TransAlta

TransAlta Corporation is a Canadian power and wholesale marketing company headquartered in , , operating a diversified portfolio of electrical generating facilities across , the , and . Established as Calgary Power Company in , TransAlta has delivered electricity for over 114 years, evolving from early hydroelectric developments to a broad mix of thermal, renewable, and assets while phasing out coal-fired and operations by 2021. The company generates power primarily from hydroelectric, , , , and battery storage facilities, positioning itself as a leader in clean electricity solutions amid industry shifts toward lower emissions. Notable achievements include significant investments in renewable projects, such as expansions in and battery storage in , and contributions to reliability through long-term contracts and operational expertise. However, TransAlta has encountered controversies, including a $32.7 million penalty in 2025 for misrepresenting the availability of backup power from its Brazeau hydroelectric plant, highlighting regulatory challenges in an era of increasing scrutiny on energy reliability and compliance.

Corporate Profile

Founding and Headquarters

TransAlta Corporation traces its origins to the Calgary Power Company, Ltd., established in 1909 to form the basis of an investor-owned utility in , . The company's inaugural project was the hydroelectric plant on the west of , completed in 1911, which initiated electricity supply to the city and surrounding areas. This marked the beginning of organized power generation in the region, expanding with the addition of the Kananaskis Falls hydro project in 1913 and service to Cochrane in 1915. Originally headquartered in , , the operations and administrative focus shifted to , , in the , aligning with the company's growing regional presence in . The name evolved from Calgary Power to TransAlta Utilities Corporation in 1981, reflecting broader operations across , and later to TransAlta Corporation. TransAlta's current headquarters are located at TransAlta Place, Suite 1400, 1100 1st Street SE, , , T2G 1B1, serving as the central hub for its power generation and marketing activities.

Core Business and Market Presence

TransAlta Corporation engages in the ownership, operation, and development of electrical generation assets, producing from a diversified portfolio including hydroelectric, , , battery storage, , and legacy facilities. The company focuses on clean , with a commitment to fully phasing out coal-fired generation by the end of 2025, having already achieved a 70% reduction in since 2015. Its operations emphasize merchant and contracted power sales, leveraging hedging strategies in competitive markets like . The core markets span , the , and , with a strong emphasis on , where TransAlta operates as the province's largest hydroelectric producer and one of Canada's leading and generators. In , the company announced an agreement to acquire Heartland Generation, adding approximately 1.8 of capacity primarily from assets in , enhancing its position in the region's power market amid increasing supply additions and price volatility. This acquisition aligns with a technology-agnostic growth strategy targeting core jurisdictions and customer segments for contracted clean energy and selective gas-fired power. TransAlta maintains a market presence as one of 's largest publicly traded power generators, with geographically diversified assets supporting operational resilience. Its portfolio includes hydro assets in Alberta's system, wind farms across and the U.S., solar projects in , and natural gas facilities serving and reliability needs. The company's strategic priorities include optimizing thermal assets, expanding renewables, and utilizing marketing and trading capabilities to navigate merchant exposures, particularly in Alberta's deregulated .

Historical Development

Origins and Early Expansion (1909–1960s)

The Calgary Power Company, Ltd. was established in 1909 as an investor-owned utility in , , with the aim of developing hydroelectric resources to meet growing electricity demand in the region. Its inaugural project, the hydroelectric plant on the west of , was completed in 1911, marking the beginning of commercial power generation and supply to 's urban grid. This facility represented 's first major hydroelectric installation, harnessing the 's flow to produce reliable power amid rapid population growth and industrialization in southern . Early expansion focused on additional hydroelectric developments to bolster capacity and extend service areas. In 1913, the Kananaskis Falls project came online, enhancing output and enabling power delivery to nearby communities like Cochrane by 1915. The 1920s saw further growth, culminating in the 1929 completion of the hydroelectric plant, which facilitated transmission lines extending 300 kilometers northward to by 1930, thus broadening the company's footprint across . During the 1940s, Calgary Power acquired and upgraded the plant, initiated the Barrier hydroelectric project, and relocated its headquarters to to centralize operations amid wartime industrial demands. Postwar rural electrification efforts accelerated expansion, with the creation of Farm Electric Service, Inc. in 1948 to serve agricultural areas. By 1950, the company employed over 400 people, added 6,000 customers, and supplied 24 towns and villages, achieving dominance in Alberta's hydroelectric market with five major projects operational and capturing 99% of the province's hydro generation share. The marked a strategic pivot toward thermal power due to hydro limitations, including the commissioning of Alberta's first coal-fired station at Wabamun Lake in 1956, which diversified generation amid rising demand. In 1956, shares were first offered to employees and then the public, supporting further infrastructure investment. Into the early 1960s, hydroelectric augmentation continued with the plant on the Brazeau River beginning operations around 1961, coinciding with the company's 50th anniversary and preparations for larger dam projects on the Brazeau and rivers under provincial agreements. These developments solidified Calgary Power's role as Alberta's primary provider, transitioning from localized reliance to a mixed portfolio while extending underground distribution and rural lines.

Growth and Diversification (1970s–1990s)

During the 1970s, TransAlta's predecessor, Calgary Power, pursued significant expansion in thermal generation capacity despite economic recessionary pressures that elevated food prices by 96% and housing costs by 70% from 1961 to 1972. In the early 1970s, Unit 1 of the Sundance Thermal Generating Station near Lake Wabamun, , entered operation, marking a shift toward coal-fired steam to meet rising demand; the facility incorporated innovative electrostatic precipitators achieving 99.5% fly ash capture efficiency to address environmental concerns. The Bighorn Dam on the was completed, bolstering hydroelectric assets. By decade's end, the company generated approximately 70% of 's electricity. In 1981, following a thwarted takeover bid by rival Ltd., Calgary Power rebranded as TransAlta Utilities Corporation to reflect its expanded provincial footprint and established TransAlta Resources as a for non-utility ventures in sectors like and . The Keephills Thermal Generating Station began operations between 1984 and 1985, further entrenching dependency. By 1985, TransAlta supplied 81% of Alberta's , retiring its outdated Seebe center in favor of a modern System Control Centre in . Customer base expanded by 25% over the decade, with generation reaching 72% of Alberta's total—94% derived from —and positioning the company as Canada's largest miner. The 1990s marked diversification beyond Alberta's coal-centric grid, with early entries into international markets including , , and . In 1991, TransAlta secured a $25 million, four-year power supply contract with the U.S. , initiating cross-border exports and energy marketing in the while exploring sales to . By 1993, the company ventured into through facilities in and , , reducing reliance on for new capacity. These moves supported broader portfolio growth amid trends.

Restructuring and Modern Challenges (2000s–Present)

In the early 2000s, TransAlta pursued diversification into sources amid evolving market dynamics, acquiring Windelectric in 2000, which added 67 wind turbines with 44 MW capacity. This move supported a strategic shift toward , aligning with growing emphasis on lower-emission generation. By 2009, the company acquired Canadian Hydro Developers, incorporating additional wind, hydro, and biomass assets, while listing on the to broaden investor access. A significant internal reorganization occurred effective January 1, 2009, transferring assets and business affairs from subsidiaries TransAlta Utilities Corporation (TAU) and TransAlta Energy Corporation (with exceptions for certain wind assets) directly to the parent corporation, streamlining operations and corporate structure. This aimed to enhance efficiency but preceded broader challenges from regulatory shifts. The 2010s brought intensified pressures from Alberta's deregulated and changes, including the 2015 provincial mandate accelerating by 2030, which disrupted operations and prompted financial strain. In response, TransAlta created TransAlta Renewables in 2013 as a separate entity to hold and grow and assets, isolating clean energy investments. volatility and uncertainty, including rate caps and a shift away from , led to accumulation; however, by 2018, the company reduced by $1.2 billion since 2015 through asset sales, early unit mothballing compensation ($524 million secured), and operational overhauls focused on gas and renewables. These efforts positioned TransAlta to capitalize on rising Alberta power prices post-2015 reforms. Commencing in 2016, TransAlta initiated coal-to-gas conversions in compliance with Alberta's mandates, investing $295 million since 2019 across units like Keephills Unit 3 (completed December 29, 2021), Sundance Unit 6 (Q1 2021), and Units 1 and 2, converting 1,659 MW of capacity while retiring 3,794 MW of coal-fired generation since 2018. The Highvale coal mine closed December 31, 2021, achieving Canada's full nine years ahead of the federal target, reducing scope 1 and 2 CO2 emissions intensity by approximately 50% (from 0.86 to 0.43 tonnes CO2e/MWh). This transition created peak construction jobs (~600) but highlighted challenges in maintaining reliability amid increasing renewable and hour-to-hour output variability. Into the 2020s, TransAlta merged with TransAlta Renewables to form a unified clean platform, emphasizing gas, , , and expansions, including plans for 2 GW of new clean by 2025. Persistent challenges include Alberta's energy-only market design, which exposes generators to risks without payments, prompting reviews of further investments in conversions and hybrids; supply peaks with excess entry; and regulatory debates over reforms to support reliability as renewables grow. Despite strong ($358 million in 2020), these factors underscore ongoing tensions between decarbonization mandates and economic viability in competitive markets.

