Fact-checked by Grok 2 weeks ago

RIMAC

The Recreation, Intramural, and Athletic Complex (RIMAC) is a sports and recreation facility on the campus of the (UCSD) in , . Opened in 1995, the 200,000-square-foot complex serves as the primary venue for UCSD's recreational programs, , and athletics, supporting thousands of students, faculty, and staff annually. RIMAC includes indoor spaces such as the LionTree Arena (a 44,000 sq ft multi-purpose venue with 5,000 ) and the RIMAC Annex, as well as outdoor facilities like RIMAC Field, Triton Soccer Stadium, and Triton Softball Field. An expansion project began construction in August 2025, adding about 20,000 square feet of new recreation space including cardio areas, weight training facilities, and climbing walls, with completion expected by late 2026 or early 2027.

Overview

Location and Purpose

The Recreation, Intramural, and Athletic Complex (RIMAC) is located at 9860 Hopkins Drive, , 92093, on the (UCSD) campus in the North Campus neighborhood, situated near Warren College and between Eleanor Roosevelt College and other residential areas. This positioning integrates RIMAC into the heart of campus life, providing convenient access for students living in nearby dormitories and housing facilities. RIMAC serves as the central hub for student , , and athletic events at UCSD, hosting competitions in the for sports such as , , soccer, and , as well as the Mountain Pacific Sports Federation for others including men's . As of 2025, UCSD will transition most teams to the beginning July 1, 2027. It also supports community wellness programs through fitness classes, group activities, and recreational opportunities designed to promote physical health and engagement among the campus population. The was constructed to bolster UCSD's athletic during its transition to in 2000 and subsequent move to Division I in 2020, thereby enhancing recreational and competitive offerings for the university's 45,273 students (fall 2024), with plans to expand enrollment to 56,000 by 2040. Access to RIMAC is primarily available to UCSD affiliates, including students, , and , through quarterly or annual membership options that grant entry to its gyms, pools, courts, and fields. Parking is facilitated via the adjacent Hopkins Parking Structure at 9800 Hopkins Drive, with additional options through campus permits or pay stations, while its proximity to on-campus dorms—such as those in Warren College—allows for easy pedestrian access without reliance on transportation.

Key Features and Capacity

The Recreation, Intramural, and Athletic Complex (RIMAC) at the , encompasses approximately 200,000 square feet of indoor and outdoor spaces dedicated to recreational, athletic, and wellness activities. In 2015, RIMAC achieved Silver certification under the U.S. Council's for Existing Buildings: Operations and Maintenance rating system, recognizing its sustainable design and operational practices, including energy-efficient lighting and measures. The complex features state-of-the-art fitness equipment, multi-purpose courts for various sports, activity rooms for group classes, dedicated weight rooms, and wellness centers equipped with amenities like locker rooms and nap pods. It can accommodate large-scale events, supporting up to 20,000 attendees, as demonstrated by its role in hosting the annual . RIMAC is operated by the UCSD , which maintains a strong emphasis on and through advanced equipment standards and staff training.

History

Planning and Construction (1990s)

In 1990, (UCSD) students advocated for enhanced recreational facilities amid growing enrollment and limited existing spaces, such as a small gym with only 2,000 seats and inadequate courts for sports like and . This demand led to a student referendum in February 1990, which approved a $70 quarterly fee—totaling $210 annually—to fund the proposed Recreation, Intramural, and Athletic Complex (RIMAC), marking a significant increase in student fees from $189 per year at the time. The UC Regents granted final approval for the project on November 14, 1991, establishing a of $33.5 million for a multi-purpose complex designed to address both recreational needs and the expanding athletic program. The facility was envisioned to include indoor courts for , , , and , along with weight rooms, aerobic spaces, and a 5,000-seat arena to support UCSD's growing competitiveness in athletics during the 1980s and 1990s. Construction commenced following the approval and spanned approximately two years, with the complex officially opening in January 1995 as the Recreation, Intramural, and Athletic Complex. The 200,000-square-foot structure was funded primarily through the student fees, supplemented by private donations, fulfilling the goal of creating a central hub for student wellness and athletic development without relying on state tax dollars for non-academic construction.

