Interstate 287


Interstate 287 (I-287) is an auxiliary Interstate Highway spanning 98.72 miles (158.87 km) that serves as a partial beltway around the northern and western periphery of the New York City metropolitan area in New Jersey and New York. The route begins at a junction with Interstate 95 and the New Jersey Turnpike in Edison, New Jersey, proceeds generally northward through suburban and rural areas of Middlesex, Somerset, Morris, Passaic, and Bergen counties, crosses into New York near Suffern, continues eastward concurrently with Interstate 87 along the New York State Thruway and across the Governor Mario M. Cuomo Bridge (formerly Tappan Zee Bridge), then follows the Cross Westchester Expressway through Rockland and Westchester counties to terminate at Interstate 95 near Rye. In New Jersey, it is signed north-south and maintained by the New Jersey Department of Transportation over 67.54 miles (108.70 km); in New York, it is signed east-west and covers 31.18 miles (50.18 km), including segments managed by the New York State Thruway Authority.
Designated in 1958 as part of the Interstate Highway System, I-287 was built in phases primarily during the 1960s through the 1990s to provide an alternative to the congested urban core of New York City, facilitating regional travel and commerce while traversing diverse terrain from industrial zones to the Palisades and Hudson River crossings. The final 17-mile segment in northern New Jersey, connecting Montville to the New York state line, faced prolonged controversy over environmental disruption to preserved lands, potential flooding risks, and suburban development pressures, delaying completion until November 1993 despite federal mandates for the full loop. This extension, though contentious, enhanced connectivity but has since been criticized for contributing to higher traffic volumes and maintenance challenges in ecologically sensitive areas.

Route Description

New Jersey Segment

Interstate 287 begins its segment at a partial cloverleaf interchange with Interstate 95 () and in Edison Township, Middlesex County, marking milepost 0. The freeway initially directs northwest through a mix of industrial zones and suburban developments, accommodating up to six lanes in some sections to handle commuter traffic. Within the first two miles, it features Exit 1 for , providing connectivity to central corridors, followed by Exit 2 for in South Plainfield Township, serving local access to Metuchen and Highland Park. The route crosses the via a multi-span bridge near Bound Brook, transitioning into Somerset County around milepost 10 while navigating relatively flat terrain with minor elevation changes for drainage and urban avoidance. In Somerset County, I-287 continues northwest through Bridgewater Township, interchanging with at Exit 9 (milepost approximately 13), a key east-west artery for commercial traffic, before curving northeast near milepost 17 to cross the . Major connectivity occurs at Exits 13A/B for U.S. Routes 202/206 in the Bedminster-Bridgewater area (around milepost 20), facilitating links to Princeton and points south, and at the complex trumpet-style interchange with at Exit 14A/B (milepost 21), which includes direct ramps engineered for high-volume merges amid the ' rolling hills, requiring cut-and-fill adaptations for . The highway expands to handle over 100,000 vehicles daily in this corridor, with auxiliary lanes added for weaving traffic. Entering Morris County around milepost 22, I-287 arcs eastward, bypassing Morristown to the north through Bernards and townships, traversing wooded uplands with viaducts over local streams and rail lines for terrain conformity. It interchanges with at Exit 30 (near milepost 37) in Parsippany-Troy Hills, connecting to Route 10 and western routes, and meets Interstate 80 at Exit 47 (milepost 43) west of Parsippany, a directional interchange designed to minimize congestion from freight and commuter flows. The path shifts north into Passaic County near milepost 50, passing through Wayne and boroughs amid increasing suburban density and low hills, with interchanges like Exit 53 for providing access to Pompton Lakes. In Bergen County, I-287 proceeds northeast through Oakland and Franklin Lakes, adapting to the Ramapo Mountains' steeper grades with retaining walls and superelevated curves, before reaching its northern terminus at Exit 66 (milepost approximately 67) with Route 17 in Mahwah Township. This final interchange, a high-speed partial cloverleaf, links directly to Route 17 northbound toward the , approximately 10 miles away, serving as a critical for through avoiding while connecting to the via local routes. The entire 67-mile portion emphasizes suburban relief routing, with design speeds of 55-65 mph and barriers to separate local and express where volumes exceed capacity.

New York Segment

In New York, Interstate 287 enters from New Jersey at the state line in Rockland County near Suffern, where it joins the New York State Thruway in a concurrency with Interstate 87 heading northeast through the county. This segment passes exits serving local routes such as U.S. Route 202 and New York State Route 59 in Hillburn and Suffern, before reaching the Governor Mario M. Cuomo Bridge over the Hudson River near Nyack and Tarrytown. Crossing into Westchester County, the route continues along the Thruway, providing access to Tarrytown and Sleepy Hollow via Exit 9. At Elmsford, Interstate 287 diverges eastward from Interstate 87 at Thruway Exit 9, becoming the Cross Westchester Expressway, a six-lane divided highway maintained by the New York State Thruway Authority. The expressway proceeds through Greenburgh and White Plains, intersecting the Saw Mill River Parkway and New York State Route 119, before reaching North Castle and Rye. It terminates at a cloverleaf interchange with Interstate 95 (New England Thruway) in Rye, near the Connecticut state line, facilitating connections to the Merritt Parkway and further east. This 31.18-mile portion of Interstate 287 functions as a key outer bypass for the metropolitan area, avoiding by linking the Thruway system directly to Interstate 95 without traversing urban cores. The route supports regional commuting and freight movement, with interchanges in Westchester County including access to the and Interstate 684.

Technical and Engineering Features

Design Standards and Capacity

Interstate 287 adheres to the engineering standards of the , as defined by the (FHWA), including full control of access via grade-separated interchanges, a divided roadway profile, minimum 12-foot lane widths, and clear recovery zones to facilitate safe high-speed travel. The route features a right-of-way typically 300 to 400 feet wide, with medians ranging from 50 to 100 feet to separate opposing traffic flows and mitigate crossover risks. Lane configurations vary by segment and state: the portion predominantly provides six lanes (three per direction), with some four-lane subsections and expansions to eight lanes in high-volume areas near major interchanges; the segment, including the Cross Westchester Expressway, maintains six lanes standard, widening to eight lanes at key junctions such as the Thruway split. Design speeds target 70 across the alignment to support efficient regional circulation, though posted limits are generally 65 mph on open rural and suburban stretches, reducing to 55 mph on connectors or urban approaches with geometric constraints. Pavements consist primarily of overlays, selected for durability under freeze-thaw cycles prevalent in the Northeast, though some rehabilitated sections incorporate high-performance thin overlays to address rutting and cracking. Shoulder provisions include 10- to 12-foot outside shoulders for emergency use and 4- to 6-foot inside shoulders, with narrower widths in constrained corridors increasing vulnerability to debris accumulation or breakdown-related incidents. Design capacities were projected at 50,000 average annual daily traffic (AADT) vehicles by the mid-1990s, scaling to 75,000 AADT by 2010 in core segments to accommodate anticipated growth without immediate reconstruction, aligning with FHWA guidelines for level-of-service thresholds on multi-lane freeways. These figures reflect serviceable flows under free-flow conditions, with eight-lane sections inherently supporting higher theoretical maxima through increased lane density and reduced merge conflicts.

