Fact-checked by Grok 2 weeks ago

Quebec Autoroute 50

Autoroute 50, officially designated as Autoroute Guy-Lafleur, is a provincial freeway in western , , extending 158 kilometres from in the region to Mirabel in the region. It parallels the north shore of the , serving as a vital east-west corridor that links the National Capital Region—encompassing and —to the Area, facilitating regional commerce, tourism, and daily commutes. Construction of the autoroute began in 1977 and proceeded in phases, with the final 18-kilometre segment between L'Ange-Gardien and Notre-Dame-de-la-Salette opening to traffic on November 26, 2012, marking the completion of the full route. The project addressed long-standing transportation needs in the and Lower Laurentians, evolving from earlier proposals dating back to the for a high-capacity to bypass local roads like Route 148. Today, the autoroute handles between 9,800 and 102,000 vehicles daily, underscoring its role as a backbone of Quebec's , though sections remain undivided two-lane roadways prone to safety concerns. In recognition of Quebec's sporting heritage, the route was renamed Autoroute Guy-Lafleur on May 4, 2023, honoring the legendary forward born in nearby , who scored during the 1975–76 season—a nod to the highway's number. Ongoing improvements, including the twinning to four lanes across its entire length, are targeted for completion by 2032, with initial works already underway on segments like to Mirabel to boost capacity and reduce accident risks. These enhancements reflect the autoroute's strategic importance in supporting while prioritizing environmental and safety standards in one of Quebec's most dynamic corridors.

Overview

General characteristics

Autoroute 50, officially known as Autoroute Guy-Lafleur since May 4, 2023, is a provincial highway in , , renamed to honor the legendary player , who passed away on April 22, 2022. The autoroute spans a total length of 158 kilometers (98 miles) and serves as a primary east-west connecting the and regions. The western terminus is located at Rue Montcalm in . At its eastern end, the autoroute meets Route 117 in Mirabel, providing a linkage to Autoroute 15 and further integration with the area. Maintenance and oversight of the entire route are handled by Transports Québec, the provincial ministry responsible for transportation infrastructure. In terms of design, Autoroute 50 features four to six lanes in the urban sections of to accommodate higher traffic volumes, while the majority of the route elsewhere consists of two undivided lanes. Notably, the highway includes two at-grade railway crossings operated by the Quebec Gatineau Railway: one located between exits 260 and 272, and the other further along the route. This configuration positions Autoroute 50 as a key alternative to the parallel Route 148 for regional travel.

Regional significance

Autoroute 50 serves as a vital east-west corridor in western Quebec, connecting Canada's National Capital Region—spanning and —to the area through Mirabel, facilitating efficient inter-regional travel along the north shore of the . This linkage enhances access to Mirabel International Airport and supports seamless movement between the and regions, promoting overall regional integration without the need to traverse Ontario's for Quebec-bound destinations, thereby alleviating cross-border congestion at key points like the bridges. The autoroute plays a crucial role in bolstering the local economy by enabling commerce, tourism, and daily commuting, particularly in the region where it aids travel to communities like and industrial zones in Brownsburg-Chatham. In the , it facilitates access to agricultural areas near and recreational sites, driving economic activity through improved goods transport and visitor influx. Peak sections, such as between Lachute and Mirabel, handle 19,100 to 24,700 vehicles daily, underscoring its capacity to manage substantial regional traffic while supporting these sectors. Integration with the broader network further amplifies its significance: it connects westward to Autoroute 5 in for direct access to , and eastward via Route 117 to Autoroute 15 near Mirabel, creating a cohesive link to and beyond. Overall, Autoroute 50's development has diverted traffic from older routes like Route 148, reducing congestion and enhancing safety for regional users.

Route description

Gatineau to L'Ange-Gardien

Autoroute 50 begins at kilometer 0 in at the Rue Montcalm interchange, where it provides a direct connection to Autoroute 5 for access to northern routes toward and southern crossings into via the Macdonald-Cartier Bridge. The highway immediately transitions into an urban multilane freeway, serving as a high-traffic bypass through the Hull sector of . This initial portion features commercial developments along key interchanges, such as Boulevard de la Gappe, facilitating local business access amid dense urban surroundings. As the route progresses eastward, it crosses the Gatineau River on the Pont des Draveurs, linking the Hull and Masson-Angers sectors while maintaining freeway standards. Around kilometers 10 to 15, the landscape shifts from built-up areas to semi-rural terrain characterized by forested hills and reduced development density. This transition includes initial sections that were previously two lanes but have undergone recent upgrades. The segment concludes at L'Ange-Gardien around kilometer 25, where the autoroute enters a more distinctly rural portion of the landscape, with interchanges like and Chemin Doherty providing local access. Notably, the 9.7-kilometer stretch from to L'Ange-Gardien was fully widened to a four-lane divided roadway, with construction completing on August 22, 2024, to improve capacity and flow in this foundational urban-to-rural link.

