Chiltern Main Line

The Chiltern Main Line is a major railway route in , spanning approximately 112 miles (180 km) from London Marylebone station to Birmingham Snow Hill station, providing an alternative to the busier for intercity travel between London and the West Midlands. Operated primarily by —a subsidiary of —since the privatization of in 1996, the line serves commuter, regional, and long-distance passengers across , , , and the West Midlands, with key intermediate stations including , , Bicester North, and . Originally developed in the mid-19th century by the Great Western Railway as part of efforts to link with and , the route's early sections—such as the line reaching in 1850—facilitated connections between and , with extensions to completed in 1852 and to Marylebone in 1899, including North station opening in 1910. Predominantly double-track and diesel-operated (non-electrified as of 2025), the infrastructure supports maximum speeds of up to 100 mph and includes enhancements like the 2016 Bicester Chord, enabling direct to services and integration with the project. Chiltern Railways operates up to two trains per hour on core sections like to and to , carrying around 22.4 million passengers annually as of 2024, with additional branches to , , and peak services to Junction, and new Mk5A trains entering service from 2026 alongside operation of the segment from to opening in December 2025. The line also accommodates limited freight traffic (up to 24 paths per day) and faces ongoing challenges such as capacity constraints at and an aging fleet averaging around 30 years old as of 2025, prompting plans for battery-hybrid trains by 2030 to boost capacity, reliability, and decarbonization. Notable for its scenic passage through the , the route underscores regional connectivity, supporting access to education, healthcare, and tourism hubs like outlet centre.

Overview

Route description

The Chiltern Main Line is a railway route in spanning 112 miles (180 km) from London Marylebone to Birmingham Snow Hill, linking the capital with the West Midlands via a northwest trajectory. Departing from London Marylebone, the line navigates through suburbs, serving stations including , Sudbury Hill Harrow, and , before ascending into the . It traverses the Chilterns , a designated landscape of chalk escarpments, woodlands, and valleys, with key intermediate stops at , , Saunderton, and . Beyond the Chilterns, the route continues through the area and open countryside, crossing the multiple times as it parallels the corridor northwards. Principal stations in this section include Haddenham & Thame Parkway, Bicester North, and , followed by , Warwick Parkway, Dorridge, and . The line terminates at Birmingham Snow Hill, with some services extending to or from Moor Street. Named for the it traverses, the route was constructed in phases between 1852 and 1910, initially as part of the Great Western Railway's network to provide a direct link.

Key characteristics

The Chiltern Main Line is a non-electrified throughout its length, utilizing standard gauge track of 1,435 mm (4 ft 8½ in). The infrastructure features predominantly double track sections, with historical single track portions having been doubled as part of capacity enhancements, enabling efficient bidirectional operations. The route supports a maximum speed of 100 mph (160 km/h) for passenger services, contributing to journey times of approximately 2 hours (with fastest services around 1 hour 45 minutes) between London Marylebone and Snow Hill, as of 2025. With rated at RA8 (and RA7 in select sections), the line accommodates a range of freight traffic, including aggregates and intermodal containers up to W8 , alongside its primary passenger focus. It includes 32 stations, serving commuter, regional, and long-distance markets across the 112-mile (180 km) corridor from to . The infrastructure is owned and managed by , with operations controlled via Track Circuit Block signalling, incorporating multiple-aspect colour-light signals to enforce absolute block principles for safe train spacing. This system ensures compatibility for up to two trains per hour in each direction on key segments, balancing capacity with reliability.

History

Construction and early development

The origins of the Chiltern Main Line trace back to the mid-19th-century railway expansion, when the Great Western Railway (GWR) sought to develop an alternative route from to the , bypassing the London and North Western Railway's direct path through the . Early proposals for lines through the Chiltern region emerged in the amid competing schemes for connecting to , with routes like those surveyed by John Rennie and Francis Giles considering paths via the Gade Valley and Dagnall Gap to avoid steep gradients. However, the specific infrastructure for what would become the Chiltern Main Line was authorised by the Wycombe Railway Act of 1846 (9 & 10 Vict. c. ccxxxvi), which empowered the construction of a single-track line from the GWR's station to , along with a branch toward , as a closely allied project to extend GWR influence northward. Construction of the Wycombe Railway's initial section faced delays after the 1846 powers initially lapsed, but was revived in 1852 under GWR oversight. The 9.75-mile (15.69 km) broad-gauge line, engineered to the GWR's 7 ft ¼ in (2,140 mm) standard championed by , opened for passenger traffic on 1 August 1854, linking directly to the GWR main line and facilitating local traffic in furniture and agriculture. Meanwhile, the GWR independently advanced its Oxford extension, opening the 11-mile (18 km) branch from to on 1 June 1851; this single-track, broad-gauge segment, also influenced by Brunel's design principles for gentler curves and gradients through the Chiltern valleys, provided the northern foundation for future connectivity. Subsequent phases under the Wycombe Railway further integrated the route. In 1862, a 10-mile (16 km) extension from via reached on 1 August, followed by the final 13 miles (21 km) from Thame to on 24 October 1864, completing a circuitous but viable link via a junction at . These broad-gauge additions enhanced regional access but required reversal at Oxford for through travel. The line's full potential as a direct main line to was realised with the Bicester cut-off, an 18.25-mile (29 km) GWR deviation authorised in 1905 and opened for goods on 4 April 1910 and passengers on 1 July 1910; this bypassed Oxford by connecting Ashendon Junction (near ) to Junction, streamlining the route with improved gradients. By this point, much of the network had transitioned from Brunel's broad gauge to standard gauge, completed GWR-wide by 1892 to align with interconnecting lines. The infrastructure then fell under full GWR management, setting the stage for operational expansion.

Great Western Railway era

The Great Western Railway (GWR) era began with significant expansions aimed at enhancing connectivity between and the . In 1910, the Bicester cut-off opened, providing a direct link from to and bypassing the longer detour via . This 18.25-mile shortcut reduced the to journey time, enabling a competitive two-hour service against the London and North Western Railway. During the inter-war period, the GWR focused on improving services and along the route to meet growing . By the early , the line supported around six local stopping trains daily in each direction, complemented by 16 express services running approximately every 20 minutes. Innovations included extensive slip-coach operations, allowing detached carriages to serve intermediate stations without stopping the main train; these were prominent in , with the final slip at North occurring in 1960. Station enhancements, such as the modernist rebuilding of station in , exemplified GWR's architectural style with its solid, functional design featuring polished timber elements. World War II underscored the route's strategic value under GWR management. The line handled heavy traffic for evacuations, essential goods, and military movements, with timings severely strained by wartime demands. In 1942, the Bicester Military Railway connected to the main line, facilitating troop deployments and supply transport; activity peaked in with over 100 wagon loads daily. Post-war recovery of pre-conflict schedules took several years.

