) in Roseville, underwent construction primarily during the in Macomb County. This approximately 8-mile (13 km) stretch integrated with established radial freeways like I-75, providing direct links to local roads such as Mound Road and Schoenherr Road for industrial access and residential suburbs. Progressive openings culminated in January 1979, when the segment fully activated, enhancing east-west connectivity across northern by bridging to I-94's regional network without disrupting ongoing urban development patterns. Like the western portion, it utilized surfacing and full barriers to handle projected freight and passenger volumes in an auto-manufacturing hub.

Central Segment Controversies and Delays (1960s-1970s)

The proposed routing of Interstate 696's central segment through the affluent northern suburbs of encountered fierce local opposition starting in the mid-1960s, centered on fears of seizures, increased traffic noise, and fragmentation of cohesive residential neighborhoods. Municipalities including Lathrup Village, Pleasant Ridge, Oak Park, and Ferndale viewed the freeway's path—requiring the demolition of hundreds of homes and businesses along corridors like 10 Mile Road—as a threat to their small-town character and property values, leading to protracted refusals to approve designs and condemnation proceedings that halted progress for years. This resistance aligned with national "highway revolts," where suburban communities prioritized preserving existing land uses over accommodating regional traffic demands, though empirical data from similar projects elsewhere indicated freeways often boosted long-term economic connectivity despite short-term disruptions. Prior to 1967, law mandated local governmental approval for locations and designs traversing municipalities, empowering cities to state proposals and exacerbating delays for I-696 amid competing local interests. The impasse prompted the to enact Act 12 of the Extra Session of 1967 on January 16, 1968, which created a location arbitration board to resolve interstate routing disputes impartially, enabling the state to override municipal blocks after binding . This mechanism directly addressed the I-696 stalemate by prioritizing interstate system completion under federal mandates while incorporating limited concessions like noise barriers or elevated sections, though it faced immediate legal challenges from affected communities asserting violations of authority. Pleasant Ridge and Lathrup Village contested the arbitration statute's constitutionality, filing suits that reached the , which upheld Act 12 in City of Pleasant Ridge v. Governor (382 Mich. 225, 1969), affirming the state's overriding interest in efficient interstate construction amid prior litigation-induced delays. Lathrup Village, in particular, pursued additional lawsuits alongside Pleasant Ridge and the Detroit Zoological Society to enjoin construction outright, citing irreparable harm to local amenities, but withdrew opposition after arbitration awards incorporated some mitigations. These proceedings, coupled with fragmented property acquisitions, deferred groundbreaking on the core suburban stretch until the early 1970s, extending overall project timelines by more than a decade from initial planning and underscoring causal trade-offs: local veto power preserved short-term community preferences but impeded broader mobility gains for commerce and daily commuters across .

Completion and Full Operation (1979)

The eastern segment of Interstate 696 from the Walter P. Chrysler Freeway (I-75) to the Freeway (I-94) opened to traffic on January 4, 1979, marking the completion of approximately 8 miles in Macomb County. This section featured six lanes with interchanges at M-53 (Van Dyke Expressway) and other local roads, designed to standards set by the for the Interstate System, including full control of access and grade-separated crossings. The opening integrated the route with existing east-west corridors, enabling direct freeway travel between eastern suburban areas and points east along I-94 without reliance on surface streets through Warren and Roseville. Initial operations established a posted of 55 miles per hour, consistent with national Interstate standards following the 1974 Emergency Highway Energy Conservation Act. The segment's linkage to I-75 provided immediate connectivity for north-south traffic flows, diverting some volume from parallel arterials like 11 Mile and 12 Mile roads, though the unbuilt central portion between Lahser Road and I-75 limited end-to-end continuity from the western segments opened in 1963. This partial linkage supported early freight movements in the auto-dependent region, connecting assembly plants and suppliers in Macomb County to broader distribution networks via I-94. Post-opening traffic patterns reflected relief for local commuters in the northern suburbs, as the new alignment offered a higher-capacity bypass around Detroit's urban core congestion points, such as the mixing bowl at I-75/I-94. While comprehensive annual average daily traffic (AADT) data for 1979 remains sparse, the route's design accommodated projected volumes exceeding 50,000 vehicles per day based on contemporaneous planning estimates for suburban Interstate spurs. The integration set foundational patterns for regional logistics, particularly in the automotive supply chain, by streamlining east-west hauls between Oakland and Macomb counties' industrial zones.