L'Ange-Gardien to Lachute

The segment of Quebec Autoroute 50 from L'Ange-Gardien to spans approximately 55 km through the central rural portion of the region, characterized by gently rolling hills and expansive farmland that reflect the area's agricultural heritage. This stretch, part of a larger 87 km corridor extending to Mirabel, winds through a of undulating with elevations ranging from about 45 m to 120 m above , providing a mix of open vistas and subtle grade changes that accommodate the natural topography. The highway primarily follows a two-lane undivided configuration here, serving as a key east-west link in the region while avoiding the need to cross into . As it progresses eastward from L'Ange-Gardien around km 25, the autoroute passes near small communities including , where industrial activity centers on a prominent pulp and that has historically shaped economy, and Pointe-au-Chêne, a rural along the route's path. Further along, it serves Saint-André-Avellin, traversing the —a of the —and adjacent forested zones that support diverse wildlife such as . The terrain introduces moderate curves to navigate these wooded areas and river crossings, including a notable 74 m-high bridge over the Rivière Rouge near Pointe-au-Chêne, enhancing connectivity while preserving the scenic rural character. A distinctive feature of this segment is an at-grade crossing with the Quebec Gatineau Railway near km 50, an unusual element for a that underscores the route's integration with regional rail infrastructure. The autoroute concludes at the Lachute interchange around km 80, transitioning into the region where traffic volumes rise due to commuters heading toward via Mirabel Airport and the . This endpoint highlights the segment's role in facilitating regional mobility, with recent safety enhancements like rumble strips installed to address rural driving hazards.

Lachute to Mirabel

The eastern segment of Quebec Autoroute 50 extends from to Mirabel, covering kilometers 80 to 158 and traversing approximately 78 kilometers through the and Les regional county municipalities. Beginning near , the highway heads eastward, initially passing through semi-rural landscapes in the vicinity of Brownsburg-Chatham before entering the municipality of , characterized by agricultural and forested areas. As it progresses, the route transitions into more suburbanizing zones within the , supporting growing residential communities and light industrial developments along its corridor. The terrain along this section is predominantly flat to gently rolling, situated within the St. Lawrence Lowlands at elevations between 30 and 100 meters, with clay deposits influencing the landscape. The autoroute passes in close proximity to , providing direct access via dedicated interchanges for cargo and passenger operations, though the airport has seen scaled-back expansion plans in recent years. Further east, the highway serves expanding suburban areas on the outskirts of , facilitating commuter traffic and economic activity in sectors such as and . A notable feature is the second at-grade railway crossing of the Quebec Gatineau Railway near Brownsburg-Chatham at approximately kilometer 120, one of only two such crossings on the entire autoroute. Autoroute 50 terminates at kilometer 158.3 in Mirabel with a connecting to Route 117 southbound, offering seamless access to Autoroute 15 and the area. This endpoint enhances regional connectivity, with daily traffic volumes reaching up to 102,000 vehicles on busier sections, underscoring the route's role in supporting suburban growth and inter-regional travel.

History

Planning and early development

The planning of Quebec Autoroute 50 originated in 1962, when engineer and Member of the Oswald Parent proposed its development as part of a broader expansion of Quebec's autoroute network during the Quiet Revolution era. This initiative aimed to modernize the province's transportation infrastructure amid rapid economic growth and urbanization in the 1960s, which saw significant investments in to support industrial expansion and regional connectivity. Parent's proposal emphasized creating a high-speed corridor to alleviate congestion on existing roads and foster economic ties within the region. In 1970, Quebec Premier Jean-Jacques Bertrand, leader of the Union Nationale party, officially announced plans for the autoroute's construction, envisioning a 400-kilometer route stretching from near in the west—specifically Île-aux-Allumettes on the border—to Berthier east of Montreal, effectively linking the National Capital Region to central without reliance on highways. The project was influenced by the need to enhance accessibility in the area, paralleling the existing Route 148 to bypass its limitations and reduce dependency on cross-border routes like for east-west travel. This alignment was designed to promote local , support , and integrate the region more fully into 's provincial network during a period of booming infrastructure projects. By the mid-1970s, however, the ambitious scope faced significant setbacks, leading to its truncation. The opening of Montréal-Mirabel International Airport in 1975, intended as a major hub that would justify eastern extensions, quickly proved underutilized due to shifting aviation trends and economic factors, diminishing the rationale for full connectivity to the facility. Additionally, the government's 1976 moratorium on new autoroute constructions—enacted amid fiscal constraints and a push for environmental and social priorities—halted further planning, resulting in a much shorter route focused primarily on the sector rather than the original trans-provincial vision.

