Fact-checked by Grok 2 weeks ago

Office of Rail and Road

The Office of Rail and Road (ORR) is a non-ministerial department of the government that serves as the independent economic and safety regulator for Britain's railways while also monitoring performance and efficiency on England's strategic road network. Established through the Railways and Transport Safety Act 2003, which created the Office of Rail Regulation effective in 2004 to oversee rail infrastructure and operations following the sector's , the ORR expanded in 2015 under the Infrastructure Act to incorporate road responsibilities from the . In its rail role, the ORR enforces health and safety standards across mainline ways, the London Underground, , trams, and heritage lines; it regulates Network Rail's stewardship of infrastructure, sets access charges, issues operator licenses, and promotes fair access and competition to enhance passenger and freight services. For roads, it assesses ' delivery against efficiency targets, including data and technology utilization, to ensure taxpayer value on the strategic network comprising motorways and major A-roads. The organization conducts periodic reviews of safety performance, infrastructure management, and market studies, such as on signaling systems, to drive improvements amid ongoing challenges like post-privatization growth in usage and safety enhancements traceable to regulatory oversight since the . Key defining characteristics include its statutory from ministerial direction on regulatory decisions, enabling decisions based on evidence like cost-benefit analyses for enhancements, though it has faced scrutiny over balancing investment incentives with fiscal constraints in periodic reviews of Network Rail's . Achievements encompass sustained reductions in rail accident rates through enforced protocols and advocacy for and compensation schemes benefiting users, while road monitoring has highlighted efficiencies in digital adoption. No major systemic controversies dominate its record, with operations grounded in empirical assessments rather than ideological impositions, reflecting a focus on causal factors like operational efficiencies over narrative-driven policies.

History

Establishment as Rail Regulator

The Office of Rail Regulation (ORR) was established on 5 July 2004 as a non-ministerial under the Railways and Transport Safety Act 2003, which abolished the independent office of the Rail Regulator previously created by section 1 of the Railways Act 1993. The Rail Regulator, a statutory position effective from 1 December 1993, had overseen economic aspects of the privatized , including issuing operator licences, regulating track access agreements, and promoting among freight and passenger services. This transition to ORR as a corporate body aimed to provide greater institutional stability and capacity for handling the complexities of privatization, which had fragmented the industry into separate infrastructure managers, train operators, and companies since the mid-1990s. At inception, ORR's core mandate focused on economic , enforcing the duties of (the infrastructure owner) to maintain and develop the network efficiently, while approving charges for track access and resolving disputes between operators. It inherited powers to impose penalties for non-compliance, capped at 10% of a licensee's turnover, and to conduct market investigations under concurrent jurisdiction with the . This framework built on the Rail Regulator's role but expanded oversight to include periodic reviews of 's funding and performance targets, typically every five years, to align incentives with objectives like affordability and reliability. The Railways Act 2005 further consolidated ORR's authority by transferring rail safety regulation from the Health and Safety Executive's HM Railway Inspectorate to ORR, effective 1 April 2006, thereby establishing it as an integrated for both economic and matters. This merger addressed prior fragmentation where economic and functions operated separately, enabling unified enforcement of standards across operations, , and , though economic regulation remained distinct from 's emphasis on accident prevention and compliance with European directives. By 2006, ORR employed around 100 staff, primarily focused on monitoring compliance and issuing guidance to support industry investment exceeding £20 billion in the subsequent control period.

Expansion and Mergers

In April 2006, the Office of Rail Regulation (ORR) expanded its remit by assuming responsibility for rail safety policy and integrating the functions of Her Majesty's Railway Inspectorate (HMRI), which had previously operated under the . This transfer, effective from 1 April 2006, consolidated economic regulation, safety oversight, and standards enforcement within a single independent body, aiming to streamline accountability and enhance coordination in railway safety management without creating a new entity. The integration aligned with broader reforms under the Railways and Transport Safety Act 2003 and subsequent regulations, such as the Railways (Safety Management) Regulations, which emphasized risk-based safety verification over traditional prescriptive inspections. A significant further expansion occurred on 1 April 2015, when the ORR was renamed the Office of Rail and Road (also retaining the ORR acronym) and acquired statutory powers to monitor the performance and efficiency of Highways England (subsequently rebranded ) under the Infrastructure Act 2015. This role, designated as the Highways Monitor, involved assessing compliance with the government's Road Investment Strategy, including metrics on , project delivery, and efficiency, but did not extend to direct operational control or economic of roads. The change reflected a policy intent to leverage ORR's expertise in infrastructure —derived from its rail oversight—across strategic highways, comprising England's motorways and major A-roads, without merging organizational structures but rather extending the body's statutory duties. No formal merger of distinct agencies occurred; instead, the integrated new functions into ORR's existing framework, supported by a with the . These developments marked the primary instances of functional expansion for the organization, driven by legislative mandates rather than voluntary consolidations, with no subsequent mergers or significant remit changes reported as of 2025. The and shifts enhanced ORR's dual-sector oversight but maintained its non-ministerial status, ensuring operational from both the and regulated entities.

Key Legislative Changes and Recent Developments

The Office of Rail Regulation was established under the Railways Act 2005, which consolidated and formalized the economic and safety regulatory functions previously exercised by the independent Rail Regulator since the of under the Railways Act 1993. This legislation empowered the ORR to set track access charges, enforce competition, and oversee safety across the rail network, replacing ad hoc regulatory arrangements with a statutory non-ministerial structure. A significant expansion occurred with the Infrastructure Act 2015, which assigned the ORR the independent monitoring role for Highways England (rebranded as in 2021), including assessments of efficiency, financial performance, and delivery against strategic objectives like environmental commitments. Section 12 of the Act mandated the ORR to report annually to on National Highways' compliance, enforce performance standards through incentives or penalties, and advise the Secretary of State on funding needs, thereby integrating road infrastructure oversight without altering core rail duties. This dual remit prompted the organization's rebranding to the Office of Rail and Road effective April 1, 2015. Ongoing rail sector reforms, outlined in the Williams-Shapps Plan for Rail and subsequent legislative proposals, propose recalibrating the ORR's powers in light of the planned (GBR) entity, which would centralize infrastructure management, track access, and train operations. Key changes include transferring ORR's authority over access approvals and standard terms for GBR-managed infrastructure to GBR itself, while preserving ORR's independent economic regulation for open-access freight and passenger operators, enforcement, and periodic reviews of charges. The ORR would gain a new mandate to scrutinize GBR's business plans for , , and deliverability, with powers retained for breaches related to network access, competition, and , though fines for general licence non-compliance would be eliminated. As of March 2025, the government launched consultations on the Rail Reform Bill to enact these shifts, incorporating fare simplification, a new passenger , and statutory duties for long-term planning, amid delays from prior iterations under the (Creeping Incrementalism) Bill framework. In September 2025, the ORR announced internal adjustments to service standards, including faster infrastructure authorization processes effective January 2026, to align with reform-driven efficiencies without awaiting full . An independent review of the ORR's , commissioned October 21, 2025, aims to evaluate its capacity for sector transformation and organizational adaptation under these evolving mandates.

Organizational Structure and Governance

Leadership and Management

The Office of Rail and Road (ORR) is governed by a board responsible for setting , overseeing delivery of regulatory functions in , economic , and competition, and ensuring accountability to stakeholders including rail and road users. The board meets approximately ten times per year, with minutes published as a corporate record, and maintains an annual review of members' register of interests to manage conflicts. It operates four standing advisory committees to support decision-making on , , and other matters, as outlined in its rules of procedure. The Chair and non-executive members are appointed by the Secretary of State for Transport for fixed terms of up to five years, providing independent oversight without executive responsibilities. Declan Collier has served as Chair since 1 January 2019, following his appointment on 19 November 2018, and was reappointed in August 2023 for a further five-year term; his background includes prior CEO roles at and Authority, alongside non-executive positions in aviation. Current non-executive members include Xavier Brice (appointed 17 January 2022), with experience as CEO of and at ; Madeleine Hallward (appointed 13 April 2020, reappointed to 2030), specializing in strategic communications from roles at ; Anne Heal (reappointed to 2026), with telecommunications expertise from and ; Dr. Daniel Ruiz (appointed 17 January 2022), former CEO of Zenzic UK Ltd. and chair of the Audit and Risk Committee; Catherine Waller (appointed 17 January 2022), with retail and consultancy background; and Ian Dobbs (appointed 2 December 2024), bringing 47 years in including CEO positions at and . An independent member, Nick Bateson (appointed 1 October 2021), supports the Audit and Risk Committee with his accounting and government finance experience from The Health Foundation. Executive leadership is headed by Chief Executive John Larkinson, an executive board member since March 2017 and confirmed in the role in March 2021 after serving as interim since October 2018; he oversees ORR's operations, accountability for , and protection of user interests, drawing on over 20 years in rail including prior ORR roles and the Strategic Rail Authority. The executive team reports to Larkinson and includes Richard Hines as HM of Railways and of Railway Safety (appointed 27 June 2024), leading safety risk management after joining ORR in 2020 as Deputy Chief Inspector; Liz Herridge as , handling corporate efficiency; Liz Thornhill as , providing legal support; Stephanie Tobyn as of Strategy, Policy and Reform, focusing on rail access and passenger protection; Feras Alshaker as of Planning and Performance, monitoring and ; Will Godfrey as of Economics, and Markets, leading financial reviews; Russell Grossman as ; and Graham Richards as Director of TfL Analysis. This structure ensures separation between strategic governance by the board and operational management, with the Chief Executive accountable to the board for performance.

