Fact-checked by Grok 2 weeks ago

Calder Valley line

The Calder Valley line is a key railway route in , connecting the cities of and through the scenic Calder Valley in and , while also providing links to for certain services. Spanning approximately 50 miles, it serves as a vital Trans-Pennine corridor for both and freight traffic, running parallel to the and traversing historic towns and villages. Opened in sections between 1839 and 1841 by the and Railway, the line was constructed to facilitate industrial transport, particularly for textiles and in the burgeoning towns of the region. Key developments included the main valley route from Normanton to in 1840–1841, with extensions to by 1841, transforming local economies by linking isolated communities to major urban centers. A branch to was added in 1844, enhancing connectivity but initially leaving the town on a siding that contributed to its relative decline compared to nearby in the wool trade. As of November 2025, the line operates hourly services operated by , serving 15 stations including , New Pudsey, , Low Moor, , , , , , Walsden, Littleborough, Smithy Bridge, , Castleton, Mills Hill, and Victoria, with journey times from to averaging around 1 hour 20 minutes. It supports sustainable travel, tourism to heritage sites like the Grade I-listed in and , and local economic growth through the Calder Valley Line Community Rail Partnership, which promotes station enhancements and scenic walking routes. Recent upgrades include signaling improvements to boost capacity and reliability, along with the planned opening of Elland station expected in late 2026.

History

Construction and Opening

The construction of the Calder Valley line began in the late 1830s as part of the expanding network of early , primarily driven by the need to connect industrial centers in and . The core segment from to was initiated by the Manchester and Leeds Railway (M&LR), which obtained parliamentary approval in 1836 to build a 40-mile route paralleling the through the challenging Pennine terrain. Construction commenced in 1837, facing significant engineering obstacles including deep cuttings, embankments, and the navigation of narrow river valleys like the Calder and Roch. The most formidable challenge was the Summit Tunnel near , a 2,885-yard bore through solid rock at an elevation of 700 feet, which required simultaneous excavation from both ends using hand tools and ; work started in September 1838 and was completed in December 1840 after claiming 41 lives due to collapses and flooding. The tunnel opened to traffic on March 1, 1841, marking the line's full operational debut and establishing it as the world's longest railway tunnel at the time. Following the M&LR's absorption into the (L&YR) in 1847, extensions were rapidly developed to integrate the line with nearby textile hubs. The to section, approximately 9 miles long, was constructed by the L&YR amid steep gradients and canal alignments, opening on August 7, 1850, and providing direct access to 's growing mills. Further expansion came with the Copy Pit line, a 6.5-mile branch from to built by the L&YR through the rugged Cliviger Gorge; this single-track route demanded multiple short tunnels, viaducts such as the 100-foot-high Rose Grove structure, and gradients up to 1:100 to overcome the hilly landscape, opening on November 12, 1849. These additions enhanced connectivity across the , facilitating and transport alongside the existing infrastructure. To the east, the Leeds to Bradford segment was constructed independently by the Leeds and Bradford Railway, later incorporated into the Great Northern Railway (GNR) network, covering 9 miles through the Aire Valley with embankments and bridges over waterways. This line opened on July 1, 1846, linking directly to and bypassing longer routes via . Meanwhile, the London and North Western Railway (LNWR) developed the Huddersfield branch as a 20-mile extension from the main line at Heaton Lodge Junction to via , authorized in 1846 and opened in stages starting with a single track to on August 2, 1847, and completing to Manchester by August 1849; it featured viaducts like the 120-foot Standedge and tunnels to navigate the Valley's contours. These interconnected builds by the L&YR, GNR, and LNWR formed the foundational Calder Valley corridor by the mid-1850s, totaling over 80 miles of track despite the era's labor-intensive methods and geological hurdles.

Major Incidents and Closures

The Beeching Report of 1963 recommended widespread rationalization of the British railway network to address financial losses, leading to numerous station closures along the Calder Valley line in the 1960s. Stations such as Greetland, which had opened in 1844, were closed to passengers on 8 September 1962 as part of these cuts, reflecting the broader impact on local services in . Similarly, earlier post-war closures like Bradley station in February 1950 contributed to the line's diminishing passenger footprint, though these predated Beeching but aligned with ongoing network contractions. One of the most significant incidents on the line was the on 20 December 1984, caused by the of a carrying 13 petrol tankers due to an axle box failure, which led to spillage and ignition within the 1.6-mile tunnel near . The resulting blaze burned intensely for four days and smouldered for several weeks, severely damaging the brick lining and necessitating an eight-month closure of the Manchester-Leeds section of the Calder Valley line. Repairs, including relining the tunnel with segments, exceeded £1 million and incorporated long-term safety enhancements such as improved , fire-resistant materials, and stricter protocols for hazardous goods transport to prevent future and fires. In 2013, ground movement caused distortion and partial collapse risks in Holme Tunnel, a 250-metre structure on the eastern extension near , prompting to implement major engineering works. The tunnel was closed from November 2013 to March 2014, with bus replacements serving passengers between and Manchester Road, while contractors stabilized the surrounding geology through grouting and relined the bore with sprayed and arches. The project, completed in 2014, cost £11.5 million and restored full operational capacity, addressing ongoing instability from the tunnel's 1840s construction era. The Beeching-era rationalization also resulted in the suspension of regular passenger services on the to section from 1970 to 2000, following the closure of key stations like in January 1970, leaving the route primarily for freight use. This 30-year gap severely limited connectivity between towns until services were reinstated in 2000 with the reopening of station and hourly trains, revitalizing the link as part of broader network recovery efforts.

