The Cascade Tunnel is a 7.79-mile-long (12.55 km) railroad tunnel located in the Cascade Mountains of Washington state, United States, that serves as a critical link in the BNSF Railway's transcontinental mainline over Stevens Pass. Constructed between 1925 and 1928 by the Great Northern Railway at a cost of $14 million, it replaced an earlier 2.63-mile (4.23 km) tunnel built in 1900, which had been plagued by operational challenges including heavy snowfall, avalanches, and excessive smoke from steam locomotives. The new tunnel features a straight alignment with a consistent 1.56% descending grade from east to west, concrete lining, and electrification to enhance efficiency and safety, reducing the route's curvature, grades, and exposure to winter hazards while shortening the overall line by about 9 miles. Opened to traffic on January 12, 1929, following a dedication ceremony broadcast nationally on radio, the tunnel was part of a broader $25 million improvement project to optimize the Great Northern's Pacific extension. Excavation involved over 1,700 workers using a pioneer adit and multiple faces to bore through solid granite, though the project was not without tragedy, including the deaths of four laborers in rockslides during late 1928. Today, it remains in active use by BNSF for freight and Amtrak's passenger service, carrying essential cargo to and from the while forming a cornerstone of the , listed on the .

Overview

Location and Route

The Cascade Tunnel is situated in the North Cascade Range of Washington state, United States, spanning King and Chelan counties. Its west portal is located near Scenic in King County, while the east portal is near Berne in Chelan County. The tunnel's approximate central coordinates are 47°44′33″N 121°04′10″W, with the east portal at an elevation of 2,881 feet (878 m) above sea level. As part of the BNSF Railway's Scenic Subdivision, the tunnel facilitates rail traffic along a key transcontinental corridor, linking on the to Spokane in via the challenging crossing. This subdivision extends approximately 155 miles from to Wenatchee, with the tunnel serving as a critical segment for freight and passenger trains navigating the mountainous barrier between western and eastern Washington. The surrounding terrain features the rugged, glaciated peaks and deep valleys of the , characterized by dense coniferous forests and steep slopes that challenge transportation infrastructure. The area lies within the boundaries of the Okanogan-Wenatchee National Forest, encompassing protected with alpine meadows, rivers, and wildlife habitats that underscore the tunnel's remote and environmentally sensitive setting. The tunnel plays a vital role in traversing the Cascade crest at , providing a direct subterranean path that avoids the pass's exposed summit; trains enter from the west near the community of Scenic, adjacent to , and emerge eastward near Berne, descending toward the Wenatchee Valley.

Specifications

The new Cascade Tunnel, completed in 1929, spans 7.8 miles (12.55 km) in length, making it the longest active railroad tunnel in the United States. This surpasses the original Cascade Tunnel, which measured 2.63 miles (4.23 km) and was operational from 1900 until its replacement. The tunnel accommodates a standard track gauge of 4 ft 8½ in (1,435 mm) in a single-track configuration, facilitating efficient passage for operations. It features a consistent of 1.565% rising from west to east, which influences train handling and power requirements. Maximum speeds are limited to 30 mph for passenger trains and 25 mph for freight to ensure safety and control within the confined space. At the portals, reinforced doors are installed at both ends to manage airflow and support the ventilation system, closing automatically during train transits to direct exhaust gases effectively. These features underscore the tunnel's design for operational reliability in a high-elevation mountain environment.

History

Original Tunnel

In 1890, engineer John F. Stevens discovered and surveyed Stevens Pass in the Cascade Mountains, identifying a feasible route through the challenging terrain that led the Great Northern Railway to select it for their transcontinental line. This discovery replaced earlier proposals for more difficult paths, enabling the railway to bypass steep switchbacks and reduce grades. Construction of the original Cascade Tunnel began in August 1897 to further streamline the route, with crews working from both ends using direct measurement techniques rather than traditional triangulation. The project employed a workforce of 600 to 800 laborers operating in three eight-hour shifts around the clock, excavating through granite and schist to create a 2.63-mile single-track tunnel with a 1.7% descending grade from east to west. The tunnel, fully lined with concrete, opened to traffic on December 20, 1900, marking it as the longest railroad tunnel in the United States at the time and significantly shortening the distance between Seattle and Spokane. Early operations revealed severe limitations due to steam locomotives filling the enclosed space with smoke and heat, prompting in with a pioneering three-phase () system at 6,600 volts. This innovation, powered by Baldwin-Westinghouse Z-1 electric locomotives, spanned about three miles through the tunnel and adjacent sections, allowing safer and more efficient passage without the asphyxiation risks posed by coal-fired engines. However, the route's exposure to heavy snowfall persisted as a major challenge, necessitating the construction of numerous snowsheds along the approaches to mitigate dangers in the steep, forested terrain. These structures aimed to deflect sliding snow but proved insufficient against ; on March 1, 1910, a massive at struck two stalled trains near the tunnel's west portal, burying them and killing 96 people—35 passengers, 58 railroad crew members, and three station employees—making it the deadliest disaster in history. The tunnel's operational difficulties, including ongoing avalanche threats and maintenance demands for snowsheds, ultimately highlighted the need for a longer but lower-elevation replacement to improve reliability and capacity. It remained in service until January 12, 1929, when the new Cascade Tunnel opened nearby, leading to its immediate abandonment. The disused structure deteriorated over decades, with a significant section of its roof collapsing during the winter of 2007–2008 due to water infiltration and structural weakening, rendering it impassable and hazardous.