Board and Decision-Making Processes

The Office of Rail and Road (ORR) is governed by a statutory board comprising and non-executive directors, appointed by the Secretary of State for Transport for terms of up to five years, renewable subject to performance and eligibility criteria. As of March 2024, the board consisted of eight non-executive directors, including the , and two directors, providing a balance of strategic oversight and operational expertise. The board holds collective responsibility for setting ORR's strategy, overseeing performance against statutory duties in economic regulation, safety, and highways monitoring, and ensuring compliance with principles of good and regulation. Decision-making occurs primarily through board meetings, scheduled approximately 11 times annually, with provisions for additional sessions as needed. A requires at least five members, including three non-executives, and decisions aim for but may proceed by majority vote, with the Chair holding a in ties. Matters reserved for the board, such as strategic approvals, major policy changes, and financial frameworks, cannot be delegated, while operational decisions are delegated to the or staff, subject to oversight. In 2023-24, the board convened 13 times, addressing key areas like , regulatory periodic reviews, and . Conflicts of interest are managed through a and mandatory disclosures, ensuring impartiality in deliberations. The board is supported by four standing committees that advise on specialized functions and enhance decision quality: the Audit and Risk Committee, which scrutinizes governance, controls, and assurance; the Health and Safety Regulation Committee, focusing on safety strategy and enforcement; the Highways Committee, providing input on road network monitoring per inter-agency agreements; and the People Committee, handling , nominations, and workforce strategy. Each committee, chaired by non-executives and including a mix of board members and independents where appropriate, meets four to six times yearly and reports recommendations to the board or executive, without independent decision authority. This structure facilitates delegated scrutiny while maintaining board accountability for final outcomes, aligned with the Railways and Transport Safety Act 2003.

Regulatory Functions

Economic Regulation of Railways

The Office of Rail and Road (ORR) serves as the economic regulator for Britain's railways, with primary responsibility for overseeing , the monopoly owner and operator of the infrastructure, as well as networks such as (HS1). Under section 4 of the Railways Act 1993, ORR's statutory economic duties encompass promoting improvements in the performance of railway services, safeguarding the interests of users in respect of services, fares, and quality, and enabling the provision of efficient and economic railway services. These duties also require ORR to facilitate competition in the provision of railway services for the benefit of users, encourage the use of the railway network for passenger and freight transport where economically viable, and contribute to an integrated transport system while considering environmental impacts and guidance from relevant ministers. A central tool of ORR's economic regulation is the periodic review process, undertaken every five years to establish the outputs Network Rail must achieve and the funding it receives through track access charges during the ensuing control period. This process evaluates Network Rail's strategic business plans, assesses efficiency potentials, and sets binding targets for , renewals, and enhancements to deliver value for money to users and taxpayers. For Control Period 7 (1 April to 31 March 2029), the Periodic Review 2023 (PR23) final determination, published on 31 October 2023, specified expenditure allowances of approximately £22.3 billion in constant prices, alongside efficiency savings targets and performance incentives tied to reliability and metrics. ORR similarly applies periodic reviews to HS1, with the Periodic Review 2024 (PR24) draft determination issued in September covering funding from 1 April 2025 to 31 March 2030. ORR regulates access to the rail network by approving and enforcing track access agreements between infrastructure managers and train operators, ensuring charges are cost-reflective, non-discriminatory, and conducive to . It issues operator licenses, monitors compliance with license conditions including financial health and efficiency benchmarks, and investigates potential breaches of Network Rail's network license, which mandates sustainable of assets. To foster entry and , ORR promotes third-party schemes for capacity enhancements and freight paths, streamlining approval processes; updated guidance on this was released on 24 October 2025 to accelerate private investment. Through ongoing monitoring, ORR tracks Network Rail's operational efficiency, such as unit costs for maintenance and renewals, and intervenes where inefficiencies persist, as evidenced by efficiency adjustments in PR23 that required £1.8 billion in savings over the control period. This regulatory framework aims to balance investment needs with fiscal restraint, protecting freight and passenger operators from monopolistic pricing while incentivizing long-term resilience.

Safety Regulation Across Rail Sectors

The Office of Rail and Road (ORR) holds statutory responsibility for regulating health and safety across Britain's mainline railway network, , systems, tramways, and railways. This encompasses oversight of operators, infrastructure managers, and related entities to mitigate risks to passengers, workforce, and the public, with approximately 6,000 level crossings on the mainline network managed by and around 1,500 additional crossings overseen by heritage operators. Core to ORR's framework is the Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS), which transposes the Railway Safety Directive (2004/49/EC) into law and mandates that duty holders implement a (SMS) for identifying, assessing, and controlling risks. Operators must secure safety certificates or authorisations from ORR prior to commencing or altering operations, with ROGS applying uniformly to mainline, metro (including ), light rail, trams, and heritage sectors, subject to limited exclusions for certain low-risk heritage operations. Complementary enforcement draws from the Health and Safety at Work etc. Act 1974, enabling ORR to investigate breaches, issue improvement or prohibition notices, and impose penalties. ORR evaluates compliance through proactive inspections, incident investigations, and the (RM3), a five-level assessment tool measuring maturity in policy, risk control, monitoring, and communication across all regulated sectors. For mainline and railways, this includes scrutiny of safety; light and trams face targeted reviews of urban interface risks; while London Underground oversight emphasizes high-volume passenger flow hazards. Performance is quantified via metrics like the Fatalities and Weighted Injuries (FWI) index for actual harm and the Rail Safety and Standards Board's (RSSB) Safety Risk Model (SRM) and Precursor Indicator Model (PIM) for predictive risk modeling, with data aggregated from sources including Network Rail's Safety, Health, Environment and Performance (SHEP) reports and the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR). Enforcement actions underscore sector-wide accountability, such as the £3.41 million fine imposed on in 2023 for health and safety breaches under the 1974 Act following a fatal incident, alongside ongoing audits to ensure cost-effective risk reduction without undue regulatory burden. Recent annual assessments (covering April 2024 to March 2025) highlight stable or declining precursor risks in mainline operations via PIM dashboards, though heritage and sectors show variable maturity levels under RM3, prompting tailored interventions like enhanced guidance on implementation. ORR's approach prioritizes evidence-based , integrating economic regulation insights to balance safety imperatives with across diverse rail environments.

Monitoring of National Highways

The Office of Rail and Road (ORR) assumed responsibility for monitoring ' management of England's strategic road network—the motorways and major 'A' roads—in April 2015, as part of a broader government initiative to enhance oversight of road infrastructure performance and efficiency. This role focuses on economic and operational aspects rather than safety regulation, which remains under separate Highways England (now ) and (DfT) frameworks. ORR's monitoring ensures delivers value for money, meets efficiency targets, and adheres to investment plans outlined in the Road Investment Strategy (RIS). Under the second Road Period (RP2, covering 2020 to 2025), ORR tracks ' progress against specific performance metrics, including delivery of the Smart Motorways Action Plan, which addresses safety and reliability concerns on all-lane running motorways following incidents and public scrutiny. In its annual assessments, ORR evaluates factors such as capital delivery, , and , reporting that achieved significant improvements in road user outcomes during RP2, including enhanced journey time reliability and reduced disruption from . Enforcement powers allow ORR to impose penalties or require remedial actions if targets are missed, with informed by data submissions, audits, and stakeholder input from bodies like Transport Focus. A notable development occurred in February 2024, when ORR initiated a formal investigation into ' overall performance, capability, and delivery mechanisms, prompted by concerns over slippage in RP2 commitments and governance issues. The probe concluded with findings of systemic shortcomings, leading to publish an improvement plan in September 2024, which ORR continues to oversee through enhanced routine monitoring and quarterly updates. This includes scrutiny of efficiency evidence for the upcoming Road Investment Strategy 2 (RIS2, post-2025), where ORR verifies cost benchmarks and productivity gains to inform DfT funding decisions. ORR's highways monitoring also extends to promoting and , such as assessing progress on environmental targets within RIS periods, though critiques from observers note that ORR's influence is advisory compared to its binding rail regulatory powers, relying on DfT for ultimate enforcement. reports, published via ORR's portal, provide transparent metrics like percentage of network meeting standards—e.g., over 95% availability targets in RP2—and enable without direct operational .

