Frederick Douglass Memorial Bridge

The Frederick Douglass Memorial Bridge is a six-lane vehicular in , spanning the at the southern edge of Anacostia Park and carrying traffic between the Southwest Waterfront and the neighborhood. Originally constructed in 1950 as the South Capitol Street Bridge, it was renamed to honor the 19th-century abolitionist and orator , who resided in from 1877 until his death in 1895. The bridge's replacement project, part of the broader corridor improvements, addressed the original structure's structural deficiencies and seismic vulnerabilities after over 70 years of service. of the new 1,600-foot-long bridge began in 2018, featuring three sets of parallel white arches inspired by the city's architectural heritage, along with enhanced pedestrian and bicycle accommodations, and integration with the reconstructed Suitland Parkway interchange. The $441 million project was completed and opened to traffic in September 2021, with demolition of the old bridge following shortly thereafter to improve regional connectivity and safety. As a key link in the District's transportation network, the bridge facilitates access to federal facilities and supports in underserved areas, while its design evokes Douglass's legacy of resilience and advocacy for civil rights without altering the empirical focus on infrastructure functionality.

History

Original Construction

The South Capitol Street Bridge, the original structure later renamed the Frederick Douglass Memorial Bridge, was constructed in 1949 as a steel swing girder bridge with concrete piers. It opened to vehicular traffic in January 1950, spanning the Anacostia River to connect the southwest and southeast quadrants of Washington, D.C. The design incorporated a movable swing span to allow passage of river traffic, addressing the navigational demands of the Anacostia waterway at the time. This bridge represented one of the first major federally funded infrastructure projects in following , aimed at improving urban mobility and supporting postwar development. Prior proposals for a crossing dated back decades, but wartime constraints delayed realization until the late 1940s. The structure facilitated daily crossings for tens of thousands of vehicles, serving as a key link in the city's roadway network.

Renaming in 1965

The South Capitol Street Bridge, completed in 1950, was renamed the Frederick Douglass Memorial Bridge in 1965 to honor Frederick Douglass (1818–1895), the escaped enslaved person who became a leading abolitionist, orator, statesman, and author advocating for the end of slavery and expansion of civil rights. The renaming recognized Douglass's historical residence in the Anacostia area of southeast Washington, D.C., where he owned Cedar Hill, his longtime home from 1878 until his death, thereby linking the bridge to his local legacy as a community figure and supporter of education and self-improvement among African Americans. The redesignation occurred during a period of heightened awareness in the United States, though specific legislative or municipal records detailing the exact impetus or process—such as a formal resolution by the or public referendum—remain sparsely documented in available historical accounts. Family descendants, including , attended the renaming event, representing Douglass's lineage and underscoring the tribute's personal significance to his heirs. Some minor renovations accompanied the change, but the action was primarily symbolic, affirming Douglass's enduring influence without altering the bridge's core infrastructure at that stage.

Deterioration and Replacement Planning

The original Frederick Douglass Memorial Bridge, completed in 1950, experienced extensive deterioration over its service life, characterized by perforating steel beams, cracking that exposed reinforcing bars, and periodic detachment of fragments into the below. These issues stemmed from long-term exposure to environmental factors, including deicing salts and moisture ingress, which accelerated rust formation and material degradation in the structure's steel and components. By the mid-2000s, inspections revealed the bridge's underpinnings had significantly thinned, rendering sections structurally unstable despite ongoing efforts. Department of Transportation classified it as structurally deficient, a designation reflecting substantial deterioration in primary load-bearing elements that required continuous monitoring and precluded simple repairs as a viable long-term solution. Replacement planning integrated into the Anacostia Waterfront Initiative's South Capitol Street Corridor Project, with preliminary studies and federal funding pursuits extending more than a decade before the 2017 design unveiling. In late , officials formalized a $906 million initiative to fully replace rather than rehabilitate it, citing the advanced and obsolescence that limited capacity for its 77,000 daily vehicles. The plan included realigning approaches, expanding to six lanes, and incorporating pedestrian and bicycle accommodations to address both structural failings and outdated design. Final design approval occurred in 2017, featuring a signature triple-arch structure intended to symbolize while ensuring a 100-year ; construction proceeded adjacent to the existing span to minimize disruptions. This approach prioritized comprehensive renewal over patchwork fixes, driven by engineering assessments that deemed partial inadequate for and seismic .