Operations and Assets

Thermal Power Generation

TransAlta's thermal power generation operations have transitioned significantly toward following the complete retirement of -fired capacity in by December 31, 2021, with the company retiring 3,794 MW of generation and converting 1,659 MW to between 2018 and 2021. This shift aligned with Alberta's regulatory phase-out of by 2030, accelerated through conversions at facilities like Keephills and Sundance, where ceased alongside the closure of the Highvale mine. Remaining thermal assets emphasize flexible -fired plants for baseload, peaking, and , supporting grid reliability amid rising renewable integration. In , the Keephills facility, located 70 km west of , underwent conversion of its Unit 3 to in December 2021, preserving 466 MW of capacity with reduced emissions compared to prior operations. The adjacent Sundance similarly transitioned to , contributing to the converted capacity total while maintaining operational flexibility for merchant markets. TransAlta retains partial ownership in (400 MW share), which completed its -to-gas conversion as part of the national phase-out. These assets, optimized for Alberta's deregulated market, provide dispatchable power to balance intermittent renewables, with enabling rapid ramping to meet . Outside Canada, TransAlta operates the 670 MW Centralia coal-fired plant in Washington state, supplied by rail from the Powder River Basin and equipped with advanced controls making it among North America's lowest-emitting coal facilities per unit of output. Cogeneration plants, such as the Sarnia facility in Ontario, utilize natural gas to simultaneously generate electricity and steam for industrial use, enhancing efficiency. The November 2024 acquisition of Heartland Generation bolstered thermal capacity with 507 MW of cogeneration, 387 MW of contracted and merchant peaking units, and additional flexible assets totaling approximately 1,747 MW, primarily enhancing operations. These additions support TransAlta's strategy for thermal gas as a bridge , with ongoing evaluations of advanced technologies like small modular reactors at sites to further decarbonize thermal generation.

Renewable Energy Portfolio

TransAlta's portfolio, distinct from its hydroelectric assets, emphasizes and generation, supplemented by initiatives. As of 2024, the company's overall capacity, including , , and , reached approximately 3,600 MW, reflecting growth from 900 MW in 2000 through targeted expansions. assets form the core, with TransAlta ranking as one of Canada's largest producers, supported by long-term contracts that ensure stable revenue. Wind generation dominates the non-hydro renewables, with key facilities spanning Canada and the United States. Notable projects include the Wolfe Island Wind Farm in Ontario, featuring 86 turbines and 197.8 MW capacity under a 20-year power purchase agreement. The New Richmond Wind Farm on Quebec's Gaspé Peninsula delivers 67.8 MW from 33 turbines, powering approximately 25,000 homes annually. In the U.S., the Skookumchuck Wind Project in Washington state provides 137 MW across Thurston and Lewis counties. Recent additions bolstered capacity: the 300 MW White Rock Wind Project achieved commercial operation in April 2024, expanding U.S. renewables to 820 MW net operating capacity, while the 202 MW Horizon Hill facility followed in May 2024. These developments contributed to 2.2 GW of total fleet additions in 2024, including three contracted wind sites. Solar assets remain smaller in scale but support diversification, particularly in Australia and North America. A planned 18.5 MW solar PV park in Western Australia exemplifies international exposure. Domestic efforts include facilities like Mass Solar and North Carolina Solar, integrated into the broader portfolio. Battery storage enhances renewable integration, with projects like WindCharger addressing intermittency. In 2025, TransAlta invested in Nova Clean Energy, securing options on over 4 GW of advanced-stage clean energy projects in the Western Electricity Coordinating Council region, prioritizing wind, solar, and storage to fuel future growth.
Major Wind FacilitiesCapacity (MW)LocationKey Notes
White Rock300United StatesCommercial operation April 2024
Horizon Hill202Commercial operation May 2024
Wolfe Island197.8Ontario, 86 turbines, 20-year PPA
Skookumchuck137, U.S.Spans two counties
New Richmond67.8, Powers ~25,000 homes
Ardenville69, Operational wind asset
Antrim28.8, U.S.Part of U.S. portfolio

Hydroelectric Facilities

TransAlta owns and operates hydroelectric facilities with a total generating capacity of approximately 922 megawatts, concentrated in , , with additional assets in , , and the . These assets include 26 projects, encompassing run-of-river and storage-type plants on major river systems such as the , Spray River, and . The company's hydroelectric portfolio features several key systems in . On the , TransAlta operates four plants: Barrier (13 MW), Bearspaw (17 MW), Horseshoe (14 MW), and Kananaskis (19 MW), which collectively support water management and power generation in the region. The Spray system includes the Spray plant (112 MW, commissioned 1951) and the smaller plant (3 MW), which regulates releases from the Spray Lakes reservoir created by the Canyon and dams. Larger storage facilities on the system include Bighorn (120 MW, operational since 1972, producing about 408,000 MWh annually) and Brazeau (350 MW). Other notable plants are (36 MW, acquired 1941) and Rundle (50 MW, generating 73,000 MWh yearly). These facilities contribute to TransAlta's mix, leveraging natural for baseload and peaking power while adhering to water-sharing agreements in the Basin.
FacilityLocationCapacity (MW)Type/Notes
Brazeau350Storage on
Bighorn, AB120Storage, creates Lake Abraham; 1972
SprayCanmore, AB112Spray system; 1951
RundleCanmore, AB50 system
Cascade, AB36; acquired 1941
Bearspaw, AB17
KananaskisKananaskis, AB19
BarrierSeebe, AB13
Three SistersCanmore, AB3Spray system
Outside , smaller assets include Akolkolex (10 MW) in . TransAlta's hydro operations emphasize reliability, with historical performance tied to precipitation and river flows, as evidenced by strong output in wetter years.

Regional Focus: Alberta Operations

TransAlta's Alberta operations represent the foundation of its electricity generation activities, originating with the commissioning of the company's first hydroelectric facility in 1911. The portfolio includes hydroelectric, , and natural gas-fired assets across 38 facilities, delivering a combined capacity of 3,328 MW as of November 2024. These operations serve , where TransAlta holds a leading position among independent power producers. Thermal generation centers on the Keephills and Sundance stations, situated 70 kilometers west of near Wabamun Lake. Both sites underwent coal-to-gas conversions between 2020 and 2021 to comply with Alberta's phase-out of -fired by 2030, eliminating operations ahead of schedule. Keephills Unit 3, converted in December 2021, retains 466 MW of capacity. Sundance Units 3, 4, and 5 provide 368 MW, 406 MW, and 406 MW respectively post-conversion, while Unit 6 (401 MW) was mothballed on April 1, 2025. Additional gas capacity includes the 550 MW Battle River facility and the cogeneration plant at serving Dow Chemical . Hydroelectric assets are primarily along the system, supporting power generation, , and . Key facilities encompass Kananaskis (19 MW), Barrier (13 MW), Bearspaw (17 MW), and Horseshoe (14 MW), forming part of the Bow Mainstream System. Other sites include Spray, , and Pocaterra on the Kananaskis River tributaries. Wind generation features multiple farms in southern and , such as Ardenville (69 MW), Garden Plain (130 MW), Summerview (136 MW), and Cowley North (19.5 MW from 15 turbines). Windrise and other projects operate in the Municipal District of Willow Creek, contributing to renewable output amid recent market challenges prompting project reviews. The 2023 acquisition of Heartland Generation added 1,747 MW of flexible, largely contracted capacity, enhancing TransAlta's baseload and peaking capabilities in .

Energy Transition and Sustainability

Coal-to-Gas Conversion Timeline

TransAlta accelerated its transition from coal-fired generation in through a series of coal-to-gas conversions at its Sundance and Keephills facilities, completing the process in , nine years ahead of the provincial 2030 phase-out mandate established in a 2016 agreement with the government. These conversions preserved approximately 1,659 MW of capacity while shifting to , reducing CO2 emissions intensity by over 50% at the affected units, and were supported by $295 million in investments since 2019. The program involved retrofitting existing with firing systems, enabling continued operation beyond coal retirement deadlines without new . Key milestones in the conversion timeline include:
  • February 1, 2021: Completion of the first conversion at Sundance Unit 6 (401 MW), marking the initial step in TransAlta's three-unit coal-to-gas program near Wabamun Lake, Alberta.
  • July 19, 2021: Conversion of Keephills Unit 2 (395 MW) to natural gas, the second in the series, maintaining grid reliability during the transition.
  • December 29, 2021: Final conversion at Keephills Unit 3 (463 MW), achieving TransAlta's complete phase-out of coal-fired generation in Canada and retiring its associated Highvale mine.
These efforts contributed to Alberta's broader coal elimination by 2023, ahead of federal and provincial schedules, with TransAlta retiring a total of 3,794 MW of capacity since 2018. Post-conversion, the units operate under extended licenses, with enabling lower emissions and flexibility for integration with renewables.

