Fact-checked by Grok 2 weeks ago

European Service Module

The European Service Module (ESM) is a cylindrical component developed by the (ESA), measuring approximately 4 meters in and height and weighing over 13 tonnes at launch, that provides propulsion, electrical power, thermal control, air, and water to NASA's crew vehicle for deep-space missions in the . Built primarily by as ESA's prime contractor, the ESM draws on technology from the Automated Transfer Vehicle (ATV) that resupplied the , incorporating eight Airbus-designed engines for main propulsion and attitude control, solar arrays generating up to 11.2 kilowatts, and water storage for crew needs. Development of the ESM began following a 2013 agreement between ESA and , with the first module delivered in 2018 for integration with ahead of the uncrewed Artemis I test flight launched on November 16, 2022, during which it successfully demonstrated propulsion maneuvers, power generation, and orbital insertion around the . The module's role extends to crewed missions, including Artemis II planned for 2025 to orbit the with astronauts and targeting a lunar landing, with the third ESM handed over to in September 2025 after rigorous testing to ensure reliability for human-rated operations. ESA's contribution underscores international collaboration, with components supplied by firms across 10 European countries, enhancing 's capability for sustained deep-space travel without relying solely on U.S.-built systems.

Origins and Development

ATV Heritage and Initial Concept

The Automated Transfer Vehicle (ATV) was ESA's uncrewed resupply spacecraft, designed to deliver cargo, propellant, and supplies to the (ISS) through autonomous and capabilities. Operational from 2008 to 2014, it completed five missions, demonstrating reliable propulsion systems using hypergolic bipropellant engines for raising and attitude control, large solar arrays for power generation up to 4-5 kW, and for precise and station-keeping. The European Service Module (ESM) for NASA's Orion spacecraft inherits core technologies from the ATV, repurposing its propulsion, power, and avionics elements to provide uncrewed support functions including main engine thrust for orbital maneuvers, electrical power distribution, and thermal management, while interfacing directly with the Orion crew module instead of carrying cargo. This adaptation shifts the ATV's ISS logistics focus to deep-space service operations, retaining proven subsystems to ensure reliability for crewed missions. In the early , amid NASA's transition from the —retired in July 2011—discussions arose on ESA's potential in supporting the Multi-Purpose Crew Vehicle (MPCV), Orion's precursor designation, to address gaps in capabilities. A ESA-NASA formed in May 2011 to evaluate using ATV-derived hardware for the service module, prioritizing feasibility studies that highlighted the benefits of existing European expertise in autonomous space operations. Basing the ESM on ATV technology aimed to mitigate development risks and accelerate timelines by capitalizing on flight-proven components and industrial know-how from ATV production, allowing focus on integration rather than foundational redesign, as ATV's ISS successes validated the subsystems' performance in long-duration missions.

International Agreements and Funding Commitments

In December 2012, the (ESA) and the National Aeronautics and Space Administration (NASA) formalized a bilateral under which ESA committed to developing and providing the European Service Module (ESM) for NASA's spacecraft's Exploration Mission-1, formally announced on January 16, 2013. This arrangement offset ESA's share of (ISS) common operating costs—valued by the agencies at approximately €150 million per year—by repurposing hardware from ESA's retired Automated Transfer Vehicle (ATV) program, equivalent to about three years of such contributions, while securing European access to for future astronaut missions. ESA's initial funding pledge for the ESM program was estimated at around €470 million, covering , of the first unit, and spares, with contributions distributed across multiple ESA member states including , , , and the through national delegations. On November 17, 2014, ESA awarded a valued at €390 million to serve as prime contractor, leveraging the company's prior ATV experience to integrate subsystems from various European suppliers across ten member states. This emphasized cost efficiency while prioritizing the ATV-derived architecture for proven reliability in , power, and , amid broader geopolitical efforts to sustain transatlantic collaboration in post-ISS . Early program reviews in 2014 and 2015, conducted jointly by ESA and , affirmed the baseline design's viability but identified opportunities for scope optimizations, such as modular component , without altering the commitment to ATV elements essential for in deep-space operations. These assessments ensured alignment with fiscal constraints while reinforcing the partnership's strategic value in enabling Europe's technical contributions to objectives.

Design Evolution and Scope Adjustments

The European Service Module (ESM) design originated from adaptations of the Automated Transfer Vehicle (ATV) heritage, with initial feasibility assessments conducted by a joint ESA-NASA working group in May 2011. By 2014, the baseline configuration shifted to incorporate U.S.-provided elements, notably the AJ10-190 main engine for primary propulsion, selected for its compatibility with Orion's system ( and nitrogen tetroxide) and proven performance from missions. This replaced the ATV's Snecma-engineered main propulsion, while preserving European contributions such as the X-shaped solar array wings and battery systems derived from ATV designs to leverage existing and reduce development risks. Post-2014, iterative refinements addressed Orion-specific requirements identified in technical reviews. In , updates enhanced radiation tolerance in avionics and subsystems to withstand deep-space environments beyond , differing from the ATV's ISS-focused operations, with designs incorporating radiation-hardened components for reliability during lunar missions. feedback also prompted modifications to support abort scenarios, including improved propulsion interfaces and structural reinforcements to ensure ESM functionality during failures or trajectory corrections, ensuring safe crew return capabilities. Scope adjustments amid cost pressures prioritized cost-effective evolutions over expansive redesigns. Efforts focused on modular upgrades for scalability across missions, enabling software and hardware reusability without full overhauls. Despite analyses suggesting potential benefits from higher-thrust for increased delta-v margins, no major engine replacements were implemented due to budgetary constraints and complexities, maintaining the AJ10-190's 26 output to align with timelines and ESA's €400 million contribution cap for initial units. These decisions reflected trade-offs balancing performance needs with fiscal realism, as evidenced by mass optimization studies that reduced structural weight by refining materials and configurations without altering core scope.

Technical Design and Specifications

Structural and Configuration Overview

The European Service Module (ESM) features a cylindrical, unpressurized primary with a of 4.5 meters and a main body height of 2.7 meters, excluding the protruding Engine. This configuration draws from the Automated Transfer Vehicle heritage, employing composite materials for lightweight strength and modularity to facilitate integration and maintenance. The ESM attaches to the crew module via the Crew Module Adapter, a standardized and electrical that ensures structural continuity and transfer of propulsion, power, and thermal resources without compromising the crew compartment's integrity. Fully fueled, the ESM achieves a launch mass of approximately 13,000 kilograms, accommodating about 8.6 metric tons of hypergolic propellants in four main tanks configured for deep-space endurance and orbital maneuvering. Four deployable array wings, each comprising three rigid panels that unfold to 7 meters in length, extend to a total span of 19 meters, optimizing power collection while maintaining aerodynamic stability during launch within the 5.2-meter fairing. This layout prioritizes efficiency, with the dry weighing around 3.5 metric tons, enabling the module's role in extended missions beyond .