Design and Engineering

Architectural Features

The Frederick Douglass Memorial Bridge employs a through-arch and cable-stayed design, featuring three pairs of arches that support a 1,445-foot-long deck spanning the . These arches, positioned above the deck, utilize cable-stay technology with 88 stays arranged in vertical planes outside the deck edges to suspend the structure, minimizing roadway hazards from potential falling . The arches form a visually dynamic profile resembling a across water, with the central pair rising 30 feet higher than the outer ones and all dipping below the deck to anchor at two V-shaped piers in the river, creating an illusion of floating supports. Each arch rib adopts a hexagonal cross-section fabricated from plates with internal detailing and butted splices, which reduces apparent mass through while spanning unbraced over the deck for structural efficiency. Integrated LED lighting illuminates the arches and cables at night, enhancing aesthetic appeal and navigational visibility, while the overall white-painted framework contributes to the bridge's iconic role as a neighborhood connector. The design prioritizes a 100-year minimum through corrosion-resistant materials and coatings, ensuring durability in the urban coastal environment.

Structural Specifications

The Frederick Douglass Memorial Bridge features a three-span tied-arch design with three parallel steel arches positioned above the deck, spanning the . The total structure measures 1,445 feet (440 meters) in length, consisting of a central main span of 540 feet (165 meters) flanked by two side spans of 452 feet (138 meters) each. The arches, fabricated from (grades 50W and HPS 70W) with variable hexagonal cross-sections, reach a maximum height of 168 feet (51 meters) above the water at the central arch, which stands 20 feet taller than the side arches. The bridge deck, typically 122.5 feet (37 meters) wide and widening to 166 feet (51 meters) at the V-shaped piers for overlooks, supports six vehicular lanes (three per direction) with provisions for future expansion to eight lanes, plus 18-foot-wide shared-use paths on each side. The deck employs a composite system of panels over girders and floor beams, suspended via vertical cable hangers from the arches. Foundations comprise 60-inch-diameter steel pipe piles, epoxy-coated and filled with reinforced concrete, driven to lengths of 85 feet at abutments and 105 feet at piers, providing nominal driving resistances up to 2,010 tons. The V-shaped interior piers utilize post-tensioned concrete substructures on these pile foundations. The design ensures a vertical clearance of 42 feet (13 meters) and a minimum service life of 100 years for non-replaceable components, incorporating approximately 8,100 tons of structural steel.

Multimodal and Safety Enhancements

The replacement incorporates enhancements to accommodate vehicles, bicycles, pedestrians, and users, expanding from the original structure's limited provisions. The bridge provides six vehicular traffic lanes to manage approximately 77,000 daily commuters, alongside dedicated bicycle lanes and widened sidewalks that connect to of Columbia's extensive trail network, facilitating safer non-motorized crossings of the . These features augment connectivity for alternative transportation modes, supporting the broader Anacostia Waterfront Initiative's goals of improved mobility and accessibility. Safety improvements address longstanding vulnerabilities in the aging predecessor, which suffered from structural deterioration and inadequate separation of traffic types. New traffic ovals at the bridge's western (intersecting , Potomac Avenue, and Q Street SW) and eastern (intersecting , Suitland Parkway, and Howard Road SE) approaches calm vehicular speeds and reduce collision risks through geometric redesign. The reconstructed Suitland Parkway/I-295 interchange enhances interchange flow, minimizing merging conflicts, while upgraded drainage and stormwater management systems mitigate flooding hazards that previously compromised roadway integrity. Four integrated pedestrian overlooks provide secure vantage points with barriers, promoting public use without compromising structural safety. These enhancements collectively prioritize empirical risk reduction, with design standards implemented by the District Department of Transportation emphasizing separation of modes and resilient infrastructure to prevent incidents observed in the original bridge, such as pedestrian exposure and vehicular instability.

Construction and Completion

Project Timeline

The replacement of the Frederick Douglass Memorial Bridge was integrated into the broader South Capitol Street Corridor Project, initiated in 2012 to address infrastructure needs in Washington, D.C. Design concepts for the new bridge were publicly unveiled on August 10, 2017, by Mayor Muriel Bowser, with construction anticipated to start by late 2017 and conclude by 2021. Preparatory work began in summer 2017, followed by an official groundbreaking ceremony on February 14, 2018, coinciding with the 200th anniversary of Frederick Douglass's birth. Significant construction milestones included the erection of the bridge's distinctive arch spans, with a key achievement marked by the completion of the arches on August 14, 2020. The new bridge opened to traffic ahead of initial projections, with a ribbon-cutting ceremony on September 7, 2021, and full northbound access by September 12, 2021. Dismantlement of the original 1950 bridge commenced later in 2021, extending into early 2022 to complete the transition.
  • 2012: South Capitol Street Corridor Project launched, encompassing bridge replacement.
  • August 10, 2017: Design and timeline announced.
  • Summer 2017: Preparatory construction activities initiated.
  • February 14, 2018: Groundbreaking held.
  • August 14, 2020: Arch construction milestone reached.
  • September 7, 2021: Official opening ceremony.
  • September 12, 2021: Northbound lanes opened to traffic.
  • Late 2021–Early 2022: Demolition of old bridge completed.