Major Bridges and Interchanges

In , Interstate 287 crosses the via a multi-span bridge structure between exits 9 and 10, spanning from Piscataway in County to Franklin Township in Somerset County, accommodating the highway's four lanes amid the river's flood-prone valley. The bridge, classified as scour critical due to potential erosion from river flows, features foundations stable for calculated scour depths above the footing level, reflecting standard for regional waterways. A prominent interchange occurs at I-78 in Bedminster and Bridgewater townships, designed as a multi-level directional cloverleaf with looping ramps to handle high-volume east-west and north-south flows, though early configurations included suboptimal left-side entries contributing to weave conflicts. Ongoing improvements, initiated around 2020, relocate the eastbound I-78 to northbound I-287 ramp to a right-side entry, add a new flyover for northbound I-287 to westbound I-78, and refine diverge geometrics to Routes 202/206, aiming to reduce accidents from abrupt merges without expanding overall capacity. In , I-287 merges with the (I-87) at Interchange 15 near Suffern in Rockland County, where the auxiliary route joins the Thruway's mainline in a concurrent alignment northward, facilitating seamless transition via high-speed ramps integrated into the toll road's six-lane profile. This junction demands precise engineering for traffic weaving, with recent rehabilitations addressing aging structures to maintain structural integrity under heavy freight loads. The route's most significant bridge is the Governor Mario M. Cuomo Bridge over the , a 3.1-mile twin cable-stayed span carrying the I-87/I-287 concurrency between Rockland and Westchester counties, replacing the 1955 to address fatigue, scour, and seismic vulnerabilities identified in prior assessments. The westbound span opened on August 25, 2017, with full two-way traffic commencing September 8, 2018, incorporating deeper foundations and tuned mass dampers for enhanced stability against low-to-moderate seismic events in the region per AASHTO guidelines.

Historical Development

Planning and Federal Approval (1950s–1960s)

The planning of Interstate 287 emerged in the mid-1950s amid broader efforts to develop a national network of controlled-access highways for national defense, commerce, and congestion relief in densely populated regions. Conceived as an outer beltway circumventing to the west and north, it aimed to link existing radial routes like the and , thereby diverting through-traffic from Manhattan's bottlenecks. This alignment reflected first-principles considerations of traffic flow dynamics, prioritizing circumferential routes to minimize urban bottlenecks where radial highways converged, a pattern observed in prewar congestion studies by state highway departments. The provided the authorizing legislation, allocating federal funds at 90% of construction costs for approved Interstate routes to facilitate rapid suburban interconnectivity amid postwar population shifts. In , the southern segment drew from earlier proposals for the Middlesex Freeway, a limited-access route envisioned in the early to connect coastal areas with inland radials, which state officials lobbied the Bureau of Public Roads to incorporate into the Interstate System as Federal-Aid Interstate Corridor 104. This corridor received the I-287 designation in following federal review of state-submitted plans, which emphasized its role in regional commerce by bridging the vicinity to the state line. Debates centered on precise alignments through and counties, balancing engineering feasibility—such as terrain avoidance and right-of-way acquisition—with pressures from burgeoning suburban development, where empirical traffic counts from the early indicated overloads on and parallel arterials exceeding 20,000 vehicles daily. Federal approval proceeded under Bureau of Public Roads oversight, confirming compliance with Interstate standards for minimum 20-foot medians and full . New York's portion, including the Cross-Westchester Expressway, paralleled this timeline, with initial proposals in integrating Thruway extensions already under construction since 1950. Initially numbered I-187 in August 1958, it was renumbered I-487 in December and finalized as I-287 to denote its auxiliary status to parent I-87, reflecting American Association of Officials conventions for circumferential routes. Approval hinged on projections that the beltway would alleviate radial overloads, with state engineers estimating up to 30% diversion of cross-Hudson traffic based on origin-destination surveys showing heavy reliance on ferries and bridges like the . These plans navigated local opposition from municipalities concerned with land impacts but advanced due to federal prioritization of defense-linked mobility, as articulated in Bureau of Public Roads reports linking suburban arterials to stockpiling routes.

Construction and Phased Openings (1970s–1990s)

Construction on Interstate 287 advanced in phases during the and 1980s, prioritizing segments that connected key industrial and suburban areas in while navigating rocky terrain in the and securing federal Interstate Highway funding amid rising construction costs from inflation. By 1973, the portion extended continuously for 47 miles from the interchange in Edison (Middlesex County) northward through Somerset County to in Montville, allowing initial traffic relief for commuters bypassing via the developing beltway. This early connectivity spurred immediate economic activity, including over $75 million in new housing developments along the corridor within the following year, as businesses and residents gained direct access to regional hubs without relying on congested radial routes. The northern New Jersey segment, spanning about 20 miles from near Interstate 80 in Morris County to the New York state line near Suffern, encountered prolonged delays from local opposition over environmental impacts and land acquisition disputes in the 1970s and 1980s, pushing completion beyond initial targets. Engineering challenges included bridging valleys and stabilizing cuts through the Highlands region, addressed via phased earthwork and viaduct construction funded by a mix of state bonds and federal aid. The full New Jersey length of 66.9 miles opened to traffic on November 19, 1993, closing the beltway loop and redirecting freight and passenger flows away from urban bottlenecks, which reduced travel times across northern New Jersey by integrating with existing parkways. In New York, minimal new construction occurred in this period, as the Cross Westchester Expressway segment from Interstate 87 to Interstate 95 had been completed earlier; however, the Authority took over operations of this 11-mile toll-free portion in , expanding the Thruway system to 570 miles and enabling seamless I-287 continuity with the tolled Thruway mainline westward to the . The phased strategy across both states mitigated broader disruptions by prioritizing high-volume connectors first, yielding early gains in logistics efficiency for Westchester and commerce despite overall project costs escalating due to material price surges and regulatory hurdles.

Post-Completion Modifications

The replacement of the with the Governor Mario M. Cuomo Bridge, completed between 2017 and 2019, significantly upgraded the segment of Interstate 287 by expanding capacity from six to eight lanes across the and incorporating modern safety features such as wider shoulders and a dedicated pedestrian/bicycle path. This $3.98 billion project addressed structural deficiencies and increasing traffic volumes observed post-1990s completion, reducing congestion bottlenecks for I-287 traffic bypassing . In Rockland County, a $19.4 million rehabilitation of two aging bridges on I-87/I-287, initiated in 2025, further improved structural integrity and load-bearing capacity in response to wear from sustained high-volume freight and commuter use. In Westchester County, a $32.4 million resurfacing and restoration project along a 5.5-mile stretch of I-287, announced in 2024, repaired pavement joints, added new asphalt overlays, and upgraded striping to mitigate deterioration from post-completion traffic growth exceeding original design projections. These data-informed adjustments, derived from ongoing monitoring of average daily traffic volumes surpassing 100,000 vehicles in peak areas, prioritized minimal disruption through phased night work. On the New Jersey segment, the I-287/I-78 interchange reconstruction, commencing in 2016, relocated the eastbound I-78 to northbound I-287 ramp from left- to right-side entry, widened approach lanes, and removed obsolete bridges to enhance merge/diverge flows amid observed weaving-related delays. This $200 million-plus effort, completed in phases by 2020, incorporated geometric realignments based on traffic modeling showing 20-30% capacity gains for the high-demand corridor linking I-287 to eastern New Jersey routes. High-occupancy vehicle (HOV) lane extensions along I-287 between I-78 and I-80, operationalized in the early 2000s following 1990s pilots, were refined post-implementation with enforcement and access adjustments to sustain occupancy thresholds amid rising single-occupancy demand.

Economic and Strategic Role

Facilitation of Regional Commerce

Interstate 287 serves as a vital artery for freight transportation, enabling trucks to bypass the severe congestion associated with roadways and directly linking New Jersey's major ports and industrial hubs—such as those in and counties—to markets in , , and via connections to I-78, I-80, and the . This circumferential routing around the urban core facilitates the movement of goods from the Port of Newark-Elizabeth complex northward, avoiding Manhattan's bottlenecks and supporting New Jersey's role as a national freight gateway handling over 466 million tons of truck-borne cargo annually. High truck volumes along the corridor highlight its freight significance, with certain segments in Passaic County exceeding 15,000 trucks per day, comprising a substantial portion of the 25% through-truck tonnage impacting regional highways like I-78 and the . By providing reliable access between manufacturing zones in and counties and distribution points, I-287 has lowered effective costs through shorter detour avoidance and improved routing efficiency, as evidenced by its designation as a critical freight corridor in state planning documents. The has spurred a suburban warehousing and boom, particularly in the I-287 corridor, where net absorption reached 5.1 million square feet of space from 2012 to 2016, followed by 2.7 million square feet of leasing activity in 2019 alone, driven by demands and proximity to interstate networks. This development has enhanced job access for regional labor markets, supporting business expansion in , , and distribution sectors across serviced counties, with vacancy rates remaining low due to sustained demand for facilities offering direct ingress.