Propulsion and Orbital Maneuvering Systems

The European Service Module (ESM) employs a primary Orbital Maneuvering System (OMS) engine, the Aerojet Rocketdyne AJ10-190, which is a refurbished unit originally developed for the Space Shuttle's OMS and provided by NASA. This hypergolic engine, fueled by Aerozine 50 and nitrogen tetroxide, delivers approximately 26 kN (5,778 lbf) of thrust and features thrust vector control via gimbaling in pitch and yaw for precise trajectory corrections, deorbit burns, and abort scenarios during ascent or in-space operations. Complementing the main engine, the ESM integrates eight auxiliary R-4D-11 bipropellant thrusters, each producing 490 N (110 lbf) of thrust, arranged for three-axis attitude control and finer orbital adjustments. These thrusters, derived from designs and manufactured for the program, enable roll control, fine pointing, and contingency maneuvers independent of the primary engine. The propulsion architecture incorporates redundancy through dual series-arranged tanks for (MMH) fuel and nitrogen tetroxide (NTO) oxidizer, each with independent pressurization systems using , along with duplicate plumbing lines, valves, and feed systems to mitigate single-point failures in both uncrewed test flights and crewed missions. This design ensures fault-tolerant operation for critical functions like high-altitude aborts and orbital transfers, drawing from proven Shuttle-era reliability while adapting to Orion's deep-space profile.

Power Generation and Distribution

The European Service Module employs four deployable solar array wings to generate electrical power, producing a total of 11.2 kW at full output to support ESM , operations, and interfaces with the Orion crew module. Each wing spans 7.375 meters and comprises three rigid panels measuring 2.13 by 1.92 meters, equipped with silicon-based solar cells that initially generate power at around 120 V DC. This design scales up from the Automated Transfer Vehicle's solar arrays, delivering more than twice the power capacity to meet the demands of deep-space missions. Rechargeable lithium-ion batteries store excess , providing uninterrupted power during periods when direct is unavailable, such as during lunar transits. These batteries, integrated into the electrical power subsystem, ensure redundancy and reliability for critical functions, with the majority of generated power—approximately 90%—allocated to charging and supporting crew module systems after initial ESM needs are met. The power distribution network conditions and routes electricity via regulated DC buses, incorporating fault-tolerant features like redundancy and radiation-hardened electronics to operate in the harsh radiation environment beyond low Earth orbit. Drawing on ATV heritage, the subsystem maintains high conversion efficiencies exceeding 95% in power processing units, contingent on precise solar array deployment and spacecraft attitude control for optimal solar exposure.

Thermal Control and Life Support Systems

The thermal system of the European Service Module maintains habitable conditions within the ESM and interfaces with the Orion crew module to regulate temperatures across the , countering the of where external surfaces can experience extremes from approximately -150°C in shadow to +120°C in direct . It features an active thermal subsystem with two independent single-phase loops operating in hot redundancy, utilizing HFE-7200 as the coolant to absorb and transport from , electronics, and other components. Each loop incorporates a package, four cold plates for acquisition, a three-way modulating for , and six body-mounted radiators for passive dissipation, ensuring efficient rejection of internal loads without reliance on expendable fluids during nominal operations. Supplementary electrical heaters, wired across critical components and powered by the ESM's solar arrays, prevent freezing during eclipses or low-heat periods, while sublimators provide additional evaporative cooling capacity for high-heat scenarios, such as pre-reentry preparations when efficiency diminishes in Earth's atmosphere. The system's design draws from heritage Automated Transfer Vehicle technology but incorporates -specific interfaces, including thermal control units that monitor and adjust fluid flow based on data from the consumables storage and bays. For life support, the ESM stores and supplies consumables essential for crew habitability, including pressurized oxygen, nitrogen for cabin pressurization, and potable water, which are transferred via umbilical interfaces to the Orion crew module's Environmental Control and Life Support System (ECLSS). The ECLSS, housed primarily in the crew module, performs active functions such as CO2 scrubbing via lithium hydroxide canisters and partial water recycling through urine processors, but depends on ESM reservoirs to sustain air revitalization and humidity control for missions extending beyond short durations. This integration supports uncrewed operations for extended periods and crewed phases by providing backup supplies, with the ESM's tanks sized for nominal mission profiles including transit to lunar orbit and return. Temperature regulation ties into life support via shared fluid pathways that precondition air and water inflows, ensuring stable environmental conditions without cross-contamination risks.

Production and Flight Hardware

Assembly of ESM-1 for Artemis I

The assembly of the first European Service Module (ESM-1) for NASA's Artemis I mission began in 2016 under the lead of , building on the Automated Transfer Vehicle (ATV) heritage as a baseline configuration without modifications for crewed systems, focusing instead on , , and validation. Key structural elements, including propellant tanks, were fabricated starting in 2015 by European partners such as in , with integration occurring primarily at Airbus facilities in , , rather than as initially conceptualized for later modules. This initial unit served to demonstrate the feasibility of adapting ATV-derived cylindrical architecture and subsystems to interface with the Module Adapter (). Following structural and subsystem integration, ESM-1 underwent rigorous ground testing in , including vibration tests to simulate launch loads and thermal-vacuum chamber simulations to verify performance in space-like and temperature extremes, confirming the module's structural integrity and subsystem functionality prior to shipment. These tests, conducted at facilities like those managed by and ESA partners, addressed potential interfaces between the service module's propulsion and systems without the added complexity of crew-specific environmental controls. Completion of these qualification efforts paved the way for packaging and . ESM-1 was shipped from to the in 2018 via Antonov An-124 aircraft, arriving at (KSC) on November 7 for with the Crew Module. At KSC, technicians from and mated ESM-1 to the Crew Module in a process that involved electrical, fluid, and data interface verifications, followed by shipment to the Test Facility in for integrated vehicle testing, including and end-to-end system checks. Minor hurdles, such as tolerances and harness routing, were resolved through iterative checkout procedures, enabling the fully stacked to return to KSC by late 2020 for final preparations ahead of the 2022 launch. This phase validated the ESM's role in the uncrewed demonstration without introducing crew-dependent adaptations.

