Fact-checked by Grok 2 weeks ago

First Great Western Link

First Great Western Link (FGWL) was a train operating company owned by plc that provided passenger rail services in as part of the Thames franchise from 1 April 2004 until 31 March 2006. The company took over operations from the previous franchisee, Thames Trains Limited, following FirstGroup's acquisition of that contract, and focused on local and semi-fast stopping services using non-express . FGWL's network centered on routes from to key destinations in the , including Reading, , and & Eton; the Kennet Valley to Newbury; and the line to and beyond. Additional services extended along the line from Reading to , , and , as well as connections to via the Paddington-Heathrow Express and Connect routes. These operations complemented longer-distance services run by the related First Great Western (FGW) franchise, providing essential commuter and regional with an emphasis on for local passengers. During its tenure, FGWL contributed to a combined annual turnover of approximately £601 million across FirstGroup's western rail operations (including FGW and ) for the 2003/2004 financial year, underscoring its role in a significant portion of the UK's privatized rail network. The franchise emphasized performance metrics such as public performance measure () targets, though specific data from the period highlighted ongoing challenges in the sector, including with bus services in areas like Reading and . In April 2006, FGWL's services were absorbed into the newly consolidated Greater Western , which has been operated by since April 2006, initially under the First Great Western brand and rebranded to Great Western Railway in 2015. The company itself was ultimately dissolved on 28 2020.

Background

Franchise Context

In November 2002, the Strategic Rail Authority (SRA) introduced a revised to address inefficiencies in the fragmented structure of the UK's privatized rail network, which consisted of 25 separate passenger awarded in the mid-1990s. The emphasized consolidation into fewer, larger to achieve operational synergies, better resource utilization, and improved passenger services through enhanced integration at key terminals and routes. Announced on 6 November 2002 during a parliamentary , this approach sought to align franchise boundaries with major flow patterns and reduce administrative overheads, enabling operators to invest more effectively in reliability and capacity upgrades. The Thames franchise exemplified the regional operations ripe for such restructuring under the SRA's framework. Established in 1996, it provided local and regional passenger services across , Southeast (including and ), the (via connections to Northamptonshire borders), Southwest (such as and ), and the West Midlands (extending to ). Centered on as the primary hub, the franchise managed 95 stations and focused on commuter routes to destinations like Reading, , and , alongside slower regional lines supporting connectivity. Operated initially by Thames Trains as a short-term extension amid the SRA's consolidation efforts, the franchise highlighted the challenges of smaller units in delivering consistent performance and funding major enhancements.

Predecessor Operations

Thames Trains, a subsidiary of the Go-Ahead Group, operated the Thames franchise from October 1996 until March 2004, providing commuter and regional passenger services primarily in west London and the Thames Valley region. The operator's route network centered on key lines radiating from London Paddington, including services to Oxford via the Great Western Main Line, Reading and Slough in the Thames Valley, Didcot and Banbury in the Kennet Valley, and connections to the Cotswolds as well as the North Downs line from Reading to Gatwick Airport. These routes emphasized suburban and inter-urban travel, serving densely populated areas with a mix of stopping and semi-fast trains to support daily commuting patterns. During its tenure, Thames Trains faced significant performance challenges, particularly in reliability and punctuality, which contributed to passenger dissatisfaction and regulatory scrutiny. Thames Trains also came under intense criticism following the on 5 October 1999, when a Thames Trains Turbo service passed a signal at danger and collided with an oncoming First Great Western high-speed train near Paddington station, killing 31 people and injuring 417 others. An official inquiry attributed the accident to multiple factors, including inadequate driver training by Thames Trains, leading to the company's prosecution; in April 2004, Thames Trains was fined £2 million at the for breaching health and safety regulations. Strategic Rail Authority (SRA) data for April to October 2001 indicated that only 79.6% of Thames Trains services arrived on time, marking a 9% decline from the previous period and placing it among the lower-performing operators. These issues, including frequent delays attributed to infrastructure constraints, rolling stock reliability, and operational inefficiencies, prompted the SRA to opt for a short-term two-year extension of the franchise in late 2003 rather than a full renewal, allowing time for strategic consolidation of rail services. The extension was awarded to following competitive bidding, with Thames Trains continuing operations until the handover on 1 April 2004. Upon the franchise's conclusion, Thames Trains transferred its entire fleet to the incoming operator, First Great Western Link, comprising 36 two-car Class 165 Turbo units and 21 three-car Class 166 Turbo Express units, totaling 57 diesel multiple units dedicated to non-electrified routes. This handover ensured continuity of services without disruption, as the inherited was well-suited to the Thames Valley's diesel-dependent . The SRA's broader plan influenced the transition, aiming to integrate the Thames operations with adjacent franchises for improved efficiency.