Oversight of Network Rail

The Office of Rail and Road (ORR) oversees , the public sector body responsible for owning and operating most of Great Britain's railway infrastructure—including approximately 20,000 miles of track, 30,000 bridges and tunnels, and over 2,500 stations—to ensure efficient, reliable stewardship serving train operators, passengers, freight users, and taxpayers. This regulatory role emphasizes long-term network performance, fair access for operators, and alignment of investments with public needs, enforced through licence conditions, periodic funding determinations, and ongoing monitoring rather than day-to-day management. Network Rail operates under a network licence granted by the Secretary of State for Transport pursuant to the Railways Act 1993, which ORR enforces to uphold obligations such as infrastructure maintenance, enhancements, stakeholder consultation, and adequacy across defined geographical areas (including a dedicated route) and the national System Operator function. Key conditions prohibit cross-subsidization between activities, restrict non-rail ventures, and mandate ORR consent for land disposals that could affect network operations; the licence, updated on 17 2024, also requires periodic compliance returns and adherence to a "managing change" policy for modifications during Control Period 7. Through quinquennial periodic reviews, ORR establishes binding outputs—like targets, enhancements, and capacity projects—alongside funding caps and efficiency benchmarks to incentivize cost-effective delivery without excessive reliance on public . The most recent, Periodic Review 2023 (PR23), determined parameters for Control Period 7 (1 April 2024 to 31 March 2029), approving Network Rail's strategic with £43.1 billion in funding focused on against weather disruptions, , and freight growth, following assessments of costings, risks, and alternatives submitted in early 2023. ORR monitors adherence via quarterly and annual reports on key performance indicators, regional route metrics, and system-wide planning, intervening early on deviations such as underspending or delays through formal undertakings or escalated . Breaches of licence terms or output commitments trigger powers including mandatory referrals to reporters, enforcement orders, or penalties, as outlined in ORR's holding-to-account policy tailored for CP7, which prioritizes resolution over litigation where feasible.

Oversight of High Speed 1

The Office of Rail and Road (ORR) acts as the economic and safety regulator for High Speed 1 (HS1), the 108-kilometer high-speed rail network linking London St Pancras International to the Channel Tunnel, managed and operated by HS1 Ltd under a 30-year concession agreement commencing in 2010. ORR's oversight ensures efficient infrastructure maintenance, development to high standards, and compliance with health and safety obligations, while promoting competitive access for passenger and freight train operators. In economic regulation, ORR approves track access contracts, sets frameworks for charges, and conducts periodic reviews—such as the 2014 review (PR14)—to balance investment needs with affordability for users; an interim review in January 2025 directed HS1 Ltd to further reduce access charges by up to 5% for passenger services and additional amounts for freight, aiming to support post-pandemic recovery and shift from road. ORR enforces these through monitoring powers, including annual performance assessments that track metrics like train punctuality (public performance measure, or ), traffic volumes, and ; the July 30, 2025, assessment reported a rise in PPM to over 90% from prior years alongside increased freight and passenger volumes, but identified persistent shortfalls in lift and escalator reliability at stations, mandating remedial plans. Safety oversight encompasses holding HS1 Ltd accountable for risk management, incident prevention, and compliance with railway safety laws, with ORR empowered to investigate breaches and impose enforcement notices; this aligns with broader duties under the Railways and Transport Safety Act 2003, integrating HS1 into the UK's rail safety regime without separate franchising. In July 2023, ORR's review criticized delays in asset renewal programs, prompting accelerated corrective measures to mitigate risks to service reliability and user safety. These activities underscore ORR's dual mandate to foster efficiency and protect public interest, with concessions reverting assets to government control post-2040 unless extended.

Promotion of Access and Competition

The Office of Rail and Road (ORR) facilitates access to railway infrastructure by approving track access agreements between train operators and infrastructure managers like Network Rail, ensuring terms are fair, reasonable, and non-discriminatory to support the efficient operation of services. Under section 17 of the Railways Act 1993, ORR must consent to such agreements unless they are deemed contrary to its general duties, thereby enabling operators to secure capacity on tracks, stations, and depots. This process includes reviewing applications for new or modified access rights, with ORR empowered to impose conditions or direct amendments to prevent undue discrimination or inefficient allocation. ORR enforces access obligations through oversight of the Railways Infrastructure (Access, Management and Licensing of Railway Undertakings) Regulations 2016, which transpose directives into law and require transparent, competitive capacity allocation by infrastructure managers. The regulator issues guidance interpreting these regulations, emphasizing the need for infrastructure managers to prioritize path requests based on objective criteria like and network efficiency, while intervening in disputes or non-compliance cases. For freight and passenger operators, this promotes equitable entry to the network, with ORR able to license railway undertakings and monitor adherence to access charges set periodically, as in the 2021-2024 control period. In promoting competition, ORR discharges a statutory duty under section 4 of the Railways Act 1993 to further the interests of rail users by enabling effective competition where practicable and facilitating the provision of services through access rights. This extends to assessing open access applications from operators seeking to run unsubsidized services on competitive routes, evaluating factors such as incremental costs, revenue abstraction from franchised services, and overall benefits to passengers via its April 2019 updated guidance. Approvals, such as those granted to entrants like Grand Union Railway or Lumo, aim to introduce rivalry that drives innovation and lower fares without net subsidy costs. ORR advances competition through enforcement of the Competition Act 1998, holding concurrent powers with the to prohibit anti-competitive agreements, abuses of dominance, or practices harming rail markets, including those involving access denial or . It conducts market monitoring, accepts reports of suspected breaches, and undertakes reviews under the Enterprise Act 2002 to identify structural issues, such as barriers to amid franchising dominance. These tools ensure fair play for passengers, freight users, and operators, with interventions like investigations into training services provision demonstrating proactive deterrence against .

Core Economic and Efficiency Duties

The Office of Rail and Road (ORR) is mandated under section 4 of the to exercise its economic functions with a primary focus on promoting improvements in railway service , protecting user interests, and enabling the economic provision of services through efficient use and . This includes a specific duty to foster efficiency and economy among railway service providers, ensuring operations deliver value for money while balancing available funding from the Secretary of State. ORR must also promote in rail services where it benefits users, facilitate policies for integrated , and minimize restrictions on operators to avoid undue financial hindrance. In practice, these duties manifest through ORR's economic regulation of , the manager, via periodic reviews that set targets, output specifications, and financial frameworks for control periods, such as the 2024–2029 period established in 2023. ORR monitors Network Rail's cost annually, assessing factors like operating expenditure, renewals, and asset stewardship against benchmarks derived from industry data and econometric models to incentivize productivity gains and cost reductions. For instance, incentives include sharing savings from outperformance with taxpayers and users, while penalties apply for underdelivery, aiming to align costs—totaling approximately £12.3 billion annually in recent assessments—with sustainable levels. ORR further advances by regulating track and station access charges, ensuring they reflect efficient costs and do not deter or , as outlined in the track access framework under the Railways Act. This involves approving charges that cover Network Rail's regulated asset base while promoting operators, whose entry has historically pressured incumbents to improve service . In oversight of , similar principles apply, with charge controls designed to maintain economic viability and encourage third-party bids for capacity. Overall, these mechanisms prioritize causal drivers of , such as against European peers and incentivizing , over unsubstantiated assumptions of automatic improvements.

Health and Safety Obligations

The Office of Rail and Road (ORR) bears statutory obligations under section 1 of the Health and Safety at Work etc. Act 1974 to secure the health, safety, and welfare of persons employed on railways and to protect other individuals from risks to health and safety arising from or in connection with railway activities. These duties encompass ensuring the proper construction and safe operation of railways, tramways, locomotives, and , as well as mitigating injury risks to the public and workers from railway operations. Under Schedule 3 of the Railways Act 2005, ORR holds a general to undertake appropriate actions and arrangements for the purposes of railway , including assisting and encouraging persons engaged in railway activities to improve outcomes. As the designated health and enforcing authority for the railway sector—covering mainline railways, the London , , tramways, and heritage railways—ORR enforces both general health and provisions under the 1974 Act and rail-specific legislation to fulfill these obligations. Key rail-specific laws enforced by ORR include the Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS), which mandate safety management systems; the Railways (Interoperability) Regulations 2011 (as amended), addressing technical standards for interoperability; the Railway Safety (Miscellaneous Provisions) Regulations 1997 and Railway Safety Regulations 1999, covering operational safeguards; the Health and Safety (Enforcing Authority for Railways) Regulations 2006, designating ORR's enforcement role; the Train Driving Licences and Certificates Regulations 2010; and the Rail Vehicle Accessibility Regulations 2010. Compliance monitoring involves approvals for safety-critical elements, such as under Transport and Works Act Orders, and oversight of standards like train protection systems. To discharge these obligations, ORR inspectors exercise powers under the 1974 Act, ranging from providing advice and information to formal enforcement actions, including investigations of incidents reported via the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR), issuance of improvement notices to rectify breaches, prohibition notices to halt dangerous activities, and prosecutions for non-compliance, with maximum penalties applicable upon conviction. ORR also responds to recommendations from the Rail Accident , ensuring duty holders address underlying safety risks effectively.