Development of ESM-2 for Artemis II

The contract for ESM-2 was signed between ESA and Airbus on February 16, 2017, initiating production for the first crewed Orion mission under the Artemis program. Manufacturing commenced prior to the full qualification of ESM-1 to meet the aggressive delivery schedule, with assembly and integration activities ramping up around 2019 at Airbus facilities in Bremen, Germany. These efforts faced disruptions from the COVID-19 pandemic, which impacted supply chains and testing timelines across the European aerospace sector. ESM-2 incorporates evolutions from ESM-1 design reviews, including enhanced software configurations tailored for crewed operations, such as integration with Orion's abort systems to enable rapid response to anomalies during launch and ascent phases. Hardware refinements focus on human-rating requirements, with improvements to seals and interfaces to boost reliability and prevent potential leaks in and systems critical for safety. These upgrades ensure the module's , power, and thermal systems can sustain a four-person crew during the 10-day Artemis II lunar flyby. Following structural assembly, ESM-2 underwent subsystem testing and system-level verification at before shipment to NASA's in October 2021. At KSC, it progressed through environmental testing and mating to the crew module on October 24, 2023, marking a key milestone despite ongoing refinements informed by Artemis I data. Integration challenges, including compatibility checks for crew interfaces, contributed to schedule slips, deferring Artemis II's launch to no earlier than April 2026 to prioritize safety validations.

Fabrication of ESM-3 for Artemis III

The fabrication of the European Service Module (ESM-3) for NASA's Artemis III mission, the first crewed lunar landing since Apollo 17, involved assembly by Airbus Defence and Space at its Bremen, Germany facility using components sourced from over 20 companies across more than 10 European countries, including propulsion elements manufactured in Italy. Key integration milestones occurred between 2022 and 2024, encompassing the installation of 11 kilometers of wiring, 33 engines, four propellant tanks holding approximately 8,000 liters total, and deployable solar arrays capable of generating up to 11.2 kilowatts. ArianeGroup finalized adaptations to the propulsion system, including the main engine derived from the Automated Transfer Vehicle heritage, under contracts signed in June 2024 to ensure compatibility with the mission's extended lunar orbit operations supporting Human Landing System rendezvous and proximity maneuvers. Following completion of environmental testing and final outfitting in Bremen, ESM-3 shipped aboard the vessel Canopée on August 22, 2024, arriving at Port Canaveral, Florida, on September 2, 2024, for transfer to NASA's Kennedy Space Center. At the center, technicians mated ESM-3 to its crew module adapter on September 27, 2024, verifying structural interfaces and propulsion alignments critical for the module's role in providing up to 1.5 kilometers per second of delta-V for orbital adjustments, abort contingencies, and trans-Earth injection burns tailored to the Artemis III profile involving prolonged exposure near the lunar surface. The European Space Agency formally handed over ESM-3 to NASA on September 10, 2025, during a quarterly project review at Kennedy Space Center, marking the transition to U.S.-led processing ahead of full Orion spacecraft stacking targeted for 2026 integration with the mission's enhanced abort and return propulsion demands.

Mission Integration and Performance

Integration with Orion Crew Module

The European Service Module (ESM) integrates with the crew module via the Crew Module Adapter (), a structural ring that connects the modules mechanically while bridging electrical, data, and fluid interfaces, including umbilicals for power and propulsion lines. This mating process requires precise alignment of the ESM's forward compartment to the , followed by bolting, welding of fluid and gas pipelines, and routing of electrical harnesses to ensure seamless system interoperability across ESM variants. For reentry separation, pyrotechnic bolts and thrusters jettison the ESM from the crew module after lunar operations, allowing the crew module to independently reenter Earth's atmosphere. Ground-based verification of these interfaces occurs at NASA's Operations and Checkout Building and Kennedy Space Center's Multi-Payload Processing Facility, where integrated Orion stacks undergo electromagnetic compatibility tests, leak checks on systems, and simulations of fluid transfers between modules to confirm compatibility without flight-specific fueling. These tests, applied to ESM-1 through ESM-3, validate structural integrity and subsystem handoffs prior to stacking on the (). The ESM's integration contributes to Orion's overall mass balance for SLS launch, with the module's launch mass exceeding 13 metric tons—comprising structure, propellants, and systems—positioning the spacecraft's center of gravity optimally for ascent and stage separation dynamics. This distribution, roughly three-fifths of the total stack mass, ensures stability during SLS's powered flight phases, with verifications confirming no adverse shifts from interface additions.

Artemis I Flight Outcomes and Data

The European Service Module (ESM) for Artemis I successfully supported the uncrewed Orion spacecraft throughout its 25-day mission, launched on November 16, 2022, from Kennedy Space Center aboard the Space Launch System (SLS). The ESM provided essential propulsion, power, and thermal control, enabling key maneuvers such as trajectory corrections and the outbound powered lunar flyby on November 21, 2022. All primary systems operated nominally, with the module separating from Orion on December 11, 2022, prior to splashdown, and subsequently deorbiting into the Pacific Ocean. Solar array wings deployed successfully shortly after launch, generating approximately 15% more electrical power than pre-flight predictions, exceeding the baseline capability of 11.2 kW to support spacecraft operations including avionics and propulsion firings. The four deployable wings, equipped with 15,000 solar cells, maintained orientation toward via dual-axis rotation, ensuring continuous power during the trans-lunar injection, lunar vicinity phases, and return trajectory. No failures in power generation were reported, validating the ESM's electrical distribution system's reliability for deep-space environments. The ESM's propulsion subsystem, featuring the Engine (OMS-E) and (RCS) thrusters, executed 19 burns without anomaly, delivering the precise delta-V required for mission trajectory adjustments totaling around 15 m/s across corrections and flyby maneuvers. Hypergolic propellants—monomethyl hydrazine and nitrogen tetroxide—performed as expected in the bipropellant system, though post-flight analysis noted minor discrepancies in propellant usage efficiency due to unpredicted pressurization behaviors in helium tanks. These did not impact overall mission success but informed refinements for subsequent flights. Thermal control systems upheld stability across temperature extremes encountered during the lunar flyby and phase, with radiators and heaters preventing overheating or freezing in uncrewed conditions. Empirical data from onboard sensors confirmed thermal margins exceeded design thresholds, achieving over 95% system uptime despite isolated performance variations that were mitigated via ground-commanded redundancies. The absence of major faults underscored the ESM's robustness, though efficiency shortfalls highlighted areas for causal improvements in pressurization modeling.

