Army Nuclear Power Program

The Army Nuclear Power Program (ANPP) was a United States Department of Defense initiative established in 1954 to develop compact, portable nuclear reactors capable of providing reliable power to remote military outposts, thereby reducing logistical dependencies on diesel fuel and fossil fuel supplies in harsh or isolated environments. Headquartered at Fort Belvoir, Virginia, under the oversight of the Army Reactors Branch, the program emphasized innovative designs for light-water and advanced reactors suitable for both fixed installations and semi-mobile operations, such as arctic radar stations and polar expeditions. Over its two-decade span, ANPP constructed and operated eight small-to-medium-scale reactors across diverse global locations, marking pioneering advancements in peacetime military nuclear power generation. Key achievements included the SM-1 reactor at , which achieved criticality on April 8, 1957, and became the first U.S. connected to a grid, demonstrating scalable production for needs. Other notable facilities encompassed the SM-1A at , for cold-weather power supply; the PM-2A at , , a temporary station operational from 1960 to 1963 that was fully dismantled afterward; the PM-3A at , , supporting scientific operations in extreme isolation; and the floating barge reactor on , , designed for potential rapid deployment. The program also trained approximately 800 operators through a rigorous one-year course at , fostering expertise in reactor operation, maintenance, and safety protocols. By the early 1970s, operational priorities shifted, leading to the deactivation of all reactors: the SM-1 was decommissioned in 1973 and placed in safe storage, with the last operator training class graduating in 1977, effectively concluding the program's active phase. The U.S. Army Corps of Engineers now manages the Deactivated Nuclear Power Plant Program (DNPPP), overseeing environmental assessments, maintenance, and eventual dismantlement of remaining sites including SM-1 (projected completion by late 2025) and SM-1A (by 2029), following the full decommissioning of in 2019, to eliminate long-term liabilities. ANPP's legacy endures in contributions to , remote power technologies, and collaborations, though it highlighted challenges in , , and for military applications.

Background and Establishment

Historical Context

Following , escalating tensions between the and the heightened the strategic importance of maintaining military outposts in remote and harsh environments, such as the regions and forward operating bases. These locations demanded reliable, independent sources of heat and electricity to support installations, communications, and defense operations, where conventional supply lines were vulnerable to disruption. The U.S. military recognized that could provide a self-sustaining energy solution, eliminating dependence on lengthy fuel convoys and enabling sustained presence in isolated areas critical to . The U.S. Atomic Energy Commission's (AEC) early reactor programs in the 1940s laid foundational technological groundwork that influenced subsequent military nuclear initiatives. At , the , activated in November 1943, became the world's first continuously operating , producing and advancing technology essential for both weapons and power applications. This facility, part of the , demonstrated the feasibility of controlled nuclear reactions and informed later designs for compact, military-grade reactors by showcasing innovations in reactor moderation and heat management. The limitations of diesel generators became acutely evident during the (1950-1953), exacerbating fuel challenges in rugged terrains and . These generators, reliant on petroleum shipments, suffered from high maintenance needs, frequent breakdowns, and supply vulnerabilities, with convoys often targeted or delayed, compromising operational readiness at forward bases. The war underscored the logistical burden of transport—requiring extensive infrastructure and exposing forces to supply chain risks—prompting the to seek alternatives for uninterrupted power in austere environments. In response, the U.S. Army Corps of Engineers initiated feasibility studies on for military bases in the late , evaluating the potential for small-scale reactors to address these energy gaps. These early assessments, conducted in collaboration with the , explored reactor portability, safety, and deployment in remote settings, building directly on Oak Ridge's experimental successes to assess viability for defense applications. By the early , these studies had evolved into formalized efforts, setting the stage for the program's development.