Bypass Function and Traffic Relief

Interstate 287 serves as a key circumferential route in the , designed to divert regional through-traffic away from the dense urban core of , particularly Manhattan's congested arterials and bridges. Spanning 98.7 miles across northern and southeastern , the highway forms a partial beltway that links the (I-95) near Edison, New Jersey, to the New England Thruway (I-95) in Rye, New York, allowing motorists on cross-state journeys to bypass approximately 30 miles of Manhattan's infrastructure, including the , , and . This configuration addresses the limitations of radial interstates like I-95, which funnel high volumes into the city's bottlenecks, where peak-hour delays routinely exceed 50% of free-flow times. By integrating with western radials such as I-80 in , and I-78 near , I-287 enhances national highway network resilience, providing an alternative path for freight and passenger traffic originating from the Midwest or destined for or . This connectivity supports efficient long-haul routing, reducing dependency on urban penetration routes prone to disruptions from incidents, construction, or volume surges. Federal planning documents emphasize such bypasses for maintaining system-wide flow, with I-287's role validated in regional models showing diversion of up to 20% of potential I-95 through-traffic during high-congestion events. Empirical assessments of similar facilities indicate that I-287's avoidance of urban yields measurable efficiency gains for personal vehicles, prioritizing direct access over mass transit alternatives that often involve transfers and lower speeds in the . While the bypass adds mileage compared to direct urban traversal, operational data from comparable corridors demonstrate time savings of 1-2 hours per trip during peak periods, alongside reduced fuel consumption from sustained higher speeds averaging 55-65 mph versus sub-30 mph in city cores. These benefits underscore causal advantages of dedicated freeway loops in alleviating radial overload, though has moderated absolute relief in adjacent suburbs.

Traffic Patterns and Safety

Volume and Congestion Metrics

Annual Average Daily Traffic (AADT) on Interstate 287 typically ranges from 90,000 to over 150,000 vehicles, with the highest volumes concentrated near major interchanges. In , counts near the (I-95) in Edison and between U.S. 202 and N.J. 208 in have recorded AADTs around 90,000 to 100,000, reflecting heavy commuter and freight flows. In , AADT peaks at approximately 156,000 vehicles at the Westchester-Rockland county line and 137,000 near the start of the I-87/I-287 overlap in Westchester , while segments in Rockland , such as between the Chestnut Ridge viaduct and exit 14 (NY 59), exceed 130,000. Peak-hour congestion manifests in bottlenecks at key junctions, including the I-95/I-287 interchange in , ranked among the top national truck freight delays due to merging radial traffic from suburban origins. Similarly, the I-287 segment in , near the , ranks as a high-delay corridor for trucks, with average speeds dropping below posted limits during rush hours from 4-7 p.m. weekdays. These chokepoints exacerbate delays, as evidenced by analyses of the broader New York-New Jersey metro area, where travel time reliability indices indicate frequent variability, with 80th percentile times often 1.5 times median free-flow durations on beltway feeders like I-287. Underlying causal factors include capacity constraints from mid-20th-century design standards, which anticipated far lower volumes—such as 25,000 vehicles per day in early planning—against post- surges driven by and suburban development. Completion of the full beltway in the induced additional demand, channeling traffic from expanding exurban areas into fixed-lane originally sized for 1960s-era vehicle ownership rates, resulting in overloads exceeding 100% of theoretical during peaks.

Accident Statistics and Causal Factors

Interstate 287 in experienced 3,313 crashes in 2019, reflecting a statewide crash rate of 1.62 per million vehicle miles traveled (MVMT) for the route. This rate exceeds the national average for Interstates, which hovered around 1.37 crashes per 100 million VMT in 2021, though non-fatal crash metrics vary by and traffic exposure. The segment between mile markers 10 and 11 in Woodbridge Township registered the highest localized rate at 3.68 per MVMT, attributed to complex interchanges and high entry/exit volumes. In , I-287 segments showed lower incidence at approximately 1.71 crashes per MVMT, benefiting from less congested suburban alignments compared to 's denser corridors. Crash analyses highlight elevated risks at merge points, where speed differentials between entering and through traffic contribute to rear-end and lane-change collisions, often 15-20% higher than straightaway segments based on interstate-wide patterns. , including failure to yield and improper merging, accounts for over 90% of causal attributions in National Motor Vehicle Crash Causation Survey data, underscoring driver behavior as the dominant factor rather than inherent design flaws. Inadequate exacerbates these issues at high-volume interchanges like those with I-78 and US 1/9, where visibility and advance warning distances fall short of optimal standards in congested conditions. Weather-related incidents, such as pavement buckling from , emerged in June 2025 along segments near Exits 52 and 42, where extreme heat exceeding 95°F (35°C) caused concrete upheaval and prompted lane closures to avert collisions from sudden surface irregularities. These events, driven by joint expansion rather than routine , highlight material vulnerabilities but represent isolated infrastructure responses rather than primary drivers; post-event repairs mitigated immediate risks without reported secondary crashes. Overall, I-287's profile compares favorably to urban arterials, where crash rates often double due to signalized intersections and conflicts, affirming the controlled-access design's efficacy when human factors are managed.

Environmental and Land Use Effects

Construction-Era Habitat and Wetland Impacts

Construction of Interstate 287 in traversed ecologically sensitive areas, including freshwater wetlands in the basin and adjacent floodplains, necessitating dredge and fill activities authorized under Section 404 of the Clean Water Act administered by the U.S. Army Corps of Engineers. These impacts were documented in project-specific environmental reviews conducted pursuant to the , which evaluated alterations to hydrologic regimes and vegetation communities during the phased builds from the early 1970s to the late 1980s. Specific instances included wetland fills in Parsippany-Troy Hills Township, where highway grading displaced and forested habitats, prompting compensatory measures such as the creation of a three-acre replacement by the New York State Department of Transportation to offset losses. A 20-mile segment in central similarly resulted in destruction, with subsequent restoration efforts involving the deposition of clean fill to rehabilitate affected sites and mitigate erosion and sedimentation. These actions fragmented local habitats, displacing species adapted to and riparian environments, though federal and state approvals incorporated engineering controls like stormwater management to limit broader downstream effects. The ecological trade-offs inherent in these disruptions prioritized the highway's role in enabling regional and decongestation over undisturbed preservation, as determined through regulatory balancing in an era of rapid and demands. Post-construction , where implemented, focused on stabilization rather than comprehensive recovery, reflecting the causal priority of durability for human activity over static natural baselines.

Operational Emissions and Mitigation Efforts

Operational emissions from Interstate 287 primarily consist of tailpipe pollutants including (CO2), (NOx), and from the high volume of passenger vehicles and freight trucks traversing the route. Average passenger vehicles emit approximately 400 grams of CO2 per mile driven, though this figure decreases on highways like I-287 where steady speeds of 55-65 enable fuel efficiencies 20-30% higher than in stop-and-go conditions, reducing per-mile emissions by minimizing idling and losses. Congestion hotspots, such as the I-287/I-95 interchange in , elevate local NOx and CO2 outputs during peak hours due to idling, but overall corridor operations yield lower emissions per mile compared to diverted local road travel, as fragmented routes amplify consumption through frequent stops. Mitigation efforts include installation of noise barriers along segments of I-287 to reduce acoustic from , with projects such as the 2007 construction near ramps in , incorporating walls without disrupting mainline flow. Stormwater management systems, featuring vegetated swales and permeable pavements in upgraded sections, capture runoff pollutants like oil and sediments before discharge, aligning with standards for highway environmental controls. Air quality monitoring by the New Jersey Department of Environmental Protection demonstrates compliance with EPA (NAAQS) along the corridor, with ambient levels of criteria pollutants remaining below thresholds in 2023 assessments, supported by ongoing conformity determinations for transportation plans. Electrification trends further mitigate emissions, as federal National Electric Vehicle Infrastructure (NEVI) funding allocates resources for charging stations along I-287 in , facilitating () adoption for both passenger and freight fleets. Electric trucks achieve up to 80% lower lifecycle emissions than diesel equivalents on highway routes, where and consistent speeds preserve battery range better than urban stop-go patterns, enabling greater freight decarbonization potential than local road reliance. This counters claims that highways inherently exacerbate emissions, as smoother operations support efficiency gains absent in congested alternatives.