Preparations for Crewed Artemis Missions

Following the successful uncrewed I mission in November 2022, data from the European Service Module (ESM) propulsion system, including performance of its 24 (RCS) thrusters and main engine firings, has been analyzed to validate and refine systems for crewed operations. This telemetry confirmed stable chamber pressure responses and inlet regulation, informing enhancements such as verified thruster redundancy to mitigate potential single-point failures during human-rated flights. 's human-rating certification process for , encompassing the ESM, requires demonstration of fault-tolerant designs meeting standards for deep-space crew safety, with Artemis I outcomes contributing to the required certification products for subsequent missions. For crewed Artemis missions, the ESM incorporates redundant avionics and propulsion elements to support extended durations up to 21 days, providing essential oxygen, water, and thermal control in conjunction with the crew module's Environmental Control and Life Support System (ECLSS). Ground-based demonstrations of ESM abort propulsion capabilities, leveraging the engine derived from heritage systems, ensure reliable in-space trajectory corrections and deorbit burns critical for crew return scenarios. These adaptations build on I validations, emphasizing causal reliability in power distribution and attitude control for human presence. Preparations for ESM-2 on Artemis II and ESM-3 for include integrated ground rehearsals at , such as closed-loop mission simulations that replicate full flight profiles, including ESM activation sequences and contingency responses. Teams from ESA, , and conduct these tests to verify ESM-Orion interfaces, with ESM-2 undergoing final mating and environmental checks as of October 2025 ahead of vehicle stacking. Abort scenario drills, coordinated with Department of Defense assets, further certify ESM propulsion readiness for crewed aborts post-liftoff. Ongoing delays have shifted Artemis II to a target launch in April 2026, allowing additional time for ESM-2/3 qualification amid rigorous integrated vehicle testing to ensure human-rated performance. These efforts prioritize empirical validation from flight data over speculative adjustments, maintaining focus on verifiable system robustness for the inaugural crewed .

Challenges and Criticisms

Schedule Delays and Technical Setbacks

![Orion Service Module testing][float-right] The delivery of the first European Service Module (ESM-1) for NASA's Artemis I mission incurred an 8-month schedule slippage primarily due to delays in hardware delivery and testing failures by the European Space Agency (ESA) and its contractor Airbus. These issues, including problems with component integration and qualification testing, pushed back the overall Orion spacecraft assembly timeline, contributing to the postponement of the uncrewed lunar flyby from initial 2017 targets to November 2022. The U.S. Government Accountability Office (GAO) highlighted that such ESM-related delays were a key factor in the Orion program's failure to meet its June 2020 launch goal. Subsequent ESM units faced additional hurdles, with ESM-2 production affected by global disruptions intensified by the , leading to broader II timeline shifts from 2024 to April 2026. Technical challenges, including failures in motor valve drive circuits within the Environmental Control and (ECLSS) components integrated from ESM elements, required extensive rework and verification, further compressing integration margins with the crew module. NASA's Office of noted persistent supply chain visibility gaps across the , exacerbating risks of cascading delays tied to international dependencies like the ESM. The ESM's position as a in the multinational has amplified its role as a bottleneck, where ESA's production timelines directly constrain U.S. and [Space Launch System](/page/Space Launch System) (SLS) readiness due to sequential handover and testing requirements. Early GAO assessments underscored that ESM delivery slippages, such as the 22-month overall impact on Artemis I from ESA commitments, underscored vulnerabilities in cross-agency coordination, with ripple effects persisting into crewed mission preparations. These setbacks have necessitated repeated baseline revisions, highlighting engineering realism over optimistic projections in deep-space development.

Cost Overruns and Budgetary Pressures

The initial contract awarded by the European Space Agency (ESA) to Airbus Defence and Space in November 2014 for the development and construction of the first European Service Module (ESM-1) was valued at a fixed €390 million. However, the total cost for ESM-1, encompassing full development activities, escalated to €650 million, reflecting expanded scope in adapting Automated Transfer Vehicle (ATV) heritage components for human-rated deep-space operations, including enhanced propulsion and power systems. This increase highlights underestimations in upfront planning for custom integrations required to meet NASA's stringent Orion spacecraft interfaces, despite the fixed-price structure intended to cap contractor liabilities. Subsequent ESM units have imposed ongoing budgetary strains on ESA member states, with contracts for ESM-2 at approximately €200 million in 2017 and ESM-3 at €250 million in 2020, followed by a €650 million agreement in 2021 for three additional modules (ESM-4 through ESM-6). Inflation, supply chain disruptions—exacerbated by the COVID-19 pandemic—and iterative design refinements for improved reliability have contributed to these per-unit costs exceeding initial projections of around €450 million for the overall program baseline. While NASA provides in-kind offsets through technology transfers and mission opportunities, the net financial burden falls primarily on European taxpayers, amplifying opportunity costs for alternative ESA priorities like independent launchers or scientific missions. U.S. () and Inspector General audits have underscored ESM-related risks within the broader program, citing potential overruns of up to $200 million for the second service module (ESM-2) due to complexities and dependency on suppliers. These assessments point to systemic underestimation of for bespoke components, such as the main engine cluster derived from ATV, contrasting with potentially more efficient commercial propulsion alternatives that private entities have developed at lower marginal costs. ESA program managers have maintained that core contracts remained within bounds, but cumulative escalations underscore inefficiencies in government-led international collaborations versus agile private-sector models.

Limitations in Capability and Strategic Dependencies

The European Service Module's (ESM) , utilizing a single AJ10-190 main engine derived from the Space Shuttle's and producing 27.7 kN of with hypergolic propellants, delivers a total of approximately 1,340 m/s, which supports insertion and return but falls short for more demanding trajectories. This capability, while adequate for near-Earth and operations in the , proves underpowered for Mars missions, where interplanetary transfers demand delta-V exceeding 5,000 m/s even with efficient trajectories, necessitating additional stages or vehicles that the ESM cannot independently provide. Analyses in 2025 highlight this constraint, noting the ESM's fixed hypergolic architecture limits abort agility and maneuver flexibility compared to reusable chemical or nuclear thermal alternatives, which offer higher and scalability for beyond-lunar exploration. The ESM's reliance on U.S.-sourced components introduces strategic vulnerabilities, particularly the engine manufactured by , subjecting European operations to American supply chain disruptions and shifting priorities. 's 2023 Inspector General report on Artemis supply chain risks underscores broader interdependencies, where delays in U.S. propulsion elements have historically propagated to partners, amplifying exposure for ESA without domestic equivalents for high-thrust, restartable engines. A 2022 assessment of supply chains further identifies such cross-Atlantic dependencies as critical risks, with the lacking full over key subsystems, potentially constraining mission pacing to U.S. budgetary and policy cycles. By committing to the ESM as its contribution to the Orion spacecraft under a 2013 barter agreement—exchanging modules for astronaut seats on future missions—ESA has structurally aligned its deep-space efforts with the SLS/Orion ecosystem, diverting resources from autonomous European propulsion developments like advanced Ariane derivatives or independent crewed vehicles. This integration, while enabling participation in lunar returns, perpetuates a junior-partner dynamic, as evidenced by ESA's limited influence over Orion evolution and the opportunity costs in pursuing standalone capabilities for Mars or asteroid missions, where self-reliant architectures would mitigate geopolitical frictions. Such dependencies, rooted in technology transfer limitations and industrial specialization, hinder Europe's trajectory toward equitable multilateral exploration without U.S. primacy.