Post-nationalisation and decline

Following nationalisation on 1 January 1948, the Chiltern Main Line was incorporated into the , continuing operations under a unified national structure that inherited the Great Western Railway's legacy of express services from London Marylebone to . In the , dieselisation commenced on the line as part of British Railways' broader Modernisation Plan launched in 1955, which prioritised replacing steam locomotives with diesel multiple units (DMUs) on secondary routes to improve efficiency and reduce operating costs. By the early , local services on the Chiltern route were operated using four-car Class 115 DMUs, marking the end of steam traction in everyday passenger operations. The Beeching Report, published in March 1963, identified significant portions of the British railway network for closure to stem mounting losses, and while the core Chiltern Main Line avoided full abandonment, it faced partial rationalisation with the closure of several underused stations in the mid-1960s, including Denham Golf Club in 1962 and Saunderton in 1964. These cuts reflected the report's emphasis on eliminating low-traffic facilities amid competition from . The electrification of the rival , completed in 1967, accelerated the Chiltern route's decline by diverting long-distance passengers to the faster electric services, leading British Railways to discontinue most express trains between and via in 1967–68. In the 1970s and 1980s, the line was downgraded to primarily local stopping services, with sections such as between and Junction reduced to single track and overall speeds restricted to a maximum of 75 mph due to deferred maintenance and infrastructure simplifications.

Revival under privatisation

Following the post-nationalisation decline that had reduced services on the Chiltern Main Line to minimal levels, revival efforts began in the early as part of British Rail's preparations for privatisation. In May 1993, restored passenger services from London Marylebone to using turbo trains, with extensions to Birmingham Snow Hill providing a two-hourly connection via ; this marked the re-emergence of the route as a viable to the congested . Privatisation accelerated the recovery when, on 25 June 1996, the Office of Passenger Rail Franchising awarded the Chiltern franchise to M40 Trains Ltd, a backed by investors and John Laing, for an initial seven-year term starting 21 July 1996. The new operator, soon rebranded as , committed to maintaining existing services while investing in , including £1 million for station upgrades such as expanded car parking, CCTV installation, and automatic ticket barriers at , alongside plans for new diesel multiple units to improve journey times to . In the early 2000s, pursued capacity enhancements through the projects, with 1 in 1998 redoubling sections between and North to alleviate bottlenecks, and 2 from 2002 to 2006 introducing new signalling and track realignments, such as at , to enable higher line speeds and support an hourly service pattern between and . These initiatives, funded partly through franchise commitments and government support, significantly boosted reliability and passenger numbers, positioning the line as a competitive corridor. By late 2025, the project opened the to section, enhancing connectivity.

Chiltern Railways operations

Chiltern Railways was awarded the franchise for services on the Chiltern Main Line in July 1996 as part of the broader , transitioning operations from public to private management and initiating a revival of the route's passenger services. The initial seven-year contract ran until March 2002, after which the company secured a 20-year agreement starting that month, committing to significant investments in and . This long-term deal was extended conditionally by 7.5 years in 2010 in recognition of Chiltern's delivery on engineering projects such as Evergreen 3, with the ending in 2022. In December 2021, a new contract replaced the expiring , with a core term until March 2025 and an option for extension to December 2027, reflecting ongoing government support amid industry reforms. Upon commencing operations, inherited a fleet of Turbo diesel multiple units, which had entered service in the early to modernize diesel operations on the line. To enhance capacity and performance, the operator introduced Class 168 Clubman Turbo trains in 1998, adding longer four-car formations that allowed for expanded services and improved reliability during the late growth period. The 2000s brought operational challenges, including severe disruptions from the partial collapse of Tunnel in June 2005, which spilled rubble onto the tracks and closed the main line for nearly two months, requiring Chiltern to reroute services and manage commuter impacts through alternative arrangements. During the , Chiltern adapted by implementing a reduced timetable from March 2020 to prioritize travel and , cutting peak-hour frequencies while enhancing station cleaning and measures to mitigate health risks. In 2025, amid persistent capacity pressures from an aging fleet averaging 30 years old and rising passenger demand, Chiltern addressed overcrowding through a £10.7 million refurbishment program on its 27-year-old Class 168 trains (as of 2025), introducing new seating, carpets, 5G Wi-Fi, and charging points to boost interior comfort and effective capacity without new acquisitions. This initiative, approved by the , forms part of broader efforts to maintain service resilience until fleet modernization under the Right Route 2030 plan.

Infrastructure

Track layout and engineering features

The Chiltern Main Line is predominantly a over its approximately 112-mile (180 km) length, with short single-track sections in areas such as the approach to and the branch. The route features challenging terrain through the , including the steepest gradient of 1 in 88 near Saunderton, which tests train performance on the ascent and descent. The line includes several tunnels to navigate urban and hilly sections, among them the Snow Hill Tunnel south of Birmingham Snow Hill station, measuring 635 yards (581 m) in length,) and Harbury Tunnel south of , measuring 70 yards (64 m). These structures, along with others, facilitate the route's passage under roads and through . Major viaducts and cuttings are key engineering features, exemplified by the Chalfont Viaduct, a five-arch structure spanning 114 yards (104 m) across the near . The line also incorporates deep cuttings through the clay soils of the , such as those in , to maintain alignment while minimizing environmental impact.

Stations and facilities

The Chiltern Main Line features approximately 30 stations, serving as key access points for commuters and travelers between London and Birmingham. These stations vary in size and function, with larger termini and interchanges providing comprehensive amenities, while smaller stops offer basic facilities. Principal stations include the southern terminus at London Marylebone and the northern terminus at Birmingham Snow Hill, alongside important intermediate hubs like . London Marylebone serves as the primary London terminus for the line, featuring six platforms covered by a mix of modern and historical roofing structures. Opened in , it handles a significant volume of passengers, with around 16 million entries and exits annually in the pre-COVID year of 2018-19. The station offers amenities including toilets, , ATMs, ticket offices, and step-free access from street to platform via lifts. At the northern end, Snow Hill acts as the main Birmingham terminus, rebuilt and reopened in 1987 as part of efforts to revitalize the city's rail network after earlier decline. It includes three platforms and integrates closely with the tram system, with Line 1 departing directly from an adjacent stop to enhance multimodal connectivity. Pre-COVID passenger figures reached about 4.4 million entries and exits in 2018-19, supported by facilities such as waiting areas, ticket machines, and accessibility aids. High Wycombe functions as a vital intermediate interchange, connecting the main line to local bus services and handling over 2.5 million passengers annually. The provides four platforms with step-free access via lifts, alongside parking for over 200 vehicles, toilets, , and a ticket office. It plays a central role in regional travel, facilitating transfers for passengers heading to nearby towns. General facilities across the line emphasize passenger convenience and accessibility, with parking available at most major stops—such as over 1,000 spaces combined at and —and ongoing upgrades to support inclusive travel. As of 2025, more than 20 stations, including key sites like , Snow Hill, and , offer step-free access from street to platform through lifts or ramps, fulfilling commitments under the Accessible Travel Policy. Historical events, such as the 2005 closure of due to a tunnel collapse during adjacent construction (which disrupted services for about seven weeks with single-line working for a further five weeks before full reopening in September 2005), highlight resilience efforts, with the station now featuring basic amenities like shelters and cycle storage.
StationPlatformsKey AmenitiesAnnual Passengers (2018-19, entries/exits)
London 6Toilets, , step-free access, ticket office16.1 million
Birmingham Snow Hill3Waiting areas, Metro integration, accessibility aids4.4 million
4Parking (200+ spaces), , step-free lifts2.5+ million

