Fact-checked by Grok 2 weeks ago

High Speed 2

High Speed 2 (HS2) is a high-speed railway initiative in the , presently limited to constructing Phase 1 from to the West Midlands after the cancellation of planned extensions to , , and beyond in 2023. The project seeks to enhance rail capacity north of , cut end-to-end journey times—such as to from 1 hour 21 minutes to 49 minutes—and support economic connectivity with trains operating at up to 360 km/h on dedicated tracks. Launched with parliamentary approval in 2013 for Phase 1, construction began in 2020, incorporating extensive tunnelling (over 80% complete as of late 2025) and new stations at , Euston, , and . Despite these ambitions, HS2 exemplifies challenges in large-scale delivery, with costs surging from initial estimates of around £37 billion (2009 prices) to over £50 billion for Phase 1 alone, exacerbated by £40.5 billion already expended by April 2025 on work roughly halfway done. Delays have pushed the opening beyond the original 2029-2033 timeline, now extending past 2033, including recent deferrals of four years for the connection critical for northern access. Premature progression to with underdeveloped designs, coupled with systemic in forecasting, has driven these overruns, as acknowledged in official reviews. The purported benefits, including job creation, regional growth, and a benefit-cost of approximately 1.2 for Phase 1, rest on assumptions of substantial time savings and demand growth that independent analyses deem overstated, yielding questionable net value amid alternative investments like road or upgrades. Controversies encompass environmental impacts from tunnelling and land acquisition, compulsory property purchases affecting thousands, and political debates over fiscal prudence, culminating in the northern phase axing to redirect funds. As of 2025, site works continue amid safety pauses and resets, underscoring ongoing efforts to salvage viability from a project once hailed as transformative but now scrutinized for efficiency.

History

Origins and Early Proposals

In January 2009, the UK established High Speed Two Limited (HS2 Ltd), a , to examine strategic options for developing a new network beyond the existing line, with an initial focus on addressing chronic capacity shortages on intercity routes such as the , which was projected to reach full utilization by 2024 even after recent upgrades. HS2 Ltd commissioned and economic studies, including a route by Arup, evaluating alignments from to the West Midlands that could accommodate trains operating at up to 360 km/h while minimizing environmental disruption through tunneling and rural routing. In December 2009, HS2 Ltd delivered its preliminary to the , advocating for a dedicated new line over upgrades to legacy infrastructure, citing superior long-term capacity (up to 18 trains per hour in each direction) and journey time savings, such as reducing -Birmingham travel to 49 minutes. On 11 March 2010, Transport Secretary Lord Adonis presented these findings to alongside the government's command paper "High Speed Rail: to the West Midlands and beyond," formally endorsing HS2's development as a Y-network starting with the 140-mile -to-Birmingham phase (estimated cost £17-20 billion in 2009 prices), with branches planned to , , and potentially further north to integrate with regional networks. The proposals positioned HS2 as a catalyst for regional economic rebalancing, projecting up to 40,000 jobs during construction and broader connectivity benefits, though initial route options drew criticism for potential impacts on Chiltern countryside and property values.

Approval and Initial Planning

The government established HS2 Ltd in January 2009 to assess options for a new line connecting to northern England, building on the success of High Speed 1. HS2 Ltd delivered its initial report to the by December 2009, recommending a Y-shaped network prioritizing the -West corridor for capacity relief on congested lines like the . On 11 March 2010, the government published the command paper , formally proposing HS2 Phase 1 as a 225-mile-per-hour line from Euston to , estimated at £17-19 billion in 2009 prices, with services to commence around 2026. Following the May 2010 general election, the Conservative-Liberal Democrat endorsed the proposal, confirming in December 2010 plans for a -West link with potential extensions and a Heathrow spur in Phase 2. Initial planning advanced through 2011-2012, with HS2 Ltd tasked from January 2012 to develop detailed routes, conduct environmental assessments, and prepare hybrid bills for parliamentary scrutiny. The government announced the preferred Phase 1 alignment in January 2012, spanning 140 miles with intermediate stations at and , following public consultations on alternatives. Parliamentary approval for preparatory works came via the High Speed Rail (Preparation) Bill, introduced in May 2013 to authorize up to £11.1 billion in spending for land acquisition, design, and safeguards ahead of full construction powers. The bill passed its third reading in the House of Commons on 28 October 2013 and received Royal Assent on 21 November 2013, enabling HS2 Ltd to proceed with detailed engineering and compulsory purchases while the Phase 1 hybrid bill was drafted. This step addressed early programme risks identified by the National Audit Office, such as optimistic cost assumptions, by ringfencing funds for non-recoverable pre-construction activities.

Key Reviews and Assessments

In August 2019, Transport Secretary commissioned the independent Oakervee Review to evaluate the HS2 project's viability, costs, and s amid growing scrutiny over delays and budget increases. Published in February 2020, the review, chaired by engineering expert Douglas Oakervee, recommended proceeding with HS2 Phase 1 while implementing urgent reforms to address governance failures, weak supplier management, and inefficiencies at HS2 Ltd. It emphasized that no "shovel-ready" could deliver comparable and connectivity benefits, but warned of potential cost escalation beyond the then-estimated £56-62 billion (in 2019 prices) for Phase 1 without stronger oversight, including appointing a senior responsible owner from outside the (DfT) and exploring design simplifications like reduced tunneling or slower speeds in certain sections. A dissenting report by review panel member Lord Tony Berkeley contested the majority's cost projections, asserting that HS2 Ltd had understated expenses through optimistic assumptions on productivity, inflation, and risk contingencies, with Phase 1 potentially exceeding £80 billion in 2019 prices based on extrapolated data from comparable projects. criticized the review's reliance on DfT and HS2 Ltd evidence, arguing it overlooked systemic underestimation evident in prior rail megaprojects like . The National Audit Office (NAO) conducted multiple assessments highlighting persistent risks to value for money. A March 2023 NAO report on Euston development found that DfT and HS2 Ltd lacked a robust to manage £1.7-2.6 billion in uncertain s (in 2020 prices), with deferred decisions on scope exacerbating funding gaps and timelines slipping to 2040 or later. In July 2024, following the October 2023 cancellation of 2, the NAO examined programme reconfiguration, noting DfT's incomplete reassessment of overall benefits and sunk s exceeding £11 billion by mid-2024, alongside remediation expenses projected at up to £100 million (in 2024 prices) for land and works by summer 2027. These reports underscored causal factors such as , inadequate early risk pricing, and fragmented between DfT and HS2 Ltd, contributing to real-terms of over 130% for 1 from 2012 to 2022 estimates.

Phase 2 Cancellation

On 4 October 2023, Prime Minister announced the cancellation of HS2's Phase 2 during his closing speech at the in , citing ballooning costs estimated at over £100 billion for the full project, persistent delays, and reduced demand for travel following the . The decision axed the entirety of Phase 2, including Phase 2a ( to , approximately 32 miles) and Phase 2b ( to via the western leg and to via the eastern leg). Sunak justified the move by arguing that Phase 2 would not provide sufficient economic benefits relative to its expense, with journey time savings deemed marginal compared to upgrading existing infrastructure like the . He pledged to redirect approximately £36 billion in projected savings—though critics noted much of this was already committed—to alternative northern transport initiatives, including £12 billion for improvements between , , , and , as well as road and bus enhancements. The announcement prompted immediate criticism from transport industry bodies, regional mayors, and economists, who contended that cancelling Phase 2 undermined long-term capacity relief on congested lines and regional equalization efforts, potentially exacerbating north-south disparities. warned of lost jobs and growth opportunities, while the National Audit Office later highlighted ongoing financial liabilities from contracts and land acquisitions totaling billions despite the scope reduction. In response, the lifted statutory and safeguarding restrictions across most of 2 routes by early 2024, enabling property owners to develop or sell land without HS2 constraints, though a compensation was introduced for those impacted by prior compulsory purchases or disruptions. The decision also triggered a of HS2 Ltd, with involvement proposed for 1 delivery to address management shortcomings identified in prior reviews. As of mid-2025, 2 remains cancelled with no reinstatement, though the incoming has emphasized completing 1 while scrutinizing alternatives for northern connectivity.

Developments Since 2023

In October 2023, Prime Minister announced the cancellation of HS2's Phase 2a and Phase 2b extensions beyond , limiting the project to the London-to-Handsacre corridor while redirecting savings to other transport initiatives. This decision followed years of escalating costs and delays, with the remaining Phase 1 forecast to cost £36.1 billion by 2030. The government's election in July 2024 led to confirmation that cancelled phases would not be revived, citing irreversible contractual and financial commitments. In October 2024, the government allocated funding in the Budget for tunneling from to a rebuilt Euston station, reversing prior scaling-back plans and enabling a direct terminus. HS2 Ltd's annual report for 2024-25 highlighted ongoing delivery efforts amid these policy stabilizations, with expenditures reaching £2.2 billion in the . By June 2025, the project faced additional delays without a revised completion timeline, attributed to issues and reviews, pushing back initial 2033 targets. In July 2025, a six-monthly parliamentary report detailed a reset, including enhanced oversight and community impact assessments, while emphasizing benefits like reduced journey times between and . October 2025 brought further deferral of the Handsacre junction linking HS2 to the by four years, as part of cost-control measures. HS2's priorities for 2025-26 remain focused on advancing works to support operational readiness in the early .

Route and Infrastructure

Phase 1 Alignment

The Phase 1 alignment of High Speed 2 extends 225 kilometres northwest from London Euston station to a junction near Handsacre in , with a branch serving central . This route incorporates intermediate stops at in west London and near the airport, terminating at Birmingham Curzon Street station. Approximately 32 kilometres of the alignment lie in twin-bore tunnels, with additional green tunnels and extensive cuttings to navigate urban and environmentally sensitive areas. Commencing at Euston, the line proceeds through 7.5 kilometres of tunnelled approach ramps and urban tunnels to mitigate disruption in densely populated . It surfaces near Old Oak Common Lane, where the first passenger station connects to existing , , and Great Western services. Beyond this, the alignment follows the 13.5-kilometre Northolt Tunnel northwest under and , emerging in the Colne Valley. Here, the 3.4-kilometre spans reservoirs, the Grand Union Canal, and the , elevating the track 20 metres above ground to preserve local wetlands. In Buckinghamshire, the route employs deep cuttings such as South Heath and Little Missenden before entering the 10.3-kilometre , which bores beneath the to limit visual and ecological impact. Emerging near the A413, the alignment continues through rural countryside, crossing the M40 and HS2's dedicated path avoids major settlements, utilizing embankments and smaller viaducts in areas like Wendover Dean and the Claydon area, where it intersects the line. North of Aylesbury, the line arcs northeast through Oxfordshire's countryside, featuring the 1.6-kilometre and passing west of before turning northwest into . Key structures include the Water Orton Viaducts, a pair spanning the River Tame and floodplains near Kingsbury. The route then serves station adjacent to the M42 and , before descending into 6.6 kilometres of twin-bore tunnels to reach Curzon Street in . From Handsacre junction, northward extensions link to the . The design prioritizes straight alignments for speeds up to 360 km/h, with gradients limited to 1:67 outside tunnels.

Connections to Existing Networks

HS2 Phase 1 integrates with existing rail infrastructure primarily through interchanges at key stations and a junction to the , enabling onward travel to destinations beyond the dedicated high-speed alignment. This design aims to leverage legacy networks for broader connectivity while alleviating capacity constraints on conventional lines. At station in northwest London, HS2 will provide direct interchange with the (), facilitating transfers to destinations such as in approximately 6 minutes and Liverpool Street in 20 minutes, as well as access to via and Great Western Railway services. The station features eight surface-level platforms for these connections alongside six underground HS2 platforms, with construction of foundations completed as of February 2025. Further north, at Handsacre Junction near in , the HS2 alignment merges with the approximately 5 miles north of Lichfield, allowing high-speed trains to transition onto existing tracks for services to , , , and other northern cities. This integration supports up to 18 trains per hour continuing on the WCML post-Birmingham, though construction of the junction has been deferred by four years to at least 2029 to prioritize core tunneling and station works. In the West Midlands, terminus connects to local transport via an extension of the tram network to , separating from the existing line at Bull Street to serve the HS2 directly and link to Eastside developments. , located between and , provides access to the , airport rail links, and regional bus services, enhancing multimodal connectivity for events and air travel.

Design Specifications

The High Speed 2 (HS2) network is designed as a dedicated, grade-separated optimised for passenger services at maximum speeds of 360 km/h (225 mph), substantially exceeding capabilities of upgraded conventional lines limited to around 200-220 km/h. This requires alignments with gentler horizontal and vertical geometry than existing , including larger minimum radii and reduced gradients to maintain stability and at high velocities, achieved through extensive use of tunnels, viaducts, and embankments. Track infrastructure adheres to 1,435 mm standard , matching the UK's national network to enable "classic compatible" trains that can transition seamlessly to legacy lines without bogie changes, though with compromises such as narrower envelopes for compatibility compared to pure high-speed continental designs. The follows a uniform derived from kinematic references including UIC GC for upper profiles, permitting wider (up to approximately 2.9-3.15 m) and taller trains than typical , which supports increased passenger capacity via spacious interiors or potential bi-level while navigating UK-specific clearance constraints. Double- prevails throughout, with slab predominant in tunnels and viaducts for and reduced , alongside ballasted sections in open cuttings. Electrification employs overhead line equipment at 25 kV 50 Hz AC, standard for UK high-speed and mainline operations, to deliver efficient power for regenerative braking and low-emission performance aligned with project goals. Signalling integrates European Train Control System (ETCS) Level 2 with moving-block principles via radio-based communication, eliminating fixed signals and enabling headway reductions to as low as 3 minutes for higher throughput; Automatic Train Operation at Grade of Automation 2 overlays this for driver-supervised functions like precise stopping. Platform heights standardise at 1,150 mm for step-free access with high-floor trains, and rolling stock specifications accommodate formations up to 400 m long (plus 1% tolerance) with capacities exceeding 1,000 passengers per set. Common design elements standardise visual and functional aspects across structures, such as noise barriers, aesthetics, and , to create a cohesive identity while prioritising durability, low lifecycle costs, and minimal visual intrusion in rural settings. policies embed features from inception, including wider doors, universal toilets, and step-free interchanges, exceeding basic regulatory minima to accommodate diverse user needs without compromising speed or capacity.

Stations and Interchanges

London Terminals

Old Oak Common station will serve as the initial London terminus for HS2 Phase 1 services, functioning as a major interchange hub in northwest London spanning the boroughs of Brent, Ealing, and Hammersmith and Fulham. The station features 14 platforms, comprising six dedicated to high-speed HS2 trains and eight for conventional services, with capacity for up to 250,000 daily passengers. It connects directly to the Elizabeth line, Great Western Railway services, and Heathrow Express, enabling onward travel to Heathrow Airport and central London without changing trains. Major construction, including platform excavation and structural works, is advancing, positioning Old Oak Common as the UK's best-connected rail station upon completion. London Euston station is designated as the permanent terminus for HS2 in , integrating with the existing Victorian-era station to accommodate high-speed arrivals from the north. Original plans envisioned 11 platforms for HS2, but these were scaled back to six platforms capable of handling up to 10 trains per hour, reflecting efforts to control costs amid inflationary pressures. Construction of the HS2 elements at Euston was paused on 9 March 2023 to develop a more affordable design, though preparatory works like the Euston Approaches continue. HS2 services will link Euston to via the 7.2 km Euston Tunnel, a twin-bore structure designed to carry passengers underground from to the northwest hub before diverging northwards. The UK government reaffirmed commitment to completing the Euston connection in the October 2024 Budget, allocating funding for the tunnels while pursuing a rescoped station design separate from broader Euston redevelopment. Until Euston's HS2 facilities open, will act as the effective endpoint, with passengers transferring via existing networks for central access.

Intermediate Stations

Old Oak Common station, situated in northwest adjacent to the existing , serves as the first intermediate stop on the HS2 Phase 1 route from London Euston. It functions as a key interchange hub, linking HS2 services with the , , and future , while also providing connections to via existing services. The station design incorporates 14 platforms, including six dedicated to HS2 trains operating below ground level parallel to surface tracks of the . commenced following the Phase 1 hybrid bill approval in 2017, with major works including platform installation reaching a milestone in June 2025, positioning it as a temporary terminus until Euston completion. The site emphasizes , aiming to handle high passenger volumes through integrated urban development above the station. Birmingham Interchange station, located near in the West Midlands, acts as the second intermediate stop before the Curzon Street terminus. Positioned adjacent to and the (), it facilitates direct access for air and event passengers, integrating with existing rail links including the and via an 18-mile connector north of , though the latter's construction has faced delays as of October 2025. The station features multiple platforms for HS2 and conventional services, designed to support regional connectivity and in . Approved under Phase 1 planning, its development aligns with broader infrastructure to serve projected demand from airport traffic, with no additional intermediate stations planned between and Interchange to maintain high-speed efficiency.