Expansions and Renaming (2000s–2020s)

In the late 2000s, the (UCSD) undertook significant expansions to the Recreation, Intramural, and Athletics Complex (RIMAC) to address growing demand for recreational and athletic facilities. Groundbreaking for the RIMAC Annex occurred in April 2008, adding a three-level, 15,700-square-foot structure designed to enhance fitness, multipurpose spaces, and community areas, including lounges, conference rooms, a café, and outdoor seating. The project, costing approximately $8.46 million, was completed and opened in fall 2009, providing additional resources for student recreation and athletics. Concurrently, improvements to the Triton Softball Field began in 2008, funded in part by the Donald and Carole Chaiken Foundation, which included upgrades to dugouts, fencing, a netted backstop, and a to better support women's athletics. These enhancements continued into the with a focus on sustainability. In 2015, RIMAC achieved Silver certification from the U.S. Council for its existing buildings, recognizing retrofits that improved , , and indoor environmental quality across the complex's 181,260 square feet. This certification highlighted UCSD's commitment to practices in its recreational infrastructure. The brought further adaptations tied to UCSD's athletic evolution. As the university transitioned its athletics program to in 2020, joining the , RIMAC facilities underwent renovations to meet higher competitive standards, including a new court design in the arena and upgrades to support hosting conference events. In 2022, the arena portion of RIMAC was renamed Arena in recognition of a $5 million gift from the family to fund scholarships for scholar-athletes, enhancing support for the Division I programs. These changes solidified RIMAC's role as a central hub for UCSD's elevated athletic presence. An ongoing expansion project, announced in May 2025, aims to add 20,000 square feet of additional recreation space, including areas for cardio equipment, weight training, , and climbing walls; construction is set to begin in August 2025 and complete by late 2026 or early 2027.

Indoor Facilities

LionTree Arena

The LionTree Arena serves as the primary indoor venue within the RIMAC complex at the , featuring a 44,000-square-foot floor that can be configured into five courts or adapted for other activities. This expansive space includes and courts equipped with 10 retractable glass backboards, floor plates, and sleeves for and , along with a spring-loaded Robbins Bio-Cushion I system designed for optimal and safety. The arena's multi-level design incorporates telescopic providing up to 5,000 seats for spectators, including accommodations for handicapped access, and supports a maximum of 5,000 for various configurations. Architecturally, the LionTree Arena was constructed as the core component of the RIMAC complex, which opened in January 1995, emphasizing versatility with curtain-divisible sections for simultaneous multi-sport use. It underwent a major renovation in September 2018, modernizing the facility with new seating, suite boxes, a large video board, and improved training and competition areas to support UC San Diego's transition to NCAA Division I athletics. The arena features advanced technical infrastructure, including H.D. lighting at 100 foot-candles for high-definition broadcasts, a built-in JBL loudspeaker system for superior acoustics during events, and integrated communication networks with intercom, paging, data, and telephone capabilities. The arena primarily hosts NCAA Division I men's and women's basketball games, women's volleyball matches, and fencing competitions for the UC San Diego Tritons athletic teams, drawing over 50 home events annually. It is also configurable for large campus events such as concerts, assemblies, ceremonies, and tournaments, accommodating up to 5,000 attendees with adjacent facilities like dressing rooms, team rooms, a box office, and concession stands on the concourse level. The venue integrates seamlessly with nearby fitness areas, including the RIMAC Annex, to support broader recreational programming.