Funding and Partnerships

The replacement of the Frederick Douglass Memorial Bridge was funded through a combination of federal grants and local District of Columbia appropriations, totaling approximately $441 million for the design-build contract. Federal contributions exceeded 60 percent of the project cost, pieced together over more than a via congressional appropriations and transportation grants administered by agencies such as the (FHWA). Specific federal awards included $75 million from the SAFETEA-LU National Corridor Infrastructure Investment Program, $68 million in 2011 for right-of-way acquisition and related work, and smaller allocations like $950,000 from Federal Lands Access Program grants in 2010. These funds were secured through advocacy by congressional delegates, including Representative and Majority Leader , who prioritized the bridge as critical infrastructure linking federal and local networks. Local funding from the District exceeded $250 million, drawn primarily from the (DDOT) capital budget and taxpayer-supported bonds, reflecting the project's status as the largest infrastructure initiative in District history. The overall financing model emphasized public investment without private financing mechanisms like public-private partnerships for the core bridge construction, though ancillary developments in the surrounding corridor involved separate mixed-use funding. Key partnerships centered on the 2017 design-build contract awarded by DDOT to the South Capitol Bridge Builders , comprising contractors such as Archer Western (Walsh Group), Traylor Bros., Inc., and Kiewit Infrastructure , with as lead designer. This collaboration integrated oversight from FHWA for compliance with national standards, alongside local coordination with community stakeholders and Anacostia Waterfront Initiative partners to align the project with broader urban revitalization goals. The pooled resources from and entities enabled accelerated delivery under the design-build framework, minimizing traditional bid-protest delays common in federally aided projects.

Technical Challenges During Building

During the construction of the V-shaped piers in summer 2019, the of Granite Construction Inc. and Archer Western encountered significant issues with voids and . These defects, including voids measuring 6 ft by 30 in. and 3 ft by 6 ft by 8 in., resulted from inadequate of the due to congested reinforcing bars and embedded hardware, weakening the structure's load-bearing capacity. The geometry of the cast-in-place V-shaped piers further complicated placement, requiring intricate with limited access for vibratory consolidation. Initial pours led to spalling, necessitating a switch to a mix, adjustments to the curing process, and precise control of placement rates to avoid defects. Construction often occurred at night over 2-3 months, utilizing concrete trucks from a closed lane on the existing bridge. These pier defects required full demolition and rebuilding in October and November 2019, involving ramps and diamond-wire saws, which added millions of dollars to the costs. Microcracks observed were later deemed typical and not contributory to the failure. For the arch base connections, challenges arose from the internal anchorage system, differing from standard steel-to-concrete interfaces, including complex stiffener and anchor rod layouts to mitigate edge spalling effects, detailed baseplate fabrication, and coordination with V-pier post-tensioning. The V-pier substructure demanded large temporary on pile supports and custom for its tapering hexagonal shape to transfer arch loads.

Controversies and Criticisms

Construction Defects and Cost Impacts

During the summer of 2019, while removing from the new bridge's substructures, inspectors identified significant defects including voids and in two V-piers and both legs of one . These flaws stemmed from inadequate vibration of the during placement, exacerbated by congested and embedded hardware that hindered proper consolidation. Notable examples included a 6-foot-square void reaching depths of up to 30 inches and another measuring 3 feet by 6 feet by 8 inches deep. Remediation required partial of the affected elements in October and November 2019, followed by rebuilding using temporary ramps, diamond-infused wire saws for precise cuts, and coring techniques for debris removal and lifting. The design-build of Granite Construction Inc. and Archer Western Contractors bore responsibility for the errors and executed the repairs, incurring costs estimated in the millions of dollars. The contractors filed an claim under a builders risk policy with Lexington Insurance Co., which was denied on grounds that the damages fell outside coverage for faulty workmanship; this sparked a , with a judge ruling in favor of the joint venture on coverage issues as of September 29, 2023, and a trial pending. Post-completion, visible microcracks emerged on the piers supporting the bridge's arches after the structure opened to traffic in September 2021. District Department of Transportation (DDOT) officials attributed these to shrinkage in the high-strength mix, characterized by a low water-to-cement ratio and rapid evaporation during curing, deeming them non-structural. Repairs, described as aesthetic sealing, were scheduled for spring 2023 using warmer weather to facilitate material adhesion, with no additional taxpayer costs anticipated as the contractor assumed responsibility. The original project budget stood at $441 million as announced in August 2017, encompassing bridge replacement, interchange , and traffic ovals but excluding certain ancillary works. Final expenditures reached approximately $442 million by 2024, incorporating the multimillion-dollar remediation for the 2019 concrete defects, though broader scope variations in reporting pushed some estimates to $480 million without evidence of substantial overruns beyond defect-related fixes. These incidents highlight execution challenges in a high-profile design-build but did not derail the overall timeline, as the bridge met its substantial completion target in January 2021 ahead of full demolition of the prior structure.