Expansion into Renewables and Storage

TransAlta accelerated its renewable energy development in the early 2020s amid broader industry shifts toward decarbonization, focusing on wind, solar, and hybrid facilities to diversify beyond thermal generation. In September 2021, the company committed CAD 3 billion to add 2 GW of renewable capacity by 2025 through development, construction, and acquisitions. By November 2023, TransAlta expanded this ambition, targeting up to 1.75 GW of incremental renewables by 2028 with a $3.5 billion investment, projected to yield $350 million in annual EBITDA once operational. Key milestones included the 2023 acquisition of TransAlta Renewables Inc. for approximately $800 million in cash, integrating 1.3 GW of wind and solar assets across Canada and the United States, and the purchase of Heartland Generation, adding gas-fired flexibility to support renewable intermittency. In 2025, TransAlta invested in Nova Clean Energy, LLC, a U.S.-based developer, to bolster its pipeline in the , aligning with a broader 10 GW development queue that emphasizes utility-scale and solar projects. Internationally, the company commissioned a hybrid renewable facility with in on November 22, 2023, combining solar, , and battery storage to supply emissions-free power to remote operations, demonstrating of integrated renewables in off-grid settings. However, regulatory hurdles emerged; in May 2024, TransAlta cancelled one project and paused three others in due to new provincial setback requirements for industrial buffers near residences. Parallel to renewables, TransAlta has invested in to enhance grid reliability and renewable integration, pioneering utility-scale systems in . The WindCharger facility, a 10 MW/20 MWh system (BESS) charged by an adjacent , received Alberta Utilities Commission approval on November 7, 2019, marking one of the country's earliest commercial-scale deployments. The WaterCharger project, a 180 MW/180 MWh BESS near , , advanced through regulatory approval by the AUC, with development focusing on four-hour discharge capacity to support and frequency regulation. In a complementary move, TransAlta acquired a 50% stake in a 320 MW early-stage pumped hydro project, leveraging water reservoirs for long-duration . These initiatives position as a core enabler for TransAlta's renewables growth, targeting hybrid configurations to mitigate and capitalize on emerging AI-driven demand for firm power.

Emissions Reductions and Environmental Metrics

TransAlta has achieved significant reductions in (GHG) emissions through its coal-to-gas conversions and phase-out of -fired generation, completing the transition at its Canadian facilities by early 2022 ahead of Alberta's regulatory timeline. These conversions reduced CO2 emissions intensity by approximately 50%, from 1.05 tonnes CO2e per MWh for to 0.52 tonnes CO2e per MWh for at affected units. The company's scope 1 and 2 GHG emissions have declined by 70% or 22.7 million tonnes CO2e since the 2015 baseline, positioning it to meet its target of a 75% by 2026. From a longer-term perspective, emissions have fallen 77% or 32 million tonnes CO2e since 2005, reflecting sustained decommissioning of assets and efficiency improvements. In 2024, scope 1 and 2 emissions intensity further decreased to 0.35 tonnes CO2e per MWh, down from prior years, driven by optimized gas operations and renewable integration. TransAlta's long-term goal includes net-zero 1 and 2 emissions across 100% of its operations by 2045, supported by ongoing investments in renewables and carbon capture technologies. Environmental metrics beyond GHG include usage reductions tied to retirements and monitoring at hydroelectric sites, though quantified data emphasizes emissions as the primary focus of disclosed performance indicators. These reductions align with in and federal carbon pricing mechanisms, contributing to avoided emissions equivalent to removing millions of vehicles from roads annually.

Governance and Strategy

Leadership and Board Structure

John Kousinioris serves as President and of TransAlta Corporation, having been appointed to the role on April 1, 2021. His total compensation for the most recent was CA$6.58 million, consisting of 15.2% base and 84.8% performance-based incentives. The leadership team, comprising corporate officers, includes Joel Hunter as Vice President of Finance and ; Jane N. Fedoretz as Vice President of Operations; Kerry O'Reilly Wilks as Vice President of Legal, General Counsel, and Corporate Secretary; Chris Fralick as Vice President of Growth and Development; Mark Flickinger as Vice President of Commercial; Blain van Melle as Vice President of Capital; and Nancy Brennan as Senior Vice President of . This team oversees TransAlta's operations across thermal, renewable, and hydroelectric assets, with a focus on strategies. The consists of independent members led by Chair John P. Dielwart, an independent non-management director responsible for leading board deliberations and ensuring effective . As of the 2025 annual meeting on April 24, 2025, the board comprises 11 directors, including CEO John Kousinioris as a member, alongside Brian Baker, Alan J. Fohrer, Laura W. Folse, Candace MacGibbon, Thomas M. O'Flynn III, and Bryan D. Pinney; all were re-elected with majority shareholder approval. The board size is set between nine and 14 members to balance expertise in markets, , and . TransAlta's board structure features four standing committees, each composed entirely of independent directors to enhance oversight: the Audit, Finance and Risk Committee (chaired by Thomas O'Flynn, with members Alan Fohrer, Candace MacGibbon, and Bryan Pinney); the Governance, Safety and Sustainability Committee; the Human Resources Committee; and the Investment Performance Committee. These committees address key areas including financial reporting, risk management, executive compensation, sustainability practices, and investment decisions, aligning with the company's strategic shift toward renewables and emissions reductions. The Governance, Safety and Sustainability Committee annually reviews board composition and director independence to maintain rigorous standards.

Regulatory Engagements and Compliance

TransAlta's electricity generation and transmission operations are subject to oversight by regulatory bodies including the , which handles facility approvals, tariff applications, and market surveillance under the Public Utilities Act and Fair, Efficient and Open Competition Regulation. In , the company routinely engages the for generation and transmission facility decisions, such as the approval in September 2025 of an order for TransAlta's operations under the Public Utilities Act (Decision 30170-D01-2025). Environmental compliance falls under , while U.S. subsidiaries interact with the (FERC) and state agencies like Washington's Department of Ecology. TransAlta's internal requires personnel to adhere to all applicable laws, with violations subject to disciplinary action, and the company reports its facilities as in material compliance with regulatory requirements in filings. Regulatory approvals have supported TransAlta's , particularly coal-to-gas conversions at plants like Keephills and Sundance to meet provincial mandates phasing out coal-fired generation by 2030. Environment and Parks granted final approvals in July 2019 for engineering modifications, including installation of natural gas-fired simple cycle turbines, allowing Sundance Unit 6 to commence operations that year and Keephills Unit 3 in December 2021—nine years ahead of the deadline. These conversions reduced CO2 emissions by nearly 50% from pre-transition levels at affected units, aligning with emissions performance standards. TransAlta has faced enforcement actions for non-compliance. In October 2015, the approved a $56 million consent order settling allegations of , where TransAlta timed outages at plants from 2010 to 2012 to inflate prices and benefit its trading positions; this included a $51.9 million administrative penalty (with $26.9 million in ) plus $4.3 million in costs—the largest such penalty in Canadian history at the time. In early 2025, the Alberta Market Surveillance Administrator imposed penalties totaling $33 million for TransAlta misrepresenting backup power availability from the Brazeau hydroelectric facility, impacting market reliability assessments. Environmentally, the Centralia plant in incurred a $331,000 penalty in June 2018 from state regulators for three mercury emissions exceedances and a control equipment failure, prompting an by TransAlta. These incidents highlight ongoing of operational and emissions controls, though TransAlta has since decommissioned Centralia and advanced enhancements.

Strategic Acquisitions and Investments

In July 2023, TransAlta Corporation announced its intention to acquire all outstanding common shares of TransAlta Renewables Inc. (RNW) not already owned by the company or its affiliates, aiming to simplify its corporate structure and consolidate its clean energy assets into a single entity. The transaction, completed later that year, integrated RNW's portfolio, which included interests in 26 facilities, 11 hydroelectric facilities, and eight generation facilities, enhancing TransAlta's position as a diversified clean electricity producer with improved operational synergies and capital allocation flexibility. In November 2023, TransAlta agreed to acquire Heartland Generation Ltd. and from Energy Capital Partners for an initial enterprise value of $658 million, adding approximately 1,844 MW of primarily natural gas-fired generation capacity in , including 507 MW of , 387 MW of peaking plants, and 950 MW of gas-fired combined cycle assets. The deal price was subsequently reduced to $542 million due to market conditions and asset adjustments, with the acquisition closing on December 4, 2024, at a net cash cost of $215 million after planned divestitures of the Poplar Hill and Rainbow Lake facilities. This move expanded TransAlta's footprint, bolstering its gas generation portfolio amid rising demand for reliable baseload power while supporting the province's . During the first quarter of 2025, TransAlta made a strategic in Clean Energy, LLC, a developer focused on , solar, and storage projects in the , to gain exposure to high-growth development pipelines. This was followed in May 2025 by a broader , including a $100 million facility and a $75 million to , enabling TransAlta to participate in early-stage renewable opportunities without full ownership risks. These investments align with TransAlta's emphasis on selective renewables expansion, leveraging external developers to complement its core , , and gas operations.