Public Interest and Environmental Duties

The Office of Rail and Road (ORR) holds statutory duties to protect public interests by promoting efficient, high-quality rail and road services that serve users' needs, including passengers, freight operators, and road users, while balancing these against economic viability. Under section 4 of the Railways Act 1993, ORR must enable the provision of services that offer reasonable pricing and quality, facilitate among operators, and support an integrated across modes. For the strategic road network, section 12 of the Infrastructure Act 2015 requires ORR to oversee ' performance with regard to user interests, safety, and long-term asset maintenance, ensuring proportionate regulation that avoids undue burdens. Environmental duties mandate that ORR contributes to and assesses the ecological impacts of regulated activities. In rail regulation, this includes explicit requirements to consider environmental effects from railway operations and infrastructure, as outlined in the Railways Act 1993, alongside guidance from government ministers emphasizing net zero transitions. For roads, ORR evaluates environmental consequences in performance monitoring, such as emissions from maintenance and operations, integrated into Road Investment Strategies (RIS). These obligations are not absolute but weighed against primary economic and safety functions, with ORR required to prioritize efficiency where conflicts arise. ORR operationalizes these duties through targeted enforcement and monitoring. In rail, it imposes environmental metrics on , including Scope 1, 2, and 3 emissions reductions, enhancements, and waste minimization for Control Period 7 (2024–2029), building on prior periods' data showing rail sector emissions at 2.2 million tonnes of CO₂ equivalent in 2022–2023. For roads, ORR advises on RIS3 targets, scrutinizing ' environmental claims—such as 0.5 million tonnes of CO₂ equivalent emitted in 2022–2023—and promotes adaptation to climate risks like flooding. It also reviews railway licensees' environmental policies to ensure compliance with statutory protections against and habitat disruption. elements extend to and equity, though subordinated to core efficiency mandates, with ORR facilitating user complaints mechanisms and to curb monopolistic practices.

Performance Metrics and Statistics

Rail Industry Productivity and Efficiency Data

The Office of Rail and Road (ORR) measures industry primarily as outputs (such as train kilometres) relative to inputs (expenditure or labour), with data spanning 2014-15 to 2023-24 in constant 2023-24 prices. Overall industry , defined as train kilometres per thousand pounds of expenditure, rose 7% in 2023-24 compared to 2022-23 but stood 25% below 2014-15 levels. Post-pandemic recovery has been partial, reaching 87% of 2019-20 output levels, though quality-adjusted improved 11% since 2020-21; factors including and elevated fixed costs have constrained further gains. Sector-specific trends reveal varied performance. For passenger train operators, productivity measured as passenger kilometres per employee increased 11% year-on-year in 2023-24 but declined 18% from 2014-15, with productivity dropping 49% due to an 89% rise in associated costs. 's infrastructure productivity, gauged by train kilometres per employee, advanced 8% in 2023-24 versus the prior year yet fell 19% since 2014-15, amid a 15% expansion; renewals productivity specifically worsened 20-25% over Control Period 6 (2019-24). Freight operators faced a 31% productivity drop (tonne kilometres per employee) over the decade, exacerbated by a near-total phase-out of transport. (GVA) per employee similarly declined: 24% for passenger rail, 22% for freight, and 1% for from 2014-15 to 2022-23.
SectorKey Productivity MetricChange Since 2014-15
Overall IndustryTrain km per £1,000 expenditure-25%
Passenger Train OperatorsPassenger km per employee-18%
Train km per employee-19%
Freight OperatorsTonne km per employee-31%
ORR's efficiency monitoring emphasizes Network Rail's financial and operational performance against periodic review targets. In Control Period 7 Year 1 (April 2024–March 2025), achieved £325 million in savings, surpassing the £263 million target by 24%, driven by contracting reforms (£97 million), modernization (£47 million), and reduced activity for equivalent output (£39 million); all five regions met or exceeded regional goals. Total expenditure fell to £14.5 billion, a 5% reduction from the previous year, though renewals and underperformed plans by £259 million and £106 million, respectively, against a £47 million enhancement overrun. Staff costs totaled £3.0 billion (21% of expenditure) for 41,702 full-time equivalents, with headcount up 2% year-on-year and 61% over the past decade. These assessments against prior periods and PR23 assumptions to incentivize cost control. Data limitations, such as incomplete quality adjustments and fixed-cost distortions, apply across metrics. The Office of Rail and Road (ORR) monitors rail safety incidents through annual statistics, revealing a mixed performance in recent years. Train accident risk has remained consistent with prior periods, but specific categories show concerning rises. For the year ending March 2025, there were 11 non-workforce fatalities (passengers and public) on mainline rail, alongside 1 workforce fatality, compared to broader networks reporting two workforce deaths total. Suicides or suspected suicides reached 293 fatalities, the highest since 2002, while trespass-related incidents resulted in 17 deaths and level crossings saw 5 pedestrian fatalities. Assaults on the network surged to 10,231 reported cases in the same period, a 7% increase from the previous year and more than triple the figure from a decade earlier. Signals Passed at Danger (SPADs) incidents also rose, though high-risk events stabilized. High-potential risks persisted at level crossings, with 29 such events recorded in 2024-25, alongside incidents like a freight at Audenshaw in September 2024 that damaged but caused no injuries. Workforce injuries from slips, trips, and falls increased, with severe cases up notably in prior years. These trends underscore ongoing challenges in , passenger assaults, and operational errors, despite historical declines in overall accident rates since the . ORR enforces safety compliance primarily under the Health and Safety at Work etc. Act 1974, issuing improvement notices, prohibition notices, and pursuing prosecutions or fines. In 2024-25, it issued 4 improvement notices and initiated 3 criminal prosecutions, targeting failures in track worker protection and maintenance. Notable actions included fining £3.75 million in 2025 for breaches leading to two track worker deaths at in 2019, stemming from inadequate protection planning, plus £175,000 in costs. Separately, received a £3.41 million fine in 2025 for a Surbiton track worker fatality in 2020 due to similar safety lapses, with additional costs of £43,096. Post-Audenshaw , ORR launched targeted enforcement against for track maintenance deficiencies. Earlier interventions included an October 2023 improvement notice to for inadequate crowd management at Euston station, risking passenger safety during disruptions. In July 2023, (TfL) and Tram Operations Limited (TOL) were fined £10 million and £4 million, respectively, for systemic failures contributing to the 2016 Croydon tram crash that killed seven passengers. These actions reflect ORR's focus on accountability for infrastructure managers and operators, with fines directed toward victim funds where applicable.

Road Network Delivery Assessments

The Office of Rail and Road (ORR) conducts annual assessments of National Highways' performance in managing and delivering England's strategic road network, comprising motorways and major A-roads, as mandated under the regulatory framework established by the Infrastructure Act 2015. These assessments evaluate delivery against key performance indicators (KPIs), strategic commitments, efficiency targets, and the capital programme outlined in the Road Investment Strategy (RIS) for each five-year Road Period (RP). The process includes reviewing operational data, financial outcomes, safety metrics, and user impacts, with findings informing periodic reviews and recommendations for future periods. In the second Road Period (RP2, April 2020 to March 2025), ORR's final annual assessment, published on 18 July 2025, concluded that achieved notable efficiencies and infrastructure enhancements but fell short on several commitments due to factors including disruptions, asset limitations, and delays. The company exceeded its efficiency savings target by delivering £2.2 billion against a £2.0 billion goal, with £764 million from renewals and £538 million from operating costs, enabling reinvestment in network improvements. Key delivery successes included opening 30 major enhancement schemes, starting 17 others, and completing 151 emergency areas under the National Emergency Area Retrofit (NEAR) programme to enhance safety on smart motorways. Renewals expenditure reached £4,915 million, surpassing the revised budget of £4,835 million, while meeting targets for pavement condition (96.5% compliant) and (benefiting 7,776 households against a 7,500 target). However, performance gaps were evident in and resilience metrics. National Highways missed or is projected to miss five of 12 KPIs, including a 39% reduction in killed or seriously injured () incidents against a 50% target by December 2025, average delay per vehicle mile at 11.8 seconds versus 9.5 seconds targeted, and road user satisfaction at 68.6% below the 71% goal. Eleven enhancement commitments were undelivered, alongside shortfalls in two of five renewals targets, such as 14 lane kilometres of reconstruction and 16% on safety barriers. ORR attributed these to inadequate , evidence-based planning deficiencies, and external pressures, prompting an improvement plan following a 2024 investigation into systemic delivery issues.
KPI CategoryTargetAchievementStatus
Safety (KSI reduction)50% by Dec 202539% by end 2023Likely missed
Average delay9.5 sec/vehicle mile11.8 sec/vehicle mileMissed
Road user satisfaction71%68.6%Missed
Incident clearance85% within 15 min (avg)88.7%Met
Pavement condition95% compliant96.5%Met
ORR recommended that for Road Period 3 (RP3, starting 2025), prioritize robust , timely shortfall reporting, and to sustain progress and mitigate risks like shortfalls observed in RP2. These assessments underscore ORR's role in enforcing accountability, with data drawn from ' monitoring statements and independent verification.