RIMAC Annex

The RIMAC , completed in October , was constructed at a cost of $8.46 million and added 15,700 square feet of space adjacent to the main , Intramural, and Athletic Complex (RIMAC) facility on the UC San Diego . This three-level addition enhances recreational opportunities by providing dedicated spaces for social and academic gatherings, complementing the primary athletic functions of the original structure. Since 2021, the Annex has housed the Triton Center (TEC), a hub for esports and technology enthusiasts featuring state-of-the-art gaming PCs, console lounges, and event spaces. Key amenities in the annex include the TEC Cafe offering fresh, healthy foods, , , and pastries; a ; student lounges for studying and relaxation; and a conference center on the lower level. The Dugout Conference Room stands out as a versatile multipurpose space, equipped with a , screen, and , and featuring a floor-to-ceiling windowed wall that opens to an outdoor patio for added flexibility. It supports configurations for lectures (up to 64 seats), classroom-style setups (up to 36 seats), and boardroom arrangements (up to 30 seats). Primarily utilized for intramural-related meetings, student wellness activities such as group study sessions, esports events, and overflow social events from the main gym, the annex functions as a pre-game gathering spot and casual lounge area. Its design emphasizes natural lighting, ventilation, and views of the surrounding campus, promoting a supportive environment for daily recreational use. The annex integrates seamlessly with the adjacent LionTree Arena through visual and physical connections, including large roll-up glass doors and a shared "front porch" entry along Ridge Walk, facilitating easy access during peak hours without disrupting competitive athletic events.

Outdoor Facilities

RIMAC Field

The RIMAC Field, also known as the North Campus Recreation Field, encompasses approximately 12 acres of open turf space measuring 330 yards by 170 yards, providing a layout divided into multiple zones for various activities. This expansive area supports large-scale gatherings and recreational programming, with its design allowing for simultaneous use across sections equivalent to five full-sized soccer fields. Primarily utilized for athletic and community events, the field hosts practices for UC San Diego's men's and women's soccer teams, as well as intramural games organized by the campus recreation department. It serves as the central venue for the annual , a student-curated music and arts event that draws up to 23,000 attendees, and commencement ceremonies for graduating classes. The field features a natural grass surface, which provides a durable playing area suited to the region's mild climate, along with surrounding pathways that facilitate access and circulation. Temporary seating options, including cement bleachers accommodating around 800 spectators and additional portable setups, enhance its flexibility for events. Adjacent to the Soccer Stadium, it complements structured athletic venues with its open, multi-purpose configuration. Maintenance of the RIMAC Field is overseen by UC San Diego's and facilities services to ensure year-round usability, incorporating irrigation systems adapted to San Diego's dry summers and moderate winters for consistent turf health. This proactive approach includes regular landscaping and supplemental services to support high-traffic recreational demands.

Triton Soccer Stadium

Triton Soccer Stadium serves as the primary venue for soccer at the , San Diego's Recreation, Intramural, and Athletic Complex (RIMAC). Constructed as part of the RIMAC complex that opened in January 1995, the stadium provides a dedicated space for competitive play within the broader athletic facilities. The facility features a natural grass pitch resurfaced with drought-resistant Bermudagrass prior to the 2022 season, offering one of the premier playing surfaces on the due to its laser-leveled, low-cut design that promotes fast gameplay. Amenities include a state-of-the-art and spectator seating with a permanent capacity of 750, which can expand to 1,750 using portable bleachers for postseason or high-attendance events. Positioned at the northwest corner of the RIMAC Fields, it sits adjacent to RIMAC Field, facilitating shared access for team practices and operations. It functions as the home for the UCSD Triton men's and women's soccer teams, which compete in as members of the . The venue hosts regular-season conference matches, tournaments, and other athletic events, providing a distinct home-field advantage through its intimate setting and well-maintained field conditions. To support UCSD's transition to athletics in 2020, the received targeted upgrades for compliance and enhanced functionality, including the installation of 663 chairback seats (with 10 ADA-accessible options) and a new 10-by-42-foot press box featuring an elevated video platform for broadcasts. These improvements focused on elevating the spectator experience and media capabilities without major structural changes.

