NHPC


NHPC Limited is an Indian public sector undertaking under the Ministry of Power, Government of India, focused on the comprehensive development of hydroelectric power projects from conceptualization through commissioning and operation, with expansions into solar and wind energy generation. Established on 7 November 1975 as the National Hydroelectric Power Corporation Private Limited, it operates as a Navratna company and ranks as India's largest hydropower organization, accounting for approximately 15.5% of the nation's total installed hydroelectric capacity.
As of October 2025, NHPC's operational portfolio includes an installed capacity of 8,332.90 MW, comprising 7,771.20 MW from hydroelectric sources, 511.70 MW from , and 50 MW from . The company is actively constructing 15 additional projects totaling 9,704 MW and has 10 more in the pipeline awaiting clearances, aggregating 7,666 MW, underscoring its pivotal role in bolstering India's . Notable achievements include record daily power generation milestones and diversification beyond traditional hydro to support national clean energy goals, though projects have occasionally faced local opposition and isolated corruption probes typical of large-scale infrastructure endeavors.

Overview

Company Profile

NHPC Limited is a Navratna undertaking under the Ministry of Power, , incorporated on November 7, 1975, as National Hydroelectric Power Corporation Private Limited and later converted to a with CIN L40101HR1975GOI032564. Its registered office is located at NHPC Office Complex, Sector-33, , 121003. The company's founding purpose centers on planning, promoting, and organizing the integrated development of hydroelectric resources to bolster India's . NHPC's mandate encompasses the full lifecycle of projects, from conceptualization and construction to operation and maintenance, thereby contributing to national and sustainable economic development. As India's premier organization, NHPC has expanded beyond traditional hydroelectric focus to include and energy initiatives, aligning with the escalating demand for diversified renewable sources in the country's . This evolution supports broader goals of clean energy adoption while maintaining as its .

Core Operations and Capacity

NHPC's core operations focus on the generation of hydroelectric power, leveraging river systems primarily in the Himalayan region and northern for run-of-the-river and storage-based projects. As of 2025, the company's total installed stands at 8,332.9 MW, encompassing 23 operational hydroelectric stations that form the backbone of its . This includes 7,771.2 MW from wholly owned hydro assets and approximately 1,681.7 MW from joint ventures, enabling consistent output suited to variable water flows and seasonal monsoons. The stations are interconnected with India's regional grids—northern, western, northeastern, and southern—facilitating real-time scheduling and dispatch coordinated by Regional Load Despatch Centres (RLDCs) under the System Operation Corporation (POSOCO). This integration allows NHPC to supply dispatchable baseload and peaking , with hydroelectric offering high (up to 90% plant load factor in optimal conditions) and rapid ramp-up capabilities compared to alternatives. Annual averages exceed 30 billion units, prioritizing stability through firm commitments under long-term power purchase agreements with state utilities. While NHPC has initiated diversification into non-hydro renewables, solar and wind capacities remain marginal at around 369 MW as of mid-2025, underscoring hydroelectricity's superior reliability as a controllable amid the intermittency challenges of and . operations emphasize water management, including regulation for and benefits, with to mitigate ecological impacts in sensitive terrains.

History

Formation and Initial Development (1975–1990)

The National Hydroelectric Power Corporation (NHPC) was incorporated on November 7, 1975, initially as the National Hydro Electric Power Corporation Private Limited, a government-owned entity under the Ministry of Power aimed at systematically developing India's vast hydroelectric resources to support national energy needs. This formation aligned with India's broader energy strategy following the , which exposed vulnerabilities in imports and prompted a shift toward indigenous renewable sources like for long-term . Early operations focused on surveying, planning, and executing projects in the Himalayan regions, where abundant water resources offered high potential but demanded rigorous site-specific assessments. NHPC's initial development emphasized takeover and completion of inherited projects, including the Loktak Downstream Hydroelectric Project (105 MW) in , which involved integrating existing infrastructure with enhanced engineering for reliable output. The corporation prioritized foundational hydroelectric stations, addressing the era's limited grid connectivity and technological constraints through phased construction of dams, reservoirs, and powerhouses. By the late , annual reports highlighted progress on multiple fronts, with investments in geological mapping and material procurement to mitigate risks inherent in rugged terrains. A pivotal milestone came with the commissioning of the Baira Siul Hydroelectric Project (180 MW) in on April 23, 1982, marking NHPC's first fully operational station and demonstrating proficiency in overcoming Himalayan challenges such as unstable rock formations and high-altitude logistics for tunnel boring, penstock installation, and deployment. This project, spanning a 22 km headrace tunnel and a 180-meter-high , required innovative adaptations to seismic activity and variability, setting precedents for subsequent developments while contributing initial megawatts to the northern grid. Through these efforts, NHPC established core competencies in run-of-the-river schemes, laying the groundwork for scaled amid India's push for decentralized power generation.

Expansion and Key Milestones (1990–2010)

During the 1990s, NHPC expanded its portfolio with the commissioning of the 94.2 MW run-of-the-river hydroelectric project on the in , operationalized in 1992–93 as the corporation's initial major development in the region. This was followed by the 480 MW Uri-I project on the in , fully commissioned in 1997, which featured four 120 MW units and contributed significantly to northern grid stability through peaking capacity. The 60 MW Rangit project in , a run-of-the-river scheme with pondage on the Rangit River, entered commercial operation in 2000, enhancing power supply to eastern states and demonstrating NHPC's capability in challenging Himalayan terrains. Into the 2000s, NHPC accelerated capacity additions with the 300 MW Chamera-II project in , commissioned progressively from 2003 to 2004 across three 100 MW units, boosting cumulative installed capacity and supporting industrial load growth in the north. The 280 MW Dhauliganga-I project in followed in 2005, with all four 70 MW units synchronized by November, providing dispatchable hydro output that mitigated seasonal variability in fossil fuel-dependent generation. Culminating the decade's efforts, the 390 MW Dulhasti project in achieved full commissioning in 2007, featuring three 130 MW Pelton turbine units operationalized sequentially from February to March, adding robust high-head power to the national grid amid regional security challenges. These milestones collectively augmented NHPC's installed capacity by over 1,600 MW during the period, shifting contributions toward India's evolving power mix where hydroelectricity's inherent flexibility—enabling rapid ramp-up for —outweighed intermittency issues in non-hydro renewables and complemented coal's baseload reliability, thereby reducing vulnerability to fuel import fluctuations. Concurrently, NHPC ventured into joint initiatives, such as deepening ties with state entities exemplified by NHDC Limited's Indira Sagar advancements, fostering shared risk in large-scale developments while prioritizing technical feasibility over expedited timelines. By 2010, these expansions had elevated NHPC's role in national , with hydroelectric dispatch aiding grid frequency control and averting shortages during monsoonal surpluses versus dry-season deficits.

Modern Era and Diversification (2010–Present)

In the period following 2010, NHPC prioritized the advancement of major hydroelectric initiatives to bolster India's , exemplified by the Subansiri Lower Hydroelectric (2,000 MW), where construction commenced in 2005 but encountered repeated delays due to geological challenges, local opposition, and regulatory hurdles. The project's first unit (250 MW) achieved wet commissioning on October 24, 2025, marking a pivotal step toward amid national commitments to low-carbon baseload power generation that supports stability, unlike intermittent sources requiring extensive backup infrastructure. This focus aligned with empirical evidence favoring hydroelectricity's dispatchable capacity for meeting and integrating renewables, as hydro reservoirs enable flexible output to compensate for and variability without relying solely on costly systems. NHPC initiated diversification into non-hydro renewables to adapt to policy emphases on and expansion, commissioning a 300 MW photovoltaic project in , , on October 16, 2025, as part of broader efforts to tap government incentives for hybrid energy models. Ventures into included pilot-scale production facilities, such as a 25 kWe unit in , aimed at leveraging excess renewable output for , though these remain experimental and secondary to hydro's proven reliability in providing firm power. Such pilots reflect responsiveness to India's mission, yet first-principles analysis underscores hydro's causal advantages in and via reservoirs, mitigating the risks inherent in and that necessitate overbuild and curtailment to maintain system inertia. Facing 2020s regulatory reforms promoting private participation in power distribution and renewables implementation, NHPC, as a Navratna public sector undertaking, preserved its operational autonomy through strategic partnerships rather than full divestment, including memoranda of understanding with entities like Indian Oil Corporation for pumped storage and a power purchase agreement with ACME Solar for 250 MW firm dispatchable renewable energy. These collaborations enabled NHPC to leverage private sector efficiencies in execution while retaining public oversight, countering broader sector privatization pressures that have targeted discoms and retail markets without directly impairing hydro-focused PSUs' mandate for national infrastructure development. This approach sustained NHPC's role in delivering cost-effective, large-scale hydro capacity, empirically demonstrated by lower levelized costs for established hydro plants compared to unsubsidized intermittent alternatives dependent on policy-driven tariffs.

