Fact-checked by Grok 2 weeks ago

Silverlink

Silverlink was a train operating company in the owned by National Express Group plc that managed the franchise, delivering suburban and regional passenger rail services primarily around from March 1997 until November 2007. The company divided its operations into two distinct brands: Silverlink Metro, which handled intensive inner suburban routes such as the from to , the from Junction to , and the from Euston to Junction; and Silverlink County, which focused on longer-distance commuter and regional services, including the line from Euston to and shuttles from Junction to St Albans Abbey. Silverlink's fleet consisted mainly of Class 313, 317, 321, and 508 electric multiple units, painted in a distinctive silver that became synonymous with the brand. In a major restructuring announced by the , Silverlink's franchise was not renewed; its Metro services transferred to on 11 November 2007, rebranded and integrated into the expanded network to improve frequency and reliability for commuters. Simultaneously, Silverlink County routes were absorbed into the newly awarded West Midlands franchise, operated by , which combined them with other regional services. This transition marked the end of Silverlink as an independent operator and contributed to the modernization of London's rail infrastructure, with Metro services now under public control by .

History

Formation and Early Operations (1996–1998)

The privatization of British Rail, enacted through the Railways Act 1993, established a framework for transferring passenger services to private sector operators via competitive franchising to improve efficiency and service quality. This process divided British Rail's operations into regional franchises, with the North London Railways franchise specifically created to manage suburban and local passenger services in north and west London that had previously fallen under the Network SouthEast sector of British Rail. Following a bidding process overseen by the Office of Passenger Rail Franchising, the Railways franchise was awarded to National Express Group on 7 February 1997, marking one of the final awards in the initial wave of privatizations. National Express assumed operational control on 2 March 1997, taking over services primarily serving commuter routes with an inherited fleet of diesel multiple units including Classes 117 and 121, and electric multiple units Classes 313 and 321 from . Initial setup focused on maintaining service continuity, with depots at locations such as and established for maintenance and operations. In September 1997, the operator rebranded from North London Railways to Silverlink to better align with National Express's portfolio and emphasize regional connectivity, accompanied by the rollout of a distinctive silver-dominated featuring blue accents on its . This early phase through 1998 saw no significant new fleet acquisitions, relying instead on leased and refurbished existing units to support the core suburban network while preparing for future expansions.

Mid-Period Developments (1998–2006)

In 1998, Silverlink expanded its regional services under the Silverlink County brand, introducing semi-fast trains from London Euston to Birmingham New Street via the Main Line's slow lines, enhancing connectivity for passengers traveling between the capital and the . These services complemented the existing Metro operations focused on , providing hourly links that operated alongside faster services and supported growing commuter and business travel demand. By 2004, competitive pressures from improved schedules on the prompted significant adjustments to Silverlink's longer-distance offerings. In September 2004, the Birmingham extensions were withdrawn, with all Silverlink County services terminating at instead, allowing capacity for higher-speed operations and reducing journey overlaps. This change streamlined the network but shifted focus toward London- routes, where Silverlink introduced Class 350 Desiro electric multiple units in 2005 to modernize the fleet and improve acceleration and passenger comfort on electrified sections. The 30 new four-car units, shared with , were deployed initially on these core services, marking a key upgrade amid ongoing modernization. As the franchise approached its original end date, the Department for Transport announced an extension on 11 August 2006, prolonging Silverlink's operations from 15 October 2006 to 11 November 2007 to ensure service continuity during the transition to new operators. This period saw further network adjustments, including the closure of the Stratford to North Woolwich branch on 9 December 2006, as the line was transferred to the Docklands Light Railway for extension works, ending Silverlink's operation of this North London Line segment and prompting minor timetable revisions elsewhere to reallocate resources. The closure impacted local access to the Royal Docks area but facilitated broader London rail integration under Transport for London.

