Fact-checked by Grok 2 weeks ago

TOPS

The '''Total Operations Processing System''' (TOPS) is a computer system for managing railway locomotives and . It tracks vehicle locations, requirements, and operational status, enabling efficient and real-time reporting. Originally developed in the United States during the 1960s by the in collaboration with and , TOPS replaced manual paper-based systems for tracking cars and locomotives. British Rail adopted TOPS in the early 1970s, with initial implementation for freight operations beginning in 1973 using mainframes. This centralized system revolutionized rail management by providing automated control over across the network. After the privatization of in the 1990s, TOPS continued in use by and train operating companies. As of August 2024, the system remains operational, though is exploring options for its replacement.

Origins and Development

Development in the United States

In the late , railroads grappled with significant inefficiencies in manual tracking systems for locomotives and , which relied on records prone to errors, delays, and incomplete data across vast networks. These limitations hindered effective management, , and , spurring the need for an automated, solution to monitor assets comprehensively. The joint study group formed in June 1960 by the and , aimed at creating a comprehensive computerized system for railroad operations, marking the formal start of the project funded primarily by Southern Pacific as a major client. A preliminary report outlining the system's design was submitted in October 1960. Early contributions included models for freight car operations developed by Stanford (SRI) researchers using systems, laying groundwork for broader asset management. Key innovations in TOPS encompassed real-time data processing powered by mainframes, enabling rapid updates across distributed locations, and a modular that facilitated tracking of asset locations, scheduling, and utilization metrics. Initial testing phases from 1965 to 1968 focused on prototype software for and utilization forecasting, refining the system's ability to handle dynamic railroad environments after an extensive effort involving approximately 660 man-years of development. The first full-scale demonstration occurred in 1968, when Southern Pacific commenced operational use of TOPS to manage its fleet, demonstrating feasibility for large-scale deployment. This pioneering US development later influenced international adoption, including by British Rail in the 1970s.

Initial Implementation by Southern Pacific

The rollout of the Total Operations Processing System (TOPS) by the Southern Pacific Railroad commenced in 1969, initially focusing on locomotive tracking across its network in California and the Southwest United States, marking the transition from development to operational deployment. This phase built on earlier feasibility studies and partial implementations, with the first operational components going online in mid-1968 after extensive programming efforts. The hardware infrastructure centered on computers, including two Model 65 mainframes at the railroad's headquarters for central processing, supplemented by four smaller Model 20 units for local data handling at depots. Remote terminals at key locations enabled yard clerks and train crews to enter data on asset movements, such as assignments and freight car locations, transmitted via leased lines and the railroad's network for real-time updates. This setup replaced fragmented paper records, allowing centralized monitoring of status across the 13,000-mile network. Key achievements included improved equipment utilization through predictive forecasting, which aimed to extract an additional day's work per month from each freight car, yielding annual savings exceeding $3 million by optimizing distribution and reducing unproductive downtime. By 1972, the system fully managed approximately 2,500 locomotives and 89,000 freight cars system-wide, demonstrating scalable real-time tracking that enhanced operational efficiency. Implementation faced practical challenges, including data entry errors from manual keyboard inputs at remote sites, which required ongoing refinements to validation protocols. Integrating TOPS with legacy paper-based workflows proved disruptive, as staff accustomed to traditional waybills adapted to digital reporting, necessitating extensive training for over 5,000 employees across divisions. Additionally, the reliance on point-to-point limited flexibility for complex routing queries, prompting iterative hardware and software adjustments through the early 1970s. The total implementation cost approximated $10 million in 1970 dollars, forming part of a broader $21.5 million in the TOPS infrastructure acquired in 1966. These refinements solidified TOPS as a foundational tool for railroad operations by 1975, influencing subsequent adaptations elsewhere.