Formation and History

Award and Launch

In November 2003, the Strategic Rail Authority (SRA) selected as the preferred bidder for a two-year extension of the Thames Trains franchise following a competitive bidding process against . The award aimed to integrate the Thames services with 's existing Great Western operations for improved efficiency. First Great Western Link (FGWL), a wholly owned by , officially commenced operations on 1 April 2004, directly succeeding Thames Trains and taking over its suburban and regional services around London Paddington. This short-term served as a bridge until a larger reorganization of western rail services, with FGWL inheriting the predecessor's fleet of 33 diesel multiple units (Class 165 and 166 Turbo). For its initial rollout, FGWL retained the distinctive white, blue, and green livery of Thames Trains on its , supplemented only by added First Great Western Link logos and branding to signify the ownership transition without a full repaint. This approach minimized disruption during the handover and aligned with FirstGroup's strategy for gradual integration across its rail portfolio.

Key Developments

One of the initial key developments for First Great Western Link (FGWL) occurred in December 2004, when services to were transferred to as part of franchise adjustments following the integration of the former Thames Trains operations. This shift allowed FGWL to streamline its network focus on core routes while enabling to extend its operations northward. Concurrently, FGWL introduced Class 180 Adelante diesel multiple units on the starting with the December 2004 timetable change, deploying five five-car sets to replace shorter Turbo units and provide enhanced capacity for growing passenger demand on services from London Paddington to , , and . These 125 mph capable trains, leased from sister company First Great Western, offered increased seating for up to 245 passengers per unit, improving reliability and comfort on the scenic but capacity-constrained route. A significant expansion came on 12 June 2005 with the launch of the service, a joint venture between FGWL and BAA (now ) aimed at providing affordable rail access to . This stopping service operated between London Paddington and Heathrow Central (later Terminal 4 and Terminals 2 & 3), calling at intermediate stations including Ealing Broadway, , , and Hayes & Harlington, with journeys taking approximately 25-30 minutes at a lower fare than the non-stop . FGWL utilized Class 360/2 Desiro electric multiple units supplied by BAA, which were adapted for the service with on-board staff and integrated ticketing, running every 30 minutes from early morning to late evening. Throughout its operations, FGWL maintained its fleet primarily at Reading Traction Maintenance Depot, ensuring efficient servicing for Thames Valley diesel and electric units. These developments collectively enhanced service quality, capacity, and connectivity during FGWL's tenure, setting the stage for further integrations within the Greater Western franchise.

Operations

Route Network and Services

First Great Western Link (FGWL) operated a focused network of suburban and services centered on the , providing essential commuter and local connectivity from London Paddington along the and its branches. The core of the network comprised stopping and semi-fast services from Paddington to Didcot Parkway, with onward extensions to , serving key Thames Valley destinations and supporting daily travel patterns for business and leisure passengers. These routes emphasized accessibility to intermediate stations, integrating with broader Great Western services for seamless journeys westward. Branch lines extended the network's reach, offering vital links to surrounding areas. Services operated to via the Greenford branch, providing direct access for commuters; to and Eton Central via ; to Marlow from ; to from Twyford; and to Bedwyn from Reading along the Berks and Hants line. These branches typically featured hourly or bi-hourly frequencies, catering to local demand while connecting to main line flows at hubs like Reading and . Beyond the main line core, FGWL managed additional routes including the Reading to line, which facilitated cross-regional travel in and , and North Downs services from Reading to via and Redhill, enhancing airport access for passengers. Service patterns were designed for high-frequency commuter reliability, with four trains per hour from to Reading during peak periods, incorporating all-stops patterns to maximize station coverage. Half-hourly services ran to destinations like , while branch lines maintained hourly operations to ensure consistent integration with the London Underground at Paddington and the London Overground at stations such as Ealing Broadway and . The overall network served numerous stations, underscoring its role in supporting dense suburban flows across the and . Most services utilized Class 165 and 166 Turbo diesel multiple units for efficient short-haul operations.