Demise and Transition (2006–2007)

In 2006, the Department for Transport (DfT) decided to redraw rail franchise boundaries in the London and West Midlands region as part of broader reforms to devolve certain services to local authorities and consolidate others into larger franchises, resulting in the termination of the Silverlink franchise. This restructuring split Silverlink's operations into two distinct parts: the urban "Metro" services, which were transferred to Transport for London (TfL), and the regional "County" services, which were integrated into the new West Midlands franchise operated by London Midland. The DfT extended the Silverlink franchise from October 2006 until 11 November 2007 to facilitate a smooth transition, aligning it with the start of the successor operators. Silverlink continued operations through early November 2007, with its final services running on 11 November before the handover took effect that day. The Metro services, including lines such as the from Richmond to Stratford, the from Willesden Junction to , the Gospel Oak to Barking Line, and the from Euston, were devolved to TfL and rebranded as the London Overground. This integration enabled immediate compatibility with the system, allowing pay-as-you-go fares across the network, alongside commitments for station staffing during operating hours and a £1.4 billion investment program for upgrades. The County services, encompassing regional routes like those from London Euston to and , were transferred to as part of the expanded West Midlands franchise, which also absorbed elements of the former operations. assumed responsibility on 11 November 2007, maintaining these inter-urban connections while TfL focused on the denser suburban network. The transition marked a significant legacy for Silverlink's routes, with successors addressing inherited challenges such as overcrowding and reliability issues through targeted investments. Under , on-time performance improved to 96% by 2014/15 from 91% pre-devolution, and overcrowding was reduced to zero on key metrics despite a 136% rise in passenger demand, supported by new air-conditioned trains and station refurbishments completed by 2010. similarly benefited from the franchise consolidation, contributing to enhanced regional connectivity, though some overcrowding persisted on high-demand lines like Euston to into the successor era.

Branding

The Silverlink brand was developed and introduced in September 1997, replacing the original Railways branding under which the franchise had operated since its award in March 1997. This rebranding aimed to establish a distinct identity for the amid the UK's process. The visual identity, including the logo and , was created by design agency Best Impressions as part of National Express's portfolio. Described as bold yet controlled in its use of color, the sought to convey a dynamic presence for services linking key parts of and beyond. The centered on silver and blue tones, applied across the fleet to emphasize and regional . Following the rebrand, marketing efforts promoted the new identity, with updates to station signage implemented to unify under the Silverlink name. The branding evolved in alignment with National Express's , incorporating guidelines for across its operated franchises.

Sub-Brands: Metro and County

Silverlink introduced sub-brands to segment its operations and better address the varying needs of urban and regional passengers. Silverlink was designated for intensive inner suburban routes primarily around , including the from to , the from Willesden Junction to , and the from Euston to Junction; in contrast, Silverlink handled longer-distance commuter and regional services that extended beyond , linking the capital to destinations in adjacent counties like and .