Branches and connections

The Chiltern Main Line features several key branches that extend its network, providing access to regional centers and supporting both passenger and freight movements. The primary branch to diverges from the main line at Bicester North, spanning approximately 11 miles through station to Oxford. This route, originally constructed as part of the Buckinghamshire Railway's extension and opened on 1 October 1851, was restored for modern passenger use through the Evergreen 3 upgrade project completed in . Another significant branch is the Aylesbury line, which departs from on the main line and runs for about 7 miles as a single-track rural route to . This connection facilitates commuter services and integrates with the broader infrastructure north of the branch. At , the main line interfaces with extensive freight facilities, enabling connections to the via the adjacent southward to . These sidings and loops support intermodal and aggregate freight flows, with the route designated for RA8 to accommodate heavy goods traffic toward the . Key interchanges along the line enhance connectivity with other networks. provides seamless transfer to the London Underground , which terminates adjacent to the Chiltern platforms, serving as a vital link for commuters. Further north, station offers interchange opportunities with services operated by and , connecting to destinations like Birmingham New Street and .

Upgrades and improvements

Chiltern Main Line Upgrade project

The Chiltern Main Line Upgrade project, known as 3, represented a major infrastructure initiative from 2006 to 2017 designed to boost capacity, raise line speeds, and support expanded passenger services on the route between London Marylebone and . Divided into two phases, the first focused on enhancements to the existing main line, while the second extended connectivity to via , with financial close achieved in January 2010 and principal works commencing in March 2010. The project built on prior efforts to reverse historical underinvestment, enabling more reliable and frequent operations without public subsidy. Funded through a £250 million investment by in partnership with —recovered over 30 years via facility charges—the program emphasized private-sector-led improvements to track, signaling, and stations. Phase 1 works on the Chiltern Main Line included the installation of new passing loops at Northolt Junction and , alongside the upgrade of over 50 miles of track for higher speeds and the addition of 87 new signals to enhance operational flexibility. Phase 2 targeted the former single-track Bicester to section, involving its redoubling, construction of a new chord at for seamless integration, and complete rebuilding of Bicester Village (formerly Bicester Town) station, with 37 level crossings abolished including three new footbridges. At , platforms were upgraded and track realigned to support faster running and longer consists. These enhancements culminated in line speeds reaching 100 mph across much of the route, including sections from to and North, reducing average journey times by about 20%. increased to two trains per hour, enabling an hourly to service from 2016 with journey times as low as 90 minutes for semi-fast workings. The extension, completed in December 2016, added two trains per hour to that destination in 66 minutes, further integrating the network and diverting services from congested routes.

Recent enhancements

In the 2020s, and have focused on enhancing the resilience and reliability of the Chiltern Main Line through targeted works, building on the benefits of earlier upgrades such as increased and faster journey times. These efforts address environmental challenges and prepare the route for future connectivity. Key resilience improvements included emergency repairs following landslips in the Chilterns area, which caused significant disruptions. For instance, in January 2024, heavy rainfall triggered a landslip between Bicester North and Haddenham & Thame Parkway, destabilizing the embankment and requiring the full closure of the line for several days; , supported by contractor , installed sheet piling and other stabilization measures to restore safe operations by mid-January. Similar repairs addressed a major landslip near Harbury Tunnel in early 2015, involving the removal of over 350,000 tonnes of material to prevent ongoing risks from the area's clay geology. Platform enhancements at Banbury station have supported operational efficiency, with recent upgrades in 2024 including track and drainage works immediately north of the station to accommodate longer trains and reduce maintenance needs, as part of broader line improvements between and . Sustainability measures have emphasized flood resilience and . In February 2023, upgraded drainage systems along the line from London Marylebone to West , installing improved culverts and pumps to mitigate flooding risks from intense rainfall, ensuring more consistent service reliability. Additionally, replaced lighting across its 36 stations and offices with LED fixtures in 2019, achieving an estimated 70% reduction in electricity use and cutting CO2 emissions by over 600,000 kg annually. In 2025, preparations advanced for integrating the project at , with testing and staff training underway to enable passenger services from to via Bicester North, planned to start in late 2025 but potentially delayed due to a dispute over driver-only operation as of November 2025; was appointed as the operator for this initial phase, enhancing cross-country connectivity. Minor track renewals continued throughout the year, including replacements and signalling adjustments between Wembley Stadium and Denham in November, aimed at maintaining line speeds and safety amid growing passenger demand.

Passenger operations

Service patterns

The service patterns on the Chiltern Main Line are designed to support commuter, business, and leisure travel, with off-peak frequencies emphasizing reliability between London Marylebone and destinations along the route. During weekdays, direct services from London Marylebone to Birmingham Snow Hill operate at a frequency of approximately two trains per hour off-peak, with journey times of around two hours; these typically stop at High Wycombe, Bicester North, Banbury, Leamington Spa, Warwick Parkway, Dorridge, and Solihull. Semi-fast services to High Wycombe run every 30 minutes, taking about 27 minutes and calling at intermediate stations such as Beaconsfield and Gerrards Cross. Additional peak-hour trains are scheduled in the morning (typically before 10:00) and evening (after 16:00) to handle higher demand, including express options that reduce stops north of Banbury. Branch services to via Bicester Village and Oxford Parkway provide hourly direct connections from , with journey times ranging from 1 hour 5 minutes on faster services to 1 hour 24 minutes; these call at key intermediate points like and Haddenham & Thame Parkway. On the Aylesbury branch, stopping services depart every 30 minutes, covering the 34-mile route in 49 minutes direct and serving stations including and . Weekends and public holidays feature reduced frequencies of two trains per hour on the main line to and , maintaining consistent intervals without disruption from freight operations, as the route prioritizes passenger traffic.

