Fact-checked by Grok 2 weeks ago

Interstate 96

Interstate 96 (I-96) is an east–west Interstate Highway spanning 192 miles (309 km) entirely within Michigan's Lower Peninsula. The route begins at an interchange with US 31 in Muskegon and extends eastward to terminate at I-75 in Detroit, traversing key urban centers such as Grand Rapids and the state capital, Lansing. Designated as Michigan's sole two-digit intrastate Interstate, I-96 largely supplanted the alignment of former US Highway 16 upon its completion in phases during the late 1950s and 1960s, facilitating regional connectivity for freight, commuters, and tourism across western and southeastern Michigan. Notable features include its integration with auxiliary routes like I-496 in Lansing and business loops in intermediate communities, alongside complex interchanges such as the Novi "Spaghetti Bowl" that underscore its role in the Detroit metropolitan area's dense highway network.

Route Description

Western Section: Norton Shores to Grand Rapids


Interstate 96 begins at a with US 31 in Norton Shores, Muskegon County, serving as the connection to Muskegon, Grand Haven, and Ludington. The initial exits include 1A for US 31 south toward Airline Road, 1B for US 31 north, and 1C for Hile Road, with milepost 0 at the western terminus. From there, I-96 angles southeast through rural Muskegon County, passing Fruitport at approximately mile 4 with an exit for Airline Road.
The freeway continues into Ottawa County, traversing agricultural areas and small communities. Key interchanges include exit 10 at 112th Avenue in Nunica Township and exits around mile 16 serving Coopersville from both sides. Further east near mile 24, an exit provides access to Marne. The route maintains a generally eastward trajectory, crossing into Kent County and the Grand River before reaching the Grand Rapids metropolitan area. Entering Township on the northwest side of Grand Rapids, I-96 intersects US 131 at a major interchange around mile 30, facilitating north-south travel to and . The highway then passes through suburban areas, providing access to local roads and reaching the junction with I-196 near mile 37 on the east side of Grand Rapids, where I-196 continues south toward while I-96 proceeds east. Throughout this section, the freeway serves as a primary east-west corridor, bypassing Grand Rapids to the north and connecting the shore to the inland urban center.

Central Section: Grand Rapids to Howell

From its interchange with I-196 and US 131 (exit 31) on the northeastern edge of Grand Rapids in Kent County, I-96 trends eastward through suburban and semi-rural terrain, paralleling the historic Grand River Avenue corridor. The freeway initially serves the Cascade Township area with exits for local roads such as Cascade Road (exit 40) before crossing into more open countryside. It interchanges with M-6 (exit 69), a state route connecting to the south, and M-37 (exit 72), providing access to Ada and further southern communities. Entering Ionia County, I-96 continues east-northeast, bypassing Lowell to the north via exit 81 for M-50 and serving agricultural lands with periodic rural interchanges. Near , Business Loop I-96 (BL I-96) diverges at exit 73 (Portland Road) and rejoins at exit 77 (Grand River Avenue), routing traffic through the community along the former US 16 alignment. The mainline remains a four-lane divided freeway throughout, designated as part of the National Highway System for its role in regional freight and commuter traffic. In Clinton County, the route shifts slightly southeast, interchanging with M-100 (exit 89) north of Grand Ledge, where BL I-96 for Lansing branches off to connect the state capital via the pre-freeway Grand River Avenue path, rejoining I-96 at exit 104 east of the city. Key junctions include the cloverleaf with I-69 (exit 97, formerly US 27), facilitating southward access to Lansing and southward extensions, and a partial interchange with I-496 (exit 102), the auxiliary route looping around Lansing's southern periphery. These interchanges handle significant volumes, with I-69 serving as a primary east-west corridor to . Crossing into Livingston County, I-96 straightens eastward through farmland and wooded areas north of Williamston (served by exit 122 for M-52), approaching the Howell vicinity. At exit 133, M-59 and BL I-96 diverge southeastward into Howell along Grand River Avenue, providing city center access before terminating at exit 141 near Lake Chemung. This segment, known locally as the Officer Mason Samborski Memorial Highway in portions near Howell, maintains consistent rural character with service-oriented exits emphasizing safety and capacity for through traffic.

Eastern Section: Howell to Detroit

Interstate 96 continues eastward from the vicinity of Howell through southern Livingston County, interchanging with its business loop (Exit 141) that serves the city of Howell directly. The freeway then approaches , with exits at Grand River Avenue (Exit 145) and Spencer Road (Exit 147), before meeting U.S. Highway 23 at Exit 153 in a that connects to Ann Arbor southward. Entering Oakland County, I-96 passes through rural and suburban terrain near South Lyon and transitions into more developed areas around Wixom and Novi. A major interchange occurs near Novi at the "Spaghetti Bowl," where I-96 meets Interstate 275 southward, the beginning of M-5 (Haggerty Connector) northward, and eastward in a complex handling high traffic volumes. East of this junction, the route traverses Farmington Hills and provides access to M-39 (Southfield Freeway) at Exit 185 near the Oakland-Wayne county line. In Wayne County, I-96 enters as the Jeffries Freeway, featuring a split into local and express lanes eastbound from Outer Drive to manage congestion. The freeway interchanges with M-8 (Davison Freeway) and others before reaching its eastern terminus at Interstate 75 (Fisher Freeway, Exit 48) in , near the .

Design and Engineering

Roadway Specifications and Capacity

Interstate 96 adheres to federal as a fully controlled-access, divided freeway with grade-separated interchanges and service roads in urban segments. Pavement primarily consists of , supplemented by in reconstructed or high-stress sections to enhance durability and ride quality, consistent with Michigan Department of Transportation (MDOT) design guidelines for rigid and flexible pavements. The posted speed limit is 70 miles per hour on rural and most suburban portions from Norton Shores westward to near Lansing, with reductions to 55-65 mph in denser urban areas like Detroit and during construction or variable conditions. Lane configurations vary to match traffic demands: typically two lanes per direction in the rural western section, expanding to three or more per direction through Grand Rapids, Lansing, and the eastern metropolitan corridor, where some segments support up to six lanes per direction or utilize dynamic shoulders for additional capacity. Capacity is managed through MDOT's Traffic Monitoring Program, which tracks average annual daily traffic (AADT) volumes ranging from lower figures in outlying areas to over 150,000 vehicles per day near , reflecting congestion pressures in the eastern third. To mitigate bottlenecks, features like the I-96 Flex Route in Oakland County—operational since 2025—employ part-time shoulder use, dynamic , and ramp metering to effectively add lanes during peak hours, boosting throughput without permanent widening.