Modern Reinstatements and Upgrades

In the early , efforts to reinstate closed sections of the Calder Valley line focused on restoring disrupted by mid-20th-century closures, enhancing regional links between , , and . Key projects addressed Beeching-era rationalizations, prioritizing direct services and capacity upgrades to support economic growth in underserved areas. A significant reinstatement was the Todmorden Curve, a 500-meter section connecting the Calder Valley line to the line near . Construction began in summer 2013 and completed in early 2015 at a cost of £10 million, funded by , Burnley Borough Council, and . The curve reopened on 17 May 2015, enabling direct passenger services from Victoria to Manchester Road for the first time since 1962, reducing journey times by up to 25 minutes and eliminating changes at or . This upgrade has supported hourly services and boosted local employment and tourism in East Lancashire. The section, closed to passengers in 1970, saw full service restoration in following campaigns by local rail groups. Services recommenced on 28 May with an hourly frequency between , , and , linking to and . Central to this was the rebuild of station, which had closed in 1970; the new facility included modern platforms and access improvements to integrate with the Calder Valley and lines. These enhancements improved cross-Pennine connectivity, addressing a 30-year gap in direct rail options. Low Moor station, between Bradford Interchange and Halifax, reopened on 2 April 2017 after closing on 14 June 1965, marking over 50 years without service. The £10.8 million project, funded by the , featured a new build with step-free access, parking for 250 vehicles, and facilities for hourly Calder Valley services to and . It serves as a park-and-ride hub near the M606 and M62, projecting over 500,000 annual passengers and easing congestion at . In 2021, undertook a major track renewal project in Summit Tunnel, replacing 3 km of track during a 9-day from 23 to 31 . This upgrade improved reliability and safety on the vital Trans-Pennine route. 's proposals, outlined in the Northern Route Utilisation Strategy, envisioned broader upgrades for the Calder Valley line, including additional peak-hour s (up to 2 trains per hour) between and , train lengthening to four cars on services like Wigan Wallgate to , and linespeed increases to 90 mph between and Smithy Bridge. Extensions to and were proposed to enhance interchanges, with a focus on doubling passenger traffic through capacity enhancements. While fully implemented elements include some introductions and the Todmorden Curve, broader frequency and electrification plans remain partially realized, supporting 45-55% demand growth projected to 2024.

Route Description

Leeds to Bradford Interchange

The Leeds to Bradford Interchange section forms the northern terminus of the Calder Valley line, extending approximately 8 miles (13 km) westward from city center through urban landscapes of . This double-track route, designed for both passenger and freight traffic, navigates the relatively flat topography of the lower Aire Valley, with engineering features including embankments and bridges to cross local waterways and roads. The line's construction addressed the need for direct connectivity between the industrial centers of and , facilitating the transport of goods like and during the mid-19th century. Key stations along this segment include , the busiest hub in the region serving as the line's starting point; New Pudsey, which provides access to the suburban areas of and ; and , a major multimodal transport node in city center integrating rail, bus, and coach services. Bramley station, located between and New Pudsey, reopened in 2016 to enhance local connectivity for residents in the densely populated area. The route's urban character means it passes through built-up neighborhoods, with limited rural scenery until approaching . Originally developed as part of the , and Junction Railway, authorized in 1854 and opened on 1 January 1856, this line provided a more direct alternative to earlier routes via Shipley. It was absorbed into the in 1876 and later the London, Midland and Scottish Railway in 1923, before nationalization in 1948. The segment was formally designated as part of the Calder Valley line in the 1980s as part of British Rail's efforts to rebrand and promote regional routes for improved passenger awareness and service integration.

Bradford to Halifax

The segment of the Calder Valley line from to covers approximately 8 miles, navigating through the industrial valleys of and initially following the course of the River Aire before entering the steeper terrain of the area. This stretch presents notable engineering challenges due to the undulating landscape, with the route departing from the urban confines of and ascending through former mill towns and rural pockets shaped by the region's heritage. Key stations along this portion include , serving as the eastern terminus for many services, the reopened Low Moor station, and . Low Moor station, located about 2 miles from , was reconstructed and reopened on 2 2017 after over five decades of closure, enhancing connectivity for residents in the Wyke and Low Moor areas with modern facilities including step-free access. The line's path integrates with regional infrastructure, passing beneath the viaduct near Low Moor, which underscores its role in supporting trans-Pennine transport links alongside road networks. The terrain demands steep gradients, particularly the 1 in 70 rise immediately west of , testing locomotive performance and contributing to journey times on this curving alignment. Multiple bridges span the valleys and waterways of , including structures over the River Calder and local roads, built to accommodate the line's 19th-century construction through narrow, flood-prone corridors. In the Wyke area, midway along the route, historical freight sidings—once vital for serving nearby industries like quarrying and —have been significantly reduced since the mid-20th century, reflecting the shift away from heavy goods traffic toward passenger-focused operations.

Halifax to Huddersfield

The Halifax to Huddersfield section forms the eastern branch of the Calder Valley line, serving as a diversionary route that parallels the main TransPennine line through the Colne Valley in . This 8-mile segment connects , acting as a key junction from the Bradford direction, to via intermediate stations at and Deighton. Originally opened in the as part of the network, the line saw declining passenger services in the mid-20th century, leading to its to regular passenger traffic on 3 January 1970. Freight operations continued sporadically, but the route fell into disuse for most passenger purposes until its reopening on 28 May 2000, when short sections of track were relaid to restore connectivity for diversions. The reopening included the reconstruction of Brighouse station, which had been demolished after , providing a modern facility to support revived services. Today, the route primarily handles freight traffic, including heavy goods trains that utilize its capacity for decarbonization efforts through potential electrification. Passenger services are occasional, consisting of shuttle operations between Halifax, Brighouse, Deighton, and Huddersfield, often hourly during peak periods or as diversions when the main TransPennine line is disrupted. Deighton station sees limited calls, mainly by Huddersfield line services, while Huddersfield serves as the eastern terminus with connections to Leeds and beyond. Significant infrastructure upgrades have enhanced the route's resilience and capacity for diversions, as part of the broader , enabling the addition of up to two extra trains per hour on the section during disruptions. The line features a mix of single- and double-track configurations, optimized for freight and intermittent passenger flows without major capacity constraints.

Halifax to Manchester

The to Manchester section of the Calder Valley line spans approximately 37 kilometres (23 miles) as a double-track route, traversing the Pennine foothills and closely paralleling the River Calder and the for much of its length. Departing from , the line descends through the before climbing steadily westward, navigating the challenging terrain that connects to . This trans-Pennine segment serves as a vital east-west corridor, facilitating both passenger and freight movements while offering passengers views of industrial heritage sites, moorland landscapes, and canal-side scenery. Key stations along this stretch include , , , , Walsden, Littleborough, Smithy Bridge, , Castleton, and Mills Hill, before terminating at Manchester Victoria or Oxford Road depending on the service. These stops reflect the line's role in serving densely populated mill towns and suburban areas, with many stations featuring heritage architecture from the . The route's infrastructure supports frequent local and regional trains operated by Northern, connecting communities in and . Engineering challenges define this portion, including Pennine gradients reaching 1 in 100 in several sections, which test locomotive performance and require careful operational management. The most notable feature is the Summit Tunnel, a 2.6-kilometre horseshoe-shaped bore completed in 1841, carrying the tracks beneath the Pennine ridge at the line's highest point. At , a 300-metre curve branch, reinstated in 2015 after decades of disuse, links the main line to the route toward Burnley Manchester Road, enabling direct services northward without reversal and improving connectivity for East Lancashire. The Summit Tunnel was notably closed following a major in 1984, which damaged its structure and prompted extensive repairs. Ongoing proposals include of this section to enhance capacity and reduce emissions.