Program Initiation

The Army Nuclear Power Program was formally established in 1954 as a joint effort between the U.S. and the U.S. Army to pursue military applications of . This initiative built directly on the organizational expertise from the and precursor studies conducted by the Army in 1952, transitioning military nuclear efforts from wartime weapons production to peacetime power generation. Administration of the program fell to the Nuclear Power Division (NPD), created in 1952 within the U.S. Army Corps of Engineers to oversee reactor design, construction, and operations. The NPD was led by successors to director , including figures such as James B. Lampert, who directed early efforts from 1955 to 1957 and emphasized integrating nuclear training into Corps engineering roles. This structure ensured coordination between military logistics and civilian nuclear expertise, with the Corps assuming full operational responsibility for initial prototypes by 1960. The program's core objectives centered on engineering compact, reliable nuclear reactors rated at 1-10 MW thermal output to provide electricity and heating for isolated military bases, minimizing dependence on vulnerable fossil fuel supply lines. These systems were designed for deployment in harsh environments, prioritizing mobility, safety, and simplicity to support forward operations. Initial funding came through joint AEC-Army appropriations, enabling rapid prototyping in collaboration with private firms such as Alco Products, which handled design and construction for the SM-1 stationary reactor, and Aerojet General, responsible for the mobile ML-1 prototype. By 1953, these partnerships had advanced feasibility studies, setting the stage for operational plants in the late 1950s.

Development and Technology

Reactor Designs

The Army Nuclear Power Program primarily utilized (PWR) technology as its core design, adapting proven naval reactor principles to achieve land-based portability and ruggedness suitable for remote installations. These adaptations emphasized compact cores and simplified systems to facilitate and rapid deployment, drawing from the U.S. Navy's experience with plants developed under the Atomic Energy Commission. Reactors were developed by contractors such as the (ALCO) under AEC oversight. The PWR design involved a primary loop under high pressure to prevent boiling, enabling efficient heat transfer to a secondary for production, while prioritizing scalability for outputs ranging from a few megawatts to support tactical operations. Key innovations in these reactors included the use of highly enriched uranium (HEU) fuel, typically enriched to over 90% U-235, which allowed for smaller core sizes and higher power density essential for military mobility without compromising neutron economy. Some models incorporated natural circulation cooling, relying on thermal gradients and to drive coolant flow rather than mechanical pumps, thereby reducing complexity, maintenance needs, and potential failure points in harsh environments. For instance, the portable medium-power reactors like the PM-2A eliminated pumps entirely, enhancing reliability for deployments. These features collectively addressed the program's goal of producing resilient, low-footprint power sources capable of operating autonomously for extended periods. A prominent variation was the SM-1 (Stationary Medium Power) , a 10 MW thermal PWR that served as the program's , featuring a single-loop configuration with stainless-steel-clad UO2 fuel plates and integrated steam generation for direct grid connection—the first such U.S. in 1957. While was explored in related experimental contexts for reflection to improve efficiency, the SM-1 relied on standard moderation with steel reflectors, though later variants optimized reflector materials for better flux distribution. Challenges in design included robust radiation shielding, achieved through layered lead, , and barriers to protect personnel and equipment by minimizing exposure to safe levels. Modular was another critical innovation, with reactor components prefabricated into sections weighing under 20 tons, enabling air via C-130 for assembly at forward sites, thus supporting the program's emphasis on logistical flexibility.

Construction and Deployment

The Army Nuclear Power Program emphasized modular and prefabricated reactor designs to facilitate rapid construction and deployment at remote military sites, with much of the initial fabrication occurring at the National Reactor Testing Station (now ) in . Components such as reactor vessels and shielding were manufactured off-site and shipped for on-location assembly, enabling most plants to be completed in under two years from groundbreaking. For instance, the SM-1 prototype at , , began construction in late 1955 and achieved completion by early 1957, demonstrating the efficiency of this approach. Deployment posed significant logistical challenges, particularly for transporting heavy components to isolated locations. Reactor vessels weighing up to 100 tons or more required specialized heavy-lift methods, including ships for ocean crossings and aircraft like the C-130 for air delivery of modular parts; the total PM-2A system at , , exceeded 330 tons but was broken down into transportable sections fitting within cargo plane dimensions. At , these elements were assembled in underground ice tunnels amid extreme conditions, including subzero temperatures and snow drifts that complicated site access and installation. Site preparation involved rigorous engineering to ensure stability and integration with existing infrastructure. Foundations were reinforced for seismic resilience, incorporating concrete bases designed to withstand potential ground movements at military bases, while utilities were linked to local grids for power distribution. The SM-1 at , for example, was tied directly into the base's electrical system, marking the first U.S. connected to a commercial grid and providing 10 megawatts of electricity to support operations. Initial budget estimates for each plant hovered around $5 million, covering design, fabrication, and basic installation, but costs frequently escalated due to the need for custom shielding and unforeseen site-specific adaptations. The SM-1A at , for instance, aligned with this $5 million projection but saw adjustments for Arctic environmental factors, while overall program expenses rose as complexity increased for remote deployments. The first prototype, SM-1, was fully operational by April 1957 following these processes.