Financial Performance

Key Revenue Streams and Metrics

TransAlta generates revenue primarily through the sale of produced by its portfolio of hydroelectric, , , and natural gas-fired generation assets, supplemented by payments, environmental attributes such as credits, production tax credits, and ancillary services from energy marketing activities. These streams are influenced by a mix of long-term contracts covering approximately 59% of and merchant sales in competitive markets like Alberta's pool price system, where revenues fluctuate with wholesale prices averaging $45 per MWh in Q2 2024. Segmented revenue reflects the company's operational diversity, with the Gas segment leading in Q2 at $284 million, driven by converted coal-to-gas and high-demand peaking units, followed by ($79 million, encompassing legacy assets), & ($107-112 million, bolstered by new 300 MW additions like White Rock and Horizon Hill facilities), ($99 million, from run-of-river and reservoir assets), and Energy Marketing ($47 million, from trading and optimization). For the full year , total reached $2.076 billion, down from $2.485 billion in 2023, amid lower Alberta power prices and hydro output variability. Key performance metrics underscore and cash generation, with adjusted EBITDA for 2024 reaching levels supporting $450-550 million in projected 2025 , after $143 million returned to shareholders via dividends and repurchases. The Gas segment delivered $535 million in adjusted EBITDA for 2024, reflecting robust utilization post-coal conversions, while Wind & Solar contributed $316 million, up 23% year-over-year due to contracted renewables growth.
Metric2024 Full YearNotes
$2.076 billionDecline from 2023 due to market pricing.
Adjusted EBITDA (Q4)$285 millionComparable to prior year; full-year supports FCF guidance.
Guidance (2025)$450-550 millionPost-capital expenditures and dividends.
Gas Segment Adjusted EBITDA$535 millionPrimary contributor from flexible generation.

Recent Results and Outlook (2020s)

In 2024, TransAlta reported earnings before income taxes of $319 million, a decline from $880 million in 2023, primarily due to lower unrealized gains on commodity derivatives and reduced contributions from its energy marketing segment, offset partially by higher generation from renewables and assets. Adjusted EBITDA for the fourth quarter reached $285 million, compared to $289 million in the prior year's quarter, reflecting stable operational performance amid the company's ongoing . Entering 2025, TransAlta demonstrated resilience with strong first-half results, including adjusted EBITDA of $349 million in the second quarter, driven by asset performance and a 10% year-over-year EBITDA increase attributed to favorable and contracted renewables output. First-quarter revenue fell 20% to $544 million, impacted by lower power prices and weather-related generation variability, though operational availability improved to 91.6% year-to-date from 90.8% in 2024. The board approved an 8% increase to $0.02 annualized per common share in February 2025, signaling confidence in cash flow generation. Looking ahead, TransAlta reaffirmed its 2025 guidance for adjusted EBITDA of $1.15-1.25 billion and of $450-550 million, supported by a hedged position covering approximately 80% of expected generation and contracted renewables growth. Strategic priorities emphasize expansion in renewables and , including power supply agreements and selective M&A to enhance fleet post-coal cessation by year-end 2025, with long-term targets aligned to 2026 goals for emissions reductions. Market dynamics, including Alberta's deregulated pricing and asset contributions, underpin expectations for sustained profitability into 2026, though exposure to remains a key risk factor.

Market Position and Competitive Dynamics

TransAlta Corporation operates as a leading in Alberta's competitive, deregulated , with a total installed capacity of approximately 9,014 megawatts across gas, (phasing out), , , and assets as of mid-2025. The company's Alberta-focused generation segment benefits from long-term contracts covering 52% of its capacity with creditworthy counterparties, providing revenue stability in an energy-only pool market prone to price volatility. This positioning is bolstered by strategic expansions, such as the November 2024 acquisition of Heartland Generation for $542 million, which added 1,747 MW of net flexible gas-fired and capacity to address reliability needs amid rising renewable . Key competitors in include , ENMAX, Suncor, and formerly independent Generation, with the market exhibiting high concentration as five major players control roughly 67% of installed capacity. The deal drew regulatory intervention from Canada's , requiring TransAlta to divest three peaking plants in November 2024 to prevent excessive market power that could elevate wholesale prices during high-demand hours. Nationally, TransAlta faces rivalry from diversified firms like , , and Boralex in renewables and utilities. Competitive dynamics hinge on 's merchant-oriented structure, where generators bear full exposure to supply-demand imbalances exacerbated by coal retirements, solar/wind growth, and electrification-driven load increases. TransAlta counters volatility through active hedging—securing 7,000 GWh of Alberta output at $67/MWh for 2026—and by prioritizing dispatchable assets for peak response, yielding synergies like $20 million in annual pre-tax savings from the integration. Provincial reforms, finalized in August 2025, introduce enhanced pricing mechanisms and cost-sharing for reliability services to better integrate renewables, potentially favoring operators with TransAlta's balanced thermal-renewable mix.

Controversies and Criticisms

Environmental and Emissions Disputes

TransAlta has faced legal challenges related to Alberta's policies, particularly under off-coal agreements requiring the company to cease -fired emissions at facilities like Keephills and Genesee by December 31, 2030, in exchange for transition payments totaling approximately $97 million annually shared among TransAlta, , and . In 2024, the dismissed TransAlta's appeal in TransAlta Generation Partnership v. Alberta, rejecting claims that provincial property assessment guidelines discriminated against operators by devaluing assets prematurely due to emissions cessation mandates, ruling the guidelines valid and non-discriminatory. At its Centralia coal plant in Washington state, TransAlta encountered emissions-related enforcement actions, including a 2018 fine of $331,000 from state regulators for exceeding federal mercury emission limits and failing to properly operate air pollution control equipment, with the plant cited for contributing about 10% of Washington's greenhouse gas emissions at the time. The company planned to appeal the penalty, arguing operational complexities, while environmental groups and the Quinault Tribe opposed wastewater permit renewals in 2010, citing repeated violations of chemical discharge limits documented in state reports. Earlier petitions, such as a 2009 filing to the EPA, highlighted the plant's mercury emissions—estimated at 360 pounds in 2009—and CO2 outputs as detrimental to health and welfare, contributing to pressures that led to production reductions and eventual closure commitments by 2025. TransAlta's 2012 abandonment of a planned project at its Keystone plant in drew criticism for undermining emissions reduction efforts, with the company citing unfavorable economics despite provincial incentives, amid broader debates on the feasibility of such technologies for coal-fired operations. These incidents reflect ongoing tensions between regulatory demands for emissions controls and the operational costs imposed on coal-dependent assets, though TransAlta has complied with phase-out timelines without admitting liability in emissions violation cases.

Regulatory and Contractual Conflicts

In 2015, the Utilities Commission () found that TransAlta had contravened market rules by engaging in conduct that undermined the fair, efficient, and competitive operation of electricity pool, specifically through strategic unit outages and bidding practices that artificially inflated prices during high-demand periods between 2003 and 2009. The imposed a $56 million on TransAlta, comprising $27 million in of economic benefits, a $25 million administrative penalty, and $4 million to cover investigative costs borne by the Market Surveillance Administrator, with funds directed to the government's general revenue. TransAlta did not admit liability but accepted the resolution to avoid prolonged litigation. In TransAlta Generation Partnership v. Alberta, 2024 SCC 37, the quashed an regulation under the Municipal Government Act that established lower valuation standards specifically for coal-fired generating facilities, deeming it unreasonable and discriminatory. The regulation, enacted to accelerate the province's by increasing property tax burdens on such assets, treated plants differently from other regulated properties without a rational connection to its environmental objectives, prompting a 7-2 majority to lower the threshold for challenging subordinate legislation on reasonableness grounds. This ruling favored TransAlta's assets in , which faced accelerated decommissioning under provincial policy. TransAlta has faced ongoing contractual disputes with the Balancing Pool, 's entity managing legacy power purchase arrangements (PPAs), over claims, termination notices, and payment entitlements. For example, in 2022, the Alberta Court of Appeal upheld TransAlta's successful claim of for the 2013 offline trip of its Keephills 1 unit, entitling it to compensatory payments under the PPA. Separate proceedings involved challenges to the Balancing Pool's obligation to reimburse the net of the Highvale Mine amid PPA transitions, with the dismissing related requests in 2021. In a hybrid regulatory-contractual matter, TransAlta initiated litigation against Environment and Parks in 2020, alleging breach of a 1960 agreement governing the Bighorn Dam by issuing mineral leases authorizing hydraulic fracturing within a 5 km radius without adequate safeguards. TransAlta sought declarations of breach and indemnification for potential damages to the provincially owned structure. The of , in 2024 ABCA 127, upheld claims of solicitor-client and for certain government documents, limiting disclosure but leaving the substantive merits unresolved.