Construction and openings

The construction of Quebec Autoroute 50 proceeded in phases over several decades, beginning in 1975 with a 19-kilometer segment near Mirabel in the region. Initial segments in the region followed during the late 1970s and 1980s. Work started in 1977 with a 4-kilometer section connecting Autoroute 5 to Boulevard Maloney in , providing early access from the national capital area. This was followed by a major 27-kilometer extension in 1986, reaching Masson-Angers and , which covered approximately kilometers 0 to 40 and marked the completion of the core Gatineau-to- corridor. A further 8-kilometer around opened in December 2004 at a cost of CAD 57.5 million, enhancing traffic flow through the sector and funded jointly by provincial and federal governments. Central sections between and , spanning roughly kilometers 40 to 100, were developed primarily in the and early amid various delays. Construction resumed after a period of stagnation, with key advancements including a tronçon opened in November 2008 that advanced connectivity toward , bringing the route closer to full operational status by the early . These phases faced significant challenges, including environmental reviews in the late for river crossings—such as over the Rivière —and integrations with existing lines, as well as opposition from agricultural groups concerned about habitat disruption for protected plants. Resolutions involved impact assessments and mitigation agreements, allowing progress to continue. The eastern extension from to Mirabel, completing the route's 159-kilometre length, was finalized between 2010 and 2012. Notable openings included a segment between Grenville-sur-la-Rouge and Pointe-au-Chêne in August 2011, followed by the final 18-kilometre tronçon from Papineauville to on November 26, 2012, which connected the previously isolated sections. Across all phases, the project exceeded CAD 800 million in total costs, drawn from provincial budgets to support regional infrastructure development.

Renaming and recent changes

On May 4, 2023, Quebec Transport Minister François Bonnardel officially renamed Autoroute 50 as Autoroute Guy-Lafleur to commemorate the legendary player's contributions to the province, including his five wins with the and his enduring legacy as a native. The renaming honors Lafleur's artistry on the ice and his role as a in . Signage along the autoroute was updated to reflect the new designation by late 2023, incorporating bilingual French-English markers particularly in the region to accommodate local linguistic needs. Minor resurfacing projects on sections, part of routine infrastructure maintenance, occurred between 2020 and 2022 but faced delays due to restrictions impacting construction timelines across . The initial phase of widening in the western segment from to L'Ange-Gardien was completed on August 22, 2024, adding 9.7 km of four-lane divided roadway to enhance and .

Design and safety

Roadway standards and features

Autoroute 50 features a posted of 100 km/h along its entire length, with a design speed of up to 120 km/h in sections planned for full configuration. This standard aligns with general norms for autoroutes, ensuring consistent while accommodating regional variations in terrain. The roadway cross-section is predominantly undivided with two lanes per direction outside urban areas, each lane measuring 3.65 m in width, accompanied by outside shoulders of 3.0 m and inside shoulders of 1.3 m where applicable. In the urban segment, it expands to four lanes to handle higher volumes, transitioning to the narrower profile eastward. Shoulders generally range from 2 to 4 m across the route, providing space for emergency stops and maintenance. Pavement consists of throughout, utilizing bituminous mixes such as enrobé surfaces for durability in varying traffic conditions. The route incorporates more than 10 structures, including overpasses for transverse roads, viaducts over railway lines, and bridges such as the Rouge River Bridge, but features no tunnels. Signage employs the standard Quebec autoroute shield, with exit numbering based on kilometer posts that commence at km 131 in the area, reflecting the province's regional sequential system for autoroutes in the .

Safety improvements and incidents

Autoroute 50 has experienced a high incidence of collisions, particularly in its undivided sections. Between 2012 and 2022, the highway recorded 34 fatal collisions, 81 serious collisions, and 846 minor collisions, highlighting ongoing safety concerns in rural areas with two-lane configurations. In response to these risks, centerline rumble strips have been installed along significant portions of the undivided highway to alert drivers to unintentional lane departures and reduce head-on crashes. These measures, combined with other adjustments, have contributed to lower collision rates compared to pre-improvement periods, with on similar rural highways indicating potential reductions of 38% to 50% in fatal and injury crashes following rumble strip implementation. More recently, in July 2024, the Quebec Ministry of Transport announced enhanced safety initiatives, including increased patrols by the to target speeding, aggressive driving, and fatigue along the corridor between and . Additionally, mobile speed enforcement radars were deployed in high-risk zones following the end-2024 schedule. These actions follow a series of fatal incidents in early 2024 and aim to address persistent vulnerabilities in undivided segments. As of November 2025, efforts continue with ongoing assessments of the 87 km undivided section between L'Ange-Gardien and Mirabel, and of guardrails planned to begin in spring 2026 between Scotch Road (Route 344) in Grenville-sur-la-Rouge and other segments, with projects extending through 2026. A fatal collision occurred in August 2025, underscoring the need for these enhancements.