Triton Softball Field

The Triton Softball Field serves as the primary outdoor venue for softball at the (UCSD), featuring a regulation-sized with all-natural grass surface. It accommodates up to 750 spectators through seating behind home plate and along the foul lines, supplemented by informal seating beyond the outfield fence. Key design elements include a netted backstop, perimeter , and a to support game operations and media coverage. As the home field for the UCSD women's team, the facility hosts regular-season games, practices, and postseason events within the . The team, known as the Tritons, utilizes for training sessions and competitive matches, with the venue enabling night games through installed lighting and adjacent batting cages equipped for practice. In recognition of its maintenance and playability, the field earned the 2019 Turface Athletics NFCA Division II of the Year award. Significant upgrades occurred as part of the 2008–2009 and Improvement Project, a $8.46 million initiative that enhanced both spectator amenities and athletic infrastructure. The softball-specific improvements, completed by early 2010, added renovated sunken dugouts with storage for equipment, expanded fencing for safety, and a dedicated ; these changes were partly funded by a $250,000 donation from UCSD alumna Dana Chaiken. The project also integrated lighting for evening play, boosting the field's versatility for the Tritons' schedule. Located within the broader RIMAC outdoor complex, the Triton Softball Field sits north of LionTree Arena and adjacent to the RIMAC Annex, facilitating shared access paths and parking at 9730 Hopkins Drive. This positioning allows efficient connectivity to nearby facilities like RIMAC Field for team logistics and campus events.

Future Developments

RIMAC Expansion Project

The RIMAC Expansion Project at the , aims to add approximately 20,000 square feet of new recreation space to address overcrowding and enhance fitness opportunities for the growing population. This includes expanded and areas, a new wall, and 43-foot walls with eight top-rope lanes, along with multipurpose rooms and improved entrances to better serve campus needs. The project partners with as the general contractor and LPA Design Studios for architectural design, focusing on creating a modern hub for wellness. Funding for the , estimated at $18.5 million in costs, comes from university reserves and debt service without imposing additional fees on students, reflecting a student-backed initiative approved through environmental review processes in 2024–2025. The issued a Notice of Determination on May 27, 2025, confirming compliance with the for the project. This approval builds on prior expansions, such as the 2009 RIMAC Annex, to sustain the facility's role amid UCSD's enrollment growth. Design goals emphasize sustainable and user-friendly features, incorporating open-air architecture, natural ventilation, and maximized daylight to target Gold certification, advancing beyond the facility's 2015 Silver status. These elements promote better flow between indoor and outdoor areas, fostering community and wellness programs. As a temporary measure during , a new entrance was implemented in September 2025 along the Arena walkway facing RIMAC Field to maintain .

Timeline and Expected Impacts

The construction of the RIMAC expansion project commenced in August 2025 as a multi-phase endeavor designed to limit disruptions to daily operations. The project incorporates sequential phases, beginning with work on the and adjacent areas, followed by subsequent stages to ensure progressive development. Completion is anticipated for late 2026 or early 2027, allowing for comprehensive integration of new facilities into the existing complex. Throughout the construction period, the RIMAC will maintain full operational status, with all fitness, , and programmatic services remaining accessible to users. While temporary closures may affect parking lots and pathways—such as Lot P704—efforts including signage and staff guidance will facilitate smooth navigation and minimize impacts on patrons. Any affected areas, including gyms, will involve temporary relocations to preserve continuity, ensuring no long-term interruptions to and athletic activities. The expansion is expected to significantly boost capacity to accommodate UC San Diego's growing population of over 45,000 students, adding approximately 20,000 square feet of versatile space for enhanced cardio zones, expanded weight training areas, and advanced climbing facilities featuring 43-foot walls with eight lanes and a dedicated bouldering area. These additions will support escalating athletic demands by providing dedicated areas for resistance training and group activities, while elevating wellness programs through an open-air design that promotes natural light, ventilation, and connection to the outdoors. Furthermore, the project introduces potential for new multipurpose event spaces, enabling expanded hosting of community gatherings and recreational events. On a broader scale, the initiative will deliver community-wide benefits by improving standards and advancing goals, with the facility targeting Gold certification through passive strategies such as natural ventilation and daylight optimization. These enhancements align with UC San Diego's overarching initiatives, which emphasize holistic support for students, faculty, and staff via integrated fitness and preventive programs.