Operators and timetables

The primary on the Chiltern Main Line is , a of , which handles the majority of passenger services along the route. The company's current contract, awarded in 2021, runs until 31 March 2025, with an option for extension up to 31 December 2027, though nationalisation under is anticipated in early 2026. A small number of services are operated by other companies. provides limited express trains using sections of the line north of to destinations beyond . runs local passenger services on sections of the line around , such as between and Birmingham Snow Hill. Timetables for the Chiltern Main Line are coordinated by , which allocates train paths to operators through its planning processes, ensuring integration across the network. These are published within the Timetable, with the version effective from 18 May 2025 introducing minor adjustments to improve capacity and reliability on key sections.

Rolling stock

The rolling stock on the Chiltern Main Line primarily consists of diesel multiple units (DMUs) and locomotive-hauled sets operated by . The fleet is diesel-powered, with no implemented as of 2025. operates 39 Class 165 Turbo DMUs, each comprising two cars with a top speed of 90 mph (145 km/h). These units, built in the early , provide capacity for up to 186 passengers and are deployed on shorter routes such as London Marylebone to and local services to . Complementing them are 28 Class 168 Clubman DMUs, each with three cars and a top speed of 100 mph (161 km/h), offering seating for around 204 passengers. These are used for longer journeys, including to and , and can be coupled with Class 165 units for added flexibility. For express services between London Marylebone and Birmingham Snow Hill, Chiltern employs locomotive-hauled trains using Class 68 diesel locomotives paired with coaches. These sets, typically forming six- or eight-car formations, provide enhanced capacity and comfort, with the locomotives capable of 125 mph (201 km/h) but line speeds limiting operations to 100 mph. The coaches feature modernized interiors including sliding plug doors. In 2025, ongoing refurbishments are improving passenger amenities across the DMU fleet. The Class 165 units began a £4 million refresh in early 2025, introducing new seating, enhanced , and USB charging points, with completion targeted for late 2026. Similarly, the Class 168 fleet's £12 million program, which started in 2024, includes repainted exteriors, upgraded interiors with better lighting and , plus the same connectivity features, with most units refreshed by mid-2025. These updates aim to extend the life of the aging fleet while improving reliability and customer experience. The loco-hauled coaches remain unrefurbished in 2025, pending replacement. The current fleet represents an evolution from Chiltern's initial reliance on Class 165 units inherited in 1996, with later additions of Class 168 DMUs in the late 1990s and loco-hauled operations introduced in the 2010s.

Future plans

New fleet introductions

In August 2025, Chiltern Railways entered into a lease agreement with Beacon Rail for 13 sets of Mark 5A coaches, previously operated by TransPennine Express. These loco-hauled sets, comprising 52 standard carriages and 14 driving trailers built by CAF, are set to enter service on the London–West Midlands routes starting in early 2026. The rollout will provide an additional 10,000 seats per weekday, addressing capacity constraints from the current fleet's aging Mark 3 coaches. The first refurbished Mark 5A trainset was unveiled on 14 October 2025, featuring enhanced Wi-Fi, plug sockets, USB ports at every seat, and improved accessibility. The new fleet will be introduced in phases, prioritizing the replacement of the oldest coaches, which date back nearly 50 years and lack modern amenities. Refurbishments include enhanced accessibility features such as two dedicated areas per train with companion seating and hearing loops, plus a fully alongside three standard ones. Low-emission capabilities are supported by the paired Class 68 locomotives, equipped with modern engine stop-start technology to reduce noise and emissions. This introduction aims to facilitate increased service frequencies from late 2026, enabling to better accommodate rising passenger demand, subject to approval from the Office of Rail and Road by the end of that year.

Electrification and sustainability

As of 2025, there are no firm plans for full of the Chiltern Main Line, though is actively studying discontinuous as a cost-effective alternative to replace its ageing diesel multiple units (DMUs), particularly the Class 165 fleet. This approach would involve partial overhead wiring combined with or to enable emission reductions without extensive infrastructure overhauls across the non-electrified route. In a notable past initiative, trialled a conversion on 168/3 unit No. 168329 under the HybridFLEX project, launched in February 2022 following retrofitting by and Rolls-Royce. The two-car unit operated passenger services between London Marylebone and , aiming for up to 25% reductions in CO2 emissions and fuel consumption through battery-assisted zero-emission running at stations and on short stretches. However, the trial concluded in 2023, and the system was removed due to unexpectedly poor air quality performance, including higher-than-anticipated emissions that undermined the environmental benefits. Chiltern Railways' 2030 Vision outlines a phased for a low-carbon fleet, emphasizing the transition from to sustainable alternatives like (HVO) fuel, which can cut carbon emissions by up to 90% compared to traditional . This includes potential trials of battery-electric multiple units (BEMUs) as part of broader decarbonisation efforts, building on the HybridFLEX learnings to support discontinuous . These initiatives align with the 's goal of by 2050, with Chiltern committing to ongoing environmental footprint reductions through fleet renewal and operational efficiencies.

Network expansions

The project marks a key expansion integrating with the Chiltern Main Line, restoring direct passenger services between and (connecting to ) for the first time since the . Phase 1, operated by , was expected to launch in late 2025 following completion of the Bicester to upgrade in 2024, but has been delayed due to train door issues, with no confirmed timeline as of November 2025; it will serve six intermediate stations, including , , Blackhorse Halt (near Launton), , Winslow, and . This 57-mile section leverages existing Chiltern infrastructure from to , upgraded since 2016, to provide hourly services and enhance regional connectivity across , , and . Subsequent phases will extend the network further, with Oxford to Bedford services targeted for 2030 via the existing , aiming for hourly frequencies. The full route to , completing the east-west corridor, is projected for the mid-2030s, subject to and approvals; this will create a strategic link spanning over 100 miles without passing through , boosting in England's Economic Heartland. These developments build on the Chiltern Main Line's current branches, such as the and lines, to form a more integrated regional network. Additional capacity projects include a proposed interchange at , where new platforms on the Chiltern Main Line would facilitate seamless connections with the , , , and potentially the . This long-discussed scheme, first advanced by in 2003, aims to address connectivity gaps in northwest London and support increased passenger volumes from events at . At , track remodelling is planned to optimize operations for both Chiltern and services, including diversion of the northbound main line to platform 1, construction of a new terminating platform between platforms 1 and 2, and potential platform widening. These changes would eliminate conflicting movements, enable cross-platform interchanges, and improve links from the branch to destinations, reducing timetable constraints. Long-term visions incorporate (HS2) integration, where the new line's completion—featuring the 10-mile beneath the , with construction completed in August 2025 ahead of schedule—is anticipated to free up capacity on the existing Chiltern Main Line, potentially allowing more frequent local services to Birmingham Snow Hill. Freight enhancements are also under consideration, with proposals for upgraded connections extending toward to support increased goods traffic alongside passenger growth.