Bridges, Interchanges, and Infrastructure Features

Interstate 96 incorporates numerous bridges spanning rivers, railroads, and local roadways across its 192-mile length in . The highway crosses the Grand River twice: near in County with a mid-20th-century curved structure typical of 's era highway designs, and further east in Eaton County where eastbound and westbound bridges over the Grand River and Billwood Highway are undergoing replacement as part of a $43 million project from February 2023 to September 2025 to enhance safety and extend service life. In Livingston County, two I-96 bridges over Grand River Avenue, constructed in 1962 and carrying 44,600 vehicles daily, are structurally deficient and slated for replacement within a $45 million interchange rebuild starting fall 2024. The westbound I-96 bridge over M-39 (Southfield Freeway) in Wayne County handles 45,000 vehicles per day and faces closure risk by 2035 absent additional funding, amid broader bridge deterioration affecting 180 structures. Interchanges along I-96 vary from simple to complex multi-level configurations, particularly in urban areas. The Novi "Spaghetti Bowl" connects I-96 to I-275, I-696, and M-5 (Grand River Avenue) in a braided network of ramps serving high-volume regional traffic. In Wayne County, the I-96/M-39 interchange features stacked ramps and is complicated by aging bridges integral to its structure. The I-96/Grand River Avenue interchange in Livingston County is being reconstructed as a (DDI) from 2024 to 2026 to reduce congestion and improve safety through signalized crossovers. Eastern terminals involve trumpet-style merges with I-75 and I-94 in , facilitating seamless transitions amid dense urban flow. Infrastructure enhancements on I-96 emphasize capacity and resilience. The Flex Route system in Oakland County, from Kent Lake Road to the I-275/I-696/M-5 interchange, employs dynamic shoulder lanes for intermittent use during peak periods, supplemented by ramp metering at eight locations to optimize and . Ongoing rebuilds incorporate upgraded , culverts, guardrails, and barriers to mitigate flooding and collision risks, as seen in Ionia County reconstructions. These features reflect MDOT's focus on adaptive designs amid growing average daily traffic exceeding 100,000 vehicles on metro segments.

Historical Development

Planning and Initial Designation (1950s)

Planning for what became Interstate 96 aligned with the establishment of the national Interstate Highway System under the Federal-Aid Highway Act of 1956, which authorized federal funding for approximately 41,000 miles of controlled-access highways to improve interstate commerce and national defense. In Michigan, the State Highway Department had initiated freeway development along key corridors prior to federal designation, including upgrades to US 16 (Grand River Avenue), with the Brighton–Farmington Expressway opening in 1957 as an early segment of the future I-96 route. The State Highway Department proposed I-96 as an east-west route extending from westward through Lansing to Grand Rapids, with a along US 16 to Muskegon initially considered for inclusion under the primary designation. This plan drew from alignments that repurposed earlier route proposals, such as a temporary I-94 designation for the Benton Harbor–Grand Rapids–Detroit corridor. By mid-1959, the Bureau of Public Roads approved Michigan's interstate configuration, assigning I-96 to the southern leg from I-94 near Benton Harbor through Grand Rapids to , while reclassifying the northern extension to Muskegon as I-196 to optimize numbering and connectivity. Initial I-96 route markers were erected in fall 1959 along existing US 16 freeway sections, including from southeast of to east of and from to Farmington, marking the formal of these state-built facilities into the interstate . This designation facilitated reimbursement for prior investments and prioritized full interstate-standard on the remaining undivided highway segments.

Primary Construction Phases (1960s-1970s)

The construction of Interstate 96 advanced rapidly in the 1960s, with multiple segments opening in western and to establish the core east-west corridor from Muskegon toward . On November 15–25, 1961, a 10-mile section from US-31 in Norton Shores to Nunica opened to traffic at a cost of $10 million, marking one of the initial freeway links in the Muskegon area. Earlier that year, on December 21, 1961, the 3.4-mile Bypass opened, incorporating a $2 million interchange with US-23 to improve regional connectivity southeast of the main route. These openings reflected Michigan's aggressive interstate build-out, supported by federal funding under the Interstate Highway Act, which prioritized high-capacity rural freeways to replace surface routes like US-16. A pivotal development occurred on October 21, 1963, when the American Association of Officials approved swapping designations between I-96 and its planned (later I-196), assigning I-96 to the primary Detroit-to-Muskegon alignment for better numbering consistency with the national system. This facilitated continued progress, culminating on December 12, 1962, with the opening of a 54.5-mile segment from Grand Ledge to Lake Chemung; this completion linked the freeway continuously from to Muskegon, prompting the decommissioning of overlapping US-16 and enhancing intercity travel efficiency across . By the mid-1960s, these phases had established over 60 miles of the route's backbone, emphasizing four-lane divided roadways with controlled access to accommodate growing truck and commuter traffic. In the 1970s, focus shifted to the challenging urban extension in , designated as the Jeffries Freeway, where construction proceeded in incremental stages amid funding constraints and litigation over route alignment through densely populated neighborhoods. The initial 1.3-mile portion from I-75 to I-94 opened on July 27, 1971, at a of $37 million, providing a critical link in the city's west side. This was followed by a 2.8-mile extension to Grand River Avenue on December 7, 1972 ($35.8 million), a 2.5-mile "dogleg" section on , 1974, and a 2-mile segment from Schaefer Highway to M-39 on November 9–17, 1976. Full completion of the Jeffries Freeway to I-275 occurred on November 21, 1977, integrating I-96 into Detroit's metropolitan network despite local opposition to further freeway expansion, which halted connections like the Davison Freeway extension. These urban phases, totaling about 10 miles, incorporated elevated structures and complex interchanges to navigate industrial and residential zones, though they displaced communities and faced criticism for prioritizing vehicular capacity over neighborhood preservation.