Future Role and Prospects

Planned Additional Service Modules

In February 2021, the European Space Agency (ESA) awarded Airbus a €650 million contract to manufacture three additional European Service Modules (ESMs)—designated ESM-4, ESM-5, and ESM-6—for integration with NASA's Orion spacecraft on the Artemis IV, V, and VI missions. These units build on the baseline design validated during Artemis I, incorporating no fundamental changes to propulsion systems amid stable ESA budgets that prioritize production continuity over capability expansions. ESM-4, the first of this series, is slated to support by enabling to with and tow the Lunar I-Hab habitation into position at the Gateway lunar orbital , facilitating initial of the station. Production of ESM-4 progressed to structural integration stages by early 2023, with targeting delivery alignment to NASA's revised timeline, currently projected no earlier than 2028 pending prior mission delays. Subsequent modules, ESM-5 and ESM-6, will sustain 's role in crewed lunar operations and Gateway logistics through the late . ESA's commitment to these modules stems from a 2019 ministerial approval of financing for extended support, resulting in six ESMs under contract as of 2023, underwritten by member state contributions emphasizing reliable service over innovative upgrades like enhanced battery capacity or thrust. This pipeline ensures European propulsion and power contributions to U.S.-led deep-space missions without introducing dependencies on unproven technologies, though recent U.S. proposals have prompted ESA reviews of post-Artemis VI viability.

Potential for Reuse and Mission Adaptations

In a study presented at the 2025 Lunar and Planetary Science Conference, an team led by Carol Raymond of NASA's proposed repurposing post-mission European Service Modules (ESMs) for extended uncrewed operations, drawing from a JPL conducted in summer 2024. The ESM, which separates from the crew module prior to Earth reentry and is conventionally disposed of via atmospheric burnout, could be modified for roles such as autonomous observers targeting near-Earth asteroids, lunar surfaces, Mars' moons and Deimos, or , leveraging its existing solar electric power generation, chemical propulsion systems, and capacity for up to 300 kg of additional scientific payloads. Key adaptations would capitalize on the ESM's durable propellant tanks and main engine, originally derived from the Automated Transfer Vehicle heritage, to enable delta-V maneuvers for these trajectories without fabricating entirely new propulsion infrastructure, potentially yielding significant cost efficiencies compared to developing bespoke modules for low-thrust missions. Additional concepts include deployment as a lunar tug for kinetic impactors into permanently shadowed regions or near-Earth asteroid deflection demonstrations, or as a long-duration communications in Venus orbit to support surface and orbiter assets. However, realizing these extensions faces hurdles, including redesigning the ESM for controlled separation and orbital capture to avoid destructive reentry—necessitating capture mechanisms or upper-stage assists—and incurring refurbishment expenses for inspection, replenishment, and subsystem recertification after deep-space exposure. Proponents argue that such investments could offset new-build costs through reused hardware longevity, while strategically reducing the environmental footprint of ocean-disposal trajectories by integrating ESMs into architectures alongside lunar landers for enhanced orbital science returns. These ideas remain conceptual, with no committed ESA or implementation as of 2025, pending feasibility assessments of modification risks versus baseline single-use operations.

Long-Term Viability in Artemis and Beyond

The European Service Module's long-term viability within the Artemis program hinges on the continued centrality of NASA's Orion spacecraft, which relies on the ESM for propulsion, power generation, and life support during cislunar missions. As of 2025, Orion with ESM remains the baseline for crew transport to lunar orbit in early Artemis flights, including Artemis II (targeted no earlier than February 2026) and subsequent missions docking with the Lunar Gateway or Starship Human Landing System. However, evolving architectures favoring SpaceX's Starship for surface operations and potential Earth-to-orbit transport introduce risks of reduced Orion reliance, with analyses proposing a transition away from SLS/Orion by the mid-2030s to prioritize reusable systems amid budgetary constraints. This dependency underscores ESM's sustainability as contingent on U.S. political and fiscal commitments to legacy hardware, rather than inherent scalability. Empirical performance data from Artemis I (November 2022) validated the ESM's reliability, with its bipropellant main engine and auxiliary thrusters executing 33 maneuvers over 25 days, delivering precise trajectory corrections and thermal control without anomalies, thus confirming its value for deep-space excursions beyond . Yet, these results also highlight intrinsic limitations: the ESM's design, supporting up to 21 days of undocked operations for a four-person , lacks the and shielding for extended interplanetary transits, such as the 6-8 month Mars journey requiring far greater delta-v and logistical resupply. 's solar-electric architecture and finite (approximately 8.6 metric tons of hypergolic fuels) prioritize lunar return profiles, rendering ESM ill-suited for Mars-scale without redesigns incompatible with current agreements. While the ESM enables Europe's technical contributions—building on Automated Transfer Vehicle heritage to furnish four modules through Artemis VI—the arrangement perpetuates strategic dependencies on NASA's SLS/Orion paradigm, potentially sidelining autonomous European innovation in favor of collaborative inefficiencies. Proponents of phase-out argue that Starship's refuelable architecture could supplant for crewed deep-space roles post- IV (planned 2028), diminishing ESM production incentives and exposing ESA to program cancellations amid U.S. fiscal reviews. This trajectory suggests ESM's enduring relevance may wane by the 2030s unless integrated into hybrid Gateway operations, though empirical evidence from I/II favors architectures emphasizing reusability over single-use modules like ESM.

