Fact-checked by Grok 2 weeks ago

Graphite-moderated reactor

A graphite-moderated reactor is a type of nuclear fission reactor that employs graphite as the primary neutron moderator to slow fast neutrons to thermal velocities, enhancing the likelihood of fission in uranium-235 isotopes present in natural or low-enrichment uranium fuel. Graphite's effectiveness stems from its low neutron absorption cross-section and high scattering capability, which minimizes neutron loss while permitting the use of unenriched uranium, unlike light-water moderated designs that require enrichment. These reactors typically feature large graphite blocks forming the core structure, with fuel channels interspersed, and have been cooled by gases like air, carbon dioxide, or water depending on the design. The pioneering graphite-moderated reactor was Chicago Pile-1 (CP-1), assembled in 1942 beneath the University of Chicago's Stagg Field by Enrico Fermi's team, achieving the first controlled nuclear chain reaction on December 2, 1942, using stacked graphite bricks as moderator around natural uranium lumps. This breakthrough paved the way for production-scale reactors, including the X-10 Graphite Reactor at Oak Ridge National Laboratory, which went critical in November 1943 as the world's first continuously operated reactor and produced the initial quantities of plutonium-239 for the Manhattan Project. Commercial applications followed, with the UK's series—graphite-moderated, carbon dioxide-cooled reactors using metal fuel—entering service in the 1950s as the first generation of plants, generating electricity while also capable of plutonium production. Successors like the Advanced Gas-cooled Reactors (AGR) improved efficiency with and higher temperatures, powering much of the UK's grid until recent decommissioning. The Soviet design, a channel-type light-water-cooled graphite-moderated reactor, enabled on-line refueling and large power outputs but exhibited inherent flaws such as a positive , contributing to the 1986 catastrophe where graphite ignition exacerbated the meltdown. Despite safety upgrades post-Chernobyl, graphite-moderated reactors' vulnerability to moderator oxidation, radiation-induced degradation, and stored Wigner energy have led to their decline in favor of water-moderated alternatives in most nations, though they remain operational in and inform advanced high-temperature gas-cooled designs.

Fundamental Principles

Neutron Moderation and Graphite Properties

Neutron moderation in relies on of fast neutrons, averaging 2 MeV in energy, with carbon atoms ( 12) to reduce their speed to energies of approximately 0.025 eV, where the cross-section of peaks at around 580 barns. Each collision transfers a fraction of the neutron's to the heavier carbon , with the average logarithmic energy decrement ξ calculated as approximately 0.158, requiring about 114 collisions for thermalization from typical spectra, far more than the 18 collisions in light water due to hydrogen's ξ near 1. This process occurs diffusively within the , where neutrons lose energy gradually without significant directional bias, enabling a large moderator volume to achieve effective slowing-down while minimizing capture losses in uranium-238. Graphite excels as a moderator owing to its favorable nuclear properties: a thermal neutron absorption cross-section of 3.5 millibarns for , vastly lower than light water's effective value influenced by hydrogen's 332 millibarns, which yields a superior moderating (ξ Σ_s / Σ_a) despite graphite's lower macroscopic density. This low absorption preserves neutron multiplicity for sustaining the chain reaction, particularly advantageous with fuel, as parasitic captures are curtailed. , synthetically produced from calcined and , maintains densities of 1.6 to 1.75 g/cm³—below crystalline graphite's 2.26 g/cm³ due to controlled for stability—without compromising moderation efficiency, as microstructural voids and cracks do not disrupt the phonon spectra governing . Critical to performance is graphite's engineered purity, with boron-equivalent impurities restricted to under 5 parts per million to avoid elevated capture rates from elements like (3,840 barns) or , ensuring overall absorption remains below 0.004 barns effectively. Such specifications demand meticulous raw material selection and processing, distinguishing nuclear variants from industrial graphite and enabling reliable long-term operation under fluxes up to 10^{21} n/cm².

Core Configuration and Materials

The core of a graphite-moderated reactor features a heterogeneous design where blocks of nuclear-grade serve as the primary moderator and structural material, arranged to form channels for fuel elements, control rods, and coolant flow. This configuration slows fast s emitted from to thermal energies, enhancing fission probability in , while maintaining separation between moderator and fuel to optimize neutron economy. Graphite blocks are typically machined into prismatic shapes, stacked vertically or horizontally depending on the , with interstitial gaps minimized to reduce parasitic neutron . Nuclear-grade graphite is manufactured from calcined and a pitch binder, achieving purity levels with total ash content below 300 ppm to minimize by impurities like . Key properties include a low absorption cross-section (approximately 0.0035 barns for neutrons), high conductivity (up to 150 W/m·K at ), and density around 1.7-1.9 g/cm³, enabling effective and heat dissipation under . However, induces dimensional changes, such as initial followed by , and potential oxidation risks in oxidizing coolants, necessitating careful and core design for longevity. Fuel elements are inserted into dedicated channels within the graphite matrix, often consisting of metal, , or slugs or pins clad in materials like magnesium, , or to prevent product release and interaction. channels are integrated into the graphite structure, with gases such as or , or light water in some variants, flowing through to remove heat without significant moderation interference. Reflectors of dense graphite surround the core to minimize leakage, typically comprising replaceable inner layers and permanent outer blocks.

Reactor Types

Gas-Cooled Designs

Gas-cooled graphite-moderated reactors utilize (CO₂) as the primary , which flows through vertical channels in a stack of bricks serving as both moderator and structural matrix. This configuration permits higher coolant outlet temperatures than light-water systems, enhancing while mitigating risks inherent to aqueous coolants; gas is maintained at 7-40 depending on design, with low by CO₂ supporting the use of natural or low-enriched fuel. The series, the inaugural commercial gas-cooled graphite-moderated power reactors, featured metal fuel rods clad in Magnox alloy (magnesium with 0.7-0.9% aluminum) to prevent oxidation and enable uncooled storage for extraction. Core power densities remained low at under 1 kW per liter to limit fuel temperatures below 560°C, with CO₂ inlet at 150-200°C and outlet at around 400°C, yielding steam conditions for turbines at 2-3 MPa and 350-400°C. Construction of the prototype at Calder Hall began in 1953, achieving first criticality on May 1, 1956, and initiating by October 17, 1956, marking the world's first sustained output for civilian use. Twenty-six Magnox units were ultimately built across 11 sites between 1956 and 1971, with gross electrical outputs per reactor ranging from 50 MWe to 325 MWe, though many underwent derating for safety and efficiency. Succeeding , the (AGR) incorporated stainless-steel-clad pellets of (UO₂) enriched to 2-3.5% U-235, arranged in 36- or 37-pin clusters within sleeves, enabling fuel burnups exceeding 18 GWd/t and reduced refueling intervals via on-load mechanisms. CO₂ coolant operates at higher pressures (39-42 ) and temperatures (inlet ~300°C, outlet ~650°C), driving steam generators to produce at 16 MPa and 560°C for cycle efficiencies around 41%, a marked improvement over Magnox's 30-35%. The AGR prototype at Windscale (now ) reached criticality in 1962 and generated power from 1967, but commercial deployment commenced with Hinkley Point B in 1976; 14 AGR reactors were constructed in pairs at seven sites by 1988, each pair typically rated at 1,000-1,300 MWe gross. Both designs enclose the core, coolant headers, and once-through steam generators within a pre-stressed concrete pressure vessel, with circulators ensuring flow and reactivity control via boronated control rods and gray absorbers. Graphite swelling from fast neutron fluence and potential Wigner energy storage necessitated periodic annealing in Magnox cores, while AGRs employed higher-purity graphite and design margins to extend life beyond 25-35 years. Operational data from these reactors, totaling over 3,000 reactor-years in the UK, validate the inherent safety of gas cooling against coolant loss but highlight graphite degradation as a life-limiting factor, addressed through empirical monitoring rather than unproven models.