Controversies and Challenges

Opposition to Extensions and Environmental Litigation

Opposition to extensions of Interstate 287 arose primarily in the 1970s and 1980s, driven by local governments, residents, and environmental organizations concerned about habitat disruption and pollution in northern New Jersey. A key challenge was the proposed 20.6-mile extension from Montville to the New York state line at Suffern, which faced scrutiny for traversing sensitive areas including 36 acres of wetlands, 75.4 acres of parkland across five state and county parks, and 745 acres of woodland habitat. Plaintiffs, including Bergen County, the Borough of Franklin Lakes, the Township of Montville, and citizens' groups, argued in County of Bergen v. Dole (1985) that federal and state agencies violated the National Environmental Policy Act (NEPA) by inadequately assessing alternatives, impacts on endangered species like the small whorled pogonia, and overall environmental quality in the Final Environmental Impact Statement (FEIS) approved in 1982. The U.S. District Court for the District of rejected these claims, denying an and finding that agencies had conducted extensive reviews over decades, including three environmental impact statements and public hearings, while considering feasible alternatives like the costlier Roe (estimated at $802 million versus $400 million for the selected route). The court upheld mitigation measures, such as noise barriers, soil erosion controls, parkland replacement programs, and design adjustments to minimize wetland and floodplain encroachment, deeming the process neither arbitrary nor capricious under NEPA, Section 4(f) of the Act, and related statutes. Similar suits, including threats from 11 municipalities, delayed construction until , but judicial rulings favored proceeding, as no evidence supported claims of procedural overreach or unmet coordination requirements with local agencies. Later capacity expansions, such as lane additions in the 1990s, drew further litigation from groups like the , alleging insufficient analysis of noise and air quality under NEPA, though these focused on operational rather than extension impacts. Proponents argued that court validations enabled regional economic connectivity by bypassing congested urban routes, fostering commerce without viable alternatives to halt sprawl. Critics from environmental quarters, often aligned with preservation priorities, achieved temporary halts through redesigns that reduced direct habitat loss but did not prevent completion of the extension by , underscoring how litigation extended timelines without derailing infrastructure needs substantiated by traffic and defense rationales.

Recent Infrastructure Vulnerabilities

In June 2025, Interstate 287 in experienced multiple buckling incidents in Morris County, triggered by extreme heat during a with temperatures approaching 100°F (38°C). On June 24, southbound lanes closed at mileposts 52.6 in and 49.3 in Montville due to buckled slabs, where expansion of metal joints exerted on the underlying , causing it to and uplift. A subsequent event on June 25 affected southbound lanes near milepost 52 south of Exit 52 (Route 23) in Pequannock Township, leading to full closure for emergency repairs and significant traffic disruptions. These failures highlighted vulnerabilities in the highway's aging infrastructure, originally constructed with substandard slabs prone to without sufficient relief joints. The (NJDOT) attributed the bucklings directly to heat-induced expansion of bridge joints pushing against rigid sections, a mechanical process common in older pavements during high temperatures. Emergency repairs involved temporary stabilization, with overnight lane closures extending into late June for joint replacements and slab patching across a 10-mile inspected stretch. Comprehensive rehabilitation of the affected northern County segment—from Route 202 in Montville to Interstate in Wharton—is deferred until 2027, encompassing repairs, high-performance overlays, and ride quality improvements, underscoring prior deferrals on this oldest pavement portion. Causal factors center on material fatigue and thermal dynamics rather than novel climatic extremes, as concrete buckling from joint expansion has long been documented in engineering literature for highways lacking modern flexible designs. While some analyses invoke broader infrastructure "climate readiness," NJDOT records emphasize localized joint failures on decades-old , raising accountability concerns over delayed upgrades despite known risks from recurrent NJ . No fatalities or major accidents were reported from these closures, but they amplified congestion on parallel routes like U.S. Route 46.

Debates Over Tolling and Funding

In early , a New Jersey state report identified declining gasoline tax revenues as a shortfall for highway maintenance, recommending consideration of tolls on nontolled interstates including I-287 to generate dedicated user fees for repairs and expansions. Proponents argued that tolls would align costs with usage, providing a stable revenue stream less vulnerable to fluctuations in fuel consumption compared to the federal gasoline tax, which has remained at 18.4 cents per since 1993 despite and rising vehicle miles traveled. Critics countered that introducing tolls on previously free routes like I-287 could discourage essential commuting, divert traffic to local roads, and impose regressive burdens on lower-income drivers who lack alternatives to driving. In January 2025, Jersey City Mayor proposed "reverse " measures, including electronic toll gantries on major entry corridors such as Route 17 and I-287, targeting vehicles from to offset perceived inequities from City's program that commenced on January 5, 2025. The plan aimed to raise funds for New Jersey Transit improvements amid service disruptions, with projected revenues directed toward infrastructure and transit subsidies. Opponents, including local commuters and fiscal watchdogs, highlighted New Jersey's existing high toll density—already among the nation's highest per mile driven—and warned that added fees would exacerbate affordability strains, potentially reducing economic activity in border regions without proportionally easing congestion elsewhere. Debates over funding models for I-287 underscore tensions between user-based tolling and traditional taxes, with advocates for tolls emphasizing direct linkage to road wear and benefits, such as to mitigate peak-hour bottlenecks observed on the corridor. However, evidence from similar implementations suggests potential unintended shifts in socioeconomic burdens, as lower-income households, comprising a significant portion of I-287's commuter base, face higher proportional costs without access to premium options. As adoption erodes gas tax collections—projected to decline further by the U.S. —policymakers continue weighing toll equity against fiscal sustainability, though no tolls have been enacted on I-287 as of October 2025.

Recent Projects and Planned Improvements

2020s Resurfacing and Repair Initiatives

In August 2024, the New York State Department of Transportation initiated a $32.4 million resurfacing project along a 5.5-mile segment of Interstate 287 in Westchester County, spanning from the Harrison-Rye town line to the U.S. Route 1 interchange. The work includes milling existing pavement, installing new asphalt overlays, repairing deteriorated road joints, and upgrading pavement markings to enhance durability and visibility. Conducted primarily during overnight hours from 8 p.m. to 5 a.m., the project aims to minimize daytime traffic disruptions while addressing wear from high volumes on the Cross Westchester Expressway; completion is expected by fall 2025. Initial outcomes have included smoother riding surfaces and fewer potholes in treated areas, though intermittent lane closures have caused minor delays for commuters. In , the is designing a pavement rehabilitation project for the concrete sections of I-287 between Exit 47 (Route 202) in Montville and Exit 53 (I-80) in Wharton, prompted by repeated buckling incidents, including a major event in June 2025 due to extreme heat expanding bridge joints. The initiative, set to commence in 2027, will replace deteriorated concrete slabs in both directions to prevent future failures and improve ride quality on this aging corridor. Emergency repairs following the 2025 buckling involved overnight lane closures at mileposts 49.3 and 52.6, restoring full access within days but highlighting the segment's vulnerability; long-term replacement is projected to reduce such incidents and formation. Short-term effects during will likely include phased lane restrictions, potentially exacerbating congestion in Morris County. At the I-287/I-78 interchange in , ongoing improvements initiated in the early 2020s include ramp reconfigurations to enhance safety and operational flow, such as relocating the eastbound I-78 to northbound I-287 ramp from left-side to right-side entry to reduce weaving conflicts. These upgrades address pavement wear and geometric deficiencies contributing to minor accidents, with construction phased to limit disruptions; partial implementations by 2025 have improved merge efficiency without full resurfacing. The project has resulted in fewer ramp-related delays, though temporary closures during ramp work have occasionally increased local traffic volumes on adjacent Routes 202/206.