Achievements and Impacts

Improvements in Rail Safety and Reliability

The Office of Rail and Road (ORR) has overseen sustained low levels of rail safety risk in , with the network maintaining a strong performance record through enforcement and strategic guidance. In the period April 2023 to March 2024, ORR issued nine enforcement notices to dutyholders and concluded four criminal prosecutions, resulting in fines totaling over £14.5 million, which reinforced compliance with safety standards and mitigated operational hazards. Overall train accident risk remained broadly stable compared to preceding years, reflecting effective industry management under ORR's regulatory framework, though challenges persisted in areas like signals passed at danger (SPADs), where investigations improved but incident numbers rose. ORR advanced targeted safety enhancements by publishing 10 recommendations in March 2025 to standardize cost-benefit analyses for health and safety interventions, promoting evidence-based decisions that balance risk reduction with . By September 2025, the rail industry demonstrated progress in implementing these, including refreshed inspector training and collaboration with the Rail Safety and Standards Board (RSSB), which ORR credited with potential to elevate safety outcomes while controlling costs. Incremental gains were evident in trackworker protections, drainage asset inventories, and occupational health initiatives like addressing Hand-Arm Vibration Syndrome, areas where ORR's oversight during Control Period 6 drove accountability and investment. On reliability, ORR's direct intervention in the and Western region addressed chronic underperformance by rejecting Network Rail's initial in favor of a comprehensive encompassing nearly 60 actions, such as timetable redesign for resilience, enhanced forecasting, and accelerated asset renewals. This , finalized and accepted by ORR on 26 September 2024, targeted reductions in disruptions on high-volume routes like those to London Paddington, with 90% of measures slated for completion by 2026 and ongoing ORR monitoring to ensure delivery. ORR's annual assessments have similarly prompted infrastructure improvements, with reducing the delays it causes across , contributing to stable punctuality where 84% of trains arrived within three minutes of schedule from April 2024 to March 2025. Despite elevated cancellations at 4.1%—a record high largely due to operator factors—ORR's emphasis on governance reforms, staff , and regional has yielded measurable gains in delay attribution and weather resilience, underscoring its role in incremental reliability progress amid broader industry pressures.

Efficiency Gains and Cost Controls

The Office of Rail and Road (ORR) drives efficiency gains in the rail sector primarily through its periodic reviews of , which establish five-year control periods defining funding levels, required outputs, access charges, and performance incentives to ensure cost-effective delivery of infrastructure services. These reviews, such as the 2023 determination (PR23) for Control Period 7 (CP7, spanning 2024–2029), incorporate rigorous cost to assess Network Rail's expenditures against industry standards, informing efficiency targets for operations, maintenance, and renewals. ORR enforces compliance via Network Rail's licence conditions, penalizing inefficiencies while rewarding outperformance to align incentives between infrastructure management and overall system costs. In CP7's first year (April 2024 to March 2025), realized £325 million in efficiency savings, surpassing its ORR-set target by £62 million through optimized resource allocation and process improvements in track maintenance and renewals. This progress builds on prior periods, including CP6 (2019–2024), where exceeded planned efficiency benchmarks, as verified by ORR's annual assessments that track unit cost reductions and productivity metrics. Complementary initiatives, such as the Better Value Rail toolkit launched in , further support cost controls by standardizing early-stage project evaluations to minimize overruns and enhance value for money in capital investments. Despite these gains, ORR has noted persistent pressures, including a £488 million funding shortfall in for subsequent years, driven by inflation, supply chain disruptions, and scope changes that could necessitate reduced renewals if not addressed. ORR's monitoring emphasizes that sustained efficiency requires to prioritize precise planning and execution, particularly amid reforms, to prevent efficiency erosion from external economic factors. Through ongoing and periodic adjustments, ORR maintains downward pressure on , ensuring that efficiency targets reflect verifiable improvements rather than nominal adjustments.

Contributions to Infrastructure Delivery

The Office of Rail and Road (ORR) oversees Network Rail's infrastructure investments through periodic reviews that set funding allowances and performance targets for control periods, ensuring efficient delivery of maintenance, renewals, and enhancements. In the PR23 process for Control Period 7 (April 2024 to March 2029), ORR approved Network Rail's strategic business plan, permitting £43.1 billion in total expenditure, of which significant portions fund infrastructure upgrades to enhance capacity, digital signaling, and resilience against climate impacts. This determination incorporated efficiency requirements, with Network Rail committing to £3.7 billion in savings (in 2023-24 prices) to maximize value from taxpayer and farepayer funds amid rising costs. ORR's continuous monitoring enforces compliance, as evidenced by its 2024-2025 annual assessment, which scrutinized Network Rail's £14.8 billion spend on operations, maintenance, renewals, and enhancements while identifying underperformance in delivery plans. Beyond core funding cycles, ORR facilitates supplementary infrastructure projects via its 2010 Investment Framework, approving schemes outside periodic reviews to support timely enhancements like line-speed improvements and station developments. This includes early engagement with third-party investors—such as local authorities and private funds—to navigate regulatory hurdles, including safety and access approvals, thereby enabling hundreds of smaller-scale interventions since 2006. In 2025, ORR issued updated guidance to streamline third-party rail investments, addressing identified barriers like complex approvals that had previously deterred market participation despite strong investor interest. For England's strategic road network, ORR monitors ' execution of the Road Investment Strategy (RIS), assessing efficiency in enhancement delivery during road periods. In Road Period 2 (April 2020 to March 2025), ORR's oversight tracked progress where commenced construction on 17 major schemes and opened 30 to traffic, including upgrades for capacity and safety on motorways and trunk roads. This monitoring enforces obligations under the network licence, promoting cost-effective outcomes while enforcing actions like the Smart Motorways programme to mitigate delivery risks. ORR's evaluations inform subsequent periods, such as , by highlighting efficiencies and shortfalls to guide future infrastructure expansions.

Criticisms and Controversies

Regulatory Effectiveness and Industry Complaints

The Office of Rail and Road (ORR) has faced scrutiny over the effectiveness of its regulatory framework, particularly in addressing persistent challenges such as Network Rail's asset management shortfalls and systemic safety compliance issues. In February 2025, ORR launched an investigation into Network Rail's structural examinations, citing noncompliance in asset safety management that contributed to backlogs in assessments and potential risks to infrastructure integrity. Similarly, a March 2025 ORR probe identified "systematic and wide-ranging safety failures" by Network Rail in protecting workers near the line, underscoring gaps in enforcement outcomes despite ongoing monitoring. These incidents reflect debates on whether ORR's periodic assessments and penalties sufficiently drive proactive improvements, as evidenced by recurring escalations in regulatory interventions rather than sustained compliance. Industry stakeholders have criticized ORR's regulatory approach for imposing excessive administrative burdens, which hinder and in the sector. In response to such feedback, ORR committed in June 2025 to tackling regulatory complexity by reducing the administrative load on regulated entities like , aligning with broader government directives under the Regulatory Enforcement and Sanctions Act 2008 to avoid unnecessary burdens. A September 2025 internal review further pledged a 25% reduction in ORR's administrative burden on the industry over five years, targeting streamlined processes for infrastructure managers while maintaining and economic oversight. Rail operators, including freight and open-access providers, have highlighted how short-term access rights—regulated by ORR—impede long-term planning and investment, exacerbating financial pressures amid cost inflation. An ongoing independent review, announced in October 2025, evaluates ORR's overall strategy, delivery, and impact, including process effectiveness and compliance with better principles, amid calls for enhanced to industry. Critics argue that while ORR's economic has maintained concurrency effectiveness since 2014, the cumulative burden and slow adaptation to sector reforms—such as those under —may undermine incentives for efficiency gains. Network Rail's scaling back of asset renewals in July 2025, despite ORR warnings and potential £3 million penalties, illustrates tensions where regulatory incentives have not fully mitigated fiscal constraints or delivery shortfalls.