Water-Cooled Designs

Water-cooled graphite-moderated reactors feature light as the primary circulating through individual pressure channels embedded in a massive moderator assembly, enabling direct boiling of the for generation without the need for a pressurized vessel enclosing the entire core. This channel-type configuration separates the cooling and moderation functions, allowing to efficiently slow neutrons for in low-enriched fuel while removes heat via upward flow and phase change in the channels. The design originated from Soviet efforts to scale up plutonium production reactors into power generators, prioritizing high and refueling capability during operation. The RBMK-1000 represents the standard large-scale implementation, with a cylindrical core approximately 11.8 meters in diameter and 7 meters high, containing roughly 1,900 channels spaced on a 41.5 lattice pitch and over 1,700 additional channels for control rods and . Each assembly holds 18 zirconium-alloy-clad UO2 pins enriched to 2% U-235, arranged in bundles that can be individually replaced online. enters at about 270°C, boils at around 285°C, and exits as a steam-water mixture at 2.1 , driving turbines after separation; the achieves a thermal power of 3,200 MWt and net electrical output of 925-1,000 MWe per unit. Development began in the , with the prototype reaching criticality on December 24, 1970, and commercial operation starting September 21, 1973, at Unit 1 of the Leningrad (now Sosnovy Bor) . By the , 15 RBMK units totaling over 12,000 MWe were operational across Soviet republics, with design adaptations like the RBMK-1500 featuring higher capacity (1,500 MWe) but similar core parameters scaled up. Smaller variants include the , optimized for remote, cold-climate where grid access is limited. This scaled-down derivative employs a compact stack with 106 fuel channels, natural circulation under low (1.6 ), and skeletal fuel assemblies of 31 pins enriched to 2.3-2.8% U-235, yielding 62 MWt per unit—11.76 MWe electrical plus up to 60 MWth thermal for heating. Four units, commissioned between 1974 and 1976 at the in Russia's , marked the world's first series production of such small -moderated boiling water reactors, operating reliably in conditions with minimal forced cooling requirements. Proposed evolutions, such as the series, sought to refine the architecture for enhanced , incorporating multiloop boiling circuits, reduced channel diameter for better moderation, and modifications to achieve negative void coefficients through optimized graphite-water ratios and absorber materials. The design targeted 800 with a core of about 2,500 channels, lower enrichment (1.6% U-235), and passive safety systems, but despite detailed engineering in the , no units progressed beyond planning due to post-Chernobyl regulatory hurdles and economic shifts; conceptual work continues for potential replacements.

Specialized and Experimental Variants

High-temperature gas-cooled reactors (HTGRs) represent a specialized variant of graphite-moderated designs, employing as a to achieve outlet temperatures exceeding 700°C, enabling applications beyond such as process heat and . These reactors utilize TRISO-coated particles embedded in matrices, which provide through high-temperature tolerance and product retention even under accident conditions. Prismatic HTGRs feature hexagonal blocks housing compacts, as demonstrated in the U.S. Fort St. Vrain plant (operational 1977–1989, 330 MW(e)), which validated high-temperature performance despite operational challenges like failures. Pebble-bed reactors (PBRs), a modular subtype of HTGRs, use spherical graphite pebbles containing thousands of TRISO particles, allowing continuous online refueling and enhanced passive safety via convective cooling in the pebble matrix. China's experimental achieved criticality in 2000 and full-power operation in 2003 at 10 MW(e), confirming core physics and circulation in a graphite-moderated bed. The subsequent demonstration plant, with twin 250 MW(e) modules, synchronized to the grid in December 2021, marking the first commercial-scale deployment of this variant and demonstrating stable operation at 750°C outlet temperatures. Sodium-graphite reactors (SGRs) constitute an experimental variant pairing liquid sodium with moderation to minimize neutron absorption and support with low-enriched fuel. The U.S. Hallam SGR operated briefly from 1962 to 1964 at 75 MW(th), testing sodium- compatibility but revealing issues like moderator swelling and coolant leaks that halted further development. Similarly, the UK's Seadragon in the encountered sodium-carbon reactions, underscoring risks that limited this design's viability compared to inert-gas alternatives. Ongoing experimental efforts include validation tests for advanced graphite cores, such as the 2022 integral experiments at University's Criticality Assembly, which benchmarked neutronics in -moderated configurations for next-generation HTGR safety assessments. Proposed Gen IV very high-temperature reactors (VHTRs) build on these, emphasizing 's thermal inertia for passive removal in helium-cooled systems targeting 950°C outlets.

Historical Evolution

Pioneering Developments (1940s-1950s)

The inaugural graphite-moderated reactor, Chicago Pile-1 (CP-1), achieved the world's first controlled nuclear chain reaction on December 2, 1942, at the University of Chicago under Enrico Fermi's leadership as part of the Manhattan Project. This experimental assembly comprised approximately 40,000 graphite bricks forming a 20-foot-wide by 25-foot-high pile, interspersed with 6 tons of natural uranium metal and oxide lumps arranged in a lattice to sustain fission. Graphite served as the neutron moderator due to its low absorption cross-section and high availability in sufficient purity and quantity, slowing fast neutrons to thermal energies suitable for fission in natural uranium. CP-1 operated at low power levels without cooling, validating the feasibility of graphite moderation for chain reactions but highlighting challenges such as boron impurities in commercial graphite that necessitated purification processes. Building on CP-1's success, the at in commenced operation on November 4, 1943, as the first pilot-scale facility for production. Constructed in just ten months, this air-cooled reactor featured a 24-foot-diameter stack weighing 1,500 tons, with 1,248 horizontal channels loaded with slugs for irradiation. It achieved continuous operation at up to 4 megawatts thermal power, producing the first gram quantities of and demonstrating chemical reprocessing techniques essential for weapons-grade material separation. X-10's design tested scalability, heat removal via forced air circulation, and reactivity control, informing subsequent production reactors while also initiating radioisotope production for medical and research applications. The Hanford , activated on September 26, 1944, at the in Washington, marked the transition to industrial-scale -moderated production. This water-cooled design incorporated a 36-foot-diameter moderator stack surrounding 2,004 process tubes containing aluminum-jacketed slugs, cooled by an open-cycle system drawing from the at rates exceeding 30,000 gallons per minute. Rated at 250 megawatts thermal, it produced the core for the "" bomb detonated over on August 9, 1945, and supported ongoing wartime and postwar stockpiles. Early operations revealed poisoning effects, necessitating design adjustments like increased loading to maintain reactivity, underscoring systems' sensitivity to product buildup. By the late 1940s, additional Hanford reactors (D, F, and DR) replicated and expanded B Reactor's configuration, collectively producing over 50 tons of by 1950 through iterative improvements in purity and cooling efficiency. These developments established as a for heavy-water-free, natural-uranium-fueled reactors, prioritizing production over power generation amid secrecy constraints that limited early documentation. Postwar, the design influenced international programs, including the UK's (operational 1950-1951), which adopted similar air-cooled stacks for and but incorporated lessons from Hanford's issues.

Expansion and Commercialization (1960s-1980s)