Broader Project Delays and Disputes

The Corridor project, of which the Frederick Douglass Memorial Bridge replacement formed the centerpiece, originated in planning efforts around 2005 but did not commence construction until late 2017, reflecting prolonged federal environmental reviews under the , public consultations, and iterative design adjustments. A key revision involved shifting the new bridge alignment slightly south of the existing structure to reduce disruption to adjacent areas and improve interchange flow, necessitating an updated Record of Decision in 2011. These processes extended the pre-construction phase by over a decade, prioritizing mitigation of air quality, noise, and community impacts over expedited timelines. The 2016 Project Labor Agreement (PLA) for the corridor sparked disputes over its impact on workforce participation, mandating union s and prevailing wages to stabilize labor but drawing criticism for excluding non-union residents. Department of Transportation (DDOT) evaluations indicated the $480 million bridge segment generated only one new job in Ward 8, the city's most economically disadvantaged area directly bordering the project site, despite goals for substantial hiring. Critics attributed this shortfall to PLA barriers such as union entry requirements and work-hour restrictions, which deterred entry-level applicants from high-unemployment wards, though project proponents cited over 200 total D.C. resident hires and 60% apprenticeship fill rates as evidence of partial success. Eminent domain proceedings for corridor land acquisition fueled additional contention, with a court ruling awarding a developer approximately $45 million less than the $80 million sought for a key parcel, yielding $35 million in taxpayer savings for the District but highlighting tensions between needs and valuations. Funding coordination among federal, District, and local partners proceeded without major breakdowns, though the extended amplified opportunity costs for traffic relief in underserved Anacostia-adjacent communities.

Impact and Reception

Transportation and Economic Effects

The replacement of the Frederick Douglass Memorial Bridge has significantly enhanced vehicular capacity and traffic flow across the Anacostia River, addressing longstanding bottlenecks from the original 1950 swing bridge, which carried approximately 77,000 vehicles daily and was rated structurally deficient. The new fixed-span structure features six lanes—three in each direction—along with reconstructed traffic ovals at each end and an upgraded Suitland Parkway/I-295 interchange, enabling smoother merging and reducing congestion for commuters traveling between Southwest Washington, D.C., and Southeast communities toward Prince George's County, Maryland. These modifications support the bridge's role in handling over 70,000 daily vehicles, including 3,500 trucks, while incorporating dedicated pedestrian paths, bicycle lanes, and connections to regional trail networks for multimodal transport. Economically, the bridge bolsters connectivity between historically divided wards of , facilitating access to centers and fostering along the Anacostia waterfront as part of the $10 billion Anacostia Waterfront Initiative launched in the early . By replacing a functionally obsolete crossing, it supports revitalization efforts, including the nearby Bridge District—a $1.5 billion mixed-use project encompassing 2.5 million square feet of residential, retail, and office space—which leverages improved infrastructure to attract investment to Southeast D.C. The enhanced linkages promote economic integration, enabling better goods movement via I-295 and reducing isolation of -adjacent neighborhoods, though quantifiable job creation or GDP uplift data remains tied to broader corridor improvements rather than the bridge in isolation.