Birmingham Terminals

Birmingham station serves as the principal northern terminus for HS2 Phase 1, located in the Eastside and districts of central on a site adjacent to the historic 1838 station. The station incorporates seven terminal platforms, each over 400 metres long to accommodate HS2 train sets, with a design featuring a modern reinterpretation of Victorian arched roofs spanning a 280-metre-long main building for covered passenger access. Sustainability measures include LED lighting, solar panels, and a targeted "excellent" rating, alongside over 550 cycle parking spaces and enhanced accessibility features such as additional seating and simplified platform navigation. It will integrate with 's transport network via direct links to buses, the tram system (with a dedicated line running alongside and beneath the station), and a proposed pedestrian connection to Birmingham Moor Street station, facilitating onward journeys to Birmingham New Street. Construction at advanced to foundation works in 2024, with the installation of more than 2,000 piles to support the , expected to generate over 1,000 jobs during the main build phase. Approaching viaducts, completed in sections by VINCI as of April 2024, will guide trains into the station from the south. A planned connection to the north of has faced deferral until at least 2029, as announced in October 2025, to prioritize core route completion amid broader project resets. Initial services to were originally slated for 2026 but have been delayed, with Phase 1 operations from to now projected no earlier than 2035 due to cumulative construction and procurement challenges. Birmingham Interchange , situated on a 150-hectare site in bounded by the M42, A45, and A452 motorways, functions as a major intermediate stop on HS2 Phase 1, primarily serving the and (NEC) areas. The facility includes four platforms served by stopping trains, plus two high-speed through lines for non-stop services, with provisions for 176 bicycles and future expansion. An automated will connect the station to over 2.3 kilometres, operating every three minutes to carry up to 2,100 passengers in six minutes, enhancing multimodal access alongside links to the and existing Birmingham International . Construction milestones include the installation of 15 major bridge beams by October 2024 to support approach structures. Like , its opening aligns with delayed Phase 1 timelines, originally targeted for 2027–2028 but now subject to the same post-2030 horizon.

Construction Progress

Major Civil Engineering Works

The main civil engineering works for HS2 Phase 1 are executed via seven geographic contracts known as Main Works Civil Contracts (MWCCs), awarded between 2017 and 2019, encompassing design, construction, and commissioning of route infrastructure excluding stations, depots, and systems. These packages—S1 and in southern approaches, C1 to across central and , and and N2 in the northern West Midlands—cover approximately 140 miles of alignment, integrating high-speed track with varied terrain through earthworks, minor structures, and preparatory ground stabilization. Contractors such as Align JV (for C1), Rail (for and ), and Connect JV (for and N2) manage these scopes, with combined values exceeding £10 billion, focusing on minimizing environmental disruption via landscape-led design. Central packages C2 and C3, spanning about 80 km of predominantly rural terrain between the Chilterns and West Midlands, emphasize extensive earthworks including 111 embankments totaling over 20 million cubic meters of fill material and 72 cuttings excavating similar volumes to achieve optimal gradients for 225 operations. These works incorporate using and to meet (CBR) standards of 15-30% for haul roads and permanent formations, alongside flood mitigation measures like balancing ponds and realigned watercourses. In C3, deep cuttings up to 20 meters handle unstable clays, requiring geotechnical interventions such as and retaining walls to prevent landslips. Northern packages N1 and N2 address urban-rural transitions near , involving 7.5-meter-wide haul roads stabilized for heavy construction traffic and integration with existing motorways via grade-separated junctions. Complex interchanges like the Delta Junction in , part of broader civil scopes, feature multi-level earthworks combining embankments, cuttings, and temporary haul routes to facilitate track splitting for regional services, with over 350 active sites at peak activity managing spoil removal of millions of tonnes. Progress as of 2025 includes completion of most earthworks in central sections, enabling track laying, though some northern groundworks face delays from utility relocations.

Tunneling Projects

HS2 Phase 1 requires the construction of approximately 65 miles (105 km) of tunnels between and the West Midlands, consisting of five major twin-bore bored tunnels and six cut-and-cover green tunnels designed to reduce visual and environmental impacts in ecologically sensitive and areas. Twin-bore tunnels, totaling over 27 miles (43 km), are excavated using large-diameter boring machines (TBMs) with diameters of up to 10 meters to accommodate high-speed tracks at depths reaching 50 meters. These structures incorporate cross-passages for access and shafts for air quality and egress, with spoil removal exceeding 20 million tonnes across the project. The Northolt Tunnel, the second-longest at 8.4 miles (13.5 km), runs from in to , passing beneath the suburbs of and to avoid surface disruption in densely populated zones; it was excavated by two TBMs launched in 2022, with breakthroughs achieved by mid-2024. The Chiltern Tunnel, extending 10 miles (16 km) through the , is the longest on the route and features 38 cross-passages; constructed with two TBMs starting in 2020, it removed 2.7 million cubic meters of chalk, with completion of boring in June 2024. The Euston Tunnel, a 4.5-mile (7.2 km) twin-bore section approaching Euston station, reaches depths of 50 meters and was bored by two 1,250-tonne TBMs over approximately 1.5 years, concluding in early 2025. Near Birmingham, the Bromford Tunnel spans 3.5 miles (5.5 km) from the depot area to connect with the surface route; TBM Elizabeth completed its second drive on 13 October 2025, marking the final breakthrough for deep bored tunnels in the region. This event finalized excavation for the 23 miles of deep bored tunnels from to , with all TBMs retrieved by late October 2025. Cut-and-cover green tunnels, buried post-construction to blend with the landscape, include the 700-meter Burton Green Tunnel in , which integrates with local greenways, and the 2.5 km Chipping Warden Tunnel in , where earthworks advanced in 2025 following environmental clearances. These structures employ linings and are fitted with noise barriers, with construction prioritizing minimal disruption to and corridors. As of October 2025, overall tunnelling progress stands at near-completion for excavation phases, shifting focus to lining installation, track bedding, and systems integration ahead of operational testing.

Bridges and Viaducts

High Speed 2's Phase One route incorporates over 500 bridging structures, including 175 bridges and 52 viaducts designed to carry the railway over roads, existing rail lines, rivers, and varied terrain while minimizing disruption to local infrastructure. These elements total more than 15 km for the major viaducts alone, employing innovative construction techniques such as and deck sliding to reduce environmental impact and construction time. Structures like overbridges maintain connectivity for communities and corridors. The , the longest railway bridge in the at 3.4 km, spans the Colne Valley Regional Park northwest of , crossing the Grand Union Canal and floodplains with ten 80 m spans supported by V-shaped piers up to 24 m tall. works reached structural completion in August 2025, with the gently curving design accommodating trains at up to 200 mph; it features acoustic barriers and low-maintenance concrete to blend with the landscape. In the Chilterns area, the Small Dean Viaduct, measuring 345 m, crosses the A413 road, Small Dean Lane, and the Chilterns railway line south of , . involved a four-day deck slide in January-February 2025, positioning a 4,500-tonne structure using hydraulic jacks over active transport routes; its double composite design with Y-shaped piers and steel stiffeners enhances durability and aesthetics. Further north, the Water Orton Viaducts at the Delta Junction near consist of two structures holding 700 m of track elevated over the River Tame and existing lines east of the . The 472 m single-track River Tame West completed in February 2025, utilizing 32 piers including straddle bents to span the HS2 mainline below; viaduct segments at the junction were fully positioned by September 2024. The Balsall Common Viaduct, 425 m in length, elevates the route over floodplain northeast of , , with a 19.5 m width and 13.9 m height constructed from 7,200 cubic meters of concrete. Approved in September 2023 following public input on design elements like parapets, ongoing works integrate noise barriers and landscape screening. In urban , the Lawley Middleway Viaduct features a m, 1,631-tonne span installed over the in 2025, four days ahead of schedule, as part of connectivity enhancements to station. Other notable structures include the 475 m River Blythe Viaduct crossing low-lying terrain and the 450 m Wendover Dean Viaduct employing double composite methods for efficiency.

Challenges and Delays

The High Speed 2 (HS2) project has encountered significant delays, with the original target for Phase 1 completion between and , set for 2026-2033, repeatedly postponed; as of 2025, no firm new completion date has been established, and connections such as the link to the have been deferred by an additional four years. Cost estimates for Phase 1 have escalated from an initial £37 billion in 2010 (in 2019 prices) to over £100 billion by 2025, driven by scope changes, , and inefficiencies, with real-terms increases of up to 134% between 2012 and 2022 according to independent analyses. Procurement and management shortcomings form core causal factors, as identified in the 2020 Oakervee Review, which criticized HS2 Ltd for inadequate cost control, early awarding of large fixed-price contracts before finalizing designs, and insufficient oversight of subcontractors, leading to extensive variations and disputes. Insiders have attributed initial to underestimating geological challenges in tunneling and viaducts, compounded by mishandling of compulsory land purchases that alienated property owners and triggered compensation claims. External shocks, including Brexit-related supply chain disruptions, the pandemic's halt to site work in 2020-2021, and post-pandemic shifts in travel demand, exacerbated these issues, though reviews emphasize that internal failures—such as and delayed decision-making—were primary drivers rather than solely unforeseeable events. Political interventions have reshaped the project amid these pressures; in October 2023, Prime Minister cancelled Phase 2b ( to and ), citing ballooning costs, chronic delays, and reduced viability due to changing travel patterns, redirecting approximately £36 billion to alternative northern transport initiatives like road upgrades. This decision followed earlier pauses, such as the 2023 deferral of Euston station works and -to-Crewe construction by two years, reflecting fiscal constraints and skepticism over the project's benefit-cost ratio, which had deteriorated below 1 in some evaluations. Legal and environmental hurdles have further impeded progress, with multiple s challenging aspects of the hybrid bill process; for instance, pre-Brexit claims alleged breaches of environmental directives on assessments, though most were dismissed, and HS2 secured a 2022 route-wide against protesters obstructing sites. Environmental impacts include the projected loss of over 100 ancient woodlands and disruption to bogs and waterways in Phase 1, prompting opposition from groups like , though the northern cancellation mitigated some effects by sparing additional habitats. Recent 2025 challenges, such as a dismissed over deemed permissions for works, underscore ongoing tensions between accelerated infrastructure delivery and local governance concerns.

Planned Operations

Service Patterns and Timetables

HS2 Phase 1 services are planned to provide direct high-speed connections between and the West Midlands, with trains departing from station initially and later from a new Euston terminus. The core pattern focuses on intercity routes terminating at or serving , with journey times reduced to 49 minutes from to . Peak frequencies are designed for up to three trains per hour (tph) each way between and , contributing to a total line capacity of up to 18 tph when fully operational. These services utilize classic-compatible , enabling some trains to extend northward onto the (WCML) beyond , thereby recasting overall corridor patterns by shifting intercity demand from congested legacy tracks. Integration with existing networks emphasizes capacity relief on the WCML, where HS2 operations are projected to free up paths for additional regional and freight services. For instance, post-HS2, the WCML corridor could accommodate enhanced patterns, including more stops at intermediate locations like or , though exact extensions depend on operator agreements and Phase 2a developments to . Journey times to are estimated at under 40 minutes from , supporting airport access. Timetables remain subject to revision amid construction delays, with no fixed schedules published as of October 2025; provisional plans prioritize even-spaced departures during peaks to maximize reliability and passenger throughput.
Route SegmentPlanned Peak FrequencyEstimated Journey Time
London Euston/Old Oak Common to Birmingham Curzon Street3 tph49 minutes
London to Birmingham InterchangeIncluded in core patternUnder 40 minutes
Extensions via WCML (e.g., to )Variable, classic-compatibleDependent on hybrid speeds
Operational patterns will adhere to Network Rail standards, with maintenance windows likely scheduled overnight to sustain daily service levels, though full implementation awaits infrastructure completion targeted for the late 2020s.

Rolling Stock Procurement

The procurement for HS2 rolling stock commenced in March 2017, with HS2 Ltd issuing an invitation to tender for the design, manufacture, supply, and maintenance of electric multiple units capable of operating at high speeds on dedicated HS2 infrastructure while maintaining compatibility with the existing UK rail network, including clearance through legacy tunnels and junctions. The technical specifications mandated a maximum operating speed of 360 km/h on HS2 tracks, reducing to 200 km/h on conventional lines, with units featuring a lowered floor profile, advanced aerodynamics, and energy-efficient propulsion systems to meet performance, accessibility, and sustainability requirements. After evaluating bids from multiple consortia, HS2 Ltd awarded the contract on 9 December 2021 to the Alstom-Hitachi (HAH-S), valued at approximately £2 billion for the base scope. This encompassed the delivery of a minimum of 54 ten-car trains, classified as , along with long-term maintenance services, depot operations, and options for fleet expansion to support projected service frequencies of up to 18 trains per hour from London Euston. Manufacturing is allocated to Alstom's facility in , , for approximately 60% of the workshare, and Hitachi's site in Newton Aycliffe, , with the contract emphasizing domestic integration to sustain thousands of jobs. The trains incorporate modular construction for easier upgrades and incorporate features such as increased (up to 1,000 passengers per ten-car set in coupled operation), enhanced passenger information systems, and compliance with stringent noise and vibration standards. The competitive process drew bids from at least three major manufacturers, including the eventual winner and rivals such as , but faced a challenge from an unsuccessful bidder alleging procedural flaws in evaluation criteria weighting. In December 2023, the dismissed the claim, finding no manifest error in HS2 Ltd's assessment of technical compliance, cost-effectiveness, and lifecycle value, thereby upholding the award. Subsequent to the 2023 cancellation of HS2 Phase 2b, the fleet design faces adaptation to the truncated Phase 1 network, potentially incurring additional costs within broader project impairments exceeding £2 billion, though HS2 Ltd has prioritized retaining core high-speed capabilities over full redesigns to avoid further escalation.

Capacity Enhancements

HS2 Phase 1 is projected to double the rail capacity between and the West Midlands by dedicating new tracks to long-distance high-speed services, thereby freeing slots on the congested (WCML) for additional regional, commuter, and freight trains. This enhancement addresses chronic overcrowding, with HS2 trains capable of carrying up to 576,000 passengers daily on the new infrastructure, reducing pressure on existing lines serving over 250,000 seats per day on the WCML south of . By segregating express services onto HS2, the project enables up to 144 additional freight paths per day across the network, equivalent to removing thousands of heavy goods vehicles from roads annually, as each can replace up to 76 HGVs. Integration at key junctions, such as where HS2 connects to the , and the upgraded Euston terminus, will further amplify released capacity, allowing more frequent local services without conflicting with intercity expresses. Network Rail assessments indicate this could yield a step-change in overall system throughput, with minimum capacity gains of 50-100% on WCML segments post-Phase 1 opening around 2029-2033. The use of longer 200-400 meter trains operating at up to 360 km/h on dedicated HS2 tracks, combined with classic-compatible designs for seamless transition to legacy infrastructure, supports higher passenger densities and compared to current WCML limitations. However, the 2023 cancellation of northern extensions has constrained full-network benefits, limiting capacity relief to the southern leg and prompting regional proposals for alternative Birmingham-Manchester links to mitigate bottlenecks. Official projections emphasize that these enhancements prioritize volume over speed alone, countering critiques that overemphasize journey time savings at the expense of verifiable throughput gains.

Maintenance Facilities

HS2 requires dedicated facilities for the maintenance of its and to ensure operational reliability across its 140-mile Phase 1 route from to . Rolling stock maintenance focuses on servicing the fleet of high-speed , including , repairs, and stabling, while maintenance addresses , overhead , signaling, and associated systems. These facilities are designed to support predictive and preventative strategies, minimizing downtime and enhancing safety. The primary rolling stock depot is located at , in north-east , serving as the central hub for train , servicing, and storage. This facility includes a main equipped with workshops and offices for approximately 250 staff, a Cleaners and Drivers Building in the western area for servicing teams and driver training accommodating around 200 personnel, and a stabling yard for parking trains. It also houses the Network Integrated Control Centre (NICC), a standalone structure overseeing the entire HS2 network with over 100 staff. The depot incorporates sustainable features such as solar panels, , and low-carbon materials, and is projected to create over 550 local jobs. Construction status as of 2025 includes completed site preparation, , and groundworks, with detailed and main commencing in 2024; over 1 million cubic metres of earth have been excavated and reused on-site. For infrastructure maintenance, the key site is the Infrastructure Maintenance Depot (IMD) at Calvert in , positioned approximately halfway between and to optimize coverage of the 280 miles of . This depot handles maintenance of , overhead power lines, tunnels, , , and cabling, including for on-track machines (OTMs) and staff training for incident response. Facilities emphasize integration with the landscape through green roofs, timber and brick construction, and reduced nighttime lighting, achieving 'Excellent' certification with net-zero energy goals via local materials and water management systems. Construction progress includes an operational railhead for material delivery, ongoing excavation of the 2-mile Calvert cutting, and completion of bridges, an underpass, and 3.4 km of earthworks interfacing with East-West Rail as of November 2023. Light servicing capabilities, such as cleaning and water replenishment, are integrated at terminal stations like and to support efficient turnaround without full depot visits, complementing the primary sites. No additional major depots are planned for Phase 1 following the cancellation of northern extensions, with operations relying on these centralized facilities for cost efficiency.