In the United Kingdom, the Magnox program expanded during the 1960s with the commissioning of several additional reactors, including Berkeley in Gloucestershire and Bradwell in Essex, which began operations in 1962, marking the initiation of a broader fleet deployment for commercial electricity generation alongside plutonium production capabilities. By 1971, a total of 26 Magnox reactors had been constructed across 11 sites, representing the UK's primary graphite-moderated design for power output, with cumulative capacity exceeding 5,000 MW(e) and contributing up to 20% of national electricity by the mid-1970s. These reactors utilized natural uranium metal fuel, CO2 gas cooling, and graphite moderation, achieving on-load refueling to sustain high availability, though fuel inefficiency limited thermal efficiency to around 23%. Transitioning from Magnox limitations, the UK pursued the (AGR) as its second-generation graphite-moderated design, with prototypes like the Windscale AGR achieving criticality in 1962 and full operation by 1967, demonstrating improved stainless-steel-clad fuel and higher outlet temperatures up to 650°C for better efficiency. Commercial AGR deployment accelerated in the and , with seven stations ordered between 1964 and 1978, including Dungeness B (commissioned 1983) and Heysham 1 (1983), totaling about 3,300 MW(e) capacity and operating at thermal efficiencies of 41-42%. Despite construction delays and cost overruns—such as at Dungeness B, where rose 2.5-fold due to design iterations—the AGR fleet became the backbone of UK's , with all units online by 1989 and demonstrating load-following capabilities superior to contemporary light-water reactors. In the , the -1000 design facilitated large-scale commercialization of graphite-moderated reactors for electricity production starting in the early 1970s, with the first unit at reaching commercial operation on December 21, 1973, followed by a second unit in 1974, each rated at 1,000 MW(e) using lightly , light water cooling, and graphite stacking for moderation. By the end of the 1980s, 15 RBMK units were operational across four plants (, , , and ), adding over 12,000 MW(e) to the grid and prioritizing low-enriched compatibility with domestic resources, though the channel-type core enabled online refueling but introduced pressure tube vulnerabilities not fully addressed in initial deployments. Elsewhere, graphite-moderated commercialization remained limited; in the United States, the Fort St. Vrain (HTGR), a helium-cooled prismatic graphite-moderated design with thorium-uranium fuel cycles, began commercial operation on July 1, 1976, at 330 MW(e) net capacity, serving as a demonstration for advanced gas cooling but facing operational challenges like leaks that reduced capacity factors to below 20% by the mid-1980s, leading to shutdown in 1989 after generating about 6 billion kWh. This contrasted with the dominance of light-water reactors in Western markets, where graphite designs were sidelined due to higher capital costs and regulatory preferences for proven water-moderated systems, limiting further expansion despite graphite's neutron economy advantages for use.

Post-Cold War Transitions

Following the in 1991, graphite-moderated reactors in former countries faced heightened international scrutiny and operational constraints, particularly designs after the 1986 accident, which prompted safety retrofits but no new constructions. Of the original 15 units in operation across , , and by the early 1990s, several were decommissioned: Unit 1 shut down in 1996 due to design obsolescence and pressure tube cracking, Unit 2 in 1991 following a , and Unit 3 in 2000 as part of the plant's full closure agreement under the 1994 and IAEA oversight. By 2019, only 11 reactors remained operational in , with upgrades including enhanced control rods, reduced void coefficients, and fast-acting systems to mitigate positive reactivity , though these units, operational since 1979–1990, continue under extended licenses amid geopolitical limiting . Ignalina in , an site, saw both units shut down by 2009 to meet accession requirements, with decommissioning funded partly by international aid exceeding €1.3 billion for graphite and . In the , post-Cold War transitions emphasized systematic decommissioning of graphite-moderated gas-cooled , shifting from generation to waste stabilization due to graphite activation products like and economic unviability against light-water competitors. The fleet, comprising 26 early graphite-moderated units, began full-scale decommissioning in the 1990s, with Berkeley's twin reactors—closed in 1989—completing dismantling by 2010 after 21 years in safe storage, marking the first complete UK reactor cleanup at a cost of approximately £500 million. Advanced Gas-cooled (AGRs), with graphite cores and CO2 , followed suit; as of 2021, estimated £23.5 billion for defueling and decommissioning all AGRs and the PWR, with timelines extending defueling 3.5–5 years per site post-shutdown, though larger units like B require longer due to graphite block retrieval challenges from radiolytic oxidation and dimensional instability. Recent life extensions to 2027 for Heysham 1, , Heysham 2, and Torness supported but underscore the fleet's endpoint, with Hinkley Point B ceasing operations in 2023 after 47 years. United States production reactors at Hanford, graphite-moderated for plutonium output during the , transitioned to full decommissioning in the under DOE oversight, addressing irradiated graphite volumes exceeding 100,000 tons across eight reactors shut by 1987. The process involves segmented removal, vitrification of activated graphite, and , with costs projected at billions and timelines spanning decades due to tritium and fission product leaching risks not anticipated in original designs. Globally, these efforts highlighted graphite's decommissioning complexities—thermal cracking, dust generation, and long-lived isotopes—driving research into thermal treatment and , though no commercial-scale solutions emerged by 2020, prioritizing immobilization over reuse. Emerging (HTGR) variants, -moderated with coolant, represented a niche transition toward advanced designs in select nations, emphasizing via TRISO fuel and negative temperature coefficients. China's achieved criticality in 2000 and full operation by 2003 as a 10 MWt , informing the 210 MWt module connected to in 2021, targeting 750°C outlet temperatures for process heat alongside power generation, with two units demonstrating modular scalability absent in legacy systems. Western HTGR pursuits, like the U.S. Next Generation Nuclear Plant program initiated in 2002, faltered by 2012 due to funding cuts and supply issues, reflecting a broader pivot from moderation in commercial fleets to light-water and sodium-cooled alternatives for cost and regulatory familiarity.

Key Implementations and Operations

Production and Research Reactors

The Hanford Site in Washington state hosted nine graphite-moderated, light-water-cooled reactors constructed between 1943 and 1963 specifically for plutonium-239 production from natural uranium fuel. These reactors featured large graphite blocks as moderators, with aluminum-clad uranium slugs in horizontal channels cooled by Columbia River water. The design enabled sustained chain reactions using unenriched uranium, essential for weapons-grade plutonium output without isotopic separation. The inaugural B Reactor achieved criticality on September 26, 1944, marking the first industrial-scale production facility. It produced the shipped to for the bomb detonated over on August 9, 1945. Follow-on reactors, including the D Reactor (operational December 1944) and F Reactor (operational February 1945), scaled up capacity to meet wartime and postwar demands, collectively yielding over 67 metric tons of by the time operations ceased in the 1980s. All Hanford reactors were decommissioned by 1990, transitioning to monitored storage due to degradation and radiological contamination. Graphite-moderated research reactors, often serving dual roles in process validation and scientific experimentation, included the X-10 Graphite Reactor at Oak Ridge National Laboratory in Tennessee. This air-cooled pilot plant, with a 24-foot cubic graphite moderator stack pierced by 1,248 uranium channels, achieved criticality on November 4, 1943, as the second nuclear reactor worldwide and the first designed for continuous operation. X-10 validated full-scale plutonium irradiation techniques for Hanford, produced experimental plutonium quantities for Los Alamos, and generated radioisotopes like iodine-131 for medical and tracer applications. It also pioneered nuclear-generated electricity on September 3, 1948, by powering a toy steam engine via a thermoelectric generator, and supported early studies on neutron physics, material irradiation, and radiation health effects. Decommissioned in 1963 after producing over 800 curies of isotopes, X-10 exemplified graphite moderation's utility in low-enrichment research environments.