Adoption and Implementation in the UK

Introduction by British Rail

In the wake of the Beeching cuts of the 1960s, which drastically reduced the British railway network and prompted a push for modernization and efficiency, British Rail decided to adopt the Total Operations Processing System (TOPS) as part of its broader freight revitalization efforts outlined in the Freight Plan 1971/1975, following a 1970 evaluation visit to the United States and formal approval by the Board in June 1971. This decision was driven by the urgent need to manage and track a vast fleet comprising thousands of locomotives and over 240,000 wagons, enabling better resource utilization amid declining freight services and operational challenges. Following a feasibility study and visits to the system's originators in the United States, where TOPS had proven successful with Southern Pacific Railroad, British Rail licensed the technology in 1972 from Southern Pacific and Stanford Research Institute (SRI) for adaptation to UK conditions. The adaptation process involved tailoring TOPS to the British network's denser operations, including for handling across a national system supporting 3,500 daily and differences in signaling and infrastructure compared to the more decentralized setup. Implementation began with a pilot program in 1973 at depots in the Western Region, focusing initially on to monitor location, maintenance, and utilization. The TOPS central computers, consisting of two 370 mainframes, were installed at in 1973, with the first operational cutover in August 1973 at and , integrating with British Rail's existing telegraphic reporting systems to facilitate data inputs from depots and yards. Full rollout across the network was largely achieved by late 1975, with completion in all regions by 1977, at a total cost of £16.6 million, marking a significant investment in computerized operations for the state-owned railway. To support this transition, British Rail implemented comprehensive training programs for staff, including the use of a dedicated training train during the "cut-over" phases to familiarize operators with the system's interfaces and procedures. This introduction represented the international expansion of TOPS beyond its American roots, laying the foundation for improved freight control and efficiency in the UK.

TOPS Numbering and Classification System

The TOPS system introduced a standardized classification for locomotives and multiple units using two- or three-digit codes, which were assigned based on factors such as power type, maximum speed, and operational function. For example, 08 denoted shunting locomotives under 350 horsepower suitable for yard work, while 37 represented mixed-traffic locomotives capable of speeds up to 90 for both freight and duties. These codes facilitated unique identification within the database, allowing for efficient categorization of the fleet into (classes 01-69), electric (70-79 and 90-98), and other specialized types. Locomotives were assigned five-digit running numbers under TOPS, consisting of the two- or three-digit prefix followed by a three-digit individual identifier, such as 37001 for the first 37 . Non-revenue departmental , used for engineering and maintenance purposes rather than passenger or freight operations, received dedicated codes like 97 for self-propelled departmental locomotives, numbered in the 97xxx series. British Rail's shipping fleet, including train ferries, was incorporated as 99 with numbers in the 99xxx range to enable comprehensive asset tracking across rail and sea operations. Multiple units were classified separately in higher ranges, with diesel multiple units (DMUs) in es 100-199; for instance, 150 designated the Sprinter series of two-car DMUs introduced in the for regional passenger services. Sub-variants and prototypes were distinguished by suffixes, such as /0 for initial prototypes or specific modifications, as seen in 66/0 for the original batch of freight locomotives. The transition to TOPS numbering began in 1973, replacing the pre-TOPS British Rail schemes, including the 1957 diesel and electric numbering system (e.g., to Dxxxx for diesels) and earlier coding attempts like provisional classifications for . This involved renumbering over 3,000 locomotives between 1973 and 1974, with the first TOPS classes applied to existing stock such as class 45 in early 1973, marking a shift from manual records to computerized . The rationale was to support automated processes, including vehicles by type and location, generating maintenance alerts based on usage data, and enabling detailed fleet analysis for scheduling and efficiency improvements. By 1977, the renumbering was largely complete, integrating the system fully into operations.

