Memphis Pyramid
The Memphis Pyramid is a pyramid-shaped structure in downtown Memphis, Tennessee, standing 321 feet (98 m) tall with base sides measuring 591 feet (180 m), constructed primarily of steel and glass in 1991 as the Pyramid Arena, a multi-purpose venue designed to evoke the ancient pyramids of Giza.[1][2][3] Originally built to house the University of Memphis Tigers men's basketball team, it later hosted National Basketball Association games as the home of the Memphis Grizzlies from 2001 to 2004, marking it as the only Tennessee arena to accommodate a full NBA regular season schedule.[4][5] Following the 2004 opening of the more modern FedExForum, the Pyramid fell into disuse due to its outdated facilities and poor sightlines for professional sports, remaining largely vacant for over a decade amid failed redevelopment proposals.[6] In 2015, Bass Pro Shops transformed the structure into a massive retail destination known as Bass Pro Shops at the Pyramid, featuring outdoor gear sales, a 103-room Big Cypress Lodge hotel suspended over an indoor swamp, bowling alleys, restaurants, an archery range, and a free observation deck offering views from the apex.[7][2] This repurposing preserved the landmark's iconic silhouette while adapting it for commercial tourism, drawing millions of visitors annually and generating economic activity through lease revenues for the city.[8]Conception and Construction
Planning and Inspiration
The concept for pyramidal structures in Memphis originated in the 1950s, when local artist Mark Hartz proposed constructing three such edifices along the south bluffs of the Mississippi River, drawing inspiration from the ancient Egyptian city of Memphis—the namesake of the Tennessee city founded in 1819—to create distinctive landmarks overlooking the river.[9][10] Hartz's vision aimed to capitalize on the geometric symbolism of pyramids as enduring monuments, aligning with Memphis's historical ties to river commerce and its aspiration for architectural icons amid post-World War II urban development.[11] The idea lay dormant until the 1980s, when Hartz's son revived it amid Memphis's push for economic revitalization and a modern arena to replace aging facilities for the University of Memphis Tigers basketball team.[12] Local entrepreneur John Tigrett, influenced by the pyramid's symbolic potential, advocated for a single, scaled-down version as a multifaceted venue for sports, concerts, and tourism, integrating it into broader plans for the Mud Island area to draw visitors and stimulate downtown growth.[2] Tigrett partnered with promoter Sidney Shlenker, former owner of the Denver Nuggets, who managed the project's planning and positioned it as a "tourist magnet" to elevate Memphis's profile similar to landmark arenas elsewhere.[13][14] Planning emphasized the pyramid's 32-story height—matching that of the Great Pyramid of Giza—and its location on the riverfront to evoke Memphis's Egyptian heritage while serving practical needs for a 20,000-seat arena, with approvals secured from city and county governments by 1988 leading to groundbreaking on September 15, 1989.[15][6] The design rejected grander multi-pyramid schemes for fiscal realism but retained the form's allure as a bold, recognizable symbol intended to anchor entertainment districts and host events like basketball tournaments and performances.[14]Design and Engineering
The Memphis Pyramid's design, developed by the architectural and engineering firm Rosser Fabrap International from 1989 to 1991, features a true pyramidal form with a square base spanning 591 feet per side and a height of 321 feet, comparable to 32 stories.[13] [2] This geometry draws inspiration from ancient Egyptian pyramids, evoking Memphis, Egypt, while serving as a multi-purpose arena with an interior volume capable of accommodating 20,142 seats arranged around a central court.[16] The steeper profile relative to proportional replicas allows for efficient use of the structure's height to enclose the required floor area without excessive material demands. Structural engineering was provided by Walter P. Moore and Associates, Inc., who engineered a robust framework to withstand loads from the cantilevered roof and seating tiers while maintaining clear sightlines.[13] The primary construction materials include steel for the skeletal frame and concrete for foundations and elements, clad externally in stainless steel panels that replaced initial plans for bronze or gold-tinted glass to reduce costs and reflectivity issues.[17] [15] This combination enables the pyramid to support its self-weight and environmental loads, with the steel skin contributing to a modern aesthetic distinct from ancient stone masonry. Construction oversight was managed by general contractor Huber, Hunt and Nichols, ensuring the integration of mechanical systems within the sloped envelope, including ramps and elevators for vertical circulation.[13] The design's engineering prioritizes seismic stability and wind resistance, features later evaluated and enhanced during adaptive reuse, but inherent to the original build through distributed load paths in the pyramidal geometry.[18]Construction Timeline and Costs