Symbolic and Cultural Role

The honors the 19th-century abolitionist, orator, and statesman , who escaped enslavement in , became a leading advocate against , and resided in the area of Washington, D.C., from 1878 until his death in 1895 at his Cedar Hill home. Originally opened in 1950 as the Bridge, it was renamed in 1965 to commemorate Douglass's contributions to American social reform and civil rights. The renaming reflected Douglass's local ties, including his frequent walks along the , where he studied botany and the natural environment. Spanning the , the bridge physically links the southeast quadrant—historically associated with Douglass's residence and marked by economic challenges—with central , evoking themes of connection and advancement akin to Douglass's of transcending to prominence. The 2021 reconstruction amplified this symbolism through a cable-stayed design featuring three pairs of prominent arches rising 140 feet, creating a visual gateway that underscores themes of progress and unity. Officials have described the structure as a beacon for community revitalization and inclusive development along the Anacostia waterfront. Culturally, the bridge serves as a site for commemorative events tied to Douglass's legacy, including a September 7, 2021, opening ceremony with blessings and emphasizing his role as an inspiration for and . A weekend celebration marked its public debut, highlighting it as a tribute to excellence and ongoing civic renewal. The structure also integrates into broader efforts to recognize Douglass's advocacy for , functioning as a physical of historical continuity in the nation's capital.

Long-Term Maintenance Considerations

The Frederick Douglass Memorial Bridge incorporates design features aimed at extending its to 100 years, including the use of high-performance materials and protective coatings on its to mitigate and wear from environmental exposure over the . These elements reduce the frequency and extent of routine upkeep compared to the previous 1950 bridge, which required escalating repairs due to structural deterioration by the . A key structural choice is the 540-foot center arch span, which surpasses the Anacostia River's minimum horizontal clearance standards, enabling the bridge to cross without in-water piers and thereby limiting vulnerability to riverbed scour, sediment buildup, and associated maintenance interventions. The arch configuration, combined with disk bearings selected for their inherent durability and low-maintenance profile, further supports operational reliability under heavy traffic loads from and I-295, minimizing downtime risks from component failure. Ongoing maintenance will nonetheless necessitate periodic inspections for in the tied-arch system, integrity against urban pollutants and de-icing salts, and seismic resilience given the bridge's location in a seismically moderate zone, as mandated by District Department of Transportation protocols for similar infrastructure. While construction-era concrete defects in approach elements highlighted execution risks, the core arch's fabrication standards prioritize , though long-term for weld remains essential to avert progressive degradation observed in comparable river spans.