Extension to Blackpool via Burnley and Preston

The extension from Todmorden to North forms a northern spur of the Calder Valley line, adding approximately 50 miles through via the Copy Pit line and the East Lancashire line. This route diverges at Todmorden and heads northwest, providing access to industrial towns and the coastal resort of , historically supporting both local passenger traffic and leisure excursions to the Fylde Coast. Construction occurred in stages during the mid-19th century, primarily by the and its predecessors. The Copy Pit line from to Manchester Road opened on 12 1849 as a single-track branch of the Manchester and Leeds Railway, spanning about 12 miles with a at 749 feet ; it was doubled by 1860. The East Lancashire line segments followed: Accrington to on 19 June 1848, to Accrington on 18 September 1848, and to on 1 June 1846, completing the core linkage from to over roughly 18 miles. The Blackpool North branch from opened in 1846 by the Preston and Wyre Railway, extending 17.5 miles via Kirkham and to serve the growing seaside resort. These lines facilitated cotton industry transport and seasonal holiday services, with excursions prominent from the 1860s onward. Key stations along the extension include Burnley Manchester Road (opened 1849, reopened 1986 after closure in 1961), Accrington (1848), Blackburn (1848, a major interchange), Preston (1848 on this line, serving as a West Coast Main Line hub), and Blackpool North (1846). The route connects at Rose Grove near Burnley to the East Lancashire line, which continues southeast to Accrington and Blackburn before turning west to Preston. Engineering features highlight the challenging Pennine terrain, particularly on the Copy Pit line, which climbs through Cliviger Gorge with gradients exceeding 1 in 70 for over half its length, including the 290-yard Kitson Wood Tunnel and the 13-arch . From , the East Lancashire line features the 19-arch (60 feet high, built 1847) and runs partly parallel to the in the and areas. The Preston to segment, now double-track after historical quadrupling, includes the coastal plain with minimal gradients. The entire extension remains non-electrified, operating as a two-track route for regional services.

Infrastructure

Tunnels and Engineering Features

The Calder Valley line features several notable tunnels constructed during the , reflecting the engineering demands of navigating the terrain. The most prominent is Summit Tunnel, located between Littleborough and Walsden, which was built between 1838 and 1841 by the Manchester and Leeds Railway to provide a direct route beneath the . Measuring 2,885 yards (2,638 m) in length, it was lined with approximately 23 million bricks and included 14 ventilation shafts to manage air quality and temperature extremes within its single horseshoe-shaped bore. In 2021, completed a major upgrade replacing more than 3 km of track inside the tunnel to improve reliability and capacity. The tunnel sustained significant damage from a major fire in December 1984 involving a of a petroleum train, leading to extensive repairs that closed the line for eight months and involved relining sections with fire-resistant materials. Holme Tunnel, situated between Hebden Bridge and Burnley Manchester Road on the Copy Pit line, underwent major structural repairs from November 2013 to March 2014 after severe water ingress distorted its walls due to ground movement. Spanning 250 meters, the work included realigning and strengthening the tunnel lining with over 3,000 tonnes of concrete, 400 tonnes of steelwork, and the relaying of 2.6 km of track, ensuring long-term stability for freight and passenger services. Other key tunnels include Bowling Tunnel south of , completed in 1850 and extending 1,648 yards on a north-south alignment with a falling gradient, which facilitated the integration of the line with local branches. The line also incorporates challenging inclines, such as the Copy Pit section between and , where gradients reach 1 in 100 over extended distances of more than three miles, demanding powerful locomotives for both passenger and heavy freight operations through the narrow valley. Viaducts over the River Calder represent additional feats of Victorian engineering, with near standing as a prime example; constructed in 1851 as part of the to branch, its 23 tall arches span the valley floor, contributing to the high construction costs alongside associated tunnels. These structures highlight the era's reliance on brick and stone masonry to bridge steep terrain. Ongoing engineering challenges stem from the aging Victorian brickwork in the tunnels, which varies in thickness and has required periodic reinforcements to withstand modern loads and environmental stresses. For instance, recent upgrades on the line, including a 2022 replacement of a 172-year-old footbridge in , have incorporated taller, slimmer designs to accommodate overhead wires as part of the , preserving structural integrity while enabling greener operations.

Stations and Closures

The Calder Valley line features several key stations serving major urban centers and rural communities across , , and . Principal stations include , a major interchange hub with extensive facilities including step-free access, ticket offices, and connections to multiple national routes; , offering integrated bus and rail services with modern amenities like s and accessibility features; and , equipped with step-free platforms, a staffed ticket office, and nearby retail options. Further along, provides scenic platform views and basic facilities including shelters and cycle storage, while serves as a border station with parking, a , and connections to local buses. offers comprehensive services with step-free access, a cafe, and links to the Metrolink system, and Victoria features major interchange capabilities with step-free access across all platforms, shops, and onward connections. On the extension to via the Copy Pit line and beyond, key stops include Burnley Manchester Road with basic shelters and parking; , a significant junction with step-free access, ticket facilities, and bus links; , providing extensive amenities including a large car park, step-free access, and high-speed connections; and North, the terminus with full accessibility, retail outlets, and proximity to the promenade. Historically, the line has seen numerous station closures, particularly following the Beeching Report of 1963, with approximately 20 stations shuttered post-1963 as part of rationalization efforts to reduce unprofitable services. Notable examples include Greetland, which closed to passengers on 8 September 1962 amid declining usage; Elland, shuttered on 10 September 1962 with goods traffic ending earlier that year; , closed in 1950 prior to Beeching but emblematic of earlier rationalizations; and Eastwood, which ceased passenger operations on 3 December 1951, with full closure in 1964. These closures, often driven by low patronage and operational costs, affected smaller halts and intermediate stops along the route. The closures have had lasting impacts on local connectivity, particularly in where the loss of stations like Greetland and Elland reduced direct rail access for rural communities, forcing reliance on buses or longer journeys to or . This diminished transport options in the , contributing to in some areas despite the survival of the main line. However, some reopenings have mitigated these effects, such as Kirkstall Forge near , which resumed operations on 19 June 2016 to serve a new commercial development with modern facilities including step-free access. Similarly, Low Moor reopened in 2016 as part of broader reinstatements, while Elland remains pending with a projected opening in late 2026.