Naming and Legacy

Dedication to Walter P. Reuther

Interstate 696 was designated the Walter P. Reuther Freeway by the in 1971, a posthumous honor for Walter Philip Reuther, who served as president of the (UAW) from 1946 until his death. Reuther and his wife, May, perished on May 9, 1970, in a private plane crash near Pellston, , while en route to the UAW's Black Lake retreat center; the accident also claimed the lives of the pilot, an architect, and an associate. Under Reuther's leadership, the UAW grew into one of the nation's most influential unions, negotiating landmark contracts with Detroit's automakers that established pattern bargaining, cost-of-living adjustments, and supplemental unemployment benefits, directly bolstering 's auto-dependent economy. The naming reflected Reuther's pivotal role in advancing autoworkers' rights amid the industry's post-World War II expansion, linking the freeway—designed as an east-west bypass through Oakland and Macomb counties—to the labor forces it facilitated by easing suburban and freight movement for vehicle production and sales. This symbolic gesture underscored Interstate 696's embeddedness in southeastern 's industrial identity, where gains intertwined with automotive to drive regional growth, even as the highway prioritized private vehicle mobility central to the sector Reuther represented. The designation, later codified in the Michigan Memorial Highway Act of 2001, imposed no alterations to the roadway's , signage beyond honorary markers, or operational priorities. It endures as a marker of how labor advocacy shaped—and was shaped by—the auto heartland's reliance on expansive road networks for economic vitality.

Reconstruction Efforts

Restore the Reuther Project (2010s-2020s)

The Restore the Reuther Project, initiated by the in 2019, comprises a multi-phase effort to reconstruct Interstate 696's pavement, repair and replace bridges, upgrade drainage systems, and enhance safety features across its 17-mile span. The initiative addresses infrastructure deterioration from decades of heavy use, including pavement original to the 1970s and over 60 bridges requiring intervention to prevent recurrent closures and extend the freeway's operational lifespan. These upgrades prioritize comprehensive rehabilitation to reduce long-term maintenance needs, given average daily traffic volumes ranging from 107,000 to 143,000 vehicles in the central corridor. The project's culminating phase commenced on March 1, 2025, with the full closure of eastbound I-696 from M-10 (Lodge Freeway) to I-75 through fall 2026 for pavement rebuilding, bridge work, and drainage enhancements between Lahser Road and I-75. Traffic is detoured via southbound M-10 to eastbound M-8 (Davison Freeway) to northbound I-75, with westbound lanes maintained initially to mitigate regional congestion. Westbound reconstruction shifts to this segment in 2026, followed by major roadway rebuilding, bridge repairs, and drainage improvements between I-75 and Dequindre Road in 2027. Estimated at $275 million, the endeavor justifies extended disruptions through one-time, intensive interventions that avert piecemeal repairs amid sustained high-volume usage. Completion is targeted for fall 2027, restoring full capacity and incorporating modern engineering to bolster resilience against wear.

