Fact-checked by Grok 2 weeks ago

Heathrow Connect

Heathrow Connect was a train service operating between and terminals 2 & 3 and terminal 4, with stops at intermediate stations including Hayes & Harlington via Acton. Launched on 12 June 2005, the service provided two trains per hour from Paddington to the airport terminals, along with additional services to Hayes & Harlington. Jointly operated by Heathrow Express Operating Company (HEOC) and First Great Western (later Great Western Railway), Heathrow Connect utilized the rail infrastructure owned by Limited, except for the section managed by . It served as a key link for passengers traveling to and from stations and the airport, carrying approximately 0.25 million passengers in 2018 before its discontinuation. The service ceased operations on 20 May 2018, when Transport for London (TfL) took over the routes as part of the TfL Rail concession, marking a transitional step toward the full integration into the Elizabeth line. This handover enabled the introduction of Oyster and contactless payment options at Heathrow stations and paved the way for expanded frequencies and service to terminal 5, with four trains per hour to terminals 2/3/4 commencing in December 2019. The cessation contributed to a decline in revenue for HEOC, from £131 million in 2018 to £119 million in 2019, reflecting the shift to the new Elizabeth line operations.

Overview

Service Description

Heathrow Connect was a stopping train service that connected to , serving intermediate stations in along the route. The service provided direct access to Heathrow Central station for Terminals 2 and 3, as well as station. Passengers could reach Terminal 5 via airside transfers within the airport. The route extended approximately 15 miles (24 km) from to Heathrow Central, offering a more accessible option for to and from compared to faster non-stop services. Heathrow Connect served as an affordable alternative to the premium , targeting airport passengers, staff, and local commuters who benefited from its stopping pattern for West London connections. It was operated jointly by and Great Western Railway (GWR).

Operators and Duration

Heathrow Connect was operated as a between Heathrow Express Operating Company (HEOC), a wholly owned of with the majority stake, and First Great Western (later rebranded as Great Western Railway or GWR). This partnership structure was established to leverage HEOC's control over the dedicated Heathrow rail infrastructure while integrating GWR's operational expertise on the . The service operated from its launch on 12 June 2005 until its cessation on 19 May 2018, spanning nearly 13 years. It was governed under the terms of GWR's franchise agreement with the , which mandated the joint operation as a condition of the , while sharing with the premium service. The service was ultimately replaced by in 2018 as part of preparations for the . Crewing for Heathrow Connect involved drivers supplied by GWR, with maintenance responsibilities handled by Heathrow Airport Holdings personnel, reflecting the joint venture's division of operational roles.

History

Inception and Launch

Heathrow Connect was established to meet growing demand for affordable rail connectivity to , serving as a stopping service alternative to the premium, non-stop , which had debuted in June 1998 following a track access agreement between BAA and for the shared 12-mile mainline from to the airport spur. This initiative addressed the need for cost-effective transport options for passengers and airport workers along the route, leveraging the existing infrastructure built for the Express while adding intermediate stops to enhance accessibility for suburban commuters. Planning for Heathrow Connect accelerated in , with BAA partnering with to develop an integrated timetable that incorporated the new stopping service alongside Express operations, following the franchise award earlier that year. As part of the preparations, BAA acquired five Class 360/2 five-car electric multiple units, constructed in and , specifically for the service to ensure reliable performance on the electrified tracks. Infrastructure enhancements, including signaling and platform adjustments at intermediate stations, were implemented to support the dual-service operation without disrupting the faster Express trains. The service officially launched on 12 June 2005, with the first train departing for Heathrow serving Terminals 2 and 3, operating at an initial frequency of two trains per hour throughout the day and evening. Early operations focused on seamless integration with the , as both services shared the dedicated spur from Hayes & Harlington, requiring precise scheduling to manage pathing and avoid delays on the single-track sections.