Long-Term Expansion Proposals

The (NJDOT) maintains long-range plans to reconstruct the Interstate 287 bridge spanning the in South Bound Brook, addressing a structural that constrains in Middlesex County. This initiative includes potential rebuilding of adjacent roadway approaches between exits 9 () and 10 (Possumtown Road), which could incorporate lane additions or alignment adjustments to enhance capacity amid projected freight and commuter growth along the corridor. Final phases for related bridge elements, such as drawbridge replacement, are slated to commence in 2026, with to follow, though full scoping remains subject to funding allocation. Feasibility studies, including the 2005 I-287 Mobility Plan for and counties, have evaluated capacity enhancements through multimodal strategies, recommending targeted roadway widenings in high-congestion segments alongside expansions and travel demand management to justify economic benefits via reduced delay costs. These align with North Jersey Transportation Planning Authority (NJTPA) projections in Plan 2050, which identify I-287 as a critical corridor facing 20-30% volume increases by mid-century, supporting cost-benefit analyses that prioritize relief over broad expansions. In , NYSDOT evaluations for the Cross Westchester Expressway segment emphasize interchange optimizations rather than mainline widening, with environmental reviews under the ongoing for connectivity improvements at key junctions like Route 119 to mitigate regional bottlenecks without full lane additions. Implementation faces hurdles including chronic funding shortfalls, as state transportation capital programs allocate primarily to maintenance over new capacity, and local opposition rooted in not-in-my-backyard concerns over land acquisition and noise in suburban areas. Public-private partnerships have been floated as a funding mechanism, drawing from New Jersey's prior use of such models for enhancements, though adoption for I-287 remains exploratory pending updated feasibility assessments. Integration with regional transit, such as alignments, features in NJTPA recommendations to offset highway demand, with economic modeling indicating potential 10-15% throughput gains from combined investments.

Memorial Designations

Named Highways and Tribute Segments

In New Jersey, Interstate 287 is officially designated the Korean War Veterans Memorial Highway, honoring participants in the 1950–1953 conflict through posted signage and county-specific segment names recognizing local veterans. The designation originated via legislative resolution in the 1996–1997 session, with implementation including markers for recipients of related honors such as the Purple Heart, Combat Infantryman's Badge, and Korean Service Medal. These commemorative elements apply along the full New Jersey length from the New Jersey Turnpike in Edison to the New York state line near Suffern, without altering traffic controls, tolling, or maintenance protocols. In , the Westchester County segment of I-287, known as the Cross Westchester Expressway from the (now Mario M. Cuomo Bridge) eastward to the New England Thruway (I-95) in , carries the honorary title Westchester County War Veterans Memorial . This name acknowledges veterans from multiple wars, evidenced by official signage, and extends through urban and suburban areas without influencing engineering standards or operational restrictions. The multiplexed portion with the (I-87) in Rockland County inherits general Thruway commemorative ties but lacks unique I-287-specific memorials beyond standard state designations.

Exit List

New Jersey Exits

The exits of Interstate 287 in New Jersey, as documented by the New Jersey Department of Transportation, are numbered from 1 at the southern terminus with Interstate 95 (New Jersey Turnpike) in Edison Township, Middlesex County, to 66 near the New York state line in Mahwah Township, Bergen County. Exit numbering generally aligns with approximate mileposts, resulting in non-consecutive numbers where no interchanges exist at certain markers; the route spans approximately 67.54 miles within the state. Ramp configurations vary, with most featuring partial or full cloverleaf designs, though specific partial ramps occur at transitional interchanges like Exit 1 and Exit 66.
ExitDestinationsMilepost
1 (I-95), Pierson Avenue, , Whitman Avenue0.00 (southern terminus)
2New Durham Road2.47
3Durham Avenue4.62
5Stelton Road5.88
6South Randolphville Road6.41
7Old New Brunswick Road7.71
8River Road8.47
9Easton Avenue10.27
10Davidson Avenue10.72
12Elizabeth Avenue, Union Avenue12.89
13, Chimney Rock Road13.87
1414.25
17, , Talamini Road18.73
21, Burnt Mills Road (Vincent R. Kramer Interchange)20.06
22, Layton Road23.67
26Mount Airy Road26.48
30North Finley Avenue, Madisonville Road29.94
33Sandsprings Road33.17
34Harter Road34.02
35James Street, South Street (Route 124)35.77
3635.89
37Ridgedale Avenue36.26
39Entin Road39.64
40Parsippany Road40.94
41Route 1041.92
42Littleton Road42.19
43Intervale Road43.59
44, Washington Street44.95
47River Road46.72
52Route 23, Mountain Avenue53.14
53Route 2353.83
55Ringwood Avenue55.31
57West Oakland Avenue, Ramapo Valley Road ()58.14
58Franklin Avenue59.80
59Route 20859.94
66Route 17, Ridge Road (northern terminus)66.94
Exit numbering was adjusted in the late to better correspond to mileposts, replacing an earlier system offset by approximately four miles in the southern section. No major renumbering has occurred since.

New York Exits

In , Interstate 287 extends approximately 28 miles from the state line through Rockland and Westchester counties, utilizing hybrid exit numbering: Thruway system numbers (Exits 11–15) along the concurrent I-87 segment in Rockland County to the Governor Mario M. Cuomo Bridge, followed by independent numbering (Exits 1–12) on the Cross-Westchester Expressway in Westchester County to its terminus at I-95. The Thruway concurrency integrates with the Authority's tolling system, where eastbound travelers encounter barrier toll collection upstream near the New Jersey Extension, while the Cross-Westchester Expressway lacks dedicated toll plazas and operates as a toll-free segment despite Authority maintenance.

Rockland County (Concurrent with I-87/New York State Thruway)

Eastbound exits, encountered southbound on the Thruway:
ExitDestinations
15NJ Route 17 south – Suffern; I-287 west –
14BAirmont Road – Airmont, Montebello
14A south –
14NY Route 59 – Spring Valley, Nanuet
13 south, US Route 9W – Stony Point
12NY Route 303 – Nyack, Congers
11US Route 9W – Haverstraw

Westchester County (Cross-Westchester Expressway)

Eastbound exits:
ExitDestinationsNotes
1Saw Mill River Parkway south, NY Route 119 – TarrytownNo eastbound exit
2Saw Mill River Road (NY Route 9A) – ElmsfordNo eastbound exit
3Sprain Brook Parkway south, Passenger cars only
4Knollwood Road (NY Route 100A) – Hartsdale
5NY Route 100 (Hillside Avenue), NY Route 119 (Tarrytown-White Plains Road) – White Plains
6 (NY Route 22) – White Plains, North White Plains
7Central Westchester Parkway north, – North White PlainsNo eastbound exit
8Bloomingdale Road, NY Route 119 (Westchester Avenue), NY Route 127 – White Plains; Westchester Mall PlaceSplit as 8E/8W eastbound; 8 westbound
9 north/south – , Whitestone Bridge
9AI-684 north – Brewster, Westchester Avenue
10NY Routes 120/120A (Purchase Street, Westchester Avenue), Bowman Avenue, Webb Avenue – Purchase, Port Chester
11 – Port Chester, RyeNo westbound exit
12I-95 south – ,

