Fact-checked by Grok 2 weeks ago

Copper Box Arena

The Copper Box Arena is a versatile multi-sport indoor venue located in the Queen Elizabeth Olympic Park in Stratford, , , designed and constructed specifically for the and Paralympics. Completed in early 2011 at a cost of approximately £43 million, it originally served as the primary site for preliminaries and the event of the during the Olympics, as well as events during the Paralympics, earning the nickname "the Box that Rocks" for its energetic atmosphere. With a maximum of 7,500 across upper and lower tiers, it ranks as the third-largest indoor arena in and features elements, including light pipes for natural illumination and rainwater collection systems that reduce energy and water usage by 40%. Originally named the Handball Arena, it was renamed the Copper Box Arena in 2012 to reflect its copper-colored exterior and broader post-Games utility, transitioning from infrastructure to a community and commercial hub managed by the charitable Better (formerly GLL) since 2013. Following the Olympics, the venue underwent reconfiguration to support diverse activities, including leagues, international tournaments, music concerts, competitions, corporate conferences, and in September 2025, partnered with for catering services, while integrating state-of-the-art fitness and gym facilities for public access. It currently serves as the home court for the British Basketball League's London Lions and the Netball Superleague's London Pulse, hosting their seasons and major matches, and has welcomed events like the London Grand Prix tournament and the Baller football series. The arena's adaptability—allowing configurations for audiences from 1,000 to 7,500 depending on the event—has solidified its role as one of the most flexible venues in the UK, contributing to the legacy of the Olympic Park by promoting grassroots sports participation alongside elite-level competitions and earning recognition, such as a at the 2024 Conference & Events Awards for versatility.

Overview

Location and access

The Copper Box Arena is located in the in Stratford, , at coordinates 51.5443°N 0.0199°W. It forms part of the park's legacy from the , situated adjacent to landmarks such as shopping centre and the Lee Navigation waterway. The arena's address is , E20 3HB. Visitors can access the arena primarily via , with being the main hub approximately 15 minutes' walk away. This station serves the Central, , and lines of the London Underground, as well as services and (DLR) connections. Additional nearby stations include Hackney Wick Overground (5-minute walk) and Stratford International (10-minute walk). Bus routes, notably the 388 service, run frequently from and stop directly outside the arena at stops M and N. facilities include over 140 bike racks and a docking station nearby, while pedestrian paths through the park provide scenic walking routes from stations. Driving is discouraged due to limited on-site parking (£2.20 per hour for non-members, maximum £35.20 daily), with visitors encouraged to use sustainable options; Blue Badge holders can access free parking upon registration, and larger facilities are available at . The arena and surrounding emphasize , offering step-free via lifts and hard-standing surfaces throughout the venue and pathways. spaces are available in accessible seating areas, with dedicated changing rooms and restrooms provided; event organizers should be contacted for specific arrangements. Proximity to amenities, including Blue Badge parking and shuttle services from , further supports inclusive for all visitors.

Architecture and design

The Copper Box Arena was designed by a of firms led by Populous, with contributions from MAKE Architects, PTW Architects, and Arup as structural engineers. Its exterior features a distinctive copper-clad facade covering 3,000 square meters, primarily sourced from recycled materials, which provides natural weather resistance through patination while creating a visually striking "box" form that stands out in the surrounding landscape. Internally, the arena employs a highly flexible layout to accommodate diverse sports and events, including retractable seating that can be adjusted to seat up to 7,500 spectators and a modular, pillar-free floor area of 2,712 square meters for versatile configurations such as courts or setups. Sustainability is integral to the design, earning a Excellent rating through features like 88 roof-mounted light pipes for natural , rainwater systems, and overall reductions in energy and water use by 40 percent compared to conventional venues. The structure's simple, box-like profile with colorful interior accents and open concourses enhances user flow and aesthetic appeal, integrating seamlessly with the Queen Elizabeth Olympic Park's green spaces.