Track and Signaling

The Calder Valley line is built to standard gauge of 1,435 mm (4 ft 8½ in), consistent with the British railway network. The route is predominantly double track, facilitating bidirectional traffic flow, though it includes some single-track sections, such as between and Bradley Wood, which require token working or similar single-line procedures to manage train movements. These configurations support both and freight services, with the double-track layout enabling reliable capacity despite the line's challenging terrain. The line currently lacks and relies entirely on -powered for operations. However, modifications in select areas, including structural strengthening and clearance adjustments, have prepared portions of the route for future installation of 25 kV AC equipment as part of broader initiatives. This diesel-only status contributes to higher operational emissions compared to electrified routes but aligns with the line's role as a key diesel corridor until upgrades proceed. Signaling on the Calder Valley line employs a combination of absolute block and block systems, utilizing color-light signals for train control and protection. Traditional signals have largely been phased out, with ongoing upgrades focusing on modernizing signaling systems for enhanced safety and capacity. These systems ensure absolute blocking in single-line sections and maintain safe headways across the double-track portions. Permitted line speeds reach a maximum of 75 on straighter sections, but are frequently reduced to 60 or lower due to sharp curves, steep gradients—such as the 1-in-100 rises near Copy Pit—and legacy constraints. These limitations prioritize safety on the undulating Pennine terrain while allowing for efficient freight and passenger transit; aspirations for speed enhancements to 90 are tied to track renewals and signaling improvements.

Operations

Current Services and Operators

The primary operator of passenger services on the Calder Valley line is , a publicly owned under the Department for Transport's , which has managed most local and regional services since taking over the Northern franchise in March 2020. Northern provides the bulk of daily operations, including key routes such as to via , , and , as well as extensions to introduced in 2019 using the line's infrastructure. Grand Central, an , runs a limited number of services on the northern section of the line, primarily its daily trains from King's Cross to Bradford Interchange, which traverse the to segment. , also publicly owned since May 2023, does not operate regular scheduled services on the line but frequently uses it as a diversionary route during engineering works on its primary TransPennine network, such as the ongoing , with additional calls at stations like and . Northern's fleet on the Calder Valley line primarily consists of Class 158 and Class 195 multiple units, with the latter introduced in to enhance comfort and reliability on longer routes like Leeds to . These two- and three-car units typically accommodate 100 to 170 passengers, supporting the line's role in regional connectivity.

Passenger Frequencies and Destinations

The primary passenger service on the Calder Valley line is an hourly all-stations train operated by Northern from to via , , , , , , Walsden, and , with a journey time of approximately 80 minutes (as per the timetable valid until 13 December 2025). During peak hours, this frequency increases to up to two trains per hour. A major timetable update is scheduled for 14 December 2025, expected to bring faster journeys and revised services. Local services from to Victoria via and the intermediate stations also run hourly, with some trains diverting via during disruptions or planned operations. Limited through services, typically 5–8 trains per day on weekdays, extend from to North via , the Copy Pit line through Road, , , and , taking around 2.5 hours end-to-end. Since 2019, approximately 20 daily services on weekdays have extended select trains to via and , providing connections from Calder Valley stations like and (as per the timetable valid until 13 December 2025). These patterns serve commuters traveling between and , as well as leisure passengers to coastal and rural destinations, with the line handling around 5 million journeys annually before the .

Freight and Diversionary Use

The Calder Valley line has historically served as a major freight artery in , transporting commodities such as , , and stone from local industries in the region during the 19th and early 20th centuries. traffic was particularly significant, with dedicated sidings and branches supporting the movement of fuel to mills and power stations along the route, contributing to the industrial prosperity of and surrounding areas. In contemporary operations, the line accommodates mixed traffic, including freight services that primarily involve aggregates and materials, with growing volumes driven by needs. Intermodal containers are routed via , though gauge constraints limit expansion, while the adjacent Copy Pit line facilitates occasional bulk movements such as remaining flows to legacy sites, albeit in declining quantities due to the shift toward renewables. Key operators include and Freightliner, which utilize the route for these services amid broader efforts to enhance rail's for sustainable logistics. The Calder Valley line plays a vital role as a diversionary route for the TransPennine main line, particularly during upgrades to the section as part of the (TRU). Improvements completed in 2023 strengthened infrastructure on the Calder Valley and related diversionary paths, enabling additional train paths—up to three extra per hour—to maintain service continuity while enhancing overall capacity for both passenger diversions and freight resilience. This secondary status positions the line as a reliable backup, supporting Network Rail's targets for 8.6% freight growth by 2029 without compromising its mixed-traffic operations.

Future Developments

Electrification Plans

The electrification of the Calder Valley line is a key priority for enhancing connectivity and supporting the UK's net-zero emissions target by 2050, with plans focusing on overhead line equipment at 25 kV AC to enable electric traction across the route. The Integrated Rail Plan for the North and Midlands, published in 2021, identifies the Leeds to Bradford section—approximately 16 km—as a committed upgrade, including full electrification to improve journey times and capacity between these cities, with construction anticipated to commence between 2025 and 2030 as part of broader West Yorkshire rail enhancements. This segment forms the initial phase of wider ambitions for the line, building on preparatory works for the adjacent Transpennine Route Upgrade, where electrification reached Huddersfield by 2022 to facilitate bi-modal operations. In May 2025, a proposed £15 billion plan for Yorkshire's railways outlined enhancements to the Calder Valley line, including , to support £20 billion in economic growth and 83,000 jobs over 10 years while integrating with . Further proposals target the to portion, outlined in the Transport Strategy 2040, which advocates for rail along this corridor to integrate with regional networks and boost cross-Pennine services. Local authorities, including Borough Council, have endorsed full line in their 2040 delivery plans, emphasizing its role in supporting housing growth and , with business cases advanced for potential early implementation by 2026 pending funding approval. In early 2025, inter-council agreements in and surrounding areas intensified lobbying efforts, aligning the project with developments to secure national prioritization. The Northern Sparks report by Transport for the North ranks the full Calder Valley line—encompassing routes from Leeds via Halifax to Manchester and Preston—as the top priority among 32 non-electrified lines in the region, citing strong economic benefits from reduced operating costs and increased freight capacity. However, implementation faces significant challenges, including an estimated cost exceeding £1 billion for the entire scheme, driven by the need for structural modifications to approximately 7 miles of tunnels, such as the 2.6 km Summit Tunnel between Todmorden and Littleborough, to achieve adequate electrical clearance for overhead wiring. These engineering hurdles, alongside integration with existing signaling and track infrastructure, underscore the project's complexity, yet its completion is projected to cut diesel dependency and align with decarbonization goals by enabling zero-emission electric services. In October 2025, Railfuture proposed prioritizing Calder Valley upgrades, including electrification, over building a new non-stop high-speed railway between Bradford and Huddersfield.