References

  1. [1]
    Orion European Service Module for NASA's Artemis - Airbus
    The Orion ESM is cylindrical in shape and approximately 4 metres in diameter and height. At launch, it weighs just over 13 tonnes.
  2. [2]
    European Service Module - ESA
    The European Service Module is ESA's contribution to NASA's Orion spacecraft that will send astronauts to the Moon and beyond.
  3. [3]
    The making of the European Service Modules - ESA
    Mar 11, 2022 · The first complete European Service Module was shipped to NASA's Kennedy Space Center in 2018 and is now atop the rocket that will launch it ...
  4. [4]
    Orion's European Service Module 3, the backbone of return ... - Airbus
    Aug 22, 2024 · The ESM-3 carries the main source of drinking water for the astronauts, and features a 240-litre tank. An all-electric spacecraft. Unlike the ...Missing: facts | Show results with:facts
  5. [5]
    European Service Module - Orion Spacecraft - NASA
    Apr 24, 2024 · The Orion European Service Module is the spacecraft's powerhouse, supplying it with electricity, propulsion, thermal control, air, and water in space.
  6. [6]
    ESA - History - European Space Agency
    Orion's European Service Module has evolved out of ESA's Automated Transfer Vehicle (ATV) that served the International Space Station five times between 2008 ...
  7. [7]
    ESA - Europe delivers for Artemis III - European Space Agency
    Aug 22, 2024 · The European Service Module that will power the Orion spacecraft during the Artemis III mission to the Moon is soon on its way to the United States.
  8. [8]
    Orion's Artemis III European Service Module Joined with Crew ...
    Sep 27, 2024 · It acts as the driving force behind the Orion spacecraft for deep space exploration, providing essential propulsion, thermal control, and ...
  9. [9]
    The People Bringing NASA's Orion to Life: The European Service ...
    Oct 26, 2021 · The service module is built by ESA lead contractor Airbus. Companies in the U.S. and 10 European countries supply its components. Airbus ...
  10. [10]
    [PDF] The Multi-purpose Crew Vehicle European Service Module
    Sep 1, 2025 · A joint ESA - NASA working group was established in May 2011 to assess the feasibility of Europe developing this Module based on ATV heritage.
  11. [11]
    [PDF] ESA's Service Module for Orion - European Space Agency
    The plan was given the go-ahead at ESA's Ministerial Council last November and allows European industry to capitalise ATV technology while significantly cutting ...
  12. [12]
    NASA Signs Agreement for a European-Provided Orion Service ...
    Jan 16, 2013 · NASA signed an agreement in mid-December for the European Space Agency (ESA) to provide a service module for the Orion spacecraft's Exploration ...
  13. [13]
    ESA - International partnership - European Space Agency
    The barter agreement was extended in January 2013 when ESA and NASA announced that Europe would provide one service module for Orion.
  14. [14]
    Orion's European service module faces key June review - SpaceNews
    May 23, 2016 · ESA in 2014 estimated that its entire ESM program was valued at 470 million euros, equivalent to three years of common space station operations ...
  15. [15]
    NASA-ESA Agreement on Orion Service Module is For Only One ...
    Jan 16, 2013 · Under this new agreement, ESA will compensate NASA for future common systems operating costs by using ATV hardware for the service module for ...
  16. [16]
    Airbus wins ESA contract to construct third European Service ...
    May 26, 2020 · The European Space Agency (ESA) has signed a contract with Airbus for the construction of the third European Service Module (ESM) for Orion, the ...
  17. [17]
    Meet the Orion Service Module, the European-built brain of NASA's ...
    Oct 14, 2021 · "The development of the Orion Service Module started 10 years ago," Didier Radola, Orion Service Module project manager at Airbus said ...
  18. [18]
    [PDF] update - NASA
    Its design and packaging make it tolerant to radiation, and its life ex- ... • European Service Module Structural Test. Article Dynamic Model Correlation.
  19. [19]
    [PDF] Orion European Service Module (ESM) development, integration ...
    The ownership of the STA has been handed over to NASA/Lockheed for integration in the Orion vehicle structural test article and it will be used again in 2017 ...Missing: feedback | Show results with:feedback
  20. [20]
    [PDF] NASA Assessments of Major Projects
    Jun 23, 2022 · of this cost increase, which was attributed to European Service Module. (ESM) delays and contractor performance issues. The revised cost.
  21. [21]
    Design Optimisation and Mass Saving of the Structure of the Orion ...
    Oct 1, 2018 · This paper presents an overview of the design optimisation measures that have been proposed and analysed in order to reduce the mass of the ...Missing: scope adjustments cost
  22. [22]
    European Service Module gets real – Orion blog
    Nov 26, 2014 · The ESM is a cylindrical module with a diameter of 4.5 metres and a total length – main engine excluded – of 2.7 metres. It is fitted with four ...Missing: fueled | Show results with:fueled
  23. [23]
    Airbus European Service Modules - Three in a row!
    Feb 9, 2023 · The Orion ESM is cylindrical in shape and approximately four metres in diameter and height. At launch, it weighs just over 13 tonnes, making up ...
  24. [24]
    ESA - Propulsion - European Space Agency
    A single Space Shuttle Orbital Maneuvering System engine provides 25.7 kN; gimballed in pitch and yaw; Eight fixed 490 N auxiliary thrusters, model R-4D-11 ...
  25. [25]
    [PDF] A Heat and Mass Transfer Model of the Orion European Service ...
    European Service Module Propulsion Sub-System. David B. Stephens. Michael L ... AJ10-190. 27 kN (6000 lbf) thrust with TVC. AM1 engine a spaceflight ...
  26. [26]
    [PDF] artemis i orion-esm propulsion system engine performance
    May 23, 2024 · The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane ...
  27. [27]
    [PDF] ORION Reference Guide | NASA
    Artemis II Weight 34,400 lbs. Engine/Thrusters 1 Orbital Maneuvering System;. 6,000 lbs. of thrust. 8 Auxiliary Engines; 110 lbs. of each thrust.<|separator|>
  28. [28]
    ESA - Power - European Space Agency
    The 7 m-long solar wings on the European Service Module feature the distinctive X-wing configuration that was also used in the module's predecessor, the ...Missing: span | Show results with:span
  29. [29]
    [PDF] Development of the thermal control system of the European Service ...
    Jul 20, 2017 · This paper provides an overview of the Thermal Control System (TCS) configuration of the MPCV European Service Module (ESM) at Critical Design ...
  30. [30]
    ESA - Temperature control - European Space Agency
    Coolant is pumped around a closed loop that includes six radiators near the spacecraft's exterior, much like in a car engine. Electrical heaters keep the ...
  31. [31]
    Thermal control units - Airbus Crisa's
    The TCUs are the electronic controllers for the Orion's Thermal Control System (TCS), which is one of the key services provided by the European Service Module ( ...
  32. [32]
    European Service Modules: hecho en España – Orion blog
    May 30, 2022 · ... Thermal Control System ... The Thermal Control Units supplied by Airbus collect data from the European Service Module's Consumables Storage System ...