Construction and development

Planning and funding

The planning for the Copper Box Arena originated as part of London's successful bid to host the , where it was designated as the Arena within the broader Park masterplan for Stratford in . This masterplan, outlined in the Olympic Delivery Authority's (ODA) comprehensive 2007 document, positioned the arena as one of three indoor venues to support preliminaries, quarter-finals, and elements of , while integrating it into a parkland setting for long-term urban regeneration. The ODA served as the primary authority under the London and Act 2006, ensuring alignment with the bid's vision for sustainable, multi-use facilities. Funding for the arena was allocated from the overall Public Sector Funding Package (PSFP) for the London 2012 Games, with a total construction cost of £41 million. This budget formed part of the ODA's £6.714 billion anticipated final cost for venue development, drawn primarily from central government contributions (£6.25 billion total PSFP), the National Lottery (£2.18 billion), and the /London Development Agency (£0.88 billion). From the outset, financial planning emphasized viability, incorporating flexible design elements like retractable seating to enable post-Games adaptation for community sports, cultural events, and business use, thereby minimizing long-term public expenditure. Key stakeholders in the planning phase included the ODA, which oversaw design, procurement, and delivery in collaboration with its delivery partner CLM (comprising CH2M Hill, Laing O'Rourke, and Mace), and early involvement from the London Organising Committee of the Olympic and Paralympic Games (LOCOG) for event integration. Sustainability targets were embedded from the bid stage, with the ODA mandating features such as 88 rooftop light pipes for natural illumination (achieving up to 40% energy savings) and cladding using high-recycled-content copper, aligning with broader environmental goals for the Olympic Park to reduce carbon emissions and promote resource efficiency. These measures were approved under the ODA's Sustainable Development Strategy, ensuring the arena's design supported both Games-time operations and enduring legacy benefits.

Construction timeline

Construction of the Copper Box Arena, originally known as the Handball Arena, began in July 2009, two months ahead of the initial schedule set by the Olympic Delivery Authority (ODA). The project was undertaken by main contractor Contracting Ltd., with a total construction cost of £41 million funded through the ODA's Olympic Park budget. Over the subsequent 20 months, the build progressed rapidly to meet the stringent deadlines imposed by the , incorporating elements for the raker beams and fin walls to address the venue's challenging geometry and ensure structural efficiency. Key milestones during the construction phase included the installation of the distinctive cladding, comprising 3,000 square meters of mostly recycled sourced sustainably, which was completed as part of the overall structural finishing in 2011. The retractable seating system, designed to accommodate varying event configurations with a capacity of up to 7,000 for use, was also installed during this period, allowing for flexible floor space adjustments. A significant challenge was integrating the arena with the broader infrastructure, including utilities and transport links, while adhering to the tight timeline that demanded completion well in advance of the Games to allow for testing and commissioning. The venue reached substantial completion in May 2011, enabling a soft opening for initial testing events. This included a successful test match for in April 2011, which verified the arena's operational readiness for sports like , , and . Further refinements and systems integration continued through 2011, culminating in full operational readiness by July 2012, just prior to the start of the events. The modular precast approach and early start helped mitigate delays, ensuring the arena was handed over on time despite the complexities of coordinating with multiple developments.

2012 Olympic and Paralympic Games

Olympic events hosted

During the , the Copper Box Arena served as a primary venue for the competitions and specific phases of the , accommodating up to 7,000 spectators in its configured setup. The arena featured temporary adaptations, including a court with surrounding seating and pistes installed for the events, allowing for efficient reconfiguration between disciplines while maintaining an intimate atmosphere for viewers. The tournaments, encompassing both men's and women's events, utilized the Copper Box for preliminary rounds and the women's quarter-finals, with the men's quarter-finals, semi-finals, and finals shifting to the larger Basketball Arena. Notable matches included Great Britain's men's team debut against defending champions on July 29, resulting in a 44-15 defeat before a packed house that amplified the electric energy of the venue. Another highlight was the tense men's group stage clash between and on July 31, where the arena's boisterous crowd contributed to an intense, uproarious environment. emerged as an unexpected crowd favorite, drawing widespread media attention for its fast-paced action and the passionate support from British fans unfamiliar with the sport, often described as creating one of the Games' most vibrant atmospheres. For the modern pentathlon, the Copper Box hosted the fencing discipline for both men's and women's competitions on August 11 and 12, respectively, where athletes engaged in one-touch bouts across multiple pistes to score points toward their overall totals. This phase set the foundation for subsequent events like and the combined , with the arena's setup enabling rapid bouts that showcased the sport's and under Olympic pressure.

