Fact-checked by Grok 2 weeks ago

Hanwa Line

The Hanwa Line (阪和線, Hanwa-sen) is a commuter line in the of , operated by the (JR West), that connects Tennoji Station in southern City with Wakayama Station in , spanning approximately 61 kilometers and serving as a vital link for urban and regional travel. Originally opened in 1929 by the private Hanwa Electric Railway Company, the route was initially a double-track electrified line aimed at connecting Osaka's urban areas with southern suburbs. In December 1940, it merged with Nankai Railway, becoming the Nankai , before being transferred to the Japanese government (Imperial Japanese Government Railways) in May 1944 and renamed the under national control. Following the privatization of Japanese National Railways on April 1, 1987, the line came under JR West's operation, where it has since been modernized to handle high commuter volumes, including extensions like the short Otori–Higashi-Hagoromo branch line. The line features 35 stations along its main route (numbered R20 to R54), passing through key areas in and Wakayama prefectures, such as Sakaishi and Hineno. It operates on a standard 1,067 mm narrow gauge with predominantly double tracks, supporting various services including the Kansai (connecting to the via a branch at Hineno), Kishuji (extending to Wakayama or the ), and local and direct trains that integrate with the and Kisei Main Line for broader regional connectivity. These services facilitate daily commutes, access, and to sites like Otori Taisha and Wakayama's World, with the line covered under the for most segments.

Overview

Line description

The Hanwa Line is a line owned and operated by (JR West) as part of its Urban Network, which serves the -Kobe-Kyoto metropolitan area. The line's name derives from the original Hanwa Electric Railway company that constructed it, combining "Han" from and "Wa" from Wakayama to reflect its regional scope. Stretching 61.3 km along its main route from Tennoji Station in to Wakayama Station, the Hanwa Line includes a 1.7 km Higashi-Hagoromo . It functions primarily as a vital commuter and regional corridor, linking densely populated urban areas of with and facilitating connections to via integrated services at Hineno Station. To enhance navigation for passengers, particularly international visitors, JR West implemented a station numbering system on the Hanwa Line in March 2018, designating stations from JR-R20 at Tennoji to JR-R54 at Wakayama.

Route description

The Hanwa Line originates at Tennoji Station in the southern part of Osaka City and extends southward for approximately 61 km to Wakayama Station in , traversing a mix of densely populated urban and suburban landscapes before transitioning to more rural terrain. The route passes through key areas including Sakai City, with stations such as Mozu and Sakaishi, and , featuring stops like Izumi-Fuchu and Kumeda, providing essential connectivity for local commuters and travelers heading toward the coast. The line's primary segments highlight its dual role in urban mobility and regional access: the initial stretch from Tennoji to Hineno, spanning about 28 km, navigates heavily urbanized suburbs with frequent viaducts and level crossings to accommodate high commuter traffic between and . Beyond Hineno, the route shifts to coastal and rural settings near and the , passing through stations like Higashi-Kishiwada, Kumatori, and Kii en route to Wakayama, where it encounters less developed landscapes with occasional industrial influences. This southern segment parallels the for much of its length, offering competitive access to coastal destinations. A short diverges from Ōtori Station, extending 1.7 km westward to Higashi-Hagoromo Station in a southern suburb, primarily serving local industrial and port-related areas near the bay. The main line facilitates key interchanges, including with the and at Tennoji for broader connectivity, the at Hineno for access to (about 45 minutes from Tennoji via rapid services), and the Kisei Main Line at Wakayama for southward travel along the . Local services along the full route typically require 50 to 60 minutes end-to-end, though actual times vary with stops and conditions.