References

  1. [1]
    Interstate 287 New Jersey - AARoads
    Mar 9, 2024 · Interstate 287 encircles the greater New York City area along a 67.54 mile route in New Jersey and 31.18 mile alignment through New York state. ...Missing: total official<|separator|>
  2. [2]
    Interstate 287 - East Coast Roads
    Distance: 67.54 miles; Counties: Middlesex, Somerset, Morris ... I-287 is signed as a north/south route in New Jersey and as an east/west route in New York.Missing: length | Show results with:length
  3. [3]
    Interstate 287 (New Jersey) - NYCRoads
    EARLY CONSTRUCTION AND RESISTANCE: Construction of I-287 began in Middlesex and Somerset counties in 1958. The first sections of highway opened in the early ...
  4. [4]
    Effects of Final I-287 Link Are Debated - The New York Times
    Dec 3, 1989 · The final 19-mile link of Interstate 287 is slowly taking shape amid the crumbling rock and pristine riverbanks of some of New Jersey's most desirable real ...Missing: notable | Show results with:notable
  5. [5]
    Completion of I-287 Is Called Misguided - The New York Times
    Oct 4, 1981 · A ''final effort'' to c omplete Interstate 287 through parts of Morris, Passaic and Bergen Co unties, apparently an embarrassing missing link in a highway of ...Missing: controversies | Show results with:controversies
  6. [6]
    NJDOT begins major I-287 rehabilitation project in Piscataway and ...
    Oct 28, 2014 · The project will also repair the bridge decks on I-287 in both directions over Possumtown Road and the I-287 northbound bridge deck over the ...
  7. [7]
    Interstate 287 North - Edison to Somerville New Jersey - AARoads
    May 14, 2014 · Interstate 287 leads west from Route 440 into Edison Township. A cloverleaf interchange (Exits 1A/B) follows with U.S. 1. 08/29/05.
  8. [8]
    I-287/I-78, I-287/Routes 202/206 Interchange Improvements Project ...
    Oct 26, 2020 · The project involves relocating the existing ramp from I-78 eastbound to I-287 northbound from a left side entry, as it currently exists, to a right side entry.
  9. [9]
    Frequently Asked Questions, I-287/I-78, I-287/Routes 202 ... - NJ.gov
    Oct 27, 2020 · All traffic lanes will remain open along I-287, I-78 and Routes 202/206 during peak hours. Off-peak hour lane closures, including overnight ...
  10. [10]
    Interstate 287 spans approximately 98.72 miles across New Jersey ...
    Jul 31, 2025 · ... Cross Westchester Expressway, proceeding east through Westchester ... You only rarely taste the urbanity of New York when you hit the I-287, state ...
  11. [11]
    Interstate 287 (I-287) is a major auxiliary highway that ... - Facebook
    Jan 23, 2025 · The highway spans approximately 67 miles, beginning in Edison, New Jersey, at an interchange with I-95 (the New Jersey Turnpike), and ending in ...
  12. [12]
    Speed Limits for State Roads - Route I - 287, Traffic ... - NJ.gov
    Apr 13, 2020 · Route I - 287 ; (1), For the northbound direction of traffic: ; (A) Zone 1: 55 MPH between the New Jersey Turnpike–Route NJ 440-Route I-287 ...
  13. [13]
    Interstate 287 - Cross Westchester Expressway New York - AARoads
    Mar 9, 2024 · Interstate 287 in New York is part of a 98.72 mile long loop encircling the New York City metropolitan area from Port Chester west to ...<|separator|>
  14. [14]
    I-87 South / I-287 East - Suffern to Tarrytown New York - AARoads
    Mar 9, 2024 · I-87/287 combine east along the New York State Thruway from Suffern to Nyack and across the Governor Mario N. Cuomo Bridge to Tarrytown and ...
  15. [15]
    New York State Roads - I-287 Exit List
    Apr 9, 2025 · Interstate 287 is an east-west interstate in New York north of New York City. It is sometimes referred to as the divider between upstate and downstate New York.<|separator|>
  16. [16]
    Cross Westchester Expressway (I-287) - NYCRoads
    Descriptive history and current conditions on the Cross Westchester Expressway (I-287) in Westchester County, New York ... length of the Cross Westchester ...
  17. [17]
    Interstate 287 - Cross Westchester Expressway - East Coast Roads
    It runs east through White Plains to Rye, where it ends at the New England Thruway (I-95), just south of the Connecticut border.
  18. [18]
    New York State Thruway (I-87 and I-287) - NYCRoads
    This move brought the total Thruway system mileage to 641 miles. No tolls are charged on I-287 and I-84. This 1953 photo shows paving work underway on the ...
  19. [19]
    [PDF] High-Performance Thin Overlays - Federal Highway Administration
    The section has three 12-foot lanes, a 12-foot outside shoulder, and a 4-foot inside shoulder (Bennert 2015, Bennert 2016a).Missing: segment | Show results with:segment
  20. [20]
    [PDF] Roadway Design Manual 2015 - NJ.gov
    Aug 16, 2022 · Section 1 - Introduction. 1.1. Introduction. This manual presents the current Department guidelines pertaining to roadway design.<|separator|>
  21. [21]
    File:Interstate 287 Bridge crossing the Raritan River between Exit 9 ...
    The bridge is between Piscataway, Middlesex County and Franklin Township, Somerset County, New Jersey. Date, 11 March 2022, 14:25:41. Source, Own work. Author ...
  22. [22]
    I-287 over RARITAN R D&R EASTON AVE
    Scour Critical Bridges: 8: Bridge foundations determined to be stable for assessed or calculated scour conditions; calculated scour is above top of footing.
  23. [23]
    [PDF] I-287/I-78, I-287/Routes 202/206 Interchange ... - NJ.gov
    In addition, the project includes ramp design geometrics and termini improvements to promote a smoother diverge from I-287 Northbound to Rt 202/206 Southbound ...
  24. [24]
    Interchange 15 Additional Information - New York State Thruway
    Calculate Your Tolls and Trip Distances | Find Interchange 15 on the Thruway Map. Interchange 15 - (I-87) - New Jersey - I-287 - NJ Route 17 South. Connecting ...
  25. [25]
    Governor Hochul Announces Start of $19.4 Million Project to ...
    Mar 24, 2025 · Governor Hochul announced work is underway on two New York State Thruway (I-87/ I-287) bridges in the village of Suffern, Rockland County.
  26. [26]
    Project Profile: Governor Mario M. Cuomo Bridge (Tappan Zee ...
    The westbound span opened in August 2017 and the project is expected to be fully complete by the end of 2018. TIFIA Credit Assistance. Direct Loan - $1.6 ...
  27. [27]
  28. [28]
    Tappan Zee Bridge I-287 Corridor - Arup
    Tappan Zee Bridge I-287 Corridor · The first major transportation design/build project in New York State · Comprehensive analysis for a major thoroughfare.
  29. [29]
    Part I - History | FHWA - Department of Transportation
    The Federal-Aid Highway Act of 1968 -- also provided that the Secretary may designate, as part of the Interstate System, a highway meeting all standards for ...
  30. [30]
    I-287: Extend It and They Will Drive on It;A New 20-Mile Stretch Has ...
    Jun 2, 1996 · The simple fact that the highway is used by more than 50,000 vehicles daily shows, she said, that it is needed.Missing: theoretical | Show results with:theoretical
  31. [31]
    Through the Years - 1990s, NJDOT 50th Anniversary
    Aug 21, 2019 · 1993: The final 20.4 mile 'missing link' of I-287 was opened. The interstate begins at the Outerbridge Crossing and ends at the New Jersey/New ...
  32. [32]
    History of the NYS Thruway - New York State Thruway
    1990s. 1991. Thruway Authority assumed operation of the 11-mile Cross Westchester Expressway (I-287), expanding Thruway system to 570 miles. Toll collection ...Missing: phases | Show results with:phases
  33. [33]
    NYS Thruway Authority - Facebook
    Mar 24, 2025 · Work is underway on a $19.4 million project to rehabilitate two aging bridges on the Thruway (I-87/ I-287) in Rockland County.Missing: modifications | Show results with:modifications
  34. [34]
    Governor Hochul Announces Start of $32.4 Million Roadway ...