Economic Analysis

Projected Benefits

The projected benefits of High Speed 2 (HS2) primarily revolve around enhanced transport capacity, reduced journey times, and stimulated economic activity, as outlined in official government assessments. Phase One, connecting to the West Midlands, is forecasted to deliver user benefits through time savings, with journeys between and reduced from approximately 84 minutes to 49 minutes, enabling higher frequency services and accommodating growing demand on the congested . These capacity enhancements are expected to support up to 18 trains per hour in each direction, freeing existing lines for regional and freight services, thereby improving overall network reliability and resilience. Economically, HS2 is projected to generate monetised business benefits of £34-45 billion across the full network, driven by effects such as improved labour market access and business clustering in connected cities. Wider economic impacts, including gains from better inter-city links, are estimated at £13.3 billion over 60 years, with construction anticipated to create over 22,000 direct and indirect jobs in the initial five years, alongside opportunities. In the West Midlands specifically, research commissioned by HS2 Ltd projects a £10 billion uplift in economic output over the next decade through regeneration, housing development, and enhanced local connectivity. Proponents argue these benefits extend to regional rebalancing, with extensions to and enabling faster links to the North, potentially narrowing productivity gaps between and other regions by facilitating knowledge spillovers and . analyses frame HS2 as underpinning long-term prosperity by boosting GDP through modal shifts and efficient , though such projections assume sustained demand growth and integration with other .

Cost Estimates and Escalations

The initial cost estimate for High Speed 2 (HS2) Phase 1, from to , stood at £20.5 billion in 2019 prices when the hybrid bill received in 2017, following preliminary approvals in 2012. Early projections for the broader project, announced under the government in 2009, pegged the full network at £37.5 billion in then-current prices, though these figures encompassed an expansive scope that has since been curtailed. Forecasts escalated markedly thereafter, with real-terms costs for Phase 1 completion rising 134% between 2012 and 2022 due to refined risk assessments and design maturation. By mid-2023, government reports indicated Phase 1 budgets approaching £50-60 billion in then-year prices, factoring in tunnelling complexities and land acquisition. As of July 2025, cumulative cash outlays exceeded £40 billion, including £25.3 billion allocated for 2026-2030 delivery from Birmingham Curzon Street to Euston. Construction contracts initially priced at £19.5 billion had overrun to £26 billion by that point, despite progress being only just over halfway. Projections continued upward, with December 2024 parliamentary updates estimating total Phase 1 costs could exceed £80 billion at current prices—a 15% jump from prior reports—driven by persistent pressures and Euston station refinements. These figures exclude broader network elements cancelled in 2023, such as Phase 2 routes to and , which had themselves contributed to earlier scope-driven inflations. Key drivers of escalations include initial underestimation of risks, with HS2 Ltd acknowledging overly optimistic baselines that assumed mature designs before full construction commenced on July 4, 2020. Scope expansions post-2012, such as enhanced station capacities and environmental mitigations, added billions, while external shocks like disruptions and post-2022 inflation from geopolitical events amplified material and labor costs. Internal factors, including immature strategies and mismanagement, were cited by HS2 board reviews as primary contributors, alongside unforeseen ground conditions necessitating redesigns. audits have highlighted that early political imperatives to secure approvals prioritized speed over rigorous , leading to reactive cost controls rather than proactive budgeting.
YearEstimated Cost (Phase 1, approximate then-year prices unless noted)Key Factors Noted
2012£20.5 billion (2019 prices)Initial hybrid bill baseline
2022~£50-60 billion (real terms increase of 134% from 2012)Design maturation and risk reappraisal
July 2025>£40 billion spent to date; contracts at £26 billionHalfway construction progress amid overruns
Dec 2024>£80 billion projected total15% annual escalation from inflation and station works

Benefit-Cost Ratio Evaluations

The benefit-cost ratio (BCR) for High Speed 2 (HS2) evaluates the project's monetized benefits, primarily journey time savings, reduced crowding on existing lines, and wider economic effects like , against its capital and operating costs, using the Department for Transport's (DfT) WebTAG appraisal framework over a 60-year period. Initial assessments in the 2013 economic case estimated a BCR of 2.3 for the full Y-shaped network (Phases 1, 2a, and 2b) and 1.7 for Phase 1 alone ( to West Midlands), classifying the project as medium value for money under DfT thresholds where BCRs of 1.5–2.0 indicate medium returns. These figures incorporated optimistic assumptions on traffic growth, at £20–£60 per hour for business users, and benefits across the national rail network. Subsequent revisions reflected cost escalations and scope reductions, lowering BCRs. By December 2019, the Phase 1 BCR fell to 0.9–1.0, entering DfT's "poor" value category (BCR <1.0), due to updated cost estimates exceeding £50 billion and sensitivity analyses accounting for lower traffic forecasts. For Phase 2a (Crewe to Manchester), the reference case BCR was 0.7, with a range of 0.5–1.2, driven by higher per-mile costs in northern terrain and benefits diluted by competition from upgraded West Coast Main Line services. The 2023 cancellation of Phase 2b (Birmingham to Manchester/Leeds) prompted DfT reassessments, yielding a Phase 1 BCR range of 1.1–1.8 by July 2024, as lost northern connectivity reduced network-wide benefits by approximately 0.2 BCR points, though officials argued residual capacity gains on legacy lines preserved low-to-medium value. Criticisms of HS2 BCRs highlight methodological flaws and optimism bias, including overvaluation of time savings (which empirical data from HS1 suggest passengers often repurpose rather than eliminate), exclusion of contingency in base costs, and reliance on unverified wider impacts comprising up to 40% of benefits. Independent analyses, such as Oxera's 2023 review, estimated Phase 1 BCR below 1.0 after adjusting for realistic demand plateaus and £100 billion-plus total costs (in 2020 prices), arguing the project fails DfT's typical approval threshold of BCR >1.5. Policy Exchange's 2022 assessment pegged the truncated network at 0.9, noting that for every £1 spent, benefits return only 90 pence, exacerbated by post-2023 cost forecasts of £54–£66 billion for Phase 1 completion by 2033. Proponents counter that BCRs undervalue non-monetized strategic benefits, such as enhanced productivity and resilience against emissions, though these remain speculative without causal evidence from comparable projects. The National Audit Office has flagged persistent underestimation of risks, with BCR sensitivity to a 20% dropping Phase 1 below 1.0.

Funding and Governance

Government Financing

The High Speed 2 (HS2) project is financed entirely through public funds provided by the UK central government via the (DfT). HS2 Limited, the executive responsible for delivery, receives funding as from the DfT, enabling capital contributions for infrastructure development. This arrangement is authorized under Section 6 of the Railways Act 2005 and the High Speed Rail (Preparation) Act 2013, with the government bearing the full financial risk without reliance on private sector investment for core infrastructure. Funding is allocated through the DfT's Departmental Expenditure Limit (DEL), structured in multi-year control periods to provide budgetary stability, including flexibility for reallocations between years within the HS2 programme. In the June 2025 , the government committed £25.3 billion specifically for advancing HS2 delivery from to Euston, forming part of the DfT's broader £31.5 billion capital settlement for 2028–2029. The annual budget for 2025–2026 stands at £7.1 billion, supporting ongoing construction amid demands on public finances. The October 2024 Budget reaffirmed direct government funding for the HS2 tunnels to London Euston, while exploring private contributions limited to non-core elements like the itself, though the remains predominantly publicly financed. Unlike some historical rail projects with private finance initiatives, HS2 draws primarily from resources, reflecting a public sector-led model where taxpayer funds and borrowing underpin the investment. This approach has persisted despite proposals for private finance in , which were not adopted for the mainline .

Budget Allocations and Oversight

The (DfT) allocates funding to HS2 Ltd primarily through annual capital contributions, governed by the HS2 Development Agreement and Framework Document, which establish financial controls and accountability between the DfT and HS2 Ltd. As of April 2025, cumulative programme expenditure reached £40.5 billion in nominal prices, comprising £37.9 billion on Phase 1 ( to ) and £2.6 billion on the cancelled former Phase 2. The 2025 confirmed £25.3 billion in nominal terms for progression from 2026 to 2030, focusing on Phase 1 completion including Euston tunnels, following scope reductions. For the 2025–2026 financial year, HS2 Ltd's budget totals £7.1 billion, with the following Phase 1 allocations:
CategoryAllocation (£ billion)
Civils5.4
Stations0.6
Systems0.3
Indirects0.4
Land/Property0.3
An additional £0.1 billion is allocated for former 2 close-out activities. In 2024–2025, actual expenditure was £6.9 billion against a similar , with a £30 million overspend attributed to operational variances. Oversight of budget execution involves multiple layers, including the HS2 Ltd Board, DfT monitoring, and independent scrutiny by the National Audit Office (NAO) and the . The NAO has repeatedly assessed value for money, highlighting post-2023 Phase 2 cancellation efforts to refine scope, decommission sites, and strengthen risk controls, though it noted persistent challenges in realistic budgeting and cost management. HS2 Ltd employs a three-lines-of-defence model for internal controls, supported by the Audit and Risk Assurance Committee, which reviewed 38 assurance areas in 2024–2025, rating most as substantial or moderate but identifying gaps in cost risk and prevention. receives bimonthly progress reports, as mandated, covering financial performance and governance. In response to historical cost escalations and delivery delays, the government initiated a programme reset in June 2025, appointing Mark Wild as CEO and Mike Brown as HS2 Ltd Chair to restore control, with a new cost and schedule baseline targeted for 2026 informed by James Stewart's independent review. A Ministerial Task Force was established for enhanced strategic oversight, alongside a Controls Improvement Programme to address systemic weaknesses in financial assurance. These measures aim to mitigate risks exposed by prior NAO findings, such as inadequate risk provisioning, though full efficacy remains under evaluation.

Regional Funding Disputes

The cancellation of HS2's Phase 2b in 2023, which removed the planned extensions to and , prompted significant disputes among northern English regional leaders over the reallocation of projected savings estimated at up to £36 billion by the government. Prime Minister announced that these funds would support "Network North," including enhanced local services, repairs, and bus improvements to boost connectivity without the high-speed line. However, Mayor and Mayor criticized the plan as a "betrayal of the North," arguing that dispersed investments in lower-speed projects could not replicate the economic and capacity benefits of the original HS2 legs, such as reduced journey times between major cities. Further contention arose when allocations deviated from northern priorities; for instance, in December 2023, £235 million of redirected HS2 funds was designated for repairs in , prompting northern media and politicians to accuse the government of prioritizing the Southeast despite promises of regional equity. In February 2024, the government specified £4.7 billion for local transport funds outside major cities, with £2.5 billion to the North and £2.2 billion to the , including projects like reopening the Northumberland rail line and electrifying services to . Critics, including the , highlighted that actual savings were uncertain due to prior expenditures on land and design exceeding £2 billion for the cancelled sections, potentially inflating the reallocation figures and undermining claims of net regional gains. In Wales, disputes centered on the project's classification as an "" initiative under funding formulas, which denied Wales Barnett consequentials—additional devolved funding proportional to English spending—despite no HS2 infrastructure serving the nation. This resulted in an estimated £4-4.6 billion shortfall in rail investment for Wales over the project's lifespan, as calculated by Welsh officials based on per capita equivalents provided to and . The , led by , repeatedly demanded reclassification or compensation, describing the arrangement as an "injustice" that exacerbated regional disparities, but the government refused, maintaining the designation and confirming in October 2025 that no retrospective payments would occur. Welsh ministers considered but ultimately declined legal action in April 2024, citing insufficient grounds for challenge. These conflicts underscored broader tensions over HS2's contribution to regional imbalances, with northern and Welsh stakeholders contending that the project's southern focus and subsequent perpetuated underinvestment in peripheral areas compared to the Southeast, where Phase 1 proceeds. Government responses emphasized that reallocations targeted high-impact local needs, but independent analyses, such as those from the National Audit Office, noted challenges in verifying the full extent of redirected benefits amid ongoing Phase 1 cost overruns.

Environmental Impacts

Carbon Footprint and Emissions

The construction of High Speed 2 (HS2) generates substantial embodied carbon emissions, predominantly from scope 3 activities involving the extraction, processing, manufacturing, and transportation of materials like , , and aggregates for viaducts, tunnels, and earthworks. These emissions constitute the majority of HS2's overall during the build phase, with initiatives such as low-carbon alternatives and optimized aimed at . HS2 Ltd has committed to halving whole-life carbon emissions relative to a 2013 baseline for Phase One's Main Works Civils Contracts, incorporating lifecycle assessments to track progress. By the 2024–2025 reporting period, a 33.8% reduction had been realized against this baseline, though full achievement of the 50% target remains ongoing. Operational emissions from HS2 trains are projected to be near-zero, as the network will run on electrified tracks powered by renewable or low-carbon grid from its opening, avoiding direct combustion. This efficiency—stemming from electric and high —yields emissions intensity far below that of equivalent road or short-haul , even under current grid conditions, with further reductions expected as national decarbonization advances. Proponents, including environmental advocates, contend that induced modal shifts from cars and domestic flights could deliver net lifetime savings, potentially offsetting construction impacts over 60 years or more through avoided emissions elsewhere in the transport system. Lifecycle analyses highlight tensions in HS2's net carbon profile: while operational and maintenance phases favor low emissions, the upfront construction burden—exacerbated by extensive tunneling and structures—has drawn scrutiny for potentially exceeding payback periods under conservative modal shift scenarios. Critics, referencing independent modeling, argue that total emissions may surpass savings across the asset's lifespan if decarbonization lags or if falls short of projections, rendering the project a net emitter compared to enhanced conventional upgrades. HS2's response emphasizes adaptive strategies, including material substitutions and efficiency trials (e.g., electric piling rigs saving 70 tonnes of CO2 per deployment), to refine these estimates. Official reports maintain that, with verified reductions, the project aligns with net-zero goals by not adding to emissions post-2035.

Biodiversity and Habitat Effects

The construction of High Speed 2 (HS2) has caused direct loss and fragmentation across its route, affecting woodlands, hedgerows, ponds, and associated . Phase 1 alone impacts approximately 25 s, down from initial estimates through design refinements, with over half the route incorporating tunnels and cuttings to bypass sensitive areas. A 2023 analysis by identified omissions in HS2 Ltd's mapping, such as uncounted trees, hedgerows, and ponds, resulting in at least 3.6 times greater than officially calculated for Phase 2a. By August 2021, around 15 hectares of had been felled, alongside veteran trees, contributing to ecological fragmentation that isolates populations and disrupts migration corridors for like bats and dormice. HS2 Ltd's mitigation strategy emphasizes , creation, and compensation to achieve no net loss of by operational start, measured via units accounting for quality and extent. Efforts include translocating and from ancient woodlands, planting compensatory areas, and restoring hedgerows, yielding a reported +22% net gain in hedgerows per the 2024-2025 Environmental . However, ecologists, including those from the University of the West of England, have deemed translocation ineffective for irreplaceable ecosystems, which harbor unique biota, fungi, and accumulated over centuries and not replicable in new plantings. Independent assessments highlight persistent risks of indirect effects, such as increased predation and reduced genetic viability from . Controversy surrounds claims of 108 ancient woodlands fully destroyed, which HS2 Ltd refutes as overstated since most face partial impacts rather than total loss, though campaign groups like the document verifiable damage to dozens of sites. The 2023 cancellation of the northern leg ( to ) potentially spared 32 ancient woodlands and additional hedgerows and waterways, underscoring route-specific vulnerabilities. Overall, while official metrics project restoration to baseline levels, third-party reviews question the adequacy of compensatory habitats in offsetting irreversible losses to high-carbon-storing, biodiversity-rich features.