Infrastructure

Technical characteristics

The Hanwa Line employs the 1,067 mm (3 ft 6 in) Cape gauge, which is the standard for conventional railway lines in . This narrow gauge facilitates compatibility with the majority of the nation's non-Shinkansen network, enabling efficient operations across interconnected routes. The line is electrified with 1,500 V DC overhead system along the entire main line and the Higashi-Hagoromo Branch, providing reliable power supply for electric multiple units. This voltage level is typical for urban and suburban conventional lines in the , supporting high-frequency services without the need for AC conversion. Track configuration consists of double tracks throughout the main line from Tennoji to Wakayama, allowing bidirectional and maneuvers, while the 1.7 km Higashi-Hagoromo is single-tracked to serve local freight and passenger needs. The maximum operating speed is 120 km/h on most sections of the main line, with reductions applied through urban curves to ensure safety and passenger comfort. The line includes gradients and curves that influence speed restrictions and train handling. The line plays a key role as a commuter corridor in the Osaka-Wakayama area.

Track and signaling

The Hanwa Line utilizes to manage train movements and ensure safe spacing between services. For train protection, the urban section from Tennoji to Hineno employs , which generates braking patterns based on speed restrictions and signal aspects to prevent overspeeding or passing signals at danger. From Hineno to Wakayama, a combination of base-point and is used, where ATS-SW provides basic stop enforcement at absolute signals while ATS-P handles pattern braking at key points. Level crossings number over 40 in the Tennoji to Hineno section alone, with automatic half-barriers and warning systems installed at most locations to enhance . These crossings, particularly prevalent in suburban stretches, occasionally contribute to operational due to or interference requiring verification. Interlocking systems at major stations such as Tennoji and Wakayama remain primarily relay-based, a technology dating to the that coordinates switches, signals, and points to prevent conflicting routes. Some areas are transitioning to electronic for improved reliability and remote monitoring, aligning with broader West modernization efforts. Safety enhancements include at high-traffic stations like Tennoji, where installation on platforms 11 and 14 began in 2023, with operational use starting in late 2025 to reduce falls and overcrowding risks. Earthquake detection systems have been integrated network-wide since 1995, following the Hanshin-Awaji earthquake, using seismometers to automatically halt trains upon detecting . Track maintenance involves periodic inspections using high-speed diagnostic trains, such as JR West's dedicated vehicles that assess geometry, wear, and at operational speeds. Overhead lines are renewed on a scheduled cycle to maintain electrical reliability and prevent service disruptions.

Services

Limited express services

The primary limited express service on the Hanwa Line is the Kuroshio, which connects Shin-Ōsaka and Kyōto stations in the north with Shingū station in to the south, utilizing the Hanwa Line for the initial segment from Tennōji to Wakayama. This service provides direct access to coastal destinations along the , catering to tourists and long-distance travelers with all seats reserved. Approximately 16 Kuroshio trains operate daily in each direction, with journey times from Tennōji to Wakayama averaging around 40-50 minutes. Kuroshio trains on the Hanwa Line typically stop only at major stations including Tennōji, Hineno, and Wakayama, allowing non-stop passage through urban areas to minimize travel time. Another , the Haruka, partially utilizes the Hanwa Line for its route from to Shin-Ōsaka and Kyōto, stopping at Hineno and Tennōji en route. Haruka services run frequently, approximately every 30 minutes during peak hours, emphasizing airport connectivity. Fares for these services are compatible with the contactless smart card system, enabling seamless payment and integration with other JR West lines. Through-ticketing is available for journeys continuing onto the Kisei Main Line, allowing passengers to purchase single tickets for the entire trip from urban centers to remote coastal areas. During peak seasons such as Golden Week and summer holidays, JR West operates additional Kuroshio and Haruka trains to accommodate increased demand.