Corporate Structure

Ownership and Governance

NHPC Limited operates as a Navratna undertaking under the administrative control of the Ministry of Power, , which holds a promoter of 67.40% alongside state governments, with the remaining 32.60% comprising public shareholding. This structure ensures direct governmental oversight while incorporating market accountability through its listing on the National Stock Exchange (NSE) and (BSE) effective September 1, 2009. The board of directors includes government nominees such as (IAS) officers, executive directors with domain expertise in finance, projects, and technical operations, and independent directors to enhance diversity. Shri Bhupender Gupta serves as Chairman and Managing Director, providing strategic leadership. Recent executive transitions underscore ongoing efforts to maintain operational continuity; on October 17, 2025, Shri Mahesh Kumar Sharma assumed charge as Director (Finance) for a five-year term, bringing prior experience in financial management within entities. Governance mechanisms prioritize cost efficiency, , and project execution integrity, with enforced through ministerial reviews and performance audits. This is reflected in NHPC's sustained high plant availability factors, such as 88.75% achieved across its hydroelectric portfolio in prior fiscal years, outperforming typical benchmarks and countering broader critiques of inefficiency in state-owned enterprises by demonstrating reliable asset utilization amid variable hydrological conditions.

Subsidiaries and Joint Ventures

NHPC Limited operates through a of subsidiaries and joint ventures to facilitate project development, mitigate risks, and leverage regional partnerships, particularly in challenging terrains like Jammu & Kashmir and the Northeast. These entities enable specialized execution of hydroelectric, pumped storage, and renewable projects while sharing equity with state governments or partners, ensuring alignment with local regulatory and developmental needs. As of 2023-24, NHPC holds controlling stakes in several such companies, contributing to an aggregated capacity under development exceeding 7,000 MW across these affiliates. Key subsidiaries include NHDC Limited, where NHPC maintains a 51.08% stake alongside the , focusing on basin projects such as Indirasagar and Omkareshwar to diversify NHPC's portfolio beyond core operations. Power Projects Private Limited, a fully controlled , handles multiple hydroelectric initiatives in the Chenab basin, enhancing NHPC's presence in northern through integrated . Ratle Hydroelectric Power Corporation Limited (RHPC), with NHPC's 57.41% ownership and 49% from Jammu & State Power Development Corporation (JKSPDC), targets the 850 MW Ratle project, exemplifying risk-sharing in geopolitically sensitive areas. Joint ventures further support region-specific strategies, such as Saur Urja Limited for in , promoting diversification into via state collaborations. Loktak Downstream Hydroelectric Corporation Limited aids Northeast hydro developments, while NHPC Renewable Energy Limited, a wholly owned arm, spearheads emerging and initiatives. These structures have empirically bolstered NHPC's revenue streams, with subsidiaries like NHDC adding over 1,500 MW to attributable capacity through efficient equity partnerships.
EntityOwnership by NHPCStrategic Role
NHDC Limited51.08%Narmada basin hydro projects; risk-sharing with government.
Chenab Valley Power Projects Pvt Ltd100% (subsidiary)Chenab basin developments in & .
Ratle Hydroelectric Power Corporation Ltd57.41%850 MW Ratle project execution via JV with JKSPDC.
Bundelkhand Saur Urja LimitedMajority (JV)Solar projects in region.

Power Generation Assets

Operational Hydroelectric Stations

NHPC Limited operates 21 hydroelectric power stations in with a combined installed capacity of 7,771 MW, primarily comprising run-of-river schemes that harness river flows without extensive storage reservoirs, supplemented by a few storage-type projects for regulated output. These facilities generate at low operational costs due to the absence of expenses, with mature hydro achieving generation costs as low as 27 paise per kWh after decades of operation, contrasting with thermal ' -dependent costs typically exceeding ₹3-5 per kWh. The stations demonstrated engineering resilience, recording a plant availability factor (PAF) of 88.19% in FY 2021-22, the highest ever at the time, enabling reliable peaking . Key operational stations include:
Project NameState/UTInstalled Capacity (MW)Design Energy (MU)Commissioning YearType
SalalJammu & Kashmir6903,0821987Storage-influenced
Chamera-I5401,6651994Run-of-river with pondage
Uri-IJammu & Kashmir4802,5871997Run-of-river
Teesta-V5102,5732008Run-of-river with diurnal storage
Parbati-III5201,9632014Run-of-river
DulhastiJammu & Kashmir3901,9072007Run-of-river
These projects, among others like Loktak (105 MW storage, , 1983) and Kishanganga (330 MW, & , 2018), contribute to NHPC's focus on efficient generation, with design energies reflecting optimized hydrological assessments for annual outputs. Run-of-river designs predominate, minimizing environmental footprint compared to large-dam but relying on seasonal flows, while storage variants like Indira Sagar (1,000 MW , , 2005) enable better load balancing. Overall, the fleet's high PAF underscores robust maintenance, supporting India's grid stability amid variable inflows.

Projects Under Construction

NHPC is advancing multiple hydroelectric projects under construction, with a focus on Himalayan run-of-the-river schemes that leverage advanced excavation techniques to address geological instabilities such as shear zones and high pressures. These efforts have enabled progress on tunnels and dams through the deployment of tunnel boring machines (TBMs), which provide precise, mechanized boring over conventional drill-and-blast methods, reducing downtime and enhancing safety in seismically active regions. The flagship 2,000 MW Subansiri Lower Hydroelectric Project, located on the Subansiri River straddling Arunachal Pradesh and Assam, comprises eight 250 MW Francis turbine units with a design energy of 7,418 GWh annually. Construction, initiated in 2005 but stalled from 2011 to 2019 due to technical and stakeholder halts, resumed in October 2019, culminating in the successful lowering of a 395-tonne generator stator for Unit 5 on August 8, 2025, followed by wet commissioning of Unit 1 via mechanical run on October 24, 2025. Subsequent units are slated for phased commissioning starting late 2025, bolstering grid stability through peaking power capabilities. In , the 624 MW Kiru Hydroelectric Project on the , executed via , features four 156 MW units and a 41.5 million cubic meter . Progress includes the completion of 1 million cubic meters of concreting by October 2025, with the 12.94 km headrace excavation nearing completion ahead of the targeted 2026 full operations. The 1,000 MW Pakal Dul Project, also a joint venture on the Marusudar River in , employs TBMs for its 14.7 km headrace with an 8.3-meter excavated diameter, achieving record advance rates to navigate fractured and mitigate risks from variable rock strengths. Other active hydro builds, such as the 500 MW Teesta-VI in and 850 MW Ratle in , incorporate similar mechanized tunneling to sustain momentum toward aggregate under-construction hydro capacity contributions exceeding 7,000 MW.
ProjectCapacity (MW)LocationKey Milestone (2025)
Subansiri Lower2,000Arunachal PradeshWet commissioning Unit 1 (Oct)
Kiru624Jammu & Kashmir1M m³ dam concreting (Oct)
Pakal Dul1,000Jammu & KashmirTBM tunnel advances
Teesta-VI500SikkimOngoing tunnel and dam works
Ratle850Jammu & KashmirDiversion tunnel progress