Construction of the Pyramid Arena began with a groundbreaking ceremony on September 15, 1989, following initial plans announced by city and county officials to build a $39 million basketball venue shaped like an Egyptian pyramid.[19][14] The event, dubbed the "Big Dig," featured a parade, pyramid-shaped laser lights, and fireworks, at an additional staging cost of $440,000 to the public.[20] The project, funded primarily through public bonds issued by a joint city-county building authority, faced significant cost escalation during the approximately two-year build period, ultimately totaling $65 million in public expenditures plus $4.5 million in private contributions.[13][6] This overrun from the original $39 million budget stemmed from design complexities, including the tensile steel cable suspension system and the 32-story height requirement to accommodate basketball sightlines, though specific line-item breakdowns for overruns remain undocumented in public records.[14][6] The arena reached substantial completion and opened to the public on November 9, 1991, after rapid on-site assembly that prioritized the pyramid's iconic steel-membrane skin and internal rigging over extended phased construction.[13] Ownership transferred to the City of Memphis and Shelby County upon opening, with ongoing management by a private operator under public oversight, reflecting the venue's role as a taxpayer-financed economic catalyst despite the budget exceedance.[21]Operational History
Opening and Initial Success
The Pyramid Arena opened on November 9, 1991, with an inaugural concert by country artists Naomi and Wynonna Judd, marking the debut of the 321-foot-tall structure along the Mississippi River in Memphis, Tennessee.[2][22] Built at a cost of approximately $75 million to replace the outdated 11,200-seat Mid-South Coliseum, the facility featured a capacity of 20,142 seats and was intended as a multi-purpose venue for sports, concerts, and other events.[23][24] As the new home of the University of Memphis Tigers men's basketball team, the Pyramid provided an immediate home-court advantage, with the Tigers achieving a 102-27 record (.791 winning percentage) over their first eight seasons from 1991 to 1999.[25] The arena hosted successful basketball games, drawing strong crowds bolstered by high-profile recruits such as Anfernee "Penny" Hardaway, who joined the team in 1991 and helped elevate the program's visibility during the early 1990s.[25] Attendance remained robust, reflecting the venue's appeal as a modern upgrade that accommodated growing fan interest in collegiate sports and entertainment in Memphis.[21] Beyond basketball, the Pyramid's initial years saw it host various concerts and tournaments, contributing to its role as a key entertainment hub and generating economic activity through events that filled the large-capacity space.[24] Despite minor operational glitches, such as a pipe burst on opening night that briefly flooded the floor, the arena's novel pyramid design and central location fostered early enthusiasm and positioned it as a symbol of Memphis's ambition for urban revitalization.[22][6]Sports and Entertainment Uses
The Pyramid Arena primarily served as a basketball venue following its opening on November 9, 1991, hosting the University of Memphis Tigers men's basketball team as its home court until the 2008–2009 season.[25] The facility, with a seating capacity of approximately 20,142 for basketball, accommodated large crowds for college games and drew significant attendance during the Tigers' successful runs, including appearances in national tournaments.[21] It also became the temporary home for the NBA's Memphis Grizzlies from the 2001–2002 season through the 2003–2004 season after the team's relocation from Vancouver, marking the franchise's entry into professional basketball in the city.[12] The arena hosted numerous Grizzlies games, contributing to the growth of professional sports interest in Memphis, though attendance and acoustics were later criticized as suboptimal compared to newer venues.[26] Beyond collegiate and professional basketball, the Pyramid hosted various tournaments, including the 1993 Great Midwest Conference men's and women's basketball tournaments, the 1994 and 1997 Southeastern Conference men's basketball tournaments, the 1995 and 1997 NCAA Southeast Regionals, and the 1996 Conference USA tournament.[27] [25] Other sporting events included boxing matches, such as a notable heavyweight bout considered a highlight of its sports legacy.[12] For entertainment, the arena functioned as a concert venue, featuring performances by artists like Mary J. Blige and hosting dozens of shows by major acts, family-oriented events, and circuses during its operational years.[24] [28] These uses underscored its role as a multipurpose facility, though programming declined after 2004 as the Grizzlies and Tigers transitioned to the FedExForum.[2]Operational Challenges