Operational Changes

In March 2008, following the opening of , Heathrow Express operations were rerouted to the new terminal, with a dedicated service introduced between Heathrow Central and Terminal 4, adding approximately 5-6 minutes to journeys for passengers accessing Terminal 4. Heathrow Connect services continued to terminate at Heathrow Central, requiring use of the for Terminal 4. On Sundays, Heathrow Connect services were extended to Terminal 4 from Heathrow Central, bypassing and , with reduced frequency. The service frequency remained at 30-minute intervals throughout its operation, supplemented by additional trains during hours to accommodate demand; this resulted in approximately 48 services each way on a typical day. Heathrow Connect shared infrastructure with the , including tracks from London Paddington to the airport , and benefited from signaling modernization efforts launched in 2009 that enhanced reliability by 2010 through improved systems. Passenger numbers on Heathrow Connect grew steadily alongside the airport's expansion, with the combined Heathrow rail services (including Connect) handling 6.35 million passengers in 2015—a record year for Heathrow, which saw over 75 million total passengers driven by increased air traffic and terminal developments.

Termination

In 2017, as preparations for the project advanced, (TfL) announced that the Heathrow Connect service would be absorbed into the upcoming concession to facilitate a seamless integration with the . This decision was part of broader efforts to unify suburban rail services under TfL's oversight, aligning Heathrow Connect's operations with the new infrastructure and branding ahead of the full rollout. The termination was driven by the need for cost efficiencies through consolidated operations and enhanced connectivity via the , which would replace the stopping service with more frequent and integrated trains to . By subsuming Heathrow Connect into , the transition eliminated redundant operations, allowed TfL to assume control of key suburban routes, and supported the overall goal of improving London's rail network efficiency without service disruptions. The final Heathrow Connect train operated on 19 May 2018, marking the end of the service with a smooth handover to ensure uninterrupted travel for passengers. During the wind-down, assets including the Class 360 electric multiple units and track access rights were transferred to MTR Crossrail, the operator of , enabling immediate continuation of stopping services under the new branding.

Operations

Route and Stations

Heathrow Connect operated on a route from to , following the (GWML) and branching off at Heathrow Airport Junction to access the airport via the dedicated Heathrow Airport Tunnel. The service shared infrastructure with the faster , including the tunnel and airport platforms, but called at multiple intermediate stations along the GWML to serve local communities. The entire route was electrified at 25 kV AC overhead, enabling consistent electric operation from Paddington through to the terminals. The service stopped at eight stations in total: London Paddington, Ealing Broadway, , , , Hayes & Harlington, , and . Most trains terminated at (also known as Heathrow Central), with a portion of services extending to via a short loop line within the airport complex; there was no direct service to Heathrow Terminal 5, requiring passengers to transfer. At key intermediate stations like Ealing Broadway and Hayes & Harlington, additional platforms accommodated the stopping pattern, distinguishing it from the non-stop . Typical journey times were approximately 25 minutes from to Heathrow Terminals 2 & 3 and 28 minutes to Terminal 4, reflecting the additional stops en route. Services ran every 30 minutes during peak periods, providing reliable access without direct Terminal 5 connectivity.

Rolling Stock

The Heathrow Connect service operated with a dedicated fleet of five Class 360/2 Desiro electric multiple units, each comprising four cars and constructed by . These units were delivered in 2004 ahead of the service launch the following year. Key technical specifications included a maximum speed of 100 (160 km/h), accommodation for 333 passengers per unit in standard seating, and full air-conditioning throughout. The interiors incorporated Heathrow-specific branding, such as airport-themed signage and dedicated luggage areas to cater to passenger needs on the airport route. The trains were painted in a distinctive blue and white unique to Heathrow Connect, setting them apart from the standard Great Western Railway fleet colors. Maintenance for the Class 360/2 fleet was primarily handled at Common depot under a long-term contract with , including routine servicing and major overhauls shared with facilities. This arrangement ensured high reliability, with the units achieving strong performance metrics during their operational life.