Future developments

Widening projects

In 2022, the Québec government announced a plan to widen a 96-kilometre stretch of Autoroute 50 from two to four lanes, connecting the region to central Québec, with completion targeted for 2032 through seven phased projects aimed at improving safety and traffic flow. The first section, spanning 9.7 kilometres from to L'Ange-Gardien, was fully widened to four lanes and opened to traffic on August 22, 2024, ahead of its original December schedule, marking the initial phase of the expansion. For the subsequent section from L'Ange-Gardien to , approximately 55 kilometres, preparatory studies and environmental evaluations were underway as of 2023, with initial construction slated to begin in 2026; however, by June 2025, the project was paused due to unavailable funding, with resumption dependent on future budgetary allocations. Work on the eastern segment from to Mirabel has progressed more steadily. A 6-kilometre portion from Chemin Saint-Simon to the Mirabel , under construction since September 2023, was completed in November 2025 at a cost of $64 million. An additional 17 kilometres from Route 329 to Chemin Saint-Simon is currently in the planning phase as part of the updated project structure in the 2025-2035 Québec Infrastructure Plan. These widening efforts are funded through the Québec Infrastructure Plan 2025-2035, which allocates $164 billion overall to infrastructure over ten years, though specific costs for the full Autoroute 50 project are estimated in the hundreds of millions of dollars without detailed federal contributions identified for the segments. The project has been split into portions between L'Ange-Gardien and , and and Mirabel, to prioritize studies and planning.

Additional planned enhancements

In response to ongoing safety concerns on undivided sections of Autoroute 50, the of Transport and Sustainable Mobility (MTMD) plans to install median safety barriers along high-risk stretches between L'Ange-Gardien and Mirabel. These barriers will consist of high-tension cables, semi-rigid , or rigid designs, selected based on site-specific analyses to prevent head-on collisions. A semi-rigid median barrier is scheduled for over approximately 10 km between Scotch (Route 344) in Grenville-sur-la-Rouge and 1 km east of Montée Rochon in Brownsburg-Chatham, starting in spring 2026 and completing by the end of 2026, alongside 14 km of resurfacing. Concrete barriers are planned in the Mirabel airport zone. Ongoing analysis identifies optimal placement to prioritize high-risk areas. To address speeding, a key factor in incidents, permanent speed enforcement measures include mobile photo radars, which have been installed at high-risk sites. The () has increased year-round patrols starting in 2025, building on enhanced surveillance initiated in summer 2024 to target curves and other vulnerable segments, such as those near km 90. These efforts follow 2024 announcements emphasizing proactive monitoring in response to rising accident rates. Maintenance initiatives under the 2025-2035 Infrastructure Plan include resurfacing and refurbishment of sections, budgeted at $45.5 million for maintenance and enhancements on the L'Ange-Gardien to segment within the 2025-2035 period.

Exit list

Exits in the region

The exits along Autoroute 50 in the region facilitate connections from the urban core of westward to rural communities approaching , spanning approximately the first 80 kilometers of the route. These interchanges primarily serve local and regional traffic, with access to key routes and boulevards in the area transitioning to more spaced rural access points. Exit numbering follows the kilometer-based system aligned with the autoroute's western origin, and configurations are symmetric for eastbound and westbound directions to support bidirectional flow. Traffic volumes peak at urban interchanges near due to commuter demand toward and local destinations. The following table summarizes the primary exits in this segment (as of 2019; verify current conditions due to ongoing widening projects):
ExitkmDestinationsNotes
1340Boulevard des Allumettières / Route 148Western approach in Gatineau; access to Route 148 west.
1350A-5 south to Ottawa / Boulevard MaisonneuvePartial cloverleaf interchange marking the western terminus; connects to Ottawa.
1383Route 307 / Rue Saint-Louis, CantleyUrban access in Gatineau serving residential areas.
1394Boulevard Maloney / Route 148 eastConnection to Route 148 in Gatineau.
1405Boulevard de la GappeLocal access in Gatineau.
1416Boulevard de La VérendryeAccess near Chelsea.
14510Montée PaiementRural road near Chelsea, providing access to recreational areas.
14712Boulevard LabrosseLocal access.
15015Route 366 / Boulevard Lorrain, Val-des-MontsServes communities east of Gatineau.
15722Boulevard de l’AéroportAccess to Gatineau Airport area.
15924Avenue des Laurentides, L’Ange-GardienConnection to L'Ange-Gardien.
16530Rue GeorgesAccess near Buckingham.
16631Avenue de Buckingham / Route 315 / Route 148 / Chemin de MassonServes Buckingham sector, supporting industrial and residential traffic.
17136Chemin LépineLocal rural access.
17439Route 309 north / Chemin Doherty, L’Ange-Gardien, Mont-LaurierNorthern link near Thurso.
18752Route 317, Thurso, RiponRegional travel toward Papineauville area.
19762Montée Papineau, PlaisanceRural access near Plaisance.
20570Route 321, Papineauville, St-André-AvellinNorthern link for regional travel.