References

  1. [1]
    Frederick Douglass Memorial Bridge (U.S. National Park Service)
    Feb 26, 2025 · Construction of the bridge started in 2018 and was completed in 2021. The bridge is 1,600-feet long and consists of three sets of parallel white ...
  2. [2]
    Frederick Douglass Memorial Bridge - DDOT Historic Collections
    Constructed in 1950, this bridge was originally called the South Capitol Street Bridge before being renamed after Anacostia resident, Frederick Douglass.
  3. [3]
    Frederick Douglass National Historic Site
    Mar 6, 2025 · The Frederick Douglass National Historic Site preserves and interprets Cedar Hill, where Frederick Douglass lived from 1877 until his death in 1895.
  4. [4]
    Mayor Bowser Unveils Design and Timeline for New Frederick ...
    Aug 10, 2017 · The project includes replacing the 68 year-old bridge and reconstructing the Suitland Parkway/I-295 interchange. The Mayor was joined by ...
  5. [5]
    Mayor Bowser Celebrates Opening of the New Frederick Douglass ...
    Sep 7, 2021 · The bridge design includes three above-deck arches that capture the District's arch history, two piers that will appear to float in the river, ...
  6. [6]
    [PDF] 10 9 8 11 12 Site Photos - South Capitol Street
    Local History. Frederick Douglass moved to Washington, D.C. in 1872, after his house in Rochester NY burned. In 1877, he pur- chased a property just south of ...
  7. [7]
    Frederick Douglass Memorial Bridge (Washington, 1949) - Structurae
    Project Type. Structure: Swing bridge · Girder bridge. Function / usage: Road bridge. Material: Steel bridge piers: Concrete pier. Support conditions ...Missing: original | Show results with:original
  8. [8]
    Frederick Douglass Memorial Bridge opens as DC's newest crossing
    Nov 3, 2021 · The original bridge, the South Capitol Street Bridge, was built in 1950 and renamed in honor of 19th-century abolitionist Frederick Douglass in ...
  9. [9]
    Innovating Construction Safety While Rebuilding a Landmark
    Slated for completion in early 2022, the new 1,600-foot Arch bridge will replace its 70 year-old predecessor in order to increase safety and spur economic ...<|separator|>
  10. [10]
    Frederick Douglass Memorial (South Capitol Street) Bridge
    The new was completed in 2021 and replaced an older swing bridge that was completed in 1950 as the South Capitol Street Bridge. The fixed vertical clearance ...Missing: built | Show results with:built
  11. [11]
    Frederick Douglass Memorial Bridge Project | Washington, DC
    In 1950, the current Frederick Douglass Memorial Bridge (originally referred to as the South Capitol Street Bridge) was built. Each day, it served upwards of ...Missing: history | Show results with:history
  12. [12]
    Frederick Douglass Memorial Bridge - RJ Watson, Inc
    A $441-Million design build project was awarded by the Washington, D.C. Department of Transportation in 2017 to South Capitol Bridge Builders, a joint venture ...Missing: 1950 | Show results with:1950
  13. [13]
    Modern Steel Construction April 2022: Bridge to the Future
    Mar 5, 2022 · It was renamed the Frederick Douglass Memorial Bridge in 1965 and underwent some renovations at that time, but even then, it remained a traffic ...<|separator|>
  14. [14]
    Frederick Douglass Bridge in Washington begins opening week ...
    Sep 6, 2021 · ... deterioration on the old bridge. Corrosion has eaten holes through thick steel beams that were placed seven decades ago. It has been deemed ...Missing: causes | Show results with:causes
  15. [15]
    Report: Over 65,000 U.S. bridges in need of repair - USA Today
    Sep 15, 2013 · Cracked concrete exposes parts of reinforcement bars on the Frederick Douglass Memorial Bridge which spans the ... deterioration or other problems ...
  16. [16]
    Decaying D.C. bridge reflects state of thousands of bridges nationwide
    Dec 31, 2012 · Now and then, a chunk of concrete shakes loose from the bridge's underside and plops into the river, but mostly it is quiet corrosion that has ...Missing: deck deterioration
  17. [17]
    DDOT plans to replace Frederick Douglass Bridge over the ... - WJLA
    Jan 9, 2013 · The city would tear the bridge down after completing a new bridge right next to it that would cost $660 million or $520 million if the feds ...
  18. [18]
    Report: Over 65,000 U.S. bridges in need of repair | wusa9.com
    Sep 15, 2013 · The bridge itself, however, is about as ugly as it gets: The steel underpinnings have thinned since the structure was built in 1950, and the ...<|separator|>
  19. [19]
    Frederick Douglass Memorial Bridge - Klik USA
    The Frederick Douglass Bridge was recently renovated after 70 years of public use and rededicated to Douglass. Formerly known as the South Capitol Street Bridge ...
  20. [20]
    DDOT details area's structurally deficient bridges - WTOP News
    Jun 25, 2015 · “It establishes that there is deterioration to one or more of the bridge's major components, which is/are then monitored and corrective actions ...
  21. [21]
    Mayor Bowser Unveils Design and Timeline for New Frederick ...
    Aug 10, 2017 · Construction is expected to begin at the end of 2017 and last through 2021. For more information about the South Capitol Corridor Project and ...
  22. [22]
    D.C. seeks to replace deteriorating Frederick Douglass Bridge