  33. [33]
    Service Module, assemble! – Orion blog
    Sep 30, 2024 · News and updates on Europe's Service Module for NASA's Orion spacecraft and Artemis.
  34. [34]
    European Service Module | Glenn Research Center - NASA
    May 19, 2025 · The Orion crew transport vehicle's European Service Module (ESM) is the spacecraft's powerhouse, supplying it with electricity, propulsion, thermal control, ...Service Module Overview · The European-built Service... · Orion Service Module...Missing: facts | Show results with:facts
  35. [35]
    Thales Alenia Space providing key technologies to sustain life ...
    Orion's European Service Module 4 successfully ... Thermal Control System (TCS) and the Consumable ... European Service Module, the company is ...<|separator|>
  36. [36]
    Airbus Defence and Space starts Orion service module assembly
    May 20, 2016 · In November 2014, Airbus Defence and Space was chosen by the European Space Agency (ESA) as prime contractor to develop and build the ESM ...Missing: Toulouse | Show results with:Toulouse
  37. [37]
    European Service Module (ESM) for Orion Capsule in Production
    Nov 9, 2015 · The actual flight tanks for the ESM – which will be used for the first time when the uncrewed Exploration Mission 1 launches in 2018 – will be ...
  38. [38]
    [PDF] The Multi-purpose Crew Vehicle European Service Module
    This paper provides an overview of the system and subsystem configuration of the. MPCV European Service Module (ESM) at Preliminary Design Review (PDR) ...Missing: adaptations | Show results with:adaptations
  39. [39]
    First European Service Module enroute to USA – Orion blog
    Nov 5, 2018 · On Monday morning 5 November 2018 the first European Service Module for NASA's Orion spacecraft was loaded onto an Antonov An-124 aircraft ...Missing: Toulouse | Show results with:Toulouse
  40. [40]
    Touch down: European module arrives at Kennedy Space Center
    Nov 7, 2018 · Work is already underway on the second European Service Module which will provide air, water, and temperature control for the astronauts that ...
  41. [41]
    Following ESM arrival at KSC, Orion kicks off final assembly for EM-1
    Nov 21, 2018 · The schedule calls for completion of assembly and checkout of the first integrated Orion, a series of tests of the new vehicle in Ohio, and ...
  42. [42]
    The Second European Service Module (ESM-2) Evolutions ...
    Oct 1, 2018 · This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced ...Missing: hardware seals rated
  43. [43]
    [PDF] NASA HUMAN SPACE EXPLORATION Significant Investments in ...
    Dec 15, 2020 · According to Orion program officials, assumptions about cost savings for future Orion spacecraft production are primarily derived from the reuse ...Missing: adjustments | Show results with:adjustments
  44. [44]
    NASA's Artemis II Orion Service Module Buttoned Up for Launch
    Mar 21, 2025 · The service module will provide propulsion and life support including thermal control, air, and water for the Artemis II test flight.Missing: ESM- ESA
  45. [45]
    European Service Module for Artemis II connected to Orion vehicle
    Oct 24, 2023 · The second European Service Module was connected to the rest of the Orion spacecraft which will be used in the Artemis II mission.
  46. [46]
    NASA delays historic Artemis 2 moon mission to 2026 ... - Space
    Dec 5, 2024 · NASA has delayed the planned launch of its Artemis 2 crewed moon mission to April 2026, allowing more time to prep its Orion capsule.
  47. [47]
    ESA delivers again: ESM-3 departs for US to power Artemis III
    Manufactured in Italy, assembled in Germany, and built with components sourced from over 20 companies across more than 10 European countries, ESM-3 embodies the ...<|separator|>
  48. [48]
    ARIANEGROUP TO DELIVER KEY PROPULSION SYSTEM ...
    Jun 21, 2024 · Airbus DS is prime contractor on behalf of the European Space Agency (ESA) for the ESM service module, Europe's contribution to NASA's Orion ...
  49. [49]
    Airbus ships the third European Service Module to Cape Canaveral ...
    Aug 22, 2024 · The four wings generate 11.2 kW of power per hour, enough to power two four-person households on Earth. Only about 10% of the power is needed ...Missing: generation | Show results with:generation
  50. [50]
    Keys to the Moon: ESA hands over third European Service Module
    Sep 16, 2025 · Each European Service Module ... Since then, the module has been through rigorous testing, such as environmental and life support checks, to ...
  51. [51]
    NASA's Artemis II Orion Spacecraft Completes Electromagnetic ...
    Apr 30, 2024 · On Friday, April 26, engineers completed a series of electromagnetic tests on the integrated Orion crew and service module for NASA's Artemis II mission.Missing: ground ESM
  52. [52]
    Integrated Testing on Horizon for Artemis II Launch Preparations
    May 29, 2025 · Teams responsible for preparing and launching Artemis II at NASA's Kennedy Space Center in Florida are set to begin a series of integrated tests to get ready ...Missing: ESM | Show results with:ESM
  53. [53]
    Orion's first Service Module integration complete - ESA
    ESA's European service module will provide power, water, air and electricity to NASA's Orion exploration spacecraft that will eventually fly beyond the Moon ...Missing: physical | Show results with:physical
  54. [54]
    Airbus delivers second composites-intensive European Service ...
    Oct 8, 2021 · It was announced on Oct. 6 that the second composites-intensive European Service Module (ESM-2), built by Airbus (Toulouse, France) for ...
  55. [55]
    First Artemis lunar mission ends, so long European Service Module-1
    Dec 16, 2022 · During the Artemis I mission, ESA's ESM Mission Evaluation Room team provided in-depth advice and knowledge to flight control at NASA's Johnson ...Missing: outcomes | Show results with:outcomes
  56. [56]
    [PDF] Artemis I Orion ESM Propulsion System Engine Performance
    May 23, 2024 · During Artemis I, the Service Module successfully executed 19 burns. Page 3. System Overview (Post Priming). 3 c c c c c c. RCS. String IV.
  57. [57]
    Artemis II: solar wings – Orion blog
    Mar 10, 2025 · During Artemis I, the solar arrays of the European Service Module generated 15% more power than initially expected. ... To the left of Orion are ...Missing: generation | Show results with:generation
  58. [58]
    [PDF] OVERVIEW AND ASSESSMENT OF THE ESM PRESSURE ...
    May 23, 2024 · First the 26.7 kN thrust class Orbital Manuevering System engine. (OMS-E) is the main engine and provides thrust for large delta-V maneuvers.
  59. [59]
    [PDF] Crewed Deep Space Systems Human Rating Certification ...
    May 21, 2024 · The intent of this document is to define the requirements, standards, and human rating certification process and products that will be used to ...
  60. [60]
    Artemis II: turning Orion on - ESA's blogs - European Space Agency
    Nov 6, 2023 · Apollo 1 crewmembers in 1966 in the same altitude chamber that Orion will soon be tested in at the Neil Armstrong Operations & Checkout Building ...
  61. [61]
    NASA Completes First Launch Simulation for Artemis II Moon Mission
    Jul 24, 2023 · The team is rehearsing the steps to launch NASA's Space Launch System and Orion spacecraft for the Artemis II crewed mission. Credits: NASA ...