References

  1. [1]
    About us - Rimac Automobili
    We're a 1300-people strong technology powerhouse focused on designing, engineering and producing electric hypercars and high-performance EV components.
  2. [2]
    Companies | Rimac Group
    Rimac Technology is a leading Tier-1 automotive supplier specializing in battery, powertrain, and control systems. Renowned for powering the world's fastest ...
  3. [3]
    Company | Rimac Technology
    Starting in a small garage, Rimac has grown into a Tier 1 supplier for global OEMs, employing over 2,000 people across five countries, based in Zagreb, Croatia.<|control11|><|separator|>
  4. [4]
    Recreational and Intramural Athletic Complex (RIMAC)
    Recreational and Intramural Athletic Complex (RIMAC). UC San Diego Neighborhood: Roosevelt. 9860 Hopkins Drive, La Jolla, CA 92093. Recreational and Intramural ...
  5. [5]
    LionTree Arena - Facilities - UC San Diego - UCSDtritons.com
    ... (RIMAC) is the cornerstone of UC San Diego's sports facilities. This nearly-200,000-square-foot facility is located just south of the 12-acre North Campus ...
  6. [6]
    About UC San Diego Athletics
    Apr 18, 2020 · UC San Diego sponsors 24 intercollegiate sport programs that currently compete as members of athletic conferences The Big West, Mountain ...
  7. [7]
    UCSD Recreation
    RIMAC Fitness Gym - Available. 0% full. Main Gym Fitness Gym - Available. 37 ... Customer Service (858) 534-3557 | recreation@ucsd.edu. WHAT'S OPEN? view ...Facilities · Membership & Passes · Open Rec Hours · Login
  8. [8]
    Campus Profile - University Communications
    UC San Diego undergraduate students in class. 45,273, Total student population (Fall 2024). Undergraduate Students. Freshmen. 136,729, Freshman applicants (Fall ...
  9. [9]
    Memberships - UCSD Recreation
    Located off Voigt Drive on Main Campus. RIMAC (858) 534-3557 | recreation@ucsd.edu · 9730 Hopkins Drive, La Jolla, CA 92093-0529. MAIN GYM (858) 822-4815 ...Missing: exact | Show results with:exact
  10. [10]
    Facility Hours & Maps - UCSD Recreation
    1001 Santa Clara Pl, San Diego CA 92106. Nearby Parking Structures: Hopkins Parking Structure (nearest RIMAC). 9800 Hopkins Dr, La Jolla, CA 92093. Scholars ...Membership & Passes · Open Rec Hours · Facility Reservations · Bookings
  11. [11]
    UC San Diego Athletics Facilities
    Aug 9, 2010 · ... (RIMAC) is the cornerstone of UCSD's sports ... Located on the eastern end of campus between Eleanor Roosevelt College and Warren College ...
  12. [12]
    UCSD RIMAC | U.S. Green Building Council
    Size, 181,260 sq ft. Introducing LEED v5. How we build today will define tomorrow. LEED v5 sets a new standard for sustainable building. Currently available ...
  13. [13]
    [PDF] UC LEED Certified Projects
    UC LEED Certified Projects. Last updated: 11/30/2021. Project. GSF. USGBC Project ID ... Silver. UCSD RIMAC (2015). 186,000. 1000030254 http://www.usgbc.org ...
  14. [14]
    Students Gear Up for 33rd Annual Sun God Festival
    Apr 16, 2015 · It is expected to draw as many as 20,000 students to RIMAC Field from 2 to 8 p.m. on Sunday, May 3. In order to preserve the 30-year-old ...
  15. [15]
    Project at UCSD Stirs Controversy - Los Angeles Times
    Jun 14, 1990 · But, before it is built, Rimac could become one of the more argued-about structures ever considered on the 25-year-old campus, given the ...
  16. [16]
    [PDF] PROJECT DESIGN APPROVALS
    Jul 29, 2010 · RIMAC - Recr./Intramural & Athl. Complex. NS. 33,500. 11/14/91. 189,640 ... UCSD Medical Center East Campus Bed Tower. NS. 663,800. 7/13/2010.
  17. [17]
    [PDF] Transition to NCAA Non-Football Division I Athletics