Paralympic events hosted

During the 2012 Summer Paralympic Games, the Copper Box Arena served as the exclusive venue for competitions, a sport designed specifically for visually impaired athletes. The men's and women's tournaments took place from 29 to 9 September, featuring teams from 16 nations competing in preliminary rounds, quarterfinals, semifinals, and medal games. The arena was adapted to meet the unique needs of , emphasizing accessibility and sensory support for athletes and spectators. Key features included a low-noise to allow players to hear the bells embedded in the ball, with crowds required to remain silent during play; tactile flooring and court markings for navigation; and audio cues for announcements and game proceedings. These modifications built on the venue's configuration for , enabling a seamless transition between events with minimal structural changes, such as adjusting seating and flooring layouts. With a capacity of approximately 6,500 spectators, the arena accommodated enthusiastic but controlled audiences, fostering an inclusive atmosphere that highlighted the 's reliance on sound and touch. In the men's tournament, claimed gold with an 8-1 victory over in the final, while secured bronze by defeating . The men's team, in their Paralympic debut, showed resilience by earning their first-ever points in the competition through a 3-3 draw against but ultimately finished without a medal, suffering heavy defeats including 11-1 to and 7-1 to . The women's competition saw win gold after a 1-0 shutout of in the final, with taking bronze via a 5-1 win over ; 's women performed strongly in preliminaries, securing second place in their group with notable victories over (3-1) and , before exiting in the quarterfinals with a 2-1 loss to . These events underscored the arena's role in promoting inclusive sports, inspiring greater participation in and adaptive athletics worldwide.

Post-Games legacy and operations

Renaming and public opening

Following the conclusion of the 2012 and Paralympic Games, the Copper Box Arena—previously known as the Arena during planning but renamed in January 2012 to highlight its distinctive copper-clad exterior and anticipated multi-purpose role—underwent a seamless transition to become a permanent public facility within the Queen Elizabeth Olympic Park. The venue's design, which incorporated flexible elements like retractable seating from the outset, minimized the need for extensive post-Games modifications, allowing it to shift efficiently from a 6,000-seat configuration to a legacy mode supporting up to 7,500 spectators for diverse activities. The arena officially opened to the public on 27 2013, marking it as the first Olympic venue in the to resume operations in its repurposed form and fulfilling early plans to convert it into a multi-sport for community and elite use. These plans emphasized broad accessibility, with the facility adapted to host , , , , , and other indoor sports, alongside non-sporting events to engage local residents and promote physical activity across . Initial programming focused on reintroducing professional sport, exemplified by the relocation of the Basketball League's London Lions team, who played their first match at the venue on 14 August 2013 against the in front of a sell-out crowd of over 7,000. Community engagement was a core component of the post-opening strategy, with the arena launching drop-in sessions and affordable programs to encourage participation from diverse groups, including youth and families in the surrounding Hackney and Stratford areas. In its inaugural full year of operation, the venue hosted 224 events, including 106 community-oriented activities that drew 423,000 visitors and helped establish it as a vibrant local resource rather than an underutilized "white elephant." This rapid repurposing underscored the success of integrating legacy considerations into the original construction, avoiding significant demolition of temporary structures and enabling quick activation for sustained public benefit.