Commercial Power Reactors

Commercial graphite-moderated reactors for power generation have primarily consisted of gas-cooled designs in the and water-cooled types in the and its successor states. These systems leveraged graphite's moderation properties to enable operation with natural or low-enriched , producing on a utility scale from the mid-20th century onward. Unlike light-water reactors dominant elsewhere, these designs prioritized compatibility with available fuels and coolants, though they faced challenges in efficiency and safety retrofits. The series marked the debut of commercial , with the first unit at Calder Hall commencing grid supply on October 17, 1956, at 180 MWe electrical capacity per reactor despite dual-purpose plutonium production roles. Employing metal encased in magnesium-aluminum alloy cladding, blocks for , and gas cooling at around 400°C, the constructed 26 Magnox reactors across 10 sites by 1971, collectively generating over 4% of the nation's at peak. Operations emphasized online refueling to maintain output, but issues with Magnox cladding limited to about 3 GWd/tU, contributing to higher costs and eventual phase-out; the final unit at Wylfa ceased generation on December 30, 2015, after 59 years of fleet service. Building on experience, the UK's (AGR) fleet improved efficiency through oxide fuel (up to 2.3% U-235) in stainless-steel cladding, pre-stressed concrete pressure vessels, and CO2 cooling enabling steam temperatures of 650°C for better thermal cycle performance. The prototype AGR at Windscale achieved criticality in , but commercial deployment began with Dungeness B in , followed by 14 reactors at seven sites totaling about 8 GWe capacity. These units, operational since the 1970s-1980s, have demonstrated high availability (often exceeding 80%) and lifetime generation exceeding design expectations, though graphite sleeve cracking and corrosion prompted extended outages and life assessments. As of 2025, remaining AGRs continue operation under extensions, with full decommissioning targeted by 2028. In the Soviet bloc, (Reaktor Bolshoy Moshchnosti Kanalny) reactors provided large-scale power using graphite moderation, light-water cooling, and pressure-tube architecture for individual fuel channels, allowing online refueling and scalability to 1,000 MWe per unit with 2% . First commercialized at Leningrad NPP Unit 1 in 1973, the design evolved across generations with varying void coefficients and control features; approximately 27 RBMK units were built, powering grids in , , and . Despite generating significant baseload electricity—e.g., over 2,500 TWh cumulatively from Russian units—positive void reactivity inherent to the uneconomic graphite-water combination necessitated post-Chernobyl modifications like additional absorbers, reducing power outputs by 10-15%. As of 2022, 11 RBMK-1000 units remain active in (four at Leningrad, three at , four at ), with licenses extended to 2030-2050 pending upgrades, though international assessments highlight persistent risks from graphite's fire susceptibility and design flaws.
DesignCountryNumber BuiltTypical Capacity (MWe)First Commercial OperationStatus (2025)
Magnox26100-2501956All decommissioned (last 2015)
AGR14500-6251974Operating, decommissioning by 2028
RBMK-1000USSR/ et al.27925-1,000197311 operating in Russia, extensions to 2030+
Limited other commercial examples include France's UNGG reactors (e.g., Chinon A2, 70 , operational 1963-1973), which tested moderation with heavy-water cooling but yielded low availability (under 30%) due to , leading to abandonment after four units. No new designs have achieved widespread deployment, as light-water prevailed for economic and .

Safety and Risk Factors

Inherent Design Characteristics

Graphite-moderated reactors utilize as a solid , which effectively thermalizes fast neutrons emitted during , enabling the use of natural or low-enriched uranium fuel without relying on liquid . This separation of from cooling functions imparts inherent reactivity behaviors distinct from water-moderated designs, including a generally low or zero in gas-cooled variants where the (e.g., CO2 or ) contributes negligibly to neutron . However, in water-cooled -moderated configurations like the , the light water acts as a neutron absorber; boiling or void formation reduces this while remains unaffected, resulting in a positive that can amplify power excursions during loss or depressurization events. The graphite moderator's atomic structure allows accumulation of displacement damage from neutron irradiation, leading to stored Wigner energy—up to approximately 2.8 kJ/g in highly damaged —arising from interstitial-vacancy pairs (Frenkel defects) that can release exothermically under certain conditions, potentially contributing to localized heating or structural if not annealed. This , observed in early air-cooled graphite piles, necessitated operational annealing procedures to mitigate risks of spontaneous release, as dimensional from irradiation-induced swelling or could also alter geometry and reactivity control effectiveness over time. Graphite's chemical properties introduce oxidation risks, as it combusts with oxygen above 500–600°C, potentially sustaining fires if air ingress occurs during accidents involving breach of the primary circuit, exacerbating release as seen in historical incidents. Conversely, the material's high thermal conductivity and provide inherent dissipation margins in low-power-density designs, delaying core damage temperatures and supporting passive cooldown in helium-cooled variants like high-temperature gas-cooled reactors (HTGRs). These characteristics underscore a : robust at the cost of irradiation-induced and flammability vulnerabilities, absent in liquid-moderated systems but requiring vigilant material surveillance and strategies.

Major Incidents and Causal Analyses

The occurred on October 10, 1957, at Pile 1 of the Windscale nuclear facility in , , marking the world's first major accident. During a routine annealing procedure to release Wigner energy—stored elastic strain in the moderator from neutron-induced atomic displacements—uranium metal cartridges overheated, leading to their ignition and subsequent combustion of adjacent graphite blocks. The fire burned for three days, prompting the release of radioactive (approximately 740 terabecquerels) and other products into the atmosphere after filters were bypassed to ventilate smoke. No immediate fatalities resulted, but the incident necessitated a milk ban across 200 square miles to curb ingestion, with long-term health effects including an estimated 240 additional cases, though direct causation remains debated due to dosimetric uncertainties. Causally, the event stemmed from graphite's inherent vulnerability to Wigner energy buildup under high , compounded by inadequate temperature monitoring during annealing and insufficient understanding of oxidation kinetics in air-ingressed channels, as detailed in the UK Atomic Energy Authority's inquiry. The Chernobyl disaster unfolded on April 26, 1986, at Unit 4 of the Chernobyl Nuclear Power Plant in Ukraine, involving an RBMK-1000 graphite-water reactor and resulting in the most severe nuclear accident in history. A scheduled low-power test of turbine generator rundown for emergency cooling exposed design deficiencies: the reactor's positive void coefficient, where steam bubble formation increased reactivity, combined with graphite-tipped control rods that initially displaced coolant water (a weak absorber) and boosted fission rates upon insertion. Operators, violating protocols by withdrawing most rods and disabling safety systems amid xenon poisoning at unstable 200-megawatt power, triggered a reactivity surge, steam explosion, and graphite fire that dispersed 5200 petabecquerels of radionuclides, including cesium-137 and iodine-131. Immediate deaths numbered 2 from the explosion and 29 from acute radiation syndrome, with longer-term estimates of 4,000-9,000 excess cancer deaths per UNSCEAR, though Soviet initial reports minimized design roles by attributing fault primarily to personnel errors. The International Atomic Energy Agency's INSAG-7 analysis identifies core RBMK flaws—such as lack of a robust containment structure and inherent instability at low power—as root causes, enabling a cascading failure where human actions amplified but did not originate the vulnerability; graphite's flammability exacerbated airborne dispersal absent in water-moderated designs. No other graphite-moderated reactors have experienced comparable core-damaging events, though minor graphite oxidation incidents occurred in some and AGR units without significant off-site releases, underscoring that while graphite's neutron economy enables efficient moderation, its oxidative combustibility under fault conditions demands stringent inerting and monitoring absent in incidents like Windscale and . Post-event modifications to surviving reactors, including shortened graphite displacers and added absorbers, mitigated but did not eliminate the positive , reflecting persistent design trade-offs for plutonium production over safety margins.

Mitigation and Regulatory Responses

Following the 1957 in an air-cooled graphite-moderated pile, the UK Atomic Energy Authority introduced operational mitigations such as enhanced fuel element temperature monitoring, automated air damper controls to restrict oxygen ingress during anomalies, and filtration upgrades on exhaust stacks to limit atmospheric releases. These measures addressed causal factors like Wigner energy accumulation and uranium-graphite oxidation, informing the transition to reactors with sealed coolant loops that excluded air, reducing ignition risks by maintaining an inert environment. The 1986 Chernobyl disaster in an graphite-moderated prompted targeted retrofits across the Soviet fleet, including shortening graphite displacers on control rods to eliminate the initial positive reactivity spike during scrams, increasing fast-acting rod numbers from 24 to 40 per reactor, and adding soluble absorbers to enhance shutdown margins. Additional mitigations encompassed upgraded emergency cooling systems with independent power supplies, reinforced containment structures, and operational limits on power excursions to mitigate instabilities. These changes, coordinated via (IAEA) reviews, reduced damage probabilities, though inherent graphite-water interactions persisted as a limitation. In the , the Office for Nuclear Regulation (ONR) mandates periodic safety reviews for operational Advanced Gas-cooled Reactors (AGRs), evaluating graphite brick cracking tolerance, irradiation-induced dimensional changes, and oxidation resistance under CO2 environments. These assessments incorporate probabilistic risk analyses for fire scenarios and require licensee demonstrations of core structural integrity against seismic and thermal loads, aligning with IAEA safety standards on graphite moderator behavior. Internationally, IAEA Safety Reports Series No. 43 provides guidelines for accident analysis in graphite-moderated boiling water reactors, emphasizing conservative modeling of reactivity insertions and graphite fire propagation to inform regulatory licensing.