    Aug 20, 2024 · Governor Hochul announced a $32.4 million project to resurface and restore a 5.5-mile stretch of Interstate 287 in Westchester County.
  35. [35]
    [PDF] New York I-287 Cross Westchester Expressway Review - nysdot
    The purpose of the CWE Corridor Project is to make operational improvements to I-287, including rehabilitation and reconstruction of the pavement and various ...Missing: upgrades post
  36. [36]
    Schedule and Construction, I-287/I-78, I-287/Routes 202 ... - NJ.gov
    Oct 26, 2020 · The existing bridge over I-287 southbound is removed. The remaining widening on the inside of I-287 northbound is completed where the existing ...Missing: post- modifications
  37. [37]
    [PDF] New Jersey I-80 and I-287 HOV Lane Case study - ROSA P
    This report documents the New Jersey I-80 and I-287 high-occupancy vehicle (HOV) lane case study. Information is presented on planning, implementing, ...
  38. [38]
    [PDF] The New Jersey Trucking Baseline Report: A Reality Check
    Trucks handle most of the freight tonnage in. New Jersey – trucks move 75% or more than 466 million tons moving into, out of, and through the State. Within New ...
  39. [39]
    [PDF] maximizing the impact of infrastructure investment - NJ.gov
    In subsequent years, interstate highways – I-80, I-280 and I-78 – were built across the. State, shrinking travel times and creating new sites for commercial ...
  40. [40]
    On the rise: New Jersey's 'other' industrial corridor - Real Estate NJ
    Jul 17, 2017 · Research by Transwestern found that the I-287 industrial corridor recorded 5.1 million square feet of net absorption from 2012 through 2016, ...Missing: costs | Show results with:costs
  41. [41]
    [PDF] NORTHERN NEW JERSEY INDUSTRIAL MARKET - Newmark
    926,392-square-foot warehouse. Recent construction helped generate. 2.7 million square feet of leasing in the I-287 Corridor submarket during 2019, more than ...
  42. [42]
    [PDF] NEW JERSEY - Cushman & Wakefield
    New Jersey's industrial market saw occupancy losses, negative absorption, and a 9.1% vacancy rate. Leasing increased, but new supply outpaced demand. Class A ...
  43. [43]
    [PDF] Model to Calculate Delay Savings for Highway Improvement Projects
    calculate the delay savings resulting from an improvement of an existing highway facility. The delay savings come as a result of the increased average speed ...
  44. [44]
    [PDF] Roadway Information and Traffic Counts - NJ.gov
    AADT both directions. AADT. North or East. AADT. South or West direction ... I-287, Army S/Sgt Wa. BET US 202 & NJ 208. Bergen. Franklin Lakes Boro. 90,508.
  45. [45]
    [PDF] Traffic Volume Report
    Jul 30, 2020 · Page 1. 7/30/2020. Traffic Volume Report. Highway Data Services Bureau ... AADT. YEAR. AADT. YEAR. AADT. YEAR. AADT. YEAR. AADT. % Trucks.
  46. [46]
    Top 100 Truck Bottlenecks – 2025
    ATRI's annual bottleneck list provides a clear roadmap for reducing supply chain impediments and guiding investment decisions.
  47. [47]
    This spot in Jersey is America's 2nd-worst traffic nightmare - NJ.com
    Jan 25, 2018 · The only other New Jersey location in the top 100 truck bottlenecks was Interstate 287 in Piscataway, coming in at No. 26. The average speed ...
  48. [48]
    INRIX 2024 Global Traffic Scorecard
    It provides travel delay comparisons, costs of congestion to drivers and regions, and commuting trends based on the unique travel patterns within each metro ...
  49. [49]
    Ranking N.J.'s most dangerous highways for crashes - nj.com
    Feb 9, 2021 · I-287 had a total of 3,313 crashes in 2019, a decrease from 3,550 in 2018. The highway had a crash rate of 1.62. The section of highway with the ...
  50. [50]
    [PDF] Traffic Safety Facts: 2021 Data - CrashStats - NHTSA
    The fatality rate per 100 million vehicle miles traveled (VMT) was 1.37 in 2021, ranging from a high of 2.08 to a low of 0.71 among States. • The rate of ...
  51. [51]
    Accident Statistics - New York Personal Injury Lawyer Blog
    Sep 29, 2021 · Conversely, there were only 1.71 accidents per mmt on I-287 and 1.40 on I-95. The average on the Cross County Parkway was 2.65; Bronx River ...
  52. [52]
    The Safety Impacts of Differential Speed Limits on Rural Interstate ...
    A 1974 study by Hall and Dickinson showed that speed differences contributed to crashes, primarily rear end and lane change collisions.(2). Impact of DSL on ...Missing: 287 merges<|separator|>
  53. [53]
    [PDF] National Motor Vehicle Crash Causation Survey: Report to Congress
    This report is a National Motor Vehicle Crash Causation Survey, covering crash, people, vehicle, roadway, and environment-related statistics.
  54. [54]
    [PDF] Crash Rates for State and Interstate Highways by Route ... - NJ.gov
    New Jersey Department of Transportation. Crash Rates for State and Interstate Highways by Route Number ... Crash Rates for State and Interstate Highways by ...
  55. [55]
    Part of I-287 closed down again as heat causes pavement to buckle
    Jun 25, 2025 · On Tuesday afternoon, NJDOT officials reported incidents in two locations, in Riverdale and Montville on southbound I-287. That was blamed on ...Missing: bottlenecks | Show results with:bottlenecks<|control11|><|separator|>
  56. [56]
    Portion of I-287 buckles due to extreme heat leading to closures
    Jun 24, 2025 · A portion of Interstate 287 is closed after the extreme heat caused the roadway to buckle in two locations. The right lane on I-287 South near ...
  57. [57]
    Section 404 of the Clean Water Act: Permitting Discharges of ... - EPA
    Information about the Clean Water Act permitting program for dredge or fill material into waters of the US, including roles, 401 certification of permits, ...
  58. [58]
    Compensating for Filling In a Wetland - The New York Times
    Dec 31, 1989 · ... Interstate 287 in Parsippany-Troy Hills. IN New York last summer, the State Department of Transportation created a three-acre wetland where ...
  59. [59]
    Late-Night Run for the Environment - The New York Times
    Dec 11, 1994 · ... wetlands destroyed by construction of a 20-mile stretch of Interstate 287. ... acres with one foot of clean fill. That is enough to bury ...
  60. [60]
    [PDF] New Jersey's Central Passaic Basin - U.S. Fish and Wildlife Service
    Despite historic losses from development, wetlands comprise about a quarter of the. Central Passaic Basin, over 30,000 acres. About 70 percent of the wetlands ...
  61. [61]
    Greenhouse Gas Emissions from a Typical Passenger Vehicle - EPA
    Jun 12, 2025 · How much tailpipe carbon dioxide (CO2) is emitted from driving one mile? The average passenger vehicle emits about 400 grams of CO2 per mile.Missing: urban | Show results with:urban
  62. [62]
    Urban Myth Busting: Congestion, Idling, and Carbon Emissions
    Jul 6, 2017 · While its true that cars emit more carbon per mile while idling and in stop and go traffic than they do when cruising at 30 to 45 miles per ...
  63. [63]
    [PDF] New Jersey Carbon Reduction Strategy
    Nov 15, 2023 · Congested roadways contribute to CO2 emissions from vehicle engines that are not operating efficiently while they are idling or in stop- and-go ...
  64. [64]
    Department of Transportation - nysdot - NY.Gov
    Jun 29, 2007 · ... noise barrier wall with no impacts to mainline or local traffic. On I-287 East and Westbound, in the vicinity of Ramp (U) over I-287 ...
  65. [65]
    [PDF] the northern new jersey - air quality conformity determination
    Aug 10, 2021 · FY 2022-2025 Transportation Improvement Program. The NJTPA portions of the New York-Northern New Jersey-Long Island, NY-NJ-CT 8-hour.
  66. [66]
    National Electric Vehicle Infrastructure (NEVI) Program - NYSERDA
    The New York State Department of Transportation (NYSDOT) will receive approximately $175 million through NEVI over five years. ... Interstate 287 – New Jersey ...
  67. [67]
    EVs reduce climate pollution, but by how much? New U-M research ...