Management and facilities

The Copper Box Arena is owned by the London Legacy Development Corporation (LLDC), the body responsible for managing legacy assets from the 2012 London Olympics in Queen Elizabeth Olympic Park. Since 2013, the venue has been operated by GLL, trading as Better, a charitable social enterprise structured as a worker-owned cooperative that prioritizes community benefits and reinvests surpluses into local services. In February 2024, LLDC awarded GLL a new 10-year operating contract to continue managing the arena, including upgrades to enhance community access and sustainability. In September 2025, GLL entered a partnership with Oak View Group (OVG) to oversee all food and beverage operations, including concessions, VIP lounges, and suites, aiming to elevate hospitality standards through premium offerings and improved guest experiences. The arena's facilities include a state-of-the-art gym with over 80 stations, a functional training suite for specialized workouts, and dedicated studios for group fitness classes such as cycling and high-intensity sessions. A multi-use sports hall supports various activities, from handball to basketball, accommodating both recreational and competitive use. Membership programs provide tiered access to these amenities, offering unlimited gym entry, class bookings, and discounts on events, with options for individuals, families, and corporate groups to promote inclusive fitness. Sustainability initiatives are integrated into operations, with the venue designed for up to 40% annual savings through efficient systems and monitoring tools that track consumption in real time. The exterior features 3,000 square meters of cladding with high recycled content, contributing to its environmental footprint reduction, while event menus emphasize sustainable sourcing.

Current uses and events

The Copper Box Arena primarily serves as the home venue for the London Lions, the professional team competing in the , where it hosts their domestic and international fixtures, including BKT EuroCup games. It is also a key location for internationals, accommodating matches for the Vitality Roses and serving as the base for the London Pulse team under a 10-year that includes community-focused events. The venue further supports a range of activities such as bouts, tournaments, and fitness classes offered through its on-site gym and multi-purpose spaces, enabling diverse programming from amateur training to professional competitions. In 2024 and 2025, the arena has showcased its event-hosting capabilities with high-profile concerts, including Gorillaz's residency in August and September 2025, where the band performed their debut album and in full to sold-out crowds. Sporting highlights include the return of Baller League UK for its second season, with multiple matchdays in November 2025 featuring influencer-led 5-a-side ; London Lions' EuroCup clashes, such as against Panionios on November 12, 2025; and GB Basketball's FIBA qualifier victory over on November 21, 2024. Netball programming featured the Vitality Netball Series with four matchdays hosted for the team in 2025, while other events encompassed the Major 2 in June 2024 and boxing cards like Adam Azim's knockout win over in October 2024. The arena's adaptability underscores its role in and regional vitality, attracting over 300,000 visitors annually on average since its public opening, based on more than 3 million total attendees by early 2024. It facilitates sports programs, such as camps, masterclasses with London Pulse, and the annual Better Club Games for participants over 60, promoting inclusivity and local participation. These initiatives, alongside major events, generate economic benefits for by creating jobs and stimulating tourism and business in the Queen Elizabeth Olympic Park area.