  62. [62]
  63. [63]
    NASA, DoD Practice Abort Scenarios Ahead of Artemis II Moon ...
    Jun 13, 2025 · The team rehearsed procedures they would use to rescue the crew during an abort of NASA's Orion spacecraft while the SLS (Space Launch System) ...
  64. [64]
    NASA Shares Progress Toward Early Artemis Moon Missions with ...
    Jan 9, 2024 · NASA will now target September 2025 for Artemis II, the first crewed Artemis mission around the Moon, and September 2026 for Artemis III.Missing: ESM | Show results with:ESM
  65. [65]
    [PDF] IG-20-018.pdf - NASA OIG
    Jul 16, 2020 · 45. The OTB incorporated $900 million in cost overruns incurred from 2015 to 2019 when Lockheed encountered technical challenges including ...
  66. [66]
    [PDF] GAO-19-377, NASA HUMAN SPACE EXPLORATION
    Jun 19, 2019 · The Orion program is not on schedule to meet the June 2020 launch date for the first mission due to delays with the European Service Module and.
  67. [67]
    [PDF] IG-24-003 - NASA's Management of the Artemis Supply Chain
    Oct 19, 2023 · In this audit, we assessed NASA's management of the Artemis campaign's supply chain, including reviewing supply chain challenges and risks, as ...
  68. [68]
    NASA Delays Artemis II and III Missions, Cites “Incredibly Large ...
    Jan 9, 2024 · NASA has delayed its return-to-the-Moon Artemis II mission to NET Sept 2025 and its Artemis III landing mission to NET Sept 2026, ...<|separator|>
  69. [69]
    [PDF] GAO-19-262SP, NASA: Assessments of Major Projects
    May 30, 2019 · months from the delivery of the European service module. (ESM)—which occurred in November 2018—to EM-1 launch. As a result, the Orion program ...
  70. [70]
    European Service Module - Wikipedia
    The European Service Module (ESM) is the service module component of the Orion spacecraft, serving as its primary power and propulsion componentHistory · Initial design · European ATV-based module · Design
  71. [71]
    Moon mission's human-rated European Service Module is giant leap ...
    Aug 24, 2022 · He said the first ESM, including all development costs, had a price tag of 650 million euros ($790 million), with subsequent modules costing 2.1 ...
  72. [72]
    Airbus Defence and Space wins 200 million euros ESA contract for ...
    Feb 16, 2017 · The contract is worth around 200 million euros. The ESM is a key ... In total, the ESM weighs just over 13 tonnes. In addition to its ...Missing: value overruns<|separator|>
  73. [73]
    Airbus awarded €650 million contract to build three more Orion ...
    Feb 4, 2021 · The European Space Agency (ESA) signed a €650 million ($790 million) contract with Airbus Space and Defence to produce three more service modules for NASA's ...
  74. [74]
    ESA member states commit funding for Orion service module
    Dec 3, 2014 · But ESA member states had only committed to paying for slightly more than half of the service module's 450 million euro ($550 million) cost.Missing: initial | Show results with:initial
  75. [75]
    The European Service Module (ESM)
    When developing the service module, European aerospace engineers drew upon the experience that they had gained from the successful Automated Transfer Vehicle ( ...
  76. [76]
    GAO Warns about SLS, EGS and Orion Cost and Schedule Concerns
    Jul 27, 2016 · Orion program officials are tracking the EM-2 service module “as one of the largest cost risks facing the program,” potentially $200 million, ...
  77. [77]
    Cost and schedule overruns continue to grow for NASA programs
    NASA suffered increasing cost overruns ... The GAO reported that the pandemic caused delays for production of the European Service ...
  78. [78]
    NASA contract signing for space station program - Facebook
    Jul 31, 2025 · Philippe Deloo, ESA's ESM program manager, said the agency's 390-million-euro contract with Airbus signed in 2014 has not be exceeded despite ...
  79. [79]
    The Lunacy of Artemis (Idle Words)
    May 24, 2024 · [10] Orion/ESM has a delta V budget of 1340 m/s. Getting into and out of an equatorial low lunar orbit takes about 1800 m/s, more for a ...
  80. [80]
    Phasing out the SLS and Orion programs and embracing Starship
    Jan 27, 2025 · This paper proposes a plan for transitioning from using both transportation systems for Artemis missions to using only the Starship.
  81. [81]
    [PDF] Criticality assessment of the EU space systems' supply chains
    Oct 11, 2022 · ➀ EU is a space power with a significant industrial capacity & know-how but its value chain is exposed to supply risks / industrial dependencies.
  82. [82]
    [PDF] Case Study of European Mars Missions utilizing System Design and ...
    This paper presents a Stakeholder Value Network (SVN) analysis of the ESA Exploration Program and component based interface-technology risk design/ dependency ...
  83. [83]
    Fly Me to the Moon: Airbus Wins ESA Contract for Three More ...
    Feb 2, 2021 · The ESMs announced today will be used for the Artemis IV to VI missions, the first two of which are part of the European contribution to the ...
  84. [84]
    Airbus highlights European Service Module work for Artemis
    Aug 26, 2022 · It is built by a large coalition of European partners, and the final assembly is done by Airbus Space and Defense in Bremen, Germany.
  85. [85]
    ESA - Artemis IV - European Space Agency
    Orion and the European Service Module will tug the module into position around the Moon and dock with the Gateway, pushing Lunar I-Hab into position. Lunar I- ...
  86. [86]
    [PDF] IG-23-004 - NASA's Partnerships with International Space Agencies ...
    Jan 17, 2023 · ESA's budget for fiscal year 2022 is approximately $7 billion (7.2 ... Details provision by ESA of ESM 1 through 3 to NASA. 2022.
  87. [87]
    ESA studying impacts of proposed NASA budget cuts - SpaceNews
    Jun 14, 2025 · The biggest is in exploration, with the budget proposing an end to the Orion spacecraft, to which ESA provides the service module, after ...
  88. [88]
  89. [89]
    Artemis ESM's Could be Repurposed for Future Missions
    Apr 4, 2025 · In a recent paper, an international team of scientists identified how the Orion spacecraft's European Service Module (ESM) could be reused.
  90. [90]
    Low-Cost Mission Opportunities Using Re-Purposed Artemis ...
    The European Service Module that returns the Orion Crew Module to Earth presents an opportunity for re-use in extended missions with some modifications.
  91. [91]
    Artemis II - NASA
    April 2026. Mission Duration. 10 days. Mission Overview. Artemis II. First Artemis Flight With Crew Important Step on Long-term Return to the Moon, Missions to ...Artemis II Map · Our Artemis Crew · Artemis III · Learn How to Draw Artemis!Missing: delays ESM<|separator|>
  92. [92]
    Is Orion really capable of reaching Mars? - NASA Spaceflight Forum
    Dec 4, 2020 · A Mars mission would require a one-way journey of at least six to eight months, depending on the relative positions of the Earth and Mars at the time of launch.
  93. [93]
    Orion Spacecraft - NASA
    NASA's Orion spacecraft is carrying humanity to the Moon. Launching atop NASA's Space Launch System (SLS) rocket, Orion will carry the crew to lunar orbit.Orion Overview · Orion News · Orion's Missions · Orion Media Resources<|separator|>