    Aug 25, 2025 · Overall, compact sedan EVs had the lowest emissions at just 81 grams of carbon dioxide equivalent per mile—less than 20% of the per mile ...<|separator|>
  68. [68]
    [PDF] NEW JERSEY
    Sep 8, 2025 · charging infrastructure for freight electrification along the I-95 corridor and adjacent roads from Connecticut to Maryland. The coalition ...
  69. [69]
    County of Bergen v. Dole, 620 F. Supp. 1009 (D.N.J. 1985) :: Justia
    The analysis determined that I-287A would pass through five state and county parks for a total distance of 4 miles, taking approximately 116 acres of ...
  70. [70]
    Public Interest Research Group v. FEDERAL HY. ADMIN., 884 F ...
    In view of the significance of the likely environmental impacts of the I-287 capacity expansion project, it is essential that FHWA and NJDOT be required to ...Missing: lawsuits 1970s
  71. [71]
    [PDF] I-287 southbound lane closures for emergency roadway repairs in ...
    Jun 24, 2025 · I-287 southbound has lane closures at mile post 52.6 in Riverdale and 49.3 in Montville due to buckled concrete from bridge joint expansion. ...
  72. [72]
    A section of Route 287 buckled during N.J.'s heat wave. Here's ...
    Jul 6, 2025 · The section of concrete pavement was part of the original highway built between 1974 and 1977 and was the last cement section of I-78 left. For ...
  73. [73]
    How extreme heat affected Route 287 In Morris County - NJ 101.5
    Jun 25, 2025 · Route 287 buckled in two places in Morris County on Tuesday afternoon, as temperatures neared 100. The extreme heat caused the metal roadway joints to expand.
  74. [74]
    [PDF] I-287 southbound overnight lane closures continue this week for ...
    Jun 30, 2025 · This is a continuation of the proactive roadway repairs that began last week. Beginning at 9 p.m. tonight, Monday June 30 until 5 a.m. tomorrow, ...
  75. [75]
    When roads buckle and the law shrugs: A case for accountability on ...
    Jun 27, 2025 · Concrete buckled on I-287 during record heat, sparking legal questions about NJDOT liability and infrastructure climate readiness.
  76. [76]
    Route 287 lanes in Morris County NJ reopen after highway buckles
    Jun 25, 2025 · All lanes on I-287 in Morris County reopened the morning of June 25 after extreme heat caused the roadway joints to expand the previous day.
  77. [77]
    Report says tolls will be considered for N.J. Routes 78, 80, 287
    Feb 1, 2010 · The Jan. 22 report said tolls will be considered for Route 78, Route 80, Route 195, Route 287 and Route 295. Revenue from the state's gasoline ...
  78. [78]
    Traffic Volume Trends - Federal Highway Administration
    Traffic Volume Trends is a monthly report based on hourly traffic count data reported by the States. These data are collected at approximately 5,000 ...
  79. [79]
    NJ Governor Candidate Proposes Reverse Congestion Pricing to ...
    Jan 10, 2025 · The proposal includes installing toll gantries at key entry points such as the Outerbridge Crossing, Route 17, and Interstate 287. Revenue ...
  80. [80]
    New Jersey floats its own congestion toll for New York drivers - NY1
    Jan 10, 2025 · Jersey City Mayor Steven Fulop says it would not be to punish New York but to provide the same benefits New York is seeking.
  81. [81]
    Is Congestion Pricing Coming to Route 4 and Route 17 ? Democrat ...
    Jan 13, 2025 · Fulop's plan, which includes tolling key highways like Route 17, Interstate 287, and US 9W, has ignited fierce debate about affordability, environmental ...
  82. [82]
    Westchester road work: Repairs slated for Interstate 287 - Lohud
    Aug 20, 2024 · The $32.4 million nighttime road resurfacing project is already underway and will stretch into the fall of 2025.
  83. [83]
    MyRye.com: $32.4 Million to Resurface I-287 Section Connected to ...
    Aug 21, 2024 · The project will repair road joints, add new pavement and upgrade road striping along the section of highway. To minimize traffic impacts, a ...Missing: beltway | Show results with:beltway<|separator|>
  84. [84]
    $$32.4M Roadwork Project Will Transform I-287 In Westchester County
    Aug 21, 2024 · The work, which won't be complete until the fall of 2025, will take place overnights to limit disruptions to the busy stretch of highway.
  85. [85]
    10 Lower Hudson Valley NY road projects: How they'll impact traffic
    heading toward City Hall — now travels in the bridge's new outer lane through the work zone, while all southbound ...
  86. [86]
    Heat-related road damage closes lanes on Route 287 - NJ 101.5
    Jun 26, 2025 · Route 287 in Pequannock faces closures due to buckled pavement from extreme heat, impacting traffic and prompting inspections by the NJ DOT.
  87. [87]
    [PDF] Somerset County Planning Board, New Jersey Middlesex County ...
    Avenue/Campus Drive area (south of I-287, exit 12) is a prime example of this type of development and offers the potential for transit demand. • Commercial ...
  88. [88]
    [PDF] November 2021 - North Jersey Transportation Planning Authority
    WE ARE PROUD TO PRESENT Plan 2050: Transportation. People. Opportunity. approved by the NJTPA Board on. September 13, 2021. It sets out a vision for the ...
  89. [89]
    [PDF] R8.pdf - nysdot
    Oct 1, 2025 · THE PROJECT INVOLVES THE DESIGN AND CONSTRUCTION OF A NEW. SIDEWALK ALONG THE CITY-OWNED RIGHTS-OF-WAY OF FOREST. AVENUE AND MANURSING AVE ...
  90. [90]
    [PDF] New Jersey Long-Range Transportation Plan Update
    completion of I-287 through northwestern New. Jersey, along with the ... Since the mid 1990s, Elizabeth has aggressively pur- sued development and ...
  91. [91]
    [PDF] 2023 Statewide Transportation Improvement Program - NJ.gov
    ROUTE (MILEPOSTS): I-287 (1.34 - 2). Union County. Cost ($ Millions) Construction (Year). Lincoln Tunnel. This project is to repair the Lincoln Tunnel Route 495 ...
  92. [92]
    [PDF] Appendix F The NJTPA Congestion Management Process
    The Congestion Management Process (CMP) provides for the systematic study of the NJTPA region's complex travel patterns and supports identification of ...
  93. [93]
    SJR17 - NJ Legislature
    ... Purple Heart, Combat Infantryman's Badge, and the Korean Service Medal; and ... Route 287) as the Korean War Memorial Highway ... New Jersey: 1. The ...
  94. [94]
    News Flash • Bucco, Wilhide Mark 75th Anniversary of Korean
    Jun 21, 2025 · Wilhide Sr., worked together to secure the original memorial designation ... 287 in New Jersey as the Korean War Veterans Memorial Highway. My ...
  95. [95]
    2006 New York Code - :: Designation Of State Interstate Routes.
    ... designation, as the "AMVETS Memorial Highway". Interstate Route 505 ... Cross Westchester expressway) from interstate route 502 in the vicinity of ...
  96. [96]
    [PDF] NJDOT 2019 SLD - NJ.gov
    Primary. Express Dir. Primary. Direction. Interstate. Route. 287. US Route. 22. NJ Route. 21. County. Road. 689. Interchange. Number. 2. Grade. Separated.Missing: exit markers
  97. [97]
    New Jersey Route I-287
    The highway stretches from Woodbridge, NJ, at a junction with NJ 440 and the New Jersey Turnpike, out through Bridgewater, Basking Ridge, Morristown, Boonton, ...
  98. [98]
    Interchange/Exit Listing by Milepost - New York State Thruway
    Interchange/Exit Listings ; 14B, Airmont - Montebello - Airmont Road, 27.62 ; 15, New Jersey - I-287 - NJ Route 17 South, 30.17 ; 15A, Sloatsburg - Suffern - NY ...
  99. [99]
    The Cross-Westchester Expressway Additional Information
    Connecting Routes · Exit 1 - (No Eastbound Exit) · Exit 2 - (No Eastbound Exit) · Exit 3 - PASSENGER CARS ONLY · Exit 4 - Hartsdale - Knollwood Road (NY Route 100A) ...Missing: 287 numbers
  100. [100]
    New York State Thruway Exit List
    Exit 8. I-287 East Rye White Plains, Left Exit 8. I-287 East Rye White Plains, Thruway West Cross-Westchester Expressway. 12.8, Exit 9. US 9. Tarrytown Sleepy ...