Responses to Rail Disruptions and Delays

The Office of Rail and Road (ORR) monitors rail performance metrics, including punctuality and reliability, attributing delays through its Delay Attribution Board and enforcing standards via fines, improvement notices, and required action plans when operators or fail targets. In response to significant disruptions, ORR conducts inquiries to identify systemic failures, as seen in its 2018 investigation into the May timetable changes, which caused widespread cancellations and delays on (GTR) and Northern services due to over-optimism in planning, resource strains from delayed electrification projects, and inadequate risk management by 's System Operator. The inquiry highlighted a lack of accountability across the industry, with passengers "badly treated" through poor information provision, and criticized the (DfT) and ORR itself for not sufficiently challenging industry assurances on risks. ORR has imposed financial penalties for persistent underperformance, such as a £2 million fine on in 2015 for missing national punctuality targets in 2014-15, where public performance measure (PPM) fell short amid infrastructure issues. More recently, in regions like & Western and Eastern, ORR has issued enforcement notices requiring comprehensive improvement plans to address rising delay minutes—e.g., from 2.4 million to 3.3 million in Eastern attributable to —and underlying causes like earthworks failures and drainage problems. It has also investigated discrepancies between reported cancellation statistics and passenger experiences, finding record-high levels in 2023 and mandating better alignment with actual disruptions. Critics argue ORR's responses remain reactive and insufficiently deterrent, with train cancellations approaching historic highs in 2024 despite interventions, and total delay minutes since equating to over 252 years of lost service. Ongoing complaints about delay compensation, rising to 12.7% of grievances in 2024-25, underscore perceived gaps in enforcement efficacy, while broader reform efforts have yielded minimal improvements in reliability amid ageing . Industry stakeholders have questioned whether ORR's regulatory focus adequately balances performance incentives with operational realities, contributing to debates over accountability in chronic disruption patterns.

Debates Over Scope and Bureaucratic Overreach

Critics of the Office of Rail and Road (ORR) have argued that its combined mandate for rail economic regulation, safety oversight, and road investment monitoring fosters unnecessary bureaucratic layers, duplicating functions better handled by industry or government directly. In a 2018 analysis, rail industry commentator contended that ORR's economic regulatory role over —a publicly owned entity—serves little purpose, as it imposes periodic reviews and efficiency targets that hinder operational flexibility without commensurate benefits, echoing broader concerns that post-privatization regulators like ORR perpetuate complexity rather than streamline delivery. These debates intensified amid rail sector reforms, with proposals under the 2024-2025 legislative push for (GBR) to curtail ORR's authority, including removing its power to approve infrastructure access or direct access rights sales for GBR-managed assets, on grounds that centralized public ownership reduces the need for independent economic oversight. Industry stakeholders have similarly highlighted ORR's scope as contributing to delays, citing a 2015 review that scrutinized the regulator's role following Network Rail's delivery shortfalls, including costing errors and productivity lapses attributed partly to regulatory constraints. More recently, on October 21, 2025, the government launched an independent review of ORR led by Dr. Richard Judge as part of a broader " blitz" targeting regulatory bodies, explicitly questioning the necessity and efficiency of its oversight in road investment and rail safety amid calls to curb bureaucratic expansion. Proponents of reform argue this dual-sector scope dilutes focus and inflates administrative costs, with earlier National Audit Office findings in 2011 noting ORR's evolving but imperfect methods for assessing efficiency, which sometimes imposed overly prescriptive benchmarks on operators. ORR representatives have responded cautiously to such critiques, emphasizing adaptive supports , though without detailing potential power reductions post-reform.