Technical Advantages and Drawbacks

Performance Benefits

Graphite's low thermal cross-section, combined with its high efficiency, provides a superior neutron economy relative to light moderation, reducing neutron losses and enabling more effective chain reactions with minimal parasitic capture. This inherent property facilitates higher fuel and , as neutrons are primarily slowed rather than absorbed by the moderator itself. In gas-cooled designs like the Magnox reactor, graphite moderation supports the use of metal fuel without enrichment, lowering fuel cycle costs and eliminating early dependency on uranium enrichment infrastructure, while achieving initial thermal efficiencies around 32%. Subsequent advanced gas-cooled reactors (AGR) leverage graphite's high-temperature stability—withstanding core outlet temperatures up to 640°C—to attain thermal-to-electric efficiencies of 41-42%, exceeding pressurized water reactors' typical 33-34% due to higher steam parameters. For water-cooled graphite-moderated reactors such as the , the design yields high and output, with standard units delivering 1000 electrical power from 3200 MWt thermal, and larger variants up to 1500 , supported by online refueling that sustains capacity factors above 80% during normal operations. The moderator's neutron-reflecting capability further enhances core performance by returning escaping neutrons, optimizing reactivity in large-core configurations.

Operational and Material Limitations

Graphite moderators in reactors undergo radiation-induced dimensional instability, characterized by initial contraction under low fluence followed by anisotropic swelling at higher exposures, which distorts geometry, induces cracking, and alters channel dimensions. These changes arise from interstitial-trap recombination and formation in the , limiting operational fluence to approximately 10-20 displacements per atom (dpa) before significant structural compromise occurs. In advanced gas-cooled reactors, such as the UK's AGRs, bricks exhibit and exceeding 10-15% after decades of service, necessitating fluence-based shutdown criteria. Stored Wigner energy, resulting from Frenkel defects where carbon atoms are displaced from lattice sites, accumulates during irradiation and can release exothermically upon annealing or fault conditions, potentially raising local temperatures by hundreds of degrees . In early air-cooled designs like Windscale, unannealed Wigner energy contributed to a 1957 fire when an experimental release triggered oxidation, though commercial high-temperature operations (>650°C) mitigate much of this by continuous partial release. Risk assessments confirm that inadvertent full release requires specific low-temperature or handling scenarios, but historical precedents underscore the need for preemptive annealing protocols. Oxidation of , accelerated by radiolytic production of reactive species and air or ingress, erodes material via surface recession and pore enlargement, reducing by up to 50% and increasing propagation potential under faulted aeration. Nuclear-grade resists self-sustained below 600-700°C due to low reactivity sites, yet incidents like Windscale demonstrate that combined oxidation and Wigner release can sustain , imposing operational constraints such as inert gas blanketing or CO2 cooling to limit oxygen exposure. Long-term models predict weight losses of 5-20% over 30-40 years, correlating with elevated channel blockage risks and requiring periodic inspections. These material limitations translate to operational constraints, including reduced power densities (typically <10 MW/m³) to manage heat gradients, positive void coefficients in unenriched designs exacerbating instability, and mandatory surveillance programs tracking key properties like decline. Decommissioning timelines are extended but finite, with cores like reactors reaching end-of-life after 40-50 years due to cumulative damage exceeding safety margins.

Contemporary Role and Prospects

Active Fleet and Decommissioning

As of October 2025, the active fleet of graphite-moderated commercial power reactors consists primarily of Russia's RBMK-1000 units and the United Kingdom's Advanced Gas-cooled Reactor (AGR) stations. Russia operates seven second-generation RBMK-1000 reactors—located at the Leningrad Nuclear Power Plant (units 3 and 4), Smolensk Nuclear Power Plant (units 1, 2, and 3), and Kursk Nuclear Power Plant (units 3 and 4)—each with a gross electrical capacity of approximately 1,000 MWe following power uprates implemented post-2000. These units, designed for 30-year lifetimes, have received extensions to 45-60 years through safety modifications after the 1986 Chernobyl accident, including enhanced control rods, reduced void coefficients, and improved containment structures, enabling continued operation into the late 2020s and beyond. In the UK, nine AGR reactors remain operational across five sites (Hartlepool, Heysham 1 and 2, Torness, and others), providing about 5.9 GWe total capacity, or roughly 15% of the nation's electricity. Originally commissioned between 1976 and 1989, these 625 MWe-class units have undergone graphite core inspections revealing manageable cracking, prompting extensions such as Heysham 1 and Hartlepool to March 2028, with potential for further prolongation based on ongoing assessments. No other nations maintain commercial graphite-moderated power reactors, as earlier Magnox designs in the UK and prototypes elsewhere were retired by the early 2000s. Decommissioning of graphite-moderated reactors addresses the inherent difficulties of managing irradiated graphite moderators, which constitute 2,000-4,000 tonnes per reactor and accumulate radionuclides such as carbon-14, tritium, and activation products like chlorine-36, complicating retrieval due to mechanical degradation, dusting, and dimensional changes from neutron irradiation. Processes typically begin with fuel removal and safe storage (often 5-10 years for decay heat reduction), followed by segmentation of graphite stacks using remote tools to minimize worker exposure, as demonstrated in UK's Magnox program where stations like Dungeness A (decommissioning since 1989) and Sizewell A (since 2006) employ vacuum-assisted cutting and interim storage in silos pending disposal pathways. In Russia, first-generation RBMK units such as Leningrad 1 (shut 2018) and Kursk 1-2 (shut 2021-2024) are in active decommissioning, involving graphite block removal and entombment options, though full strategies remain constrained by regulatory and technological hurdles, with completion timelines extending decades. Key challenges include the absence of standardized graphite waste classification—treated variably as intermediate or high-level across jurisdictions—and limited reprocessing options, leading to reliance on geological disposal or volume reduction techniques like thermal oxidation, which face scalability issues due to variable isotopic inventories. Costs for graphite-specific phases can exceed hundreds of millions per reactor, as seen in European efforts, underscoring the need for international coordination on long-term storage absent commercial viability for graphite recycling.

Innovations in Advanced Reactors

Advanced graphite-moderated reactors, primarily high-temperature gas-cooled reactors (HTGRs), incorporate innovations centered on enhanced safety through tri-structural isotropic (TRISO) fuel particles embedded in matrices, enabling operation at core outlet temperatures of 750–950°C. These designs leverage as a coolant to achieve high exceeding 40% for , while also supporting for industrial heat applications such as via thermochemical processes. The moderator facilitates a thermal neutron spectrum with or low-enriched fuel cycles, reducing risks compared to light-water reactors. A pivotal innovation is the pebble bed configuration, where spherical fuel elements—each containing thousands of TRISO-coated particles—are continuously recirculated, allowing online refueling and burnup levels up to 15–20% without compromising integrity. TRISO particles, with their ceramic layers of pyrolytic carbon and silicon carbide, retain over 99.9% of fission products even under accident conditions exceeding 1600°C, providing inherent meltdown resistance through passive decay heat removal via conduction and radiation. This contrasts with traditional fuel rods, as the low power density (around 5–10 MW/m³) and negative temperature coefficients ensure self-stabilization without active intervention. China's HTR-PM demonstration plant at Shidao Bay, operational since December 2023, exemplifies these advancements with two 250 MWth modules driving a 200 MWe turbine, achieving first criticality in 2021 and full-load testing by 2024. Its modular setup demonstrates load-following capabilities and inherent safety validated through tests simulating loss-of-coolant events, where core temperatures remained below fuel failure thresholds. Similarly, the Xe-100 design by X-energy features 80 MWe pebble bed units scalable to 320 MWe plants, with NRC-submitted topical reports in 2024 confirming graphite core stability under irradiation and high-temperature helium flows. These systems prioritize factory-fabricated components for reduced construction timelines to 3–4 years per module. Further innovations address material durability, including irradiated formulations resistant to dimensional changes and oxidation, as informed by ongoing qualification programs at facilities like . Prismatic block variants, an alternative to pebbles, enable higher power densities for very high-temperature reactors (VHTRs) targeting 950°C outlets for advanced applications, though pebble beds dominate current deployments due to simpler fuel handling. These developments position HTGRs as viable for decarbonizing heat-intensive sectors, with projected fuel utilization efficiencies doubling those of legacy graphite designs like AGRs.