References

  1. [1]
    [PDF] LNW Route Specification 2017 - Network Rail
    A major rail-connected MoD site is located to the south of Bicester Village station. Markets: The Chiltern Main Line is a high speed route serving markets ...
  2. [2]
    None
    ### Summary of Chiltern Main Line from Chiltern Railways' Right Route 2030 Vision Report
  3. [3]
    Chiltern celebrates 175 years of rail in Bicester
    Oct 2, 2025 · Chiltern Railways is part of the Arriva group, one of the leading providers of passenger transport in Europe, employing around 36,200 people and ...
  4. [4]
    Trains from London to Birmingham | Chiltern Railways
    Train fares from: £6.40 · Fastest journey: 1 hr 43 mins · Average journey: 2 hr 3 mins · Journey type: Direct · Distance: 99 Miles (159 km) · Train operators: ...
  5. [5]
    [PDF] SUMMARY REPORT - GOV.UK
    Apr 7, 2014 · CFA 10 is within the Chilterns Area of Outstanding Natural Beauty (AONB) and the potential ... Proposed Scheme, south of the Chiltern Main Line ...
  6. [6]
    [PDF] Network Specification 2016 - London North Western
    The Chiltern Main Line runs from London Marylebone to. Birmingham Snow Hill via High Wycombe, Princes Risborough,. Bicester, Banbury, Leamington Spa and ...
  7. [7]
    history of the railways | Great Western Railway
    A new site was opened in 1852 with the original finally closing in 1872 after operating as a goods station. The current station was completely rebuilt in 1970, ...
  8. [8]
  9. [9]
    [PDF] Train Operating Company Key Statistics 2020-21 Chiltern Railways
    Jul 29, 2021 · Number of stations managed, 2016-17 to 2020-21. Chiltern Railways managed 35 stations as of 31 March 2021. Page 3. TOC Key Statistics 2020-21 ...
  10. [10]
    WYCOMBE RAILWAY. - Ariadne portal
    Sep 15, 2004 · Branch railway authorised in 1846 between Oxford and Maidenhead, with a branch to Aylesbury. The Wycombe - Maidenhead section was completed ...
  11. [11]
    Great Western Railway. Hungerford. - Parliamentary Archives
    Links to information about the five major collecting areas of the Parliamentary Archives: Commons and Lords, Palace of Westminster, Societies and Staff, ...
  12. [12]
    Wycombe Railway - Marlow-Maidenhead Passengers' Association
    Jun 15, 2019 · The Wycombe Railway Company was incorporated by an Act of Parliament passed in July 1846. The Act authorised the construction of a single line ...
  13. [13]
    Great Western Railway - ASCE
    West of Reading he laid out the railway to follow the Thames River and pass through the valley of the Chilterns. For a distance of 77 miles the track would ...Missing: Birmingham | Show results with:Birmingham
  14. [14]
    Branch Line Focus - Regattas, donkeys and Royals
    Jul 2, 2018 · By 1854, a broad-gauge single line almost 10 miles long was opened with stations at Maidenhead (Wycombe branch) which, in the 1860s was renamed ...
  15. [15]
    Monument record 0586100000 - RISBOROUGH TO THAME RAILWAY
    Aug 2, 2022 · EXTENSION OF WYCOMBE RAILWAY THROUGH PRINCES RISBOROUGH-THAME OPENED 1 AUG 1862; LAST 13 MILES TO OXFORD FROM THAME OPENED 24 OCT 1864.<|control11|><|separator|>
  16. [16]
    Railways - Bicester Local History Society
    This station was opened in May 1851. Oxford Station - Rewley Road. The early years were marked by a terrible accident at Bicester when a number of people were ...
  17. [17]
    The Great Western Railway in Warwickshire
    This Bicester cut off was completed and opened for goods traffic on 4th April 1910 and for passengers on 1st July 1910.
  18. [18]
    Banbury crossed…no longer - Rail Magazine
    Here the 1930s station remains a fine example of GWR architecture of the period - simple, solid, with minimal decoration and polished solid timber doors. Its ...
  19. [19]
    History of rail - Railway 200
    1825: Opening of the Stockton and Darlington Railway. The official launch of the railway was arranged for the 27 September 1825 and attracted considerable ...Missing: 1910 | Show results with:1910
  20. [20]
    Diesel Multiple Units - IGG.org
    During the later 1950s BR introduced a large number of diesel multiple units, or DMUs, with body designs based on the new (and for its time advanced) BR Mk 1 ...
  21. [21]
    Great Central Dieselisation - What if? - UK Prototype Questions
    Apr 7, 2023 · What I was thinking/wondering was, if diesels had made more of an in-road into the line's working, as they did on the Midland Main Line where ...Missing: 1950s | Show results with:1950s
  22. [22]
    End of the Line: British railway closures from 1948 to Beeching
    Sep 8, 2022 · End of the Line chronologically traces the history of 467 long forgotten railway lines, region by region, from their opening to closure and in a few cases to ...Missing: Chiltern Main 1980s
  23. [23]
    How Beeching got it wrong about Britain's railways - The Guardian
    Mar 2, 2013 · As rail companies struggle to meet growing demand, the legacy of 1960s cuts has been to hold back revitalisation of the network.Missing: Chiltern 1948- 1980s<|control11|><|separator|>
  24. [24]
    Chiltern Main Line beyond Wolverhampton | beleben
    Apr 18, 2011 · In 1967-68, British Railways discontinued use of the Great Western route for regional passenger trains through Wolverhampton, ...
  25. [25]
    Chiltern Main Line - UK Transport Wiki - Fandom
    The original line from Birmingham to London was built by the Great Western Railway (GWR) in the 1850s, to connect Oxford to Birmingham and Wolverhampton. For ...Missing: facts | Show results with:facts
  26. [26]
    House of Commons Hansard Debates for 24 May 1993
    The Network SouthEast Chiltern line turbo train service was extended to Birmingham Snowhill and there is now a two-hourly service via Solihull. It is ...
  27. [27]
    [PDF] Rail Passenger Franchises - Research Paper 96/85 - UK Parliament
    Aug 8, 1996 · 25 June 1996. The franchise to operate the Chiltern Railway Co Ltd is awarded to. M40 Trains Ltd. 26 June 1996. ITTs issued for Anglia and ...
  28. [28]
    [PDF] ORR CEPA Rail case studies
    Jul 3, 2015 · Under Chiltern's franchise agreement, they received a longer-than-usual franchise ... Chiltern (owned by 'M40 Trains') also held the ...Missing: 1996 | Show results with:1996
  29. [29]
    Evergreen II to boost Chiltern | News | Railway Gazette International