References

  1. [1]
    What we do | Office of Rail and Road - ORR
    We are the independent economic and safety regulator for Britain's railways. We also regulate performance and efficiency on England's strategic road network.
  2. [2]
    Who we are | Office of Rail and Road - ORR
    The Office of Rail and Road is the independent economic and safety regulator for Britain's railways and the monitor of performance and efficiency for England's ...
  3. [3]
    About us - Office of Rail Regulation - GOV.UK
    The Office of Rail Regulation (ORR) is responsible for ensuring that railway operators comply with health and safety law.
  4. [4]
    Health and safety guidance and compliance | Office of Rail and Road
    We regulate health and safety for the entire mainline rail network in Britain, as well as London Underground, light rail, trams and the heritage sector.Missing: across | Show results with:across
  5. [5]
    [PDF] The evolution of Network Rail and the consequences for regulation
    Nov 16, 2017 · I first started attending these lectures in the late nineties as an economist at the ORR, which then stood for the Office of the Rail Regulator.Missing: milestones | Show results with:milestones
  6. [6]
    [PDF] Signalling market study - Final Report - 9 November 2021 - ORR
    Nov 9, 2021 · 1.1. The Office of Rail and Road (“ORR”) is the independent economic and safety regulator for the railways in GB, and the monitor of ...
  7. [7]
    175 years making Britain's railways safer | Office of Rail and Road
    Aug 18, 2015 · In 1840, through the Railway Regulation Act, the Board of Trade appointed the first Railway Inspector to inspect construction and equipment of ...Missing: establishment | Show results with:establishment
  8. [8]
    [PDF] A review of the delivery and impact of National Highways' digital ...
    1. AECOM has been commissioned by the Office of Rail and Road (ORR) to undertake an independent review and facilitate a better understanding of National ...<|control11|><|separator|>
  9. [9]
    Appointment of the Chair of the Office of Rail Regulation
    May 7, 2009 · It was established in 2004 under the Railways and Transport Safety Act 2003, taking over the functions and duties of the Rail Regulator that it ...<|separator|>
  10. [10]
    The law and our duties | Office of Rail and Road - ORR
    May 26, 2017 · Railway and Transport Safety Act 2003​​ This Act abolished the Rail Regulator and created the Office of Rail Regulation. Pursuant to the Office ...Missing: History | Show results with:History
  11. [11]
    Railways Act 2005 - Legislation.gov.uk
    An Act to amend the law relating to the provision and regulation of railway services; and for connected purposes.
  12. [12]
    [PDF] Office of Rail Regulation Resource Accounts 2006–07 - GOV.UK
    Jul 3, 2007 · On 1 April. 2006, ORR took on the responsibility for Rail Safety Policy and HM Railways Inspectorate from the. Health and Safety Executive.
  13. [13]
    Office of Rail Regulation to be re-named Office of Rail and Road
    Mar 20, 2015 · Note: Use of the name, the Office of Rail and Road, reflects the new roads functions conferred on the Office by the Infrastructure Act 2015.<|control11|><|separator|>
  14. [14]
    Highways monitor: memorandum of understanding - GOV.UK
    Mar 12, 2015 · The Highways Monitor, part of the Office of Rail Regulation, will be responsible for the monitor function. This means monitoring the performance ...Missing: formation | Show results with:formation
  15. [15]
    Cross Heading: References to the ORR - Railways Act 2005
    Changes to legislation: There are currently no known outstanding effects for the Railways Act 2005, Cross Heading: References to the ORR.<|separator|>
  16. [16]
  17. [17]
    [PDF] mou-orr.pdf - GOV.UK
    The Infrastructure Act 2015 (the Act) allows the Secretary of State for Transport to appoint a Strategic Highways Company, Highways England (the Company) ...
  18. [18]
    Office of Rail and Road - GOV.UK
    The Office of Rail and Road (ORR) is the independent safety and economic regulator for Britain's railways and monitor of National Highways.Missing: History | Show results with:History
  19. [19]
    [PDF] Legislative Changes to Implement Rail Reform - GOV.UK
    ORR will also independently assess Great British Railways' business plan for key matters including safety, performance, efficiency, deliverability, long-term ...
  20. [20]
    A railway fit for Britain's future - GOV.UK
    Feb 18, 2025 · The ORR will no longer approve access or direct the sale of access rights for the GBR railway and will not set standard access terms for GBR .
  21. [21]
    Office of Rail and Road March 2025 newsletter - ORR
    Mar 4, 2025 · Rail reform - Bill consultation launched · establishing a new passenger watchdog. · reform of fares and selling tickets online. · a new statutory ...
  22. [22]
    [PDF] A review into our rail industry-facing service standards - ORR
    Sep 26, 2025 · 4.7. We will implement this change to the service standard for infrastructure authorisations from January 2026. Page 9. Office of Rail and Road ...
  23. [23]
  24. [24]
    The board | Office of Rail and Road - ORR
    Declan Collier, Chair · Declan Collier · John Larkinson, Chief Executive · John Larkinson · Xavier Brice · Xavier Brice · Ian Dobbs ...
  25. [25]
    ORR board committees | Office of Rail and Road
    The board has four standing advisory committees and their terms of reference are included in the board's rules of procedure.
  26. [26]
    Declan Collier reappointed as ORR Chair - Global Railway Review
    Aug 23, 2023 · The Office of Rail and Road have announced that Declan Collier is to be reappointed as ORR Chair for a further five-year term.
  27. [27]
    Executive directors | Office of Rail and Road - ORR
    John Larkinson - Chief executive ... John was confirmed as Chief Executive at the Office of Rail and Road (ORR) in March 2021, having held the interim position ...
  28. [28]
    Corporate governance report | Office of Rail and Road - ORR
    Jul 30, 2024 · This report explains the composition and organisation of ORR's governance structures and how they support the achievement of our strategic objectives.
  29. [29]
    [PDF] ORR Board Rules of Procedure
    Feb 27, 2024 · good corporate governance and good regulation. All our members accept collective responsibility for all decisions made by our board. Our non ...
  30. [30]
    Section 4 of the Railways Act 1993 - Legislation.gov.uk
    Section 4 outlines duties of the Secretary of State and the Office of Rail and Road, including promoting railway service improvements, user protection, and ...
  31. [31]
    [PDF] Our rail and road duties - ORR
    ORR's duties are governed by statutory duties, with different duties for economic and safety functions. Economic duties are under the Railways Act 1993, and ...
  32. [32]
    Periodic review 2023 of Network Rail: final determination - ORR
    Oct 31, 2023 · ORR's periodic review process is one of the principal mechanisms by which we hold Network Rail to account and secure value for money for users ...
  33. [33]
    Periodic review of HS1 Ltd 2024: draft determination - GOV.UK
    Sep 30, 2024 · The Office of Rail and Road ( ORR ) invites stakeholders to respond to any decisions within our periodic review 2024 ( PR24 ) draft ...
  34. [34]
    Economic regulation | Office of Rail and Road - ORR
    Economic regulation · Measuring the financial health of our rail infrastructure · Monitoring Network Rail's efficiency · Investigations of National Highways.
  35. [35]
    Periodic review 2023 (PR23) | Office of Rail and Road - ORR
    Our PR23 final determination set out our decisions on Network Rail's outputs and funding for control period 7 (CP7), which runs from 2024 to 2029.
  36. [36]
    ROGS | Office of Rail and Road - ORR
    This page provides an overview of the regulatory requirements for managing safety on the railways, tramways and other guided transport systems.Missing: across | Show results with:across
  37. [37]
    Health and Safety across the railway sector: the regulator's view
    Jul 17, 2025 · Introduction. This section provides a summary of our key findings across the railway sectors we regulate. It highlights significant risk ...
  38. [38]
    Enforcement | Office of Rail and Road - ORR
    Network Rail has today been fined £3.41m and ordered to pay costs of £43,096.39 after pleading guilty to an offence under the Health and Safety at Work etc.Missing: sectors | Show results with:sectors
  39. [39]
    Health and safety strategy | Office of Rail and Road - ORR
    Our health and safety regulatory strategy sets out our approach to regulating health and safety risks created and managed by Britain's railways.
  40. [40]
    About us - Office of Rail and Road - GOV.UK
    As highways monitor ORR is responsible for monitoring National Highways' management of the strategic road network – the motorways and main 'A' roads in England.
  41. [41]
    Roads monitoring | Office of Rail and Road - ORR
    Office of Rail and Road. Menu. Statistics and Data Portal. Statistics · Statistics ... National Highways licence monitoring and enforcement. Our monitoring ...
  42. [42]
    Monitoring National Highways | Office of Rail and Road - ORR
    National Highways has delivered significant improvements for road users in the second road period (RP2 2020 - 2025), says the Office of Rail and Road (ORR), but ...
  43. [43]
    [PDF] Post ORR Investigation Improvement Plan Six Month Update
    Mar 31, 2025 · In February 2024, ORR launched an Investigation into National Highways' performance, capability and delivery. This Investigation concluded ...<|control11|><|separator|>
  44. [44]
    [PDF] National Highways' Improvement Plan following ORR's Investigation
    Sep 6, 2024 · The ORR Relations Team will ensure, during routine and enhanced monitoring, that the National Highways business is using this new state of mind ...
  45. [45]
    Review of National Highways RIS2 efficiency evidence - Rebelgroup
    One of the key responsibilities of the Office of Rail and Road (ORR) is to monitor National Highways' progress in achieving its Road Period 2 (RP2) efficiency ...
  46. [46]
    [PDF] Estimates memorandum (2025-26) for the Office of Rail and Road 1 ...
    May 6, 2025 · The Office of Rail and Road ... ORR is responsible for monitoring National Highways' management and operation of the strategic road network.<|separator|>
  47. [47]
    Network Rail regulation | Office of Rail and Road - ORR
    We regulate Network Rail's stewardship of the rail network: for funders, train companies and their passengers, freight operators and their customers and ...
  48. [48]
    Network Rail's network licence | Office of Rail and Road - ORR
    Jun 17, 2024 · Network Rail's network licence sets out the organisation's obligations and requires it to comply with the conditions we set in the public interest.
  49. [49]
  50. [50]
    Price controls | Office of Rail and Road - ORR
    Information about the current 2023 periodic review (PR23) of Network Rail's outputs and funding for control period 7 (2024 – 2029). Periodic review 2018 (PR18).
  51. [51]
    Licence enforcement taken by us to date | Office of Rail and Road
    This page contains information about our enforcement action taken against Network Rail and others. It covers enforcement orders, monetary penalties, notices
  52. [52]
    High Speed 1 (HS1) regulation | Office of Rail and Road - ORR
    Office of Rail and Road. Menu. Statistics and Data Portal. Statistics ... High Speed 1 (HS1) regulation · Access to HS1 · Annual reports on London St ...
  53. [53]
    High Speed 1 (HS1) access | Office of Rail and Road - ORR
    High Speed 1 (HS1) regulation · Channel tunnel · Northern Ireland · Network ... Office of Rail and Road. Menu. Statistics and Data Portal. Statistics · Statistics ...
  54. [54]
    Rail Regulator orders HS1 Ltd to further lower charges for train ...
    Jan 6, 2025 · The Office of Rail and Road announced today that it is directing HS1 ... High Speed 1 (HS1) regulation · Channel tunnel · Northern Ireland ...
  55. [55]
    High Speed 1 (HS1) regulation | Office of Rail and Road - ORR
    Rail regulator calls for rapid action by High Speed 1 to address missed targets. 31 July 2023. Body. The Office of Rail and Road's (ORR) annual assessment of ...
  56. [56]
    Regulator: Passenger train performance on the High Speed 1 ... - ORR
    Jul 30, 2025 · ... Office of Rail and Road said today (30 July) in its annual report on ... High Speed 1 (HS1) regulation · Channel tunnel · Northern Ireland ...
  57. [57]
    The Railways (Access, Management and Licensing of Railway ...
    ... access to railway infrastructure for the purpose of operating a ... Part 6 allocates certain regulatory functions to the Office of Rail and Road (“ORR”).
  58. [58]
    [PDF] guidance-on-the-access-2016-regulations.pdf - ORR