Operational Plants

Stationary Plants

The stationary plants of the Army Nuclear Power Program were fixed nuclear facilities designed to deliver electricity and heating to permanent military bases, emphasizing reliability in remote or challenging environments such as Arctic regions. These plants utilized pressurized water reactor technology to generate power for base operations, including lighting, equipment, and radar systems, while also serving as training platforms for nuclear operators. The designs prioritized compact size, safety, and integration with conventional electrical grids, drawing on general principles of boiling and pressurized water reactors developed under the program. The SM-1 at , , represented the program's inaugural stationary plant and the first U.S. military nuclear reactor to produce electrical power. This 1.75 MW electrical (10 MW thermal) achieved initial criticality in April 1957 and operated until 1973, supplying power to the base and demonstrating grid connectivity to a commercial utility. It also functioned as a primary training facility, educating approximately 800 personnel in nuclear operations over its lifetime. The plant's single-loop configuration highlighted early advancements in compact, land-based nuclear systems for sustained base support. Building on the SM-1 design, the SM-1A was constructed at , to address power needs in extreme subzero conditions for the military reservation and associated radar installations. This , rated at approximately 2 MW electrical (20.2 MW thermal), began operations with criticality in March 1962 and continued until 1972, providing both electricity and 72,000 pounds per hour of steam for heating. Its deployment validated nuclear power's viability in harsh Arctic settings, where conventional fuel logistics posed significant challenges, and it supported critical defense infrastructure like radar sites. Overall, these stationary plants exemplified the program's focus on self-sufficient base power, with the SM-1 and SM-1A providing representative examples of successful long-term deployment in diverse geographies.

Mobile and Floating Plants

The Army Nuclear Power Program developed and floating nuclear plants to deliver reliable power to remote or temporary installations where conventional was impractical, emphasizing prefabricated, transportable designs for rapid deployment in harsh environments. These units, primarily pressurized water reactors (PWRs), were engineered for self-containment, including integrated shielding and minimal on-site construction needs, distinguishing them from stationary plants by prioritizing adaptability over long-term fixed operations. An experimental component was the ML-1 , a compact mobile low-power unit with 3.3 MW thermal (net electrical output of approximately 0.34 MW) tested from 1961 to 1965 to explore integrated designs suitable for field applications, including potential stationary use at remote sites like . This closed-cycle, nitrogen-cooled system tested innovative mobility concepts while contributing data on efficiency and for fixed installations, achieving up to 25% in trials. Although primarily a prototype for transportable systems, its findings informed optimizations in stationary plant outputs and operational reliability. The , also known as the Sturgis, was the program's flagship , a 45 MW thermal (MWT)/10 MW electric (MWe) single-loop PWR mounted on a converted . Commissioned in 1967 after testing at , , it was towed to in the , where it operated from 1968 to 1976, generating electricity to alleviate chronic power shortages exacerbated by the Vietnam War-era demand surge at a 54% while using low-enriched fuel (4-7% U-235). The 's mobility allowed it to moor flexibly without permanent docking . Decommissioned in 1977 due to maintenance costs and shifting priorities, the demonstrated the feasibility of barge-mounted for strategic waterways. The PM-2A represented an early portable land-based reactor, a 10 MWT/1.56 PWR designed for truck-transportable prefabricated components totaling around 300 tons, enabling assembly in remote conditions. Deployed to , , it operated from 1960 to 1963, supplying electricity and heat (1.05 GJ/hr) to the underground base and proving the concept of field-erected nuclear plants with high-enriched fuel. The unit was fully dismantled and relocated in 1964, highlighting its temporary, non-permanent nature despite challenges like cold-weather logistics. Building on the PM-2A, the PM-3A was a compact 9 MWT/1.5 MWe (net) PWR adapted for extreme polar use, operational at , , from 1962 to 1972 and refueled once in 1970. It generated approximately 78 million kWh, powering the station's electricity needs and supporting a desalination plant for fresh water, though ice buildup on components led to operational inefficiencies and eventual leaks requiring enhanced maintenance. Like its predecessor, the PM-3A featured modular construction for air and sea transport, with self-contained shielding to minimize site preparation in ice-covered terrains. Overall, these plants incorporated designs limiting total weight to under 500 tons for systems, integrated shielding, and streamlined processes achievable in under six months, facilitating deployment to isolated sites without extensive groundwork. High-enriched uranium fueled the PM-series for compact , while the MH-1A's platform enabled waterborne relocation, collectively validating power's role in mobile before the program's wind-down in the .