Research Funding and Independence Concerns

In 2018, TransAlta Corporation, a major coal-fired power generator in , commissioned a research project at the focused on the impacts of emissions. The company paid $54,000 to select and fund work by Dr. Warren Kindzierski, a in the school's program, to produce a study and supporting materials assessing health risks from fine and other pollutants associated with plants. These outputs were subsequently used by TransAlta in regulatory submissions to the government, arguing that the health effects of its operations were overstated and advocating against accelerated policies. Critics, including environmental advocates and research ethicists, raised alarms that the arrangement compromised the project's independence, as TransAlta directly chose the researcher, provided input on scope, and anticipated outcomes aligned with its business interests in prolonging operations. The controversy highlighted broader tensions in corporate funding of academic research, particularly in fields intersecting with industry regulation. Reports indicated that TransAlta reviewed drafts and influenced the framing to emphasize uncertainties in health risk data, potentially introducing favoring perspectives over precautionary approaches. A subsequent review in WIREs Climate Change (2024) cited the case as an example of firms exerting influence through targeted grants, noting that such funding can skew questions toward minimizing environmental harms to support policy delays, as evidenced by TransAlta's use of the materials to lobby for extended use amid Alberta's phase-out mandate targeting 2030. Professional Warren Mabee and others argued that awareness of the sponsor's desired results—such as downplaying coal's externalities—could systematically bias methodologies, eroding in university outputs when deployed in high-stakes regulatory contexts. TransAlta defended the project as arm's-length and compliant with university protocols, stating that funds were not redirected and the research adhered to ethical standards without altering conclusions. The University of Alberta maintained its oversight ensured independence, though it acknowledged the sponsorship's visibility in TransAlta's advocacy. Nonetheless, the incident fueled calls for stricter disclosure and firewalls in industry-academia partnerships, with ethicists like Arthur Schafer arguing that public tax-funded institutions should prioritize impartiality over corporate contracts to avoid perceptions of captured science. No formal investigations found misconduct, but the episode underscored risks of funding dependencies in energy policy research, where emitters like TransAlta hold financial stakes opposing emission reductions.