    Jan 9, 2013 · D.C. seeks to replace deteriorating Frederick Douglass Bridge. By Liz ... Frederick Douglass Memorial Bridge. The 63-year-old bridge ...
  23. [23]
    [PDF] South Capitol Street Corridor and Frederick Douglass Memorial Bridge
    Apr 5, 2018 · Suitland Parkway was originally constructed in the mid-1940s to provide a connection between the newly opened Andrews Air Force Base located in ...
  24. [24]
    [PDF] Design and Construction of the New Frederick Douglass Memorial ...
    The new six-lane bridge, designed to be elegant and iconic, opened in May 2021, with design completed in Nov 2018. It has 100-year min service life for non- ...
  25. [25]
    The New Frederick Douglass Memorial Bridge
    Structural steel was the only solution for the bridge to achieve its signature arches, which have a variable hexagonal shape and a variable depth from the base ...
  26. [26]
    Frederick Douglass Memorial Bridge - AECOM
    The Frederick Douglass Memorial Bridge (FDMB) project transforms Washington DC's South Capitol Street corridor into an iconic, grand, urban boulevard.<|control11|><|separator|>
  27. [27]
    Award of Merit Highway/Bridge: Frederick Douglass Memorial Bridge
    Oct 16, 2023 · The six-lane, 1,445-ft-long Anacostia River crossing uses an above-deck arch design coupled with cable-stay bridge technology to transform the ...Missing: pylon | Show results with:pylon<|separator|>
  28. [28]
    DC's Frederick Douglass Memorial Bridge Named Bridge of the Year
    Mar 28, 2024 · The project scope included the replacement of the South Capitol Street Bridge (renamed the Frederick Douglass Memorial Bridge), the demolition ...
  29. [29]
    NO. 3 BRIDGE: New Frederick Douglass Memorial Bridge
    Dec 2, 2021 · ... Capitol Bridgebuilders. Cost: $441 million. Length: 1,445 LF. Completion Date: April 30, 2022. Sign up for Roads & Bridges eNewsletters. Get the ...
  30. [30]
    Frederick Douglass Memorial Bridge - Washington, D.C. - SYSTRA IBT
    A three-span arch bridge over the Anacostia River. The total length is 1445 ft (440.6 m), with a main span of 540 ft (164.6 m) and side spans of 452 ft-6 in ( ...
  31. [31]
    about the project - Frederick Douglass Memorial Bridge
    This project will increase pedestrian and vehicular safety, improve multimodal transportation options, increase community accessibility and support economic ...
  32. [32]
    Frederick Douglass Memorial Bridge - HNTB
    The new Frederick Douglass Memorial Bridge in Washington DC crosses more than just the Anacostia River. The largest infrastructure investment in the District ...
  33. [33]
    [PDF] aLL HaNDS ON DECK - ddot - DC
    In our Fall 2019 issue of Progress, we shared some of the multimodal safety standards that the District. Department of Transportation have implemented on the ...
  34. [34]
    New Douglass Bridge Evokes Vision of a More Inclusive City
    Feb 17, 2022 · The new bridge is part of a $906 million project launched in 2012 to replace the original four-lane structure, which opened in 1950 and was ...
  35. [35]
    Mayor Bowser Celebrates Opening of the New Frederick Douglass ...
    Sep 7, 2021 · Mayor Bowser broke ground on the project to replace a more than 70-year-old bridge in February 2018 on the 200th anniversary of Douglass' birth.
  36. [36]
    Frederick Douglass Memorial Bridge - Arch Completion Milestone
    Aug 14, 2020 · ... milestone in the construction of the largest public infrastructure project in DDOT's history. “The new Frederick Douglass Memorial Bridge ...Missing: milestones | Show results with:milestones
  37. [37]
    New Frederick Douglass Memorial Bridge To Open In September
    Aug 18, 2021 · A ribbon-cutting is scheduled for 11 a.m. on Tuesday, and the bridge will open to traffic on Friday. But the whole project, which includes large ...
  38. [38]
    The New Frederick Douglass Memorial Bridge and Suitland ...
    The projected opening date for the replacement bridge is late 2021. When it opens, the new bridge will have six traffic lanes and improved accommodations for ...Missing: timeline | Show results with:timeline
  39. [39]
    [PDF] Opening of the New Frederick Douglass Memorial Bridge ...
    Sep 9, 2021 · On Sunday, September 12, northbound traffic on South Capitol Street will be shifted onto the new bridge. All travel lanes will be open in both ...
  40. [40]
    Mayor Bowser to Break Ground on the New Frederick Douglass ...
    Feb 13, 2018 · The new Frederick Douglass Memorial Bridge is a prime example of a strong federal-local funding partnership, with federal grants that make up ...
  41. [41]
    SAFETEA-LU Designated Projects by State -- National Corridor ...
    Mar 23, 2020 · District of Columbia. Total Projects: 1; Total Funding*: $75M; Project List: Frederick Douglass Memorial Bridge; Annual Funding Levels. 2005: ...
  42. [42]
    Hoyer, Norton Announce $68 million Award for Frederick Douglass ...
    Nov 17, 2011 · "A new Frederick Douglass Memorial Bridge is critical to improving ... Specifically, the funding announced today will be utilized for right of way ...
  43. [43]
    Transportation Secretary Announces Nearly $94 Million for Federal ...
    Jan 13, 2010 · This is the largest amount of grant funding awarded to public ... New Frederick Douglass Memorial Bridge Construction Project, $950,000.
  44. [44]