Expansions, Renamings, and Modifications (1980s-2000s)

In the 1980s, the (MDOT) decommissioned segments of business routes associated with I-96 to streamline maintenance and local control. On April 1, 1986, a 0.426-mile segment of Business Spur I-96 (BS I-96) in downtown Muskegon, following Sixth Street, Western Avenue, and Mart Street, was cancelled as a state trunkline and transferred to city jurisdiction. Earlier in 1984, BS I-96 route markers in Muskegon had been removed, though the underlying BUS US-31 concurrency persisted. A significant modification occurred on July 18, 1988, with the completion of a new US-27 freeway bypass between I-96 exits 89 and 91 northwest of Lansing and the US-27/US-127 junction south of DeWitt, establishing a concurrency between US-27 and I-96 west of Lansing to improve traffic flow and regional connectivity. This adjustment reflected ongoing efforts to integrate overlapping routes efficiently following primary construction. In 1991, completed the widening of Business Loop I-96 (BL I-96) in Lansing, enhancing capacity on the local alignment through the city. Further refinements to concurrencies took place in the 1990s. On October 15, 1992, the I-69/US-27 overlap along I-96 was shortened by approximately one mile, shifting from exit 98 to a new exit 97 interchange southwest of Lansing to optimize interchange spacing. On August 1, 1996, raised the to 70 mph on I-96 from Muskegon to west of Lansing, aligning with updated safety and efficiency standards for rural freeway sections. Into the early 2000s, signing adjustments clarified route designations. In 2001, US-27 markers were removed from the six-mile concurrent segment with I-96 west of Lansing, emphasizing I-96 as the primary identifier. On , 2007, the entire BS I-96 route in was transferred to city control, ending state maintenance though markers lingered until later removal. These changes prioritized operational simplicity over expansion, with limited mainline widening during the period; intersecting routes like the East Beltline (M-37/M-44) near Grand Rapids underwent reconstruction and widening in the 1980s to accommodate growing traffic at I-96 junctions.

Gateway Project and Mid-2000s Upgrades

The Ambassador Gateway Project, undertaken by the Michigan Department of Transportation (MDOT) in collaboration with the Detroit International Bridge Company, aimed to improve and access to the at the eastern end of I-96 in by reconstructing interchanges connecting I-96, I-75, and bridge approaches. Initiated in 2007, the $174 million initiative included 2.66 miles of freeway along I-75 from Clark Street to Boulevard, alongside upgrades to I-96 segments, the or of 18 ramps, and the addition of high-occupancy vehicle lanes. These enhancements addressed longstanding and safety issues at the urban freeway nexus, incorporating the state's first structure to separate local and through traffic. Construction phases involved temporary closures of major freeway segments, including I-96 and I-75, to facilitate ramp rebuilding and pavement replacement, with work projected to generate approximately 2,800 jobs through 2009. implemented strategies, such as routing and phased lane reopenings, to minimize disruptions during the multi-year effort. The also featured street lighting, traffic signal upgrades, and entrance/exit ramp modifications along both I-96 and I-75 corridors. Key milestones included the full opening of ramps from I-75 and I-96 directly to the plaza on September 20, 2012, marking substantial completion of the core interchange improvements and enabling more efficient cross-border freight and commuter movement. These mid-2000s upgrades, spanning 2007 to 2012, represented a targeted response to capacity constraints in Detroit's international gateway , prioritizing durability through resurfacing and geometric realignments over patching. No major cost overruns were reported in primary contractor accounts, though the phased approach extended beyond initial timelines due to urban coordination challenges.

Recent Projects and Maintenance

Reconstruction Initiatives (2010s-2023)

In 2015, the began a two-year reconstruction at the I-96/US-23 interchange in , , converting the existing I-96 mainline lanes to collector-distributor lanes to facilitate safer merging and reduce congestion on the high-volume corridor handling over 100,000 vehicles daily. The $50 million project included pavement rehabilitation, bridge preservation, and ramp enhancements, with major construction phases completed by November 2016, though minor work extended into 2017. Earlier in the decade, the Livingston County Road Commission advanced interchange improvements at Latson Road over I-96 in Howell Township, funded partly by a $4.7 million federal grant secured in , which added ramps and addressed capacity constraints for local traffic growth. In Kent County, undertook pavement reconstruction and bridge replacements along I-96 during the early , including the M-50 overpass replacement scheduled for 2014, aimed at extending the 50-year-old roadway's service life amid heavy freight and commuter use exceeding design capacities. These efforts, supported by federal stimulus funding from 2009, focused on full-depth repairs to combat deterioration from freeze-thaw cycles and overloading. A landmark initiative occurred in March 2019 with the "96 Fix" project, where fully closed 7 miles of I-96 from east of I-275 to US-24 (Telegraph Road) in Farmington Hills and for 62 hours, enabling accelerated reconstruction including , base repairs, and resurfacing to address severe potholing and structural fatigue accumulated over decades. From March 2022 through 2023, launched the $269 million I-96 Flex Route project in Oakland County, reconstructing eastbound and westbound lanes from Kent Lake Road to the I-275/I-696/M-5 interchange—a 10-mile segment prone to peak-hour backups—while installing median shoulder flex lanes for dynamic capacity (open 6-9 a.m. eastbound and 3:30-6 p.m. westbound), ramp metering at eight locations, and updated signage and drainage. Initial phases shifted traffic to temporary configurations and rebuilt shoulders, improving throughput by up to 20% during rush hours based on modeling.

2024-2025 Developments and Future Plans

In 2024, the Michigan Department of Transportation (MDOT) initiated a $105 million project to rebuild approximately 8 miles of I-96 in Ionia County between Bliss Road and Sunfield Road, encompassing roadway reconstruction, drainage enhancements, new culverts, guardrails, and improvements to the Jordan Lake Road bridge over the freeway; the effort began in June and involves ongoing lane closures and traffic shifts through 2025, with full completion targeted for November 2026. Concurrently, reconstruction advanced on the westbound I-96 segment from the I-275/M-5/I-696 interchange to Kent Lake Road as part of the I-96 Flex Route initiative in Oakland County, aimed at enabling intermittent median shoulder use and ramp metering at eight locations to mitigate congestion during peak periods, incidents, or maintenance. Also commencing in fall 2024, a $45 million overhaul of the I-96/Grand River Avenue interchange in Livingston County converted it to a diverging diamond design, including replacement of two I-96 bridges over Grand River Avenue and acquisition of additional right-of-way to enhance safety and traffic flow; this project extends into 2025 with westbound I-96 rebuilding while maintaining two lanes in each direction via temporary configurations on the eastbound side. Throughout 2025, continued multiple bridge and preservation efforts on I-96, including a $700,000 partial deck replacement on the westbound I-96 bridge over M-52 (Stockbridge Road) near Webberville, which started July 28 and concluded by mid-October, featuring lane reductions and shifts to extend the structure's service life. The M-14/I-96 between Sheldon Road and Newburgh Road progressed through late fall 2025, focusing on ramp rebuilding at the I-275 interchange, rehabilitation of 17 bridges, drainage upgrades, installations, and lighting replacements to improve reliability and capacity in the Plymouth Township and area. Preparatory work for rubblizing— a process existing —in the Howell vicinity supported broader , with full lane closures alternating between eastbound and westbound directions scheduled for 2025 and 2026 to minimize disruptions while refreshing the roadway base. Looking ahead, completion of the County and Grand River Avenue projects by 2026 will prioritize restored pavement longevity and reduced crash risks through modernized interchanges and infrastructure. The I-96 Flex Route's full activation post-reconstruction will introduce dynamic lane management via variable speed limits, message boards, and designated crash investigation sites, representing a shift toward strategies without full widening. MDOT's broader Rebuilding Michigan program signals potential for additional targeted upgrades, such as further preservation and enhancements, contingent on and volume assessments, though no large-scale expansions like lane additions have been announced for the near term beyond these initiatives.