Rapid and local services

The rapid services on the Hanwa Line primarily consist of the , which runs from Tennoji to Wakayama while skipping minor stations to provide faster commuter travel, with an end-to-end journey time of approximately 66 minutes. These trains often originate further north on the or connect from the , forming part of an integrated Osaka-area loop for regional passengers. The operates from Tennoji to via Hineno Station, catering specifically to airport commuters by coupling with trains until the split at Hineno, achieving a travel time of about 50 minutes from Tennoji. Regional services extend coverage to Hineno or Wakayama with limited stops beyond key urban areas, enhancing connectivity for southern suburbs. Local services provide all-stops coverage along the main Hanwa Line from Tennoji to Wakayama and operate as shuttles on the Higashi-Hagoromo Branch Line, ensuring accessibility for short-distance riders. During peak hours, these combined rapid and local operations achieve frequencies of up to 15 trains per hour, supporting high commuter volumes between Osaka and Wakayama Prefecture. Services run from around 5:00 AM to midnight daily, with seamless integration to the Yamatoji Line at Tennoji for through services that complete an Osaka Loop circuit. Limited express trains occasionally share tracks with these services during off-peak periods. Operational reliability is affected by frequent delays from person-related incidents on the tracks, averaging 7-10 such occurrences per year as of , which can disrupt the high-frequency schedule and cause widespread knock-on effects across connected lines.

Stations

Hanwa Line stations

The Hanwa Line's main line features 35 stations extending from Tennoji in to Wakayama in , serving as vital links for commuters, tourists, and local travel in the . These stations vary in size and function, with urban ones often elevated to navigate dense built environments and suburban ones incorporating park-and-ride lots to facilitate car-to-train transfers. All stations are equipped with gates for seamless fare payment, a standard across West's network since the early . Accessibility has improved significantly, with elevators and other barrier-free facilities installed at approximately 80% of stations following upgrades initiated around 2010 to support aging populations and principles. Key stations highlight the line's role in regional connectivity. Tennoji Station, the northern terminus, is a major interchange hub handling around 200,000 daily passengers and linking to the , , and multiple subway lines. Hineno Station serves as a critical junction for the , providing direct access to , and houses a maintenance depot for rolling stock servicing. Sakaishi Station, located in the industrial heart of Sakai City, supports freight and passenger traffic in a manufacturing-heavy area. Stations like Higashi-Kishiwada offer coastal views and proximity to beaches, enhancing their appeal for leisure travelers. The following table lists the main line stations in order from north to south, including station codes, locations, and notable interchanges or features.
CodeStation NameLocationKey Features and Interchanges
R20TennojiOsaka PrefectureMajor hub; interchanges with Osaka Loop Line, Yamatoji Line, Osaka Metro Midosuji and Tanimachi Lines; high passenger volume.
R21BishōenOsaka PrefectureResidential area stop; all trains stop.
R22Minami-TanabeOsaka PrefectureUrban residential; all trains stop.
R23TsurugaokaOsaka PrefectureLocal access; all trains stop.
R24NagaiOsaka PrefectureNear Nagai Stadium; all trains stop.
R25Abiko-chōOsaka PrefectureResidential; all trains stop.
R26Sugimoto-chōOsaka PrefectureUrban stop; all trains stop.
R27AsakaOsaka PrefectureLocal service; all trains stop.
R28SakaishiOsaka PrefectureIndustrial zone in Sakai; near ancient tombs; frequent stops.
R29MikunigaokaOsaka PrefectureInterchange with Nankai Koya Line.
R30MozuOsaka PrefectureAll trains stop.
R31Ueno-shibaOsaka PrefectureResidential; all trains stop.
R32TsukunoOsaka PrefectureLocal access; all trains stop.
R33ŌtoriOsaka PrefectureNear Ōtori Taisha Shrine and shopping mall; origin of branch line.
R34TonokiOsaka PrefectureSuburban stop.
R35Kita-ShinodaOsaka PrefectureResidential area.
R36Shin-ŌdayamaOsaka PrefectureLocal service.
R37Izumi-FuchūOsaka PrefecturePark-and-ride facilities.
R38KumedaOsaka PrefectureSuburban commuter stop.
R39ShimomatsuOsaka PrefectureResidential.
R40Higashi-KishiwadaOsaka PrefectureNear Kishiwada Castle; coastal proximity.
R41Higashi-KaizukaOsaka PrefectureUrban-suburban transition.
R42Izumi-HashimotoOsaka PrefecturePark-and-ride; elevated structure.
R43Higashi-SanoOsaka PrefectureLocal access.
R44KumatoriOsaka PrefecturePark-and-ride; near nature areas.
R45HinenoOsaka PrefectureAirport line junction; maintenance depot; elevated.
R46NagatakiOsaka PrefectureSouthbound limited service.
R47ShingeOsaka PrefectureCoastal views; selective stops.
R48Izumi-SunagawaOsaka PrefectureSuburban residential.
R49Izumi-TottoriOsaka PrefectureSelective stops.
R50YamanakadaniOsaka PrefectureNear hiking areas; selective stops.
R51KiiWakayama PrefectureRegional access.
R52MusotaWakayama PrefectureLocal stop.
R53Kii-NakanoshimaWakayama PrefectureSelective stops.
R54WakayamaWakayama PrefectureSouthern terminus; interchanges with Kisei Main Line, Wakayama Line, Kishigawa Line.