Rolling Stock

First Great Western Link inherited a fleet of 57 multiple units from its predecessor, Thames Trains, upon commencing operations in April 2004. This consisted of 36 two-car Class 165 Turbo units, constructed by between 1990 and 1992, and 21 three-car Class 166 Turbo Express units, built by ABB Transportation between 1992 and 1993. These units were primarily allocated for suburban and regional services in the area. In December 2004, the franchise received an additional allocation of five 5-car Class 180 Adelante diesel multiple units, specifically for enhancing capacity on the . These units, built by between 2001 and 2002, were transferred from to support longer-distance operations. By June 2005, First Great Western Link began operating four five-car Class 360/2 Desiro electric multiple units on services between and , though these were provided and staffed by BAA rather than forming part of the core leased fleet. The inherited Turbo units retained the blue and white livery originally applied under Thames Trains, with modifications limited to the addition of First Great Western Link branding such as logos and route indicators, ensuring visual continuity while distinguishing the operator. No major structural adaptations were undertaken during the franchise's short lifespan, with the fleet maintained primarily at Reading Traction Maintenance Depot. This resulted in a total operational fleet size of 62 units under First Great Western Link control.

Infrastructure

Depots and Maintenance

First Great Western Link's primary depot was Reading Traction Maintenance Depot (TMD), located adjacent to Reading station in , , which served as the central facility for all fleet stabling, servicing, and heavy maintenance needs during the operator's tenure. The depot, with the TOPS code RG, was equipped to handle the diesel multiple units forming FGWL's fleet, including provisions for fuelling, interior and exterior cleaning, and minor repairs such as component replacements and fault rectification. Given the franchise's limited two-year duration from April 2004 to March 2006, no major overhauls or structural modifications to the were undertaken at the site, with such work typically outsourced or deferred under the short-term agreement. Operationally, Reading TMD played a key role in supporting daily inspections, safety checks, and rapid turnaround times for trains on Thames Valley routes, ensuring high availability for commuter and regional services originating or terminating in the area. First Great Western Link (FGWL) entered into a collaborative arrangement with Heathrow Express, operated by BAA, to introduce the Heathrow Connect stopping service between London Paddington and Heathrow Airport in June 2005. This project involved FGWL operating semi-fast trains on the dedicated Heathrow rail link infrastructure, sharing tracks originally developed for the non-stop Heathrow Express services while adding intermediate stops at stations such as Ealing Broadway and Hayes & Harlington to serve local passengers. The initiative enhanced connectivity to the airport for suburban commuters, with FGWL handling day-to-day operations in conjunction with Heathrow Express under a section 18 track access agreement approved by the Office of Rail Regulation (ORR). As part of the project, platform upgrades were implemented at Heathrow Central and Heathrow Terminals 2 & 3 stations to accommodate the stopping services and improve passenger flow, including better signage and access provisions funded through the joint partnership. The service employed Class 360 Desiro electric multiple units (EMUs), introduced specifically for these routes to provide reliable, high-frequency operations on the electrified line. However, the franchise's brief duration—from April 2004 to March 2006—limited opportunities for further expansions, such as additional EMU fleet introductions beyond the initial Heathrow Connect allocations, as resources were prioritized for the impending merger into the larger Greater Western franchise.

Demise and Legacy

Merger Announcement

In December 2005, the Department for Transport (DfT), which had assumed the franchising responsibilities from the Strategic Rail Authority (SRA), officially awarded the consolidated Greater Western franchise to FirstGroup plc, effective from 1 April 2006. This decision effectively ended the separate operation of First Great Western Link (FGWL), whose two-year extension of the former Thames Trains franchise was scheduled to conclude on 31 March 2006. The award incorporated FGWL's services into the new structure without a competitive tender process for the extension period, reflecting its transitional, short-term role in bridging to the consolidated franchise. The merger announcement stemmed from the SRA's broader strategic initiative outlined in to consolidate fragmented rail s across the network. This plan sought to enhance operational efficiency by reducing the number of independent operators serving key hubs like London Paddington, thereby minimizing coordination challenges and improving overall service integration. Specifically for the Greater Western area, the consolidation merged the existing First Great Western, FGWL (encompassing routes), and operations into a unified to address fragmentation and streamline management. The DfT's selection of followed a competitive process involving multiple operators, with the company committing to significant investments in and services over the initial 10-year term. FGWL's operational during its tenure, including handling increased passenger volumes on lines, contributed to FirstGroup's strong position as the incumbent bidder. This announcement marked a pivotal step in rationalizing the UK's privatized rail landscape, aligning with the SRA's long-term goals for sustainability and improvement.