Safety and Incidents

Analysis of Michigan Traffic Crash Facts data from 2019 to 2023 reveals four primary 2-mile crash hotspots along Interstate 96, concentrated in Wayne and Oakland Counties near , accounting for 3,222 reported crashes and 8 fatalities. These segments exhibit crash rates exceeding surrounding areas due to factors such as traffic, interchange complexity, and express/ lane configurations. Rear-end collisions predominate in two hotspots, while single-vehicle run-offs and sideswipes are common elsewhere, often linked to speed, , and poor .
Hotspot LocationCrashes (2019-2023)FatalitiesPrimary Causes
Between 7 Mile Road and M-14/I-96 interchange (Wayne County)9781Rear-end collisions
Between Novi Road and I-696/M-5 interchange (Oakland County)8151Rear-end collisions
Between Greenfield Road and Wyoming Avenue (Wayne County)7576Single-vehicle crashes
Between express/local split and M-39/Southfield Freeway (Wayne County)6720Single-vehicle (37%), sideswipe (28%), rear-end (27%)
Temporal trends show variability across hotspots, with peaks in and correlating to adverse and reduced daylight, alongside afternoons and evenings when commuter volumes surge. Fewer incidents occur in summer months like and , and on Sundays. At the I-96/I-69 interchange near Lansing, earlier data from 2016-2020 indicate an average of 87 crashes annually, predominantly involving deer (115 total) or commercial vehicles (48), though fatalities were rare post-2016. Statewide, Michigan's interstate crashes, including those on I-96, represent over 8% of total traffic incidents, with freeway segments like those on I-96 showing elevated risks from high annual daily traffic exceeding 100,000 vehicles in areas. Fatality rates remain low relative to crash volume on I-96 compared to rural highways like US 131, reflecting denser but better-engineered infrastructure.

Major Accidents and Investigations

On December 8, 2016, a chain-reaction collision involving 53 vehicles occurred on eastbound I-96 near Fowlerville in Livingston County, killing three people—including a husband and wife from Ann Arbor and a semitruck driver from Florida—and injuring 11 others. The pileup was initiated by sudden snow squalls that deposited ice on the roadway, reducing visibility and causing vehicles to slide out of control around 9:50 a.m. Michigan State Police (MSP) investigated the incident, determining adverse weather as the primary causal factor, with no evidence of impairment or mechanical failure cited in initial reports. A semitruck on November 2, 2024, at approximately 11:42 p.m. on westbound I-96 near M-52 in the Webberville area resulted in four fatalities and 17 injuries across 15 involved vehicles, with multiple fires erupting post-impact. The struck a line of stopped caused by a construction-related closure, failing to decelerate in time despite illuminated emergency flares. MSP's subsequent investigation led to charges against the driver, 58-year-old James Edward Glendon, including four counts of causing death and four counts of causing serious injury, emphasizing failure to maintain control and disregard for controls. Other notable incidents include weather-induced multi-vehicle crashes, such as those attributed to in 2005 near Webberville, which involved over 200 vehicles and two deaths, though detailed investigations remain limited to weather advisories rather than individual culpability. routinely probes high-fatality events on I-96, often identifying speed, , or failure to adapt to conditions—like construction zones—as recurring factors, informing targeted enforcement without federal oversight typical for highways.

Mitigation Measures and Enforcement

Following multiple fatal crashes in construction zones along I-96 in County, the (MDOT) implemented enhanced work-zone safety protocols, including reduced speed limits, temporary barriers separating traffic from active work areas, and illuminated signage to alert drivers of hazards. These measures, introduced during the $105 million of 8 miles between Bliss Road and Sunfield Road starting in 2023, aimed to mitigate risks from narrowed lanes and ongoing pavement replacement. The I-96 Flex Route project in Oakland County incorporates dynamic ramp metering at eight entrance ramps, which regulates vehicle entry to prevent bottlenecks and reduce collision risks by smoothing merge flows, alongside intermittent use for peak-period that indirectly enhances safety through decreased . An Active System, deployed along segments of I-96, uses monitoring to adjust speeds, detect incidents, and deploy variable message signs, contributing to faster response times and fewer secondary crashes. Additionally, the reconstruction of the I-96/Grand River Avenue interchange into a diverging diamond design, completed in phases through 2025, reduces conflict points at the junction to lower crash rates at this high-volume crossover. Enforcement efforts by the () have intensified on I-96, particularly in response to 10 fatalities in the County construction zone by September 2025, with increased patrols testing the efficacy of heightened visibility in curbing . Operations like "" employ data-driven targeting of speeding and improper merging, yielding dozens of citations per detail—such as 85 issued during a three-hour enforcement near Joy Road in October 2025—focusing on from overpasses and emphasis on merge compliance in lane-closure areas. motor carrier units have conducted commercial vehicle enforcement blitzes in construction segments, addressing a surge in injury crashes linked to heavy trucks since lane reductions began. These initiatives align with Michigan's Highway Safety Improvement Program, which prioritizes systemic reductions in serious injuries through targeted interventions on high-risk freeways like I-96.