Higashi-Hagoromo Branch Line stations

The Higashi-Hagoromo , a short 1.7 km spur of the Hanwa Line also known as the Line, features two stations: Ōtori Station (JR-R30), serving as the junction point with the main Hanwa Line in Sakai's Nishi-ku, and Higashi-Hagoromo Station, the terminal in Takaishi City's Higashi-Hagoromo district. Ōtori Station integrates seamlessly with main line operations, while Higashi-Hagoromo functions primarily as an endpoint for local shuttles. Established on July 18, 1929, by the Hanwa Electric Railway as part of its initial network expansion, the branch was designed to facilitate industrial access in the and Takaishi areas, connecting to emerging chemical plants and port facilities amid the region's growing sector. Following in 1944 and renaming to reflect its position east of the Nankai Main Line's Hagoromo Station, the line has maintained its role in supporting local industry, with freight sidings at Higashi-Hagoromo enabling cargo handling for nearby chemical operations. The single-track configuration limits operations to shuttle services, emphasizing its appendage-like status to the broader Hanwa Line. Passenger usage remains modest, with Higashi-Hagoromo Station recording approximately 5,018 boarding passengers daily in 2022, reflecting its niche service to industrial workers and minimal commuter traffic. Facilities at both stations are basic, prioritizing functionality over amenities; Higashi-Hagoromo offers wheelchair-accessible restrooms and platforms but lacks advanced features like platform doors or extensive retail. As of 2025, JR West has announced no plans for extensions or major upgrades, underscoring the branch's stable, low-volume operational profile.

Rolling stock

Current rolling stock

The Hanwa Line utilizes a fleet of electric multiple units (EMUs) operated by (JR West), primarily consisting of the , 225 series, 283 series, 287 series, and 289 series, all based at Hineno Depot for allocation and daily operations, with periodic maintenance performed at Depot. These trains support rapid, local, and services on the line, incorporating features such as systems for and accessibility enhancements including priority seating for elderly and disabled passengers. As of 2025, the active fleet on the Hanwa Line totals approximately 200 cars across these series. The , a suburban type, operates in 6-car, 8-car, and 10-car formations primarily for rapid services, with some 4-car sets used for shorter runs; these sets were first introduced in 1994 as part of West's modernization efforts for commuter lines. Deployed from Hineno Depot, the features bodies and is noted for its role in high-frequency operations on the Hanwa Line and connected routes. The 225 series serves local and rapid services in 6-car formations, with bodies for durability and reduced weight; these sets entered service on the Hanwa Line starting in to replace older models and improve passenger comfort. Allocated to Hineno Depot, the series includes variants like the 225-5000 subseries optimized for the line's suburban demands, equipped with LED lighting and improved . For services such as the Kuroshio, the 283 series, 287 series, and 289 series operate in 6-car formations that include Green Cars (first-class seating) for enhanced comfort on longer journeys. These sets, based at Hineno Depot, feature advanced vibration-dampening technology and are designed for speeds up to 130 km/h on the Hanwa Line section.