Station Reopenings and Extensions

One of the most advanced station reopening projects on the Calder Valley line is the new Elland station, which will serve the town closed to passengers since 1962. In September 2024, Keltbray Infrastructure Services was appointed as the main contractor by Council and the to oversee the final design and construction phases of the £25 million scheme. The station will feature two elevated platforms capable of accommodating six-car trains, along with lifts, ramps, stairs, a 116-space car park including charging points, and integration with enhanced walking and routes. Although initially targeted for late 2026, the opening has been delayed to 2028 due to project complexities and stakeholder requirements. Proposals for reopening other closed stations along the line remain at earlier stages. A for reinstating Greetland station, also shuttered in 1962 and located near Elland, has been discussed in local rail advocacy contexts but lacks formal advancement as of 2025. At , a 20-week refurbishment of the II-listed station building, completed in autumn 2025, incorporated modern heating, , , and to improve facilities, alongside earlier enhancements to and flood protection completed in 2021. Potential further developments, such as increased service frequencies to leverage the station's large car park capacity, are under consideration by transport authorities. Route extensions aim to enhance connectivity beyond the core Calder Valley corridor. Partial links to Chester and Liverpool were introduced in May 2019 with the launch of an hourly Leeds-Chester service via Halifax, operated by Transport for Wales using Class 195 diesel trains, providing direct access to these destinations for the first time in decades. Full integration with Northern Powerhouse Rail (NPR) plans, outlined in the 2021 Integrated Rail Plan, will upgrade conventional lines from Liverpool to Warrington Bank Quay and eastward through Manchester, enabling faster NPR services to interface with the electrified Calder Valley route and improve overall northern connectivity. Earlier proposals to extend Calder Valley services southward to Crewe, which would have linked to HS2 infrastructure, were scaled back or scrapped under the same 2021 plan in favor of prioritizing HS2's Crewe-Manchester leg. Community-led efforts through the Calder Valley Line Community Rail (CRP), formalized in its 2020 prospectus, focus on improvements to support reopenings and extensions. Initiatives include appointing a officer to form adoption groups, collaborating with groups for level upgrades, and promoting sustainable travel options like walking, cycling, and integrated information to reduce isolation and boost off-peak usage.

Capacity Enhancements

Efforts to enhance capacity on the Calder Valley line build on remnants of the programme, which aimed to increase connectivity across by targeting two trains per hour (2tph) between and . This includes proposals for passing loops at to allow faster services to overtake slower ones, thereby accommodating higher frequencies without major disruptions to existing operations. Integration with the () initiative emphasizes digital signalling upgrades to boost line capacity, potentially enabling up to 4tph by 2035 through improved train headways and reliability. The line is also serving as a key diversionary and testing route for the 2025 , where enhanced infrastructure handled additional services, including three trains per hour diverted via and during closures in summer 2025. Between 2023 and 2025, reinforcement works have focused on strengthening bridges and tracks along the route to support heavier electric trains, ensuring the infrastructure can withstand increased loads as advances. Complementing these -specific improvements, the (WYCA) is advancing bus- integration measures, such as coordinated timetables and multi-modal ticketing, to optimize overall network capacity and reduce reliance on alone during peak periods. These capacity enhancements are projected to reduce end-to-end journey times by 10–15 minutes on key sections, such as upper to , while supporting up to 20% growth in passenger volumes through more reliable and frequent services.