    Sep 7, 2016 · Throughout the 1980's and 1990's, UC San Diego teams became more competitive and the institution's enrollment grew. Scheduling opportunities ...
  18. [18]
    RIMAC's renovation part of UCSD's march toward Div. I sports
    Nov 8, 2018 · It is part of the $6 million renovation of 23-year-old RIMAC that is the most extensive facility work done thus far as UCSD moves toward NCAA Division I status.
  19. [19]
    RIMAC Renamed - UC San Diego Today
    Sep 26, 2022 · RIMAC (Recreation, Intramural and Athletic Complex) is a student-driven athletic and event complex that opened in 1995. The arena hosts a ...
  20. [20]
    What Does This Building Mean for Student Power? – The UCSD ...
    The RIMAC fee was established by a 1990 referendum that ... already drawn on RIMAC fees for its planning and design. ... fees.ucsd.edu/rimac-annex for ...
  21. [21]
    RIMAC Annex University of California San Diego | Athletic Business
    Oct 1, 2009 · Recreation and athletics have a new focus at UC San Diego with the completion of the new three-level annex to the adjacent Recreational and ...
  22. [22]
    Softball Alumna Dana Chaiken Brings UC San Diego Athletics to ...
    Jan 23, 2020 · In 2008, the Donald and Carole Chaiken Foundation funded improvements to the university's Softball Field Complex, which recently received ...
  23. [23]
    UC San Diego Unveils New Court Design for RIMAC Arena
    Sep 16, 2020 · The court design features a sleek, modern look, paying homage to UC San Diego's proximity to the Pacific Ocean as well as proudly promoting the ...
  24. [24]
    UC San Diego Renovating Sports Arena As It Readies For NCAA ...
    Jul 26, 2018 · New seats, suite boxes, and a big-screen TV are part of an NCAA Division I makeover for UC San Diego's RIMAC Arena.
  25. [25]
    RIMAC Arena is Named LionTree Arena in Honor of Scholarship Gift
    Jun 15, 2022 · UC San Diego announced today that RIMAC Arena has been named LionTree Arena ... UC San Diego, which will conclude on June 30, 2022. Bourkoff also ...
  26. [26]
    LionTree Arena - UCSD Recreation
    Employing the use of telescopic bleachers and floor seats, the LionTree Arena may accommodate up to 5,000 people. Seating capacity varies per event ...Missing: 2022 | Show results with:2022
  27. [27]
    Production & Tech Information for LionTree Arena - UCSD Recreation
    LIONTREE ARENA SPECIFICATIONS. Special Events Reservations & Questions (858) ... UC San Diego 9500 Gilman Dr. La Jolla, CA, 92093-0529. Copyright@ 2018 ...
  28. [28]
    University of California at San ... - UCSD Women's Basketball Camps
    There is no built in seating on the 9,450 square-foot main floor, but a collection of folding chairs can be set up for a maximum capacity of 400. The ...
  29. [29]
    UCSD Rimac Annex | Eric Chang - Archinect
    The three-level, 15,700 SF building provides an upscale cafe, a campus store, and a lounge on its main level; a conference center on the lower level; and ...
  30. [30]
    Meeting Rooms - UCSD Recreation
    We offer four reservable conference rooms located in RIMAC, RIMAC Annex, and the Main Gym complex. Designated mainly for meetings, press conferences, or ...
  31. [31]
    RIMAC Annex - UCSD Recreation
    RIMAC Annex is the premier meeting and gathering spot located next to RIMAC in the north campus neighborhood.
  32. [32]
    Playing Fields - UCSD Recreation
    North Campus Recreation Field (RIMAC Field). 330 yards x 170 yards, approx. 12 acres; 3,000 capacity for concerts; Santa Ana grass; 5 full-sized soccer fields ...
  33. [33]
    Sun God Festival Draws Sell-out Crowd - UC San Diego Today
    May 23, 2013 · The annual festival, which has been a campus tradition for more than three decades, once again reached capacity this year, with 23,000 ...