Routes and Services

Silverlink Metro operated four key routes that emphasized urban and suburban connectivity within , focusing on orbital travel and links to major transport hubs. These services utilized existing infrastructure to provide frequent passenger trains, with integration into the wider transport system through acceptance of pay-as-you-go cards introduced with the franchise transfer to in November 2007. The network spanned approximately 90 km and served 50 stations, supporting around 63,000 daily passengers and 23 million annual journeys prior to the franchise transfer. The provided an orbital service from in the southwest to in the east (with some services terminating at Stratford), routing via Willesden Junction and traversing north and suburbs. This 31 km route connected residential areas and employment centers, with key interchanges at stations such as (linking to ), Willesden Junction (Bakerloo and Watford DC lines), Highbury & Islington (Victoria line and Great Northern), and Stratford (Central, Jubilee, and Elizabeth lines). It offered vital cross-London travel avoiding central termini, with typical service frequencies reaching up to 6 trains per hour on core sections during peak times under Silverlink operation; frequencies increased to 8 trains per hour on the central segment following the transfer to . The West London Line served as a north-south connector from Willesden Junction to Clapham Junction, spanning about 10 km through west London and bridging northern and southern parts of the city. Key stations included Willesden Junction, Kensington (Olympia) for interchange with District line services, and Clapham Junction, a major hub for Southern, Thameslink, and South Western Railway lines. This route facilitated travel between northwest London and south London destinations, with frequencies of up to 4 trains per hour on peak services, enhancing links to the broader rail network. The delivered radial services from Euston to Junction, covering 24 km and utilizing 750 V DC third-rail electrification for efficient suburban operation. Notable stations along the route were Euston (connecting to and high-speed services), Queen's Park (), South Hampstead, Wembley Central ( and London Northwestern Railway), and Junction (). It provided direct access from northwest suburbs to , with service frequencies typically up to 4 trains per hour during peaks, supporting commuter flows. Finally, the Gospel Oak to Barking Line offered an east-west freight and passenger corridor from to Barking, extending 22 km and serving as a vital link for local communities in north and . Key stops included (interchange with ), , Upper Holloway, and Barking ( and Hammersmith & City lines). This route enhanced connectivity for areas underserved by other lines, with frequencies of 3 trains per hour during peaks under Silverlink, increasing to 4 trains per hour following infrastructure upgrades and the franchise transfer in 2007, alongside compatibility for seamless travel. Silverlink County routes encompassed three regional services designed to connect suburbs and nearby counties with the capital, emphasizing connectivity along the and associated branches. These routes operated under the Silverlink County sub-brand, distinguishing them from the more urban-focused services by serving longer-distance commuters and rural communities in , , , and . All services integrated with the broader network at London Euston, facilitating transfers to and freight operations. The primary County route ran from London Euston to , utilizing the slow lines of the and passing through key intermediate stops including Watford Junction, , , , , Milton Keynes Central, and . This service, which provided essential regional links for commuters traveling to and from the , originally extended further to Birmingham New Street until its truncation in September 2004 amid upgrades and franchise adjustments, after which the segment north of was reassigned to . Hourly frequencies were maintained on this route during Silverlink's operation, with typical journey times from Euston to around 60-70 minutes, supporting daily travel patterns for work and leisure. The offered a short service between Watford Junction and St Albans Abbey, spanning approximately 10.5 km (6.5 miles) through Hertfordshire's semi-rural landscapes and serving stations such as Park Street, How Wood, , and Garston. This single-track, electrified route functioned as a local connector, enabling passengers to access Watford Junction for onward connections to Euston or other networks, while providing direct access to St Albans' historic sites and employment centers. Operating as a with hourly departures in each direction during peak and off-peak periods, the service accommodated low-volume demand typical of s, with end-to-end journeys taking about 20-25 minutes. Complementing the network, the linked to , traversing 27 km (16.5 miles) through Bedfordshire's communities and stopping at stations including Fenny Stratford, Bow Brickhill, , Aspley Guise, Ridgmont, Lidlington, Millbrook, , and St Johns. This non-electrified diesel-operated route focused on serving residential and agricultural areas, offering vital local transport options in a region with limited alternative rail access. Hourly services ran in both directions, with typical travel times of around 45 minutes, integrating at for connections to the Northampton line and .

Performance

Reliability and Punctuality

Silverlink demonstrated notable improvements in reliability and over its operational period, particularly in the mid-2000s. In the early years, was hampered by challenges such as on key routes, with over 25% of trains arriving more than five minutes late in early . By late , this figure had reduced to around 10%, contributing to a Public Performance Measure ()—the percentage of trains arriving within five minutes of schedule or not cancelled—reaching 85% in 2005. These trends continued into the final full financial year, with Silverlink achieving a of 91.2% for 2006-07, reflecting stable and enhanced . Quarterly data underscored this progress, including 89.7% in the third quarter of 2006-07. This positioned Silverlink as a top-tier performer among commuter operators, surpassing the national average PPM of 88.1% for the same period. A key factor influencing reliability was the shared infrastructure on lines like the , where passenger services operated alongside slower freight trains, limiting capacity to six trains per hour and causing delays. The (SRA) had set industry benchmarks aiming for PPM improvements toward 90% or higher by the mid-2000s, targets that Silverlink met or exceeded in its later years through better track maintenance and reduced speed restrictions.