Economic and Strategic Role

Connectivity and Regional Development

Interstate 96 functions as a crucial east-west artery spanning approximately 192 miles across Michigan's Lower Peninsula, linking the western coastal region near Muskegon to the metropolitan area via key intermediate cities such as Rapids suburbs, Lansing, and . This alignment bypasses central urban cores while providing direct access to manufacturing and logistics nodes, reducing transit times for freight and commuters between ports and southeastern industrial districts. The route intersects major north-south corridors, including US-31 and I-196 at its western end for access to West Michigan's agricultural and base, I-69 southeast of Lansing for connections to and markets, and I-275/I-696 near for integration into the national Interstate network. These junctions facilitate efficient goods distribution, particularly for automotive components and consumer products, supporting Michigan's position as a hub where timely delivery correlates with competitive output. By enabling high-volume traffic flow—critical highways like I-96 handle substantial portions of the state's freight tonnage—I-96 underpins regional economic cohesion, allowing rural Ionia County producers to reach urban consumers and vice versa without excessive bottlenecks. Ongoing capacity enhancements, such as the Flex Route system in Oakland County, aim to sustain this role amid rising demand, preserving access that bolsters employment in adjacent townships and averting isolation of peripheral economies from core markets.

Infrastructure Investments and Cost-Benefit Analysis

The Department of Transportation () has allocated substantial funds to Interstate 96 (I-96) for reconstruction and enhancements, primarily through state bonding programs and federal grants. A key example is the $105 million investment to rebuild approximately 8 miles of I-96 in County between Bliss Road and Sunfield Road, encompassing full roadway reconstruction, upgraded drainage systems, and bridge rehabilitations to extend service life and mitigate structural failures. Similarly, a $44 million, three-year targets bridge and roadway rebuilding on a segment of I-96, including eastbound and westbound overpasses, to address aging and improve load capacities. The interconnected M-14/I-96 corridor reconstruction, budgeted at $257 million since 2021, reconstructs roadways and repairs 56 bridges from Northline Road to 6 Mile Road, enhancing connectivity between western and eastern segments of the interstate. These initiatives draw from the Rebuilding Michigan program, which provides $3.5 billion over five years for high-traffic state highways like I-96, supplemented by federal allocations under the Bipartisan Infrastructure Law exceeding $61 billion nationally for roads and bridges in 2024. Cost-benefit analyses for I-96 projects follow MDOT's standardized protocols, including (LCCA) mandated for all paving components exceeding $1 million, which compares initial expenses against long-term maintenance, user delay costs, and vehicle operating savings over a 20-40 year horizon. In MDOT's 2026-2030 Five-Year Transportation Program, project selections incorporate benefit-cost ratios calculated in 2022 dollars with a 3.1% per U.S. guidelines, prioritizing reductions in crash rates, congestion delays, and future repair expenditures. For instance, corridor enhancements like those on I-96 yield economic benefits through lowered transportation costs—estimated via reduced fuel consumption and accident-related losses—and improved regional accessibility, with phases generating temporary and supplier demand. However, broader assessments indicate Michigan's costs rose 26.4% from 2020 to 2023 due to material and labor inflation, potentially compressing net present values for ongoing I-96 work amid competing statewide needs estimated at up to $3.9 billion annually for comprehensive repairs. Innovations such as the I-96 Flex Route in Oakland County, involving dynamic shoulder use and ramp metering from Kent Lake Road to the I-275/I-696/M-5 interchange, exemplify targeted investments balancing capital outlays against operational gains in traffic throughput and incident response times, though specific benefit-cost figures remain integrated into 's programmatic evaluations rather than isolated per-project disclosures. These approaches prioritize empirical metrics like average daily traffic volumes—exceeding 100,000 vehicles on urban I-96 segments—and projected reductions in user costs, substantiating investments through causal links between pavement quality and economic efficiency, while accounting for regional variations in material pricing via the Michigan Construction Cost Index.

Reference Data

Exit List

The exits of Interstate 96 are numbered sequentially from west to east, beginning at approximately mile 0 near its western terminus with US 31 in Norton Shores and increasing to around mile 192 at its eastern terminus with I-75 in Detroit. Mile markers align closely with exit numbers, as established by the Michigan State Highway Department in 1963.
ExitDestinations
1BUS 31, Muskegon
1CHile Rd, Muskegon
4Airline Rd, Fruitport
9M-104, Spring Lake, Grand Haven, Nunica
10Ottawa County B31, Nunica
16Ottawa County 835, Coopersville, Eastmanville
19Lamont, Coopersville
23Marne
24M-11, Walker, Grandville
26Fruit Ridge Ave, Grand Rapids
28Walker Ave, Grand Rapids
30M-37 north, Alpine Ave, Newaygo, Grand Rapids
31AUS 131, Grand Rapids
31BUS 131, Grand Rapids
33Plainfield Ave, M-44 connector, Grand Rapids
36Leonard St, Grand Rapids
38M-44, M-37 south, E Beltline Ave, Grand Rapids
39M-21, Lowell, Flint, Grand Rapids
40ACascade Rd west, Grand Rapids
40BCascade Rd east, Cascade, Grand Rapids
43AM-11 west, 28th St, Grand Rapids
43B28th St east, Grand Rapids
4436th St, Grand Rapids
46M-6, Grand Rapids
52Lowell
59Saranac, Clarksville
64Lake Odessa, Saranac
67M-66, Ionia, Battle Creek
73Portland Rd, Grand River Ave, Portland
76Kent St, Portland
77Grand River Ave, Portland (former BL I-96, decommissioned 2007)
84Westphalia, Eagle
86M-100, Grand Ledge
90Grand River Ave, BL I-96, Grand Ledge
93AM-43 west, Saginaw Hwy, Lansing
93BM-43 east, Saginaw Hwy, Lansing
98ALansing Rd south, Lansing
98BLansing Rd north, Lansing
101M-99, Martin Luther King Jr Blvd, Eaton Rapids, Lansing
104Cedar St, Holt, Lansing (BL I-96 ends)
106AUS 127 south, Lansing
106BUS 127 north, Lansing
110Okemos, Mason
117ADansville, Williamston
117BWilliamston
122M-43, M-52, Webberville, Stockbridge, Williamston
129Fowlerville
133BL I-96, M-59, Howell, Pontiac (BL I-96 begins)
137County D19, Pinckney, Howell
140Latson Rd, Howell
145Grand River Ave, Brighton
147Spencer Rd, Brighton
148AUS 23 north, Brighton
148BUS 23 south, Brighton
151Kensington Rd, Brighton
153Kent Lake Rd, South Lyon
155Milford, New Hudson
159Wixom Rd, Wixom
160Beck Rd, Novi, Wixom
162Novi, Northville
164M-5, Novi
16412 Mile Rd, Novi
1678 Mile Rd, Northville
1697 Mile Rd, Livonia
1706 Mile Rd, Livonia
173Newburgh Rd, Levan Rd, Livonia
174Farmington Rd, Livonia
175Merriman Rd, Livonia
176Middlebelt Rd, Livonia
177Inkster Rd, Livonia
178Beech Daly Rd, Redford
179US 24 (Telegraph Rd), Redford
180Outer Dr, Detroit
186BM-8 (Davison Fwy), Detroit
187Grand River Ave, Detroit
188Livernois Ave, Joy Rd, Detroit
189Tireman Ave, West Grand Blvd, Detroit
190BWarren Ave, Detroit
191US 12 (Michigan Ave), Martin Luther King Jr Blvd, Detroit
192AVernor Hwy, Detroit
192BI-75 south (Fisher Fwy), Ambassador Bridge, Detroit (eastern terminus)
Note that some exits are split (e.g., A/B for directional ramps) and business loops for I-96 serve Lansing and Howell, following former alignments of US 16 and Grand River Avenue. The route parallels Grand River Avenue throughout much of its length, with exits serving local and connecting state highways. Business Loop Interstate 96 (BL I-96) serves Lansing, spanning 13.595 miles from I-96 exit 90 to exit 104 via the former alignments of US Highway 27 and M-43 (Saginaw Street). This route provides access to the state capitol complex and downtown Lansing. Another active BL I-96 runs through Howell for 8.144 miles between I-96 exits 133 and 141 along the old US Highway 16 corridor, facilitating local traffic to commercial districts and residential areas. Former business routes include a 0.426-mile Business Spur I-96 (BS I-96) in Muskegon, connecting the I-96 terminus to downtown before its cancellation in 1986; a 1.289-mile BS I-96 in , decommissioned on October 31, 2007, after relinquishment to local control; and a BS I-96 in the Detroit-Farmington area, redesignated as part of M-5 in 1977.
Business RouteLocationTypeLength (miles)TerminiStatus
BL I-96Lansing13.595I-96 exits 90–104Active
BL I-96Howell8.144I-96 exits 133–141Active
BS I-96Muskegon0.426I-96 terminus to downtownDecommissioned 1986
BS I-961.289Downtown to I-96 exit 77Decommissioned 2007
BS I-96Detroit-FarmingtonNot specifiedI-96 terminus to US-12Redesignated M-5, 1977
I-96 intersects several key routes, including its western terminus at US-31 near Muskegon, a junction with I-196 and US-131 near Grand Rapids, concurrency with I-69 and connection to I-496 (an auxiliary loop around Lansing) near the state capital, and links to I-275, I-696, and M-14 in the Detroit metro area before ending at I-75. These connections support regional freight and commuter flows across western and central Michigan.