Renewable and Emerging Projects

NHPC Limited has initiated several non-hydroelectric renewable energy projects, primarily in solar power, though these remain limited in scale compared to its core hydroelectric portfolio of over 7,000 MW installed capacity. The company's Bundelkhand Saur Urja Limited joint venture with the Uttar Pradesh New and Renewable Energy Development Agency is developing a 1,200 MW solar park in Jalaun district, Uttar Pradesh, under the Union Ministry of New and Renewable Energy's Park scheme, with an estimated investment of ₹7,969 crore; tenders for 1.2 GW of solar plants (in 300 MW modules) were issued in July 2025, alongside bids for civil works at a 600 MW segment costing ₹40.27 crore. A smaller operational component, the 65 MW Kalpi Solar Power Project in the same region, generates approximately 148 million units annually. In solar procurement, the Maharashtra Electricity Regulatory Commission approved the Maharashtra State Electricity Distribution Company's long-term purchase of 1,475 MW from NHPC at a tariff of ₹2.60 per kWh for 25 years in September 2025, supporting state demand while highlighting NHPC's entry into utility-scale solar supply. Additionally, NHPC has pursued hybrid projects, including a 250 MW solar-wind hybrid with Juniper Green Energy under a July 2025 power purchase agreement and a 300 MW solar-wind hybrid PPA with JSW Energy for Andhra Pradesh sites. These efforts are channeled through the wholly owned subsidiary NHPC Renewable Energy Limited, established for solar, wind, and small hydro development. Emerging initiatives include pilot projects for mobility. NHPC is establishing stations in , , powered by 500 kWp with generation for two fuel-cell buses, awarded to Gensol ; and in , targeting 40 kg daily production and storage for bus operations. These pilots test scalability amid India's green hydrogen push, but remain experimental with capacities under 25 kWe equivalent. Relative to hydroelectric projects, these renewables exhibit lower practical viability due to ; Indian hydroelectric capacity factors average 38-50%, enabling dispatchable output, whereas typically achieves 15-25% in regional conditions, necessitating storage or backups for reliability. NHPC's non- pipeline, exceeding 27,000 MW including 8,193 MW , contrasts with current operational scales below 500 MW outside , underscoring 's dominance for baseload stability.

Pipeline and Investigation Projects

NHPC's and projects focus on the pre-construction evaluation of hydroelectric and pumped storage potential, involving detailed surveys for hydrological data, geological mapping, and seismic risk assessments to ensure project viability and safety. These stages prioritize sites with high hydraulic heads, which enable greater and higher returns on through efficient conversion and minimal per megawatt. Feasibility reports incorporate economic modeling of power tariffs, costs, and long-term revenue from , particularly for pumped storage to support amid rising renewable . A key example is the Siang Upper Multipurpose Project in , proposed at 11,200 MW, where investigations emphasize the river's steep gradients for optimized output alongside flood moderation storage of 14 billion cubic meters; pre-feasibility studies, initiated with local consultations in 2025, assess basin-wide and seismic stability to validate its strategic economic value. The following table summarizes select projects under survey and investigation, aggregating over 10,000 MW across domestic and international sites:
Project NameLocationCapacity (MW)Type
Savitri PSP2,400Pumped Storage
KALU PSP1,800Pumped Storage
Gadikota1,200/PSP
Yaganti1,000/PSP
Masinta PSP1,000Pumped Storage
Garba Tawaghat630
Indirasagar-Omkareshwar PSP640Pumped Storage
West Seti800
These initiatives reflect NHPC's strategy to expand capacity through high-ROI assets, with ongoing investigations feeding into detailed reports for regulatory clearances and financing.

Financial and Market Performance

Revenue Generation and Economic Impact

NHPC derives the majority of its revenue from the sale of generated by its hydroelectric projects to state distribution companies and regional , particularly the Northern . For the financial year 2024-25, from energy sales amounted to ₹8,920 , underpinning a net profit of ₹3,084 . This revenue stream benefits from long-term power purchase agreements and mechanisms that ensure stable returns, with hydroelectric power's low operational costs—primarily and minimal expenses—enhancing profitability per megawatt generated at ₹56 lakhs in FY25. Specific projects underscore NHPC's revenue contributions, such as those in , where facilities like Dulhasti and generated approximately ₹19,400 for the company over the 15 years ending in 2016 through power sales and related allocations. Dulhasti alone recorded the highest before among NHPC stations at ₹773 in FY25, highlighting the profitability of established assets in challenging terrains. In the fourth quarter of FY25, NHPC achieved a surge of 24.4% to ₹2,347 , coupled with a 52% increase in after tax to ₹919 , despite elevated costs from project escalations and prior impairments; this performance validated hydroelectricity's cost-effectiveness amid record levels from operational plants. Overall FY25 grew 7% year-over-year to ₹8,994 , driven by higher and adjustments, though full-year dipped 15% due to one-time expenses. NHPC's revenue model extends economic benefits to by supplying affordable baseload and peaking power, which lowers average grid tariffs through its negligible marginal generation costs relative to coal or gas-based alternatives. This supports national energy affordability, with NHPC's output displacing higher-cost generation and thereby aiding conservation by curtailing fuel import dependencies in the power sector. development and operations further stimulate local economies in remote Himalayan regions via direct for thousands during —often exceeding 5,000 workers per major site—and ancillary in supply chains, though precise multipliers vary by project scale.

Stock Performance and Valuation

NHPC Limited's shares traded at approximately ₹84.79 on the National Stock Exchange as of October 24, 2025, reflecting a year-to-date decline amid broader market pressures on utilities. The company's stood at around ₹85,242 on the same date, down 8.84% over the preceding year, influenced by subdued sales growth of 0.73% annually over the past five years and a averaging 9.20% in the last three years. Valuation metrics indicate a trailing price-to-earnings ratio of 27.9 to 32.67, positioning NHPC at a premium relative to historical PSU peers but below the broader Indian renewable energy sector average of 83.2x, reflecting its stable hydroelectric revenue streams backed by long-term power purchase agreements. Dividend yield remains attractive at 2.20-2.25%, supported by a payout ratio of 71.41% and consistent distributions, such as the ₹1.91 per share annual dividend, outperforming volatile renewable peers during periods of stable hydrological conditions.
MetricValue (as of Oct 2025)
Market Cap₹85,242 Cr
P/E Ratio (Trailing)27.9-32.67
2.20-2.25%
(3-Year Avg)9.20%
Debt-to-Equity1.0
In August 2025, NHPC's board approved a revised borrowing plan of up to ₹10,000 crore for FY 2025-26, to be raised via bonds or term loans, enabling funding for capacity expansions while maintaining financial stability through monetization of project cash flows. As a public sector undertaking, NHPC's valuation benefits from hydroelectricity's low operational volatility—due to dispatchable baseload generation—contrasting with weather-dependent renewables, drawing investor interest for predictable returns in a sector prone to policy-driven fluctuations. Empirical data shows NHPC's total returns exceeding the Indian renewable energy industry's -8.9% over the past year, bolstered by dividends that have provided stability amid peers' earnings variability.

Awards and Operational Achievements

NHPC Limited recorded a Plant Availability Factor (PAF) of 97.73% at its Loktak hydroelectric station in 2024-25, representing the highest among its operational assets and demonstrating superior equipment reliability and maintenance efficacy. The company achieved its peak daily generation of 127.97 million units () on June 18, 2025, surpassing prior records and underscoring optimized hydrological and operational coordination across its portfolio. Similarly, the Tanakpur Power Station attained a monthly record of 72.68 in July 2025, reflecting enhanced efficiency during peak inflows. In 2024-25, NHPC generated 19,862 of , contributing significantly to India's mix through consistent output from its 24 operational hydroelectric stations totaling over 6,971 MW installed . A landmark operational occurred on October 24, 2025, with the wet commissioning of the 250 MW Unit-I at the 2,000 MW Subansiri Lower Hydroelectric Project, NHPC's largest single-unit to date and India's premier run-of-the-river facility upon full operation, achieved after rigorous mechanical trials and synchronization preparations. NHPC received the GEEF Global Environmental Excellence Company of the Year 2025 award in the power sector, recognizing its integration of sustainable practices in hydroelectric operations, including reduced emissions and safeguards. Earlier, in September 2024, it was conferred an Honorary Award by the government for outstanding contributions to development, tied to executions enhancing stability. These accolades align with empirical performance metrics, such as the Salal station's 2,652 MU output in the first half of FY'25, exceeding its annual design energy.