Exits in the region

The segment of Autoroute 50 in the region runs from Lachute to Mirabel, spanning approximately 78 km and characterized by a sparser distribution of exits compared to the more densely developed portion to the west. This rural and suburban stretch supports local access for communities along the route while handling rising traffic volumes as it approaches the area, with daily average traffic reaching up to 20,000 vehicles near the eastern end. Several interchanges are positioned adjacent to railway lines, aiding integration with infrastructure. The following table lists the key exits in this region, focusing on their connections to local routes and communities (as of 2019; verify current conditions):
Exit NumberLocation and ConnectionApproximate km MarkerNotes
210Route 323, Montebello, Mont-Tremblant75Access near Grenville-sur-la-Rouge.
216Fassett81Local rural access.
226Grenville-sur-la-Rouge / Chemin Avoca91Rural community access.
233Harrington / Grenville-sur-la-Rouge / Chemin Kilmar98Agricultural and local links.
239Route 344 east / Route 148, Grenville, Hawkesbury104Connection to parallel Route 148.
252Brownsburg-Chatham117Access to Brownsburg-Chatham.
254Route 148 / Rue Principale, Lachute119Approach to Lachute, integrating with Route 148.
258Route 327 / Avenue d'Argenteuil, Saint-André-d’Argenteuil123Serves rural areas near Rivière-Beaudette.
260Route 329 / Lachute Centre-ville, Mirabel (Saint-Hermas)125Provides access to Lachute's downtown and links to Mirabel; used for detours.
272Route 148 / Route Arthur-Sauvé, Saint-Eustache137Suburban transition near Mirabel.
279Saint-Colomban / Mirabel (St-Canut, Ste-Scholastique) / Chemin St-Simon144Access to growing suburban developments; occasional closures.
285Boulevard Henri-Fabre / Aéroport Mirabel International / Fret Cargo150Serves the Mirabel International Airport vicinity and industrial zones; high volumes.
288Boulevard Henri-Fabre153Local access near Mirabel.
292Autoroute 15 / Route 117 (eastern terminus in Mirabel)157Trumpet interchange connecting to A-15 (Trans-Canada Highway) and Route 117; high-capacity flow to Montreal.
These exits prioritize efficient local connectivity while minimizing disruptions in the less urbanized terrain, though ongoing widening projects aim to accommodate projected growth in commuter and commercial traffic.