Former rolling stock

The former of the Hanwa Line encompassed a range of passenger and freight vehicles that operated from the line's opening in through the post-nationalization era, reflecting the transition from operations to (JNR) and eventual privatization. Passenger services initially relied on the Hanwa Electric Railway's MoYo 100 series wooden electric multiple units (EMUs), introduced in 1929 as the line's flagship stock. These bi-cab cars featured a 20-meter body length, 2.81-meter width, fixed cross seats with 1.83-meter pitch, and were designed for high-speed operations up to 100 km/h, with seven units built by and . They operated in formations with control trailers like the KuYo 500 series until the , when they were withdrawn due to obsolescence and the need for more durable steel-bodied replacements following wartime wear and modernization. Following the 1944 nationalization and merger with Nankai Railway assets, the line incorporated Nankai 7000 series control trailer cars, built between 1941 and 1942 as semi-steel vehicles for the former Line (now part of the ). These 17-meter cars, with longitudinal bench seating for 80 passengers, were renumbered under JNR as KuHa 6220–6231 and served commuter duties until the 1980s, when they were phased out in favor of standardized JNR EMUs amid fleet unification efforts. Withdrawal was driven by aging infrastructure and the push for improved safety and capacity on electrified routes. Freight operations predating full utilized early until 1944, after which electric locomotives took over. The JNR EF15 , a 1,350 kW Bo-Bo-Bo design built from 1944 to 1952, handled freight on the Hanwa Line among other routes, with 98 units produced for heavy haulage at speeds up to 95 km/h. These were withdrawn progressively through the 1980s, with the last examples retired by 1986, transitioning to diesel locomotives like the DE10 in the 1990s as freight volumes declined and maintenance costs rose. Most EF15 units were scrapped, with no known preserved examples from Hanwa operations. The last wooden passenger cars, including remnants of the MoYo 100 series, were retired in the due to concerns and material degradation post-electrification upgrades. The 1987 privatization of JNR into JR West marked a full shift to standardized EMUs, ending the use of legacy stock.

History

Origins and early operations

The Hanwa Electric Railway Company was established on April 24, 1926, as a private venture aimed at constructing a high-standard railway to connect with Wakayama, facilitating industrial growth in the Izumi and Wakayama regions through enhanced passenger and freight transport. This initiative stemmed from proposals dating back to the early , driven by the need for a second route parallel to the existing Nankai Railway, with significant investment from Keihan Electric Railway to support regional and , including access to the Fourth Division in the area. The company's emphasized goods transportation in the Izumi district alongside residential expansion along the route, positioning it as a key infrastructure project for southern Osaka Bay's burgeoning industries. Construction commenced on February 20, 1927, focusing on a double-track, electrified line designed for high-speed operations, including elevated sections near Tennoji and tunnels through the Mountains to minimize travel time. The initial segment from Tennoji (then Hanwa-Tennoji) to -Fuchu opened on July 18, 1929, covering approximately 20 kilometers and immediately serving commuter and traffic. Simultaneously, the Higashi-Hagoromo from Otori to Higashi-Hagoromo (1.7 kilometers) was completed to provide access to the port area, supporting freight handling for local industries and . The full main line to Wakayama (then Hanwa-Higashi-Wakayama) was extended and opened on June 16, 1930, spanning 61.3 kilometers in total and establishing direct connectivity for the entire route. From its inception, the line operated on 1,500 V electrification, a higher voltage than contemporaries like Nankai's 600 V , enabling efficient power delivery for accelerated services across the predominantly straight and level alignment. Early operations centered on local passenger trains using wooden-body electric multiple units (EMUs), such as the initial 1000-series cars, alongside freight services to transport goods from Wakayama's emerging and chemical sectors to markets. These services prioritized reliability for daily commuters and industrial shipments, with representative examples including hourly locals between Tennoji and key intermediate stops like Otori, though rapid patterns were introduced shortly after full opening to compete with parallel routes. Despite its technical advancements, the Hanwa Electric Railway encountered severe financial strains during the of the early , exacerbated by high construction costs from elevated viaducts and tunneling, leading to persistent operating deficits and heavy reliance on loans. Passenger volumes grew modestly through industrial demand, but competition from Nankai and economic downturns limited revenue, resulting in annual losses that strained the company's short-term viability by the late .