Timeline and Operations

Key Milestones

The U.S. Army Nuclear Power Program (ANPP) was formally initiated in 1954 when the Army awarded a contract to Alco Products, Inc., for the design and construction of the SM-1, a prototype pressurized water reactor intended to demonstrate nuclear power generation for military applications. This marked the beginning of the program's efforts to develop compact, reliable nuclear reactors for remote and mobile operations under the oversight of the U.S. Army Corps of Engineers. A major breakthrough occurred on April 8, 1957, when the SM-1 reactor at , , achieved initial criticality, becoming the first U.S. nuclear power plant to generate . By April 15, it produced its first electrical power and was connected to the local utility grid, predating the and validating the 's approach to small-scale nuclear generation for defense needs. In 1962, the program demonstrated its adaptability to extreme environments with the deployment of the PM-3A reactor to McMurdo Station in Antarctica. The PM-3A, a compact pressurized water reactor based on the SM-1 design, achieved criticality on March 4 and began supplying power to the U.S. Navy's Antarctic research operations by July 12, proving the viability of nuclear power in polar conditions where conventional fuels were logistically challenging. The feasibility of mobile nuclear power was further advanced in 1967 with the activation of the , the world's first , aboard the barge Sturgis. Commissioned on January 25 at , the was towed to the and began contributing to the grid in 1968, providing reliable electricity for canal operations and showcasing the potential for barge-mounted reactors in tropical and strategic waterway environments. By 1968, the ANPP had developed eight reactor projects (SM-1, SM-1A, PM-1, PM-2A, PM-3A, , ML-1, and ), with four operational power plants—SM-1, SM-1A, PM-3A, and —supporting remote installations across diverse global locations. However, escalating costs and shifting national priorities, exacerbated by budget constraints in the 1970s stemming from aftermath, program reductions, and broader defense reallocations under the Nixon administration, began to curtail further expansion and maintenance efforts.

Decommissioning and Closure

The decommissioning phase of the Army Nuclear Power Program began in the early 1970s with the shutdown of remote installations, driven by escalating maintenance and operational costs that made continued use uneconomical compared to conventional diesel generators. The at , , was permanently shut down in September 1972 after routine inspections revealed corrosion and coolant leaks in the vessel, compounded by low availability rates and high repair expenses. Similarly, the at , ceased operations in 1972 due to prohibitively high operating costs, marking the beginning of a broader phaseout that extended through 1977 with the deactivation of remaining plants like the floating barge. Decontamination efforts involved coordinated actions by U.S. Army teams and the Department of Energy () to remove radioactive components, such as spent fuel and contaminated equipment, from the sites. For instance, the PM-3A's module and over 9,000 cubic meters of contaminated were shipped back to the for disposal, in compliance with the Antarctic Treaty prohibiting nuclear waste on the continent. In cases like the PM-2A at , , highly radioactive components were transported to the for burial, exemplifying the program's waste management approach where hazardous materials were centralized at facilities. Partial decommissioning of the SM-1A in 1973-1974 included fuel removal and initial radiological cleanup, placing the site in safe storage pending full dismantlement. The program was formally discontinued in 1976 under the Ford administration, as cheaper alternatives and evolving energy technologies reduced the strategic need for mobile nuclear reactors, while international non-proliferation efforts further shifted priorities away from proliferation-sensitive designs. Legacy sites continue to undergo , with annual radiological surveys at locations like confirming radiation levels at background or acceptably low thresholds and no major leaks or contamination incidents reported since shutdown. As of 2025, decommissioning of the SM-1A at is underway, having begun in 2024, with full dismantlement expected by 2029; the was fully decommissioned and dismantled by 2019.