Land Use and Mitigation Strategies

The HS2 Phase One route necessitates the permanent acquisition of 204 hectares of land, of which 194 hectares comprises productive farmland, alongside temporary use of 460 hectares during construction. This equates to approximately 0.04% of England's Best and Most Versatile agricultural land. The project severs or acquires around 2,800 hectares of farmland between London and Birmingham, affecting agricultural operations through fragmentation and loss of viable holdings. Woodland impacts include the permanent loss of 250 hectares of forestry land and 32 hectares of ancient woodland across 19 sites. Portions of the route traverse green belt areas, contributing to concerns over urban containment and coalescence, though the linear nature of rail infrastructure limits sprawl compared to broader development. To mitigate surface-level land disruption, HS2 incorporates extensive engineering solutions, including 16 km of twin-bore tunnels through the Chilterns to avoid visual scarring and habitat severance in sensitive chalk downland. Green tunnels—cut-and-cover structures backfilled and vegetated to blend with the landscape—total over 7 km across five sections: Copthall (0.8 km), (1.1 km), Greatworth (2.7 km), Chipping Warden (2.5 km), and Burton Green (0.7 km). Additional features such as deep cuttings, embankments, and viaducts minimize footprint in flood-prone or ecologically vital zones, with designs refined to reduce land take for affected dwellings from 342 to 172 in select refinements. Surplus and former is restored to productive use where feasible post-construction. Ecological compensation strategies emphasize habitat creation and connectivity, targeting no net loss in biodiversity via metrics for area-based habitats, hedgerows, and watercourses. This includes planting 650 hectares of new woodland to offset forestry losses and establishing a "green corridor" along the route with climate-resilient planting to defragment existing green infrastructure. Around the Chiltern tunnels, 127 hectares are allocated for rewilding, utilizing nutrient-poor subsoils to recreate chalk grassland and sequester carbon, thereby reducing construction-related emissions. Conserved soils support restoration for agriculture, landscape earthworks, and habitat enhancement. Independent assessments, such as those from wildlife organizations, contend that these measures may inadequately address risks to 693 Local Wildlife Sites encompassing 9,696 hectares, potentially exacerbating fragmentation in an already intensified agricultural matrix.

Social and Community Effects

Property Acquisition and Compensation

HS2 Ltd has acquired land and properties primarily through voluntary agreements and compulsory purchase orders (CPOs) under the for Phase One, with similar powers under subsequent legislation for other phases before their partial cancellation. Compulsory purchase enables the Secretary of State for Transport to obtain land required for the railway, even without owner consent, provided it serves a public purpose and compensation is paid at . As of September 2023, Phase One property spending totaled £2.81 billion, including £1.53 billion via CPOs, while northern extensions (prior to cancellation) involved £600 million in acquisitions. Compensation for affected landowners and homeowners follows statutory frameworks, offering plus a 10% "loss " (capped at £50,000 for homes) and for disturbance costs such as relocation expenses. The Need to Sell scheme allows qualifying owners within 300 meters of the route to request purchase at full value if unable to sell due to HS2 , while the Homeowner Payment Scheme provides fixed sums of £8,000 to £47,000 based on property location bands, claimable without selling. For Phase One, HS2 issued approximately 12,000 individual notices, acquiring 492 properties voluntarily for £881 million and 165 via CPOs by mid-2018, with total land costs forecasted at £3.36 billion—below initial budgets but having tripled from £1 billion estimates in 2013 due to expanded scope and legal delays. Disputes have arisen over valuation adequacy, procedural delays, and post-acquisition uncertainties, particularly after the October 2023 cancellation of Phases 2a and 2b, which left some landowners unable to repurchase sold land despite no longer needing it for the route. In January , MP accused HS2 of intimidating landowners by warning them against discussing compensation grievances with parliamentarians, prompting calls for independent oversight. A January parliamentary highlighted ongoing claims for losses and psychological impacts, with critics arguing statutory payments often fail to cover long-term economic harms to farms and rural , though HS2 maintains compliance with legal requirements and availability of appeals via the Upper (Lands Chamber). By early 2022, only 75% of Phase One land had been secured, exacerbating for remaining owners amid expired acquisition powers. Following the rescoping, safeguarding was lifted in many Phase 2 areas, allowing unaffected owners to market without HS2 restrictions but complicating buyback for those already compensated.

Noise, Disruption, and Health Concerns

Construction of HS2 has generated significant noise and , particularly in areas like Euston and , where residents reported levels rendering homes "unliveable" and causing sleep disturbances as of 2021-2023. Night-time works exceeded expectations, with allowable limits up to 80 decibels cited as intolerable by local councils in 2022 and 2025, prompting near-official complaints. Ground-borne from tunneling and piling has transmitted into nearby structures, amplifying complaints of structural unease and personal discomfort. Disruption extends beyond sound to , dust, and site lighting, affecting daily commutes and local businesses along the Phase One route from to . Residents in affected communities expressed anxiety and hostility over prolonged upheaval, with indirect effects like exacerbating perceived quality-of-life declines as of 2023. HS2's mitigation strategies, including noise barriers and community funds, aim to limit these, but reports indicate inconsistent enforcement, leading to sustained grievances. Health concerns primarily link to chronic exposure, with residents near Euston and reporting exacerbated respiratory conditions, stress, and impacts on children and vulnerable groups by 2025. Vibration-induced effects, such as potential balance disruption from low-frequency sources, have been noted in assessments, though empirical on long-term remains limited to reports. Operational projections anticipate similar issues post-completion, with HS2 committing to ongoing but acknowledging persistent concerns. Eligibility for insulation triggers at specific thresholds, yet affected parties argue these inadequately address cumulative vibration and risks.

Archaeological Discoveries

Archaeological investigations associated with the High Speed 2 (HS2) project represent one of the largest such programs in history, involving over 1,000 archaeologists, specialists, and conservators across more than 60 sites along the route. These excavations have uncovered artifacts and structures spanning approximately 10,000 years, from prehistoric periods through to the Second World War, including three excavated grounds. The program's scale stems from statutory requirements under the HS2 Act 2017, which mandates mitigation of impacts on , yielding insights into settlement patterns, trade, and daily life that were previously undocumented. Prominent Roman-era discoveries include a vast trading settlement at Blackgrounds in south Northamptonshire, where an Iron Age village dating to around 400 BC evolved into a prosperous Roman site. Excavations revealed over 30 roundhouses, a 10-meter-wide Roman road, stone buildings, workshops, kilns, wells, and artifacts such as more than 300 coins, glass vessels, decorative pottery, jewelry, and evidence of metalworking and bread-making, indicating wealth derived from trade along the nearby River Cherwell and Roman roads. In Buckinghamshire, at the ruins of St Mary's Church in Stoke Mandeville, well-preserved Roman statues—of a man's head and shoulders, a woman's head, and a child's head—along with an intact hexagonal glass jug were unearthed in 2021, suggesting the site functioned as a Roman mausoleum before the Norman church's construction in 1080; the finds, buried for over 1,000 years, highlight exceptional preservation conditions. Nearby, a rare early Roman carved wooden figure was recovered from a waterlogged ditch, providing rare organic material insight into Romano-British artistry. Anglo-Saxon finds include a nationally significant site in , , excavated in 2022, which contained skeletal remains and illuminating post-Roman settlement and the so-called 'Dark Ages' through analysis of practices and artifacts. Later historical discoveries encompass the world's oldest and remnants of an early Victorian railway station at in , preserved due to limited post-construction development and offering a unique view of 19th-century rail infrastructure origins. These findings are documented in the HS2 Historic Environment Digital Archive and shared publicly to advance historical understanding without altering project timelines.

Controversies and Perspectives

Support Arguments

Proponents of High Speed 2 (HS2) emphasize its role in addressing chronic capacity constraints on the , which currently operates near full capacity during peak hours, leading to and unreliable services. By providing dedicated high-speed tracks, HS2 is projected to free up space on existing lines for additional regional and freight services, potentially increasing overall rail capacity by up to 50% between and the without the need for extensive upgrades to Victorian-era infrastructure. This shift would reduce disruptions from conflicting passenger and freight traffic, enhancing reliability for commuters and businesses reliant on just-in-time logistics. Economic analyses supporting HS2 highlight substantial job creation and GDP contributions during construction and operation. The project is expected to generate around 22,000 direct construction jobs at peak, with indirect supply chain effects supporting tens of thousands more, many in regions outside London such as the Midlands and North. Post-completion, stations are anticipated to catalyze local development, creating additional employment and housing opportunities; for instance, areas around Birmingham Interchange are forecasted to support thousands of jobs through improved accessibility. Wider economic impacts, including agglomeration effects from better-integrated transport networks, are estimated at over £13 billion over 60 years, driven by enhanced productivity in urban clusters. Travel time reductions form a core benefit, particularly for users, with HS2 projected to cut -Birmingham journeys from 1 hour 20 minutes to 49 minutes and -Manchester to 1 hour 8 minutes upon full Phase 1 operation. These savings, accounting for approximately 70% of quantified user benefits through reduced crowding and higher reliability, enable more efficient daily workflows and wider catchment areas for labor markets. Supporters argue this fosters regional rebalancing by integrating northern economies more closely with , potentially boosting GDP by facilitating interactions that current limits due to time penalties. Overall transport user benefits are valued at around £60 billion against net costs, yielding a benefit-cost above 1 in official appraisals, though reliant on sustained demand growth.

Opposition and Criticisms

Opposition to High Speed 2 (HS2) has centered on its escalating costs, questionable economic benefits, environmental destruction, and social disruptions, with critics arguing that the project represents inefficient use of public funds compared to alternatives like upgrading existing rail infrastructure. Initial cost estimates from the 2009 government placed the full project at £37.5 billion in 2009 prices, but by 2024, the projected £45-54 billion for Phase 1 alone ( to ), while HS2 Ltd estimated £49-57 billion, reflecting overruns attributed to poor initial planning, scope changes, and mismanagement rather than solely environmental protections. The National Audit Office (NAO) and have deemed HS2's value for money "very poor," citing unreliable forecasting, optimistic assumptions about passenger demand, and failure to deliver promised benefits relative to expenditures exceeding £25 billion by mid-2024 without operational track. Think tanks such as the Institute of Economic Affairs (IEA) and have labeled HS2 a "" for contractors and a commercially loss-making venture reliant on taxpayer subsidies, arguing that its overstates capacity relief on the and ignores cheaper digital signaling upgrades that could achieve similar journey time savings at a fraction of the cost. These groups contend that HS2's benefit-cost ratio has deteriorated below 1.0 in real terms, meaning societal returns do not justify the investment, especially amid competing priorities like regional transport needs outside the London-Birmingham corridor. Critics, including the IEA, highlight systemic risks in mega-projects, where political prestige drives decisions over empirical cost-benefit analysis, leading to sunk costs that deter cancellation despite evidence of underperformance. Environmental concerns have fueled campaigns by groups like the and , which document HS2's route severing over 100 ancient woodlands, rare peat bogs, and habitats in areas like the Chilterns , with construction causing irreversible despite mitigation promises. Residents report landscape alteration, flooding, dust pollution, and from earthworks, exacerbating opposition in rural communities where the project's footprint disrupts green belts without proportional national gains. While proponents claim net habitat creation and modal shift to rail for emissions reduction, independent analyses question these offsets, noting that construction emissions and concrete use may offset operational savings, particularly after Phase 2's 2023 cancellation reduced the project's scale and potential efficiency. Social and community criticisms emphasize prolonged disruption, including compulsory property purchases affecting thousands of homes and farms, , and health impacts from vibrations and construction traffic in constituencies spanning urban and rural areas. Local opposition has manifested in legal challenges and protests, with reports of "open hostility" in villages due to unfulfilled compensation schemes and severed ties, underscoring causal links between linear and localized socioeconomic costs that national benefits fail to alleviate. Overall, detractors argue HS2 exemplifies flawed prioritization, where of overruns and limited gains—coupled with alternatives yielding higher returns per pound—warrants scrutiny of institutional incentives favoring large-scale spending over targeted, evidence-based investments.

Political and Policy Debates

The High Speed 2 (HS2) project has elicited significant political contention since its inception, with initial cross-party endorsement giving way to sharp divisions over fiscal viability and strategic priorities. Announced in 2009 under the government with an estimated cost of £37.5 billion in 2009 prices, HS2 garnered support from both major parties for its promise to enhance connectivity between and , potentially boosting economic productivity through faster journey times and capacity relief on existing lines. However, escalating costs—revised to between £72.1 billion and £78.4 billion in 2015 prices by 2020, and later exceeding £100 billion in current estimates—shifted the debate toward questions of value for money, prompting Conservative to cancel Phase 2 (the Birmingham-to-Manchester leg) in October 2023. Sunak argued that the decision redirected £36 billion to broader northern improvements, citing Phase 1 costs having doubled from initial projections and the need to address regional disparities more pragmatically amid post-pandemic fiscal pressures. Opposition to the cancellation came predominantly from northern across party lines, who contended that truncating HS2 would entrench London's economic dominance and fail to deliver promised benefits, such as increased business clustering and mobility. Critics, including some figures, highlighted that the northern leg's removal undermined the project's original rationale of rebalancing the economy, with benefit-cost ratios (BCRs) for the full Y-network estimated at around 2.3 in official assessments but dropping below 1.0 for isolated segments according to independent analyses. , a conservative , asserted in 2022 that the overall BCR stood at 0.9, implying net economic losses unless non-monetized strategic gains—like enhanced international competitiveness—were overweighted, a view contested by government economists who emphasized wider societal returns not captured in standard models. Under the government elected in July 2024, debates intensified around project governance and completion of Phase 1, with confirming in June 2025 that the London-to-Birmingham segment would proceed but face further delays beyond 2033 due to billions in overruns, rejecting reinstatement of cancelled sections as unaffordable. A parliamentary on an "HS2 " in June 2025 underscored bipartisan frustration with mismanagement, attributing cost spirals to political interventions that prioritized timelines over , as detailed in reports from bodies like the . have blamed high ministerial turnover—over 10 secretaries since 2010—and inconsistent directives for eroding technical control, leading to suboptimal contracting and . Broader policy discussions have pivoted to alternatives, such as upgrading the or investing in , which proponents argue offer higher BCRs without HS2's land acquisition burdens. The Audit Office's 2024 review post-cancellation noted lingering uncertainties in integrating remaining HS2 elements with the network, including Euston station redevelopment, while cautioning that partial delivery risks suboptimal outcomes like underutilized . These debates reflect a between long-term ambition and short-term fiscal realism, with of overruns—Phase 1 costs now projected at £54-£66 billion—fueling skepticism toward mega-projects amid stagnant productivity growth.

Cancelled and Alternative Proposals

Phase 2 and Northern Extensions

Phase 2 of High Speed 2 (HS2) encompassed extensions northward from the Phase 1 terminus at , designed to link major cities including , , and , with projected journey time reductions such as London to in 68 minutes and London to in 81 minutes. Phase 2a involved a 34-mile (54 km) segment from to Handsacre near , connecting to the (WCML) at , while Phase 2b was divided into the Western Leg (48 miles/77 km to ) and Eastern Leg (often termed HS2 East, to via ). These segments required tunneling through the Chilterns and , with estimated costs exceeding £40 billion by 2023 due to inflation, design changes, and land acquisition. On 4 October 2023, Prime Minister announced the cancellation of Phase 2a, Phase 2b Western Leg, and Phase 2b Eastern Leg, citing escalating costs projected to reach £100 billion overall for HS2 and the need to redirect funds to broader transport improvements amid fiscal constraints. The decision halted hybrid bill proceedings for Phase 2b, which were in committee stage, and revoked for much of the route, though some preparatory works like tunneling at Euston continued under Phase 1. Cancellation incurred closure costs of up to £100 million over three years, including site remediation and contract settlements, on top of £1.7 billion already spent on Phase 2a preparations by 2019 prices. The government, upon taking office in July 2024, confirmed no reinstatement of northern extensions, prioritizing Phase 1 completion to while facing powers expiry for Phase 2a by February 2026. Northern extensions beyond Phase 2b, such as potential links to or fuller integration with the Scottish rail network, were outlined in early HS2 proposals but never advanced to detailed planning due to intergovernmental coordination challenges and cost concerns. These extensions aimed to achieve end-to-end high-speed connectivity from to or but were deprioritized in the 2021 , which favored conventional upgrades over new high-speed alignments north of . Post-cancellation, regional bodies like Transport for the North proposed alternatives including enhanced (NPR) schemes, such as electrifying and upgrading the WCML and for speeds up to 140 mph (225 km/h), alongside new Manchester-Leeds links via new tracks parallel to existing lines. Alternative proposals emphasized cost-effective capacity boosts over new infrastructure, including digital signaling on legacy routes to increase train frequencies by 50% and targeted investments in stations like Leeds and Manchester, funded partly by £36 billion reallocated from HS2 savings. However, NPR elements faced delays, with a 2025 announcement postponing Manchester-Liverpool upgrades by four years to 2034, reflecting ongoing funding and procurement hurdles. Critics, including engineering bodies, argued that forgoing Phase 2b forgoes long-term capacity gains, as upgraded conventional lines cannot match HS2's 18 trains per hour versus the WCML's current 11, potentially exacerbating freight and passenger bottlenecks by 2040. Regional authorities continue advocating hybrid models blending HS2 remnants with NPR to address northern connectivity gaps without full reinstatement.