Interchanges and Connections

Exit List

miExitDestinationsNotes
0.00I-96 west / I-275 southWestern terminus at in Farmington Hills.
~11M-5 north (Farmington Road) – NoviPartial cloverleaf; provides access to I-96 east and I-275 north via M-5 south. Two-lane exit ramps.
~55Orchard Lake Road – Farmington serving local traffic.
~77American DriveEastbound exit and westbound entrance only; local service road access via Franklin Road.
~88Lahser Road – Southfield; key access point for Southfield area, affected by recent closures.
~1010M-10 north ( Freeway/Northwestern Highway) – US-24 (Telegraph Road) / Lahser RoadDirectional interchange with flyover ramps to M-10 north; partial access to Lahser Road.
~1111Evergreen Road – SouthfieldAccess within trenched freeway section near 11 Mile Road.
~1212Southfield Road / 11 Mile RoadPartial cloverleaf serving Southfield and local connections.
~1313Greenfield Road – Oak ParkMarks shift to eight lanes eastward; .
~1414Coolidge Road / 10 Mile Road – Oak ParkPartial cloverleaf .
~1818I-75 ( Freeway) – Detroit / FlintSymmetrical paralleling 10 Mile Road in Ferndale; major junction with full access.
~2323Mound Road – WarrenFour-level interchange for local industrial access.
~2727M-3 (Gratiot Avenue) – RosevilleEight-lane section access; .
28.372811 Mile Road / I-94 east ( Freeway) – Port HuronEastern terminus at unnumbered T-interchange with I-94; partial access.
Mile markers are approximate based on the total length of 28.37 miles maintained by MDOT; exact positions derived from interchange descriptions. Ramp configurations vary, with major junctions featuring flyovers or partial cloverleaves for high-volume traffic. Current reconstruction under the Restore the Reuther project may alter temporary access. Interstate 696 interfaces with primary Interstate highways and state trunklines that enable circumferential travel around the Detroit urban core. At its western terminus near Novi, I-696 connects to I-96, I-275, and M-5 in a multi-level interchange known as the "Spaghetti Bowl," facilitating westward extension via the M-5 Haggerty Connector to Pontiac and integration with I-96's broader east-west path across southern Michigan. Eastward, it interchanges with M-10 (John C. Lodge Freeway) in Southfield, providing radial access southward to downtown Detroit, and crosses I-75 (Chrysler Freeway) in Madison Heights, the region's principal north-south spine linking suburbs to northern Michigan. At its eastern end in St. Clair Shores, I-696 meets I-94, allowing seamless continuation along the east-west corridor toward Port Huron and points east. Secondary connections include US 24 (Telegraph Road), which offers local north-south access paralleling I-696 for suburban distribution, and M-8 (Davison Freeway), utilized for detours and linking to eastern radials like M-10 and I-75. These linkages position I-696 as the northern arc of a beltway system, complementing the southern traversal of I-94 through proper and distributing traffic away from the city's radial bottlenecks.

Impact and Significance

Economic and Traffic Benefits

Interstate 696 serves as a vital around Detroit's core, accommodating an annual daily volume exceeding 200,000 vehicles at key interchanges such as I-75, thereby alleviating congestion on parallel local routes like 8 Mile Road. This high utilization reflects its role in facilitating efficient east-west mobility across Oakland and Macomb counties, where commuters from western suburbs like Farmington Hills access eastern destinations without navigating downtown bottlenecks. By design, the freeway shortens typical trips between northern Oakland County and Macomb County by 20-30% relative to surface street alternatives, as evidenced by detour analyses showing direct freeway travel times of 17 minutes versus 33 minutes on arterials during comparable conditions. The corridor's completion in 1979 directly supported post-recession suburban economic expansion by linking residential areas to employment centers in and Sterling Heights, home to automotive research facilities and assembly operations for firms including and (now ). This enhanced accessibility enabled just-in-time logistics for auto suppliers, reducing delivery times and inventory costs critical to 's manufacturing sector, which relies on rapid parts movement to assembly plants. In turn, I-696's capacity promoted decentralized development, allowing workers to commute to suburban jobs amid Detroit's mid-20th-century urban decline, thereby sustaining regional commerce without overdependence on central city infrastructure. Traffic data from the Michigan underscores this, with sustained high volumes indicating ongoing contributions to labor mobility and goods transport in an economy historically anchored by the auto industry.