Timetable and Capacity

Heathrow Connect operated on a standard timetable of two trains per hour from to terminals, running every 30 minutes from approximately 5:00 a.m. to just before midnight on weekdays and Saturdays. On Sundays, the frequency was reduced to one train per hour, with all services extended to and not calling at or . This schedule provided consistent connectivity along the 14-mile route, accommodating commuters and airport travelers without the non-stop emphasis of the parallel service. The service's capacity reached up to approximately 950 passengers per hour per direction, derived from the typical 476-passenger configuration of the four-car trains used, such as the Class 360 EMUs, operating at the half-hourly frequency. Peak-hour loads occasionally exceeded this, with some services carrying up to 786 passengers, representing 165% of rated capacity (65% over capacity) during morning rushes. Overall, the timetable supported reliable volume handling for the suburban-airport link, though it was constrained by shared . Performance metrics for Heathrow Connect included a public performance measure (PPM) of around 91% in the mid-2010s, indicating that the majority of trains arrived within five minutes of schedule. Delays were primarily attributed to track sharing with freight trains and Great Western Railway suburban services on the approach to , which occasionally impacted punctuality during peak periods. Accessibility features were integrated throughout the service, with step-free access available at most stations via lifts and ramps, facilitating ease of use for passengers with needs. At stations, dedicated assistance staff were allocated to support transfers and boarding, ensuring compliance with accessibility standards for the airport-bound route.

Company Structure

Organizational Setup

Heathrow Connect was operated by Heathrow Express Operating Company Limited (HEOC), a wholly owned subsidiary of Heathrow Airport Limited, which later became part of . The service functioned as an open access operation rather than a franchised one, distinct from standard models. The organizational structure involved a joint operational arrangement between HEOC and First Great Western (later Great Western Railway, or GWR), as required under GWR's franchise agreement to provide to . HEOC handled the core operations, including safety management at Heathrow stations and overall service delivery, while GWR contributed to route integration on the . In 2015, ownership of the and Connect services fully transferred to HEOC on an arm's length basis from , consolidating control under the airport operator. This structure was in place until the service's cessation on 20 May 2018. Day-to-day management was overseen by the HEOC team, which managed operations, , and access on the Heathrow spur owned by Limited. The board of HEOC included representatives from Limited, ensuring alignment with airport priorities, though no direct GWR board involvement was specified in operational . Revenue from fares and commercial activities was collected and transferred directly to Limited, with costs reimbursed to HEOC plus a ; any sharing with GWR focused on integrated ticketing for local segments rather than direct fare splits. Regulatory oversight fell under the Office of Rail and Road (ORR), which monitored Heathrow Connect as an service with specific performance regimes. Key targets included the Public Performance Measure () for punctuality, where trains arriving within a set time threshold counted toward compliance; for example, Heathrow Connect achieved a of 92.8% in 2013, reflecting commitments to reliability amid shared infrastructure use with . Annual audits and financial reporting to ORR ensured transparency in cost recovery and performance against these benchmarks.

Fares and Revenue

Heathrow Connect employed a fare structure aligned with the London zonal system for segments between and Hayes & Harlington, while applying fixed supplements for the Heathrow branch to reflect its airport connectivity. In 2018, the off-peak single fare from to Heathrow stood at £10.30, positioning it as a more affordable alternative to the , which charged £22 for a comparable off-peak single journey during the same period. Ticket options included contactless pay-as-you-go, accepted on Heathrow Connect from January 2015, allowing seamless tapping in and out for zonal journeys. The service integrated with the for pay-as-you-go travel within zones, enabling daily and weekly capping to limit costs for frequent users. Season tickets were offered for regular commuters, with specialized options available for airport staff to facilitate workforce travel. The revenue model relied primarily on ticket sales, generating fare income that, when combined with Heathrow Express operations, totaled around £158 million in 2015–16 according to data. Roughly 70% of this income stemmed from airport-bound trips, underscoring the service's role in passenger access, while subsidies from supported the stopping services at local stations to enhance community connectivity. Discounts were available to promote accessibility, including a 50% reduction for employees on applicable fares to support daily commutes. Family railcards provided additional savings, offering one-third off adult tickets and 60% off children's fares (ages 5-15) when traveling together on the service. Revenue was primarily managed by HEOC, with arrangements for integrated ticketing involving GWR.