Other Abandoned Branches

The Golborne Link was a proposed 13-mile spur connecting the HS2 route near to the north of , intended to enable direct high-speed services from to via without routing through . Announced for removal from the (Crewe–) on 6 June 2022, the link was estimated to cost approximately £3 billion and faced opposition from local communities in areas like Warburton due to environmental and disruption concerns. Rail industry groups, including the Railway Industry Association and Rail Freight Group, criticized the decision, arguing it would create capacity bottlenecks on the WCML and reduce overall network efficiency for freight and passenger services north of . Proponents of cancellation highlighted potential cost savings and the option to explore alternative connections, though engineers warned that its absence would diminish the strategic value of HS2 integration with existing lines. A direct spur to was another early proposal considered during HS2 Phase 1 route development, involving an approximately 8-mile branch from the main line near the Colne Valley or a loop configuration to provide high-speed access without interchange. Transport Minister Claire Perry ruled out the Heathrow link on 10 March 2015, citing high costs exceeding £2 billion, significant environmental disruption including tunneling under the M25, and projected low passenger demand insufficient to justify the investment. Instead, HS2 services were planned to connect via station, utilizing the and for airport access, a decision endorsed in government reports assessing route viability. Critics, including some transport analysts, argued the spur's omission overlooked Heathrow's role as Europe's busiest airport, potentially limiting HS2's international connectivity benefits. These abandonments reflect iterative refinements to HS2 amid fiscal pressures and local opposition, prioritizing core trunk routes over peripheral extensions with uncertain returns.

Prior Regional Proposals

In the years leading up to the formal authorization of HS2 Phase 2 in 2019, various regional stakeholders and think tanks proposed alternatives emphasizing upgrades to existing infrastructure over new high-speed lines extending from . These initiatives focused on enhancing within and between northern English cities, arguing that targeted investments could deliver comparable economic benefits at lower cost and with less disruption. For instance, the 51m alliance, comprising local authorities opposing HS2, outlined in its 2013 report a £51 billion strategy reallocating funds to 40 nationwide projects, including northern enhancements such as full electrification of the to Trans-Pennine route, capacity expansions on the to line, and improved freight links via the Valley corridor, projected to cut journey times between key regional hubs by up to 20 minutes while boosting overall network capacity. The UK Department for Transport's 2013 HS2 Strategic Alternatives study systematically assessed such upgrade packages for routes to and , modeling options like additional tracks, signaling improvements, and selective line-speed increases on the , , and . It estimated these could reduce to travel times to around 1 hour 15 minutes by the 2040s but highlighted limitations in ultimate capacity (e.g., only 6-8 high-speed paths per hour versus HS2's 18) and higher operational costs due to mixed-traffic constraints, leading to a benefit-cost ratio below 1.0 for some scenarios compared to HS2's higher projections. Regional bodies in also advanced localized plans, such as the pre-2010 advocacy for the Hub in , a scheme to reconfigure tracks and add platforms for better cross-city links, initially costed at £2-3 billion and aimed at accommodating 5,000 extra passengers per hour. These efforts influenced later frameworks like , proposed in 2014 to deliver 30-minute Manchester-Leeds journeys through a mix of new alignments and upgrades, independent of southern HS2 extensions. Critics of HS2, including the 51m group, contended that such regional-focused investments better addressed localized bottlenecks and effects without the £30-40 billion price tag of Phase 2b, though government analyses prioritized national spine connectivity for long-term growth.