References

  1. [1]
    Our Legacy | Copper Box Arena, Stratford, East London
    History and Legacy ... Copper Box Arena, fondly known as the 'Box that Rocks' during the 2012 Olympic and Paralympic Games, is the third largest arena in London ...Missing: capacity | Show results with:capacity
  2. [2]
    GLL in the saddle of Copper Box Arena - Coliseum
    Feb 28, 2024 · 'QUEEN ELIZABETH OLYMPIC PARK' stated that the Copper Box Arena is the Park's most versatile venue, with a maximum seating capacity of 7500.
  3. [3]
    Copper Box Arena: History, Capacity, Events & Significance
    Feb 27, 2021 · The Copper Box Arena has hosted the goal ball event of the 2012 Paralympics. The arena hosted the London "Grand Prix Badminton" Tournament ...
  4. [4]
    Step Inside: Copper Box Arena – Home of the London Lions
    Mar 28, 2025 · Copper Box Arena has a total capacity of 7,500 across an upper and lower tier, a number that remains constant even when the seating is ...<|control11|><|separator|>
  5. [5]
    Gym, Sports & Events | Copper Box Arena, Stratford, East London
    A world-class events venue and the third largest arena in London with state-of-the-art gym and fitness facilities.Events · Sports Arena · History and Legacy · Sports Arena Activities
  6. [6]
  7. [7]
    Copper Box Arena | Venue Hire - Better
    The Copper Box Arena is the large-scale venue for hire in London. Home to handball, modern pentathlon, fencing and goalball during London 2012.Missing: history | Show results with:history
  8. [8]
    Copper Box Arena wins bronze medal at Conference & Events Awards
    Jul 10, 2024 · The Copper Box Arena was awarded a bronze medal at the Conference & Events Awards as the most versatile venue in the category for venues ...
  9. [9]
    Copper Box Arena, location on the map
    51.5443004, -0.0198937. What users often mention about Copper Box Arena: "Easy to get in ...
  10. [10]
    Find Us | Copper Box Arena, Stratford, East London
    ... Park, either by train, underground, bus or cycle. Copper Box Arena is in Queen Elizabeth Olympic Park, Stratford, London E20 3HB. The nearest Overground ...
  11. [11]
    Stratford Underground Station - Transport for London
    Lines at this station · Central Central · DLR DLR · Elizabeth line Elizabeth line. disruption on this line · Jubilee Jubilee · Mildmay Mildmay. disruption on this ...
  12. [12]
    Getting here, Nearest Train & Tube Station, Car Parking
    The 388 bus runs between London Bridge and Stratford City near the station entrance, going through the Park and stopping at the Copper Box Arena and Here East.
  13. [13]
    Copper Box Arena - AccessAble - Your Accessibility Guide
    There is step free access to the fitness suite. Level access is by lift. There are doors into the fitness suite. The doors open towards you (pull). The ...
  14. [14]
    Accessibility | Copper Box Arena, Stratford, East London
    Our arena is designed with accessibility in mind, featuring accessible changing rooms and restrooms as well as accessible seating in the arena for events.
  15. [15]
    Purpose-built 2012 Olympic Venues have been ingeniously ... - Affino
    Aug 7, 2012 · Copper Box Arena (MAKE architects, Populous, PTW Architects, Arup). Originally designed for Handball, the former 'Handball Arena' was renamed ...
  16. [16]
    Copper Box Venue to Save Energy - Paralympic.org
    “The venue has got its Games-time name as the top half of the building is clad in 3,000 square metres of copper cladding – mostly recycled and from sustainable ...Missing: features capacity
  17. [17]
    Copper Box Arena - Make Architects
    The adaptable design caters for an incredibly diverse range of sports – from handball and badminton to boxing and wheelchair rugby – and other events.
  18. [18]
    Event Space Copper Box Arena | Queen Elizabeth Olympic Park
    The flexible auditorium design allows the main seating blocks to be tucked away, providing an open pillar-free area of 2,712m2. Event facilities include staging ...Missing: features | Show results with:features
  19. [19]
    Olympic Handball Arena, London | Stormsaver