References

  1. [1]
    The Calder Valley Line Community Rail Partnership | Rochdale ...
    The Calder Valley Line offers a direct route to many different leisure and tourism opportunities and links us to Manchester and Leeds city centres. The Calder ...
  2. [2]
    Calder Valley Line CRP: Home
    The Calder Valley line runs parallel with the Rochdale Canal where you can walk from station to station and take in some fabulous scenery. Explore, Discover and ...Missing: UK | Show results with:UK
  3. [3]
    Railways in Calderdale: Historical themes: From weaver to web
    The Manchester and Leeds Railway, which came to be built through the Calder Valley in 1841, ran through Todmorden, Hebden Bridge and Sowerby Bridge.
  4. [4]
    Calder Valley Line - Scenic Rail Britain
    History & heritage. Travel back in time as you explore the historic villages of Heptonstall, Mytholmroyd and Hebden Bridge. · Seen on TV. You may recognise the ...
  5. [5]
    Summit Tunnel Celebrates 175 Years - Community Rail Lancashire
    175 years ago on 1 st March 1841 the Summit Tunnel was opened and celebrations took place at Littleborough earlier this week on 1 st March 2016 to mark the ...
  6. [6]
    Summit Tunnel - LYR00285 - Pennine Horizons Digital Archive
    At the time of its completion in December 1840 at 2885 yards (2663m) it was the longest railway tunnel in the world, but still well short of Standedge canal ...
  7. [7]
    How the first railway line to connect Lancashire to Yorkshire was built
    Feb 23, 2025 · The first railway to link Manchester and Leeds was completed by 1841.
  8. [8]
    Manchester and Leeds Railway - Huddersfield Exposed
    Sep 1, 2023 · Constructed by the Manchester & Leeds Railway Company (M&LR) between 1836 and 1841, the Manchester & Leeds Railway was the first railway line to link ...
  9. [9]
    Copy Pit Route history - Disused Stations
    Sep 28, 2016 · The railway route between Rose Grove, on the line from Preston to Colne, and Todmorden was seen as an offshoot of the Manchester & Leeds (Calder Valley) ...
  10. [10]
    Taking the Todmorden Curve - Northern Life Magazine
    Aug 29, 2015 · The following year he was sacked and the rail company decided to finish the work themselves with the single track line operating in 1849 and the ...<|separator|>
  11. [11]
    The Coming of the Railways
    Nov 25, 2024 · The Leeds & Bradford Railway was finally formed in 1843 and it opened a station in 1846 when the line first became operational. The route from ...
  12. [12]
    Huddersfield and Manchester Railway
    Feb 6, 2025 · A single-track line between Huddersfield and Heaton Lodge Junction (near Colne Bridge) was opened on 2 August 1847, following a favourable ...
  13. [13]
    The Reshaping of British Railways - Part 1: Report
    The 'Beeching Report' is one of the most notorious government reports of the 20th century. The failure of the modernisation plan to stem BR's losses led the ...
  14. [14]
    Report on the Derailment and Fire that occurred on 20th December ...
    The report into the derailment of a petroleum train in Summit tunnel, and the fire that broke out due to spillage of the train load.
  15. [15]
    Remembering the Summit Tunnel Fire 40 years on - Halifax Courier
    Dec 20, 2024 · But half way through the tunnel, at about 5.50am, a roller bearing in the forward axle of the fourth tanker failed, causing the axle to break.Missing: impact | Show results with:impact
  16. [16]
    Summit Tunnel: from fire to ice | Investigations - Rail Magazine
    Mar 30, 2016 · Opened on March 1 1841, the completion of Summit Tunnel overcame the final construction hurdle on the UK's first trans-Pennine route: the ...Missing: Lancashire | Show results with:Lancashire
  17. [17]
    Tunnel repairs: reinstating the line | Ground Engineering
    Long-term ground movements had led to distortion of a Victorian-era rail tunnel in Lancashire to the extent that Network Rail had been forced to ...
  18. [18]
    Burnley and Todmorden rail users urged to find out more about ...
    May 3, 2013 · The main tunnel blockade will run from Saturday 9 November 2013 to Sunday 30 March 2014, during which time a replacement bus service will ...Missing: Valley collapse
  19. [19]
    There's no place like Holme | Major projects - Rail Magazine
    Dec 10, 2014 · The main part of this began in May 2013, to stabilise the ground surrounding the tunnel. AMCO drilled through the existing tunnel lining in ...Missing: Valley collapse
  20. [20]
    A look at the Calder valley railway. - Paul Bigland
    Dec 27, 2021 · Manchester to Littleborough, on July 4th, 1839, from Hebden Bridge to Normanton, on October 5th, 1840 and from Littleborough to Hebden Bridge ...Missing: UK | Show results with:UK
  21. [21]
    Brighouse railway station - Wikipedia
    Opened in 1840, and closed in 1970, it reopened in 2000 and is served by Northern Trains, TransPennine Express and Grand Central services. Brighouse. National ...
  22. [22]
    [PDF] 2000 Annual Reconciliation Statement - Network Rail
    services between Halifax and Huddersfield. These services began in May 2000. • Wharfedale and Airedale - Route works and platform extensions were being ...
  23. [23]
    [PDF] Northern Route Utilisation Strategy Draft for Consultation
    The draft Northern Route Utilisation. Strategy (RUS) sets out the priorities for rail investment in the north of England for the next 20 years. We believe that.
  24. [24]
    Todmorden Curve reopens after £10m railway investment
    May 18, 2015 · A key new section of railway in the north west of England has reopened providing a direct link between Manchester and Burnley for the first time in over 40 ...Missing: Calder Valley
  25. [25]
    Todmorden Curve: Rail link reopens from Manchester to Burnley
    May 17, 2015 · Direct rail services between Manchester and Burnley have been reinstated. It follows the reopening of the 500m stretch known as the Todmorden Curve.Missing: Calder Valley
  26. [26]
    History of Brighouse Station
    Brighouse station reopened on Sunday 28 May 2000. It also serves the town of Elland some 2 miles (3 km) away. Plans for a station in Elland to open at the same ...
  27. [27]
    Tale of three stations (going on four) and wider view along line
    Jun 5, 2025 · The line had closed to regular passenger trains in 1970, but ... The “main” Calder Valley line runs west from Brighouse. The “Hebble ...
  28. [28]
    New £10.8m railway station opens in Bradford - BBC News
    Apr 2, 2017 · A new £10.8m railway station has opened to the south of Bradford. Low Moor, on the Calder Valley line, has hourly services between Bradford ...
  29. [29]
    Low Moor station opens - Global Railway Review
    Apr 4, 2017 · Leeds City Region is celebrating the opening of an unprecedented third new rail station in 14 months - the Low Moor station.
  30. [30]
    [PDF] Report on Northern Hub - Network Rail Manchester Piccadilly and ...
    Oct 29, 2014 · • New direct services from the Calder Valley and Rochdale to Manchester. Airport. • Faster journey times to Hull, Newcastle and the North East.
  31. [31]
    Trains Leeds to Bradford Interchange from £2.20 | Trainline
    Starting from £2.20The train ride from Leeds to Bradford Interchange covers a distance of around 8 miles (13 km). The quickest journeys on this route can take 16 minutes. Can ...Missing: Calder Valley
  32. [32]
    [PDF] West Yorkshire Connectivity Plan - Calder Valley and Bradford
    • The Calder Valley line: Leeds via New Pudsey to Bradford Interchange ... Settlement with a proposed rail station, approximately 17 hectares of employment.
  33. [33]
    Train timetables - Leeds - WY Metro
    Northern Rail Timetables. Calder Valley Line, 36, Leeds - Bramley - New Pudsey - Bradford Interchange - Halifax - Brighouse - Sowerby Bridge - Mytholmroyd ...Missing: list | Show results with:list