Controversies and Challenges

Environmental and Displacement Issues

NHPC's hydroelectric projects have displaced thousands of individuals, primarily through land acquisition for reservoirs and infrastructure. The Lower Subansiri Hydroelectric Project (LSHEP), a 2,000 MW initiative spanning and , has affected an estimated 3,000 to 5,000 project-affected families, disrupting traditional livelihoods dependent on riverine agriculture and fishing. Rehabilitation efforts under India's Land Acquisition, Rehabilitation and Resettlement Act, 2013, include cash compensation, land allotments, and resettlement colonies, with NHPC reporting compliance through packages providing housing, employment preferences, and community infrastructure; however, local grievances persist over inadequate compensation values, loss of cultural sites, and incomplete implementation, leading to ongoing disputes. Environmental concerns in NHPC projects center on hydrological alterations, including and impacts from damming s. Studies on LSHEP highlight risks of reduced downstream flow, potentially exacerbating and affecting habitats, alongside fragmentation of ecosystems that threatens migratory species and endemic flora-fauna in the . NHPC mitigates these through environmental impact assessments (EIAs), compensatory —planting over twice the diverted forest area in some cases—and conservation plans, including ladders and eco-monitoring; empirical data from similar projects indicate lifecycle of approximately 24 gCO2eq/kWh, far below coal's 820 gCO2eq/kWh, yielding net carbon savings when displacing generation despite initial ecosystem costs. Protests against NHPC initiatives, often amplified by NGOs and groups, underscore fears and ecological risks, as seen in the proposed 11,200 MW Siang Upper Multipurpose in . Local Adi communities in Siang and Upper Siang districts, affecting at least 27 villages, have mobilized since 2024 against submergence of farmlands, sacred sites, and potential seismic vulnerabilities, halting surveys and prompting detentions of activists; these oppositions, while rooted in verifiable livelihood threats, have delayed projects amid critiques that they overlook India's , where expansion addresses chronic deficits without expansion.

Corruption and Governance Criticisms

In 2025, allegations emerged regarding the misuse of approximately ₹300 allocated for anti-erosion works by NHPC since 2012, with reports indicating the funds were under scrutiny for potential in project execution. These claims, based on investigative reporting, highlighted systemic oversight failures in fund utilization for riverbank protection in erosion-prone areas, though official NHPC responses and confirmatory audits remain pending as of the latest available data. Governance criticisms have centered on profit repatriation from Jammu and Kashmir projects, where RTI disclosures revealed NHPC generated ₹19,431 in revenue from seven hydroelectric stations between 2001 and 2015, without corresponding or project handovers to the state as stipulated in a 2000 . Local stakeholders and activists have argued this arrangement disadvantaged the region by retaining operational control and expertise federally, exacerbating perceptions of unequal resource extraction akin to colonial-era practices, though NHPC maintained with central directives. Additionally, (CSR) initiatives faced backlash for inefficiencies, such as in where NHPC-funded recreational developments were halted in after the company deemed sites like Chinka unsuitable for , effectively blocking local economic opportunities despite initial investments. Accountability measures include investigations by the () and () into individual cases, notably against former Chief General Manager Harjeet Singh Puri, accused of amassing disproportionate assets worth ₹1.04 beyond known income sources; attached ₹47 in properties in January 2025. A 2022 graft case against Puri and associates further underscored internal procurement irregularities. audits of Central Enterprises, including NHPC, have flagged broader CSR execution lapses, such as in projects, prompting internal reviews, though quantified recoveries remain limited relative to alleged scales, with no comprehensive NHPC-specific restitution figures publicly detailed as of 2025.

Project Delays and Stakeholder Disputes

The Subansiri Lower Hydroelectric Project, a 2,000 MW facility on the India-China border, experienced an eight-year construction halt from 2011 to 2019 primarily due to protests and legal challenges from anti-dam activists citing environmental and displacement risks. These disruptions stemmed from litigation in the and public opposition in , delaying progress despite prior approvals. Causally, such activism prolonged timelines through repeated injunctions and safety reviews, escalating project costs from an initial estimate of around ₹9,000 to over ₹26,000 by 2025, though recent milestones like installations signal resumption toward partial commissioning. Empirical outcomes highlight that while delays inflated via idle labor and material , the project's advancement has enabled phased power addition, with three 250 MW units targeted for 2025 integration into the grid, underscoring litigation's role in deferring but not derailing supply benefits. In , stakeholder disputes have centered on a 2000 (MoU) under which NHPC executed and operated projects like Dulhasti and while state ownership was retained, with provisions for eventual asset transfer back to the government. By 2015, NHPC had generated approximately ₹194 billion in revenue from these assets between 2001 and 2015, including over ₹41 billion directly from the state, yet the MoU-mandated mechanism for project handover remained unresolved, fueling claims of unfulfilled equity sharing. This impasse reflects causal tensions between central execution efficiency—enabling rapid development—and local demands for control, as state interventions post-2019 sought reclamation without full settlement of NHPC's investments and dues exceeding ₹1,000 crore in some cases. Compensation disputes in dam-affected areas, such as those tied to the Multipurpose Project, have exacerbated frictions, with affected families alleging shortfalls in land and payouts despite NHPC's legal challenges to awards. Local groups have accused NHPC of delaying or inadequately addressing demands under the Multipurpose Project Affected Families framework, linking unfulfilled promises to halted works and petitions for interim relief. Resolution efforts, including interventions on NHPC's compensation stance, reveal how negotiation breakdowns—often rooted in valuation disagreements—prolong disputes, contrasting with the operational gains from completed segments that have bolstered despite such hurdles. Overall, these cases illustrate litigation and equity impasses as primary delay drivers, imposing fiscal burdens but yielding long-term value upon mitigation.

Strategic Outlook

Capacity Expansion Plans

NHPC Limited plans to more than double its installed capacity to 15,000 MW over the next five years, primarily through hydroelectric developments augmented by and projects. This expansion emphasizes hydroelectric power, which constitutes about 80% of the company's , with the remaining 15-20% allocated to and related initiatives. A critical component of this growth is the Subansiri Lower Hydroelectric Project, with a capacity of 2,000 MW (eight units of 250 MW each), slated for full commissioning by May 2026 following the recent wet commissioning of its first unit in October 2025. This project, located in the Brahmaputra basin, will represent India's largest hydroelectric powerhouse upon completion, enhancing dispatchable power supply to address regional energy deficits. Supporting these efforts, NHPC is aligning with national plans, including a ₹6.4 trillion transmission master plan to evacuate over 76 of hydroelectric capacity from the Brahmaputra by 2047, encompassing 208 projects across 12 sub-basins. Additionally, NHPC has pursued pumped storage developments through MoUs signed in August 2025 with state governments, contributing to India's 19 pumped storage target by 2030 and bolstering reliability with storage-enabled resources. This -led focus prioritizes firm, controllable generation to mitigate supply variability inherent in unsubsidized intermittent alternatives, thereby supporting economic viability in markets reliant on consistent baseload.

Technological and Sustainability Initiatives

NHPC has implemented advanced dam safety technologies, including a cloud-based launched in August 2022 to monitor river water levels and provide real-time alerts for hydroelectric projects, enhancing operational resilience against hydrological risks. The company integrates , sensors, and modeling to optimize dam and power station operations, enabling and seismic monitoring in compliance with India's Dam Safety Act of 2021. These enhancements prioritize proven reliability over speculative innovations, as hydroelectric infrastructure's long-term viability stems from robust, data-driven upgrades rather than nascent technologies. In sustainability efforts, NHPC emphasizes pumped storage projects (PSPs) for , which facilitate grid stability by storing excess renewable generation and dispatching power during peaks, thereby minimizing curtailment of intermittent sources like and . Lifecycle from hydroelectric power average 24 gCO₂eq/kWh, lower and more consistent than solar photovoltaic (48 gCO₂eq/kWh) and comparable to onshore (11 gCO₂eq/kWh), accounting for , operation, and methane releases, underscoring hydro's dispatchable advantage for baseload reliability. This positions hydro enhancements, including PSPs, as pragmatically superior for decarbonization compared to variable renewables requiring extensive backup. NHPC pursues research and development in through pilot mobility stations, including a 500 kWp solar-powered facility in , , initiated in 2023 to operate buses, and another in , targeted for completion by August 2025. A third 25 kW pilot operates in , focusing on emission reduction via renewable . These initiatives explore monetization through operational cash flows from fuel supply and bus services, yet remain experimental, with scalability constrained by high costs and infrastructure needs, favoring incremental hydro optimizations for proven sustainability gains.