Training and Human Factors

Operator Training

The Nuclear Power Plant Operators Course (NPPOC), established at , , in 1958, served as the primary training facility for the Army Nuclear Power Program, preparing military personnel to operate nuclear reactors. Over the program's lifespan, the course trained approximately 800 operators, primarily from the , many of whom later contributed to both military and civilian nuclear facilities. The curriculum featured a rigorous 52-week program structured in three phases: a 16-week academic phase covering foundational subjects such as , , physics, and engineering principles; a 19-week operations phase focused on hands-on reactor management; and a 17-week specialty phase in mechanical systems, electrical systems, , or . Core topics included physics, , heat transfer, fluid flow, principles, and emergency procedures to equip trainees with the knowledge needed for safe and efficient plant operation. Practical training relied on the operational SM-1 reactor at , where operators conducted drills in scram simulations, fuel handling, and functions to build real-world proficiency. Entry qualifications targeted enlisted personnel with high school-level proficiency in and physics, ensuring candidates possessed the analytical foundation for advanced concepts. Graduates received certifications as equipment operators, control room or reactor operators, or shift supervisors, tailored to their assigned plants. The training incorporated safety integration to align operator skills with nuclear health and operational protocols from the outset.

Safety Protocols

The Army Nuclear Power Program (ANPP), established in 1954 through a joint agreement between the U.S. Army Corps of Engineers and the Atomic Energy Commission (AEC), adopted rigorous AEC safety standards to manage risks associated with small-scale nuclear reactors deployed in remote locations. These standards mandated the incorporation of redundant cooling systems, such as dual primary coolant pumps in reactors like the PM-1 and SM-1, to ensure continuous circulation and prevent overheating during normal operations or transients. Additionally, automatic shutdown systems, or scram mechanisms, were required to respond to anomalies including temperature spikes exceeding operational limits, utilizing 2-out-of-3 coincidence logic in power range channels to trigger rapid reactor trips within seconds. This framework prioritized inherent safety features and defense-in-depth principles to mitigate potential accidents in harsh environments. Incident reporting protocols under the ANPP emphasized prompt and of operational anomalies, resulting in an exemplary record with only minor events recorded and no instances of release beyond site boundaries. These events typically involved equipment malfunctions or minor containment issues that were contained through built-in monitoring, such as gamma scintillators on blowdown lines in the PM-1 reactor, without escalating to risks. The program's adherence to guidelines ensured that all incidents underwent thorough root-cause analysis and corrective actions, contributing to zero off-site radiological impacts across its operational history. Maintenance regimens were structured to uphold reactor integrity, incorporating periodic inspections—conducted at least quarterly for critical components—and fuel rod replacements aligned with core life cycles, typically every 1 to 5 years depending on load factors, as seen in the SM-1A's annual core refresh at 60% capacity. Worker safety was safeguarded through comprehensive programs, including self-reading dosimeters and film badges, enforcing exposure limits below 5 rem per year for whole-body in line with historical regulations under 10 CFR Part 20. These measures applied the ALARA (As Low As Reasonably Achievable) principle, with continuous area surveys and fluid sampling to monitor radiological conditions. To prepare for potential emergencies, the ANPP implemented annual exercises simulating loss-of-coolant accidents (LOCA), focusing on response coordination, system failover, and containment integrity, in accordance with AEC safety standards.

Accomplishments and Legacy

Technical Achievements

The Army Nuclear Power Program marked a pioneering engineering success with the SM-1 reactor at , , which achieved the first non-naval connection of a U.S. to an in 1957. This 10 MWt delivered 1,750 kWe of net electrical power to the local utility, proving the feasibility of compact, land-based systems for sustained generation in remote or strategic locations. The program's reactors demonstrated robust performance in extreme environmental conditions, operating reliably at temperatures as low as -50°F in and settings without structural or operational failures attributable to cold. Deployments such as the SM-1A at , served as an inservice test facility in harsh conditions, supplying and while validating for cold-weather bases. Similarly, the PM-3A at McMurdo Station, , functioned as the only on the continent, powering research operations amid subzero extremes and irregular resupply challenges. Economic efficiency was a key technical outcome, exemplified by the SM-1's generation of substantial at costs far below diesel alternatives, enabling long-term savings for remote installations where fuel logistics were prohibitive. Over its operational life from to , the plant underscored power's advantage in reducing dependency on fossil s, with levelized costs demonstrating viability for military applications. Engineering innovations from the program included advancements in compact reactor shielding and systems. These contributions emphasized scalability, enhanced , and efficient thermal management for transportable units.