Passenger Experience and Criticisms

Passengers on Silverlink services, particularly the routes, frequently reported a subpar experience characterized by , discomfort, and concerns during peak hours. The London Assembly Transport Committee's 2006 review of the described services as "shabby, unreliable, unsafe, [and] overcrowded," with trains operating at up to 150% of capacity in rush hours, leading to standing passengers throughout journeys and heightened stress levels. Criticisms from external reports highlighted severe overcrowding and unreliability on Metro routes, exacerbating passenger frustration. The same Assembly report noted that 15% of trains arrived more than five minutes late in 2005, often resulting in compounded crowding as delayed services absorbed passengers from missed connections. A 2009 London Assembly analysis of rail overcrowding in London further emphasized Silverlink routes' high passenger loads, with up to five passengers per square meter during peaks, contributing to discomfort and minor incidents like fainting. Passenger surveys and feedback underscored issues with station facilities and ticketing systems. Users complained of unstaffed, dirty, and poorly lit stations lacking adequate , which created confusion around fares and routes, particularly for orbital lines. A consultation document reflected on Silverlink 's neglected stations and low levels, including inconsistent ticketing enforcement that led to and disputes. In response to such feedback, Silverlink implemented measures to boost capacity, notably introducing new Class 350 Desiro electric multiple units in 2004 to replace older stock and alleviate overcrowding on key routes. These efforts, supported by a two-year franchise extension from the Strategic Rail Authority, aimed to improve comfort and reliability amid rising demand. Overall satisfaction with Silverlink trailed many other train operating companies, with early post-franchise surveys for the transitioned indicating levels around 65% in spring 2008—reflecting lingering issues from Silverlink's tenure—compared to national averages exceeding 80%. The 2006 Assembly report captured broad user discontent, positioning Silverlink below peers in qualitative assessments of and amenities.

Rolling Stock and Depots

Fleet Composition

Silverlink operated a mixed fleet of diesel multiple units (DMUs) and electric multiple units (EMUs) to accommodate both non-electrified branches and electrified main lines within its network. This composition emphasized reliability on suburban and regional routes, with units selected for their acceleration capabilities and capacity to handle peak commuter demands. The DMU portion initially included Class 117 three-car units and older bubble cars for unelectrified lines like the Gospel Oak to Barking and Marston Vale branch, later supplemented by Sprinter units. The Class 117 comprised approximately 3 three-car DMUs with a top speed of 70 mph, inherited from British Rail and in service with Silverlink from 1997 until late 1999, when they were replaced by more modern stock. These units, originally built in 1959–1961, provided capacity for suburban services. The Class 121 comprised 4 single-car DMUs with a top speed of 70 mph, introduced to Silverlink operations in 1997 and withdrawn in 2001 following replacement by more modern stock. These units, originally built in the early 1960s, provided short-formation flexibility for low-density services. Complementing them were 7 Class 150 two-car DMUs capable of 75 mph, built between 1984 and 1987, and in service with Silverlink from 1999 until 2007. These Sprinters offered improved passenger amenities over the Class 117 and 121, supporting operations on lines such as Gospel Oak to Barking. The core of the EMU fleet consisted of PEP-stock derivatives and newer Desiro units for high-frequency electrified corridors. The formed the backbone with 23 three-car units reaching 75 mph, built in 1976–1977 and serving as Silverlink's primary fleet from 1997 to 2007. These dual-voltage units were ideal for inner suburban routes around , providing rapid acceleration for stop-start services. For longer-distance County operations, 37 four-car EMUs with a 100 mph top speed were the main express units from 1997 to 2007; these were built in 1989–1990 and allocated specifically for enhanced capacity on lines to and . To upgrade the County fleet, Silverlink introduced 30 four-car Class 350 EMUs in 2004–2005, also rated at 100 mph, as purpose-built units to replace aging stock and improve comfort on branches. Finally, 3 three-car Class 508 EMUs with 75 mph capability, built in 1979–1980, were added between 2003 and 2007 to supplement workings.
ClassTypeNumber of UnitsTop Speed (mph)Build PeriodOperational Period with Silverlink
117DMU3701959–19611997–1999
121DMU4701960–19611997–2001
150DMU7751984–19871999–2007
31323751976–19771997–2007
321371001989–19901997–2007
350301002004–20052004–2007
5083751979–19802003–2007