References

  1. [1]
    About Us - TransAlta
    TransAlta owns, operates and develops a diverse fleet of electrical generation assets in Canada, the United States, and Australia.
  2. [2]
    Investor information - TransAlta
    TransAlta Corporation is one of Canada's largest publicly traded power generators, owning and operating a diverse fleet across Canada, the United States and ...
  3. [3]
    Our history - TransAlta
    114 years of proven industry leadership. For generations TransAlta has been serving our customers, first in Alberta and today across Canada, ...
  4. [4]
    Our Operations - TransAlta
    We are building on our 30-year history in Australia with significant new investments made over the past several years, including solar, battery energy storage, ...
  5. [5]
    TransAlta - A Clean Energy Solutions Company
    We are a leader in clean electricity, offering clean energy solutions that will help you meet your business, operational, and sustainability goals.Careers · Contact Us · About Us · Investors
  6. [6]
    Grid reliability takes center stage as TransAlta eyes 2030s growth
    Aug 1, 2025 · Few power generators can claim the operational heritage of TransAlta Corporation, which has been delivering electricity since 1911 ...
  7. [7]
    TransAlta hit with $33-million penalty for misrepresenting backup ...
    Feb 3, 2025 · TransAlta Corp. has been hit with $32.7 million in penalties for misrepresenting the availability of backup power supply from its Brazeau power plant.
  8. [8]
    Contact Us - TransAlta
    TransAlta Corporation: TransAlta Place Suite 1400, 1100 1 St SE Calgary, Alberta T2G 1B1 General phone inquiries: 1-403-267-7110
  9. [9]
    [PDF] Q1 2025 News Release - TransAlta
    May 7, 2025 · While the Company's merchant portfolio in Alberta was partially impacted by softer power prices, our hedging strategy and active asset.
  10. [10]
    [PDF] 2023 Integrated Report - TransAlta
    Feb 22, 2024 · Across our sector, 2023 was marked by significant challenges, ranging from increasing geopolitical risks, high inflation and rising equipment ...
  11. [11]
    Our Priorities - TransAlta
    Our growth plan is guided by a technology-agnostic approach, focusing on our core operating jurisdictions and clear target customer segments within them.Missing: presence | Show results with:presence
  12. [12]
    Our strategic priorities - TransAlta
    Using a technology- agnostic approach, we are focused on our core operating jurisdictions and clear target customer segments within them. Realize the value ...Missing: presence | Show results with:presence
  13. [13]
    Early Alberta Hydro History: to 1913 - Electricity & Alternative Energy
    In 1911, Calgary Power (which would evolve into TransAlta Utilities over the next century) completed the province's first major hydroelectric plant in order to ...
  14. [14]
    Water, Fire and Wind in Alberta - LinkedIn
    Apr 22, 2020 · In 1956, Calgary Power energized its first coal-based thermal generating station at Lake Wabamun, west of Edmonton. Until the coal mine was ...
  15. [15]
    Transalta Utilities Corporation | Encyclopedia.com
    Incorporated: 1947 as Calgary Power Ltd. Employees: 2,700. Sales: C$1.16 billion. Stock Exchanges: Toronto Montreal Alberta. TransAlta Utilities Corporation is ...
  16. [16]
    History of TRANSALTA UTILITIES CORPORATION
    The forerunner of TransAlta Utilities, Calgary Power Company, was founded by banker W. Max Aitken in 1903. Aitken, who later became Lord Beaverbrook, ...
  17. [17]
    transalta corporation - SEC.gov
    GPEC became commercially operational in 2005. Generation from GPEC is sold to Canadian Forest Products Ltd., Alberta Infrastructure and the City of Grande ...<|separator|>
  18. [18]
    [PDF] Energizing the Future. - TransAlta
    Feb 22, 2023 · Expansion of our business through development projects and acquisitions may place increased demands on our management, operating systems ...
  19. [19]
    TransAlta Corp. says it's ready to power ahead after cutting debt ...
    Aug 5, 2018 · The Calgary-based electricity generator has slashed debt and overhauled the business to take advantage of strengthening Alberta power prices.
  20. [20]
    TransAlta Achieves Full Phase-Out of Coal in Canada
    Dec 29, 2021 · TransAlta completed coal-to-gas conversions, including Keephills Unit 3, and closed the Highvale coal mine, fully transitioning to natural gas.
  21. [21]
    [PDF] Investor Presentation - TransAlta
    Jul 1, 2024 · Increasing renewable generation will result in larger hour-to-hour changes in output. – challenging the reliability of the electricity system.
  22. [22]
    [PDF] Accelerating Clean - TransAlta
    In September 2021, we announced our Clean Electricity. Growth Plan, which will guide TransAlta's path to building an additional 2 GW of clean generation by 2025 ...
  23. [23]
    TransAlta Responds to Continued Energy-Only Market in Alberta
    Jul 25, 2019 · The Company has undertaken a review of its future investment decisions on coal-to-gas conversions and repowering through hybrid investments, as ...
  24. [24]
    [PDF] Energizing the Future. - TransAlta
    Mar 10, 2023 · TransAlta aims to be a leader in clean electricity, focusing on renewable generation, carbon reduction, and a customer-centered approach, with ...Missing: controversies | Show results with:controversies
  25. [25]
    [PDF] Our E2SG Advantage - Responsibility Reports
    Mar 2, 2021 · Despite the challenges of the year, the TransAlta team delivered strong free cash flow of $358 million, proving once again the value of our ...
  26. [26]
    [PDF] Highvale Mine Decommissioning and Reclamation Plan - TransAlta
    Active coal mining at TransAlta's Highvale Mine ceased at the end of December 2021 with the end of coal-fired generation at the Keephills and Sundance power ...
  27. [27]
    Keephills - TransAlta
    The Keephills power plant is located 70 kilometres west of Edmonton, Alberta and five kilometres south of Wabamun Lake.
  28. [28]
    [PDF] January-2024-Investor-Presentation.pdf - TransAlta
    Company's business; expected changes to the Alberta power market; the impacts arising from the significant supply additions in the Alberta market; the ...
  29. [29]
    Centralia - TransAlta
    The facility is one of the cleanest coal-fired power plants in North America. Fuel for Centralia Plant is delivered by train from the Powder River Basin in the ...Missing: thermal | Show results with:thermal
  30. [30]
    Sarnia - TransAlta
    The Sarnia plant is a cogeneration facility, meaning electricity and steam are produced simultaneously from a single energy source – in this case, natural gas.Missing: thermal | Show results with:thermal
  31. [31]
    TransAlta to Acquire Heartland Generation from Energy
    Nov 14, 2024 · Heartland owns and operates generation assets consisting of 507 MW of cogeneration, 387 MW of contracted and merchant peaking generation, 950 MW ...<|separator|>
  32. [32]
    X-energy, TransAlta Partner to Study Deployment of Advanced ...
    Apr 2, 2024 · X-energy and TransAlta will evaluate the economics, regulatory impacts, licensing requirements, timelines, and overall suitability of deploying an Xe-100 plant.Missing: thermal | Show results with:thermal<|control11|><|separator|>
  33. [33]
    Sustainability Targets & Performance - TransAlta
    ... hydro power in Alberta – we have grown our nameplate renewable energy capacity from approximately 900 MW in 2000 to ~3600 MW in 2024. Reduced our annual ...
  34. [34]
    Wolfe Island - TransAlta
    The site has a nameplate capacity of 197.8 megawatts and includes 86 wind turbines. The power produced from Wolfe Island is sold under a 20-year Renewable ...
  35. [35]
    New Richmond, Saint-Alphonse and Caplan - TransAlta
    Located on the Gasp© Peninsula, TransAlta's New Richmond wind farm has a capacity of 67.8 megawatts generated by 33 wind turbines and could annually supply ...
  36. [36]
    Skookumchuck Wind - TransAlta
    The 137 MW Skookumchuck Wind Project is located on approximately 19,500 acres of land across Thurston and Lewis counties in the state of Washington, U.S..
  37. [37]
    TransAlta Achieves Commercial Operation of 300 MW White Rock ...
    Apr 24, 2024 · TransAlta's portfolio in the US now totals 820 MW in net operating renewable energy capacity. €œWe are pleased to bring into service our first ...
  38. [38]
    TransAlta Reports Strong 2024 Results, Announces Dividend ...
    Feb 20, 2025 · During the year, we added 2.2 GW of generation to our fleet, with three contracted wind facilities achieving commercial operation in addition to ...
  39. [39]
    Power plant profile: TransAlta Renewables Solar PV Park, Australia
    Oct 21, 2024 · TransAlta Renewables Solar PV Park is an 18.5MW solar PV power project. It is planned in Western Australia, Australia.
  40. [40]
    Facilites - TransAlta
    Plants in operation. We operate a diverse fleet of electrical power generation assets in Canada, the United States and Western Australia.Centralia · Keephills · Sheerness · Horseshoe
  41. [41]
    Our Growth Strategy - TransAlta
    Nova Clean Energy: A Strategic Growth Partnership​​ In 2025, TransAlta made a strategic investment in Nova Clean Energy, LLC, a renewable energy developer with a ...
  42. [42]
    TransAlta (TAC) Company Profile & Description - Stock Analysis
    The Hydro segment holds interest of approximately 922 megawatts (MW) of owned hydroelectric generating capacity located in Alberta, British Columbia, and ...
  43. [43]
    TransAlta says “exceptional performance” of Alberta hydro projects ...
    May 14, 2021 · TransAlta owns 26 hydroelectric projects in Alberta, British Columbia, Ontario and the U.S. (one plant) with a total capacity of 949 MW. In ...
  44. [44]
    TransAlta, other Bow River Basin water license holders sign water ...
    Apr 26, 2024 · TransAlta has four hydropower plants on the Bow Mainstream System: 13 MW Barrier, 17 MW Bearspaw, 14 MW Horseshoe and 19 MW Kananaskis.
  45. [45]
    Spray hydroelectric plant - Global Energy Monitor - GEM.wiki
    Apr 24, 2025 · The Spray hydroelectric plant is an operating plant in Canmore, Alberta, Canada, with a 112 MW capacity, commissioned in 1951, and owned by  ...
  46. [46]
    Three Sisters - TransAlta
    The Three Sisters Plant is one of TransAlta' s smallest power plants, with a generating capacity of three megawatts.
  47. [47]
    Power plant profile: Bighorn, Canada
    Oct 21, 2024 · Bighorn is a 120MW hydro power project. It is located on North Saskatchewan river/basin in Alberta, Canada.
  48. [48]
    Cascade Hydroelectric Power Plant Canada - GEO
    Mar 22, 2011 · This infrastructure is of TYPE Hydro Power Plant with a design capacity of 36 MWe. It has 2 unit(s). The first unit was commissioned in 1942 ...
  49. [49]
    Rundle - TransAlta