Nationalization and post-war development

In December 1940, amid wartime consolidation efforts for efficiency, the Hanwa Electric Railway was merged into the Nankai Railway, with its line redesignated as the Nankai Yamate Line. This merger aligned with broader Japanese government policies to streamline rail operations during World War II. On May 1, 1944, the Nankai Yamate Line was nationalized by the Japanese Government Railways (JGR) under wartime acquisition policies and renamed the Hanwa Line. Following Japan's defeat in 1945 and the establishment of Japanese National Railways (JNR) in 1949, the line underwent significant post-war recovery efforts, including infrastructure rebuilding to address war damage and meet rising demand during economic reconstruction. By the 1950s, JNR prioritized track doublings on key sections to enhance capacity, while the line's original electrification was maintained and upgraded as part of broader network improvements. In 1959, integration with the Kisei Main Line enabled through passenger services from Osaka to Wakayama and beyond. During the and 1970s, amid Japan's high , JNR introduced rapid services on the Hanwa Line, such as the Yamatoji Rapid, to accommodate surging commuter and intercity traffic between and southern regions. Concurrently, freight operations declined sharply due to competition from trucking and the shift toward , which JNR adopted in the to modernize cargo handling but ultimately reduced traditional rail freight volumes on lines like the Hanwa. By the 1980s, escalating operational costs and a massive burden—exceeding ¥37 by 1987—plagued JNR, prompting reforms that culminated in its and the creation of JR West on April 1, 1987.

Modern expansions and updates

In 1994, the opening of the provided a direct rail connection from the Hanwa Line at Hineno Station to , enhancing access to the new international hub for passengers traveling from and Wakayama regions. Following the privatization of and the establishment of JR West in 1987, the company initiated several upgrades on the Hanwa Line during the 2000s, including a major renovation of Tennoji Station to improve overall connectivity and facilities for commuters from . Concurrently, the trains were introduced in April 1994 for rapid services on the Hanwa Line, featuring bodies designed for suburban operations and later extended to airport shuttle services. To aid navigation for international visitors, JR West implemented a station numbering system across its network, including the Hanwa Line, in March 2018; stations on the line were assigned codes from JR-R20 to JR-R54, with symbols displayed on and maps. In recent years, the Hanwa Line has faced operational challenges due to frequent person-related incidents, resulting in and suspensions; for instance, 2025 saw eight such accidents, including one at Minami-Tanabe Station on October 19 that halted services between Tennoji and Hineno and one on November 16 between Kii and Rokko Stations that affected services between Wakayama and Izumi-Sunagawa. These disruptions have periodically strained regional transportation, affecting commuters and the local economy in and Wakayama by interrupting daily travel and freight links. As of November 2025, JR West's medium-term management plan emphasizes reliability enhancements and safety across its network, with no new projects announced specifically for the Hanwa Line, focusing instead on and amid ongoing network priorities.