System Features and Operations

Core Functionalities

The Total Operations Processing System (TOPS) delivered essential technical capabilities for the real-time management of locomotives and , enabling to track assets, schedule maintenance, analyze utilization, and process data across its network. These functionalities formed the backbone of operational efficiency, creating a digital model of the transportation system that supported both freight and passenger services. By integrating inputs from depot terminals, TOPS provided controllers with up-to-date information to optimize and reduce inefficiencies. Inventory tracking was a primary feature, involving daily updates on asset locations, statuses (such as available or under repair), and mileage recorded via terminals at depots and automatic freight control (AFC) points. Status categories encompassed Normal, Cripple, Stored Serviceable, Stored Unserviceable, and Condemned, with defect codes like "Red Card - Not to be Moved" automatically updating records to reflect operational constraints. This allowed for real-time visibility into yard inventories and train consists, using the TOPS numbering system for unique asset identification. Maintenance scheduling relied on algorithms that predicted overhaul requirements based on utilization data, including accumulated duty hours and mileage. The system integrated directly with workshops, facilitating parts ordering and requiring post-repair entries of Work Done codes to synchronize records with status. These predictions helped prioritize interventions, ensuring assets remained serviceable while minimizing unplanned downtime. Utilization analysis provided metrics on , , and fleet performance to support optimization strategies that reduced idle assets. Territory-level controllers accessed data on wagon loading, usage, and empty to enhance train planning and overall resource deployment. This analysis drove decisions to improve loading ratios and minimize surplus equipment across the network. Data flow was orchestrated through a centralized mainframe at headquarters, which processed inputs from over 200 remote sites connected via dedicated communication lines. By 1979, TOPS managed approximately 120,000 daily transactions, reflecting its scale in handling complex railway operations. The system utilized IBM's IMS hierarchical database management system, enabling efficient querying of asset histories and supporting ad-hoc investigations into performance trends.

Reporting and Data Outputs

The Total Operations Processing System (TOPS) produced a range of standard reports essential for operational oversight, including daily availability lists that detailed serviceable units by depot, weekly mileage summaries tracking utilization across the fleet, and exception reports highlighting overdue or anomalies such as delayed inspections. These reports were generated centrally on 370 mainframes and disseminated to control offices, enabling rapid assessment of asset status and planning adjustments. The first automated reports were issued in , coinciding with the system's expansion to cover the full network and handling up to 200,000 daily accesses to the locomotive file. Outputs from TOPS were primarily delivered in printed formats via line printers, producing manifests and lists for manual distribution at depots, alongside early teletype outputs for urgent updates. Coded messages, such as "LOC 37025 AT YARD 5, FUEL LOW," provided succinct, machine-readable alerts on conditions, transmitted over dedicated networks to terminals. By the late , visual display units (VDUs) at Area Freight Centres supplemented these, allowing on-screen queries for retrieval. The system's processing reduced overall reporting times from days to hours, facilitating proactive decision-making in allocation and maintenance. A fictionalized example of a daily locomotive status report, based on typical TOPS outputs like the Power Enquiry or TV Report, might summarize key details for a subset of the fleet as follows:
ClassNumberLocationCondition
4737025Yard 5Fuel low, serviceable
4737028Depot AUnder
3737210En route BAvailable
4737045Yard 3Ready for service
0808015Shunt yardMinor defect
4737062Depot COverdue exam
3737188Location DIn use
4737019Yard 1Fuel full, available
3131405MaintenanceScheduled repair
4737033En route ENormal
This format emphasized class, identification number, current position, and operational state to prioritize assignments. was a core strength of TOPS for , with the system's flexible query tools, such as the AB transaction, enabling tailored queries for regional managers, such as filtering availability lists by Class 47 locomotives for high-speed express services or generating exception reports for specific maintenance thresholds. These adaptations, implemented post-1975 cutover, integrated local operational needs like yard-specific shunt lists while maintaining compatibility with the core tracking data from input terminals.