Maintenance Facilities

Silverlink primarily utilized two key maintenance facilities for its fleet: Traction Maintenance Depot (TMD) in , , and Willesden Traction Maintenance Depot in . These sites handled the servicing, stabling, and repairs for both the Metro and County sub-brands' , supporting the operator's diverse fleet across electrified and non-electrified routes. Bletchley TMD served as the primary facility for the Silverlink fleet, focusing on heavy maintenance and stabling for its electric multiple units, including the Class 321 sets. Opened in its modern form in 1965, the depot conducted comprehensive overhauls, such as work on traction motors and , contributing to the fleet's exceptional reliability—six times the average for similar units—which earned it the Engineering Excellence of the Year award. The site performed all in-house maintenance for operations, including daily inspections and repairs to ensure compatibility with the 25 kV electrification of the , with direct access to the route facilitating efficient train movements. Stabling capacity supported over 30 units, accommodating the bulk of the County's operations to , , and beyond. Willesden TMD became a key site for Silverlink Metro electric multiple unit (EMU) servicing following the 2003 cessation of Virgin Trains' electric locomotive operations, which prompted the relocation of Metro fleet maintenance there. Operated by Alstom on behalf of Silverlink, the depot handled light maintenance for the Class 313 dual-voltage units, including routine checks, minor repairs, and daily servicing to maintain performance on the North London Line and other Metro routes. With capacity for 20–25 units, Willesden featured dedicated sidings and infrastructure tailored for third-rail (750 V DC) and overhead line compatibility, supporting the Metro's intensive urban services while reporting directly to Silverlink's depot management. By late 2007, some maintenance functions began shifting back toward Bletchley amid timetable adjustments, though Willesden remained integral until the franchise's end. Across both depots, Silverlink emphasized in-house control for daily inspections, electrification system verifications, and minor repairs, with major overhauls concentrated at to minimize downtime. The facilities' sidings collectively stabled the fleet overnight, with strategic positioning near major lines like the enabling seamless integration into operations. No significant of core maintenance occurred, ensuring consistent standards for the operator's diverse services.