References

  1. [1]
    Physics of Uranium and Nuclear Energy
    May 16, 2025 · In a reactor using natural (unenriched) uranium the only suitable moderators are graphite and heavy water (these have low levels of unwanted ...Nuclear Fission · Control Of Fission · Neutron Capture: Transuranic...
  2. [2]
    Nuclear Glossary
    Feb 18, 2025 · Moderator: A material such as light or heavy water or graphite used in a reactor to slow down fast neutrons by collision with lighter nuclei so ...Nuclear Glossary · Index · B
  3. [3]
    Nuclear Power Reactors
    These are the second generation of British gas-cooled reactors, using graphite moderator and carbon dioxide as primary coolant. The fuel is uranium oxide ...Small Nuclear Power Reactors · Advanced reactors
  4. [4]
    Manhattan's critical moment - The University of Chicago Magazine
    Aug 30, 2017 · Chicago Pile-1, or CP-1 for short, weighed more than 400 tons and ... The graphite served as a moderator, slowing the released neutrons ...
  5. [5]
    Graphite Reactor | ORNL
    It produced the first electricity from nuclear energy. It was the first reactor used to study the nature of matter and the health hazards of radioactivity.
  6. [6]
    RBMK Reactors – Appendix to Nuclear Power Reactors
    Feb 15, 2022 · A water-cooled reactor with individual fuel channels and using graphite as its moderator. It is also known as the light water graphite reactor (LWGR).Features of the RBMK · Positive void coefficient · Operating RBMK plants
  7. [7]
    [PDF] IAEA-TECDOC-1521
    Graphite has been used as a moderator and reflector of neutrons in more than 100 nuclear power plants and in many research and plutonium-production reactors ...
  8. [8]
    Advanced Nuclear Power Reactors
    Apr 1, 2021 · High-temperature gas-cooled reactors. (Graphite-moderated). These reactors use helium as a coolant at up to 950ºC, which either makes steam ...
  9. [9]
    Average Logarithmic Energy Decrement | nuclear-power.com
    Elastic Scattering and Neutron Moderators. To be an effective moderator, the probability of elastic reaction between neutron and the nucleus must be high.
  10. [10]
    Moderators - DoITPoMS
    Graphite is the most common allotrope of carbon found in nature, and is often used as a neutron moderator. Upon irradiation Wigner energy builds up inside the ...
  11. [11]
    [PDF] Graphite: Advantages, Limitations, and Applications (a) - OSTI.gov
    Graphite is also used as a combined moderator and neutron absorber to shield fast reactors, in which case a nuclear poison such as boron is added to the ...
  12. [12]
    Moderating Ratio - MR | nuclear-power.com
    Graphite has much heavier nuclei than hydrogen in water. Even though graphite has much lower ξ and σs, it is a better moderator than light water due to its ...
  13. [13]
    [PDF] Nuclear graphite for high temperature reactors.
    Early nuclear graphites had typical densities of 1.6 g/cm3, the second generation of graphite moderated reactors used graphites with densities around 1.72 g/cm3 ...<|control11|><|separator|>
  14. [14]
    Decades-old graphite moderation question answered | ORNL
    Sep 30, 2025 · ORNL's research confirms that the tiny cracks and voids in graphite do not disturb the atomic vibrations that determine its interactions with ...
  15. [15]
    Nuclear Grade Graphite
    Graphite having a purity level better than 5 parts per million boron equivalent and with a density greater than 1.50 g/cm3 for use in a nuclear reactor.
  16. [16]
    Graphite in Nuclear Energy: What You Need to Know - Semco Carbon
    Jun 26, 2025 · When fast neutrons collide with carbon atoms in the graphite, they bounce around and gradually lose speed, much like billiard balls colliding on ...
  17. [17]
    [PDF] Chapter 4 THE HIGH TEMPERATURE GAS COOLED REACTOR ...
    The reactor core is entirely constructed by graphite materials, no metallic component are used in the region of the core. • The two reactor shut down systems, ...
  18. [18]
    [PDF] Nuclear Graphite Components - Idaho National Laboratory
    Jul 17, 2019 · Graphite is manufactured from calcined coke and a pitch binder. Purity (Total Ash Content) < 300 ppm Reduced component activity levels during ...
  19. [19]
    [PDF] Description of the Magnox Type of Gas Cooled Reactor ... - INIS-IAEA
    The present report comprises a technical description of the MAGNOX reactor. The Magnox reactor is gas cooled (CO2) with graphite moderators. The fuel is ...
  20. [20]
    Nuclear Development in the United Kingdom
    Jun 12, 2025 · The world's first commercial-scale nuclear power reactor started up in the UK in 1956. A fleet of 26 Magnox power reactors was built.Beginning of UK civil nuclear... · BNFL · Power reactor decommissioning
  21. [21]
    calder hall-1 - PRIS - Reactor Details
    MAGNOX. Nuclear Decommissioning Authority · Sellafield Limited. Reference Unit ... Construction Start Date, First Criticality Date. 01 Aug, 1953. 01 May, 1956 ...
  22. [22]
    Farewell Magnox: 1956 – 2015 | The Lyncean Group of San Diego
    May 21, 2016 · Magnox reactors were the first UK nuclear power plants, CO2-cooled, graphite moderated, using natural uranium with magnesium-aluminum cladding. ...
  23. [23]
    [PDF] A History of Dosimetry for the Advanced Gas-cooled Reactors
    This paper summarizes the first 40 years of AGR neutron dosimetry, influenced by Magnox reactors, and the design features to reduce irradiation issues.<|separator|>
  24. [24]
    [PDF] Description of the Advanced Gas Cooled Type of Reactor (AGR)
    The fuel in AGR's consists of slightly enriched UO2 in the ... maintain the coolant gas temperature within the design limits, individual channel control.
  25. [25]
    Nuclear Fuel and its Fabrication
    Oct 13, 2021 · AGR fuel assemblies consist of a circular array of 36 stainless steel clad fuel pins each containing 20 enriched UO2 fuel pellets, and the ...Nuclear Fuel Fabrication... · Fabrication Supply And... · Advanced Nuclear Fuel...<|separator|>
  26. [26]
    Graphite core of AGRs - Office for Nuclear Regulation
    Jul 15, 2025 · The UK has a long history of using graphite as a moderator from the early Magnox reactors to the Advanced Gas-cooled Reactors (AGRs).
  27. [27]
    [PDF] Light Water Graphite Reactors
    Light water graphite moderated reactors use graphite blocks as the moderator. The RBMK -. 1000 type reactors, 1000 meaning 1000 MW of electrical output ...
  28. [28]
    [PDF] Russian RBMK Reactor Design Information - INIS-IAEA
    In each RBMK-unit, a group of control rod channels with rods arid rod drives of new design was separated. The rods are called "fast-acting control rods" (BAZ).
  29. [29]
    Chernobyl: Chapter I. The site and accident sequence
    The RBMK-1000 (Figure 2) is a Soviet designed and built graphite moderated pressure tube type reactor, using slightly enriched (2% 235U) uranium dioxide fuel.<|separator|>
  30. [30]
    Small Nuclear Power Reactors
    These four 62 MWt (thermal) units are an unusual graphite-moderated boiling water design with water/steam channels through the moderator. They produce steam for ...
  31. [31]
    Analysis of a severe beyond design basis accident for the EGP-6 ...
    Nov 26, 2018 · Bilibino NPP (BiNPP) consists of 4 reactor blocks of EGP-6 reactor, with total electrical power equal to 48 MW and up to 100 GCal/h of heat ...
  32. [32]
    Status and prospects for pressure-tube water-cooled graphite ...
    The paper gives technical features of the MKER-800 reactor plant designed to replace power units with RBMK-type reactors at the end of their lifetime.
  33. [33]
    Reactor MKER-800 of increased safety with multi circuit ... - INIS-IAEA
    Jan 19, 2025 · A new reactor MKER-800 with increased safety is considered. Its design removes the disadvantages of RBMK reactors and has a series of advantages typical for ...
  34. [34]
    Nuclear graphite for high temperature gas-cooled reactors