    Copperbox arena rainwater harvesting ... BREEAM Excellent rating, making water conservation and energy efficiency central to its design. Sustainability features ...
  20. [20]
    [PDF] A WORLD CLASS SPORTS AND EVENTS VENUE IN LONDON - NET
    Copper Box Arena has 2 video boards, both positioned on level 2 concourse. One stage end and one reverse stage end. • W6,832mm X H2,562 X D150mm.Missing: ventilation curved
  21. [21]
    [PDF] Queen Elizabeth Olympic Park - Park Management Plan
    The creation of a parkland setting to the Games venues, to be retained as part of the Olympic. Legacy, was a key element of the London bid. Over the intervening ...Missing: origins | Show results with:origins<|separator|>
  22. [22]
    London - 2012 Olympic Games - 2012 master plan revealed - BBC
    Feb 6, 2007 · The Olympic Delivery Authority's (ODA) 15-volume, 10,000-page document, sets out plans for creating new venues, roads and parks in east London.
  23. [23]
    [PDF] Olympic Delivery Authority Annual Report and Accounts 2012–13
    Copper Box hosted three Olympic and Paralympic ... This table shows the sources and application of the general grant funding received during 2012–13.
  24. [24]
    [PDF] The London 2012 Olympic Games and Paralympic Games
    Dec 5, 2012 · NOTE. 1 Construction of all projects was funded from the Olympic Delivery Authority's budget, part of the Public Sector Funding Package. Costs ...
  25. [25]
    Olympic Park sustainability policy - Greater London Authority
    Sep 16, 2011 · These areas include: Maintaining and possibly raising sustainability targets set by the ODA for the construction process so that environmental ...
  26. [26]
  27. [27]
    Work starts on 2012 Handball Arena | Architecture and design news
    Jul 21, 2009 · The Olympic Delivery Authority (ODA) has announced that construction work on the 2012 Handball Arena has started two months ahead of schedule ...
  28. [28]
    Olympic venues: The legacy | Features - Building
    Jul 25, 2013 · Re-opened. RE-OPENING DATE July 2013. ARCHITECT Make CONTRACTOR Buckingham Group CONSTRUCTION COST £41m. The Copper Box proved to be one of the ...
  29. [29]
    Olympic Copper Box Arena, London - Banagher Precast
    Mar 28, 2023 · The Arena has many unique precast design features such as cantilever parapet units with integrated stairs and bespoke upper tier front parapet ...
  30. [30]
    2012 building work 83% complete - New Civil Engineer
    May 13, 2011 · The 7000-capacity handball arena has became the latest venue to be finished and the basketball venue is nearing completion.
  31. [31]
    London 2012 Olympic Park building work 83% complete‎ - BBC News
    May 12, 2011 · The handball arena, which will seat 7,000 people, has become the latest venue to be finished. In addition to handball, goalball and modern ...
  32. [32]
    First match played at London 2012 Handball Arena
    Apr 16, 2011 · Colin Naish, ODA Project sponsor for the Handball Arena, said: "The construction of the Handball Arena will be completed this spring. The venue ...<|control11|><|separator|>
  33. [33]
    London 2012 completes fifth venue in Olympic Park
    Jul 14, 2011 · London 2012 has moved one step closer to the Games with the announcement that construction work has been completed on the International ...
  34. [34]
    London 2012: Team GB receive a harsh welcome to Olympic handball
    Great Britain's men suffered a heavy defeat against 2008 champions France in their first ever Olympic match.
  35. [35]
    London 2012: Hostility plus high-fives at Croatia and Serbia handball
    Jul 31, 2012 · At half-time it was 13-9 to Croatia and the Copper Box, a boisterously intense venue of open, unobstructed views, was in a mild state of uproar.Missing: atmosphere | Show results with:atmosphere
  36. [36]
    London 2012: Handball returns to Olympic Games venue - BBC Sport
    Jul 30, 2013 · Last summer, the Copper Box played host to surprise smash-hit handball, a sport which engrossed unsuspecting British audiences.Missing: attendance notable
  37. [37]
  38. [38]
  39. [39]
    London 2012 - goalball - Paralympic.org