References

  1. [1]
    Rail Franchises - Hansard - UK Parliament
    National Express Group, —. Silverlink, 2 March 1997, 7 years 6 months, 1 September 2004, National Express Group, Formerly known as North London Railways. South ...
  2. [2]
    CCTV for Silverlink Metro and Wagn - Transport for London
    Mar 12, 2004 · CCTV for Silverlink Metro and Wagn · £ 500,000 to equip all trains on the North London Line (North Woolwich to Richmond), and the suburban route ...
  3. [3]
    England | London | Mayor to control Metro services - BBC NEWS | UK
    Feb 14, 2006 · The Silverlink County services will form part of the new West Midlands franchise as announced last October. Mr Livingstone said the ...Missing: transferred | Show results with:transferred
  4. [4]
    Tilt trains in prospect as final franchises awarded | News | Railway ...
    The decision gives NEG the highest total of franchises, coming a week after the group added suburban operator North London Railways to the Gatwick Express and ...
  5. [5]
    BBC NEWS | UK | England | London Overground services begin
    Nov 11, 2007 · A new rail service, known as London Overground (LO), has taken over the suburban routes operated by Silverlink. Transport for London (TfL) ...
  6. [6]
    London > Travel > Features > Underground... Overground - BBC
    Nov 6, 2007 · Transport for London took over the running of Silverlink Metro's train services last November, launching the first stage of London Overground.
  7. [7]
    [PDF] The Privatised Railway - Research Paper 97/71 - UK Parliament
    May 30, 1997 · Under the terms of an agreement largely negotiated with Railtrack during 1995-96 and signed on 24 April 1996, the existing north-south.
  8. [8]
    Silverlink Trains: All Images - theironroad
    Silverlink Train Services Ltd, owned by National Express Group, operated routes in North London and from London Euston to Northampton (and until 2004, ...
  9. [9]
    Railhub ::: Business ::: Franchise
    ... Silverlink Metro services in November 2007. $ start date * 2 March 1997 ** $ end date * 11 November 2007 ** start date end date owned by. National Express ...
  10. [10]
    BBC News | Track Record - Home - BBC News
    Silverlink, which runs mainly commuter services in and around London and to Birmingham, is receiving over £31m in Opraf grants in 1999/2000, declining ...
  11. [11]
    Northampton (Train Services) - Hansard - UK Parliament
    Jul 15, 1998 · The train was diverted to Rugby and, by the time I arrived in Birmingham, the event was long since over. My argument is not with Silverlink, ...
  12. [12]
    Two-year Silverlink trains deal signed - Railhub
    Sep 17, 2004 · ... Silverlink passenger rail franchise until October 2006. The extension delivers certainty for Silverlink passengers during a period of change ...
  13. [13]
    England | West Midlands | "Slow" trains between ... - BBC NEWS | UK
    Silverlink's trains shadow Virgin's fast service between Birmingham, Rugby, Coventry, Milton Keynes and Euston. Passengers will still be able to use Chiltern ...
  14. [14]
    Silverlink franchise extended to November 2007 - Railhub
    Aug 11, 2006 · The Department for Transport today confirmed that Silverlink's train franchise will be extended from 15 October 2006 to 11 November 2007. ... date ...
  15. [15]
    Silverlink franchise extended until November 2007
    The Department for Transport has confirmed that Silverlink's train franchise will be extended from 15 October 2006 to 11 November 2007.
  16. [16]
    2006-08-11 DfT-001 Department for Transport - Railnews Business
    Aug 11, 2006 · Silverlink County services will be transferred to the new West Midlands franchise. ... transferred to Transport for London (TfL) in November 2007.
  17. [17]
    Silverlink lines under new management as Mayor launches London ...
    Nov 12, 2007 · A key part of the Capital's rail network is now under new management, and will be transformed over the coming years under Transport for London (TfL) plans.
  18. [18]
    TfL welcomes Oyster on London Midland services
    Nov 19, 2007 · London Midland took over the Silverlink County services when London Overground, part of Transport for London (TfL), took control of the ...Missing: transfer | Show results with:transfer
  19. [19]
    [PDF] Devolving rail services to London - Greater London Authority
    The London Overground network was established after the Silverlink franchise was devolved to TfL in 2007. At this time, TfL became the commissioning authority ...
  20. [20]
  21. [21]
    Giving the railways an image | The Railway Magazine
    May 23, 2017 · Ray describes his work for Silverlink as producing a livery that was “a bit wild, but with controlled use of colour”. A big break in terms ...
  22. [22]
    Silverlink | Model Rail Database
    350111. British Rail Class 350, Silverlink (Silver & Blue) "Apollo". Builder: Lima. Catalogue #: L205200. Running #: 08874. British Rail Class 08, Silverlink ...
  23. [23]
    Orange Invades: All Change for London's New Overground Lines
    This weekend saw the addition of 28 new stations to TfL's hugely successful Overground network. We look at exactly what happened out in North East London.