  34. [34]
    New Pudsey Station | Train Times - Northern Rail
    New Pudsey train station - view station facilities, live departures, latest timetable or book your train ticket to or from New Pudsey station directly at ...
  35. [35]
    Bramley Station's long and rich history - West Leeds Dispatch
    Oct 29, 2019 · The railway was first mooted in 1846 by businessmen who wanted better links from the West Riding to both coasts. The wool merchants looked to ...Missing: integration | Show results with:integration
  36. [36]
    Bradford's through railway schemes
    The opening of the Leeds & Bradford Railway took place on 1 July 1846 - an auspicious day for Bradford. Sixteen years had elapsed since the first attempt to ...
  37. [37]
    Bradford Interchange to Halifax - 5 ways to travel via train, and line ...
    The distance between Bradford Interchange and Halifax is 8 miles. The road ... Northern Trains Limited operates a train from Bradford Interchange to Halifax ...
  38. [38]
    Stations: what happened in CP5 and what's happening in CP6?
    Jan 9, 2018 · A third West Yorkshire station, Low Moor on the Calder Valley line between Bradford and Halifax, opened on 2 April 2017. And that's still ...
  39. [39]
    Category:Calder Valley Line - Wikimedia Commons
    Aug 5, 2020 · English: The Calder Valley Line (formerly Caldervale Line) is a railway route in Northern England between the cities of Leeds and Manchester ...
  40. [40]
    Bradford avoiding line - narkive
    indeed rather steep - the ruling gradient is 1 in 59. Towards Halifax is a little easier (1 in 70 IIRC), but still quite challenging. As for the lack of a ...
  41. [41]
    Calder Valley line to keep passengers on the Transpennine Route ...
    The Calder Valley line will be used to keep trains moving during bridge work in Huddersfield, with most trains going via Brighouse and buses as replacements.Missing: 2000 | Show results with:2000
  42. [42]
    Distance from Halifax to Huddersfield - DistanceFrom.co.uk
    The distance from Halifax to Huddersfield is 12 km (or 8 mi). The estimated driving time for the trip is 14min and the main road for this route is the ...
  43. [43]
    Deighton Station | Trains to Deighton & Times - Northern Rail
    Deighton train station - view station facilities, live departures, latest timetable or book your train ticket to or from Deighton station directly at ...
  44. [44]
    Brighouse railway station to get a significant upgrade
    Nov 25, 2024 · Mr Sumner said the work at Brighouse “needs to be done before the first blockade” in August/September 2025 and was likely to include platform ...Missing: source | Show results with:source
  45. [45]
    [PDF] Written evidence submitted by the Halifax and District Rail Action ...
    We began in 1985 and campaigned for reopening of the lines through Elland and Brighouse, seeing success in 2000 with opening of. Brighouse station, and we ...
  46. [46]
    [PDF] Developing the Calder Valley Line timetable beyond 2019
    b) Bradford-Halifax-Huddersfield shuttle. December 2019 timetable requires 2 train diagrams to operate short-distance hourly service (journey time 35 minutes ...
  47. [47]
    Trains Halifax to Manchester from $3.01 | Get Times & Cheap Tickets
    Starting from $3.01It takes an average of 49m to travel from Halifax to Manchester by train, over a distance of around 23 miles (37 km). There are normally 92 trains per day ...
  48. [48]
    The East Lancashire Line | Railways Illustrated Magazine
    Sep 27, 2022 · The East Lancashire Line runs for just over 29 miles from the City of Preston to its current terminus at the former cotton mill town of Colne.Missing: extension | Show results with:extension
  49. [49]
    [PDF] LNW Route Specification 2017 - Network Rail
    The Todmorden Curve scheme provides new junctions, track and associated infrastructure to connect the Calder Valley line with the. 'Roses Line'. The re ...
  50. [50]
    Past & Present - Trains to Blackpool - Preston Station
    Much of the line was quadrupled during this period and as many as 6 lines were in use on the approaches to Preston. In the Cotty Brook area of Preston for ...
  51. [51]
    180 years of history: one of the world's oldest railway tunnels gets a ...
    Nov 18, 2021 · Summit Tunnel, located near Todmorden Yorkshire, is one of the world's oldest railway tunnels. Constructed between 1838 and 1841 by the ...Missing: Lancashire | Show results with:Lancashire
  52. [52]
    Calder Valley Rail Line (Gauge & Length of Tunnels)
    May 10, 2018 · I would like to request information as to the Gauge & Length of the following railway tunnels… between Leeds & Manchester via Bradford...
  53. [53]
    [PDF] Rail Accident Report - GOV.UK
    Sep 3, 2011 · For further details see Department for Transport report 'Report on the Derailment and Fire that occurred on 20th December 1984 at Summit Tunnel' ...Missing: Calder Valley
  54. [54]
    Holme Tunnel due to reopen following repairs - BBC News
    Mar 23, 2014 · A railway line in West Yorkshire, which was closed for four months to repair a tunnel, is due to reopen.
  55. [55]
    Vital rail tunnel reopens after feat of engineering delivers ...
    Mar 24, 2014 · Repairs which saw more than 3000 tonnes of concrete used to strengthen a vital rail tunnel in the north west of England have been completed.Missing: cost | Show results with:cost
  56. [56]
    [PDF] NETWORK RAIL - Amazon AWS
    Aug 7, 2004 · Bowling Tunnel. 38 18* to. (1507 m / 1648 yards) ... maximum speed of 20mph for the full length of the tunnel, without the requirement to be.
  57. [57]
    Copley Viaduct - Heritage Locations - National Transport Trust
    The line from Sowerby Bridge suffered from the high cost of the engineering works including two tunnels of over 1 km. and the Copley viaduct. This viaduct ...Missing: Valley | Show results with:Valley
  58. [58]
    172-year-old bridge replaced in Huddersfield for Transpennine ...
    Aug 19, 2022 · A 172-year-old footbridge has been replaced with a thinner and taller bridge to make way for electrification of the railway beneath it.Missing: challenges Victorian brickwork reinforcements
  59. [59]
    [PDF] Train times - Community Rail Lancashire
    May 18, 2025 · Leeds to Manchester Victoria via Bradford Interchange. Page 2. This timetable shows all our services on the Calder Valley. TransPennine ...
  60. [60]
    Greetland Station. - NGH00119 - Pennine Horizons Digital Archive
    The down platform buildings following closure of the station in September 1962. Apart from the signal box seen here which survived until 2009 the station was ...
  61. [61]
    Elland Rail Station - Calderdale Next Chapter
    “As we confirmed last November, the completion date for this scheme has been pushed back until late 2026 because of a variety of factors, including design ...
  62. [62]
    Bradley Station – open from 1847 to 1950 | North Huddersfield News
    May 7, 2012 · Bradley Station – open from 1847 to 1950. There may be some older people who remember getting on, or getting off, the train at the old Bradley ...
  63. [63]
    EASTWOOD (Yorks) - Disused Stations
    Aug 28, 2018 · Station Name: EASTWOOD (Yorks) ; Date closed to passengers: 3.12.1951 ; Date closed completely: 18.5.1964 ; Company on closing: British Railways ( ...
  64. [64]
    Elland Station – Halifax and District Rail Action Group - hadrag
    We are of course still waiting for Elland to open, latest estimate being Spring 2027 which looks realistic. So 27 years late and counting.
  65. [65]
    Kirkstall Forge Station | Train Times - Northern Rail
    Timetable for the routes on which Kirkstall Forge station is located. N40 - Skipton to Leeds and Bradford Forster Square (Airedale Line)