    Goalball Host City London, Great Britain Dates 29 - 09 September 2012 Events 2 Countries 16 Participants 128 (70 men and 58 women)
  40. [40]
    Iconic Copper Box poised to leave important local legacy
    Jun 30, 2012 · The Copper Box will host handball and modern pentathlon fencing during the Olympic Games and goalball during the Paralympic Games.<|control11|><|separator|>
  41. [41]
    Paralympics reignite the Olympic buzz but with added twists
    Aug 30, 2012 · The Copper Box, for example, hosted raucous handball matches during the Olympics and now must fall silent during play for goalball. But the ...
  42. [42]
    Copper Box - InsideTheGames
    Aug 29, 2011 · The capacity of the Copper Box will be increased to 7,500 in legacy and is set to become a multi-purpose venue available for both sport and ...Missing: cladding BREEAM
  43. [43]
    [PDF] London 2012 Paralympic Games Goalball Women Preliminaries
    London 2012 Paralympic Games. Goalball. Women. London 2012 Paralympic Games. Goalball. Women. Preliminaries. Group A. Rank. Nation. MP. W. D. L. Goals. Points.Missing: team | Show results with:team
  44. [44]
    Digging through the Goalball UK archives – London Paralympics 2012
    Sep 2, 2020 · The women registered incredible wins against Brazil, taking down the samba superstars 3-1, and then defeated the European Champions Denmark in a ...
  45. [45]
    Great Britain lose 11-1 to Lithuania - Sports Mole
    Aug 30, 2012 · Great Britain lose 11-1 to Lithuania in their goalball preliminary opener at the Paralympic Games.<|control11|><|separator|>
  46. [46]
    London 2012: Olympic venue name-change angers handball chief
    Jan 10, 2012 · British Handball chief executive Paul Goodwin says the decision to change the name of the Olympic handball venue to the Copper Box is the wrong one.
  47. [47]
    Copper Box Arena - Hoopsfix.com
    Public transport is the best and easiest way to get to and from the Park, either by train, underground, bus or cycle. ... The M25 is only a 25 minutes drive away.<|control11|><|separator|>
  48. [48]
    Copper Box Arena wins New Event Space at national Event Awards
    In its first full year in operation, the Copper Box Arena successfully delivered 423,000 visits and 224 events of which 106 were community and non-sporting ...
  49. [49]
    London's Olympic legacy – newsteelconstruction.com
    Jun 7, 2015 · The solution for the London stadium was to have an initial capacity of 80,000, but to incorporate a design with a demountable upper tier, so ...
  50. [50]
    LLDC awards GLL new contract to continue as operator of Copper ...
    Feb 22, 2024 · The London Legacy Development Corporation (LLDC) has appointed charitable social enterprise GLL, the operating contract for the Copper Box Arena at Queen ...Missing: management | Show results with:management
  51. [51]
    About us | Copper Box Arena, Stratford, East London
    Copper Box Arena proudly operates under the banner of Better, a community focused brand managed by GLL. As a charitable social enterprise and worker-owned ...Missing: operator | Show results with:operator
  52. [52]
    [PDF] GLL appoint OVG to provide elevated food and drink at London's ...
    Sep 3, 2025 · GLL has managed the Copper Box Arena on behalf of the LLDC (Queen Elizabeth. Olympic Park) for over a decade, establishing the venue as a ...Missing: ownership operator
  53. [53]
    OVG to oversee catering operations at Copper Box Arena
    Sep 3, 2025 · The partnership with GLL means OVG is overseeing all food and beverage operations within the venue, including general concessions, VIP lounges, ...Missing: ownership operator
  54. [54]
    Our Facilities | Copper Box Arena, Stratford, East London
    Copper Box Arena has a gym, group cycle, fitness class, functional studio, a sports arena, and meeting rooms.Missing: sustainability | Show results with:sustainability
  55. [55]
    Memberships and Prices - Copper Box Arena
    As a member, you'll unlock access to our outstanding facilities – including a gym, fitness class studios and sports arena. Plus, enjoy a range of discounts ...Missing: sustainability | Show results with:sustainability
  56. [56]