  34. [34]
    Nearly 100 Scholar-Athletes Graduate as Part of UC San Diego ...
    Jun 14, 2021 · LA JOLLA, Calif. – UC San Diego held commencement for the Class of 2021 on Saturday, June 12 through Sunday, June 13 at RIMAC Field.Missing: Sun God Festival practices intramural
  35. [35]
    Landscaping and Outdoor Maintenance Services
    Landscaping staff provide basic services for state-funded areas. Campus customers can request supplemental services for an additional charge.Missing: seating | Show results with:seating
  36. [36]
    Triton Soccer Stadium - Facilities - UC San Diego
    With a built-in seating capacity of 750, which is expandable up to 1,750 for NCAA postseason games, UC San Diego enjoys a tremendous home advantage. The pitch ...
  37. [37]
    Triton Soccer Stadium Receives New Grass Ahead of 2022 Season
    Jul 21, 2022 · The new sod is Tahoma Bermudagrass, a type of highly drought-resistant grass ideal for soccer fields. As part of the sod replacement process, ...
  38. [38]
    New Look Awaits Triton Soccer Stadium for Division I - UC San Diego
    **Summary of Triton Soccer Stadium Upgrades for Division I Transition**
  39. [39]
    Construction Underway for Triton Soccer Stadium's New Look
    Aug 7, 2020 · The 10 feet by 42 feet press box will feature an elevated video platform in order to provide an optimal view for the live online ESPN3 ...
  40. [40]
    turface-athletics-nfca-field-of-the-year-2019 | general | divnews
    Oct 15, 2019 · Triton softball field, located in La Jolla, Calif., was built in 2011 and features a stadium-seating capacity of 750, lights, newly renovated ...
  41. [41]
    Triton Softball Field - Facilities - UC San Diego Athletics
    The renovated Triton Softball Field, which features new dugouts, a netted backstop, fencing and a press box, was made possible by a $250,000 contribution from ...Missing: 2008 | Show results with:2008
  42. [42]
    Softball - The Big West
    Big West Conference. Big West Conference Open/Close Scoreboard ... UC San Diego, 13-14, 16-32. UC Riverside, 12-15, 21-29. UC Davis, 9-18, 15-36.Players of the Week · All-Tournament Teams · All-Americans
  43. [43]
    RIMAC Expansion, REC Expansion, RIMAC Construction,
    This project will add approximately 20,000 square feet of usable recreation space, including cardio equipment areas, more resistance and weight training space, ...Missing: athletics | Show results with:athletics
  44. [44]
    PCL Construction - Facebook
    Jun 30, 2025 · We're partnering with UCSD & LPA Design Studios to expand and transform the RIMAC complex—bringing 20,000 square feet of new space designed for ...
  45. [45]
    [PDF] The Project proposed to expand the existing RIMAC facility and ...
    May 28, 2025 · Project Description: The Project proposed to expand the existing RIMAC facility and would add 6,845 square feet (sf) to the 117,867 sf ...
  46. [46]
    UCSD Recreation | Due to RIMAC expansion, the new temporary ...
    Sep 22, 2025 · The new RIMAC entrance is now located along the LionTree Arena walkway, facing RIMAC Field. This change is a result of the RIMAC expansion.Missing: 2000s 2020s
  47. [47]
    Construction Alerts
    9/17/2025 through 3/20/2026 | IGPP Revelle 2000 Biological Grade · 8/25/2025 through December 2026 | RIMAC Expansion & Renovation · 7/31/2025 through February ...Missing: timeline | Show results with:timeline
  48. [48]
    UC San Diego enrollment reaches all-time high in the 2024–25 ...
    Oct 28, 2024 · Enrollment at UC San Diego has reached an all time high with 45,273 students across graduate and undergraduate programs matriculated for ...