The Pyramid Arena faced significant design-related operational difficulties from its inception, primarily stemming from its unconventional pyramidal shape, which compromised functionality as a multi-purpose venue. Poor acoustics plagued events, with the sloped interior causing echoes and muddled sound distribution that hindered concerts and broadcasts; this issue was noted contemporaneously by performers and critics, rendering it inferior to predecessors like the Mid-South Coliseum.[29] Similarly, sightlines for spectators were suboptimal, as the steep geometry positioned upper-level seats excessively distant and elevated from the court or stage, exacerbating visibility problems during basketball games and shows.[26] Seating and amenities further compounded user dissatisfaction, featuring cramped, narrow configurations that prioritized capacity—up to 20,142 for basketball—over comfort, leading to complaints from attendees and limiting appeal for high-profile bookings.[26] Lighting deficiencies made the interior one of the darker sports venues, requiring additional city expenditures for upgrades to mitigate the gloom.[30] For professional athletes, logistical flaws disrupted routines; Memphis Grizzlies guard Penny Hardaway highlighted in the early 2000s how the lengthy trek to distant locker rooms—separated by the arena's expansive base—impeded pre-game preparation, contributing to its unsuitability for NBA standards without costly retrofits estimated in the millions.[12] Initial operations were marred by infrastructural failures, including a pipe burst on opening night in November 1991 that flooded the court, alongside overflowing toilets inundating the basement, signaling early maintenance vulnerabilities in the glass-and-steel structure.[22] The transparent pyramid skin also generated operational nuisances, such as blinding afternoon sunlight reflecting into adjacent areas, necessitating shades and visors for nearby workers and drivers, which strained daily management.[15] These persistent issues, coupled with inadequate parking for peak crowds, eroded attendance post-novelty phase, fostering a reputation as the "Tomb of Doom" among locals and hastening the shift away from sports tenancy by 2004.[31]Closure and Vacancy Period
Factors Leading to Closure
The Pyramid Arena's transition to vacancy began in 2004 with the departure of its anchor tenants, the NBA's Memphis Grizzlies and the University of Memphis Tigers men's basketball team, both of which relocated to the newly opened FedExForum downtown. The Grizzlies, who had played at the Pyramid since their franchise moved from Vancouver in 2001, cited the venue's outdated infrastructure as inadequate for professional basketball, including limited luxury suite capacity and poor sightlines inherent to the pyramid's sloping design. Efforts to renovate the arena to meet NBA standards were abandoned due to estimated costs exceeding $20 million, rendering it economically unfeasible compared to constructing a purpose-built facility like FedExForum, which offered modern amenities such as improved concessions, club seating, and event versatility.[12][30] Post-relocation, the Pyramid faced severe operational challenges that accelerated its decline into disuse. A non-compete clause in the Grizzlies' FedExForum lease prohibited major events from being booked at the Pyramid within a certain radius, drastically reducing concert and sports bookings; arena general manager Alan Freeman reported in 2005 that this provision "virtually killed business," with attendance and revenue plummeting. The venue's remote location along the Mississippi River, coupled with competition from the centrally located FedExForum—which hosted over 200 events annually by 2005—further eroded its viability for entertainment uses. Sporadic events continued until the final concert on February 3, 2007, featuring Bob Seger and the Silver Bullet Band, after which maintenance costs for the underutilized 20,142-seat facility became unsustainable for the City of Memphis, leading to full closure and vacancy.[32][26] Economically, the Pyramid's closure reflected broader issues of venue obsolescence in an era of rapid sports infrastructure upgrades. Built in 1991 for $63 million primarily as a municipal arena, it lacked the revenue-generating features like extensive VIP areas and multi-purpose flexibility that became standard by the early 2000s, contributing to annual operating losses even during peak use. Without viable alternative tenants, the city's annual upkeep expenses—estimated at over $1 million by mid-decade—outweighed minimal income from occasional rentals, prompting officials to mothball the structure rather than subsidize indefinite idleness.[12][32]Failed Reuse Attempts
Following the Pyramid Arena's closure in 2004 for renovations that were never fully realized, and its effective vacancy by 2007 after the Memphis Grizzlies relocated to FedExForum, the City of Memphis solicited proposals to repurpose the structure, which incurred over $700,000 annually in utility costs alone during idleness.[12][33] A reuse committee evaluated ideas, but most faltered due to financing shortfalls, legal barriers, or insufficient commitment from proponents.[34] One early proposal involved converting the Pyramid into a casino, floated by former Shelby County Commissioner John Willingham around 2005, but it collapsed primarily because gambling remained illegal in Tennessee, rendering the concept unviable without legislative changes.[35][36] Similarly, an aquarium concept aimed to establish the world's tallest such facility inside the structure, pitched in the mid-2000s, but was abandoned owing to inadequate private investment and waning developer interest.[35][36] Religious reuse gained traction in 2008 when Cummings Street Missionary Baptist Church submitted a $12 million bid to acquire and adapt the Pyramid as a worship and community space, while World Overcomers Outreach Ministries Church, led by Apostle Adrian Faulkner, expressed intent to purchase it outright for similar purposes.