References

  1. [1]
    Interstate 96 - IHOZ
    Michigan- 192. Eastern End- Detroit, MI at I-75; Western End- Muskegon, MI at US 31; Major Cities Along the Route-. Grand Rapids, MI; Lansing, MI; Detroit, MI.Missing: endpoints | Show results with:endpoints
  2. [2]
    Interstate 96
    Feb 6, 2024 · East End – Detroit, MI · West End – Muskegon, MI · Branch Routes – 4 · Mileage – 192.06 · Cities – Muskegon, Grand Rapids, Lansing, Livonia, Detroit.Missing: endpoints major
  3. [3]
    Route Listings: I-96 - Michigan Highways
    The new freeway consists of 18 miles of brand-new route on new alignment from Brighton to west of Farmington (cnr Grand River Ave & Halsted Rd), while the ...Missing: endpoints | Show results with:endpoints
  4. [4]
  5. [5]
    All Exits along I-96 in Michigan - Eastbound | iExit Interstate Exit Guide
    Grand Rapids, Michigan. Nothing detected here · EXIT. 31B. US 131 (MM: 31.0) ... Interstate 96 Business; Michigan 59; Howell; Pontiac. Howell, Michigan. Fuel.
  6. [6]
    I-96 Flex Route Project - Oakland County - State of Michigan
    The I-96 Flex Route from Kent Lake Road to the I-275/I-696/M-5 interchange will consist of intermittent shoulder use and ramp metering at eight ramps within ...
  7. [7]
    Project Overview - I-96 Flex Route - Driving Oakland
    Eastbound and westbound I-96 from Kent Lake Road to the I-275/I-696/M-5 interchange will become a 'Flex Route'. Work includes freeway reconstruction.
  8. [8]
    BT's Detroit Road Guide
    3 lanes run at 65 MPH with hardly any exits while another 2 dubbed the local lanes run at 55 MPH and service most of the major roads with exits. Another ...<|separator|>
  9. [9]
    [PDF] Road and Bridge Design Publications - State of Michigan
    Sep 22, 2025 · MICHIGAN DESIGN MANUAL. ROAD DESIGN. 6.04.03 (continued). Characteristics of Concrete Pavement. Concrete pavement has a tendency to curl upward ...
  10. [10]
    [PDF] Michigan DOT User Guide for Mechanistic-Empirical Pavement Design
    Jan 13, 2025 · This manual provides guidance on utilizing AASHTO's software package Pavement ME Design, version 2.6 to arrive at a pavement cross-section that ...
  11. [11]
    Speed limits - State of Michigan
    Freeway route speed limit increases to 75 mph. The speed limit has been increased on 614 miles of freeway in Michigan. Route, Starting point, Ending point ...
  12. [12]
    Traffic Monitoring Program (TMP) - State of Michigan
    Average Annual Daily Traffic (AADT). AADT is the estimated mean daily traffic volume. For continuous count sites, it is calculated by summing the annual ...
  13. [13]
    I-96 Active Traffic Management System for MDOT - SRF Consulting
    Enhanced mobility and safety on I-96 with an Active Traffic Management System that improves traffic flow and incident response in Michigan.Missing: AADT capacity
  14. [14]
    I-96 Grand River Bridge - HistoricBridges.org
    This general design of bridge was used in Michigan in the mid-20th Century for major highway crossings of the larger bridges in the state. Several examples ...
  15. [15]
    I-96 over the Grand River - Eaton County - State of Michigan
    In Michigan, there are three publicly-owned and operated bridges: Mackinac Bridge, Blue Water Bridge, and International Bridge. There are also two privately- ...
  16. [16]
    National Bridge Inventory: Michigan - ARTBA Bridge Report
    Top Most Traveled Structurally Deficient Bridges in Michigan ; Livingston, 1962, 44,600, Urban Interstate, I-96 EB over Grand River Ave ; Bay, 1960, 44,350, Urban ...<|separator|>
  17. [17]
    I-96/Grand River Avenue Interchange Rebuilding Project
    The I-96/Grand River Avenue interchange project involves rebuilding the interchange as a diverging diamond interchange.
  18. [18]
    MDOT Metro Detroit bridges at risk of closure within the decade ...
    Aug 25, 2025 · In Michigan, there are three publicly-owned and operated bridges: Mackinac Bridge, Blue Water Bridge, and International Bridge. There are also ...
  19. [19]
    Michigan I-96 Flex Route - HNTB
    Utilizing dynamic shoulder lanes, MDOT is providing expanded driving space on I-96, enhancing mobility and safety for Michigan drivers while addressing current ...Missing: AADT | Show results with:AADT
  20. [20]
    I-96 Rebuilding - Ionia County - State of Michigan
    Work includes rebuilding the roadway, drainage improvements, new culverts, new guardrail, concrete curb and gutter, and improvements on the Jordan Lake Road ...
  21. [21]
    National Interstate and Defense Highways Act (1956)
    Feb 8, 2022 · Popularly known as the National Interstate and Defense Highways Act of 1956, the Federal-Aid Highway Act of 1956 established an interstate ...
  22. [22]
    3-digit Interstates from I-96 - Kurumi.com
    Michigan 1958 Interstate Numbering Plan (Stephen Summers; includes map.) ... Michigan's original preferred number for this highway was I-296. [13 note ]. I ...Missing: initial | Show results with:initial
  23. [23]
    What Detroit's Jeffries Freeway Took Away - Midstory
    Sep 19, 2024 · Built in stages in the early 1970s, the Jeffries' construction was bogged down by funding challenges and litigation over its route. “There were ...
  24. [24]
    [PDF] MDOT Multi-Model Program: FY 1992
    Oct 1, 1991 · In the city of Lansing, we completed the widening of I-96BL and opened this segment to traffic. We also began the extensive reconstruction and.
  25. [25]