References

  1. [1]
    What is HS2
    Sep 30, 2025 · HS2 is Britain's new high-speed railway being built between London and the West Midlands. It will mean more trains and faster journeys.
  2. [2]
    [PDF] HS2 Anuual Reports and Accounts 2023 – 2024 - GOV.UK
    Jul 25, 2024 · In October 2023, the government announced its decision to cancel HS2 Phase Two in the Network. North command paper. HS2 Ltd is responsible for.<|separator|>
  3. [3]
    [PDF] High speed rail: investing in Britain 's future phase two - GOV.UK
    HS2 is a transformational project that will bring great benefits in terms of rail capacity, connectivity and reliability, which will help underpin prosperity ...
  4. [4]
    Building HS2
    Sep 30, 2025 · HS2 is Britain's largest construction project, building 140 miles of high-speed railway and four new stations between London and the West ...
  5. [5]
    HS2 6-monthly report to Parliament: July 2025 - GOV.UK
    Jul 17, 2025 · It is now clear that cost estimates were overly optimistic and the programme moved to construction too quickly when designs were still immature.
  6. [6]
    HS2: costs and controversies | Institute for Government
    Oct 5, 2023 · The Gordon Brown Labour government initially estimated that HS2 would cost £37.5bn (in 2009 prices) but the expected cost has since increased dramatically.Hs2: Costs And Controversies · What Is Hs2? · Why Have Costs Risen?Missing: empirical | Show results with:empirical
  7. [7]
    High Speed 2 - Hansard - UK Parliament
    Jul 17, 2025 · To the end of April 2025, £40.5 billion (nominal prices) had been spent on the HS2 programme. This is provided in more detail in the financial ...
  8. [8]
  9. [9]
  10. [10]
    Rethinking HS2 - Oxera
    Oct 22, 2023 · In its official business cases, the central estimate for HS2's BCR is 1.2 for Phase 1 (London–Birmingham), and 1.1 when Phases 2a and 2b (to ...Figure 1 Passenger Demand On... · The Strategic And The... · Figure 3 The Bcr Of Hs2...
  11. [11]
    HS2 reveals the pervasiveness of optimism bias in government ...
    Feb 5, 2024 · The Government estimated the various benefits and costs associated with HS2 and comes to positive benefit-cost ratios (BCRs), as shown in Figure ...Missing: empirical | Show results with:empirical
  12. [12]
    HS2: update following the Northern leg cancellation - Parliament UK
    Feb 28, 2025 · The Department's estimated range in November 2023 is £45 billion to £54 billion compared with HS2 Ltd's latest estimate of £54 billion to £66 ...Conclusions And... · 1 Resetting The Hs2... · Revising Cost Estimates
  13. [13]
  14. [14]
  15. [15]
    [PDF] High Speed Rail Cm 7827 - GOV.UK
    In January 2009, the Government established High Speed Two Ltd (HS2 Ltd) to consider the options for a new high speed rail network in Britain, starting with a ...
  16. [16]
    Adonis unveils £30bn high-speed rail plans - The Guardian
    Mar 11, 2010 · ... Mar 2010 08.50 EST. Share. The government unveiled plans for a £30bn high-speed rail network, with the first phase between London and ...
  17. [17]
    [PDF] HS2 railway, UK: route optioneering
    The company HS2 Ltd was set up by the UK government in January 2009 with an initial brief to report on options for. High Speed Two, a high-speed railway ...
  18. [18]
    High Speed Rail - Hansard - UK Parliament
    Mar 11, 2010 · Hansard record of the item : ' High Speed Rail' on Thursday 11 March 2010.
  19. [19]
    U.K. Government Confirms High-Speed Plans - The Transport Politic
    Dec 22, 2010 · ... date 22 December 2010 · 77 Comments on U.K. Government Confirms High-Speed Plans ... The Conservative Government's endorsement of this HS2 ...
  20. [20]
    [PDF] High Speed 2: A review of early programme preparation
    May 16, 2013 · Our studies evaluate the value for money of public spending, nationally and locally. Our recommendations and reports on good practice help ...
  21. [21]
    [PDF] Options for phase two of the high speed rail network - GOV.UK
    Mar 29, 2012 · See HS2 Ltd, 2010, High Speed Rail London to the West Midlands and Beyond – a report to Government by High Speed Two Limited, http ...
  22. [22]
    High Speed Rail (Preparation) Act 2013 - Explanatory Notes
    The High Speed Rail (Preparation) Act 2013 authorises the Secretary of State to incur expenditure in preparation for a high speed rail network. Thereby the Act ...
  23. [23]
    Major milestone for HS2 as first piece of legislation receives go-ahead
    Nov 21, 2013 · HS2 took a major step forward today (21 November 2013) as the High Speed Rail Preparation (paving) Act received Royal Assent following its successful passage ...
  24. [24]
    Oakervee Review of HS2 - GOV.UK
    Feb 11, 2020 · Douglas Oakervee would chair an independent review of HS2. The review was asked to assemble and test all the existing evidence.
  25. [25]
    [PDF] Oakervee Review - GOV.UK
    10.22The Review has not seen convincing evidence that HS2 Ltd, especially the Phase One constructon team, have the level of control and management of the ...Missing: findings | Show results with:findings
  26. [26]
    [PDF] Review of High Speed 2 - Dissenting Report - About Tony Berkeley
    I wrote to Douglas Oakervee listing my concerns, including a bias towards accepting HS2's evidence in preference to those of others, leading to what I ...Missing: findings | Show results with:findings
  27. [27]
    HS2: parliament misled about true cost, says Labour peer
    Jan 5, 2020 · Parliament has been seriously misled by “fiddled” figures about the true cost of HS2, according to the deputy chairman of a review into the project.
  28. [28]
    High Speed Two: Euston - NAO report - National Audit Office
    Mar 27, 2023 · This report assesses whether DfT and HS2 Ltd are now set up to effectively manage the risks to value for money at Euston station.
  29. [29]
    [PDF] HS2: update following cancellation of Phase 2 - National Audit Office
    Jul 22, 2024 · 2. In October 2023, the government announced significant changes to the. HS2 programme. At that point the phases into which DfT had split ...<|separator|>
  30. [30]
    HS2: update following cancellation of Phase 2 - NAO report
    Jul 23, 2024 · This report examines whether DfT and HS2 Ltd are effectively managing their response to the changes in the HS2 programme to protect and maximise value for ...
  31. [31]
    UK PM Sunak offers billions for new links after scrapping HS2 ...
    Oct 4, 2023 · British Prime Minister Rishi Sunak cancelled the northern leg of the costly HS2 high-speed rail project on Wednesday and pledged to invest ...
  32. [32]
    High Speed Rail 2 - an overview - The House of Commons Library
    Dec 12, 2024 · HS2 is a project to build a high-speed rail line in England. HS2 was originally planned to connect London to Birmingham, Manchester, East ...Missing: origins | Show results with:origins
  33. [33]
    BREAKING: Rishi Sunak Confirms Cancellation of HS2 Phase 2
    Oct 4, 2023 · At Rishi Sunak's Conservative Party Conference speech in Manchester, the UK Prime Minister confirmed the cancellation of HS2 Phase 2.
  34. [34]
    Why UK PM Sunak axed part of high-speed rail link HS2 - Al Jazeera
    Oct 4, 2023 · Rishi Sunak has cancelled the northern leg of the HS2 high-speed rail project, citing ballooning costs and mismanagement.
  35. [35]
    Sunak confirms cancellation of northern leg of HS2 and Euston ...
    Oct 4, 2023 · Prime minister Rishi Sunak has confirmed that Phase 2 of High Speed 2 (HS2), Birmingham to Manchester, will not go ahead, while a new management team will take ...
  36. [36]
    Industry backlash at Sunak's 'damaging' U-turn on northern leg of HS2
    Oct 4, 2023 · Rishi Sunak has been accused of the “biggest and most damaging U-turn in the history of UK infrastructure” by scrapping the northern leg of HS2.
  37. [37]
    5 lessons from the cancellation of HS2's northern leg
    Sep 12, 2024 · In October 2023, the northern leg of High Speed 2 was cancelled after 15 years of development. ... There's never been a consensus about why HS2 ...
  38. [38]
    Project rescoping: Phase Two cancellation - HS2
    Jul 18, 2025 · In January 2024, safeguarding was removed across the majority of Phase 2a. In areas where safeguarding has been removed, property owners are no ...
  39. [39]
    No plan to revive HS2 rail link to northern England, govt source says
    Oct 17, 2024 · The new Labour government will not revive a plan to build a high speed railway line from the central English city of Birmingham to northern ...
  40. [40]
    [PDF] High Speed Rail 2: An overview - UK Parliament
    Dec 12, 2024 · 2. HS2 was first proposed by the Labour government in 2010. It had the support of the Conservatives in government between May 2010 and July ...Missing: origins | Show results with:origins
  41. [41]
    HS2 Ltd annual report and accounts 2024 to 2025 - GOV.UK
    Jul 18, 2025 · HS2 Ltd annual report and accounts 2024 to 2025. PDF , 1.87 MB, 121 pages. This file may not be suitable for users of assistive technology.
  42. [42]
    Britain's HS2 high-speed railway delayed again - ET Infra
    Jun 18, 2025 · Back when construction was approved in 2012, HS2 was expected to open by 2026 and cost 33 billion pounds ($44 billion). Its cost has spiralled ...Missing: history | Show results with:history
  43. [43]
    HS2 Project Update
    Our three priorities for 2025-26 · HS2 will create capacity for more trains, cut journey times between London and Birmingham, and create jobs and growth.
  44. [44]
    [PDF] HS2 Phase One Overview - GOV.UK
    • The HS2 Phase 1 services replace most long distance non-stop services ... Government announced post consultation route. May-July 2013. National public ...Missing: alignment | Show results with:alignment
  45. [45]
    Tunnels - HS2
    Sep 5, 2025 · HS2 will dig 65 miles of tunnels between London and the West Midlands creating five twin-bore and six cut and cover, or green, tunnels.
  46. [46]
    HS2 Phase One plan and profile maps: London to the West Midlands
    Dec 19, 2014 · These maps show the Phase One route of High Speed Two (HS2) between London and the West Midlands.Missing: 2 alignment<|separator|>
  47. [47]
    Viaducts and bridges - HS2
    Sep 10, 2025 · Balsall Common Viaduct. The viaduct will be 425m long, approximately 10m above ground level and pass over Truggist Lane in Solihull.Water Orton Viaducts · Colne Valley Viaduct · Balsall Common ViaductMissing: length | Show results with:length
  48. [48]
    Old Oak Common - HS2
    Oct 9, 2025 · It will be the 42nd stop on London's new Elizabeth line enabling passengers to get to the West End in 10 minutes, Liverpool Street Station in 20 ...
  49. [49]
    Foundations completed for HS2's Old Oak Common station
    Feb 12, 2025 · In addition, eight surface-level platforms will provide an interchange to the Great Western Railway, Elizabeth Line, and Heathrow Express.
  50. [50]
    Streamlining design coordination: connecting High Speed Two to ...
    Mar 4, 2023 · The High-Speed route joins the West Coast Main Line at Handsacre Junction just North of Lichfield, enabling HS2 Phase One services to ...
  51. [51]
  52. [52]
  53. [53]
    Birmingham Curzon Street - HS2
    Sep 17, 2025 · Once operational, HS2's Birmingham terminus will offer seamless connections to the local transport network, including buses and the Midland ...
  54. [54]
    Birmingham Eastside Metro Extension - Midland Metro Alliance
    The Birmingham Eastside Metro extension to Digbeth will serve the High Speed 2 (HS2) station at Curzon Street, separating from the existing West Midlands Metro ...
  55. [55]
    Metro Expansion - West Midlands Metro
    The route will separate from the existing line at Bull Street to serve Digbeth and the planned HS2 station at Curzon Street. The route is planned to consist ...
  56. [56]
    TRAINS FOR HS2 TECHNICAL SPEC HAS ITS MOMENTS
    Jun 22, 2017 · It is being designed for a maximum speed of at least 360km/h (225 mile/h). The European Train Control System (ETCS) Level 2 will be fitted ...
  57. [57]
    [PDF] High speed rail - UIC - International union of railways
    Special dedicated lines​​ Conventional lines, even with major upgrades, are unable to operate at more than 200-220km/h, 125-135mph. The layout parameters, ...
  58. [58]
    [PDF] Review of the Technical Specification for High Speed Rail in the UK
    This is smaller than the HS2 high speed European standard gauge. So classic compatible sets would be a high speed train design modified for the smaller gauge.
  59. [59]
    [PDF] HS2 Gauging – The Uniform Structure Gauge (USG) - The PWI
    For the kinematic gauging method, EN 15273 mandates the use of kinematic reference gauge GC for the upper part (h>400 mm) and GI2 for the lower part (≤400 mm).
  60. [60]
    [PDF] Train Technical Specification - GOV.UK
    Jul 26, 2018 · Rationale: The requirement is consistent with requirements for the High Speed 2 Project to minimise carbon emissions and supports the ...
  61. [61]
    HS2 systems contracts awarded - International Railway Journal
    Nov 27, 2024 · HS2 will be equipped with Automatic Train Operation at Grade of Automation 2 (GoA2) over ETCS Level 2, HS2 Ltd confirmed to IRJ. Siemens will be ...
  62. [62]
    [PDF] An overview of HS2 railway systems with a focus on high speed ...
    May 19, 2021 · HS2 Control-Command and Signalling System. Technology. • European Train Control System. (ETCS) Level 2 Signalling. • Automatic Train Operation ...
  63. [63]
    Curtailing HS2 - Rail Engineer
    Oct 18, 2023 · The trains have a high floor and offered level boarding at HS2's 1150mm platform height. With only four HS2 stations this becomes more ...Missing: dimensions | Show results with:dimensions
  64. [64]
    [PDF] Common Design Elements | HS2
    High Speed Two (HS2) is the new high speed railway for Britain. In 2017, Parliament approved plans for the part of the railway that will.
  65. [65]
    [PDF] Inclusive design policy | HS2
    It sets standards for accessible trains, stations and other facilities to benefit a wider range of rail users that might have difficulty with accessing rail ...
  66. [66]
    HS2 Old Oak Common Station - Network Rail
    Old Oak Common station will consist of 14 platforms, including six for new high speed trains. Major construction works are underway by HS2 Ltd.
  67. [67]
    Old Oak Common - mega station starts to build - BBC
    Dec 22, 2024 · Passengers HS2 Ltd. Old Oak Common will be a mega hub station in north-west London. Trains won ...
  68. [68]
    London Euston - HS2
    May 6, 2025 · Work to construct the HS2 station at Euston was paused on 9 March 2023 due to inflationary pressure and the need to find a more affordable design.
  69. [69]
    HS2 Euston station will only have 6 platforms, rail minister confirms
    Dec 19, 2024 · He said: “The new HS2 station will consist of six platforms, which can support up to 10 HS2 trains per hour. “No decisions have been made on the ...
  70. [70]
    Euston Approaches - HS2
    May 6, 2025 · The Euston Approaches is the section of the HS2 railway located between Parkway and Hampstead Road in the London Borough of Camden.<|separator|>
  71. [71]
    Euston Tunnel - HS2
    Jun 30, 2025 · Euston Tunnel will carry HS2 passengers between London Euston Station and Old Oak Common Station. The tunnel will be 4.5 miles (7.2km) long ...
  72. [72]
    HS2 Euston link funding announced in Budget - BBC
    Oct 30, 2024 · The new plan is for it to be a high-speed link between Birmingham and London, with a lot of work having already been completed on this section.<|separator|>
  73. [73]
    High Speed 2 (HS2) Phase 1 - The House of Commons Library
    Sep 11, 2018 · Phase 1 from London Euston to Birmingham Curzon Street and Lichfield with intermediate stations in West London (at old Oak Common) and at ...Missing: alignment | Show results with:alignment
  74. [74]
    HS2 in Old Oak and North Acton
    The station, spanning Brent, Ealing, and Hammersmith & Fulham, will feature 14 platforms – six for high-speed trains and eight for conventional services – ...
  75. [75]
    Stations - HS2
    Sep 5, 2025 · Four new train stations will be built between London and the West Midlands: Euston, Old Oak Common, Interchange and Curzon Street.Old Oak Common · London Euston · Interchange · Birmingham Curzon Street
  76. [76]
    HS2 Interchange Station - Arup
    Arup has designed HS2's Interchange Station, which will be a major transport gateway for the West Midlands, linking Solihull and the National Exhibition Centre ...
  77. [77]
    Curzon Street Station – Projects - Grimshaw Architects
    Curzon Street station will form an integral part of a major new transport interchange for Birmingham, linking the new HS2 station with Moor Street station.
  78. [78]
    Balfour Beatty VINCI completes first sections of HS2 Curzon Street ...
    Apr 25, 2024 · Balfour Beatty VINCI has completed the first sections of the landmark viaduct that will bring high speed trains into Birmingham's new Curzon Street station.
  79. [79]
    HS2 railway now not expected to open until 2035 at the earliest
    Jun 18, 2025 · HS2 is now not expected to open Phase 1 from Old Oak Common to Birmingham until 2035 at the earliest. One small saving grace in the delay in ...
  80. [80]
  81. [81]
    Automated People Mover - HS2
    Jul 21, 2025 · Services every three minutes will transport 2,100 passengers 2.3km between Interchange Station and Birmingham Airport in six minutes. Automated ...Missing: details | Show results with:details
  82. [82]
    HS2's Interchange Station Reaches New Milestone
    Oct 9, 2024 · The construction of HS2's Interchange Station in Solihull has taken a major leap forward with the installation of 15 colossal bridge beams.<|separator|>
  83. [83]
    Main civil engineering works contracts for Stage 1 of HS2 Phase One
    Jul 17, 2017 · Announcing bidders who have won contracts to design and construct bridges, tunnels, embankments and viaducts for HS2 Phase One.
  84. [84]
    HS2 civils contracts | The technical lowdown - New Civil Engineer
    Jul 19, 2017 · The contract was split into seven different geographical packages, two in the south, three in central and two in the north – the 'mythical' N3 ...
  85. [85]
    High Speed 2 Lots C2 & C3 - Dr. Sauer & Partners
    HS2's C2 & C3 covers 80km between London and Birmingham, including embankments, cuttings, viaducts, and cut-and-cover tunnels. The cost is £1.34 billion GBP.Missing: C1 | Show results with:C1<|separator|>
  86. [86]
    HS2 Rail Road - Combined Soil Stabilisation - A E Yates
    The HS2 rail road uses lime and cement for soil stabilization, with 15% or 30% CBR requirements, and is 7.5m wide.
  87. [87]
    In-depth look at one of the most complex parts of HS2 🏗️ - YouTube
    Sep 11, 2025 · HS2's Delta Junction is one of one of the most complex construction areas on the entire HS2 route. It is a triangular section of the line in ...Missing: tunnels | Show results with:tunnels
  88. [88]
    HS2 Progress | Major milestones across key 8-mile ... - YouTube
    Oct 9, 2025 · ... 2025 13:34 Outro – What's next for HS2 in West ... Subscribe for the latest news and updates from Britain's high-speed railway, HS2.Missing: 2024 | Show results with:2024
  89. [89]
    HS2 Phase One UK - Improving Delivery Models
    HS2 is a new high-speed rail line that in Phase One will connect London with Birmingham, and later with Manchester and Leeds. It will serve over 25 stations ...<|separator|>
  90. [90]
    Twin-bore tunnels - HS2
    Oct 14, 2025 · In total, high-speed trains will travel through over 27 miles of twin-bore tunnels – or almost a fifth of the 140-mile route. HS2's fleet of ...Missing: specifications | Show results with:specifications
  91. [91]
    Chiltern Tunnel - HS2
    Jul 4, 2025 · The Chiltern Tunnel is the longest tunnel on the HS2 route, stretching 10 miles (16km) beneath the Chiltern Hills.
  92. [92]
    Northolt Tunnel - HS2
    Jul 30, 2025 · The Northolt Tunnel, the second longest on the HS2 route, stretches 8.4 miles (13.5km) beneath Hillingdon and Ealing.Missing: details | Show results with:details
  93. [93]
    HS2 | Latest TBM breakthrough marks completion of tunnelling in ...
    Oct 14, 2025 · HS2 | Latest TBM breakthrough marks completion of tunnelling in Birmingham. 14 Oct, 2025 By Rob Hakimian. A tunnel boring ...
  94. [94]
  95. [95]
    Burton Green Tunnel - HS2
    Jul 3, 2025 · Burton Green Tunnel will stretch for 700 metres through Warwickshire at Burton Green and Kenilworth Greenway. It is one of five green tunnels.Missing: details | Show results with:details
  96. [96]
    Chipping Warden Green Tunnel - HS2
    Oct 6, 2025 · The Chipping Warden Green Tunnel will stretch for 2.5km (1.5 miles) through Northamptonshire. The 'cut-and-cover' tunnel is being built ...Missing: details | Show results with:details
  97. [97]
    The latest milestones in our year of tunnel progress - HS2
    Jul 28, 2025 · 2025 is rapidly turning into HS2's breakthrough year – with a total of five tunnelling machines due to complete their tunnel drives this ...
  98. [98]
    Colne Valley Viaduct - HS2
    Sep 3, 2025 · The Colne Valley Viaduct is the UK's longest rail bridge at 2.1 miles (3.4km) long, carrying HS2 trains up to 10m above the ground. It is 10m ...