Post-Merger Integration

The merger of First Great Western Link (FGWL) into the Greater Western franchise took effect on 1 April 2006, unifying it with First Great Western's services and to form a single operator under FirstGroup's management. This expansion broadened the franchise's scope to cover long-distance routes from London Paddington to the , , and the commuter network. As part of the , the distinct FGWL identity—characterized by its blue, white, and green —was fully discontinued, with all assets and services adopting the unified First Great Western branding to streamline operations and passenger recognition across the network. Fleet integration involved the seamless transfer of FGWL's entire , comprising 58 diesel multiple units (37 Class 165 Turbo and 21 Class 166 Turbo sets), to the Greater Western franchise, enabling continued deployment on and local services without withdrawal or replacement at the time of . Staff from FGWL were incorporated via standard rail franchise transfer schemes, preserving employment continuity and operational expertise within the enlarged workforce of approximately 5,000 personnel serving the combined routes. This process ensured minimal interruption to daily services during the operational . The post-merger period marked long-term enhancements in the Greater Western network, including significant improvements in service reliability; public performance metrics rose from 82% in 2006 to over 88% by 2013, reflecting investments in maintenance and timetable optimization. The transition itself proceeded without major disruptions, maintaining service continuity, including the shuttle, which persisted as a under the successor operator until its eventual absorption into in 2018. These outcomes contributed to greater operational efficiency and passenger satisfaction in the region, setting the stage for subsequent infrastructure upgrades.