References

  1. [1]
    Overview - NHPC India
    NHPC Limited is the largest hydropower development organization in India, with capabilities to undertake all the activities from conceptualization to ...
  2. [2]
    NHPC Ltd - Arihant Capital
    NHPC Limited was incorporated on November 7, 1975 as a private limited company under the name of 'National Hydro Electric Power Corporation Private Limited'.
  3. [3]
    NHPC Limited - LinkedIn
    Sep 12, 2025 · NHPC Limited is India's premier green energy NAVRATNA Company under Ministry of Power, Government of India. NHPC champions clean, renewable energy with minimal ...
  4. [4]
    NHPC Limited has reached its highest daily power generation of ...
    Jun 19, 2025 · NHPC Limited has reached its highest daily power generation of 127.97 million units (MU) on June 18, 2025. This historic achievement shows NHPC ...
  5. [5]
  6. [6]
    CBI books senior NHPC official on graft charge - The Hindu
    Feb 3, 2022 · The accused official has been identified as Harjeet Singh Puri, who was posted with the NHPC's Corporate office in Faridabad (Haryana). The ...
  7. [7]
    NHPC Limited
    श्री भूपेंद्र गुप्ता अध्यक्ष व प्रबंध निदेशक · Oct 17, 25. श्री महेश कुमार शर्मा ने एनएचपीसी लिमिटेड के निदेशक (वित्त) का पदभार ग्रहण किया · Sep 15, 25. एनएचपीसी की अध्यक्षता में संचालित नराकास (का.), फरीदाबाद गृह ...वर्तमान अधिसूचनाAll TenderOverviewपावर स्टेशनList of Employees
  8. [8]
    Contact Us - Home - NHPC India
    Registered Office: Address : NHPC Office Complex, Sector-33, Faridabad - 121003 (Haryana) NHPC Website : http://www.nhpcindia.com
  9. [9]
    NHPC Ltd - Company Profile and News - Bloomberg Markets
    ADDRESS. NHPC Office Complex Sector-33 Faridabad, 121 003 India. WEBSITE. www.nhpcindia.com. NO. OF EMPLOYEES. 3346. Executives. Name/Title. Rajendra Prasad ...
  10. [10]
    Power Stations - NHPC India
    National Hydroelectric Power Corporation Ltd, India ... 8332.9 MW. *The generation capacity of Tanakapur Power Station has been derated from 120 MW to 94.2 MW.
  11. [11]
    [PDF] एनएचपीसी ऑिफस कॉ े / NHPC Office Complex
    Sep 2, 2025 · ... 2025. NHPC's total installed capacity as on 01 July, 2025 is 8247.18 MW including 1681.70 MW in. Joint Venture, comprising 7771.20 MW from 23 ...<|separator|>
  12. [12]
    [PDF] NHPC Limited: Rating reaffirmed
    Jul 3, 2025 · On a consolidated basis, the company has an operational portfolio of 8,140 MW as of April 2025, comprising. 7,771 MW of hydro and 369 MW of ...
  13. [13]
    [PDF] CITIZEN'S CHARTER - NHPC Limited
    NHPC Ltd. previously known as National Hydroelectric Power Corporation Limited was incorporated on November 07, 1975. NHPC is a MINI RATNA Category-I ...Missing: headquarters mandate
  14. [14]
    Energy in India: from Jawaharlal Nehru to Indira Gandhi
    May 5, 2022 · The nationalization of the coal mines coincided with the first oil crisis and the preparation of the Fifth Five-Year Plan (1973/74-1978/79). In ...
  15. [15]
    NHPC Ltd: History, Latest Updates, Milestones, Subsidiaries and ...
    NHPC Limited was founded on November 7, 1975, as part of a government initiative to tap into India's abundant hydroelectric resources. Initially, the company ...
  16. [16]
    [PDF] 2nd Annual Report 1977-78 - NHPC Limited
    Jan 20, 1978 · All the Units are scheduled to be commissioned by March, 1982, which is the target date for commissioning of the project. 2.4 Baira Siul ...
  17. [17]
    NHPC Ltd - Aditya Birla Money
    In the year 1982-83, the company commissioned the Baira Siul power station in Himachal Pradesh. During the year 1983-84, the company commissioned all the units ...
  18. [18]
    Setting Benchmarks: NHPC's best practices in O&M
    Jan 4, 2020 · NHPC is undertaking/ planning the R&M of the Bairasiul and Loktak HEPs. The 180 MW Bairasiul power station was commissioned in April 1982 in ...
  19. [19]
    [PDF] National Hydroelectric Power Corporation Ltd.
    In spite of these setbacks,. I am confident that Loktak Project will be commissioned by March 1982, according to schedule. The work on the Baira Siul ...
  20. [20]
    [PDF] PROPOSAL
    Sep 1, 2017 · Tanakpur Power Station of 94.2MW capacity is the first hydel project commissioned, in the Sharda Valley, by NHPC in the year of 1992-93.
  21. [21]
    Uri - I - NHPC India
    The Power Station was commissioned in the year 1997. The layout plan features and photo gallery of the Power Station are detailed below.
  22. [22]
    Rangit - NHPC India
    It is a ROR with Pondage Scheme. The Power Station was commissioned in the year 2000. The layout plan, features and photo gallery of the Power Station are ...
  23. [23]
    Chamera - II - NHPC India
    The Power Station was commissioned in year the 2003-04. The layout plan, features and photo gallery of the Power Station are detailed below.
  24. [24]
  25. [25]
    Dulhasti - NHPC India
    The Power Station was commissioned in year 2007. The layout plan, features and photo gallery of the Power Station are detailed below.
  26. [26]
    Lower Subansiri Hydroelectric Power Project
    Jun 19, 2020 · The construction of 2,000MW Lower Subansiri Hydro Power project started in 2005. Alstom provided 250MW Francis turbines for the Lower Subansiri ...
  27. [27]
  28. [28]
    NHPC Limited - Facebook
    Oct 18, 2025 · NHPC has successfully commissioned the full capacity of its 300 MW Solar Power Project at Karnisar, Bhatiyan, District Bikaner, Rajasthan on ...Missing: website modern era
  29. [29]
    [PDF] SUSTAINABILITY REPORT - NHPC Limited
    NHPC is actively involved in a wide range of diversified projects (including wind, solar, green hydrogen) that are essential for meeting India's energy needs ...
  30. [30]
    NHPC and IOCL Forge Strategic Alliance to Boost Renewable and ...
    Jul 4, 2025 · NHPC and Indian Oil Corporation Ltd (IOCL) have signed an MoU to jointly develop pumped storage, hydroelectric, and other renewable energy projects in India ...<|control11|><|separator|>
  31. [31]
    ACME Solar and NHPC ink deal for 250 MW of renewable energy
    Jun 25, 2025 · ACME Solar Holdings Ltd has inked a PPA with NHPC Limited for its 250 MW Firm and Dispatchable Renewable Energy (FDRE) project in Rajasthan.
  32. [32]
    India proposes to open up retail power sector nationwide to private ...
    Oct 10, 2025 · India plans to open up its retail electricity market for private companies nationwide, ending the dominance of state-run distributors in ...
  33. [33]
    NHPC Q1 FY'26 presentation: Revenue jumps 19%, ambitious ...
    Sep 5, 2025 · A notable strategic shift is NHPC's growing focus on diversification beyond traditional hydropower into solar, wind, and pump storage projects.
  34. [34]
    Public Sector Undertakings | Government of India - Ministry of Power
    NHPC is a Govt. of India Navratna Enterprise with an authorized share capital of ₹15,000 crores, paid-up share capital of ₹10,045.03 crore and an investment ...
  35. [35]
    NHPC Limited: Governance, Directors and Executives & Committees
    Composition of the Board of Directors: NHPC Limited ; Bhupender Gupta. Chairman, 2025-09-03 ; Premkumar Goverthanan. 62 year. Audit Committee, 2023-03-09.