New Tunnel Construction

In 1925, the Great Northern Railway, under the leadership of Louis W. Hill, decided to construct a new Cascade Tunnel to address the original tunnel's severe inefficiencies, including smoke accumulation from that endangered crews and passengers, frequent that disrupted service, and capacity limitations that hindered growing freight and passenger traffic. The authorized the project on Thanksgiving Day, 1925, marking the most ambitious improvement in the railway's history, with the goal of creating a longer but straighter and lower-elevation route to enhance reliability and speed. Construction began on December 14, 1925, under Chief Engineer Frederick Mears and contractor A. Guthrie & Company of St. Paul, Minnesota, who oversaw the full-bore excavation using drill-and-blast methods through predominantly solid granite. A workforce exceeding 1,000 men, peaking at 1,793, labored in two headings from each portal, supported by approximately 5 million board feet of timber for temporary shoring and extensive concrete lining for the 7.79-mile tunnel. The project faced significant engineering hurdles, including massive water inflows reaching 10,000 gallons per minute that required advanced pumping systems, as well as rock instability that demanded careful blasting to prevent collapses, yet the headings met with remarkable precision—only eight inches off alignment after four miles. The project was not without tragedy; on November 8, 1928, rockslides inside the tunnel killed four workers. The total cost reached $25.7 million, covering the tunnel at $14 million, plus $5 million for the new Chumstick alignment and $6 million for electrification infrastructure, with completion ahead of schedule despite these challenges. The tunnel was dedicated on January 12, 1929, by President Ralph Budd in a nationally broadcast ceremony, immediately entering service with full over 75 miles of the route using 11 electric locomotives, including five newly built units, to eliminate steam-related issues. This electric operation continued until 1956, when it was discontinued in favor of locomotives, allowing the removal of overhead lines and systems.

Engineering and Design

Alignment and Geology

The New Cascade Tunnel adopts a straight-line to optimize and reduce compared to the original route, spanning 7.8 miles between the west portal near Scenic Hot Springs and the east portal near Berne, positioned approximately 1.5 to 2 miles south of the earlier tunnel. This design choice minimizes the overall route distance—replacing nearly 50 miles of the old winding line with about 41 miles of new track—and achieves a consistent descending grade of 1.56% from east to west for improved train handling and operational efficiency. The portals are situated at elevations of approximately 2,260 feet on the west and 2,881 feet on the east, placing the tunnel summit at 2,881 feet, which is 502 feet lower than and avoids higher-altitude and exposures. Geologically, the tunnel traverses solid formations prevalent in the Cascade Range's crystalline core, offering a relatively competent rock mass for boring but interspersed with potential zones of weakness such as fractures or faults. To address stability in these variable conditions, the entire tunnel is lined with an average of 2 feet 9 inches (0.84 ) of , totaling 262,564 cubic yards, which provides structural support against rock pressure and any localized weak sections. This lining enhances long-term durability in the region's tectonically active setting, where seismic activity from the influences design considerations for ground movement and deformation. Excavation presented significant challenges due to overburden depths reaching up to 2,000 feet over the tunnel crown, requiring careful blasting and support to prevent collapse, with a total of 923,000 cubic yards of and earth removed using 2,500 tons of . inflows were managed through the parallel 12.5-mile Pioneer Tunnel, which served as a conduit, supplemented by pumps to maintain dry working faces and prevent flooding during the three-year from 1926 to 1929. These measures, combined with a central 622-foot for multi-face advancement, ensured progress through the deep valley of Mill Creek and addressed the geological complexities of the granitic terrain.