  24. [24]
    None
    Summary of each segment:
  25. [25]
    [PDF] Travel in London - Report 9 | TfL
    Dec 16, 2016 · frequencies of these in 2017. Figure 3.9 shows the number of ... lines formerly operated under the Silverlink franchise in 2007. In ...
  26. [26]
    Silverlink Metro - Greater London Authority
    At the same time, improvements will also take place between Clapham Junction and Willesden Junction on the West London Line, with some of the additional ...
  27. [27]
    18.5m funding for the Gospel Oak to Barking line - TfL
    Jul 30, 2007 · "The scheme allows Transport for London to provide four trains per hour on the Gospel Oak to Barking line where new trains are delivered, ...Missing: details | Show results with:details
  28. [28]
  29. [29]
    Silverlink suspends London-Birmingham rail services - The Guardian
    Sep 11, 2003 · Services normally run every hour from between 05.44 (from London) and 21.36 (from Birmingham). Mr Bray said: "For Northampton, Watford and ...
  30. [30]
    [PDF] The Transport Committee's review of the North London Railway ...
    They include track improvements, increased frequency of service to provide a 'turn-up-and-go' metro service, new rolling stock and a station upgrading programme ...
  31. [31]
    [PDF] Going Local - Campaign for Better Transport
    London Overground has sharply improved station standards from the Silverlink days. All stations were upgraded with painting, new shelters and TfL branding ...
  32. [32]
    [PDF] NATIONAL RAIL TRENDS 2007-2008 QUARTER THREE - ORR
    Oct 7, 2025 · London Midland is split across two sectors (regional, and London and South East). London Overground is categorised as a London and South East ...
  33. [33]
    [PDF] 2007 Annual Return - Network Rail
    We have consulted the affected train operating companies to identify a suitable time to complete the project that will have the least impact on services. The ...
  34. [34]
    [PDF] Department for Transport Annual Report 2006 CM 6817 - GOV.UK
    May 31, 2006 · This report tells Parliament how the Department for Transport has spent its money and what it plans to do in the future. It describes our ...
  35. [35]
    [PDF] The Big Squeeze Rail overcrowding in London
    Silverlink. Southern. National Express East Anglia. First Great Western. First ... stands at 90.8%. 3.18 There is an issue, however, about whether the ...
  36. [36]
    [PDF] Department for Transport Reforming our Railways Paper and ... - TfL
    May 31, 2012 · Responsibility for the 'Metro' elements of the former Silverlink franchise was devolved to TfL in 2007. Under Silverlink Metro, services ...
  37. [37]
  38. [38]
    Class 121 DMU Operations
    The class was concentrated around the Reading, Bristol, Cardiff and Plymouth areas. They were used on the West London branch lines, the Severn Beach branch, ...
  39. [39]
    Class 121 and 122 DMU class history - Key Model World
    May 25, 2022 · On May 19 2017, the final examples of British Railway's famous 'bubble cars' were withdrawn from mainline service after a remarkable career spanning 57 years.
  40. [40]
  41. [41]
    British Rail Sprinter - loco-info.com
    The top speed of 75 mph allows for good acceleration. After the two prototypes of the class 150/0, 50 production vehicles of the class 150/1 were built, each of ...
  42. [42]
    British Rail PEP Electric Multiple Unit story - Key Model World
    Jul 28, 2023 · The first production PEP units were the 64-strong members of Class 313 ... In 2003 three more went to Silverlink for operation on the ...<|control11|><|separator|>
  43. [43]
    UK | England | West Midlands | Trains coming back on ... - BBC NEWS
    ... Class 321 trains. The solution has been certificated by Her Majesty's Rail Inspectorate. The company is now working its way through the fleet of 37 trains ...
  44. [44]
    [PDF] Rail Accident Report - GOV.UK
    ○ The Class 350 unit is operated jointly by Silverlink and Central Trains over the West. Coast Main Line. In autumn 2005, there were 30 four car units in ...
  45. [45]
  46. [46]
    Class 508: Silverlink/London Overground - Alan Thomson Simulation
    This pack depicts the 3 Class 508 units which were Leased by Silverlink in 2003 for Operation on the Watford DC line Supplementing their existing 313/1 fleet.Missing: 121 150 321 350
  47. [47]
  48. [48]
    End of the line for award-winning depot - Railnews
    Jul 1, 2008 · Bletchley was named 'simply the best' last year when the Silverlink County Class 321 fleet won the Engineering Excellence of the Year award at ...
  49. [49]
    [PDF] Rail Accident Report - GOV.UK
    ... Willesden Traction Maintenance ... Among other contracts, it carries out light maintenance of class 313 on behalf of Silverlink, reporting to the Silverlink depot ...
  50. [50]
    Silverlink Metro - The Locomotive & Carriage Institution
    Beaumont is new to the rail industry, having moved from another National Express Group Company to Silverlink in April, 2000. He started his talk with a few ...<|control11|><|separator|>