Replacement and Legacy

Transition to TfL Rail

On 19 May 2018, Heathrow Connect services concluded their operations, with seamlessly assuming responsibility for the Paddington to Heathrow route the following day, on 20 May 2018. This handover marked a key phase in integrating the service into the broader project, maintaining the existing stopping pattern while preparing for future extensions under the . , operated by under a concession agreement, continued the route's connectivity to Heathrow Terminals 2 & 3 and 4, with no service disruptions reported during the transition. The asset transfer included the five Class 360/2 electric multiple units previously dedicated to Heathrow Connect, which initially repurposed for continued operation on the route to ensure service reliability. These trains, introduced in 2005, were retained in the short term before eventual replacement by Class 345 units as infrastructure matured. Staff from the Heathrow Connect operation, including drivers and station personnel managed by Great Western Railway, transitioned to Crossrail as stipulated in the 2014 operating concession, facilitating operational continuity without layoffs. Service continuity was prioritized, with the frequency held at two trains per hour in each direction, matching Heathrow Connect's prior schedule and avoiding any gaps in passenger access. Fares under were immediately reduced for pay-as-you-go or contactless users, with a single off-peak journey from Heathrow Terminals 2 & 3 to set at £10.10—20 pence lower than the previous Heathrow Connect rate—enhancing affordability from the outset. Peak fares decreased slightly to £10.20, but overall, the structure aligned with TfL's zonal pricing to integrate better with . Preparatory works in 2017 and 2018 focused on infrastructure enhancements, particularly signaling upgrades along the route to support the eventual rollout of (ETCS) technology required for full operations. completed key renewals, including track and signaling improvements in the Heathrow area, to enable compatibility with incoming Class 345 trains and higher-capacity services while accommodating the interim Class 360 fleet. These upgrades, tested in the Heathrow tunnels during the winter of 2017–2018, ensured the route's readiness for without compromising existing operations.

Long-term Impact

Heathrow Connect served as a foundational service for subsequent improvements in airport rail connectivity, directly paving the way for the 's Heathrow branches, which began offering direct services to in December 2022. By providing affordable, stopping services between and Heathrow from 2005 to 2018, it established a reliable suburban rail option that informed the design and integration of the , enhancing overall capacity and accessibility for airport passengers. The transition to in 2018 built upon this framework, culminating in the 's full operational integration, which has since handled over 500 million passenger journeys across its network since May 2022. The service's emphasis on affordability contributed to a notable increase in rail's for Heathrow access, rising from approximately 25% in the early to around 40% by 2018 through competitive pricing relative to taxis and the . This growth supported broader economic benefits by reducing road congestion and encouraging sustainable travel patterns around the airport. Post-integration into the , public transport at Heathrow reached over 45% in 2024, reflecting the lasting influence of these affordable rail options on passenger and regional . Heathrow Connect underscored the advantages of integrated suburban-airport rail systems, influencing UK policy discussions on enhancing public transport access to major hubs amid airport expansion debates. Its operational model highlighted the value of frequent, cost-effective services in boosting ridership without premium pricing, which informed proposals like the Western Rail Approach—a planned bi-directional link from the to Heathrow aimed at reducing journey times from western regions. These lessons have shaped ongoing initiatives to achieve at least 50% public transport modal share under Heathrow's expansion plans, emphasizing rail's role in sustainable growth. As of 2025, the former Heathrow Connect route operates entirely under the branding, with no distinct successor service but significantly enhanced frequencies of up to 16 trains per hour during peak times to Heathrow terminals. This integration has sustained high demand, with the 's Heathrow services contributing to daily passenger volumes exceeding 800,000 across the network, while supporting Heathrow's record 83.9 million passengers in 2024.