Evolution and Current Status

Post-Privatization Developments

The Railways Act 1993 paved the way for the privatization of , resulting in the establishment of over 25 operating companies (TOCs) and the of infrastructure responsibilities to , which assumed ownership of the TOPS system in 1996. Operational management of TOPS initially remained with the privatized remnants of Computing Services, enabling shared access for the new TOCs to maintain centralized tracking amid the industry's fragmentation. This structure preserved TOPS as a unified platform for locomotive and wagon data, supporting coordination across multiple private entities until Railtrack's replacement by in 2002. In the late , TOPS received key upgrades to ensure longevity in the privatized environment, including modifications for compliance to mitigate potential date-related failures at the millennium transition. The system's database was expanded through hardware enhancements, such as transitions from 3330 to advanced 3390 , allowing it to handle the increased volume of privately owned assets while retaining its core IMS/DB structure for locomotive records. Early PC-based interfaces were also implemented, shifting from legacy terminal access to more accessible CICS-driven inputs that facilitated easier by depot staff across TOCs. These changes addressed the demands of a diversifying user base without overhauling the mainframe foundation. Privatization necessitated adaptations to TOPS numbering to incorporate rolling stock while upholding consistency; the existing unique identification scheme for assets was retained, with new series added for private owner wagons using 5-digit numbers prefixed by up to 4 letters denoting the owner, such as leasing firms or industrial operators. This extension integrated non-BR vehicles into the national inventory, preventing numbering conflicts and enabling real-time tracking of mixed fleets on shared tracks. By 2000, TOPS effectively tracked the statuses and movements of thousands of locomotives and tens of thousands of wagons across the decentralized network, demonstrating its resilience in managing a reduced but more specialized pool compared to pre-privatization levels. Challenges emerged from the need for among competing operators, particularly around commercially sensitive information like cargo details, which required "" for (e.g., masking loads of explosives or high-value items such as whisky). These tensions prompted the establishment of access protocols, including optimized query transactions and audit mechanisms, to reconcile operational transparency with proprietary protections while minimizing disputes over system usage.

Modern Integrations and Replacement Plans

In contemporary rail operations, the Total Operations Processing System (TOPS) maintains deep integration with the Train Reporting System (), introduced in 2000 to provide real-time monitoring of train movements and delays across the network. This linkage, where operates as "Trains Running Under System TOPS," enables automated updates to TOPS databases for and locations, supporting efficient fleet utilization without requiring additional hardware like GPS on vehicles. A notable recent enhancement occurred in 2024, when aggregates operator integrated TOPS data via the Everysens Transport Visibility & Management System (TVMS) to optimize freight performance. This API-based connection pulls live TRUST-derived information into TVMS, generating real-time maps of positions, expected arrival times, and progress for 's fleets, thereby improving route planning, , and between quarries, depots, and operators. The has enabled performance analytics and , reducing delays and enhancing overall efficiency for bulk materials transport. As of 2025, TOPS continues to serve as the central database for managing the UK's locomotives and , processing data for approximately 500 freight trains daily while upholding the original TOPS numbering and classification conventions for continuity. The system marked its 50th anniversary in 2025, highlighting its foundational role in real-time rail despite its 1970s origins. Network Rail initiated replacement efforts for TOPS and its companion Passenger Operations Information System (POIS) in 2024 through market engagement, culminating in a formal tender notice in September 2025 for a £16 million project to adopt modern, resilient technology. The initiative seeks to mitigate , operational risks, and dependency on legacy mainframe support by delivering a modular successor capable of incorporating advanced features like AI-driven for fleet maintenance and scheduling. With an planned for early 2026, the project emphasizes phased migration to ensure seamless data continuity, including retention of core TOPS numbering, while enabling future expansions such as IoT sensor integrations for enhanced . This evolution positions the replacement as a bridge to broader digitalization in rail, aligning with industry trends toward predictive and automated operations.