Ventilation System

The ventilation system of the Cascade Tunnel was installed in , shortly after the decommissioning of the tunnel's , to enable the safe operation of diesel-powered locomotives through its 7.8-mile length without the need for mid-tunnel engine swaps. This upgrade addressed the persistent accumulation that had previously required specialized procedures, marking a shift from electric to full diesel operations across the Great Northern Railway's route. The design of the ventilation system was influenced by the severe smoke and fume challenges experienced in the original 1900 Cascade Tunnel, which filled rapidly with exhaust due to inadequate natural airflow and prompted its as early as —a feature carried over to the new tunnel upon its 1929 opening. Located at the east portal in Berne, Washington, the system features two powerful 800-horsepower exhaust fans driven by electric motors, which draw in fresh air and expel contaminated air to maintain safe atmospheric conditions inside the tunnel. In operation, the system utilizes a ventilation method where, as a train approaches from the west, an automatic red-and-white-checkered door at the east portal closes to seal the tunnel, while the fans blow cool, fresh air through a secondary portal during transit to minimize fume buildup around the moving train. Once the train clears the east portal—triggered by sensors detecting its position approximately 0.6 miles away—the door remains closed, and the fans operate at full capacity to push the accumulated diesel fumes westward out the west portal, completing the clearing cycle in 20 to 30 minutes before the next train can enter. This process, combined with speed restrictions of 25-30 mph through the tunnel, results in a practical daily capacity of about 24 trains, balancing safety with throughput on the BNSF Railway's busy mainline. The infrastructure includes emergency air stations spaced every 1,500 to 2,500 feet along the tunnel for crew access to in case of ventilation failure, underscoring the system's critical role in . A notable incident in 1996 involved a malfunctioning east portal door that delayed operations, highlighting the reliance on automated controls for efficient fume management. In 2025, BNSF implemented an advanced communication system using PBE Axell's OMNIA solution to improve radio coverage and data transmission within the tunnel. Ongoing maintenance by BNSF ensures the fans and doors function reliably, supporting consistent service despite the tunnel's challenging length and gradient.

Operations

Daily Train Operations

The Cascade Tunnel is operated by , which assumed control following the 1970 merger that formed its predecessor, the , from the Great Northern Railway and other lines. The tunnel handles a daily maximum of 28 trains, predominantly freight services carrying commodities such as and intermodal containers, with the providing the primary passenger service once daily in each direction. Train scheduling incorporates staggered entries to accommodate ventilation cycles, ensuring a minimum interval—typically around 20 minutes—between passages for air ; westbound trains, descending the , tend to push air forward due to piston-like effects, while eastbound trains ascending the 1.57% slope pull air behind them. Freight trains require multiple locomotives distributed along their length to manage the sustained without the need for additional helper units, a enabled by the tunnel's straight alignment and system that allows uninterrupted operations. As a critical segment of BNSF's Scenic Subdivision, the Cascade Tunnel serves as a vital conduit for transcontinental freight, facilitating the movement of goods from ports like and Tacoma to Midwest destinations, thereby supporting regional trade efficiency. In 2025, the tunnel remains fully operational without significant disruptions, with freight volumes showing mixed trends including port container increases amid broader U.S. rail declines.

Safety Protocols and Maintenance

Safety protocols in the Cascade Tunnel emphasize preparedness for ventilation failures and air quality hazards. Train crews are equipped with air packs and masks to facilitate safe passage or evacuation if the ventilation system malfunctions, a measure required due to the tunnel's length and reliance on mechanical airflow. Crews must confirm the closure of portal doors after passage to maintain internal pressurization and prevent smoke or fumes from accumulating. (CO) levels are monitored as part of broader air quality standards, with requirements for at least 21% oxygen and compliance with NIOSH/OSHA thresholds to protect personnel during operations or emergencies. Historical incidents underscore the importance of these protocols. The original Cascade Tunnel, operational from 1900 to 1929, was linked to the avalanche on March 1, 1910, when a massive slide swept two stalled Great Northern Railway trains into a near the west portal, killing 96 people—including 35 passengers, 58 railroad employees, and 3 depot workers. On April 4, 1996, an eastbound BNSF freight train collided with the closed east portal doors after they failed to open, destroying the panels but resulting in no injuries; a spare set of doors was installed shortly thereafter. Maintenance efforts by ensure the tunnel's ongoing reliability, including routine inspections of concrete lining, wayside telephones at bay locations, and (CTC) signaling systems. The tunnel receives regular upkeep to address age-related deterioration, such as structural wear from environmental exposure. aligns with (FRA) standards for tunnels over 1,000 feet, which mandate evacuation procedures, emergency communication, and air quality assessments. risks outside the portals are mitigated through snowsheds on the Scenic Subdivision through in the Cascade Mountains, part of BNSF's network-wide protections exceeding 6,900 feet in total length. Future considerations include potential integration with the Cascadia High-Speed Rail project, which received $49.7 million in federal grants in December 2024 for planning between , , and , B.C.; however, no modifications to the Cascade Tunnel have been proposed or implemented as of November 2025.