    Feb 1, 2005 · This will give Chiltern the capability to schedule 20 trains into the terminus during the morning peak hour, and 20 out in the evening, compared ...Missing: hourly | Show results with:hourly
  30. [30]
    UK railway franchises and open access operators
    Franchises ; Chiltern Railways · British Rail Network SouthEast · 21 July 1996 to 2 March 2002 (originally to run until 20 July 2003, renegotiated for a longer ...
  31. [31]
    Chiltern Railways Co Ltd | Organisations - Railway Gazette
    Under a 20-year franchise begun on March 3 2002, renewed at a mid-franchise review on January 10 2010, Chiltern committed to further expand and upgrade its ...Missing: history | Show results with:history
  32. [32]
    Engineering deal seals seven-year extension to Chiltern's rail ...
    Jan 14, 2010 · Chiltern will be rewarded with a seven-and-a-half year extension to its twelve-and-a-half-year contract after agreeing to oversee a £250m ...Missing: timeline | Show results with:timeline<|control11|><|separator|>
  33. [33]
    Chiltern Railways operating contract extended to 2027
    Dec 8, 2021 · The new contract for Chiltern Railways will commence on 31 December 2021 and will run until the end of 2027, with a guaranteed core term of 3.25 years.Missing: timeline | Show results with:timeline
  34. [34]
    Chiltern Railways - The Cherwell Life
    On privatisation, Chiltern Railways inherited a fleet of 2 and 3-car Class 165 diesel turbo units. These had begun service with British Rail. The seeds of ...
  35. [35]
    Chiltern Class 168 - The Early Years | Rail Revisited
    Mar 1, 2021 · The first five Class 168s went into service as three-car sets, with upgrade to four-car status rolling out from late summer 1998.
  36. [36]
    BBC NEWS | Beds/Bucks/Herts | Tunnel collapse causes rail chaos
    Jul 1, 2005 · Commuters in the Midlands and London face at least a week of disruption after a rail tunnel collapsed. Tonnes of earth dropped on to the track at Gerrards ...
  37. [37]
    Chiltern Railways changes timetable from Monday 4th January to ...
    Jan 4, 2021 · Overall, the new timetable represents a reduction of 42 trains each weekday and customers should check their train times on the Chiltern website ...
  38. [38]
    Capacity challenges on Chiltern Railways services
    The knock-on impact of industrial action has also caused delays in maintenance of our trains. We do the vast majority of our maintenance and repairs in ...Missing: 2000s | Show results with:2000s<|control11|><|separator|>
  39. [39]
    [PDF] West Midlands & Chilterns Route Study
    Aug 2, 2017 · We are delighted to present the West Midlands & Chilterns Route. Study. It is an important milestone in the development of the region's.
  40. [40]
    Birmingham Snow Hill - Disused Stations
    Jun 4, 2017 · ... length reached from Snow Hill, a down platform of around 450ft ... Snow Hill Tunnel. Separate entrances were provided from Livery ...
  41. [41]
    RailwayData | Tunnels - The Railway Data Centre
    Harbury Tunnel, DCL, 100m 49ch, 100m 52ch, 3ch / 73yds. Details. Harecastle New Tunnel, CMD1, 14m 13ch, 14m 27ch, 14ch / 309yds. Details. Hastings Tunnel, TTH ...
  42. [42]
    Chalfont Viaduct - Motorway - RouteYou
    The Chalfont Viaduct is the first of two five-arch brick railway viaducts on the Chiltern Main Line in south-east England. It is located between Gerrards ...
  43. [43]
    Railway balancing act provides wildlife havens and reliable journeys
    May 24, 2024 · Network Rail has been working along the Chiltern main line cutting ... tunnels and viaducts and the thousands of signals, level crossings and ...
  44. [44]
    Chiltern Main Line Stations: (LU) London Underground | PDF - Scribd
    The document lists 30 stations along the Chiltern Main Line, beginning with Birmingham Snow Hill and ending with London Marylebone. Many of the stations are ...
  45. [45]
    Chiltern Railways Stations
    Main navigation. Buy tickets; Travel updates. Check my journey · Live train times · Planned changes to timetable · Live service information route map · Upcoming ...London Marylebone · Wembley Stadium · Aylesbury · Harrow-on-the-Hill
  46. [46]
    [ODF] Estimates of Station Usage 2018-19 - London - ORR Data Portal
    LONDON BR. London Travelcard Area Station. Eastern. 19703680. 19843524. 29935328. 69482532. 66965956. 3946313. 3. 3. 0.037579931. 1475. MYB. London Marylebone.
  47. [47]
    London Marylebone Station - National Rail
    Platform facilities. The platforms are level with the Main Entrance of the station. There are tactile warnings on all platforms. Getting to and from the station ...
  48. [48]
    Platform History: Birmingham Snow Hill | West Midlands Railway
    Oct 1, 2025 · At the end of the Snow Hill tunnel, a siding led into the Birmingham branch of the Bank of England, used to transport cash and other resources.Missing: length | Show results with:length
  49. [49]
    [PDF] West Midlands Local Transport Plan
    The Midland Metro provides a rapid transit route between Birmingham Snow Hill and. Wolverhampton city centre, with 23 stops serving a wide catchment in ...
  50. [50]
    Trains to High Wycombe Train Station | Live Times - Chiltern Railways
    Facilities at a glance · Toilets : Available · Wifi : Available · Parking : Available · ATM : Available · Ticket office : Available · Ticket machine : Available · Step ...
  51. [51]
    [PDF] Annual Report and Accounts - 2006–07 - GOV.UK
    'Light at the end of the tunnel?' – Chiltern. Railways' handling of contingency arrangements following the tunnel collapse at Gerrards Cross. July 2006.
  52. [52]
    [PDF] Princes Risborough to Aylesbury (PRA) Rail Line - GOV.UK
    The length of the north tie-in is approximately 350m while the south tie-in is. 600m long. Page 11. Supplementary Environmental Information Report – Community ...
  53. [53]
    [PDF] Solent to the Midlands Multimodal Freight Strategy; Phase 1
    Jun 1, 2021 · 5.7 CHERWELL VALLEY LINE AND CHILTERN MAIN. LINE. Overview. The Cherwell Valley Line links Didcot, Oxford and Banbury and joins the Chiltern ...
  54. [54]
    Trains to West Ruislip Station | Live Times - Chiltern Railways
    Visit Chiltern Railways to book trains to West Ruislip train station. Click to find out about live train times, opening hours and station facilities.
  55. [55]
    Leamington Spa Train Station & Live Train Times | Chiltern Railways