References

  1. [1]
    TfL to operate Heathrow Connect services ahead of Elizabeth line ...
    May 18, 2018 · From Sunday 20 May TfL will take over the Heathrow Connect services between Paddington and Heathrow terminals 2/3 and 4 in another major ...Missing: source | Show results with:source
  2. [2]
    [PDF] Local Focus Forum Rail Projects Update - Heathrow Airport
    Apr 18, 2018 · TfL Rail will replace the Heathrow Connect service. • It will initially deliver a frequency of 2 trains per hour (tph) from Paddington.
  3. [3]
    [PDF] Rail Network Statement - Heathrow Airport Ltd
    Note that Heathrow Connect is scheduled to cease in May 2018 upon the introduction of the Elizabeth Line services. • Elizabeth Line – an MTR operated ...
  4. [4]
    [PDF] Heathrow Airport Ltd – Framework Capacity Statement
    May 18, 2017 · HAL owns the rail infrastructure on which the Heathrow Express and Heathrow Connect rail services are operated other than that section of the ...
  5. [5]
    [PDF] Heathrow Express Operating Company Limited
    Dec 31, 2019 · There was no Heathrow Connect service during the year. The service ceased on 20th May 2018 and therefore carried zero passengers during the ...
  6. [6]
    [PDF] train and tubejourney - Heathrow Airport
    Heathrow Connect. Other rail services. Railair services/285/490 Bus. Underground - Piccadilly line. Marylebone. Paddington. Euston. King's Cross. St Pancras.<|control11|><|separator|>
  7. [7]
    Trains London Paddington to Heathrow Terminal 5 (Rail Station ...
    You'll usually find around 156 trains per day running on this route, which spans 14 miles (22 km). There's no need for any changes along the way, as there are ...
  8. [8]
    Heathrow Express - Railway Technology
    May 2, 2000 · Siemens has a 19-year contract to provide a 24 hours a day, 365 days per year maintenance service for the Heathrow Express/Connect fleets at the ...
  9. [9]
    HEATHROW RAIL EXPANSION - Modern Railways
    Sep 26, 2019 · ... stopping service to London Paddington: this is the Heathrow Connect service that was taken over by TfL in May 2018. This is a forerunner of ...
  10. [10]
    [PDF] Heathrow Airport Ltd and Heathrow Express - Parliament UK
    Connect is operated by HEOC under a joint venture arrangement with First Great Western. ("FGW") as it is a requirement of FGW's service franchise agreement ...<|control11|><|separator|>
  11. [11]
    [PDF] Charging framework for the Heathrow Spur - 27 May 2016 - ORR
    May 27, 2016 · the buyout removed the need for a joint venture structure ... Heathrow Connect services, HEX and some Heathrow Connect revenues have.
  12. [12]
    [PDF] Charging framework for the Heathrow Spur - ORR
    Feb 11, 2016 · Those arrangements were structured as a joint venture between the ... services, HEX and some Heathrow Connect revenues have contributed to the.
  13. [13]
    [PDF] newsrail express 290.qxp - ATOC's Travel Agent Website
    The official launch of Heathrow Connect ... Wessex Trains are pleased to announce the launch of a new package of Rover and Ranger tickets from. 12 June 2005.
  14. [14]
    The Slow Death Of Heathrow Express - London Reconnections
    Feb 21, 2023 · Facts and whispers are beginning to emerge, suggesting that maybe Heathrow Express won't exist by the end of the decade.
  15. [15]
    Final Results - Investegate | Company Announcement
    In June we will launch the new Heathrow Connect service, in partnership with British Airports Authority, calling at intermediate stops between London ...Missing: press | Show results with:press
  16. [16]
    Heathrow rail connection gets boost - Business Traveller
    Heathrow Connect could also be the only train service stopping at Heathrow's Terminal 4 once Terminal 5 opens in March 2008. This is according to ...
  17. [17]
    Heathrow Connect explained: Heathrow – London transfer
    Mar 10, 2011 · Heathrow Connect is a stopping train service between Heathrow and Central London. It is a cheaper and a bit slower alternative to Heathrow Express service.
  18. [18]
    RAIL GROWTH STRATEGY FOR THE GREAT WESTERN ...
    Sep 1, 2009 · Modernise signalling on the Great Western main line with the new in-cab European Railway Traffic Management System (ERTMS) to enhance operations ...
  19. [19]
    [PDF] Heathrow Express Operating Company Limited - Annual report and ...