  36. [36]
  37. [37]
    [PDF] INVESTOR PRESENTATION FINANCIAL YEAR 24-25 : March 2025
    Apr 12, 2025 · ❖ NHPC has awarded the EPC contract for 200 MW Grid Connected Solar photovoltaic Power Projects (stage-. 1) located in 600 MW Solar Park at ...
  38. [38]
    [PDF] Company Name - India Ratings
    NHDC Ltd. Subsidiary. 51.08%. Chenab Valley Power Projects (P) Ltd. Subsidiary ... Ratle Hydroelectric Power Corporation Limited Subsidiary. 57.41%. NHPC ...
  39. [39]
    Financial Statements of Subsidiaries - NHPC India
    Financial Statement of NHDC Limited for FY 2024-25 ( Download | 67.01 MB | PDF | Open with Adobe Reader or browser) ; Financial Statement of Chenab Valley Power ...
  40. [40]
    NHPC Ltd - Chenab Valley Power Projects
    NHPC including its JVs/ Subsidiaries is presently engaged in the construction of 15 projects aggregating to a total installed capacity of 10449 MW, which ...
  41. [41]
    Ratle Hydroelectric Power Corporation Limited
    The JVC has been incorporated on 01.06.2021 with NHPC and Jammu & Kashmir State Power Development Corporation Ltd (JKSPDC) holding equity share of 51% and 49% ...Missing: Valley | Show results with:Valley
  42. [42]
    FAQs on Hydropower | Government of India - Ministry of Power
    Different types of Hydro Schemes are : i. Purely Run - of - River Power Station. ii. Storage type Power Station. iii.Run - of - River Stations with Pondage.
  43. [43]
    [PDF] 1705653744hi.pdf - NHPC Limited
    Plant Availability Factor (PAF) and second-highest annual generation ever ... highest-ever overall PAF of 88.19% during FY 2021-22 as against 84.87% PAF.
  44. [44]
    Interview with R.K. Vishnoi: “NHPC has set new standards in project ...
    Oct 10, 2023 · Capacity index/PAF: During 2021-22 and 2022-23, the capacity index or plant availability factor (PAF) stood at 88.19 per cent and 88.75 per ...
  45. [45]
    Excavation of Kishanganga HRT Through TBM - A Successful venture
    Mar 11, 2025 · The paper briefly highlights the success story of ahead of schedule excavation of 14.727km long Kishanganga HRT by tunnel boring machine.
  46. [46]
  47. [47]
    Subansiri dam: NHPC installs 395-tonne generator stator
    Aug 10, 2025 · Subansiri dam: NHPC installs 395-tonne generator stator. Aug 10, 2025, 02:44 IST.
  48. [48]
  49. [49]
    Kiru hydroelectric project moves closer to completion with major ...
    Oct 11, 2025 · In a major milestone, the 624 megawatt Kiru hydroelectric project, under construction on the Chenab River in the Kishtwar district of Jammu ...
  50. [50]
    Kiru hydroelectric plant - Global Energy Monitor - GEM.wiki
    Apr 24, 2025 · Status, Commissioning year, Nameplate capacity, Turbines, Technology type, Owner. Construction, 2026 (planned), 624 MW, 4 x 156 MW ...
  51. [51]
  52. [52]
    “Pakal Dul Hydro Electric Project, CVPPL Achieves Record Tunnel ...
    The project envisages construction of 14.7 km-long Head Race Tunnel (HRT) with an excavated diameter of 8.3 meters, to be executed using Tunnel Boring Machines ...
  53. [53]
    National Hydroelectric Power Corporation - NHPC India
    Installed Capacity (MW), Total Capacity (MW), Status. Garba Tawaghat ... 4 * 33, 132, Power Station. Nimmo-Bazgo, UT of Ladakh, 3 * 15, 45, Power Station. Chutak ...
  54. [54]
    NHPC proposes 1,200 MW Solar Park in UP under UMREPP Scheme
    Apr 28, 2025 · NHPC has proposed the development of a 1,200 MW solar park in Jalaun, Uttar Pradesh, with an estimated investment of Rs 796.9 crore.
  55. [55]
    NHPC accepting bids to build 1.2 GW of solar in India - PV Magazine
    Jul 31, 2025 · NHPC Ltd, on behalf of Bundelkhand Saur Urja Ltd (BSUL), has launched a tender to select developers to build 1.2 GW of solar power plants ...
  56. [56]
    NHPC Invites Bids For Civil Works At 600 MW Solar Park In Jalaun ...
    Jun 13, 2025 · The estimated project cost is ₹40.27 crore. The deadline for completion of the entire work is 350 days from the date of issuing the Letter of ...
  57. [57]
    1. kalpi solar power project - BUNDELKHAND SAUR URJA LIMITED
    KALPI SOLAR POWER PROJECT. Capacity : 65 MW. Location: Village-Parasan, Tehsil-Kalpi, District-Jalaun, Uttar Pradesh. Annual Energy Generation: 148 MU ...
  58. [58]
    MERC Approves MSEDCL's 1475 MW Solar Power Procurement ...
    Sep 22, 2025 · This approval allows MSEDCL to purchase 1,475 MW of solar energy from NHPC Limited, a move aimed at meeting the state's growing electricity ...
  59. [59]
    Juniper Green and NHPC Partner on 250 MW Hybrid Project to ...
    Jul 17, 2025 · Juniper Green Energy has signed a Power Purchase Agreement (PPA) with NHPC for a 250 MW hybrid renewable energy project.
  60. [60]
    Monthly RE Update - June 2025 - JMK Research
    Jun 30, 2025 · JSW Energy has signed a 25-year power purchase agreement (PPA) with NHPC Ltd for 300 MW solar-wind hybrid capacity located across Andhra Pradesh ...
  61. [61]
    New vertical set up by NHPC Ltd. For development of renewable ...
    NHPC Limited has set up a new wholly owned subsidiary company namely “NHPC RENEWABLE ENERGY LIMITED (NREL)”, for development of Renewable Energy, Small Hydro ...
  62. [62]
    New Initiatives - NHPC India
    R&D Pilot Project Green Hydrogen Mobility Station at Kargil, UT of Ladakh. Hydrogen Generator will be powered by renewable solar power of 500 KWp.
  63. [63]
    NHPC Invites Bids for Hydrogen Fuel Cell Buses in Leh and ...
    Jan 16, 2025 · In 2023, NHPC invited bids to set up a pilot project for a green hydrogen-based mobility station in Kargil, Ladakh, to run two hydrogen fuel ...
  64. [64]
    NHPC Extends Tender Deadline for EPC Contract
    Feb 25, 2024 · The project aims to establish a pilot project for a Green Hydrogen Mobility Station in Chamba, Himachal Pradesh, along with comprehensive operations and ...
  65. [65]
    Hydroelectric power in India - Wikipedia
    The National Hydroelectric Power Corporation (NHPC) ... The generation cost after four decades of operation is about 27 paise (0.32¢ US) per kWh.
  66. [66]
    NHPC's Renewable Energy Expansion: Over 27,000 MW in Pipeline ...
    Jun 18, 2025 · NHPC Ltd, India's largest hydropower company, is ramping up renewable energy capacity with over 27000 MW in development while addressing ...Missing: evolution | Show results with:evolution
  67. [67]
    NHPC (NHPCNS) SWOT Analysis - DCFmodeling.com
    As of FY2023, NHPC's renewable energy generation capacity outside of hydro is less than 500 MW, while competitors have expanded their renewable shares ...<|control11|><|separator|>
  68. [68]
    [PDF] (A Government of India Navratna Enterprise) - NHPC Limited
    Nov 20, 2024 · Investigation is an intrinsic aspect of hydropower project during all stages of its development. NHPC is equipped with various state-of- art ...
  69. [69]
    NHPC holds discussion on Siang Upper Multipurpose Project
    Oct 11, 2025 · NHPC held a consultative meeting regarding the Siang Upper Multipurpose Project (SUMP) with the East Siang Downstream Dam Affected People's ...
  70. [70]
    NHPC engages ABK, SIFF in consultative dialogue on Siang Upper ...