Broader Impact

The Army Nuclear Power Program (ANPP) significantly influenced the transition of to the civilian sector by advancing (PWR) designs that informed early applications. Innovations from the program's small-scale reactors, developed between 1954 and 1977, provided principles for larger PWRs, enabling utilities to adapt military-derived technologies for grid-scale and accelerating the commercialization of during the late and early . The program's experiences also contributed to evolving U.S. nuclear policy, particularly in the debates surrounding non-proliferation and the use of highly enriched uranium (HEU). ANPP reactors, such as the and , utilized HEU fuel to meet military power demands in isolated locations, highlighting security risks associated with proliferation-sensitive materials in non-weapons applications. This contributed to broader U.S. policies aimed at minimizing civilian HEU use, culminating in a phase-out for most non-military purposes by the 1980s through conversion to low-enriched uranium (LEU) fuels. Environmentally, the ANPP demonstrated the feasibility of low-emission for sustained operations in harsh environments, generating electricity without significant outputs over decades of service. However, the program's legacy includes challenges in and site remediation, as evidenced by the need for long-term cleanup under the Deactivated Nuclear Power Plant Program (DNPPP) managed by the U.S. Army Corps of Engineers for facilities like those at . For in , ongoing environmental concerns involve international cooperation between the U.S. and for waste assessment and remediation. These efforts underscored the complexities of handling from compact reactors, influencing contemporary discussions on small modular reactors (SMRs) by emphasizing the importance of integrated waste strategies and modular decommissioning to mitigate environmental liabilities. As of 2023, the DNPPP awarded a contract for SM-1A dismantlement at , with full decommissioning projected by 2032. As of 2025, data and operational lessons from the ANPP continue to support U.S. microreactor initiatives, particularly Project Pele, which aims to deploy transportable 1-5 megawatt reactors for forward operating bases and remote installations. The program's history of building and operating eight compact reactors, including five portable units, serves as a direct precedent for Pele's focus on mobile, high-temperature gas-cooled designs that enhance in austere environments. This legacy informs current efforts under the subsequent Janus Program, ensuring that modern military nuclear deployments incorporate proven safety and logistical insights from mid-20th-century experiences.