    Dec 31, 2015 · The combined passenger number for both services increased by 1.0% from 6.29 million in 2014 to 6.35 million in 2015. Total Heathrow passenger ...
  20. [20]
    Heathrow traffic and business commentary December 2015
    Jan 11, 2016 · 2015 Full-Year Traffic Results: Nearly 75 million passengers travelled through Heathrow in 2015, an increase of 2.2% on 2014 and the ...
  21. [21]
    [PDF] Board Date: 19 July 2017 Item: Elizabeth Line Operations and ... - TfL
    Jul 19, 2017 · 1.1 This paper summarises recent progress towards staged opening of the Elizabeth line as well as transition of the Crossrail Project to become ...
  22. [22]
    The Final Result: Crossrail Heads to Terminal 5
    Jul 6, 2017 · July 4th 2017 saw the surprise announcement that the Elizabeth line would serve Terminal 5 at Heathrow. Heathrow Media Centre, the public ...
  23. [23]
    Heathrow loses Crossrail access charge case - BBC News
    May 26, 2017 · Heathrow cannot charge Crossrail for using its track to travel to the airport, a High Court judge has ruled.Missing: absorption | Show results with:absorption
  24. [24]
    [PDF] MTR Corporation Crossrail Limited supplemental agreement - ORR
    May 18, 2018 · This marks the commencement of Crossrail services to Heathrow by transferring rights for paths currently used by Heathrow Connect. (and held ...Missing: assets | Show results with:assets
  25. [25]
    [PDF] HEATHROW ACCESS AND STOCKLEY FLYOVER
    Access to the airport from the Great Western Main Line will be via Heathrow Airport. Junction and the Heathrow Airport Tunnel constructed for Heathrow Express.
  26. [26]
    Heathrow Connect - Find stations, train times and book tickets
    Trains run every 30 minutes from London Paddington, calling at Ealing Broadway, West Ealing, Hanwell, Southall, Hayes & Harlington, and Heathrow Central ( ...
  27. [27]
  28. [28]
    [PDF] London Heathrow Airport - The Chesterfield Mayfair
    Heathrow Connect journey time is about 25 minutes from. Paddington to Heathrow Central. For more information, and details of fares, visit the Heathrow ...<|control11|><|separator|>
  29. [29]
    ROUK buys Heathrow Connect Class 360 EMUs - Railway Gazette
    Feb 23, 2021 · Rail Operations (UK) has purchased Heathrow Airport Ltd's fleet of fleet of five Siemens Class 360/2 electric-multiple units, along with spare parts.Missing: specifications | Show results with:specifications
  30. [30]
    A tale of two Desiros - Rail Engineer
    Nov 6, 2014 · They operate on AC only (Class 350/1 is AC/DC dual voltage) and have a maximum speed of 100mph. Because they are primarily used for commuter ...Missing: top | Show results with:top
  31. [31]
  32. [32]
    Trains from Heathrow Airport | Tickets & Times - Trainline
    They start running around 5 a.m. (6 a.m. on Sundays) and stop running ... If you have enough time, you can also take the slower and cheaper Heathrow Connect train ...
  33. [33]
    London-bound train overcrowding: 100,000 have to stand - BBC News
    Jul 24, 2013 · The worst service for overcrowding was the 08:27 Heathrow Connect service from Heathrow to Paddington Station which typically travelled with 786 ...Missing: per | Show results with:per
  34. [34]
    [PDF] Heathrow Express Operating Company Limited
    Aug 3, 2016 · Heathrow Express operational performance dropped slightly with punctuality 88.89% (2014: 89.48%). The PPM for. Heathrow Connect was 90.78% (2014 ...
  35. [35]
    Trains to Heathrow Terminals 2 and 3 (Rail Station only) - Trainline
    Heathrow Connect is a stopping service, and therefore offers connections to the London Underground Central and District lines at Ealing Broadway. Heathrow ...
  36. [36]
    [PDF] Heathrow Express Operating Company Limited - ORR
    Dec 31, 2012 · Employee mformatJon. Year ended. 31 December 2012. £'000. 16. The average number of employees of the Company dunng the year was 447 (2011 435).
  37. [37]
    [PDF] UK Rail Industry Financial Information 2015-16 - 22 February 2017
    Feb 22, 2017 · 84 On 1 September 2015 the ownership of Heathrow Express and Connect transferred from Heathrow Airport Limited to Heathrow Express Operating ...
  38. [38]
    [PDF] Heathrow Network Statement - Rail - ORR