    The Rundle plant is a 50 MW hydroelectric plant in Canmore, AB, part of the Bow River system, generating 73,000 megawatt hours yearly. It is named after ...
  50. [50]
    Competition Bureau statement regarding its consent agreement with ...
    Nov 14, 2024 · In Alberta, TransAlta operates 38 hydro, wind and gas-based generating assets. These assets have a total generating capacity of 3,328 MW.
  51. [51]
    TransAlta Corp. Is Positioned for Alberta Power Gains - TSI Network
    Aug 1, 2025 · TransAlta's Alberta assets make it the leader in Canada's only deregulated power market. At the same time, its coal-to-gas conversions have ...
  52. [52]
    TransAlta Completes Second Off-Coal Conversion Another Major ...
    Jul 19, 2021 · TransAlta completed its second coal-to-gas conversion, Keephills Unit 2, reducing CO2 emissions and maintaining capacity, as part of a plan for ...
  53. [53]
    TransAlta Announces Accelerated Transition to Clean Energy
    Dec 6, 2017 · Sundance Unit 3, Sundance Unit 4 and Sundance Unit 5 comprise 368 MW, 406 MW and 406 MW, respectively, of the 2,141 MW Sundance power plant.
  54. [54]
    Sundance - TransAlta
    The first of six coal-fired generating units at Sundance was commissioned in 1970, and the sixth and final generating unit was commissioned in 1980.Missing: early | Show results with:early
  55. [55]
    Bow River Basin – TransAlta operations | Alberta.ca
    The agreement allows the government to modify operations at several TransAlta facilities to help protect communities along the Bow River against the impacts of ...
  56. [56]
    Windrise - TransAlta
    TransAlta presently operates all windfarm facilities in the municipality and has been a proud member of the local business community since 2001. The Project ...
  57. [57]
    Transforming To A Cleaner Future - Western Energy Institute
    TransAlta is transitioning from coal to gas and renewables, including wind, solar, and hydro, and converting thermal plants to natural gas.
  58. [58]
    TransAlta completes conversion from coal to natural gas power in its ...
    Dec 29, 2021 · The company says it has spent $295 million since 2019 converting units at its Keephills, Sheerness and Sundance power operations from coal to ...
  59. [59]
    TransAlta Completes Second Coal-to-Gas Conversion
    Jul 20, 2021 · Units 4 at Sundance was commissioned in 1977, and co-fired coal and natural gas, with 406 MW of capacity. TransAlta plans to discontinue ...
  60. [60]
    TransAlta Completes First Off-Coal Conversion and Achieves Major ...
    Feb 1, 2021 · It has completed the first of three planned coal-to-gas (CTG) boiler conversions at its Sundance and Keephills power generation facilities near Wabamun, ...
  61. [61]
    TransAlta completes Canadian conversion from coal to natural gas ...
    Dec 29, 2021 · TransAlta says the conversion of the Keephills Unit 3 power plant west of Edmonton to natural gas is the last of three plant conversions ...
  62. [62]
    Alberta's last coal plant powers down - Power Engineering
    Jun 18, 2024 · The Genesee Generating Station has officially stopped burning coal and is now 100% natural gas-fueled, signaling a likely end for coal power in the Canadian ...
  63. [63]
    Coal to gas conversions, profitably - Gas Turbine World
    Jun 10, 2020 · Once converted to gas, the coal fired units are anticipated to run through to between 2034 and 2039 depending on the original coal-only closure ...Missing: timeline | Show results with:timeline
  64. [64]
    TransAlta sets target of adding 2 GW renewables by 2025
    Sep 28, 2021 · By this date, TransAlta will invest CAD 3 billion (USD 2.4bn/EUR 2bn) in developing, building and acquiring new assets as it plans to step up ...
  65. [65]
    TransAlta Announces Growth Targets to 2028, Financial Outlook for ...
    Nov 21, 2023 · Delivering up to 1.75 GW of incremental renewables capacity with a targeted investment of $3.5 billion by the end of 2028;; Focusing growth on ...
  66. [66]
    TransAlta and BHP Announce Commercial Operation of Innovative ...
    Nov 22, 2023 · This innovative hybrid renewable solution is now supplying reliable, emissions-free power to BHP's mining operations in the outback of Western Australia.
  67. [67]
    TransAlta cancels one renewable project, pauses three developments
    May 3, 2024 · Varcoe: TransAlta Corp. cancels one renewable project due to new buffer zone, pauses three other greenfield power developments in Alberta.
  68. [68]
    WindCharger Battery Storage - TransAlta
    On November 7, 2019, the Alberta Utilities Commission (AUC) approved TransAlta' s application to construct and operate the WindCharger battery storage facility ...
  69. [69]
    Battery Energy Storage Solutions - TransAlta
    We created one of Canada's first utility-scale battery energy storage systems (BESS), charged by one of our wind energy facilities.
  70. [70]
    WaterCharger Battery Storage Project - AUC
    The AUC has approved applications from TransAlta Alberta Hydro Inc. to construct and operate a 180-megawatt battery energy storage power plant in the Ghost Lake ...
  71. [71]
    [PDF] WaterCharger Battery Storage Project - TransAlta
    TransAlta is currently evaluating options for the battery energy storage system which will be rated at 180 megawatts (“MW”) with up to two-hours of battery ...
  72. [72]
    TransAlta Announces Acquisition of 50% Interest in Early-Stage ...
    TransAlta Announces Acquisition of 50% Interest in Early-Stage Pumped Hydro Energy Storage Development Project · Acquisition of 50% interest in a 320 MW pumped ...
  73. [73]
    TransAlta Completes Canada Switch to Natural Gas Generation ...
    Jan 3, 2022 · TransAlta completes historic switch to natural gas generation in Canada, reducing CO2 emissions by nearly 50%.
  74. [74]
    TransAlta completes coal phaseout at Canadian facilities
    Jan 5, 2022 · The conversion of Keephills Unit 3 from coal to natural gas ends the last of three planned conversions at the power producer's facilities ...
  75. [75]
    Climate Change Management - TransAlta
    The energy transition required to combat climate change is at the core of TransAlta's strategy. Our transition from coal to natural gas has reduced our ...
  76. [76]
    [PDF] TRANSALTA CORPORATION Management's Discussion and Analysis
    Feb 19, 2025 · No significant changes to applicable laws and regulations;. • No unexpected delays in obtaining required regulatory approvals;. • No material ...Missing: controversies | Show results with:controversies<|control11|><|separator|>
  77. [77]
    [PDF] TransAlta Corporation - Climate Change 2023 - Public now
    We have retired 4,464 MW of coal-fired generation capacity and converted 1,659 MW of coal-fired facilities to natural gas since 2018. Our remaining coal-fired ...
  78. [78]
    Our Leadership - TransAlta
    Corporate officers · John Kousinioris · Joel Hunter · Jane N. Fedoretz · Kerry O'Reilly Wilks · Chris Fralick · Mark Flickinger · Blain van Melle · Nancy Brennan.Kerry O'Reilly WilksJane N. FedoretzNancy BrennanJoel HunterJohn Kousinioris
  79. [79]
    TransAlta Corporation (TA) Leadership & Management Team Analysis
    TransAlta's CEO is John Kousinioris, appointed in Apr 2021, has a tenure of 4.5 years. total yearly compensation is CA$6.58M, comprised of 15.2% salary and 84.8 ...
  80. [80]
    Governance - TransAlta
    Meet our leadership team. Our team of Corporate Officers and Senior Managers have diverse industry experience in both regulated and deregulated markets.
  81. [81]
    [PDF] transalta corporation
    Oct 23, 2024 · The Board selects its Chair from among its members to lead the Board in the course of its work. The Chair is an independent non-management ...<|control11|><|separator|>
  82. [82]
    TransAlta Corporation Announces Results of the 2025 Annual and ...
    Apr 24, 2025 · TransAlta Corporation Announces Results of the 2025 Annual and Special Meeting of Shareholders and Election of all Directors ; John P. Dielwart ...
  83. [83]
    TransAlta Corporation's Management Proxy Circular dated March 7 ...
    Dielwart, Chair of the Board, and John H. Kousinioris, President and Chief Executive Officer of TransAlta, have agreed to act as your proxyholder to vote for ...
  84. [84]
    [PDF] TRANSALTA CORPORATION
    Oct 23, 2024 · The Governance, Safety and Sustainability Committee (the. “Committee”) of the Board of Directors (the “Board”) of the.
  85. [85]
    [PDF] TRANSALTA CORPORATION
    Feb 18, 2025 · Composition of Committee. The Audit, Finance and Risk Committee (the "Committee") of the board of directors (the "Board") of TransAlta ...
  86. [86]
    [PDF] CORPORATE GOVERNANCE GUIDELINES - TransAlta
    Feb 21, 2023 · The Governance, Safety and Sustainability Committee (the “GSSC”) reviews annually the size of the Board and recommends changes in size and ...
  87. [87]
    [PDF] Decision 30170-D01-2025 TransAlta Order Pursuant to the Public ...
    the Public Utilities Act. September 5, 2025. Page 2. Alberta Utilities Commission. Decision 30170-D01-2025. TransAlta Corporation. Application for an Order ...
  88. [88]
    [PDF] Corporate Code of Conduct | TransAlta
    All employees and contractors must comply with all laws, rules and regulations applicable to TransAlta's business in the countries in which it operates.
  89. [89]
    TransAlta to pay $56M for market manipulation, AUC orders - CBC
    Oct 29, 2015 · The Alberta Utilities Commission has approved TransAlta's proposed $56-million settlement for deliberately timing outages at power plants to drive up ...
  90. [90]
    [PDF] News Release - Alberta Utilities Commission
    October 29, 2015. AUC approves $56 million TransAlta market manipulation settlement. Calgary, Alberta, Canada… In a decision and consent order issued today ...
  91. [91]
    [PDF] TRANSALTA CORPORATION Management's Discussion and Analysis
    May 6, 2025 · The following table reflects the summary financial information on a consolidated basis for the three months ended March 31: 3 months ended ...
  92. [92]
    TransAlta Fined $331,000 for Mercury, Pollution Violations at ...
    Jun 15, 2018 · The total fine for the NOx violation was $210,000. The mercury-related fine comes from three instances in which the plant exceed the emissions ...
  93. [93]
    TransAlta Power Plant - Washington State Department of Ecology
    TransAlta accounts for 10 percent of all greenhouse gas emissions statewide. The agreement reduced emissions of mercury, greenhouse gases, and nitrogen oxides.Missing: thermal | Show results with:thermal
  94. [94]
    TransAlta Corporation to Acquire TransAlta Renewables Inc. to ...
    Jul 11, 2023 · The Arrangement will provide economic contribution from an incremental 1,187 MW of generating capacity, being 39.9% of the generating capacity ...
  95. [95]
    TransAlta Corporation to Acquire TransAlta Renewables Inc. to ...