References

  1. [1]
    Nuclear Energy - National Museum of the United States Army
    SM-1 was the first power plant constructed under the oversight of the Army Nuclear Power Program (ANPP), an atomic energy program launched in 1954 and ...
  2. [2]
    The US Army's Nuclear Power Program in Film
    Feb 14, 2020 · Aside from potential mobile combat operations the Army was tasked with operating a wide variety of fixed or semi-fixed outposts worldwide such ...
  3. [3]
    Army Nuclear Power Program - Experimental Reactors
    The PM-2A nuclear reactor at Camp Century, Greenland, was a temporary facility. After three years the Army shut it down, dismantled it, and removed it from the ...
  4. [4]
    Decommissioning the Army's Former Nuclear Power Plant in Alaska
    Oct 2, 2024 · Both remaining decommissioning efforts are slated to be complete by 2029, ending the Army's liability associated with the prior nuclear power plants.Missing: termination | Show results with:termination
  5. [5]
    Army Nuclear Power Program - Army Corps of Engineers
    The program was responsible for a number of important innovations in reactor design, containment and control structures, and nuclear health and safety programs.<|separator|>
  6. [6]
    Manhattan Project to Department of Energy Formation (1939-1977)
    Between 1942 and 1945, most of this work was performed at Oak Ridge, Tennessee in support of the uranium weapon. In parallel with the work on uranium was an ...
  7. [7]
    [PDF] Mobile Nuclear Power Plants 1960-1970 - DTIC
    (2) That, in addition to the POL aspects of the problem, the Army Nuclear Power Program consider the following special areas of energy application: (a) ...
  8. [8]
    Origins of ANPP
    ### Summary of Origins of Army Nuclear Power Program
  9. [9]
    [PDF] THE ROLES OF THE U.S. ARMY IN AMERICA'S NUCLEAR ... - DTIC
    Sep 3, 2014 · Within a year's time, President Truman signed the Atomic Energy Act, which created the. Atomic Energy Commission, the civilian agency that ...
  10. [10]
    [PDF] MILITARY NUCLEAR POWER PLANTS - DTIC
    Construction of the SM - 1 was begun of S October 1Q5S by ALCO Products ... Aerojet-General Corporation under contract with the AEC. It is presently.
  11. [11]
    [PDF] Lieutenant General Ernest Graves - USACE Publications
    Leslie Groves to form a military unit to assemble nuclear weapons. Graves ... Army Nuclear Power Program, 48. Army Package Power Reactor (APPR), 48, 65.
  12. [12]
    None
    Summary of each segment:
  13. [13]
    [PDF] Small Nuclear Reactors for Military Installations - NDU Press
    6 The Army's Nuclear Power Program (1954–1977) developed, constructed, and operated eight compact reactors at remote instal- lations from Alaska to ...
  14. [14]
    [PDF] Project Pele Overview - Nuclear Regulatory Commission
    Project Pele aims to provide mobile, reliable nuclear power for the DoD using TRISO fuel, with a prototype reactor targeted for mid-2024.
  15. [15]
    [PDF] Fort Greely, Alaska SM-1A Nuclear Power Plant Fact Sheet
    The SM-1A was a 20.2 megawatt-thermal (MWt) pressurized water reactor which could supply 72,000 pounds of saturated steam per hour. The reactor used uranium ...
  16. [16]
    [PDF] SM-1 Nuclear Power Plant, Ft. Belvoir, VA
    The construction of the SM-1 at Fort. Belvoir was completed in 1957, and it achieved its first criticality in April 1957. The SM-1 was a single-loop 10.
  17. [17]
    Nuclear Power at Fort Belvoir - Army Corps of Engineers
    Army Nuclear Power Program - SM-1 at Fort Belvoir ; building the dome-shaped reactor · Lowering pressure vessel into place · aerial view of SM-1 facility.
  18. [18]
    [PDF] Concept of Operations for Microreactor Transportation
    Sep 30, 2020 · Army Nuclear Power Program ... U.S. Air Force C-124, C-130, and C-133 aircraft were the specified carriers. In the case of the C-124 and ...
  19. [19]
    Baltimore District > Missions > Environmental > SM-1
    SM-1 was a 2-megawatt nuclear reactor developed by the United States Atomic Energy Commission for the US Army Nuclear Power Program (ANPP) in the mid-1950s.
  20. [20]
    The Army tried portable nuclear power at remote bases 60 years ago
    Jul 20, 2021 · The Army called the reactor portable, even at 330 tons, because it was built from pieces that each fit in a C-130 cargo plane.
  21. [21]
    [PDF] testing nuclear power in alaska: the reactor at fort greely
    In 1952 it developed a plan called the Army Package Power Reactor. (APPR) ... An Introduction to the Army Nuclear Power Program. Fort. Belvoir VA: United ...
  22. [22]
    [PDF] Virginia SM-1 Nuclear Power Plant, Fort Belvoir fact sheet
    The construction of the SM-1 at Fort Belvoir was completed in 1957, and it achieved its first criticality in. April 1957. The SM-1 was a single-loop 10 ...
  23. [23]
    SM-1 Nuclear Reactor at Fort Belvoir - Virginia Places