References

  1. [1]
    [PDF] Anticipated acquisition by Firstgroup Plc of the Thames Trains ...
    First operates bus services in two of the areas served by the Thames franchise – the. Herefordshire/Worcestershire area and the Reading area. Passengers' choice ...
  2. [2]
    [PDF] Anticipated acquisition by FirstGroup PLC of the Greater Western ...
    Oct 19, 2005 · Greater Western Rail Franchise (GWF) will consolidate the existing operations of the. First Great Western (FGW), First Great Western Link (FGWL) ...
  3. [3]
    first great western link limited - Companies House
    FIRST GREAT WESTERN LINK LIMITED - Free company information from Companies House including registered office address, filing history, accounts, ...
  4. [4]
    Rail Franchising - Hansard - UK Parliament
    Nov 6, 2002 · ... Rail Franchising' on Wednesday 6 November 2002 ... The Strategic Rail Authority has announced today a new approach to franchising.Missing: consolidation plan
  5. [5]
    [PDF] Railways: Strategic Rail Authority, 1998-2005 - UK Parliament
    Mar 31, 2010 · Private sector operators would provide all passenger services either acting as franchisees or as independent train operators. Government subsidy ...
  6. [6]
    UK | England | Train franchise bidders announced - BBC NEWS
    Dec 22, 2003 · The Thames Trains franchise covers commuter routes through the Thames Valley into London Paddington station and services between Stratford-upon- ...
  7. [7]
    UK | Rail services worsening - BBC News
    Figures from the Strategic Rail Authority (SRA) for April-October 2001 showed the train companies had to pay poor performance ... SRA ... Thames Trains: 79.6% (-9%) ...
  8. [8]
    Thames loses franchise | UK news | The Guardian
    An SRA spokesman said the decision was based on "performance, capacity and value" and was not connected to safety. He said: "We were persuaded of the benefits ...Missing: issues | Show results with:issues
  9. [9]
    UK | England | Rail franchise out to tender - BBC News
    Apr 10, 2003 · At the end of the two years, the Thames Train and Great Western franchises will be merged to make more efficient use of congested tracks running ...
  10. [10]
    [PDF] Rail Accident Report - GOV.UK
    72 All three incidents involved class 165 and/or 166 diesel multiple units. ... recorded for the former Wessex Trains and Thames Trains franchises. However ...
  11. [11]
    Final Results - Investegate | Company Announcement
    First Great Eastern and Anglia were exited at the start of the year and First Great Western Link commenced on 1 April 2004. Subsequently we lost the First ...
  12. [12]
    Class 165 - Martin Loader's Railway Photography
    In Thames Trains livery with First branding, 165102 passes the south end of Hinksey Yard with the 13:00 Oxford to Paddington First Great Western Link service on ...
  13. [13]
    £70,000 rail link study under way | Oxford Mail
    May 18, 2012 · ... Stratford-upon-Avon, by rebuilding a route between the ... December 2004, when the London-Stratford service was transferred to Chiltern Railways.
  14. [14]
    [PDF] Great Western Specification Consultation - GOV.UK
    Western, First Great Western Link and Wessex Trains franchises). 3.6. FGW ... 5 x 5-car Class 180 intercity diesel units on London to Oxford and. London ...
  15. [15]
    ROUK buys Heathrow Connect Class 360 EMUs - Railway Gazette
    Feb 23, 2021 · ... Heathrow Connect stopping services between Heathrow Airport and London Paddington station. The service was launched in 2005 and ended in May ...
  16. [16]
    Heathrow ... at a price | Travel - The Guardian
    Jun 12, 2005 · The 25-minute Heathrow Connect will call at west London stations Ealing Broadway, West Ealing, Hanwell, Southall and Hayes-and-Harlington ...
  17. [17]
  18. [18]
    British Rail Class 165 - Wikipedia
    Thames Valley​​ In April 2004, operation of the Thames Trains franchise passed to First Great Western Link. In 2004, due to deliveries of new Class 180 Adelante ...
  19. [19]
    British Rail Class 166 - Wikipedia
    The Class 166s are still in service today, solely operated by Great Western Railway. Until 2017, they operated only on express and local services in the Thames ...
  20. [20]
    Heathrow Connect - Wikipedia
    Heathrow Connect was a train service in London provided jointly by Heathrow Express and Great Western Railway (GWR), between Paddington station and Heathrow ...
  21. [21]
    First Great Western - Railways in Worcestershire
    The Thames Trains logos were removed and replaced. First Great Western Link Publicity First Great Wester Link Publicity. A blaze of meaningless slogans about ...
  22. [22]
    Two character TOPS depot codes
    First Greater Western from 1 April 2006 to 9 September 2013 First Great Western Link ... Arlington Fleet Services from 14 May 2020, closed 31 March 2006 ...
  23. [23]
    [PDF] Report of the Office of Rail Regulation - ORR
    service which it plans to operate in conjunction with First Great Western Link. Limited. Following the publication of the model passenger track access ...<|control11|><|separator|>
  24. [24]
    [DOC] Great Western Franchise Replacement Consultation - GOV.UK
    ... First Great Western Link and Wessex Trains franchises). Table 3.1 Routes and service groups. Routes. Service groups. InterCity Great Western Main Line (GWML).<|control11|><|separator|>
  25. [25]
    Business | FirstGroup wins rail franchises - BBC NEWS
    Dec 13, 2005 · UK rail and bus operator FirstGroup has been awarded the newly-created Greater Western and Thameslink-Great Northern rail franchises.
  26. [26]
    [PDF] CC clears FirstGroup acquisition of Greater Western passenger rail ...
    Mar 8, 2006 · The Department for Transport awarded the franchise to. FirstGroup on 13 December 2005. 4. The GWF inquiry group consisted of five members: Diana ...Missing: First Link announcement SRA
  27. [27]
    UK railway franchises and open access operators
    Franchises ; Thameslink · British Rail Network SouthEast · 2 March 1997 to 1 April 2004 (original franchise) 2 April 2004 to 31 March 2006 (franchise extension).
  28. [28]
    ES181202-08an1
    ### Summary of SRA's 2002 Announcement on Franchise Consolidation for Greater Western
  29. [29]
    [PDF] Competitive Tendering of Rail Services - International Transport Forum
    Strategic Rail Authority 2002, Franchising policy statement, November. Page ... Strategic Rail Authority 2003, The strategic plan. Platform for success ...
  30. [30]
    National Express Group plc / Greater Western Passenger Rail ...
    Sep 29, 2005 · Greater Western Rail Franchise (GWF) will consolidate the existing operations of the First Great Western (FGW), First Great Western Link ...
  31. [31]
    [PDF] Railways: Great Western franchise, 2006 - UK Parliament
    Apr 7, 2010 · Great Western, First Great Western Link and Wessex Trains. A map of ... The new franchisee will be required to participate fully in the Community ...
  32. [32]
    Great Western Railway (GWR), UK | Organisations - Railway Gazette
    The current Great Western franchise was formed in April 2006 with the combining of the previous First Great Western, First Great Western Link and Wessex Trains ...<|control11|><|separator|>
  33. [33]
    [PDF] Strategic Rail Authority Annual Report 2006 HC 1235 - GOV.UK
    Feb 1, 2001 · Cardiff Railway. Central Trains. Chiltern Railways. Connex South Eastern. First Great Eastern. First Great Western. First Great Western Link.
  34. [34]
    New FGW franchise to build on improvements
    Dec 4, 2013 · First Group started its 2006 Great Western franchise with a promise of a £14 million investment to transform stations across the network of 210.