    Mar 8, 2016 · Heathrow Connect - provided jointly by HEOC and First Great Western, c onnecting Heathrow Airport with Paddington station. The service ...
  39. [39]
    TfL Confirm Elizabeth Line Fares - London Reconnections
    Mar 16, 2018 · Elizabeth Line peak fares to London Paddington are £10.20, off-peak £10.10. Daily cap is £12.50. Off-peak fares to Southall, Hanwell are £6.00.
  40. [40]
    Heathrow Express: Britain's most expensive railway slashes fares
    Oct 22, 2019 · The “Anytime” one-way fare is £25, a price per mile of over £1.60. A slightly cheaper off-peak single, avoiding rush hours, is £22. Advance ...
  41. [41]
    Contactless payments arrive on the Underground network - BBC News
    Sep 15, 2014 · TfL's introduction of contactless payment for rail journeys follows a trial in April involving about 5,000 customers.Missing: date | Show results with:date
  42. [42]
    Family & Friends Railcard | National Rail
    A Family & Friends Railcard can save you 1/3 on adult fares and 60% on kids' fares throughout Great Britain. The discount applies to all Standard, Anytime, ...Missing: employees | Show results with:employees
  43. [43]
    [PDF] Crossrail full text decision - GOV.UK
    Jan 15, 2015 · This will be followed by the transfer of the Heathrow Connect service and some Great Western services (between London Paddington and ...<|separator|>
  44. [44]
    Rail Operations UK Purchase Ex-Heathrow Express Class 360/2 trains
    Feb 21, 2021 · Rail Operations UK Limited (ROUK) have agreed with Heathrow Airport Limited to purchase five Class 360/2, along with spares.<|control11|><|separator|>
  45. [45]
    MD2245 Heathrow Airport TfL Rail fares from 20 May 2018
    Mar 2, 2018 · It is proposed that from 20 May, the fares to Heathrow on the former Heathrow Connect service will be integrated with those on the rest of the ...
  46. [46]
    Signalling Crossrail - Rail Engineer
    Jan 8, 2016 · The Heathrow Connect Class 360 service is to be replaced by a Crossrail Class 345 service. As this latter short section of route is ...
  47. [47]
    [PDF] Railway Upgrade Plan | Network Rail
    – Heathrow Connect. – Heathrow Express. 8. Scotland (p52-57). – Abellio ScotRail. 1. 3. 4. 5. 6. 7. 8. 2. Our routes at a glance. Freight and National Passenger.
  48. [48]
    Transformational Elizabeth line reaches 500 million passenger ... - TfL
    Jan 10, 2025 · More than 500 million passenger journeys have been made on the Elizabeth line in its first two and a half years, making it the single busiest railway service ...
  49. [49]
    Heathrow Connect Trains Tickets (now Elizabeth line) | Trainline
    Heathrow Connect trains are no longer in operation. Instead, you can use Elizabeth line services to travel between central London and Heathrow Airport.<|control11|><|separator|>
  50. [50]
    [PDF] Expanding-Heathrow-proposal-summary-31-07-25.pdf
    Jul 31, 2025 · The UK business community supports the expansion of Heathrow with a third runway – an investment in the nation's future.
  51. [51]
    Western Rail Approach to Heathrow - Wikipedia
    The Western Rail Approach to Heathrow is a proposed bi-directional link westward from London's Heathrow Airport to the Great Western Main Line.Missing: background | Show results with:background
  52. [52]
    Southern Access to Heathrow: strategic objectives - GOV.UK
    Nov 4, 2019 · A new Southern Access to Heathrow (SAtH) programme would make getting to Heathrow Airport quicker and easier for millions of travellers across the south of ...Introduction · 3. Connect Communities · 7. Be Deliverable<|control11|><|separator|>
  53. [53]
    Elizabeth line - Transport for London
    Get a map of London's newest rail line. Find an Elizabeth line station for live departures, status information, route maps and timetables.Elizabeth line · Elizabeth line timetables · Elizabeth line performance · Farringdon
  54. [54]
    Elizabeth line hits new record as 'transformational' £20bn railway ...
    May 23, 2025 · The number of journeys on the Elizabeth line has hit a new record of 800,000 a day. Transport for London announced the latest figures as the ...
  55. [55]
    TfL 'wants to double' number of Elizabeth line trains serving ...
    Feb 10, 2025 · Heathrow handled 83.9 million passengers in 2024 – three million more than its previous record that was set in 2019. Mr Lord said: “Clearly ...