References

  1. [1]
    A guide to AI TOPS and NPU performance metrics | Qualcomm
    Apr 24, 2024 · TOPS is a measurement of the potential peak AI inferencing performance based on the architecture and frequency required of the processor, such as the Neural ...
  2. [2]
    Decoding AI Performance on RTX AI PCs - NVIDIA Blog
    Jun 12, 2024 · Think of TOPS as a raw performance metric, similar to an engine's horsepower rating. More is better.
  3. [3]
    What Does TOPS Mean and Does It Matter When I Buy a Laptop?
    Jun 17, 2024 · TOPS is a simple acronym for Tera Operations Per Second or Trillion Operations Per Second. They're the same because "tera" is the prefix for trillion.
  4. [4]
    [PDF] Real Performance of FPGAs Tops GPUs in the Race to Accelerate AI
    The introduction of tensor compute in AI-optimized hardware has given rise to peak TOPS as a key metric when comparing acceleration solutions. However, peak ...Missing: explanation | Show results with:explanation
  5. [5]
    Stanford Research Institute - INFORMS.org
    Institute researchers developed a model of the railroad's freight car operations that ran on an IBM data processing system. To provide the system with data ...
  6. [6]
    [PDF] TOPS - British Railways' first computer based train operating system
    TOPS was developed in the USA through a collaboration between IBM and Southern Pacific. Early versions of TOPS implemented on North American freight ...
  7. [7]
    [PDF] IBM Southern Pacific system design report - Total
    time to undertake the development of a Total Operations Processing System (TOPS). A preliminary report was submitted by the study team in October, 1960.Missing: Stanford | Show results with:Stanford
  8. [8]
    The British Rail Total Operations Processing System and the Birth of ...
    SPR and IBM began development of TOPS in 1960 and commenced using it in 1968. TOPS was subsequently sold to British Rail (BR) who further developed it. TOPS is ...
  9. [9]
    [PDF] British Railways' nationwide train operating system
    Dec 27, 2023 · The Total Operations Processing System (TOPS) adopted by British. Rail during the mid-1970's is one example of an area wide telecoms.
  10. [10]
    [PDF] This Is Southern Pacific, 1967 - UtahRails.net
    Sep 12, 2022 · Major benefits of TOPS will come from increased utilization of equipment. The importance of this is obvious - if SP can eet just one more ...
  11. [11]
    Southern Pacific Lines SP TOPS
    It was the system that keep track of all cars and locomotives, where they were and where they were going. It also keep track of all of the trains as they ...Missing: Stanford Research Institute SRI
  12. [12]
    None
    Below is a merged summary of the provided segments from the document https://www.railwaysarchive.co.uk/documents/BRB_TOPS1979.pdf. To retain all information in a dense and organized manner, I’ll use a combination of narrative text and tables in CSV format where appropriate. The summary covers locomotives, wagons, fleet size, the decision-making process post-Beeching, and useful URLs, consolidating all details from the individual summaries.
  13. [13]
    British Railways Numbering Scheme - Railfaneurope.net
    The first three digits are the TOPS Class. The last three digits identify the unit, but unlike locomotives, it is not usual for the sequence to start at 001.
  14. [14]
    Era 7 - British Rail TOPS 1971 - 1986 - The Loco Shop
    One oddity was the inclusion of British Rail's shipping fleet in the system as Class 99. Diesel multiple units (DMUs) with mechanical or hydraulic ...
  15. [15]
    Diesel Multiple Units - IGG.org
    ... Class 143s. They operate in Yorkshire centered on Leeds. Class 150/151 Sprinters 3-car (150-0, only two built) and 2-car (150-2 and 150-3) units introduced ...
  16. [16]
    What is the British Rail TOPS system? - Upstairs Downstairs
    The TOPS system (Total Operations Processing System) is a computerised system used to keep track of a locomotive/rolling stock's location and servicing ...Missing: 10000 | Show results with:10000
  17. [17]
    The British Rail TOPS software system for controlling ... - Les Smiths
    The TOPS project HQ was based in Blandford House, in Melbury Terrace, London. It was a nondescript building next to Marylebone station.Missing: Stanford | Show results with:Stanford
  18. [18]
    Rail structures, ownership and reform - House of Commons Library
    Jul 27, 2017 · The infrastructure ownership and management was privatised and rebranded under Railtrack, the rolling stock companies and freight sectors were ...<|separator|>
  19. [19]
    LTSV Wagons - Reference - Numbering
    Oct 1, 2007 · The private owner fleet, which was by then growing again, was given 5-digit numbers with a prefix of up to 4 letters to indicate the owner. The ...Missing: PC00001 | Show results with:PC00001
  20. [20]
    TOPS data integration helps Tarmac optimise rail freight performance
    Jan 18, 2024 · The TVMS uses data from TRUST (Train Running Under System TOPS) to drive a live map with information on train positions and progress. This ...
  21. [21]
    Operations Processing System (TOPS & POIS) [PIN]
    ### Summary of TOPS & POIS Replacement Project
  22. [22]
    Vintage rail freight system showcases 50-year-old innovation
    Oct 29, 2025 · A system from national rail operator, British Rail in 1975, used distributed computing and a 400km data network to track freight.
  23. [23]
    Network Rail looks at TOPS replacement options - Railway Gazette
    Aug 26, 2024 · The 'complex, command-driven' Total Operations Processing System was designed to provide real-time information on the location, loading, ...Missing: Railtrack 1990s