    In both designs, the graphite acts as the moderator, fuel matrix, and a major core structural component. However, the mechanical and thermal properties of ...
  35. [35]
    [PDF] The Modular Pebble Bed Nuclear Reactor - OSTI.gov
    The lining and plain graphite pebbles moving through the centre reflect and slow the uranium's neutrons to sustain the energy- producing fission process. Helium ...<|control11|><|separator|>
  36. [36]
    The pebble bed reactor at the Shidaowan nuclear power plant
    Oct 11, 2024 · The challenges posed by the disposal of radioactive graphite waste are currently complex. There are currently no generally accepted decisions on ...
  37. [37]
    Sodium Graphite Reactors - Whatisnuclear
    Mar 13, 2023 · Someone came up with the idea of using sodium metal coolant with graphite moderator. It's a sodium-cooled slow reactor (as opposed to the more common sodium- ...
  38. [38]
    Organic Moderated Reactor and the Sodium Graphite Reactor
    The Organic Moderated Reactor (OMR) Critical Facility was used for testing uranium fueled reactors moderated and cooled by organic liquids.
  39. [39]
    Reactor Physics Experiment on a Graphite-Moderated Core to ...
    Jul 7, 2022 · In this paper, integral experiments on a graphite-moderated core were conducted at the B-rack of the Kyoto University Criticality Assembly in order to develop ...<|separator|>
  40. [40]
    Very High Temperature Reactor (VHTR) | GIF Portal
    The VHTR design makes use of the inherent safety features of a graphite-moderated core cooled by helium. The graphite possesses substantial thermal inertia, and ...
  41. [41]
    Chicago Pile 1: A bold nuclear physics experiment with enduring ...
    Dec 1, 2022 · A 20-feet wide by 25-feet high pile of graphite bricks included a few that contained small amounts of uranium. Long, vertical, wooden rods ...
  42. [42]
    Manhattan Project: CP-1 Goes Critical, Met Lab, December 2, 1942
    The Italian physicist Enrico Fermi hoped to answer some of these questions with CP-1, his experimental "Chicago Pile #1" at the University of Chicago.
  43. [43]
    X-10 Graphite Reactor - Department of Energy
    The X-10 Graphite Reactor, designed and built in ten months, went into operation on November 4, 1943. The X-10 used neutrons emitted in the fission of uranium- ...
  44. [44]
    Manhattan Project: Final Reactor Design and X-10, 1942-1943
    The X-10 was an air-cooled graphite reactor with horizontal channels. Hanford used a water-cooled design with horizontal tubes and uranium slugs.
  45. [45]
    Hanford B Reactor (1944) - ASME
    The Hanford B reactor was a graphite-moderated, water-cooled reactor, designed to operate at 250 million watts. It was loaded in September of 1944.
  46. [46]
    Nuclear Reactors - Atomic Heritage Foundation
    The B Reactor at Hanford was based on the work that Manhattan Project scientists had already done on the CP-1 and X-10 Reactors. It was also graphite-mediated, ...
  47. [47]
    1960s - NDA Archives
    First of a fleet of Magnox reactors began operating at Berkeley, Gloucestershire, and Bradwell, Essex.
  48. [48]
    [PDF] Gas cooled reactor design and safety - INIS-IAEA
    uranium fuelled advanced gas cooled reactor (AGR) stations, solely deployed in the. United Kingdom, starting in the mid-1970s. Although these two pioneering ...
  49. [49]
    Revisiting the UK's nuclear AGR programme: 2. What led to the AGR ...
    Jul 20, 2024 · The decision to choose the Advanced Gas Cooled reactor design for the UK's second generation reactor programme was forced through by state technocrats.
  50. [50]
    Short history of the russian nuclear industry
    In 1974, the first RBMK reactor with a capacity of 1,000 MW was put into operation at Leningrad NPP. By the end of the 1980s, the total NPP capacity in the USSR ...
  51. [51]
    Gas-cooled reactors and Fort St. Vrain - American Nuclear Society
    Jul 21, 2023 · Gas-cooled reactors have roots in early experimental reactors. Dragon used helium as coolant and graphite as moderator.
  52. [52]
    High-Temperature Gas-Cooled Reactors - Nuclear Energy Agency
    The Fort St. Vrain plant was the first commercial power design, operating from 1979 to 1989 with a power rating of 842 MW(th). Even though the reactor was ...
  53. [53]
    Early Soviet Reactors and EU Accession - World Nuclear Association
    Jun 10, 2019 · The RBMK reactor, a graphite-moderated type with the fuel and cooling water in pressure tubes, has been much discussed following the 1986 ...
  54. [54]
    [PDF] The decommissioning of the AGR nuclear power stations (Summary)
    Jan 28, 2022 · EDFE's latest estimate of the cost of decommissioning the AGR and PWR stations, at March 2021, was £23.5 billion.
  55. [55]
    Advanced Gas Cooled Reactor (AGR) decommissioning: factsheet
    Jun 23, 2021 · EDF aims to achieve the defueling of the AGR stations in between 3.5 and 5 years. Dungeness B will take longer due to its reactors being bigger ...
  56. [56]
  57. [57]
    Decommissioning Graphite-Moderated Production Reactors at ... - PMI
    Between 1943 and 1955, eight graphite-moderated, water-cooled nuclear reactors were built in five separate complexes on the Hanford Site. The decommissioning of ...
  58. [58]
    Decommissioning Nuclear Facilities
    May 3, 2022 · Decommissioning has begun at 33 UK reactors, 26 of them early Magnox types with graphite moderators.* One of the first was Berkeley nuclear ...
  59. [59]
    Nuclear Process Heat for Industry
    High-temperature reactors for process heat. The most advanced high-temperature gas-cooled reactor (HTR) project is China's HTR-PM, based on its successful ...
  60. [60]
    The checkered operational history of high-temperature gas-cooled ...
    May 3, 2016 · In the past, both Germany and the United States spent large amounts of money to design and construct HTGRs, four of which fed electricity into ...
  61. [61]
    [PDF] A Short History of Hanford Waste Generation, Storage, and Release
    Between 1943 and 1963, nine reactors were built along the shore of the Columbia River in the 100 Area. Hanford reactors were graphite-moderated because their ...
  62. [62]
    [PDF] at the Hanford Site, Richland, Washington - Department of Energy
    Nine water-cooled, graphite-moderated plutonium production reactors were constructed along the Columbia River by the U.S. government at the Hanford. Site ...<|separator|>
  63. [63]
    Atomic number 94 | Los Alamos National Laboratory
    Dec 13, 2021 · September 26, 1944: The Hanford Site's B Reactor goes critical at 10:48 p.m. The reactor produces plutonium239, specifically for implosion-type ...
  64. [64]
    Hanford: B Reactor Virtual Tour - National Park Service
    The graphite serves a valuable purpose in making the fission (splitting apart) happen. The graphite moderates (slows down or reduce the energy of) the fast ...
  65. [65]
    X-10 Graphite Reactor (U.S. National Park Service)
    Apr 2, 2025 · The X-10 Graphite Reactor is located within present-day Oak Ridge National Laboratory (ORNL). ORNL is a highly-secured facility.
  66. [66]
    Manhattan Project: Places > Oak Ridge > X-10 GRAPHITE REACTOR
    X-10 had provided experimental amounts of plutonium to Los Alamos and invaluable experience for engineers, technicians, reactor operators, and safety officials ...
  67. [67]
    Operational power stations - Office for Nuclear Regulation
    Jul 14, 2025 · We regulate the UK's 15 civil nuclear reactors, which consist of 14 Advanced Gas-cooled Reactors (AGR) and one Pressurised Water Reactor (PWR) operated by EDF.
  68. [68]
    RBMK reactors - Nuclear Reactors - radioactivity.eu.com
    Today, there are 11 RBMK 1 GWe reactors remaining in operation, 4 at Leningrad Nuclear Power plant (NPP), 3 at Smolensk NPP and 4 at Kursk NPP.Missing: commercial | Show results with:commercial
  69. [69]
    Safety of Nuclear Power Reactors