[37][38] These megachurch initiatives, deemed among the more practical options due to lower operational demands than entertainment venues, ultimately failed as neither group could secure funding to cover the Pyramid's substantial upkeep expenses or negotiate favorable lease terms with the city.[12] Other schemes included a $250 million indoor amusement park and theme park development outlined in January 2008, featuring 85 attractions, which advanced to presentations before county officials but dissolved amid disputes over costs and feasibility.[39] Negotiations for a Grammy Hall of Fame outpost with The Recording Academy also broke down around the same period, as the organization preferred a multi-site network over a Memphis-exclusive installation.[12] Vertical farming and shopping mall conversions were floated informally but gained no substantive traction, hampered by the building's inefficient vertical space utilization for such adaptations.[10][40] These repeated setbacks prolonged the vacancy until 2010, when Bass Pro Shops emerged as a viable tenant after years of impasse.[41]Redevelopment Process
Bass Pro Shops Involvement
In 2005, Johnny Morris, founder of Bass Pro Shops, developed interest in redeveloping the vacant Memphis Pyramid following a fishing excursion on the Mississippi River adjacent to the structure. During the trip, arranged with local angler Bill Dance and company associate Jack Emmitt, Emmitt caught a 34-pound catfish, which Morris interpreted as a positive omen for pursuing the project.[12][24] This personal anecdote, recounted by Morris and corroborated in company-affiliated narratives, marked the inception of Bass Pro Shops' engagement, shifting focus from initial Memphis market considerations to anchoring the redevelopment in the iconic pyramid.[12] Negotiations between Bass Pro Shops and Memphis city officials extended over five years, culminating in the signing of a 55-year lease agreement in June 2010.[20] Under the terms, Bass Pro Shops committed to transforming the 1.1-million-square-foot facility into a flagship retail and entertainment destination, including outdoor retail spaces, a hotel, and attractions themed around hunting, fishing, and conservation.[42] The agreement required Bass Pro to fund the interior renovations while the city handled exterior maintenance and provided incentives, reflecting prolonged discussions that included preliminary approvals like the Shelby County Board's 2008 endorsement of a development pact.[43] Bass Pro Shops secured a $215 million financing package to support the redevelopment, with construction commencing in June 2012 after finalizing arrangements.[12] This investment, substantially exceeding early estimates of $75-100 million, underscored the company's substantial financial stake in revitalizing the long-vacant landmark, positioning it as a major tourism draw rather than a traditional retail outlet.[44] The involvement preserved the pyramid's exterior while adapting its interior for experiential retail, aligning with Morris's vision of immersive outdoor-themed environments.[12]Renovation and Conversion Details
Bass Pro Shops initiated major renovations on the Memphis Pyramid in June 2012, following a 55-year lease agreement signed after five years of negotiations with city officials.[12] [20] The project transformed the 535,000-square-foot former arena into a retail, hospitality, and entertainment complex, with construction spanning until the grand opening on May 1, 2015.[45] Total renovation costs reached approximately $215 million, financed through a combination of private investment from Bass Pro Shops founder Johnny Morris and public incentives exceeding $100 million from the City of Memphis.[12] [46] Structural reinforcements addressed the pyramid's original foundation vulnerabilities, which rested on unstable Mississippi River mud prone to settling and seismic risks. Engineers implemented below-ground seismic stabilization using driven steel combi-walls, consisting of HP14x73 H-piles spaced 15 to 20 feet apart and AZ19-700 sheeting, driven 80 feet deep with an ICE I-30 diesel hammer to confine soils and limit lateral movement to under one inch during a magnitude 6.5 earthquake.[18] This reduced required pile depths from an initial 130 feet, avoiding more invasive drilling while enhancing stability against riverbank shifts.[18] Additional tenant improvements included comprehensive structural evaluations to support new loads from retail fixtures, mechanical systems, and attractions.[47] Interior conversion involved demolishing arena seating and installing an artificial cypress swamp ecosystem spanning multiple levels, complete with live fish, birds, and native plants to evoke an outdoor wilderness.[12] A key engineering feat was the 28-story freestanding glass elevator, the tallest in the Western Hemisphere at 321 feet, designed with seismic drift controls to align with the pyramid's movement and bear rooftop mechanical loads.[45] The Big Cypress Lodge, a 100-room hotel, utilized light-gauge steel framing clad in log-cabin aesthetics to mimic swamp cabins, integrated alongside features like a cantilevered glass observation deck, a 10,000-gallon aquarium restaurant, archery ranges, and bowling alleys.[45] [31] These modifications preserved the pyramid's stainless-steel exterior while repurposing its vast interior volume for immersive retail experiences.