Criticisms and Challenges

The original construction of Interstate 696 in the 1960s and 1970s displaced significant residential and commercial properties in affected suburbs, including 124 homes and 9 businesses in Pleasant Ridge. These actions fragmented local communities, though documented opposition focused more on broader regional impacts than specific compensation undervaluation for I-696. The Restore the Reuther reconstruction project, spanning multiple phases since the , has imposed high financial burdens, with total costs estimated at $655 million. Phase three, involving full eastbound and partial westbound closures between Lahser Road and I-75 from March 2025 through 2026, has exacerbated commuter delays, with detours adding up to 10-15 miles for many Detroit-area drivers. Businesses along the corridor have cited accessibility issues leading to revenue declines during these disruptions. Environmental concerns include legacy contamination, such as the 2019 seepage of hexavalent chromium-laden onto the eastbound lanes near Madison Heights, prompting EPA involvement and temporary closures due to health risks. While highways like I-696 have been critiqued for facilitating sprawl and elevating regional emissions, traffic volume data post-opening demonstrate sustained for alleviation without evidence of fully eroding those gains.

References

  1. [1]
    Interstate 696 Michigan
    Jan 26, 2024 · Completion of the 28.2 mile long route took another ten years with an opening on December 14, 1989. Opening ceremonies were held by Michigan ...
  2. [2]
    Restore the Reuther project moves to next phase: Rebuilding I-696 ...
    Jan 14, 2025 · The rebuilding of I-696 and the repair of 60 bridges will ensure a safer roadway for drivers and pedestrians. Press Release MI Newswire ...
  3. [3]
    Interstate 696 - Wikipedia
    Like other state highways in Michigan, I-696 is maintained by the Michigan Department of Transportation (MDOT). In 2011, the department's traffic surveys ...
  4. [4]
    MDOT gives update on 2-year I-696 project 6 months after first ...
    Sep 6, 2025 · The eastbound lanes will be closed through next year. In a few months, drivers heading westbound on I-696 will be back on the westbound lanes. “ ...
  5. [5]
    Interstate 696 construction history - Facebook
    Jul 7, 2025 · The highway began in 1942 as the Detroit Industrial Expressway, built to move thousands of wartime workers to the Ford Motor Company's Willow ...History and Planning of Interstate 275 in MichiganCharacteristics of Interstate 696 in DetroitMore results from www.facebook.comMissing: length | Show results with:length
  6. [6]
    Here's what to know about the massive I-696 construction project ...
    Mar 3, 2025 · They're investing $250 million to redo both the eastbound and westbound lanes, as well as improving 60 bridges, including the large bridge near ...
  7. [7]
    AsphaltPlanet.ca > Michigan > Interstate 696
    The six lane cross-section of Interstate 696 through Southfield is atypical of the freeway. Most sections of I-696 were built to an eight lane cross-section.Missing: major counts
  8. [8]
    Highways 250 through 696 - Michigan Highways
    1970 (Apr 10) – A new 17.487-mile long freeway loop through Flint is established as a state trunkline highway and assigned the I-475 designation. 1973 (Nov 8, ...
  9. [9]
    Map: Detroit Master Plan Trafficways 1951 - DETROITography
    Jun 13, 2016 · The John C. Lodge Expressway, originally designated Interstate Business Spur 696, was completed as planned, connecting with the pre-existing ...
  10. [10]
    Interstate 696 | US Highways Wiki - Fandom
    I-696 is part of the original Interstate Highway System as outlined in 1956–58. As originally proposed by the Michigan State Highway Department, the freeway ...
  11. [11]
    National Interstate and Defense Highways Act (1956)
    Feb 8, 2022 · The 1956 Act authorized the construction of a 41,000-mile interstate highway system, with $25 billion authorized for 1957-1969.
  12. [12]