    Jul 28, 2021 · 1 This guidance sets out the Office of Rail and Road's (ORR's) interpretation of The. Railways (Access, Management and Licensing of Railway ...
  59. [59]
    Promoting rail competition | Office of Rail and Road - ORR
    ORR promotes rail competition by using economic and competition powers, investigating breaches, market reviews, and engaging with authorities. Reports from ...
  60. [60]
    Competition Act 1998 | Office of Rail and Road - ORR
    Sep 22, 2025 · The Competition Act 1998 prohibits any agreement, business practice or conduct which has, or could have, a damaging effect on competition in the United Kingdom.
  61. [61]
    [PDF] Competition Act 1998 Guidance - ORR
    Sep 22, 2025 · Under the. Railways Act 1993, we share powers with the Competition and Markets Authority (CMA) to enforce the prohibitions in the Competition ...
  62. [62]
    Annual assessment of Network Rail 2024 to 2025 - ORR
    Jul 17, 2025 · Network Rail needs to carefully manage future delivery of efficiency and core renewals in a constrained funding environment impacted by ...
  63. [63]
    Health and safety laws | Office of Rail and Road - ORR
    An overview of the main rail-specific legislation that we enforce using our health and safety powers under the Health and Safety and Work etc. Act 1974.
  64. [64]
    Health and safety investigation and enforcement powers - ORR
    As well as giving advice to the industry, we also have a range of formal enforcement powers given to us under the Health and Safety at Work Act 1974.
  65. [65]
    The environment, sustainable development and rail - ORR
    ORR has duties to contribute to sustainable development and consider environmental impacts, holds Network Rail accountable, and requires environmental ...
  66. [66]
    On track for a green future: ORR's environmental role
    Apr 22, 2024 · Transport is the largest contributor to UK domestic greenhouse gas emissions. Building, operating and maintaining the strategic road network in ...
  67. [67]
  68. [68]
    Our review of how railway licence holders are protecting the ... - ORR
    May 16, 2024 · All railway licence holders must have a policy which explains how they will protect the environment from their activities.
  69. [69]
    [PDF] Report on rail industry productivity - ORR
    Mar 18, 2025 · Efficiency gains combined with the recovery of train and passenger numbers are central to rail industry productivity and will be a vital ...Missing: duties | Show results with:duties
  70. [70]
    2. Network Rail's financial performance and efficiency - ORR
    Sep 30, 2025 · The financial outperformance was driven by a higher proportion of project support expenditure being treated as capital investment, and savings ...
  71. [71]
    Monitoring Network Rail's efficiency | Office of Rail and Road - ORR
    Our report on rail industry productivity analyses the outputs produced by the rail industry in return for its inputs (in the form of expenditure or labour). We ...
  72. [72]
    Rail safety | ORR Data Portal
    There were two workforce fatalities across all the networks in the year April 2024 to March 2025, one on the mainline and the other on the non-mainline network.
  73. [73]
    Annual report of health and safety on Britain's railways 2024 to 2025
    Jul 17, 2025 · The following sections of this report describe our assessment of the railway industry's health and safety performance for the year. A series of ...
  74. [74]
  75. [75]
    Prosecutions | Office of Rail and Road - ORR
    Network Rail has today been fined £3.41m and ordered to pay costs of £43,096.39 after pleading guilty to an offence under the Health and Safety at Work etc.
  76. [76]
    Annual assessments of National Highways | Office of Rail and Road
    We published our most recent assessment on 18 July 2025. The assessment details the company's performance against its targets, commitments and capital programme ...
  77. [77]
    [PDF] Annual assessment of National Highways' performance 2024 to 2025
    Jul 17, 2025 · This year's assessment of National Highways' performance and delivery covers the year 2024 to 2025 and the whole of the second road.
  78. [78]
    ORR praises National Highways' RIS2 despite 11 missed ...
    Jul 21, 2025 · The Office of Rail and Road's (ORR's) assessment of National Highways' second road period (RIS2) highlights significant efficiency savings and key project ...
  79. [79]
    Annual report of health and safety on Britain's railways 2023 to 2024
    Jul 18, 2024 · The following sections of this report describe our assessment of the railway industry's health and safety performance for the year.<|control11|><|separator|>
  80. [80]
    ORR: Network Rail delivering efficiently, but cost pressures remain ...
    Jul 17, 2025 · The Office of Rail and Road (ORR) is the independent economic and safety regulator for Britain's railways, and also has regulatory powers to ...<|separator|>
  81. [81]
    Rail Regulator sets out key recommendations for assessing costs ...
    Mar 17, 2025 · The regulator has today published 10 recommendations to help improve how the rail industry makes health and safety interventions effectively and efficiently on ...
  82. [82]
    ORR welcomes industry progress on improving cost effective rail ...
    Sep 18, 2025 · As the joint economic and safety regulator, we can play a key role by working across both aspects of regulation to ensure the right outcome.”.Missing: sectors | Show results with:sectors
  83. [83]
    Improved reliability for rail passengers in Wales and Western ... - ORR
    Sep 26, 2024 · Improving the timetable to be more resilient · Improving the forecasting of extreme weather events · Investing in asset reliability and ...Missing: enhancements achievements
  84. [84]
    Benchmarking of Network Rail's costs | Office of Rail and Road - ORR
    We undertake cost benchmarking of Network Rail's costs to inform periodic reviews and as part of our regular monitoring of Network Rail's cost performance.
  85. [85]
    Network Rail efficiency | Office of Rail and Road - ORR
    The Office of Rail and Road (ORR) has today published its annual assessment of Network Rail's efficiency and wider financial performance for 2021-2022.
  86. [86]
    ORR Approves Network Rail's £43 Billion Plan for CP7
    Oct 31, 2023 · The Office of Rail and Road (ORR) has approved Network Rail's 43.1 billion GBP plans for Control Period 7 (CP7). These plans span five years from 1 April 2024.
  87. [87]
    Getting value for money on the £67bn spent on Britain's railway ...
    Oct 1, 2024 · As part of ORR's latest periodic review (PR23) Network Rail has committed to deliver £3.7 billion (2023-24 prices) of efficiency improvements (£ ...
  88. [88]
    2. Network Rail's financial performance and efficiency - ORR
    Oct 1, 2024 · 2.2 Network Rail spent £14,817 million (cash prices) operating, maintaining, renewing and enhancing the national rail infrastructure in April ...
  89. [89]
    Investing in the rail network | Office of Rail and Road - ORR
    The 2010 Investment Framework provides a means for infrastructure projects to be approved, specified and delivered outside of the periodic review process.
  90. [90]
  91. [91]
    Strong appetite to invest in rail but barriers hold back market - ORR
    Aug 6, 2025 · ORR review reveals strong appetite for rail infrastructure investment, with work now underway to remove barriers and streamline the ...
  92. [92]
    Enhancements delivery | Office of Rail and Road - ORR
    Jul 18, 2025 · National Highways successfully started construction of 17 enhancements schemes and opened 30 schemes to traffic in RP2, as shown in Figure 3.1 ...
  93. [93]
    ORR launching investigation into 'systemic issues' in Network Rail's ...
    Feb 17, 2025 · The Office of Rail and Road (ORR) has penned a scathing letter calling out “systemic issues” within Network Rail's compliance with asset examination ...<|separator|>
  94. [94]
    March 2025 newsletter from ORR - LinkedIn
    Mar 5, 2025 · ORR's investigation found systematic and wide-ranging safety failures by Network Rail in its measures to protect those working on or near the ...<|separator|>
  95. [95]
    [PDF] Tackling complexity and reducing regulatory burden - ORR
    Jun 25, 2025 · As set out in HMT's policy paper of 31 March 2025 we recognise the need to reduce the administrative burden of regulation by the end of the ...
  96. [96]
    [PDF] Secretary of State for Transport - GOV.UK
    The ORR also has a duty under section 72 of the Regulatory Enforcement and. Sanctions Act 2008 not to impose or maintain unnecessary burdens when exercising its ...
  97. [97]
    [PDF] A review into our rail industry-facing service standards - ORR
    Sep 26, 2025 · (a) Seeking to reduce by a quarter over the next five years the administrative burden of our regulation and monitoring on London St Pancras ...
  98. [98]
    ORR expresses concern over Network Rail scaling back asset ...
    Jul 18, 2025 · ORR praises the railway industry for strong progress in addressing overdue structure assessments and mitigating weather-related risks, ...
  99. [99]
    [PDF] ORR's response to CMA's consultation on the review of ... - GOV.UK
    Oct 20, 2023 · ORR believes concurrency is effective, broadens regulatory tools, and that Competition Act 1998 powers have proven effective in the rail sector.
  100. [100]
    the regulatory implications of Great British Railways—part 1 - Oxera
    Dec 4, 2024 · Regulators generally all have duties to minimise regulatory burdens. For example, under the Regulatory Enforcement and Sanctions Act 2008, the ...
  101. [101]
    ORR Inquiry concludes passengers let down by rail industry failures
    Sep 20, 2018 · The Inquiry found problems caused by delays to completing NWEP were worsened by Network Rail, which wrongly believed it could make up the time.Missing: criticisms | Show results with:criticisms
  102. [102]
    Train delays: 'Lack of accountability' led to rail timetable chaos - BBC
    Sep 20, 2018 · Poor accountability was to blame for severe rail disruption last May, a regulator has said.Missing: responses | Show results with:responses
  103. [103]
    ORR fines Network Rail £2m for delays in services
    Aug 10, 2015 · The UK rail regulator Office of Rail and Road (ORR) has imposed a £2m fine on Network Rail (NR) over missing punctuality targets in 2014-2015.Missing: criticisms | Show results with:criticisms
  104. [104]
    Regulator tells rail industry to ensure cancellation statistics match ...
    Jan 19, 2023 · Train cancellations are at record levels, and an ORR investigation confirmed a further gap between cancellations statistics and the passenger ...
  105. [105]
    Train cancellations close to worse ever, ORR report shows
    Aug 1, 2024 · Although safety has remained a key focus of Network Rail's efforts, ORR did highlight failures on earthworks and drainage had reached their ...<|separator|>
  106. [106]
    Britain's abysmal train service is ruining the return to the office
    Jan 13, 2025 · Network Rail data shows that trains have been delayed on Britain's railways for the equivalent of 252 years, six months and 17 days since 2015.
  107. [107]
  108. [108]
    Very little achieved on rail reforms in Great Britain in past six years ...
    May 27, 2024 · The government has “achieved very little” in reforms to Great Britain's railways six years after identifying the need for big changes to improve the situation ...
  109. [109]
    Train delays: Who is responsible for running the railways? - BBC
    Sep 20, 2018 · An independent report finds no-one took responsibility for disruptions.
  110. [110]
    Rail 857: Is the Office of Rail and Road really necessary?
    Jul 14, 2018 · It is, though, its role of economic regulator that is in question as principally this involves the ORR overseeing Network Rail, an unnecessary ...Missing: overreach | Show results with:overreach
  111. [111]
    [PDF] The future of rail - UK Parliament
    May 23, 2025 · ... Rail and. Road (ORR) would change. The ORR would no longer approve access or direct the sale of access rights for rail infrastructure managed ...
  112. [112]
    DfT to fundamentally review role of ORR - Rail Technology Magazine
    Nov 26, 2015 · When it came to delivery, early costing errors, unanticipated interdependencies, lower than expected productivity and the failure to ensure ...<|separator|>
  113. [113]
  114. [114]
    National Audit Office report criticises ORR - Rail UK
    Apr 4, 2011 · The report by the National Audit Office acknowledges that the Regulator has significantly developed the methods it uses to judge efficiency. Its ...
  115. [115]
    Office of Rail and Road coy on changes to power after ...
    Apr 24, 2024 · Key to the bill is the creation of a new Integrated Rail Body (IRB) known as Great British Railways (GBR) which will bring together powers over ...