    Fitness - London - Queen Elizabeth Olympic Park
    The three main gyms on the Park are in the Copper Box Arena, London Aquatics ... Sign up for a membership or pay for a single session to try out these world class ...
  57. [57]
    Queen Elizabeth Olympic Park: creating a sustainable community
    Feb 3, 2019 · The arena is also environmentally sustainable, the top half covered in 3,000m2 of copper with a high recycled content that gives the venue its ...
  58. [58]
    Sustainable Fish City campaign swims to victory at Queen Elizabeth ...
    High profile events in the Copper Box Arena serving wholly sustainable menus ... fitness facilities to all ages and abilities, and hosts a variety of events.
  59. [59]
    Copper Box Arena | Queen Elizabeth Olympic Park
    With retractable seating for up to 7,500 spectators, the Arena is home to a number of premier clubs, including London Lions ...Missing: architectural features Populous MAKE modular flooring integration
  60. [60]
    How to get there - London Lions
    The Copper Box is in Queen Elizabeth Olympic Park, Stratford. Take Hackney Wick Overground (5 min walk) or Stratford Underground (15 min walk). Car parks at ...
  61. [61]
    Copper Box Arena announces 10-Year partnership with London Pulse
    Oct 24, 2024 · We'll remain the home venue for London Pulse, with the Club also hosting community events, netball camps and master classes. Copper Box Arena ...
  62. [62]
    BOXXER and Sky Sports present: High Voltage | Copper Box Arena
    BOXXER and Sky Sports present: High Voltage. Sep 05, 2024. Get ready for a high-voltage night of boxing on Saturday 19th October as Adam Azim takes on Ohara ...
  63. [63]
    Activities - Copper Box Arena
    Copper Box Arena offers fitness classes, gym workouts, team sports like badminton and basketball, and holiday activities for kids.Missing: community grassroots
  64. [64]
    Gorillaz Perform Debut Album and Demon Days in Full: Watch
    Aug 31, 2025 · Gorillaz performed their 2001 debut album and Demon Days in full at London's Copper Box Arena on August 29th and August 30th.
  65. [65]
    Copper Box Arena, London | Events & Tickets - Ticketmaster
    10 November 2025 · 10. Monday 17:30 · Baller League UK - Season 2 - Matchday 3 ; 12 November 2025 · 12. Wednesday 19:30 · London Lions vs Panionios - BKT EuroCup ; 15 ...
  66. [66]
    Copper Box Arena to host crucial EuroBasket 2025 Qualifier ...
    Oct 30, 2024 · Copper Box Arena to host crucial EuroBasket 2025 Qualifier between GB Basketball and Greece. Oct 30, 2024. Great Britain's men's basketball ...
  67. [67]
    Elite netball returns to Copper Box Arena as England netball ...
    Jul 29, 2025 · England Netball has confirmed that Copper Box Arena will host four thrilling matchdays as part of the Vitality Roses' 2025 international ...
  68. [68]
    Rocket League Championship Series 2024 - Major 2: London
    Rocket League Championship Series 2024 - Major 2: London ; Location: England London ; Venue: Copper Box Arena ; Prize Pool: $255,000 USD ; Start Date: 2024-06-20.RLCS 2024 - North America... · Europe Open Qualifier 4 · RLCS
  69. [69]
    Adam Azim vs Ohara Davies - 19 Oct 2024, Copper Box Arena ...
    Oct 19, 2024 · Adam Azim and Ohara Davies are set for an explosive super lightweight clash on Saturday, October 19th at The Copper Box Arena in London.
  70. [70]
    We're levelling up at Copper Box Arena!
    Feb 12, 2024 · Works begun in early February 2024, the expansion of the health and fitness suite and fitness class studios at Copper Box Arena is a significant ...Missing: groundbreaking | Show results with:groundbreaking
  71. [71]
    Copper Box Arena hosts annual Better Club Games 2024
    Oct 7, 2024 · Copper Box Arena recently played host to the finale of the annual Better Club Games, where over 700 participants over the age of 60 came ...Missing: attendance | Show results with:attendance
  72. [72]
    Local Jobs on the Queen Elizabeth Olympic Park - Mayor of London
    The Corporate Performance report also states that 70% of the workforce at the Copper Box Arena and the London Aquatics Centre are local, as are 65% of those ...