    [PDF] TITLE I—FEDERAL-AID HIGHWAY ACT OF 1956 - GovInfo
    The Federal-Aid Highway Act of 1956 authorizes appropriations for highway construction, amends the Internal Revenue Code, and is known as the "Federal-Aid  ...Missing: Michigan 696
  13. [13]
    City of Pleasant Ridge v. Governor :: 1969 :: Michigan ... - Justia Law
    ... highway I-696. The circuit court dismissed all 3 complaints with prejudice. Previous delays in carrying out the declaration of policy appearing in the ...
  14. [14]
    [PDF] arbitration of disputes involving interstate highway routes
    ARBITRATION OF DISPUTES INVOLVING INTERSTATE HIGHWAY ROUTES. Act 12 of 1967 (Ex. Sess.) AN ACT to provide for arbitration of disputes involving the ...
  15. [15]
    [PDF] community master plan - IIS Windows Server
    The I-696 project was not without opposition. Lathrup Village, Pleasant Ridge, and the Detroit. Zoo filed lawsuits in an attempt to stop construction of the.<|separator|>
  16. [16]
    [PDF] arbitration of disputes involving interstate highway routes
    History: 1967, Ex. Sess., Act 12, Imd. Eff. Jan. 16, 1968. The People of the State of Michigan enact: 252.151 Arbitration of interstate highway route ...
  17. [17]
    Interstate 696 - Gribblenation
    May 10, 2019 · By early 1979 I-696 opened between I-75 east to I-94. The remaining segment of I-696 would be opened to traffic in December of 1989 between US ...
  18. [18]
  19. [19]
    Reuther Dies in Jet Crash With Wife and 4 Others
    Walter P. Reuther, the president of the United Automobile Workers, and his wife, May, died last night in a plane crash in ...
  20. [20]
    Reuther, Walter | Detroit Historical Society
    Walter P. Reuther, the man who eventually became the firebrand leader of ... The Metro Detroit east-west highway Interstate 696 is also named in his honor.
  21. [21]
    Walter Reuther - AFL-CIO
    Before the new group could launch any initiatives, however, Reuther; his wife, May; and two others were killed in a private plane crash. Reuther left a ...
  22. [22]
    pa014201 - Michigan Legislature
    ... Freeway". Sec. 23. Highway I-696 in Oakland and Macomb counties shall be known as the "Walter P. Reuther Highway". Sec. 24. The highway interchange at highway ...
  23. [23]
    MDOT to close part of I-696 for two years - WDET 101.9 FM
    Feb 18, 2025 · The Michigan Department of Transportation plans to begin the final phase of its Restore the Reuther project on March 1, 2025.
  24. [24]
    Project Overview - Driving Oakland
    The I-696 project includes pavement reconstruction, bridge work, and safety improvements on I-696 from I-275/I-96/M-5 to Lahser Road, with median work in 2022 ...
  25. [25]
    Two-year reconstruction of I-696 progressing on schedule: MDOT
    May 29, 2025 · The eastbound lanes are on target to be reconstructed by the end of 2025, MDOT spokesperson Diane Cross said. Westbound traffic will then be ...
  26. [26]
    Eastbound I-696 from Lahser to I-75 closing for two years starting ...
    Jan 13, 2025 · MDOT's annual average daily traffic counts from 2023 showed between 107,000 and 143,000 used the interstate between the stretch that will now be ...Missing: volume | Show results with:volume
  27. [27]
    I-696 Restore the Reuther (Phase 2) - Driving Oakland
    MAINLINE I-696 CLOSURES. EB I-696, M-10 to I-75, CLOSED through fall 2026. Detour: SB M-10 to EB M-8 (Davison) to NB I-75. WB I-696, Dequindre to Southfield ...
  28. [28]
    I-696 M-10 to I-75 - City of Novi
    May 1, 2025 · I-696 will have major road work done between I-75 and Dequindre Road. Work includes rebuilding the roadway, bridge work and drainage structures.<|separator|>
  29. [29]
    Interstate Exits for I-696 Eastbound in Michigan | TravelCoupons.com
    EXIT 5. Orchard Lake Road. Farmington, MI ; EXIT 7. American Drive. Southfield, MI ; EXIT 11. Evergreen Road. Southfield, MI ; EXIT 13. Greenfield Road. Southfield ...Missing: list | Show results with:list
  30. [30]
    I-696 Exit List