    Oct 6, 2025 · He explained that the multipurpose project aims to moderate floods, ensure water security, and generate clean hydropower, while creating avenues ...
  71. [71]
    In 15 Years, NHPC Earned Rs 194 Billion from the J&K Hydel Power ...
    Apr 21, 2016 · Of this, J&K Government had paid Rs 41 billion (Rs 4,129 Crores) to NHPC to buy 19.7% of the power that was generated by the hydel projects ...
  72. [72]
    NHPC Q4 results: PAT rises 52% to Rs 919 crore; FY25 profit slips ...
    May 21, 2025 · NHPC Q4 results: PAT rises 52% to Rs 919 crore; FY25 profit slips 15% · NHPC, under the Ministry of Power, is India's largest hydropower ...
  73. [73]
    NHPC Q4 Results 2025 - Mint
    Q4 Results Highlights ; Operating profit. ₹775.45 Cr. (7.00%) ; Profit after tax. ₹799.95 Cr. (305.16%) ; Total Income. ₹2,346.97 Cr. (2.63%) ; Operating Margin.NHPC, United Spirits, Religare... · JSW Steel, Bandhan Bank... · Dividend declared
  74. [74]
    Earnings call transcript: NHPC Q4 2025 sees revenue surge, stock ...
    Sep 5, 2025 · Company Performance. NHPC demonstrated a solid revenue growth of 7% for FY 2025, reaching INR 8,994 crore. However, the company faced ...
  75. [75]
    NHPC Limited (NHPC.NS) Stock Historical Prices & Data
    Volume. Oct 24, 2025, 85.71, 86.80, 84.61, 84.79, 84.79, 16,912,048. Oct 23, 2025, 86.06, 87.29, 85.48, 85.82, 85.82, 17,396,942. Oct 21, 2025, 86.70, 87.00 ...
  76. [76]
    NHPC Limited Share Price Today, Live NSE Stock Price, News
    NHPC Limited Share Price Today, Live NSE Stock Price: Get the latest NHPC Limited news, company updates, quotes, offers, annual financial reports, graph, ...<|separator|>
  77. [77]
    NHPC Limited Market Cap - NSE - Stock Analysis
    NHPC Limited has a market cap or net worth of 869.5 billion as of October 20, 2025. Its market cap has decreased by -8.84% in one year.
  78. [78]
    About NHPC Ltd | Key Insights - Screener
    Power Capacity​​ As of Q3 FY25, the company has an installed capacity of 7,233 MW, including hydro and renewables. It is. It operates 28 power stations across 15 ...
  79. [79]
    NHPC Limited (NHPC.NS) Stock Price, News, Quote & History
    NHPC Limited, together with its subsidiaries, engages in the generation, sale, and trading of electricity through hydro, wind, and solar power stations in ...
  80. [80]
    NHPC (BSE:533098) Stock Valuation, Peer Comparison & Price ...
    Price-To-Earnings vs Peers: 533098 is good value based on its Price-To-Earnings Ratio (28.4x) compared to the peer average (83.2x). Price to Earnings Ratio vs ...<|separator|>
  81. [81]
    NHPC Limited (NSE:NHPC) Statistics & Valuation Metrics
    Dividends & Yields. This stock pays an annual dividend of 1.91, which amounts to a dividend yield of 2.20%. Dividend Per Share, 1.91. Dividend Yield, 2.20 ...
  82. [82]
    NHPC Limited (NHPC.NS) Valuation Measures & Financial Statistics
    12/31/2024, 9/30/2024, 6/30/2024. Market Cap, 873.01B, 861.96B, 826.20B, 810.63B ... --. Income Statement. Revenue (ttm), 109.15B. Revenue Per Share (ttm), 10.86.
  83. [83]
    Nhpc Ltd Dividend & Ex-dividend History - BlinkX
    P/E Ratio (TTM). 27.9. P/B Ratio (TTM). 2.2. DTE. 1.0. ROE. 7.6. ROCE. 6.9. Dividend Yield. 2.32. DPS. 1.91. Dividend Payout. 62.21. Ann.Dividend %. 19.1 ...Missing: valuation | Show results with:valuation
  84. [84]
    NHPC board clears revised ₹10,000 crore fundraising plan ...
    Aug 29, 2025 · ... borrowing plan of up to ₹10,000 crore for FY 2025-26. The funds will be raised through secured or unsecured, redeemable, taxable, non ...
  85. [85]
    NHPC board clears Rs 10,000 crore fund raising plan and ...
    Aug 30, 2025 · NHPC said its board, at its meeting held on Friday, 29 August 2025, approved a revised borrowing plan to raise up to Rs 10,000 crore in FY 2025 ...
  86. [86]
    Is NHPC Still a Good Power Generation Company in 2025? A ...
    Jul 8, 2025 · Established in 1975, NHPC focuses on hydropower development in India and neighboring countries. Over the decades, it has diversified into solar ...
  87. [87]
    NHPC (NSEI:NHPC) - Stock Analysis - Simply Wall St
    Rating 3/6 · Review by Simply Wall StReturn vs Industry: NHPC exceeded the Indian Renewable Energy industry which returned -8.9% over the past year. Return vs Market: NHPC exceeded the Indian ...
  88. [88]
    NHPC Ltd. Peers Comparison & Competitor Analysis - ET Money
    Get a comprehensive NHPC peer comparison to understand the stock's performance ... Past Returns. Absolute Returns Shown. 1D. -0.24%. 0.57%. 1W. 1.16%. 0.37%. 1M.
  89. [89]
    NHPC Records Its Highest Ever Daily Power Generation at 127.97 ...
    Jun 19, 2025 · NHPC achieves highest daily generation of 127.97 MU on June 18, 2025. A key step in India's renewable power journey.
  90. [90]
    Record-Breaking Output: NHPC's Tanakpur Power Station Registers ...
    Aug 1, 2025 · The plant generated 72.68 million units (MU) of power in July 2025 surpassing all previous records for the month since its commissioning.
  91. [91]
    [PDF] May 21, 2025 - NHPC Limited
    May 21, 2025 · ➢ Apart from above under construction projects, NHPC is also actively pursuing to start works of projects such as Uri-I Stage –II (240 MW),.
  92. [92]
  93. [93]
    NHPC Honored with “GEEF Global Environmental Excellence ...
    NHPC Limited, a Government of India Navratna enterprise, has been conferred with the prestigious “GEEF Global Environmental Excellence Company of the Year 2025 ...
  94. [94]
    NHPC conferred with 'Honorary Award' for Outstanding Contribution ...
    Sep 27, 2024 · NHPC conferred with 'Honorary Award' for Outstanding Contribution towards Development of Renewable Energy in Uttar Pradesh.
  95. [95]
    [PDF] INVESTOR PRESENTATION FINANCIAL YEAR 24-25 - NHPC Limited
    Oct 31, 2024 · NHPC Contribution is 15% of Installed. Hydro Power On Consolidated Basis. Including 50 MW Wind Power Project, Jaisalmer & 50. MW Solar Power ...
  96. [96]
    [PDF] A Critical Study Of ‗Development Induced Displacement' In The ...
    The fourth section studies the ongoing debate on displacement induced by the Lower Subansiri Hydro- Electric Power Project (LSHEP) in North East. India followed ...
  97. [97]
    [PDF] Impacts of the Lower Subansiri Hydroelectric Project, Northeast ...
    With dam-induced displacement of these people, their livelihoods are disrupted, and establishing them to other places leads to conflicts and disrupts social.
  98. [98]
    Dams Do Not Mean Development: The Case of Hydro-Electric ...
    Feb 1, 2020 · ... Lower Subansiri Hydro Electric Project (LSHEP). The article is based ... displacement, resettlement and rehabilitation of the project-affected ...<|separator|>
  99. [99]
    Key Areas - NHPC India
    NHPC's Hydroelectric Projects are usually situated in remote hilly areas such as North and North Eastern States of India which are generally rich in ...Missing: modern era
  100. [100]
    [PDF] downstream impact study of the ongoing subansiri lower ...
    The study examines the downstream impact of the Subansiri project, which caused fear of flooding, and the project's cumulative impact on the downstream  ...
  101. [101]
    Environmental impact monitoring - NHPC