    Norton Celebrates the Frederick Douglass Memorial Bridge She Got ...
    May 20, 2021 · The Douglass bridge is a shining example of federal infrastructure dollars at work. I will be showcasing this in my role as Chair of the ...Missing: sources | Show results with:sources
  45. [45]
    [PDF] South Capitol Street Project -Initial Financial Plan
    May 31, 2013 · In addition to the new bridge, this segment of the project includes the new traffic oval at the western approach connecting South Capitol Street ...<|separator|>
  46. [46]
    Washington DC's historic bridge replacement project
    Jun 11, 2019 · The contract was awarded by the District Department of Transportation (DDOT) in 2017 to South Capitol Bridgebuilders, a joint venture between ...<|separator|>
  47. [47]
    D.C.'s Frederick Douglass Memorial Bridge is a local symbol in a ...
    Jun 6, 2024 · AECOM was the lead designer for the Frederick Douglass Memorial Bridge design-build joint venture, in partnership with South Capitol ...Missing: engineer | Show results with:engineer
  48. [48]
    [PDF] THE FREDERICK DOUGLASS MEMORIAL BRIDGE
    South Capitol Bridgebuilders will coordinate the hiring of design, trades and contractor staff positions. Opportunities available for OJT and employment include ...Missing: cost | Show results with:cost
  49. [49]
    How Concrete Mistakes Added Cost to the Recent Frederick ...
    Nov 30, 2023 · Opened in 2021, the bridge was built near a 73-year-old structure of the same name spanning the Anacostia River that was demolished as part of ...
  50. [50]
    Frederick Douglass Memorial Bridge - Project Profile Details
    Some of the design challenges the team faced included working with the arch base connection. Unlike typical steel to concrete connections, which utilize a base ...
  51. [51]
    Cracks Visible on Frederick Douglass Bridge Arches
    Feb 8, 2023 · “The cracks result from a very high-strength concrete mix that was used which had a low water-to-cement ratio. Surface water can evaporate from ...Missing: deck | Show results with:deck
  52. [52]
    DC officials reveal plans for $441M bridge - Construction Dive
    Aug 11, 2017 · Washington, DC Mayor Muriel Bowser on Thursday revealed the design for a $441 million replacement bridge spanning the Anacostia River and ...<|separator|>
  53. [53]
    A New Frederick Douglass Memorial Bridge for the Anacostia River ...
    Sep 8, 2021 · The new bridge is 1,445 feet long and cost $480 million—that latter figure making the new bridge the largest infrastructure project in the ...
  54. [54]
    [PDF] South Capitol Street Corridor and Frederick Douglass Memorial ...
    Jul 12, 2018 · The project includes the replacement of the Frederick Douglass Memorial Bridge, rehabilitation of several parks along with the I-295 Interchange ...Missing: original | Show results with:original
  55. [55]
    [PDF] DISTRICT OF COLUMBIA PROJECT LABOR AGREEMENT FOR ...
    Mar 15, 2016 · Construction of a new Frederick Douglass Memorial Bridge and removal of the existing bridge. •. Construction of the bridge approach ovals and ...
  56. [56]
    Frederick Douglass Memorial Bridge project was a local hiring disaster
    Oct 29, 2024 · In its report, DDOT placed the blame for the across-the-board failure at hiring D.C. residents squarely on the PLA. This is neither surprising ...
  57. [57]
    Project Labor Agreements - Baltimore-DC Metro Building Trades ...
    More than 200 D.C.residents were hired to build the bridge, and D.C. residents accounted for more than 60 percent of its apprentices. At least 45 minority and ...Missing: controversy | Show results with:controversy
  58. [58]
    AG Racine Announces Major Victory in Eminent Domain Case ...
    Dec 20, 2022 · “This was a hard-fought case against one of the District's largest developers who sought more than $80 million for a property the city took ...Missing: controversies | Show results with:controversies
  59. [59]
    D.C. unveils plans for new Frederick Douglass Memorial Bridge
    Aug 11, 2017 · The Frederick Douglass Memorial Bridge in Washington, D.C., transports 70,000 vehicles daily over the Anacostia River, and officials ...Missing: average | Show results with:average
  60. [60]
    WASHINGTON, DC: Welcome Home to the Bridge District
    The $1.5 billion, 8-acre project is called the Bridge District. Upon buildout, it will feature 2.5 million sq. ft. of mixed-use density currently under ...
  61. [61]
    Frederick Douglass Memorial Bridge hailed as city's 'most important ...
    Sep 7, 2021 · The bridge was blessed during the Tuesday event, and the freedom fighter it was named for was recalled as an inspiration.
  62. [62]
    Frederick Douglass Bridge opens with Labor Day celebration
    Sep 11, 2021 · “The new Frederick Douglass Memorial Bridge is a fitting tribute to an iconic Washingtonian, a forefather of Black excellence who we continue to ...
  63. [63]
    [PDF] Commemorate DC - DC Office of Planning
    Oct 2, 2024 · Named after the famed abolitionist, it commemorates his legacy of advocating for social justice and equality, while also offering a physical ...<|separator|>
  64. [64]
    D.C. Unveils $660 Million Proposal To Replace Frederick Douglass ...
    Jan 1, 2013 · Mayor Vincent Gray says a new bridge would be more cost-effective in the long run than continuing to repair the old one. According to Gray, a ...