  99. [99]
    HS2 finishes Colne Valley Viaduct, 'UK's longest railway bridge' - BBC
    Sep 10, 2025 · Colne Valley Viaduct, which runs for 2.1 miles (3.3 km), is located near Denham, Buckinghamshire, and is the longest of more than 50 major ...Missing: details | Show results with:details
  100. [100]
    UK's longest railway bridge reaches completion for HS2 - Dezeen
    Sep 11, 2025 · The 3.4-kilometre-long Colne Valley bridge for HS2 has reached completion in the south of England, becoming the UK's longest railway bridge.
  101. [101]
    Small Dean Viaduct - HS2
    May 21, 2025 · The striking 345 metre long Small Dean Viaduct just south of Wendover will carry the HS2 line across the A413, Small Dean Lane and the Chilterns rail line.
  102. [102]
    A413 near Wendover closed as HS2 installs 345m viaduct - BBC
    Jan 31, 2025 · The 6m (19ft)-high Small Dean viaduct is one of two places in the Chilterns where the railway route will be above ground. HS2 said the ...
  103. [103]
    HS2 project team reveals challenges of 4-day continuous viaduct ...
    Feb 3, 2025 · The side of the Small Dean beam also features prominent deck stiffeners which help to manage the structural forces while allowing for a more ...
  104. [104]
    Water Orton Viaducts - HS2
    May 6, 2025 · The Water Orton Viaducts, located east of the M42 and Lichfield Road, are two viaducts that will hold 700 metres of new HS2 track over the River Tame.
  105. [105]
    HS2 construction 'at a peak' as Warwickshire viaduct finished - BBC
    Feb 12, 2025 · Efforts to construct HS2 have reached a peak with the completion of the first of 13 viaducts at a key rail junction, projects bosses said.
  106. [106]
    HS2 completes first viaduct structures at Delta Junction - YouTube
    Sep 10, 2024 · HS2 engineers have completed the final operation to move two railway viaducts into place over the M42/M6 link roads in North Warwickshire, ...
  107. [107]
    Balsall Common Viaduct - HS2
    May 12, 2025 · The HS2 route will be elevated and travel along a viaduct as it passes Balsall Common on the north-eastern side of the existing Network Rail ...
  108. [108]
    HS2 bridge in Balsall Common approved - BBC
    Sep 7, 2023 · The 425m (1394ft) long viaduct will transport high-speed trains over floodplain land in Balsall Common, West Midlands. The application was ...
  109. [109]
    Balfour Beatty VINCI completes move of huge HS2 bridge in ...
    Aug 21, 2025 · Balfour Beatty VINCI has moved a 112m long, 1,631 tonne steel structure over a section of Lawley Middleway – part of Birmingham's ring road, ...
  110. [110]
    High Speed 2 - Wikipedia
    The majority of the project was planned to be completed by 2033, but this was delayed in 2025 with no new completion date given. High Speed 2. The planned ...Missing: overruns | Show results with:overruns
  111. [111]
    HS2 was doomed to be a mess before it began, say insiders - BBC
    Jul 20, 2025 · Reports state that the now-shortened line between Birmingham and London could cost £81bn.Missing: overruns | Show results with:overruns
  112. [112]
    HS2: a long and winding timeline of the troubled high-speed rail ...
    Oct 2, 2023 · June 2013 The government admits HS2 will actually cost almost £50bn. The new railway is expected to begin operations in 2026 and be completed in ...
  113. [113]
    Putting the Brakes on Infrastructure? Judicial Review Challenges to ...
    May 19, 2025 · This claim challenged the decision to authorise HS2 via hybrid Bill, largely for breaching EU environmental law. ... HS2's environmental impact.
  114. [114]
    HS2 granted route-wide injunction to tackle environmental protests
    Sep 20, 2022 · A high court judge has granted a route-wide injunction to HS2 to prevent environmental protesters from accessing hundreds of miles of land ...
  115. [115]
    High Speed Rail (HS2) - stop and rethink! | The Wildlife Trusts
    Proposals for a new high speed railway between London and Manchester puts wild landscapes including ancient woodlands and rare peat bogs under threat.
  116. [116]
    Negative environmental impact of HS2 could worsen with scaling back
    Oct 4, 2023 · The scrapping of HS2 from Birmingham to Manchester may save 32 ancient woodlands from destruction and reprieve miles of waterways and hedgerows.
  117. [117]
    Council's Legal Challenge to Ministerial Consent for HS2 Ltd Works
    Aug 27, 2025 · Thus, the works benefit from deemed planning permission under the HS2 Act. The judicial review claim was dismissed by the judge, with all three ...
  118. [118]
    [PDF] Journey times - GOV.UK
    HS2 will reduce journey times between major cities. For example, London to Birmingham, Manchester, and Leeds will have 3 trains per hour. HS2 will reduce ...
  119. [119]
    [PDF] JOURNEY TIMES AND FREQUENCIES - Parliament
    HS2 will have up to 18 trains per hour between major cities, with 3 per hour from London to Birmingham, Manchester, and Leeds, and 2 per hour to Liverpool, ...
  120. [120]
    [PDF] a2: future train service patterns on the west coast main line corridor
    Feb 23, 2017 · HS2 offers the opportunity to recast the West Coast Main Line (WCML) timetable to make better and potentially different use of the capacity on ...
  121. [121]
    HS2 rolling stock procurement - GOV.UK
    Mar 28, 2017 · This page provides information relating to the High Speed Two ( HS2 ) rolling stock procurement. HS2 Ltd wants to enable businesses to plan and prepare to ...
  122. [122]
    Government awards HS2 rolling stock contract - GOV.UK
    Dec 9, 2021 · Announced today (9 December 2021) by the government, the state-of-the-art high-speed trains will be built by Hitachi/Alstom JV at their ...
  123. [123]
    [PDF] Supply chain FAQs | HS2
    In December 2021 we awarded the rolling stock contract, a £2bn deal with Alstom/Hitachi JV to deliver a minimum of 54 high speed trains. In a major boost for ...
  124. [124]
    High Court concludes that HS2 procurement process was lawful
    Dec 28, 2023 · The Technology and Construction Court held that there was no manifest error in the rolling stock procurement run by High Speed Two (HS2) Limited.Missing: details | Show results with:details
  125. [125]
    HS2 annual report reveals £2bn cancellation cost | Rail News
    Jul 30, 2024 · HS2's 2023-24 annual report shows over £2 billion in losses due to Phase 2 cancellation, including £1 billion in asset impairment.
  126. [126]
    Analysis reveals HS2 capacity-releasing effects on Britain's network
    Sep 26, 2019 · HS2 trains will be able to carry 576,000 people per day, reducing overcrowding on the existing network. These benefits will be felt in dozens of ...
  127. [127]
    250,000 seats a day on the WCML? - Rail Engineer
    Apr 18, 2024 · The table below estimates minimum and maximum capacity increases from HS2 phase 1. It shows a massive capacity increase between London and ...
  128. [128]
    [PDF] High Speed 2: The case for released freight capacity - Logistics UK
    The entire HS2 network will create space on the existing rail network for up to 144 extra freight trains per day. Each freight train can take up to 76 HGVs.
  129. [129]
    Integrating HS2 into the existing rail network will add extra capacity ...
    Oct 27, 2014 · Mark Carne, Network Rail chief executive, said: “HS2 will provide a step-change in capacity on the rail network and boost economic growth by ...
  130. [130]
    [PDF] West Coast Main Line South Capacity Enhancement Plan Report
    May 7, 2021 · The long term solution is HS2, however HS2 is unlikely to bring about released capacity on the fast lines until 2029. This means there could ...
  131. [131]
    HS2 Connecting people, boosting capacity and cutting carbon - WSP
    The new high-speed railway will feature 200m and 400m trains operating at speeds of up to 360kph – among the fastest in Europe.
  132. [132]
    Manchester, Birmingham seek new UK railway to avert HS2 capacity ...
    Sep 13, 2024 · A new line between Birmingham and Manchester would deliver 85% of the benefits of the planned-but-axed HS2 connection at 60%-75% of the cost.
  133. [133]
    Capacity, not speed – the crucial benefit of HS2 that gets drowned out
    Aug 21, 2023 · The crucial benefit of HS2, despite its name, is capacity, not speed. By moving long-distance traffic from our current rail network onto a new high-speed line.
  134. [134]
    Washwood Heath Depot and Network Integrated Control Centre - HS2
    May 6, 2025 · This is where HS2 trains will be maintained, serviced and stored when not in use, and includes the Maintenance Building, Network Integrated ...
  135. [135]
    HS2 Infrastructure Maintenance Depot
    Sep 15, 2025 · Situated half-way between London and Birmingham, the HS2 Infrastructure Maintenance Depot, in Calvert, is the main depot for the high-speed ...
  136. [136]
    [PDF] Infrastructure maintenance and rail systems construction facilities
    Jul 6, 2022 · • Rolling stock depots (RSDs) – facilities to be used for the maintenance and servicing of HS2 passenger trains (rolling stock) and to enable.
  137. [137]
    [PDF] High speed rail: Investing in Britain's future - decisions and next steps
    HS2 will support economic growth across Britain. The monetised benefits of the network to business are forecast to be approximately £34-45 billion. These come ...
  138. [138]
    Chapter 6: Will HS2 stimulate economic growth? - Parliament UK
    The Economic Case estimated that HS2 would create wider economic benefits worth £13.3 billion over 60 years (see Table 17). The Strategic Case argued that this ...
  139. [139]
    [PDF] Economic Impacts of High-Speed Rail: A Review
    In the United Kingdom, the construction of. High-Speed 2 (HS2) is forecast to generate more than 22,000 direct and indirect jobs within five- years of the ...Missing: projected connectivity
  140. [140]
    New research shows HS2 will drive £10billion economic uplift in the ...
    Feb 20, 2024 · “Whether it's urban regeneration, improved local transport connections, increased housing provision and of course new jobs, HS2 is benefitting ...
  141. [141]
    [PDF] THE ECONOMIC CASE FOR HS2 - GOV.UK
    The initial findings are reported as part of the evidence base in this report. However, even this new research has only examined the potential implications for ...
  142. [142]
    [PDF] High Speed Two Phase Two Economic Case - GOV.UK
    Overall there is a negative impact on the BCR from these changes, reducing it by 0.2. This includes updates for:
  143. [143]
    [PDF] EHS0057 - Evidence on The Economic Case for HS2
    HS2's economic case is strong, with a benefit-cost ratio of 2.3 for the full network, and 1.7 for Phase One, with a high likelihood of being medium value or ...Missing: criticisms | Show results with:criticisms
  144. [144]
    High Speed 2 (HS2) Phase One: accounting officer assessments ...
    Dec 16, 2019 · The BCR ratio for Phase One is between 0.9 and 1.0, which would be categorised as being in the DfT's 'poor' value for money category. This is a ...
  145. [145]
    High Speed 2 (HS2) Crewe to Manchester: accounting officer ...
    ... benefits and costs of investing in HS2 . The BCR range for the scheme is between 0.5 and 1.2, with a reference case BCR of 0.7 over a 60-year appraisal ...
  146. [146]
    [PDF] High Speed Rail: HS2, a project business case in trouble
    HS2 is the UK's high-speed rail network, with escalating costs and controversial business case, but the government is committed to building both phases.Missing: empirical | Show results with:empirical
  147. [147]
    HS2: The kindest cut of all - Policy Exchange
    Nov 12, 2022 · The official benefit cost ratio (BCR) shows that for every £1 spent on the scheme, the country gets back benefits worth only 90p. Shortening the ...
  148. [148]
    High Speed Two (HS2) Limited - GOV.UK
    High Speed Two (HS2) Limited is the company responsible for developing and promoting the UK's new high speed rail network. It is funded by grant-in-aid from ...Check the HS2 route · Accessible documents policy · Complaints procedure
  149. [149]
    [PDF] Financial case for HS2 - GOV.UK
    HS2 Phase 1 is estimated at £19.4bn, Phase 2 at £19.0bn, and rolling stock at £6.9bn. The long-term funding is £42.6bn for construction and £7.5bn for rolling ...
  150. [150]
    [PDF] Stewart Review - Major Transport Projects Governance ... - GOV.UK
    Jun 18, 2025 · Governance needs to evolve over the Programme's life. The need to evolve governance is referred to in: •. Oakervee Review8- HS2 Ltd's governance ...
  151. [151]
    £25.3bn funding for HS2 in spending review - Business Live
    Jun 11, 2025 · The Department for Transport (DfT)'s total settlement provides funding of £31.5bn between 2028 to 2029. Capital investment will increase by ...
  152. [152]
    Spending Review 2025 – summary of key points related to rail and ...
    Jun 11, 2025 · The review states that capital investment, excluding spending on High Speed 2 (HS2), will increase at an annual average real terms growth rate of 3.9% per year.
  153. [153]
    [PDF] HS2 Annual Report and Accounts 2024 – 2025 - GOV.UK
    Jul 17, 2025 · • Phase Two closure implications. • Phase One cost associated activities. • MWCC commercial reset. • Recommendation to award the Phase One.
  154. [154]
    Financing UK rail infrastructure: how does today compare with the ...
    Mar 12, 2024 · Today, the public sector finances 38% of infrastructure projects in the UK (House of Commons Library, 2023). This compares with 49% from private sector sources.
  155. [155]
    Is private finance the answer for HS2? - Institution of Civil Engineers
    Sep 27, 2023 · Four ICE policy fellows share their views on what role private finance could play in delivering HS2 in the UK.
  156. [156]
    [PDF] High Speed Two Phase Two - Financial Case - GOV.UK
    6.2 An oversight regime for delivering HS2 and managing costs is in place, and includes: • The HS2 Development Agreement which governs the relationship between ...
  157. [157]
    Government Launches Urgent Reset of HS2 Project Oversight
    Jun 23, 2025 · The UK government takes decisive steps to reset HS2 after mismanagement, appointing new leadership, cutting costs, and restoring control ...
  158. [158]
    PM redirects HS2 funding to revolutionise transport across the North ...
    Oct 4, 2023 · A revolution in the country's transport infrastructure will see billions of pounds redirected from spiralling HS2 costs to build the daily connections that ...
  159. [159]
    Sunak smiled as he cancelled our hopes for HS2. Northern voters ...
    Oct 6, 2023 · But in a significant part of the north – which includes a fair few “red wall” seats – it feels like a betrayal. Sarah Lester is the editor ...Missing: reallocation | Show results with:reallocation
  160. [160]
  161. [161]
    Northern titles slam government 'betrayal' as HS2 savings are spent ...
    Dec 22, 2023 · Two regional titles in the north of England have criticised government plans to spend £235m of the cash it saved by scrapping HS2 on fixing potholes in London.
  162. [162]
    HS2: Midlands and northern England to get 'reallocated' funds - BBC
    Feb 26, 2024 · It had already announced that £4.7bn from the project would be "reallocated" to local authorities outside big cities in northern England and the ...Missing: betrayal | Show results with:betrayal
  163. [163]
    £4.7bn 'local transport fund' redirected from axed HS2 plans ...
    Feb 26, 2024 · The North of England will be allocated £2.5 billion and the Midlands will receive £2.2 billion from the money saved by abandoning HS2's northern ...Missing: savings disputes
  164. [164]
    HS2 now offers 'very poor value for money', MPs warn - BBC
    Feb 6, 2024 · The cancellation of HS2's northern legs means the project will be "very poor value for money", MPs have warned.Missing: reallocation disputes
  165. [165]
    Fact check: Some funds from HS2's cancelled northern leg are ...
    Jun 5, 2024 · In November, the Government announce £8.3 billion of redirected HS2 funding would be spent resurfacing 5,000 miles of road across England. This ...Missing: phase disputes
  166. [166]
    Westminster's rail funding spin goes up in smoke - The Party of Wales
    Oct 3, 2023 · Wales is denied billions in funding due to HS2 being classified as an 'England and Wales' project, despite not an inch of track coming close to ...
  167. [167]
    Could Wales finally get some money from HS2? - BBC
    Oct 10, 2024 · In short the controversy centres around this: HS2 is deemed to be an England-and-Wales project, so Wales gets no extra cash, which would be the ...Missing: dispute | Show results with:dispute
  168. [168]
  169. [169]
    Minister tells Senedd committee Wales won't get HS2 money back
    Oct 16, 2025 · A UK Government minister who said “something is amiss” with Wales missing out on HS2 funding has now confirmed Wales will not receive a ...<|separator|>
  170. [170]
    No court action to seek HS2 Wales cash - BBC
    Apr 18, 2024 · Welsh ministers will not take legal action for extra cash from high speed rail spending in England.Missing: regional | Show results with:regional
  171. [171]
    Regional Transport Inequality - Hansard - UK Parliament
    Sep 11, 2025 · To transform our transport infrastructure, we need sustained, long-term funding in our region that, at the very minimum, matches the UK average.
  172. [172]
    [PDF] HS2 Carbon Information Pack
    For HS2, scope 3 emissions make up most of our carbon footprint. They include embodied emissions linked to extracting, processing, transporting and.
  173. [173]
    [PDF] Net Zero Carbon Plan | HS2
    For HS2, these emissions make up most of our carbon footprint. They include the embodied emissions associated with extracting, processing and manufacturing.
  174. [174]
    Carbon Reduction in Europe's Biggest Infrastructure Project HS2
    Integrated and collaborative design with a single online platform to quantify, reduce and monitor whole project life cycle carbon emissions. HS2 staff and ...What Is Hs2 Doing? · Hs2 And Cerclos · Hs2 Carbon Management Plan<|separator|>
  175. [175]
    Leveraging Lifetime Cycle Assessment (LCA) for smarter carbon ...
    Nov 25, 2024 · This article explores HS2's approach for carbon reduction, emphasising their collaborative partnership with Cerclos in implementing Life Cycle Assessment (LCA) ...
  176. [176]
    [PDF] HS2 Environmental Sustainability Report 2024 – 2025 - GOV.UK
    Progress continues towards our goal of reducing carbon emissions by 50% and to date we've achieved a reduction in carbon of 33.8% against the baseline, narrowly ...
  177. [177]
    Combining innovation, modern methods of construction and a whole ...
    Feb 8, 2024 · HS2 has a strong focus on carbon reduction; when running, every HS2 train will be powered by zero carbon energy, in order to provide a genuinely ...
  178. [178]
    HS2 brings new zero carbon energy powered train - VERCIDA
    HS2 trains will be powered by zero carbon energy from day one of operation, offering a cleaner alternative to long distance car journeys and domestic flights.<|separator|>
  179. [179]
    The carbon numbers: what is the full potential of HS2? - Greens4HS2
    Sep 16, 2021 · The operational emissions are far lower due to being an electric railway, which is wildly more efficient than road transportation even when ...
  180. [180]
    [PDF] HS2 — towards a zero carbon future - High-Speed Rail Group
    This analysed HS2's Life Cycle Carbon. Emissions, referred to as its carbon footprint, in three different categories, which were: construction, operation and ...
  181. [181]
    [PDF] The Carbon Impacts of HS2 Interim Report | Greengauge 21
    Emissions from HSR operations will be heavily influenced by the carbon intensity of electricity generation and it is assumed that this is reduced by 90% by 2030 ...
  182. [182]
    HS2 — investing in capacity, not just speed | Croner-i
    Apr 10, 2020 · However, even with green electrification, its calculations suggest that carbon emissions could be greater than savings throughout HS2's ...
  183. [183]
    [PDF] Response to HS2 Phase Two Consultation: Appraisal of ... - GOV.UK
    There were also criticisms that the construction carbon footprint is very high for HS2 and that the AoS does not account properly for emissions relating to.
  184. [184]
    Decarbonisation construction activities - electric piling rig
    Nov 25, 2024 · Environmental: 70 tonnes of CO2 saved versus traditional diesel alternative across 320 working hours on site. Nett zero emissions and presented ...
  185. [185]
    Ancient woodland - HS2
    May 9, 2025 · As a result of our continuing design refinements, we have removed impacts to seven of these ancient woodlands, reducing the total number to 25.
  186. [186]
    Protecting the natural environment - HS2
    May 12, 2025 · For example, more than half of HS2 is in tunnels and cuttings, preserving important wildlife habitats including Sites of Special Scientific ...
  187. [187]
    New report reveals that HS2 Ltd got its nature figures wrong
    Feb 8, 2023 · Why HS2 will cost nature too much highlighted the impacts for wildlife and wild places, increased habitat fragmentation and the possibility of ...
  188. [188]