    [PDF] I-196/I-96/M-37/M-44 Grand Rapids Environmental Assessment
    The I-96 freeway provides local access for traffic in the northeastern area of Grand Rapids as well as through traffic connecting. Muskegon and Lake Michigan ...<|control11|><|separator|>
  26. [26]
    Ambassador Gateway - Toebe Construction
    The $174 million project included 2.66 miles of concrete freeway reconstruction and new concrete construction along I-75 from Clark Street to Rosa Parks ...
  27. [27]
    Ambassador Gateway project to create 2800 jobs through 2009
    Much of the construction project is nuts-and-bolts, i.e., the reconstruction of sections of the I-75 and I-96 freeways and building or rehabilitating 18 ramps ...
  28. [28]
    MI: Ambassador Bridge Gateway Project
    The entire project involved the closure of two major freeways, the construction of the state's first cable-stayed bridge and high occupancy vehicle lanes, ...
  29. [29]
    Trades go back to work completing Gateway Project
    May 11, 2012 · The entire Gateway Project began in 2007 and was intended to create an interchange to facilitate traffic flow among I-75, I-96 and cars and ...
  30. [30]
    Ambassador Gateway Reconstruction – Motor City Electric Company
    The project included street lighting and traffic signal work along I-96 and I-75 and freeway entrance and exit ramps. The Michigan Department of Transportation ...<|separator|>
  31. [31]
  32. [32]
    Two-year construction project to start on I-96/US-23 Interchange
    Feb 26, 2015 · As part of the project, the existing lanes of I-96 will become collector-distributor (CD) lanes in order to allow easier and safer lane changes ...
  33. [33]
    Major work on U.S. 23, I-96 interchange project completed
    Nov 2, 2016 · Roadworkers focus on final tasks, loose ends of I-96, U.S. 23 interchange reconstruction.<|separator|>
  34. [34]
    Road commission puts Latson Road/I-96 interchange in gear
    Nov 11, 2010 · Had the project not moved forward, the $4.7 million from the consortium would be returned. That's a lot of bang for a $1.3 million investment. I ...
  35. [35]
    [PDF] FIVE-YEAR Transportation Program, Final Draft, FY 2010-2014
    MDOT's FY 2010 Aeronautics Program provides for capital assistance with ... I-96 Bridge Project in Kent County: The M-50. Bridge, in southeastern Kent ...
  36. [36]
    Michigan road projects to get off ground in coming weeks with stimulus
    Mar 31, 2009 · Among the projects, which are spread statewide, are the repair of 11 bridges over I-96 in Detroit, reconstruction and widening of I-96 in Kent ...
  37. [37]
    I-96 Reconstruction - C.A. Hull
    The “96fix” project was a complete reconstruction of seven miles of I-96 performed under a full freeway closure from just east of I-275 to US-24.Missing: 1985-2005 | Show results with:1985-2005
  38. [38]
    Multi-year overhaul to add Flex Route to I-96 in Oakland County set ...
    Mar 14, 2022 · The three-year, $269-million rebuild of the freeway connecting Brighton and Novi enters its first phase on March 21, according to a news release ...Missing: Hour | Show results with:Hour
  39. [39]
    I-96 bridge work begins July 28 at M-52 near Webberville
    Jul 25, 2025 · Highways: I-96 and M-52 (Stockbridge Road). Closest community: Webberville. Start date: Monday, July 28, 2025. Estimated end date: Mid-October ...
  40. [40]
    M-14/I-96 Reconstruction – M-14 from Sheldon Road to Newburgh ...
    The Michigan Department of Transportation (MDOT) is reconstructing M-14/I-96 between Sheldon Rd and Newburgh Rd in Plymouth Township and the City of Livonia.Project Timeline · Information Center · Contact Us · FAQsMissing: complex | Show results with:complex
  41. [41]
    I-96 in Howell Being Prepped for Two-Year 'Rubblizing' Project - WHMI
    Sep 17, 2024 · During 2025 and 2026, one set of lanes, either eastbound or westbound, will be closed to allow for rubblizing work to be done.
  42. [42]
  43. [43]
    The 4 spots where you're more likely to crash on I-96 in Michigan
    Jun 16, 2025 · In that five-year span, there were 672 crashes reported on the Michigan Traffic Crash Facts' Data Query Tool. None of those crashes were deadly.Missing: trends | Show results with:trends
  44. [44]
    I-96 I-69 Accidents In Lansing Average Nearly 100 Each Year
    Sep 22, 2025 · The I-96 I-69 interchange averages 87 crashes yearly, with 115 deer, 9 alcohol, 4 drug, 20 distracted drivers, and 48 truck/bus involved ...
  45. [45]
    Most Dangerous Highways in Michigan - Goodman Acker
    Oct 5, 2025 · More than 23,388 (greater than 8 percent) of Michigan's crashes happened on interstate highways, per the Michigan State Police Traffic Crash ...
  46. [46]
    The Deadliest Roads in Michigan - MoneyGeek.com
    Aug 25, 2025 · MoneyGeek analyzed 2,820 fatal crashes on Michigan's roadways between 2018 and 2020 to find the deadliest stretches of road in the state. In ...
  47. [47]
    Police identify victims in 53-car pileup on I-96 - Detroit Free Press
    Dec 9, 2016 · Three people died in the 53-vehicle pileup Thursday. Authorities have identified two of the victims as a husband and wife from Ann Arbor, Homer Leon Tew, 69, ...
  48. [48]
    'Very chaotic scene' on I-96 as 3 dead, 11 hurt in 40-vehicle pileup
    they have not been identified — and 11 injured. Some motorists had to be extricated ...
  49. [49]
    Police identify victims in 53-car pileup on I-96 - Lansing State Journal