    Jul 11, 2023 · TransAlta will acquire all of the outstanding common shares of RNW (each, a "RNW Share") not already owned, directly or indirectly, by TransAlta and certain of ...
  96. [96]
    TransAlta to Acquire Heartland Generation from Energy Capital ...
    Nov 2, 2023 · TransAlta will acquire Heartland for $658 million, adding 1,844 MW of capacity, including 507 MW cogeneration, 387 MW peaking, and 950 MW gas- ...
  97. [97]
    TransAlta to Acquire Heartland Generation from Energy Capital ...
    Nov 14, 2024 · TransAlta will acquire Heartland for $542 million, adding 1,747 MW capacity, with a net price of $270 per kilowatt, and 60% of revenues ...
  98. [98]
    TransAlta Closes Acquisition of Heartland Generation
    Dec 4, 2024 · TransAlta acquired Heartland for $542 million, reduced to $215 million net cash, and will divest Poplar Hill and Rainbow Lake assets.
  99. [99]
    [PDF] 2024.06.30 TAC EX 13.1 Financial Statements - TransAlta
    Aug 31, 2024 · The majority of the Company's revenues are derived from the sale of power, capacity, environmental and tax attributes and from asset ...Missing: breakdown | Show results with:breakdown
  100. [100]
    [PDF] TRANSALTA CORPORATION Management's Discussion and Analysis
    Aug 6, 2024 · TransAlta is a Canadian corporation and one of Canada's largest publicly traded power generators. Established in. 1911, the Company now has over ...
  101. [101]
    TransAlta Revenue 2011-2025 | TAC - Macrotrends
    End of interactive chart. TransAlta (TAC) Annual Revenue. 2024, $2.076B. 2023, $2.485B. 2022, $2.289B.
  102. [102]
    TransAlta Corp (TAC) Q4 2024 Earnings Call Highlights
    Feb 20, 2025 · Wind and Solar Segment Adjusted EBITDA (2024): $316 million, a 23% increase from 2023. Gas Segment Adjusted EBITDA (2024): $535 million. Energy ...
  103. [103]
    TransAlta Reports Strong 2024 Results, Announces Dividend
    Feb 20, 2025 · Earnings before income taxes totalled $319 million for the year ended Dec. 31, 2024, compared to $880 million in the same period in 2023, a ...<|separator|>
  104. [104]
    TransAlta Reports Strong Second Quarter 2025 Results ...
    Aug 1, 2025 · Achieved strong operational availability of 91.6 per cent in 2025, compared to 90.8 per cent in 2024 · Adjusted EBITDA(1) of $349 million, ...
  105. [105]
    TransAlta Reports Strong Second Quarter 2025 Results ...
    Aug 1, 2025 · TransAlta Reports Strong Second Quarter 2025 Results, Advancement of Strategic Priorities and Reaffirms Guidance. TransAlta Corporation.
  106. [106]
    [PDF] TransAlta Corporation (TAC) | Sure Dividend
    May 10, 2025 · Revenue was off 20% year-over-year to $544 million. Adjusted EBITDA came to $194 million, off from $245 million a year ago. This was impacted by ...
  107. [107]
    TransAlta to Host Third Quarter 2025 Results Conference Call
    On Feb. 19, 2025, the Company's Board of Directors approved a $0.02 annualized increase to the common share dividend, an eight per cent increase, and declared a ...
  108. [108]
    TransAlta Q2 2025 slides: Hydro strength drives 10% EBITDA ...
    Oct 14, 2025 · TransAlta reaffirmed its 2025 financial guidance, projecting adjusted EBITDA of $1.15-1.25 billion and free cash flow of $450-550 million. The ...
  109. [109]
    [PDF] Investor Presentation - TransAlta
    Hydro and Wind and Solar fleet are core operations. 1 Enterprise value and ... Well diversified portfolio of high-quality assets. Stable contracted base ...Missing: official | Show results with:official
  110. [110]
    CER – Provincial and Territorial Energy Profiles – Alberta
    Sep 10, 2024 · The Shepard Energy Centre is Alberta's largest natural gas-fired power station. It is located east of Calgary and has a capacity of 860 MW.
  111. [111]
    DBRS Changes Trends on TransAlta and Capital Power
    The generation market in Alberta is heavily concentrated, with five main players controlling approximately 67% of the generating capacity in Alberta. These ...<|separator|>
  112. [112]
    TransAlta (TA) Competitors and Alternatives 2025 - MarketBeat
    The main competitors of TransAlta include Emera (EMA), Brookfield Renewable (BEPC), Brookfield Infrastructure (BIPC), Algonquin Power & Utilities (AQN), Aura ...
  113. [113]
    Electricity market design with increasing renewable generation
    Jul 17, 2025 · We summarize the attributes of Alberta's simplified electricity market design and examine its challenges with increasing renewable output.
  114. [114]
    TransAlta Corp (TAC) Q2 2025 Earnings Call Highlights
    Aug 2, 2025 · Alberta Generation Hedge for Next Year: 7,000 gigawatt hours at $67 per megawatt hour. Warning! GuruFocus has detected 7 Warning Signs with TAC.
  115. [115]
    Alberta Takes Major Step Toward New Future-Ready Electricity Market
    Aug 27, 2025 · The new design includes enhanced operational services, improved price signals, and cost-sharing mechanisms to support the province's evolving ...
  116. [116]
    TransAlta Generation Partnership v. Alberta - SCC Cases
    Nov 8, 2024 · Under that agreement, TransAlta agreed to cease coal‑fired emissions by December 31, 2030, in exchange for substantial “transition payments” ...
  117. [117]
    Coal-fired power plants to get $1.1B in compensation over next 14 ...
    Nov 24, 2016 · TransAlta, ATCO and Capital Power will receive $97 million in annual transition payments over the next 14 years to compensate them for closing down their coal- ...
  118. [118]
    TransAlta Generation Partnership v. Alberta, 2024 SCC 37 | Paul Daly
    Nov 13, 2024 · TransAlta owns coal-fired electricity generation facilities in Alberta. Government policy in the province is to phase out coal-fired generation of electricity.
  119. [119]
    Wash. state's only coal plant fined $331,000 for pollution violations
    Jun 14, 2018 · (AP) - Regulators in Washington state have fined TransAlta more than $331,000 for alleged air pollution violations at its coal-fired power ...Missing: environmental | Show results with:environmental
  120. [120]
    TransAlta plans to appeal $331,000 emissions fines - The Columbian
    Jun 15, 2018 · The company was penalized for exceeding federal mercury emissions standards and failing to operate its air pollution control equipment at ...Missing: penalties | Show results with:penalties
  121. [121]
    Participants in TransAlta dispute need to clear the air - The Olympian
    Feb 10, 2011 · Ecology Department spokesman Seth Preston said the TransAlta plant contributes about 10 percent of the state's greenhouse-gas emissions, giving ...
  122. [122]
    Environmental Group, Quinault Tribe Oppose TransAlta Wastewater ...
    Jul 16, 2010 · A report of violations and warnings contained in the state report shows TransAlta violated Ecology's acceptable levels on a variety of chemicals ...Missing: disputes | Show results with:disputes
  123. [123]
    [PDF] Petition to Object to the Transalta Centralia Generation, LLC Coal ...
    The TransAlta Plant is emitting and/or permitted to emit and will emit, CO2 air contaminants that are detrimental to human health and welfare, and that are ...Missing: disputes controversies
  124. [124]
    Unlikely coalition unites over TransAlta - The Olympian
    Mar 16, 2011 · A January report by Environment Washington found that the TransAlta plant emitted about 360 pounds of mercury in 2009. One remaining point of ...Missing: disputes | Show results with:disputes
  125. [125]
    The Centralia Model: How to Shut A Coal Plant Without ... - Post Alley
    Aug 15, 2021 · Back in 2011, TransAlta came under pressure from environmentalists to close the coal plant, or significantly reduce its energy production from ...<|separator|>
  126. [126]
    TransAlta abandons Alberta carbon capture project | CBC News
    Apr 26, 2012 · TransAlta has pulled out of the provinces controversial carbon capture program claiming the economics are wrong.Missing: disputes | Show results with:disputes
  127. [127]
    Emission Cuts, Not Tax Cuts: SCC Rejects Coal Company's ...
    Feb 12, 2025 · The SCC disagreed with the lower courts and held that the Guidelines indeed discriminated against TransAlta and other parties to the off-coal ...
  128. [128]
    AUC finds TransAlta guilty of manipulating electricity market - Lexology
    Jul 28, 2015 · It argued that TransAlta's practices were substandard and in breach of its obligation to conduct itself in a manner that supports the fair, ...Missing: disputes | Show results with:disputes
  129. [129]
    AUC Approves $56 Million Payment From TransAlta For Price ...
    Nov 13, 2015 · The Alberta Utilities Commission (AUC) has now approved the payment of $56 million by TransAlta Corporation (TransAlta) as an appropriate sanction.
  130. [130]
    Supreme Court of Canada lowers the bar for striking down ...
    Nov 11, 2024 · Auer and TransAlta lower the bar that litigants must meet to challenge subordinate legislation, such as regulations, municipal bylaws, executive orders, and ...
  131. [131]
    Court of Appeal Upholds TransAlta's Favourable Force Majeure ...
    Jun 9, 2022 · The Court of Appeal upheld the Company's claim of force majeure that arose when its Keephills 1 generating unit tripped off-line in 2013.
  132. [132]
    TransAlta Corporation v Alberta (Utilities Commission), 2021 ABCA ...
    Jun 28, 2021 · TransAlta was engaged in another dispute with the Balancing Pool regarding the Balancing Pool's obligation to pay TransAlta the net book ...
  133. [133]
    TransAlta Corporation v Alberta (Environment and Parks), 2024 ...
    Apr 15, 2024 · TransAlta alleged that the Crown wrongly issued mineral leases in the vicinity of the Dam without ensuring that oil and gas production, including hydraulic ...
  134. [134]
    How TransAlta used a university-sanctioned research project ... - CBC
    Jul 24, 2018 · Energy giant TransAlta paid the University of Alberta $54000 to hand-pick one of its researchers to produce a study and other materials it ...Missing: concerns | Show results with:concerns
  135. [135]
    When Coal Companies Fund Public Health Research - The Narwhal
    The University of Alberta and TransAlta, a major Alberta utility company and coal producer, struck an agreement for the company to pay the university ...
  136. [136]
    Alberta Coal Utility Vetted U of A Research on Coal and Public Health
    May 29, 2018 · Kindzierski was aware of the outcome that TransAlta wanted from his research, which could facilitate bias in his research,” said professional ...
  137. [137]
    Fossil fuel industry influence in higher education: A review and a ...
    Sep 5, 2024 · The second case focused on the coal company TransAlta's funding of research by a public health professor at University of Alberta, Dr. Warren ...
  138. [138]
    Academic research should be funded by public tax dollars - CBC
    Jul 24, 2018 · The university said it stands by the research, and the Alberta government continues its coal phase-out, which includes TransAlta's operations.