    Car park information and other interchange information ; Phone number: 08456 005 165 ; Address: Old Warwick Road Leamington Spa CV31 3NS ; Operator Name: Chiltern ...
  56. [56]
    [PDF] The Evergreen 3 Project - Railway Civil Engineers Association
    Jan 26, 2012 · • Junction of Chiltern and Didcot-. Chester lines, south of Banbury. • Chiltern line speed raised from 65 to 90mph (Up) and 40 to 85mph. (Down).
  57. [57]
    Chiltern Renaissance - The Evergreen Success - Rail UK
    Oct 26, 2011 · One of the last railways to be built, it opened in 1906 as the GW&GC Joint line, itself linking up a series of other lines to form a rival to ...
  58. [58]
    £250M RAIL INVESTMENT TO BRING MUCH FASTER JOURNEYS ...
    Jan 15, 2010 · Network Rail is funding a £250m project to create a new main line from London to Oxfordshire and to deliver much faster services on the Chiltern route to ...Missing: 1999-2000 | Show results with:1999-2000<|control11|><|separator|>
  59. [59]
    Emergency landslip repairs: passengers thanked after Chiltern main ...
    Jan 16, 2024 · Network Rail has thanked passengers after completing major repairs to shore up a landslip on the Chiltern main line after storms and heavy rain destabilised a ...
  60. [60]
    Murphy supports Network Rail with emergency landslide repairs on ...
    Jan 24, 2024 · Network Rail and contractor Murphy have completed the installation of sheet piles to stabilise an embankment in Bicester affected by storms.
  61. [61]
    Chiltern Main Line | beleben
    Bus replacement services are running between Leamington Spa and Banbury and a revised service is in effect between Banbury and Marylebone, Birmingham and ...Missing: Chilterns | Show results with:Chilterns
  62. [62]
    Chiltern Line Banbury works completed | Infrastructure - Rail Magazine
    Aug 8, 2024 · Upgrades to the Chiltern main line between Bicester and Leamington Spa have been completed following a five-day closure at the end of July.Missing: extensions | Show results with:extensions
  63. [63]
    Major changes to Chiltern main line journeys during five-day rail ...
    Jul 17, 2024 · Scotland's Railway is investing £7.7m to upgrade the braking systems on more than 70 ScotRail trains, aiming to improve safety and performance ...Missing: 2006-2017 passing loops signals rebuilds outcomes
  64. [64]
    London Marylebone drainage upgrades for more reliable rail journeys
    Jan 27, 2023 · Network Rail is carrying out major drainage upgrades from Marylebone to West Ruislip on Saturday 4 and Sunday 5 February.
  65. [65]
    Energy and Water - Chiltern Railways
    In 2019 we installed LED lights across all of our stations and offices. The energy efficient LEDs give an estimate reduction of our overall electricity ...Missing: Line | Show results with:Line
  66. [66]
    LED Lighting Switch: Chiltern Reduce Energy Costs by 70%
    With the use of energy efficient LED lighting from Airis Energy UK, Chiltern Rail's CO2 output across its 36 stations has been reduced by over 600,000kg.
  67. [67]
    East West Rail services planned to begin this year as Chiltern ...
    Mar 25, 2025 · The Rail Minister has today (25 March 2025) named Chiltern Railways as the operator for the first stage of East West Rail.Missing: integration | Show results with:integration
  68. [68]
    East West Rail - Network Rail
    Testing and training is now underway on the line for passengers services to commence in late 2025. Work is also taking place to ensure that local residents are ...
  69. [69]
  70. [70]
    Table 2
    Summary of each segment:
  71. [71]
    High Wycombe to London Marylebone Train - Chiltern Railways
    Trains from High Wycombe to London Marylebone depart twice an hour. Journey times from just 27 minutes on a direct train to the heart of the capital.Missing: pattern | Show results with:pattern<|control11|><|separator|>
  72. [72]
    Cheap Trains from London To Oxford | Chiltern Railways
    ### Service Frequency and Patterns: London Marylebone to Oxford via Bicester
  73. [73]
    London Marylebone to Aylesbury Train - Chiltern Railways
    Trains to Aylesbury depart from London Marylebone twice every hour. The journey is from 49 minutes on a direct train. Fares are from £18.70 for a single ticket.
  74. [74]
    Our timetable has changed - Chiltern Railways
    The Chiltern Railways May 2025 timetable started on Sunday 18th May 2025 and has few changes, when compared to the previous timetable.
  75. [75]
    Central route - Network Rail
    Chiltern main line between London Marylebone and the West Midlands. Snow ... Great western railway · Transport for Wales · Avanti West Coast · West Midlands ...
  76. [76]
    When will my local train operator be nationalised? - Commons Library
    Jan 8, 2025 · Franchised train operator contract expiry dates ; Chiltern Railways, 1 April 2025, 12 December 2027 ; Govia Thameslink Railway, 1 April 2025, 1 ...Missing: extensions | Show results with:extensions
  77. [77]
    [PDF] Access rights planning and use factsheet - ORR
    May 18, 2025 · The main timetable changes are made twice a year, in May (however in 2024 this took place in June) and December. New timetables must be ...
  78. [78]
    Timetable Changes | National Rail
    The National Rail Timetable is changed twice a year, in May and December. The current timetable started on Sunday 18 May 2025 and will operate until Saturday ...
  79. [79]
    More Trains, Newer Trains - Chiltern Railways
    New trains coming soon - your journey is about to get even better · When will the trains be in service? · Which stations will be served by the new Mark 5A trains?Missing: principal | Show results with:principal
  80. [80]
    Chiltern launches refreshed '168' - Modern Railways
    Oct 10, 2024 · Upgrades include improved Wi-Fi, USB sockets (in addition to the pre-existing three-pin plugs), an external repaint, new seat covers and carpets ...Missing: challenges | Show results with:challenges
  81. [81]
  82. [82]
    RVAR 2010 exemption: Chiltern Railways passenger information ...
    Dec 3, 2024 · Class 165: 39 units, 89 vehicles · Class 168/0: 5 units, 20 vehicles · Class 168/1: 8 units, 26 vehicles · Class 168/2: 6 units, 21 vehicles · Class ...<|control11|><|separator|>
  83. [83]
    First refurbished Class 168 DMU unveiled by Chiltern Railways