    Dec 9, 2016 · Police initially estimated that 40 vehicles were involved in the pileup that began around 9:50 am Thursday when snow blanketed the area and then froze.
  50. [50]
    Truck driver charged in fatal November I-96 crash that killed 4 - WILX
    Sep 26, 2025 · The impact caused the semi-truck and multiple other vehicles to catch fire, resulting in four fatalities and injuries to 17 others. The driver, ...Missing: pileup | Show results with:pileup
  51. [51]
    4 dead, 17 injured in fiery 15-car freeway crash | wzzm13.com
    Nov 5, 2024 · The fiery crash on I-96 near Lansing injured 17 people and killed four others. Lieutenant Renee Gonzalez with MSP said a total of 15 cars were involved.
  52. [52]
    Trucker charged in 2024 crash on I-96 near Lansing that killed 4
    Sep 26, 2025 · James Edward Glendon, 58, faces eight charges in connection with the crash that killed four people and injured many others.Missing: fiery dead
  53. [53]
    4 dead, 17 injured in fiery I-96 crash near Webberville : r/Michigan
    Nov 3, 2024 · Anecdotally I've seen a lot more erratic behavior the last few years; speeding/passing in the left lane, failure to signal for lane changes ...Missing: December 2017
  54. [54]
    MSP amps up I-96 enforcement after 10 crash deaths - WILX
    Sep 23, 2025 · Since lane closures began in March, the two-mile stretch between mile marker 67 and M-50/Alden Nash Avenue SE has seen 10 fatalities, the ...<|control11|><|separator|>
  55. [55]
    MDOT'S I-96/Grand River Avenue Interchange Project
    Jan 25, 2025 · The Michigan Department of Transportation (MDOT) is reconstructing the I-96/Grand River Avenue interchange into a Diverging Diamond Interchange ...
  56. [56]
    How Michigan State Police uses data-driven tactics to reduce ...
    Oct 8, 2025 · “The speed limit for the most part is 70 miles an hour. For those going 90 miles an hour, so 20 over the speed limit, the average commuter ...
  57. [57]
    Michigan motor carrier officers to hold commercial vehicle blitz in I ...
    The I-96 enforcement operation is taking place in response to “a dramatic increase in traffic crashes causing injury and death since the start of lane closures ...
  58. [58]
    [PDF] Highway Safety Improvement Program 2021 Annual Report: Michigan
    The Highway Safety Improvement Program (HSIP) is a core Federal-aid program with the purpose of achieving a significant reduction in fatalities and serious ...
  59. [59]
    I-96 closures for rebuilding begin next week - WILX
    Aug 8, 2025 · The majority of the work has already been completed in 2023 and 2024. Road work and crossover removal is taking place this year. “By the end of ...<|separator|>
  60. [60]
    Information Center - M-14/I-96 Reconstruction
    Starting in 2021, a $257 million improvement project included roadway reconstruction and repairs to 56 bridges from Northline to 6 Mile Road as well as roadway ...Missing: infrastructure | Show results with:infrastructure
  61. [61]
    Michigan Department of Transportation - Facebook
    Aug 14, 2025 · Whitmer's Rebuilding Michigan program that's providing an additional $3.5 billion over 5 years to rebuild the state roads and bridges that carry ...
  62. [62]
    Bipartisan Infrastructure Law Fuels $61B Investment in America's ...
    The $61 billion allocated for Fiscal Year 2024 is the third year of funding under this law, marking an increase of $17.6 billion in formula programs compared to ...
  63. [63]
    [PDF] Evaluation of Life-Cycle Cost Analysis Practices Used by the ...
    According to its Pavement design and selection manual, all projects with paving costs greater than 1 million dollars require LCCA in the design stage. Therefore ...
  64. [64]
    [PDF] 2026-2030 Five Year Transportation Program - State of Michigan
    Jul 31, 2025 · All cost-benefit values are expressed in 2022 dollars, discounted at 3.1 percent per U.S. Department of Transportation guidelines. Economic ...
  65. [65]
    [PDF] I 96 Construction Michigan - Free PDF Download
    I-96 corridor. Improved pavement durability using advanced materials. Enhanced bridge safety with modern design standards. Traffic flow optimization through ...
  66. [66]
    [PDF] Evaluating the Economic Benefits to Michigan of Alternative Road ...
    Abstract. A well-maintained and efficient transportation system provides the backbone for all economic activity within. Michigan. Included in the economic ...Missing: connectivity | Show results with:connectivity
  67. [67]
    [PDF] A Data-Driven Assessment of Michigan's Road Program
    The MHCCI estimates that construction costs in Michigan increased by. 26.4 percent from 2020 to 2023, far lower than the 62 percent national.
  68. [68]
    "To truly fix Michigan's roads, estimates call for up to $3.9 billion in ...
    Aug 26, 2025 · "To truly fix Michigan's roads, estimates call for up to $3.9 billion in annual investment. That's less than 5% of our state's $80 billion ...
  69. [69]
    Michigan Department of Transportation - Facebook
    May 15, 2025 · The new Michigan Highway Construction Cost Index integrates project-level data, regional variations and economic trends such as labor and materials markets, ...
  70. [70]
    Business Connections 96 through 496 - Michigan Highways
    From there, BL I-96 continues easterly through Howell via Grand River Ave to the Lake Chemung area, where it terminates at a new partial interchange with I-96. ...