References

  1. [1]
    [PDF] National Register of Historic Places ! Inventory « Nomination Form
    Stevens explored the Cascade slopes and produced a plan that would transport the tracks of the Great Northern Railway over the Cascades to a useful terminus ...
  2. [2]
    Freight wonders of the world: How BNSF solved five big engineering ...
    Aug 27, 2020 · The new main line track included the then-longest tunnel in the Western Hemisphere, the 7.9-mile-long Cascade Tunnel. Construction on the tunnel ...
  3. [3]
    The Great Northern Railway Eight-Mile Tunnel is dedicated on ...
    Jan 6, 2014 · The original Cascade Tunnel, 2.63-miles long, was built by the Great Northern Railway between 1897 and 1900. It was intended to eliminate ...Missing: facts | Show results with:facts
  4. [4]
    [PDF] Great Northern Railway, New Cascade Tunnel
    The new Cascade Tunnel and the old line abandoned January 12, 1929. wards built and has been in use since 1900. A notable feature of the Stevens Pass route was ...
  5. [5]
    the Cascade Tunnel Railfan Guide
    The current Cascade Tunnel is in full operation and receives regular maintenance from BNSF Railway. The new alignment is a straight-line tunnel running between ...
  6. [6]
    GPS coordinates of Cascade Tunnel, United States. Latitude
    GPS coordinates of Cascade Tunnel, United States. Latitude: 47.7388 Longitude: -121.0683.Missing: elevation Subdivision
  7. [7]
    Cascade Tunnel # 15 - Great Northern Railway Page
    The sign above the archway reads, "Cascade Tunnel - 7.8 Miles Long - Elevation 2,881 Feet - 41,183 Feet Long - Completed 1929 - No.-15". The BNSF recently ...<|control11|><|separator|>
  8. [8]
    New Cascade Tunnel (Skykomish/Chelan County, 1929) | Structurae
    Eastern portal of the BNSF Cascade Tunnel located at Milepost 1700 on the Scenic Subdivision. ... Show coordinates on a map. Technical Information. current ...Missing: elevation | Show results with:elevation
  9. [9]
    Cascade Tunnel Closure on the Wenatchee River Ranger District
    Sep 22, 2025 · The tunnel is deemed unsafe for entry at this time. Contact Name: Wenatchee River Ranger District. Contact Number: (509) 548-2550.
  10. [10]
    Cascade Tunnel (Washington): Map, Avalanche, Ventilation
    Aug 24, 2024 · At nearly eight miles in length it is one of the longest railroad tunnel ever built and remains in operation today by successor BNSF Railway.Missing: specifications gradient
  11. [11]
    Cascade Tunnel - LIDAR Magazine
    Feb 15, 2014 · The Cascade Tunnel serves as a crucial route for BNSF in hauling varied cargo to and from the Port of Seattle. It is also used by Amtrak on its ...
  12. [12]
    Stevens Pass Railroad Tunnels - ASCE
    John F. Stevens was made chief engineer of the Great Northern in 1895 and supervised construction of the Cascade Tunnels. The second Cascade Tunnel was the ...
  13. [13]
    Train disaster at Wellington kills 96 on March 1, 1910. - HistoryLink.org
    Jan 26, 2003 · Ninety-six people died in the avalanche, including 35 passengers, 58 railroad employees sleeping on the trains, and three railroad employees ...
  14. [14]
    Iconic Iron Goat Trail: Tracing history along abandoned railroad tracks
    Apr 2, 2024 · Part of the tunnel roof collapsed during the winter of 2007-2008, and it remains very dangerous to enter. The gentle lower trail at Iron Goat ...
  15. [15]
    Tunnel - Streamliner Memories
    The new Cascade Tunnel and the old line abandoned January 12, 1929. wards built and has been in use since 1900. A notable feature of the Stevens Pass route was ...
  16. [16]
    [PDF] Great Northern Railway, Dedication of the New Cascade Tunnel ...
    The old Cascade tunnel, built from 1897 to 1900, took the place of the old switch- back through the Cascade Mountains, reduced the distance between Puget ...Missing: workforce | Show results with:workforce
  17. [17]
    Cascade Tunnel
    Dec 14, 2020 · In 1897 construction of the Cascade Tunnel began. It's goal was to eliminate the complicated and time-consuming switchback system. The original ...