    EXIT 11, Evergreen Rd. Evergreen Rd. EXIT 12, Southfield Rd. Southfield Rd. 11 Mile Rd. EXIT 13, Greenfield Rd. Greenfield Rd. EXIT 14. Coolidge Rd. 10 Mile Rd ...
  31. [31]
    Exits along I-696 in Michigan - Eastbound | iExit Interstate Exit Guide
    EXIT. 14. 10 Mile Road, Coolidge Road. Oak Park, Michigan. Fuel. Alternative Fuel. Food. Lodging. Parks. Attractions / Entertainment. Shopping. Automotive.
  32. [32]
    Michigan Department of Transportation
    Work progresses on the final phase of rebuilding I-696. Apr 10, 2025 Season 7 Episode 217. Michigan Department of Transportation ... MDOT's second flex route, ...Travel · Business · Projects and studies · Maps
  33. [33]
    I-696 Restore the Reuther update: Southbound US-24 (Telegraph ...
    Jul 15, 2024 · The southbound US-24 ramp to westbound M-10 remains open. The northbound US-24 ramp to westbound I-696 was previously closed as part of the ...
  34. [34]
    I-696 Location Alternatives - What Could Have Been - DetroitYES!
    Oct 19, 2014 · The suburban divided roadway on Grand River, as well as the ones on Woodward, Gratiot, Michigan, Fort, and Stephenson Highway all actually had ...
  35. [35]
    [PDF] Unclogging America's Arteries - American Highway Users Alliance
    Travel-time savings can be directly traced to savings in the costs of labor ... Interstate 696. I-696 at I-75 Interchange. 213,800. 1,847. Detroit. Wayne ...
  36. [36]
    I-696 closure detour: How to get around when busy freeway closes ...
    Feb 25, 2025 · FOX 2 took this detour on Monday around 5 p.m. to see how long the drive would be. It was 33 minutes, compared to 17 minutes when taking 696.
  37. [37]
    Interstate Closure Will Force Detroit Commuters Onto City Streets for ...
    Mar 4, 2025 · I-696 is the major east-west spur of I-96, serving Detroit's wealthy northern suburbs and industrial centers, including automotive manufacturing ...Missing: support logistics
  38. [38]
    Traffic Monitoring Program (TMP) - State of Michigan
    Average Annual Daily Traffic (AADT). AADT is the estimated mean daily traffic volume. For continuous count sites, it is calculated by summing the annual ...
  39. [39]
    Pleasant Ridge Celebrates 25th Birthday of I-696
    Jan 18, 2015 · In 1979, the east section of I-696 opened. It ended at Lahser, and then started again at I-75. The nine miles in between were not yet a part ...Missing: Interstate | Show results with:Interstate
  40. [40]
    Thread: Royal Oak before I-696 - DetroitYES!
    Oct 26, 2016 · When 696 was in it's earliest planning stages, they had bought out and razed homes along it's planned route followng 10 Mi Rd. east of Woodward, ...
  41. [41]
    Last phase of 'Restore the Reuther' project begins in 2025
    May 16, 2024 · The overall cost of all three phases of I-696 construction is $655 million, of which the third phase from Dequindre to Lahser roads costs an ...Missing: total | Show results with:total
  42. [42]
    I-696 closure in Michigan begins today: Map, what to know
    Mar 3, 2025 · The I-696 closure takes place between Lahser Road and I-75, affecting communities such as Royal Oak, Ferndale, Warren, Madison Heights and ...
  43. [43]
    I-696 project to mean detours for thousands as businesses weigh ...
    Mar 1, 2025 · Beginning on approximately March 1, eastbound traffic on Interstate 696 from Lahser to Dequindre will have a detour as part of the Restore the Reuther project.
  44. [44]
    EPA: Tests of green spill beside I-696 show serious pollution
    Dec 28, 2019 · Tests are back from a green geyser that sluiced out of a freeway wall on I-696 north of Detroit. Results? Toxic.
  45. [45]
    Green slime on I-696 is hexavalent chromium - Detroit Free Press
    Dec 23, 2019 · The green liquid likely was groundwater contaminated with highly toxic hexavalent chromium, also known as chromium-6.
  46. [46]
    I-696 Update: All eastbound and westbound lanes open between I ...
    Nov 27, 2024 · All lanes of eastbound and westbound I-696 have reopened to traffic between I-275 and Lahser Road, along with all on and off ramps.