  66. [66]
    Calder Valley Rail Line Upgrade, West Yorkshire
    Apr 12, 2017 · The project will upgrade the tracks and signalling system of the line to reduce journey times and improve connectivity and commuter travel services.
  67. [67]
    Calder Valley sees latest launch of Northern's new trains
    Oct 18, 2019 · From Monday 21 October brand new trains will start to operate between Leeds and Chester via the Calder Valley.
  68. [68]
    Train Timetables | London, Yorkshire & North East - Grand Central
    From 14th December 2025, our new timetable will launch! Here's what's improving: Quicker journey times on some services on our North East route.
  69. [69]
    TPE customers set to be kept on the move during major TRU work ...
    Jul 11, 2025 · While Huddersfield station is closed, TPE will make full use of the upgraded Calder Valley route by diverting three trains per hour, making ...
  70. [70]
    New trains begin running on Chester to Leeds route - RailAdvent
    Oct 22, 2019 · Brand new trains from Northern are now running between Chester and Leeds. The Class 195 trains made their maiden journeys in customer service on the route ...
  71. [71]
    [PDF] Northern 36 (3up) 0525 61pp.indd
    May 18, 2025 · 36. Leeds to Manchester Victoria via Bradford Interchange. This timetable shows all our services on the Calder Valley. TransPennine Express.Missing: frequencies | Show results with:frequencies
  72. [72]
    [PDF] Train times - Northern Rail
    May 18, 2025 · This timetable shows the full schedule of our train services between Chester and. Leeds. Look down the left hand column for your departure.Missing: 36 Calder Valley frequencies
  73. [73]
    This is how many people used the seven train stations in Calderdale ...
    Dec 26, 2024 · There were four million recorded entries and exits across the seven stations in Calderdale in the year to March – down 11 per cent on 2020.
  74. [74]
    [PDF] Freight & Logistics Strategy - Transport for the North | TfN
    Calder Valley Line. (via Rochdale). Copy Pit Line (via Burnley). Hope Valley ... strong growth in intermodal and construction (including aggregates) traffic in ...
  75. [75]
    [PDF] North West and Central CP7 delivery plan - Network Rail
    Completed in 2023, Key Output 1 delivered improvement work on diversionary routes via Calder Valley, Healey Mills and Castleford, enabling three extra trains ...
  76. [76]
    [PDF] Decarbonising Transport: A Better, Greener Britain - GOV.UK
    In November, we announced that new diesel and petrol cars and vans would no longer be sold from 2030, and that all new cars and vans must be fully zero emission ...
  77. [77]
    [PDF] Integrated Rail Plan for the North and Midlands (web version)
    This line and Northern Powerhouse Rail (NPR) will allow direct high speed services from Birmingham to Leeds, taking 79–89 minutes8. NPR trains between Liverpool ...
  78. [78]
    [PDF] Freight Network Study April 2017
    Apr 2, 2017 · Network Rail is pleased to publish the Freight Network Study, which considers the future development of rail freight across the rail.
  79. [79]
    [PDF] Northern Sparks - Transport for the North | TfN
    The thirty-two lines of the Northern Rail and TransPennine Express franchise areas currently without electrification have all been considered and prioritised.
  80. [80]
    INV0076 - Evidence on Rail infrastructure investment
    This rebuild cost around £11.5 million and lasted for approximately 20 weeks. Beacon Hill tunnel, immediately North of Halifax station would have to be rebuilt ...
  81. [81]
    Major track upgrade complete on Calder Valley line's Summit Tunnel
    Nov 2, 2021 · Network Rail has replaced 3km of track between Littleborough and Walsden stations which includes the lines inside the 180-year-old Summit Tunnel.
  82. [82]
    Elland train station moves step closer after contractor appointed - BBC
    Sep 5, 2024 · The £25m railway station is Elland, which will be added to the Calder Valley line, is set to open in 2026. Keltbray Infrastructure Services ...Missing: reopening | Show results with:reopening
  83. [83]
    Keltbray appointed to take forward £25M Elland station project in ...
    Sep 11, 2024 · Keltbray Infrastructure Services has been appointed as main contractor on the £25M Elland station scheme by Calderdale Council and the West Yorkshire Combined ...Missing: reopening | Show results with:reopening<|separator|>
  84. [84]
    New Calderdale railway station will welcome six-car trains
    May 18, 2025 · Six-car trains will still be able to use a new £25m Calderdale railway station when it opens - despite the station only being able to fit five.Missing: capacity | Show results with:capacity
  85. [85]
    [PDF] EXPRESSION OF INTEREST Calder Valley Line: Elland Station ...
    Apr 19, 2017 · To facilitate future housing growth in Elland and western parts of Brighouse by reducing transport constraints to development – increasing the ...
  86. [86]
    Frustration over timeframe for long-awaited railway station
    Aug 7, 2025 · In the public question time at a meeting of the full Calderdale Council, Mark Ashton said the station was initially projected to open in 2024, ...<|separator|>
  87. [87]
    Work begins inside Mytholmroyd Station Building with refurbishment ...
    Apr 11, 2025 · Work is being done by West End Joiners and Builders with the refurbishment scheduled for 20 weeks.
  88. [88]
    Mytholmroyd Station upgrades sees increased parking and better ...
    Jan 20, 2021 · Mytholmroyd Station upgrades sees increased parking and better flood protection · Where Next? · Train fares to be altered in Greater Manchester.
  89. [89]
    Transport Committee - Wednesday, 22nd January, 2025 2.00 pm
    Improving service frequency at Mytholmroyd station on the Calder Valley Line and utilising the generous capacity of the station car park. The response of ...
  90. [90]
    [PDF] Written evidence submitted by Mr Chris Fox (IRP0001)
    It would also allow trains to/from Bradford (Calder Valley route) to access the station and continue south to the Airport, Crewe,. Liverpool etc. A third option ...Missing: scrapped | Show results with:scrapped<|separator|>
  91. [91]
    [PDF] CALDER VALLEY LINE COMMUNITY RAIL PARTNERSHIP ROUTE ...
    Dec 9, 2020 · The Calder Valley Line is mainly located in the Calderdale. Metropolitan Council area of West Yorkshire and the Rochdale. Borough Council area ...
  92. [92]
    [PDF] New Railway Stations in North and West Yorkshire Feasibility Study ...
    The Calder Valley Line includes 13 possible new station sites, which are shown in Figure 4-4. 4.21. Four of these lie in the section between Bradford and ...
  93. [93]
    Valley Loop: Don't get your hopes up! - hadrag
    Jul 8, 2022 · The loop will be east of and separate from the existing Hebden Bridge siding, which will be shortened. We understand the plan is for the new ...Missing: passing | Show results with:passing
  94. [94]
    [PDF] Digital Railway for Freight and National Passenger Operators
    Improved capacity and line speeds on the Calder Valley line. CP8 & beyond Capacity CP7. Gauge clearance to W12 of further routes for Yorkshire terminals ...Missing: configuration | Show results with:configuration
  95. [95]
    [PDF] West Yorkshire Combined Authority Rail Strategy
    The capacity released on existing lines - such as the Calder Valley Line, TransPennine West Line and Hallam Line - could have been used to improve both ...
  96. [96]
    [PDF] Developing the Calder Valley Line train service - hadrag
    Our understanding is that this will introduce modern signalling between Hebden Bridge and Bradford and in conjunction with Network Rail Calder Valley. Line West ...