References

  1. [1]
    Autoroute 50 entre Gatineau et Mirabel : élargissement et ...
    Construite par tronçons entre 1995 et 2012, l'autoroute 50 (Guy-Lafleur) est d'une longueur totale de 158 kilomètres. Entre 9 800 et 102 000 véhicules y ...<|control11|><|separator|>
  2. [2]
    Autoroute Guy-Lafleur - Gatineau (Ville) - Commission de toponymie
    May 4, 2023 · Il s'agit de la partie ouest de l'autoroute désignée par le numéro 50 par le ministère des Transports. Nouvelle recherche · Déclaration de ...
  3. [3]
    Quebec renames Highway 50 in honour of Montreal Canadiens ...
    an east-west route that runs from Gatineau, Que., near Ottawa, to the Mirabel, Que., area, north of Montreal — will now be known as ...
  4. [4]
  5. [5]
    Ouverture du dernier tronçon de l'autoroute 50 - Radio-Canada
    Nov 26, 2012 · La mise en service de ce tronçon de 18 kilomètres marque la fin des travaux de parachèvement de l'autoroute 50. Photo : Louka Jacques. Radio- ...
  6. [6]
    [PDF] Construction du tronçon de l'autoroute 50 entre Lachute et Mirabel
    Dès 1967, le Conseil économique de l'Ouest du Québec proposait, dans un mémoire, la construction d'une autoroute à péage. De nombreuses études subséquentes ...<|control11|><|separator|>
  7. [7]
    L'autoroute 50 nommée en l'honneur de Guy Lafleur
    May 4, 2023 · Il s'agit de la troisième plus longue autoroute dont le nom rappelle une personne, mais la seule dont celle-ci était du domaine sportif. Guy ...
  8. [8]
    Autoroute 50: quatre voies d'ici 2032 - TVA Gatineau
    L'autoroute 50 sera bel et bien élargie à 4 voies sur toute sa longueur. Le gouvernement de la CAQ s'engage à terminer les travaux d'ici 2032.<|control11|><|separator|>
  9. [9]
    Autoroute 50 (Guy‑Lafleur) entre L'Ange‑Gardien et Lachute
    Mar 25, 2025 · Le projet vise à améliorer la fluidité et la sécurité de l'axe autoroutier entre L'Ange‑Gardien et Lachute. Ce projet comprend la séparation ...
  10. [10]
    Highway 50 renamed in honor of Guy Lafleur | Montréal Canadiens
    May 4, 2023 · The Government of Quebec announced Thursday morning that the province's Highway 50 is being renamed Autoroute Guy-Lafleur in honor of the Canadiens legend.
  11. [11]
    Quebec renames highway for Canadiens legend Lafleur - CTV News
    May 4, 2023 · Highway 50, an east-west route in the greater Montreal area, will now be known as Autoroute Guy-Lafleur.
  12. [12]
    Highway 50 widening to 4 lanes over next decade, Quebec ... - CBC
    Mar 14, 2022 · A 96-kilometre stretch of the highway that connects the Outaouais region to central Quebec will be widened from two lanes to four over the next decade.
  13. [13]
    Quebec Gatineau Railway (QGRY) - Genesee & Wyoming Inc.
    Quickly access rail via truck. Transloading. Locate or expand on our railroads. Industrial Development. Access our served ports. Port Operations.
  14. [14]
    [PDF] Petite-NatioN RiveR BRidge highway 50, LochaBeR, QueBec
    To upgrade the highway links between Hull-Ottawa. (the National Capital Region) and Montréal (a major international entry point to North America);. • To support ...
  15. [15]
    [PDF] Rapport d'analyse environnementale pour le projet de l'autoroute 50 ...
    gouvernement du Québec a annoncé en février 2005 sa volonté de parachever l'autoroute 50 d'ici 2010 tout en prévoyant les investissements requis. Le tronçon ...
  16. [16]
    La 50, fréquentée par 16 000 automobilistes par jour entre Gatineau ...
    May 28, 2018 · La 50, fréquentée par 16 000 automobilistes par jour entre Gatineau et Montréal. L'autoroute 50 entre la montée Paiement et le boulevard ...
  17. [17]
    Autoroute 50 - Exitlists.com
    Longueur approximative: Approximate length, 185 km. Propriétaire Funded, Ministère des Transport du Québec (MTQ). Sortie Exit, Direction est (de haut en bas)
  18. [18]
    [PDF] GATINEAU, QUÉBEC — AUTOROUTE 50 & BOUL. DE LA GAPPE
    Walmart Supercentre. 2-5. New Build Opportunity. 8. Bulk Barn. 9. Dollarama. 10. Winners. 11. Michaels. 12-13. New Build Opportunity. 14. Barbies.
  19. [19]
    Pont des Draveurs - Autoroute 50 bridge over the Gatineau … - Flickr
    Oct 18, 2023 · Pont des Draveurs - Autoroute 50 bridge over the Gatineau River Hull; Gatineau, Quebec. splinky9000, jeff fletcher and 2 more people faved this.
  20. [20]
    Why Chelsea Is Your Next Weekend Getaway From Montreal
    Jul 15, 2025 · The route to Chelsea, roughly 200 kilometres via Highway 20 and Autoroute 50, is a smooth two-hour ride that transitions from urban sprawl ...
  21. [21]
    L'Ange-Gardien driving directions - journey, distance, time and costs
    Gatineau L'Ange-Gardien driving directions. Distance, cost (tolls, fuel, cost per passenger) and journey time, based on traffic conditions.
  22. [22]
    Autoroute 50: les travaux terminés entre Gatineau et L'Ange-Gardien
    Aug 22, 2024 · Les travaux d'élargissement de l'autoroute 50 tirent à leur fin entre Gatineau et L'Ange-Gardien. L'autoroute sera complètement ouverte dès ...
  23. [23]
    No work planned on Highway 50 between Ange-Gardien and ...