    Oct 18, 2024 · Chiltern Railways has unveiled the first of its 28 Class 168 diesel multiple-units to be refurbished under a £12m programme.
  84. [84]
    Class 168 | Eversholt Rail Limited
    Manufacturer: Adtranz · Entry into service: 2000 · Fleet size: 9 vehicles · Unit formation: DMSL-MS-DMSL · Unit seating capacity: Standard Class: 199, Tip up: 5.
  85. [85]
    First Class 68 gains new Chiltern Railways livery after maintenance ...
    Sep 26, 2025 · The first of 14 Class 68s to be taken on by Chiltern Railways (68020) has been reliveried in the company's new dark blue livery.
  86. [86]
    Chiltern seeks Mk 3 replacements - Modern Railways
    Jan 18, 2024 · Chiltern Railways has published a tender seeking replacement stock for its current loco-hauled fleet. Class 68s sub-leased from Direct Rail Services haul Mk 3 ...<|control11|><|separator|>
  87. [87]
    Chiltern Railways unveils first refurbished Mark 5A trains ahead of ...
    Oct 14, 2025 · Now Chiltern has leased all 13 of the trains from their owner, Beacon Rail. Since the deal was announced in August, work has been underway to ...
  88. [88]
    Chiltern considers Turbo future - Modern Railways
    Sep 12, 2022 · The operator has 28x2-car and 11x3-car '165s', which operate alongside its more modern Class 168 DMUs and its loco-hauled sets. The market ...
  89. [89]
    Chiltern FINALLY signs Mk 5 deal - Modern Railways
    Aug 5, 2025 · An agreement for Chiltern Railways to lease the Mk 5A coaches previously operated by TransPennine Express and owned by Beacon Rail Leasing ...
  90. [90]
    Beacon Rail leases Mark 5A sets to Chiltern | Latest Railway News
    Aug 7, 2025 · The new stock is expected to begin entering service on the operator's London–West Midlands routes from spring 2026. Chiltern Railways has ...
  91. [91]
    Chiltern Railways unveiled new trains
    Oct 21, 2025 · Chiltern Railways has unveiled its newest fleet of Mark 5A trains, which will provide an additional 10,000 seats each weekday across its ...Missing: Main enhancements 2018-2025
  92. [92]
    Chiltern Mk 5A move “expected” - Modern Railways
    Jun 17, 2025 · Should agreement be reached, Chiltern is expected to take on all 13 five-car sets as well as the spare Driving Trailer and the dedicated pool of ...
  93. [93]
    New Chiltern Railways trains set to unlock 10000 more seats a day
    Oct 14, 2025 · The trains, to be introduced between London to West Midlands from early 2026, will enable Chiltern to deliver more capacity across each of its ...
  94. [94]
    Chiltern Railways making case for discontinuous electrification to ...
    Oct 29, 2025 · CHILTERN RAILWAYS. A Strategic Business Case for partial electrification of the Chiltern Main Line has been compiled. Discontinuous ...
  95. [95]
    Chiltern electrification alternatives studied | Rail Business UK
    May 16, 2023 · Built for Chiltern services in 1990-92 as part of the total route modernisation carried out by British Rail, the DMUs were refurbished and ...Missing: 1993 Banbury source:
  96. [96]
    Hybrid '168' a first step in Chiltern decarbonisation - Modern Railways
    Feb 10, 2022 · Chiltern Railways' HybridFlex Class 168 entered service on 10 February, operating between London Marylebone and Aylesbury.Missing: trial | Show results with:trial
  97. [97]
    Cutting Emissions - cleaner, greener Turbostars - Rail Engineer
    Apr 26, 2022 · The HybridFLEX unit, fitted to the class 170, is a self-charging diesel-battery parallel hybrid. The MTU diesel engine drives the rail wheels ...
  98. [98]
    Chiltern pulls out of pilot emission reduction hybrid train project
    Sep 20, 2023 · The two-carriage HybridFLEX was designed to reduce CO2, NOx and particulate emissions. Chiltern Railways has withdrawn its battery-diesel ...
  99. [99]
    Disappointment as Chiltern Railways scraps hybrid train plans
    Sep 8, 2023 · Chiltern Railways has quietly scrapped its plans to introduce hybrid trains from services in London after reports of “unacceptably poor” air quality.Missing: end | Show results with:end<|control11|><|separator|>
  100. [100]
    Chiltern Railways 2030 Vision
    Mar 12, 2025 · We launched our Right Route 2030 vision, setting out how we intend to modernise and decarbonise our operations to deliver easier, greener, and better train ...<|control11|><|separator|>
  101. [101]
    [PDF] rightroute - Chiltern Railways
    Jul 17, 2023 · There is a huge amount to be proud of in Chiltern's history since it was formed in 1996, from ordering new trains, building new stations, ...
  102. [102]
    [PDF] Economic, Social and Environmental Value Report 2023
    We are committed to generating economic growth, encouraging social interactions, and reducing our environmental footprint to achieve net zero status by 2050.
  103. [103]
    Project overview - East West Rail
    East West Rail is a major infrastructure project which will connect communities between Oxford and Cambridge. Delivery is now underway.Missing: Main | Show results with:Main
  104. [104]
    Chiltern Railways to run first part of East West Rail - BBC
    Mar 25, 2025 · The line will serve six stations including Bicester Village, Winslow and Bletchley.
  105. [105]
    What is happening with East West Rail? - BBC
    Nov 15, 2024 · The government has said that trains between Bedford and Oxford would run from 2030. But completing the line all the way to Cambridge - Stage 3 ...Missing: timeline | Show results with:timeline
  106. [106]
    [PDF] Development of Train Services for Chiltern Routes
    For the 2020s, we recommend electrification of the route to increase its capacity and environmental sustainability and to reduce its costs. We also identify a.
  107. [107]
    Stations in West Hampstead - Wikipedia
    Stations in West Hampstead · Up arrow Chiltern Main Line to Birmingham · Up arrow LU Jubilee and Metropolitan lines · Up arrow Thameslink and Midland Main Line.Stations and lines · Current interchange · West Hampstead Interchange...
  108. [108]
    Chiltern Tunnel - HS2
    Jul 4, 2025 · The Chiltern Tunnel is the longest tunnel on the HS2 route, stretching 10 miles (16km) beneath the Chiltern Hills.Missing: Line | Show results with:Line
  109. [109]
    Rail Network Enhancements Pipeline schemes: a brief history and ...
    Jul 16, 2025 · The government's Rail Network Enhancements Pipeline lists 20 projects that it will fund in the Spending Review period.