  18. [18]
    North Cascades | Department of Natural Resources - WA DNR
    The Cascade Crystalline Core Domain rocks are made up of the accreted terranes of the Insular and Intermontane belts as well as oceanic rocks, continent-derived ...Missing: Tunnel | Show results with:Tunnel<|separator|>
  19. [19]
    The Cascade Tunnel | The Engines of Our Ingenuity
    The Cascade Tunnel was built to help the Great Northern Railway through the Cascade Mountains. The first tunnel was 2.5 miles, and the current one is 8 miles ...
  20. [20]
    [PDF] Statewide Rail Capacity and System Needs Study - Technical Memo 8
    With a practical capacity of 24 trains per day, there currently are 25 trains per day trying to use the mainline infrastructure. Figure 2 shows the existing ...
  21. [21]
    [PDF] T he History of BNSF: A Legacy for the 21st Century
    BNSF Railway's 384-acre headquarters is located in Fort Worth, Texas. The merger of BN and Santa Fe on. Sept. 22, 1995, created Burlington. Northern and Santa ...<|control11|><|separator|>
  22. [22]
    Focus on Infrastructure: Seven Feats of Freight Rail Engineering
    Sep 10, 2020 · ... maximum of 28 trains per day. BNSF's Cascade Tunnel at Stevens Pass in the Cascade Range of Washington. ... The sight of a single train ...Missing: limit | Show results with:limit
  23. [23]
    [PDF] Heavy Traffic Ahead - Western Organization of Resource Councils
    Pass / Cascade Tunnel routes for loaded trains and the Stampede Pass route for empty trains.60. 58. Washington State 2010-2030 Freight Rail Plan, page 3-28.
  24. [24]
    Empire Builder Train - Amtrak
    Take the Empire Builder train between Washington state and Chicago with stops in Seattle, Portland, Minneapolis & more. Book your trip today.Spokane, WA - Amtrak Station... · East Glacier Park, MT (GPK) · Whitefish, MT (WFH)
  25. [25]
    Explore America's Longest Tunnel: The New Cascade Tunnel and ...
    Jul 28, 2025 · The tunnel accommodates up to 28 trains per day, including Amtrak's Empire Builder route, with speed limits of 30 mph for passenger trains and ...Missing: capacity | Show results with:capacity
  26. [26]
    [PDF] Statewide Rail Capacity and System Needs Study - Final Report
    Jan 5, 2007 · The study addresses the need for policies to govern the state's rail participation, as freight tonnage is expected to increase by 60% by 2025. ...
  27. [27]
  28. [28]
    An Engineer's Life: Cascade Tunnel Adventure - Trains Magazine
    Jan 13, 2025 · In Washington State's Cascade Tunnel, it's time to don the air packs if the tunnel's ventilation system fails.
  29. [29]
    [PDF] Tunnel Safety Analysis - Federal Railroad Administration
    This report is a tunnel safety analysis prompted by a 1987 incident, focusing on tunnels over 1000 feet long, excluding shorter ones.<|control11|><|separator|>
  30. [30]
  31. [31]
    Two trains buried by massive avalanche | March 1, 1910 - History.com
    Two trains are swept into a canyon by an avalanche in Wellington, Washington, on March 1, 1910, killing 96 people. Due to the remote location of the disaster ...
  32. [32]
    BNSF freight blows door off Cascade Tunnel! - Google Groups
    >the force of the fans be enough to clear the tunnel? Without the door the natural ventilation of the tunnel would see a constant breeze travelling in one ...
  33. [33]
    There's Snow Place Like a Snow Shed - BNSF Railway
    Dec 9, 2021 · Snow sheds are structures with sloped roofs that deflect snow over tracks, like long car ports, and are a simple solution to snow hazards.Missing: Tunnel | Show results with:Tunnel
  34. [34]
    Cascadia High-Speed Rail | WSDOT - | WA.gov
    View the 2025 UHSGT status report (PDF 838KB) submitted to the Washington ... operational systems from around the world. What is the Cascadia ...
  35. [35]
    Cascadia High-Speed Rail project receives $55M for planning
    Dec 23, 2024 · The Federal Railroad Administration awarded $49.7 million for planning work for the proposed Cascadia High-Speed Rail project, with the Washington state ...Missing: Tunnel grants