    Dec 22, 2023 · NHPC also organizes occasional reforestation operations in the project area to contribute to the fight against global warming.
  102. [102]
    [PDF] Case Study of Two Selected Projects - TERI
    This report studies the socio-economic and environmental costs/benefits of Indian hydropower projects, including the value of forest lands diverted for Bhakra- ...<|separator|>
  103. [103]
    As protests hit Upper Siang project, NHPC to fast-track selection of site
    Jun 10, 2025 · A decision on the final site for the proposed 11.2 gigawatt (GW) Siang Upper Multipurpose Project is learnt to be “held up due to local issues”.
  104. [104]
    resisting hydropower dams in the Siang Valley of Arunachal ...
    Oct 6, 2025 · In September 2024, the second major protest erupted in Geku, Upper Siang district, as the NHPC surveyed surreptitiously for the project's PFR.
  105. [105]
    30 NGOs back protest against Siang Upper Multipurpose Project
    Jun 1, 2025 · The SIFF says at least 27 villages in Siang and Upper Siang districts would be directly impacted by the dam. People from the Adi community ...
  106. [106]
    RTI Reveals NHPC Sells J&K Power, Earns Rs 19431 Cr - The Citizen
    Apr 21, 2016 · SRINAGAR: The NHPC has disclosed it earned Rs 19431 crores from seven power projects in Jammu and Kashmir, putting pressure on Mehbooba ...
  107. [107]
    Nothing Social in NHPC's Corporate Social Responsibility spending
    Mar 27, 2022 · In a letter to the Reasi district administration, the company said the area was not fit for tourism and all recreational activities would stop.Missing: inefficiencies | Show results with:inefficiencies
  108. [108]
    ED attaches assets worth Rs 47 lakh of NHPC's ex-CGM - The Tribune
    Jan 3, 2025 · ED attaches assets worth Rs 47 lakh of NHPC's ex-CGM. The total value of the disproportionate asset is estimated to be around Rs 1.04 crore.Missing: executive | Show results with:executive
  109. [109]
    CAG Report: CPSEs including Coal India, NTPC under scanner
    Sep 26, 2020 · CAG Report: CPSEs including Coal India, NTPC under scanner; Irregularities found in toilet constructions under CSR schemes ... NHPC, PFC ...
  110. [110]
    Subansiri Hydro Project Delayed Till 2026 - Rediff Money
    Jun 12, 2025 · NHPC's Subansiri hydro project suffers minor monsoon damage, delaying commissioning to May 2026. Project cost escalates to Rs 26,075 crore.
  111. [111]
    NHPC set to commission 750 MW at Subansiri Lower Hydroelectric ...
    Jun 2, 2025 · NHPC stated that the commissioning process for these initial three units is expected to commence from June 2025, provided the NDSA's approval is ...<|separator|>
  112. [112]
    Jammu Kashmir Seeks to Reclaim Hydropower Projects from NHPC
    Mar 17, 2025 · The MoU signed on July 20, 2000, allowed NHPC to fund, execute, and operate certain hydropower projects while retaining ownership with the state ...Missing: disputes | Show results with:disputes
  113. [113]
    RTI reveals NHPC earned Rs.194 billion from hydel projects in J&K ...
    Apr 21, 2016 · RTI reveals NHPC earned Rs.194 billion from hydel projects in J&K between 2001-2015 while MoU requires working out a method for transfer of ...Missing: tech | Show results with:tech
  114. [114]
    NHPC 'hopeful' of recovering over Rs 1,000 crore in dues from J&K ...
    Aug 12, 2019 · According to Joshi, the J&K government's tussle with NHPC Ltd over control of older projects like the Salal hydroelectric power station has died ...
  115. [115]
    Group accuses NHPC of betrayal - The Arunachal Times
    Oct 22, 2019 · ROING, Oct 21: The Dibang Multipurpose Project Affected Families (DMPAF) has expressed anguish over alleged “betrayal” by the NHPC Ltd – which ...
  116. [116]
    NHPC challenges land compensation against Dibang Project ...
    Jun 26, 2019 · On learning about the petition, the DMPAAC has written a letter to the DMP, NHPC Ltd, and demanded an immediate stop to all ongoing work, ...
  117. [117]
    Government to address NHPC's attitude on DMP compensation
    Sep 25, 2019 · The attitude of NHPC in regard to DMP and payment of compensation is not appreciable and needs to be taken care of. The promises made during ...
  118. [118]
    NHPC to double capacity to 15 GW in 5 years: CMD Raj Kumar ...
    Oct 1, 2024 · NHPC to double capacity to 15 GW in 5 years: CMD Raj Kumar Chaudhary ... NHPC Ltd plans to more than double its installed capacity to 15,000 MW in ...
  119. [119]
    NHPC: 80% of total capex will be in hydro sector; 15-20% in solar ...
    Feb 26, 2024 · 80% of total capex will be in hydro sector; 15-20% in solar and hybrid green energy sector: RP Goyal, NHPC ... RP Goyal, Director (Finance) of ...
  120. [120]
    Subansiri Hydroelectric Project to begin power generation by mid ...
    May 31, 2025 · Subansiri Hydroelectric Project to begin power generation by mid-June, full commissioning by May 2026. The 2,000 MW Subansiri Lower ...
  121. [121]
  122. [122]
    Rs 6.4 trn plan to evacuate 76-GW hydro power from Brahmaputra ...
    Oct 13, 2025 · The Central Electricity Authority (CEA) has charted out a Rs 6.4 trillion transmission plan to evacuate 76 gigawatt (GW) of hydroelectric ...
  123. [123]
    NHPC, aligning with India's goal of 19 GW pumped storage capacity ...
    Aug 6, 2025 · NHPC, aligning with India's goal of 19 GW pumped storage capacity by 2030, signed MoUs on 06.08.2025 with the Government of Chhattisgarh and ...
  124. [124]
    NHPC launches cloud-based early warning system for hydroelectric ...
    Aug 10, 2022 · NHPC in India has launched a cloud-based software that offers an early warning system for its hydroelectric projects.
  125. [125]
    'AI, IoT and Digital Twin are Revolutionising Dam, Power Stations ...
    Jul 23, 2025 · NHPC is progressively integrating emerging digital technologies such as Artificial Intelligence (AI), Internet of Things (IoT), and Digital Twin ...
  126. [126]
    [PDF] Hydropower for Sustainability - NHPC Limited
    NHPC is committed to the seismic safety of its projects and in line with the. Dam Safety Act, Dec.2021, which has mandated seismic monitoring of all hydro ...
  127. [127]
    [PDF] Comparison of Lifecycle Greenhouse Gas Emissions of Various ...
    The report compares lifecycle GHG emissions of Nuclear, Coal, Natural Gas, Oil, Solar Photovoltaic, Biomass, Hydroelectric, and Wind.
  128. [128]
    [PDF] Life Cycle Greenhouse Gas Emissions from Electricity Generation
    These results show that total life cycle GHG emissions from renewables and nuclear energy are much lower and generally less variable than those from fossil ...<|control11|><|separator|>
  129. [129]
    NHPC aims to have installed capacity of 50 GW by 2047
    Dec 18, 2024 · Out of these, we aim to commission the 800 MW Parbati-II HE Project by March 2025 and three units of 250 MW each of the 2000 MW Subansiri Lower ...
  130. [130]
    NHPC plans over ₹80,000 cr investment for 20GW PSP, eyes green ...
    Feb 16, 2025 · The company has undertaken three pilot projects: producing green hydrogen ... Kargil, and Chamba (Himachal Pradesh). "We'll generate the ...