    The Army Nuclear Power Program built eight military compact reactors that were used at Fort Greely (Alaska), Camp Century (Greenland), and the Panama Canal Zone ...Missing: appropriation | Show results with:appropriation
  24. [24]
    SM-1A - US Army Corps of Engineers - Baltimore District
    The SM-1A Nuclear Power Plant is located in central Alaska, approximately 6 miles south of Delta Junction on the Fort Greely Military Reservation. Fort Greely ...
  25. [25]
    [PDF] SM-1A Nuclear Power Plant, Fort Greely, Alaska Fact Sheet
    The construction of the SM-1A at Fort Greely began in 1958 and was completed in 1962 with first criticality achieved on 13 March 1962.
  26. [26]
    Small Nuclear Power Reactors - World Nuclear Association
    All these were outcomes of the Army Nuclear Power Program (ANPP) for small reactor development – 0.1 to 40 MWe – which ran from 1954-77. ANPP became the Army ...
  27. [27]
    Army Nuclear Power Program - MH-1A Sturgis
    Though the Sturgis was an unpowered barge, the binnacle and compass were left on board after its conversion. Magnetic compass from the MH-1A Sturgis ...
  28. [28]
    CB&I to decommission floating reactor - World Nuclear News
    Apr 14, 2014 · MH-1A entered operation at Fort Belvoir in 1967, and the Sturgis was towed to Gatun Lake in the Panama Canal Zone in 1968. The 45 MWt ...
  29. [29]
    Nuclear Power at McMurdo Station, Antarctica - Stanford
    Mar 21, 2014 · During the 1960s and early 1970s, McMurdo Staion, the largest research base in the Antarctic, was powered by a medium-sized, portable nuclear reactor.
  30. [30]
    (PDF) Military Nuclear Power Plants 1958-1978 - ResearchGate
    ... Alco Products, Incorporated, Schenectady NY, Technical Information Extension at. Oak Ridge, Tennessee, October 14, 1955. “Military Nuclear Power Plants ...
  31. [31]
    New Nuclear - Alaska Business Magazine
    May 22, 2023 · For comparison, the construction cost of SM-1A and its prototype, SM-1 at Fort Belvoir in Virginia, was approximately $20 million each ...
  32. [32]
    The Forgotten History of Small Nuclear Reactors - IEEE Spectrum
    Apr 27, 2015 · Nuclear's high costs result directly from the very high costs of building a reactor—estimated by Lazard at $5.4 million to $8.3 million for each ...
  33. [33]
    The cold sad tale of “Nukey Poo” - Energy Central
    Jul 17, 2024 · Both costs and environmental impacts conspired to close the plant in September 1972.” But that's not the end of the story of Nukey Poo. The ...Missing: shutdown | Show results with:shutdown<|separator|>
  34. [34]
    The US Army tried portable nuclear power at remote bases 60 years ...
    The first two nuclear submarines, the Nautilus and the Skate, visited the North Pole in 1958, just before Camp Century was built.
  35. [35]
    Army Begins Decommissioning Fort Greely's Mothballed Cold War ...
    Mar 5, 2018 · “The main approach was to reduce significant fuel-transportation costs by having a nuclear reactor that could operate for long terms with just ...
  36. [36]
    U.S. Army Prime Power School - MyBaseGuide
    Sep 9, 2019 · From 1958 through 1977, the school trained nuclear power plant operators and was called the USA Nuclear Power School. The yearlong training ...Missing: date | Show results with:date
  37. [37]
    [PDF] (1996-08-16) AR 50-7 Army Reactor Program.
    Aug 16, 1996 · History. This is a new publication. Summary. This regulation establishes poli- cies, assigns responsibilities, and prescribes.
  38. [38]
    None
    ### Summary of Army Nuclear Power Program and Related Oversight
  39. [39]
    [PDF] Army Reactor Program Regulatory Bases
    Apr 7, 2025 · Consistent with the Atomic Energy Act of 1954, as amended, the Army Reactor Office (ARO) provides regulatory oversight of Army nuclear reactors, ...
  40. [40]
    APTIM to Decommission & Dismantle Reactor at Fort Greely
    Oct 18, 2023 · The SM-1A reactor facility is the last standing nuclear reactor constructed as part of the Army Nuclear Power Program.
  41. [41]
    [PDF] Highly Enriched Uranium: Striking a Balance - Public Intelligence
    HEU utilization in military reactors includes the Naval Nuclear ... The Army Nuclear Power Program developed specialized nuclear power reactors that were.Missing: debates | Show results with:debates
  42. [42]
    The Nuclear Non-Proliferation Treaty (NPT), 1968
    The Nuclear Non-Proliferation Treaty was an agreement signed in 1968 by several of the major nuclear and non-nuclear powers that pledged their cooperation.
  43. [43]
    FUSRAP - Army Corps of Engineers
    FUSRAP was initiated in 1974 to identify, investigate and, if necessary, clean up or control sites throughout the United States contaminated.
  44. [44]
    Army announces Janus Program for next-generation nuclear energy
    Oct 14, 2025 · Executive Order 14299, “Deploying Advanced Nuclear Reactor Technologies for National Security,” directs the Department of War to commence ...