    Jun 16, 2025 · No work planned on Highway 50 between Ange-Gardien and Lachute this year ... ending even as late as 2036. This delay in the schedule is far from ...
  24. [24]
    Land Capability of the Ottawa-Gatineau Area - (CLI)
    The Ottawa River tributaries have left recent alluvium containing stratified silts and fine sands. Some sandy deposits, modified and shifted by the winds ...<|separator|>
  25. [25]
    [PDF] gatineau and pontlac counties - Canadian Soil Information Service
    They occur on rolling and mountainous land between the elevations of 600 and 1,300 feet. These soils are Brown Podzolic and thin or minimal Podzols on shallow, ...
  26. [26]
    Thurso's pulp mill sees new project after 5 years empty | CBC News
    Jul 25, 2024 · The site of a cellulose pulp mill in Thurso will now be leased to Évolys Québec Inc., according to the Quebec government.Missing: Autoroute 50
  27. [27]
    ARCHIVES - Inauguration d'un nouveau tronçon de l'autoroute 50
    Aug 19, 2011 · Un nouveau tronçon de 18 kilomètres de l'autoroute 50, situé entre Grenville-sur-la-Rouge et Pointe-au-Chêne, a été inauguré vendredi par le ...
  28. [28]
    Quebec Autoroute Guy-Lafleur [Highway A50] - Page 2
    Dec 3, 2012 · Back to highway 50, the at grade crossing for the railway is completly unacceptable. To the government credit, railway are federal regulated ...
  29. [29]
    Asphaltplanet.ca > Québec > Aéroport Mirabel
    Between Lachute and Aeroport Mirabel, the highway crosses two railways at-grade, and has two minor at-grade intersections. At Mirabel Airport, A-50 widens to a ...
  30. [30]
    Un raccordement de l'Autoroute 50 réclamé jusqu'à la 25
    Apr 19, 2022 · L'autoroute 50 a été proposée par Oswald Parent, ex-député libéral de Hull, en 1962. Au départ, elle devait relier sur 400 km Berthier à l ...
  31. [31]
    Enfin la 50! - Le Droit
    L'idée d'une autoroute 50 serait née autour de 1962, sous l'impulsion d'Oswald Parent qui n'était alors qu'un jeune député libéral. Si c'est le cas, ...
  32. [32]
    L'autoroute 50 : Guy Lafleur ou Maurice Richard ? | TopoLocal
    Apr 26, 2022 · Si le numéro 50 de l'autoroute évoque les 50 buts en 50 parties de Maurice Richard, le fait que l'autoroute passe à Thurso, lieu de naissance de ...
  33. [33]
    Les 42 ans, souvent politiques, de l'autoroute 50 - Radio-Canada
    Nov 26, 2012 · C'est à la fin des années 1960 que le projet d'une autoroute en Outaouais a été lancé. À l'époque, le premier ministre libéral du Québec, Jean- ...
  34. [34]
    AUTOROUTE 50 : OUVERTURE DU CONTOURNEMENT DU ...
    Dec 8, 2004 · autoroute 50 est une priorité pour le gouvernement du Québec. Le ... une longueur de 6 km, ce qui démontre que l¿autoroute 50 est un ...
  35. [35]
    Un nouveau tronçon de l'autoroute 50 inauguré - Le Droit
    Nov 10, 2008 · L'ouverture complète de l'autoroute 50 entre Gatineau et Lachute est prévue en 2012. Les coûts totaux du projet sont estimés à 750 millions $.
  36. [36]
    [PDF] ÉTUDE D'IMPACT SUR L'ENVIRONNEMENT:
    l'autoroute 50 à l'ouest de la rivière Gatineau. 3. L'ANALYSE D'IMPACT. L'analyse d'impact vise à identifier la localisation optimale du tracé pour la ...
  37. [37]
    [PDF] Rapport d'analyse environnementale pour le projet de l'autoroute 50 ...
    Ce rapport d'analyse porte sur l'évaluation environnementale du projet de liaison routière. Lachute–Masson, tronçon Thurso–Montebello, par le ministère des ...
  38. [38]
    Prolongement de l'autoroute 50 : le dernier tronçon inauguré
    Dec 19, 2012 · Le coût des travaux de construction de ce tronçon de 24 kilomètres s'élève à 270 millions $, dont 38 millions $ qui proviennent du gouvernement ...
  39. [39]
    À propos de l'Office - Actualités
    Hommage toponymique à Guy Lafleur! 4 mai 2023. Le nom Autoroute Guy-Lafleur ... François Bonnardel, en présence du maire de Granby, M. Pascal Bonin, et du ...
  40. [40]
    L'Autoroute Guy-Lafleur officiellement inaugurée à Thurso | La Presse
    ... que l'autoroute 50 porterait désormais le nom d'Autoroute Guy-Lafleur. Mis à jour le 4 mai 2023. Partager. Pierre Saint-Arnaud La Presse Canadienne.Missing: signalisation bilingue
  41. [41]
    Travaux d'élargissement de l'autoroute Guy-Lafleur (A-50), entre ...
    Nov 16, 2023 · La mise en service partielle du tronçon entre Gatineau et L'Ange-Gardien sera effective jusqu'au printemps 2024. Afin de terminer les travaux ...
  42. [42]
    [PDF] 2024 Annual Management Plans for Public Infrastructure Investments
    Mar 31, 2023 · Investments made in 2021-2022 and probable investments in 2022-2023 for infrastructure maintenance ... • Autoroute 50, between Gatineau and L'Ange ...Missing: resurfacing | Show results with:resurfacing
  43. [43]
    [PDF] Étude d'impact sur l'environnement: Autoroute 50 Tronçon Lachute
    raccordement à l'autoroute 50 couvre une distance de 23,8 km. 2.2.2 ... DISTANCE TOTALE. (km). 6,7. 4,7. 6,3. 11,0. 4,6. 5,8. 10,4. 5,3. 4,6. 9,9. PRESENCE D ...
  44. [44]
    Normes - Transports et Mobilité durable Québec
    ### Summary of Standard Design Features for Quebec Autoroutes (e.g., A-50)
  45. [45]
    [PDF] Rapport final - Revue et analyse comparative des enrobés