    Feb 11, 2025 · All reactors have some elements of inherent safety as mentioned above, but in some recent designs the passive or inherent features substitute ...<|separator|>
  70. [70]
    Wigner energy in irradiated graphite: A first-principles study
    From the calculated formation energy of Frenkel pairs in graphite, they estimated that 2.8 kJ/g can be achieved for graphite with a Frenkel pair concentration ...
  71. [71]
    [PDF] A Safety Assessment of the Use of Graphite in Nuclear Reactors ...
    It was recognized that these two effects, dimensional changes and Wigner energy, might prove to be troublesome in the operation of graphite moderated reactors.
  72. [72]
    A safety assessment of the use of graphite in nuclear reactors ...
    There is no new evidence associated with either the Windscale Accident or the Chernobyl Accident that indicates a credible potential for a graphite burning ...<|control11|><|separator|>
  73. [73]
    [PDF] Accident Analysis for Nuclear Power Plants with Graphite Moderated ...
    The present Safety Report provides further guidance by considering specific design features of nuclear power plants with RBMK reactors. In particular, the ...
  74. [74]
    Report on the accident at Windscale No. 1 Pile on 10 October 1957
    A serious fire developed in the core of a nuclear reactor at Windscale Works, Sellafield, northwest England, which led to the release of significant quantities ...
  75. [75]
    The nuclear reactor accident at Windscale - October, 1957 - INIS-IAEA
    Jan 14, 2025 · The nature and cause of the nuclear reactor accident at Windscale in October, 1957, have been described in the summary report of the Committee of Inquiry.
  76. [76]
    [PDF] The Chernobyl Accident: Updating of INSAG-1
    This report updates INSAG-1 regarding the Chernobyl accident, identifying new information on operational safety and design issues, and the lack of feedback and ...
  77. [77]
    Chernobyl Accident 1986 - World Nuclear Association
    The Chernobyl accident resulted from a flawed reactor design, inadequate training, and a test that led to a power surge, releasing at least 5% of the core.
  78. [78]
    [PDF] NUREG-1250, "Report on the Accident at the Chernobyl Nuclear ...
    This report compiles information about the Chernobyl accident at Unit 4 on April 26, 1986, covering the accident, its consequences, and the plant design.
  79. [79]
    [PDF] Potential Damage to Gas-Cooled Graphite Reactors Due to ... - INFO
    Early studies of postulated severe accidents in graphite-moderated reactors span the time period from the late 1940s through the early 1960s in support of ...Missing: commercialization | Show results with:commercialization
  80. [80]
    [PDF] Safety of RBMK reactors: Setting the technical framework
    The reactor, which started operation in 1983, was a Soviet-designed nuclear power plant known by the Russian acronym RBMK. The RBMK evolved from Soviet uranium-.Missing: deployment | Show results with:deployment<|separator|>
  81. [81]
    [DOC] ns-tast-gd-029-graphite-reactor-cores ... - Office for Nuclear Regulation
    Appendix 1 of this TAG considers the WENRA reference levels for: reactor safety; decommissioning safety; and waste and spent fuel storage safety. 11. Appendix 2 ...
  82. [82]
    Nuclear graphite introduction and its advantages and disadvantages
    The advantages and disadvantages of graphite as a reactor material are as follows: (1) graphite has a high cross-section and a very low thermal neutron ...
  83. [83]
    Graphite in Nuclear Reactors | Jinsun Carbon
    Jan 4, 2025 · Graphite serves as a very good neutron moderator, and will not absorb neutrons too much. High Temperature Resistance: Graphite can resist very ...
  84. [84]
    [PDF] Irradiation damage in graphite due to fast neutrons in fission and ...
    Graphite is a primary material for the construction of gas cooled reactor cores, serving as a low absorption neutron moderator and providing a high temperature, ...
  85. [85]
    [PDF] Graphite Degradation Modeling and Analysis - INL Digital Library
    Graphite is used as a moderator, reflector, and structural component in many high temperature nuclear reactor designs [1]. When assessing the design of a ...
  86. [86]
    Graphite core ageing | Office for Nuclear Regulation
    Mar 28, 2024 · Limits. Within its operational safety cases EDF sets safety limits on weight-loss and cracking for each reactor core based on extensive research ...Challenges · Cracking · Limits<|separator|>
  87. [87]
    [PDF] Review of Potential Wigner Effect Impacts on the Irradiated Graphite ...
    May 18, 2022 · This report examines the potential impact from one of such factors (i.e., the residual energy stored in the irradiated reactor graphite). The ...
  88. [88]
    [PDF] Oxidation Behavior and Property Degradation of Nuclear Graphites
    During their multidecade operation in the core of nuclear reactors, graphite components are subjected to aggressive and continuous exposure to a high field of ...Missing: fire risks
  89. [89]
    [PDF] Role of Nuclear Grade Graphite in Controlling Oxidation in Modular ...
    Nuclear graphite provides neutron moderation, high temperature stability, and reactivity control. It resists burning due to limited reactive sites and the ...
  90. [90]
    [PDF] Graphite Technology Course. - Nuclear Regulatory Commission
    This improved graphite, which has better all round properties and dimensional stability under fast neutron irradiation, is known as Gilsocarbon graphite. The ...
  91. [91]
    Nuclear Power in Russia
    May 1, 2025 · A design known as the Volnolom FNPP consists of a pair of reactors (12 MWe in total) mounted on a 97-metre, 8700 tonne barge plus a second barge ...Nuclear power plants · Transition to fast reactors · Heating · Reactor technology
  92. [92]
  93. [93]
    Two UK nuclear plants to generate for longer supporting energy ...
    Sep 2, 2025 · Heysham 1 and Hartlepool power stations will continue generating until March 2028, an extension of 12 months · The decision secures more than ...
  94. [94]
    Life extension for Russia's second generation RBMK reactors
    Jul 12, 2024 · Four Russian nuclear power units with first generation RBMK-1000 reactors have been closed after 45 years of service and are being decommissioned.
  95. [95]
    The complexities of irradiated graphite
    Apr 11, 2024 · Graphite has been used as a moderator and reflector of neutrons in more than 100 nuclear power reactors and research and plutonium producing reactors.
  96. [96]
    China's demonstration HTR-PM enters commercial operation
    Dec 6, 2023 · It uses helium as coolant and graphite as the moderator. Each reactor is loaded with more than 400,000 spherical fuel elements ('pebbles'), each ...
  97. [97]
    Xe-100: High-Temperature Gas-Cooled Nuclear Reactors (HTGR)
    220,000 Graphite Pebbles with TRISO Particle fuel · High temperature tolerant graphite core structure · ASME compliant reactor vessel, core barrel & steam ...
  98. [98]
    [PDF] X-Energy, LLC, Xe-100 Licensing Topical Report Graphite Core ...
    Oct 30, 2024 · The Xe-100 is a Generation IV Advanced Reactor based on pebble bed High-Temperature Gas-Cooled. Reactor (HTGR) technology, which utilizes U.S.- ...
  99. [99]
    X-energy - Xe-100 | Description & Characteristics
    The Xe-100 reactor is an advanced high-temperature gas-cooled reactor (HTGR) that uses helium gas as a coolant, and graphite as a moderator.
  100. [100]
    Roadmap of Graphite Moderator and Graphite-Matrix TRISO Fuel ...
    In pebble bed FHRs, where the graphite moderator and fuel pebbles flow through the reactor core, the pickup of tritium by graphite may be used to remove tritium ...
  101. [101]
    Development of a Graphite Irradiation Qualification Plan for the XE ...
    Nov 29, 2023 · The program at ORNL has been developed to produce the data necessary to assist with completing the irradiation effects on materials properties ...