    HS2 Ltd Does Not Know How Many Oak Trees it has Destroyed
    Aug 5, 2021 · Alongside the 15 hectares already destroyed, the Woodland Trust estimates that a total of 108 ancient woods are also at risk of loss or damage.
  189. [189]
    HS2: what's the damage? - The Ecologist
    Jan 16, 2020 · The report shows that HS2 will divide and destroy huge swathes of irreplaceable natural habitat and important protected wildlife sites up the ...
  190. [190]
    HS2 and biodiversity
    Mar 28, 2025 · No net loss of biodiversity for HS2 means ensuring that, by the time trains are running, wildlife habitats will be restored to the same levels found before ...
  191. [191]
    HS2: Moving ancient woodland habitat for rail line flawed, ecologists ...
    Oct 22, 2020 · Dr Mark Everard, from the University of the West of England, said translocation was "essentially a smokescreen for destruction and recreation".<|control11|><|separator|>
  192. [192]
    [PDF] Compensation and Mitigation for Biodiversity Loss - Woodland Trust
    They could also include planting or restoration of hedgerows, open grown trees in wood pasture or parkland habitats, planting of trees and small copses in the ...
  193. [193]
    [PDF] HS2 Double Jeopardy - The Wildlife Trusts
    HS2 Ltd's. No Net Loss biodiversity units measure the value of different habitats according to their size and how nature-rich they are. For the post- ...
  194. [194]
    HS2 Was Never Going to Destroy 108 Ancient Woodlands
    Oct 5, 2023 · The "108 ancient woodlands destroyed for HS2" line has never been true, but has become a common mantra for people concerned about HS2.
  195. [195]
    HS2 Rail Link: Ancient Woods Under Threat - Woodland Trust
    Along the Phase 1 section of the route from London to Birmingham, HS2 Ltd has damaged and destroyed ancient woods and veteran trees. With your support we're ...
  196. [196]
    HS2: new report reveals exorbitant cost to nature
    Jan 15, 2020 · Species will be affected directly and indirectly from impacts ranging from habitat loss, reduction, change, fragmentation and isolation; to ...Missing: effects | Show results with:effects<|separator|>
  197. [197]
    [PDF] Comments on HS2 Phase One environment statement
    Feb 27, 2014 · 460 hectares of land will be taken for construction; 204 hectares will be permanently taken of which 194 ha's is currently productive farmland.
  198. [198]
    [PDF] Evidence on HS2 and the environment - UK Parliament Committees
    The Formal ES states, for example that HS2 after construction would take up 0.04% Best and Most Versatile Land in England and produce 0.15% of UK carbon ...Missing: acquisition details
  199. [199]
    HS2 land grab excessive, say landowners - Farmers Weekly
    Apr 28, 2014 · The CLA said the HS2 route between London and Birmingham would take out 6,916 acres (2,800 ha) of farm land and property. A further 4,940 acres ...Missing: permanent | Show results with:permanent<|separator|>
  200. [200]
    [PDF] Evidence on HS2 and the environment - UK Parliament Committees
    HS2 Action Alliance (HS2AA) is a not for profit voluntary organisation that opposes High Speed 2 (HS2) on economic, transport and environmental grounds.
  201. [201]
    [PDF] Evidence on HS2 and the environment - UK Parliament Committees
    It has been stated that 250ha of forestry land will be permanently removed but will be offset by replanting approximately 650 ha of woodland for landscape ...Missing: hectares | Show results with:hectares
  202. [202]
    HS2 Chiltern Tunnels – Projects - Grimshaw Architects
    The Chiltern Tunnels comprise 16km long twin-bore tunnels that run through the Chilterns Area of Outstanding Natural Beauty (AONB).
  203. [203]
    Green Tunnels - HS2
    Sep 15, 2025 · First, a cutting is excavated where the green tunnel is needed. The excavated earth is kept close by, as it will be needed later on. In the ...Missing: mitigation | Show results with:mitigation
  204. [204]
    [PDF] Summary of effects of HS2 London to West Midlands route refinements
    There would be a more substantial reduction in the number of dwellings at risk of land take, reducing from 342 to 172. 3.3. There would be about 4.5 miles of.
  205. [205]
    [PDF] High Speed Rail (London-West Midlands) Environmental ... - GOV.UK
    1. Former agricultural land not required for the railway or its mitigation will, where practicable, be restored to agricultural use after completion of HS2 ...
  206. [206]
    Soils, Landscape and Woodland: How HS2 is using integrated asset ...
    Sep 22, 2020 · Before it comes into operation, Phase One of the HS2 Project intends to create around 650 hectares of new woodlands, to provide new habitats, ...
  207. [207]
    Green Corridor - HS2
    May 9, 2025 · Our Green Corridor will run alongside the railway, creating a network of bigger, better-connected, climate resilient habitats and new green spaces for people ...
  208. [208]
    HS2 to 'rewild' 127 hectares around its 10-mile Chilterns tunnel
    Mar 3, 2021 · The Western Slopes will help HS2 meet its carbon emissions reduction targets by sequestering carbon and reducing construction road journeys.
  209. [209]
    Chilterns South Portal Chalk Grassland Project - HS2
    Sep 16, 2025 · As part of the ambitious scheme, 90 hectares of chalk grassland will be seeded into re-profiled soil layers using the nutrient poor subsoils on ...
  210. [210]
    Soils, Landscape and Woodland: How HS2 is using integrated asset ...
    Conserved soils are being used for the restoration of land to agriculture, landscape earthworks, forestry, landscape planting and habitat creation. For ...
  211. [211]
    [PDF] What's the damage: HS2 report - The Wildlife Trusts
    Additionally, 693 Local Wildlife Sites (LWS) covering 9,696 hectares (ha) are at risk of being significantly affected or destroyed under current plans for HS2.
  212. [212]
    [PDF] Compulsory purchase | HS2
    Compulsory purchase for HS2 means the government can obtain land for the railway, with or without owner permission, and compensation is available.
  213. [213]
    £600m of public money spent buying up property in north of England ...
    Sep 29, 2023 · How much has HS2 spent on property so far? · Phase 1 (London to Birmingham) – £2,813,121,282, of which £1,534,246,598 was bought via compulsory ...
  214. [214]
    HS2 Compensation - The House of Commons Library
    Jan 16, 2024 · The statutory schemes offer additional statutory loss payments of up to 10% on top of the property's market value, plus disturbance costs and ...
  215. [215]
    Claim compensation if your property is affected by HS2: Homeowner ...
    You can claim £8,000 to £24,000 depending on which homeowner payment band you're in. ... You'll be eligible for the band in which your residential dwelling sits ...
  216. [216]
    [PDF] HS2 Land and Property Review 2020 - GOV.UK
    1 The scale and challenge of the HS2 property acquisition programme should not be underestimated. HS2 Ltd have been acquiring property since 2011. Some £3.6 ...
  217. [217]
    [PDF] Investigation into land and property acquisition for Phase One
    Sep 13, 2018 · HS2 Ltd supplied CBRE with information on the land and property it thought it would require, and approved the methodology and assumptions for ...
  218. [218]
    Cost of buying land to build high-speed HS2 project tripled to £3.3bn ...
    May 21, 2019 · The costs of acquiring land needed to build the £56bn HS2 high speed rail project tripled from just over £1bn to £3.3bn over a six year period.
  219. [219]
    Staffordshire farmer facing 'uncertainty' over land sold to HS2 - BBC
    Oct 3, 2025 · A farmer says she continues to face uncertainty over whether she can buy back land she was forced to sell for HS2's northern leg before it ...
  220. [220]
    HS2 'intimidating landowners' who spoke to their Stafford MP ... - BBC
    Jan 20, 2024 · HS2 has been accused of intimidating landowners who raised compensation cases against them with their MP. Theo Clarke, Conservative MP for ...<|separator|>
  221. [221]
    High Speed 2 Compensation - Hansard - UK Parliament
    Jan 18, 2024 · This House calls on the Government to provide compensation to people who have been affected by the construction of HS2.
  222. [222]
    HS2 running out of time to purchase remaining land needed for ...
    Jan 11, 2022 · HS2 Ltd says it is already holding the majority of the unpurchased land in temporary possession. It has deferred serving permanent acquisition ...Missing: hectares | Show results with:hectares
  223. [223]
    London councillor says HS2 building work is 'a living hell' for residents
    Jun 8, 2021 · People living near Euston site of high-speed rail project complain of dust, noise and vibrations in homes.Missing: concerns | Show results with:concerns
  224. [224]
    HS2: Residents say they cannot sleep due to construction work - BBC
    Feb 14, 2023 · People living near the construction route for HS2 say they have been unable to sleep due to noise throughout the night. Residents in parts ...
  225. [225]
    HS2 risked Camden complaint over 'unliveable' noise levels
    Jul 1, 2022 · HS2 came close to facing an official complaint from Camden Council over “unliveable” noise pollution suffered by residents.
  226. [226]
    [PDF] 18th July 2025 Feedback on HS2 Environmental Improvement Plans
    Jul 18, 2025 · Noise Mitigation Plan. Resident Issues/Concerns: • The current allowable construction noise levels of up to 80dB are simply unliveable. As ...
  227. [227]
    [PDF] managing effects from ground-borne noise and vibration during ...
    The HS2 Chiltern tunnel construction uses TBMs and hydraulic breaking, generating ground-borne noise and vibration. Vibration is periodic and decays with ...
  228. [228]
    Managing impacts of construction - HS2
    Aug 21, 2024 · Our key aims are to minimise disruption to local residents and businesses, reduce the impact on the road and transport network and to minimise our impact on ...
  229. [229]
    HS2 leaves Midlands communities with 'hostility' and mixed feeling
    Jul 17, 2023 · HS2's rising costs and impact on the countryside continue to prompt accounts of anxiety, "open hostility" and also mixed feeling among ...
  230. [230]
    Construction noise and vibration - HS2
    During building works, HS2 will seek, through design and mitigation, to control the effects of noise and vibration from within our worksites.
  231. [231]
    [PDF] Construction noise and vibration Monthly Report – June 2024
    Aug 2, 2024 · HS2 is required to undertake noise (and vibration) monitoring as necessary to comply with the requirements of the High Speed Rail (London-West ...
  232. [232]
    Operational noise and vibration - HS2
    Aug 30, 2024 · Sound, noise and vibration resulting from the operation of HS2 is a key concern of our neighbours who are living or working near the railway ...
  233. [233]
    [PDF] HS2 Approach to Noise - London
    Residents qualify for noise insulation in connection with HS2 if the predicted or actual construction noise goes above a certain 'trigger' level.
  234. [234]
    Archaeology - HS2
    Sep 9, 2025 · This once-in-a-generation archaeology opportunity will reveal over 10000 years of British history; from the Ice Age to the Victorians.
  235. [235]
    HS2: Vast Roman settlement found by archaeologists - BBC
    Jan 10, 2022 · Discoveries showed the settlement expanded over time, becoming more prosperous during the Roman period, with new stone buildings and roads being ...
  236. [236]
    'Astounding' Roman statues unearthed at Norman church ruins on ...
    Oct 29, 2021 · Roman statues of a man, woman and child have been uncovered by archaeologists at an abandoned medieval church on the route of the HS2 high-speed railway.Missing: villa | Show results with:villa
  237. [237]
    'Exquisite' Roman figure found on HS2 dig in Buckinghamshire
    Jan 13, 2022 · An extremely rare, carved wooden figure from the early Roman era has been unearthed in a waterlogged ditch in Buckinghamshire.
  238. [238]
    HS2 Historic Environment Digital Archive - Archaeology Data Service
    The discoveries made along the route of HS2 help to tell the story of our nation. From the earliest prehistoric times, Roman and Medieval we can see how ...<|separator|>
  239. [239]
    [PDF] HS2 railway, UK – why the country needs it
    HS2 will connect major cities, rebalance the economy, reduce overcrowding, increase capacity, and support a strong economy by reducing journey times.
  240. [240]
    The case for High Speed Rail: a regional, social and economic ...
    Though the benefits from a new HS2 high-speed raillink between London and the North, are potentially large in terms of faster journeys, less disruption, and ...
  241. [241]
    [PDF] HS2 – Jobs Analysis - Greengauge 21
    This work sets out an estimate of the direct and indirect (supply chain) jobs that would be attributable to the high speed rail project being promoted by HS2 ...Missing: verifiable | Show results with:verifiable
  242. [242]
    [PDF] HS2 Outline Business Case Economic Case - GOV.UK
    The table below summarises the net costs to Government which are subsequently combined with the benefits to generate a Benefit Cost Ratio (BCR) for the scheme.
  243. [243]
    EHS0021 - Evidence on The Economic Case for HS2
    The full HS2 network generates benefits to transport users of approximately £60bn and Wider Economic Impacts totaling over £13bn compared to net scheme costs of ...Missing: arguments | Show results with:arguments
  244. [244]
    [PDF] Tenth report of Session 2023-24 - Department for Transport - HS2 ...
    Based on a report by the National Audit Office, the Committee took evidence on 16 November. 2023 from the Department for Transport and High Speed Two (HS2) Ltd.
  245. [245]
    [PDF] FAILURE TO TRANSFORM: - Institute of Economic Affairs
    DfT (Department for Transport) (2014), High Speed 2: Get Ready. A report to the Government by the HS2 Growth Taskforce, London: DfT. Page 38 ...
  246. [246]
    Past: Scrap HS2 - TaxPayers' Alliance
    Commissioned by transport secretary Grant Shapps in August 2019, the Oakervee Review was designed to be an independent review into HS2. After carrying out a ...
  247. [247]
    [PDF] THE HIGH-SPEED GRAVY TRAIN: - Institute of Economic Affairs
    Aug 13, 2013 · HS2 will be heavily loss-making in commercial terms – hence the requirement for massive taxpayer support. An economically rational transport ...
  248. [248]
    'It's been beyond difficult': earthworks of HS2 take toll on Chilterns ...
    Oct 2, 2025 · Locals complain of a changed landscape, flooding, dust and disruption as rail project cuts through area of outstanding natural beauty.
  249. [249]
    HS2 Mitigation Projects: Inflation - Hansard - UK Parliament
    Mar 14, 2025 · HS2 Ltd had recognised that the noise impact from construction and ... disruption, environmental damage and upheaval in our communities.
  250. [250]
    High Speed 2 costs | Institute for Government
    Jan 29, 2020 · The government's last full economic appraisal of the scheme in 2013 revised the benefit-cost ratio to 1.8 in 2013. When Phase 1 was approved by ...
  251. [251]
    What killed HS2? Explaining the loss of political support for the UK's ...
    HS2 has exhibited a very public decline in the notional sum returned to the taxpayer for every pound of public money spent and by some estimates has fallen some ...Levelling Up · Methods · The Demise Of Hs2
  252. [252]
    HS2: Why was Phase 2 cancelled, and are there any benefits as it is?
    Despite unveiling HS2's replacement plan at the Conservative Party Conference in October 2023, Prime Minister Rishi Sunak was quickly undermined when it ...
  253. [253]
    HS2 delayed again as minister says rail line has gone billions over ...
    Jun 18, 2025 · The opening of HS2 will be delayed beyond the planned date of 2033, the Government will confirm. Transport Secretary Heidi Alexander is ...Missing: 2023-2025 | Show results with:2023-2025
  254. [254]
    Debate: HS2 Reset - 18th Jun 2025 - Parallel Parliament
    Jun 18, 2025 · It means this Government will get the job done between Birmingham and London. We will not reinstate cancelled sections we cannot afford, but we ...
  255. [255]
    What can be learned from the cancellation of HS2's northern leg?
    May 15, 2024 · Combined with spiralling costs and the high turnover of politicians overseeing HS2, it made the prime minister's decision much easier.
  256. [256]
    Politicians blamed by engineers for HS2 collapse - Railnews
    Sep 12, 2024 · The cancellation of the Northern leg of HS2 almost a year ago was caused by a combination of political factors, according to a report by the Institution of ...
  257. [257]
    How to waste £37bn on HS2, from botched contracts to political ...
    Jun 18, 2025 · Key decisions about HS2 were made because of “pressure from politicians to maintain momentum”, the report says. Too often, having a schedule for ...
  258. [258]
    [PDF] assessing the costs and benefits - Centre for Economic Performance
    Unfortunately, the wider costs and benefits of HS2 are, if anything, even more uncertain. Public debate continues to rage about the decision to build a new high ...<|control11|><|separator|>
  259. [259]
    Regional authorities are piecing together a future rail plan for growth ...
    Sep 17, 2025 · The previous government cancelled HS2 North and slashed Northern Powerhouse Rail, but the need for improved rail connections in the North of ...
  260. [260]
    NAO spells out costs of HS2 Phase Two cancellation
    Jul 26, 2024 · Closing down Phase Two of HS2, following its cancellation by the previous Government in October 2023, will take three years and cost of up to £100 million.
  261. [261]
    HS2 | Northern Powerhouse Rail - Transport for the North | TfN
    Leaders agree final Northern Powerhouse Rail plan to create jobs and define the North's future. Final recommendations for the new Northern Powerhouse Rail ...
  262. [262]
    The clock is ticking on the West Coast Main Line's looming capacity ...
    Oct 7, 2025 · With the powers to deliver HS2 Phase 2a set to expire in February 2026, the Government must now make a clear decision on the future of rail ...
  263. [263]
    HS2 scaled back further as £3bn link to Scotland quietly culled
    Jun 7, 2022 · The 13-mile “Golborne Link” near Manchester is to be culled, HS2 minister Andrew Stephenson has announced.
  264. [264]
    Removing the Golborne Link from the HS2 Bill - GOV.UK
    Jun 6, 2022 · Intention to remove the Golborne Link from the High-Speed Rail (Crewe – Manchester) Bill announced with alternative options to be explored.
  265. [265]
    Rail industry groups outraged as HS2 Golborne link quietly scrapped
    Jun 7, 2022 · Three leading industry bodies said the decision to scrap the Golborne link would create a bottleneck for trains and negatively affect passengers ...
  266. [266]
    HS2 | Engineers warn cancelling Golborne link 'hobbles the value' of ...
    Apr 12, 2022 · Rail experts and engineers have warned that cancelling the Golborne link of HS2 Phase 2b will significantly reduce the value of the high-speed line.
  267. [267]
    [PDF] HS2 phase two engineering options report Heathrow - GOV.UK
    2) HS2 Ltd was later asked to develop route options for a direct high speed link to Heathrow, including options for a loop and a spur from the main trunk route ...Missing: abandoned | Show results with:abandoned
  268. [268]
    HS2: Heathrow spur plans dropped by transport minister - BBC News
    Mar 10, 2015 · A proposed new rail link to Heathrow Airport as part of the HS2 high-speed network is ruled out by the transport minister.Missing: abandoned | Show results with:abandoned
  269. [269]
    Heathrow Airport transport proposals - Wikipedia
    ... (HS2) railway line. The spur from HS2 to Heathrow was dropped from the plans in March 2015. Heathrow–Gatwick rail link (2011–2013). edit.Proposals · Heathrow–Gatwick rail link... · Heathrow Southern Railway...
  270. [270]
    What happened to HS2? The project that made Britain a laughing ...
    Jun 18, 2025 · It was supposed to close the north-south divide and boost the economy, but 20 years late the high-speed rail project is in tatters.
  271. [271]
    Golborne Spur plans for HS2 axed by government | Leigh Journal
    Jun 7, 2022 · THE controversial plans for Golborne Spur as part of the HS2 project have been scrapped. The Golborne Spur of the proposed HS2 railway would ...Missing: cancelled | Show results with:cancelled
  272. [272]
    [PDF] Better than HS2 The 51m Alternative Infrastructure Investment Strategy
    HS2 provides no addifional rail capacity between London and Birmingham unfil 2026 at the earliest, and 2033 for the North of England. The West Coast Main Line ...Missing: history | Show results with:history
  273. [273]
    [PDF] HS2 Strategic Alternatives Final Report - GOV.UK
    Oct 28, 2013 · This report is for the HS2 Strategic Alternatives study, covering the purpose, objectives, and approach to upgrade packages. It is for the ...
  274. [274]
    [PDF] Instead of high- speed rail | Policy Exchange
    wrong direction were also slated to carry the northern leg of HS2, phases. 2a and 2b, which were cancelled in 2023. And some still hope that phase. 2 can rise ...