    Apr 26, 2021 · Autoroutes de la série 50 = carottage. Série 60 (autres que les ... • Validation of Alberta Asphalt Concrete Mix Type Selection, http ...
  46. [46]
    Rouge River Bridge (Highway 50) - Canam - Bridges
    The launched-girder erection technique was used to erect this bridge. This bridge has piers 230 feet (70 m) high, among the tallest bridge piers in Quebec.
  47. [47]
    Répertoire des autoroutes du Québec
    Le Répertoire des autoroutes du Québec permet d'accéder aux renseignements (nom, description, longueur en kilomètres du tronçon, année de l'ouverture à la ...
  48. [48]
    Repère kilométrique - Jeu de données - Données Québec
    Les repères kilométriques sont installés sur l'ensemble des autoroutes et ils peuvent aussi être installés sur les autres classes de routes (ex.: route ...
  49. [49]
    MRC d'Argenteuil wants faster action on Autoroute 50 safety
    Jul 14, 2024 · Between 2012 and 2022, there were 34 fatal collisions, 81 serious collisions, and 846 minor collisions along Autoroute 50. A statement ...Missing: 2007 | Show results with:2007
  50. [50]
    Plus de policiers et de glissières, annoncera la ministre | La Presse
    Jul 5, 2024 · Le coût de l'élargissement complet de l'autoroute 50 est estimé à plus de 100 millions de dollars. ... bandes rugueuses ont été ajoutées ...
  51. [51]
    Frequently Asked Questions | FHWA - Department of Transportation
    Jul 9, 2024 · ... rumble strips provide statistically significant reductions in fatal and injury crashes: 38 to 50 percent on rural two-lane roads; 37 to 91 ...
  52. [52]
    More police, speed cameras and barriers in the works for Highway 50
    Jul 5, 2024 · The Quebec government is rolling out a series of changes along a highway connecting Gatineau and Montreal after multiple fatal crashes, ...
  53. [53]
    Autoroute 50 will be fully twinned in 10 years - The Review Newspaper
    Mar 17, 2022 · Ultimately, the project will provide the Lower Laurentides and Outaouais regions with a fully four-lane highway over a distance of 96 kilometres ...
  54. [54]
    Autoroute 50 (Guy‑Lafleur) entre Gatineau et L'Ange‑Gardien
    Le projet d'amélioration de l'autoroute 50, entre Gatineau et L'Ange‑Gardien, consiste en la réalisation de travaux qui permettront de rehausser la sécurité ...
  55. [55]
    Pas de travaux en vue sur l'autoroute 50 entre L'Ange-Gardien et ...
    À noter que les travaux d'élargissement du tronçon 1 entre Gatineau et L'Ange-Gardien ont été réalisés le 22 août 2024, après plus de deux ans de travaux.
  56. [56]
    Aucun budget disponible » pour l'élargissement d'un tronçon de l'A-50
    Jun 3, 2025 · À court terme, le budget pour l'élargissement à quatre voies de l'autoroute 50 entre L'Ange-Gardien Lachute n'est pas « disponible ».
  57. [57]
    Autoroute 50 (Guy‑Lafleur) entre Lachute et Mirabel
    Le projet vise à améliorer la fluidité et la sécurité de l'axe autoroutier entre Lachute et Mirabel. Ce projet comprend la séparation des chaussées et le ...
  58. [58]
    [PDF] Québec Infrastructure Plan 2024-2034
    Mar 31, 2024 · The Québec Infrastructure Plan is a planning tool that allows the government to ensure that public funds are invested optimally, ...
  59. [59]
    [PDF] Liste détaillée des projets d'infrastructure - Gouvernement du Québec
    Liste détaillée des projets d'infrastructure – Plan québécois des infrastructures 2025-2035 ... 1291 Autoroute 50 (Guy‑Lafleur) entre L'Ange‑Gardien et ...
  60. [60]
    Outaouais - Transports et Mobilité durable Québec
    Les principaux axes routiers de la région sont : autoroutes : 5 et 50; routes nationales : 105, 117 et 148, portion de route ​315; routes régionales : 301 ...
  61. [61]
    Autoroute 50, QC - Essence Montréal
    Chemin Doherty (Route 309). Sortie 187, Route 317. Sortie 195(futur), Montée ... L'INFO ROUTE. Routes Travaux routiers · État de la circulation · Caméras de ...
  62. [62]
    Fermeture de l'autoroute 50 à Lachute et Mirabel - Journal l'Éveil
    Mar 11, 2025 · Un détour balisé d'environ 17 km sera mis en place via la sortie no260 Lachute (centre-ville)/Mirabel (Saint-Hermas), l'avenue Bethany, la route ...Missing: Rue | Show results with:Rue
  63. [63]
    Autoroute 50 – Etat des routes | Québec 511
    Vérifiez les conditions de circulation sur Autoroute 50 : état de la chaussée et visibilité, accidents, travaux routiers, fermetures, et plus encore.
  64. [64]
    Fermeture prolongée d'une bretelle de l'A-50 — CIME 103.9 - 101.3
    May 21, 2025 · La sortie 279, menant de l'autoroute 50 ouest vers Mirabel, Saint-Canut/Sainte-Scholastique et Saint-Colomban sera fermée à compter de lundi ...<|control11|><|separator|>
  65. [65]
    Fermeture de la sortie 285 de l'autoroute 50 (Guy-Lafleur)
    Aug 19, 2025 · Fermeture de la sortie no 285 (Boul. Henri-Fabre Ouest, Fret Cargo), menant de l'autoroute 50 en direction est à la rue Service-A1. · Fermeture ...
  66. [66]
    Échangeur entre les autoroutes 50 et 15 - Des travaux intensifs pour ...
    Jun 29, 2023 · Les usagers de la route voulant prendre l'autoroute 50 en direction ouest sont invités à prendre le chemin de détour via la route 117, la route ...