References

  1. [1]
    The Hanwa Line: An Artery Across Kansai - Osaka.com
    Mar 13, 2020 · The Hanwa Line (阪和線) is a railway line owned and operated by JR West. It links the district of Tennoji, in the southern part of Osaka ...
  2. [2]
    Hanwa Line - NamuWiki
    Jun 7, 2025 · It is a line that connects Tennoji Station and Wakayama Station in southern Osaka, competing with the Nankai Main Line of Nankai and running almost the entire ...
  3. [3]
    Our footsteps | Nankai Electric Railway Co.,Ltd.
    ### Summary of Hanwa Line History
  4. [4]
    Hanwa Line | Dovetail Games Forums
    Aug 14, 2022 · About The Hanwa Line (阪和線, Hanwa-sen) is a commuter rail line in the Osaka-Kobe-Kyoto Metropolitan Area, owned and operated by West Japan ...
  5. [5]
    [PDF] Station Number Route Map - JR西日本
    Hanwa Line. 阪和線. P 16. ユニバーサルシティ. Ashiharabashi. H 44. JR. H. JR Tōzai Line. JR東西線. E01. Hieizan-Sakamoto B 27. Karasaki B 28. * Ōtsukyō B 29.
  6. [6]
    [PDF] JR-West Group Integrated Report 2023
    This report contains forward-looking statements that are based on the JR-West Group's current plans, assumptions, estimates, and projections ...<|separator|>
  7. [7]
    Hanwa Line Route Map, Station List | JR West - Commute Tour Japan
    Mar 3, 2025 · JR Hanwa Line, operated by JR West, has 35 stations from Tennoji Station to Wakayama Station in Osaka and Wakayama Prefecture.
  8. [8]
    The JR Hanwa Line & Kishuji Rapid Service for Otori, Hineno ...
    The JR Hanwa Line runs between Tennoji Station in Osaka and Wakayama Station in the city of Wakayama. Although this line does not extend to Osaka Station, ...
  9. [9]
    Higashi-Hagoromo Station - Wikipedia
    Lines. Higashi-Hagoromo Station is served by a spur line of the Hanwa Line, and is located 1.7 kilometers from the terminus of the spur at Ōtori.Missing: length | Show results with:length
  10. [10]
    [PDF] Technical Regulatory Standards on Japanese Railways
    ... DC 1,500 volts or AC overhead negative feeders shall be not less than 4 meters (3.5 meters when using cable or insulated electric wire for high voltage ...
  11. [11]
    The Mechanism of Railway Tracks
    Railway tracks consist of rails and sleepers, fixed by ballast on a road bed. Rails are 50- or 60-kg, and sleepers are concrete or synthetic.
  12. [12]
    Railway Electric Power Feeding Systems
    Railway power systems include DC and AC systems, with DC using 1500V in Japan, and AC using 25kV for Shinkansen and 20kV for conventional lines.
  13. [13]
    [PDF] Development of the gauge change EMU train system in Japan
    It has been designed to run at a maximum speed of over 300 km/h on Shinkansen and 130 km/h on conventional lines under a catenary voltage of 20 kV, 25 kV (50/60 ...Missing: Hanwa | Show results with:Hanwa<|control11|><|separator|>
  14. [14]
    [PDF] Southern and Eastern Kinki Region
    This third and final article on railways in the Kinki region looks at the southern and eastern parts of the region—southern Osaka.
  15. [15]
    [PDF] ATS-Pの整備線区
    阪和線(鳳〜日根野). 使用開始 H6.5. 学研都市線. (松井山手〜京田辺). 使用開始 H14.3. 松井山手. ATS-Pの整備線区. : 整備計画線区.
  16. [16]
    [PDF] お客様に「安心」「信頼」していただくために vol.23 ATS-SW ...
    当社では、「安全性向上計画」に基づき、 運行面・設備面での安全対策. として、ATS-SWを増設したほか、列車本数の多い線区でのATS-Pの拡大に ... 阪和線 (日根野~和歌山間) ...
  17. [17]
    阪和線(天王寺~日根野駅間)の踏切で長時間の鳴動を防ぐ対策が ...
    Dec 19, 2014 · JR西日本では、阪和線における輸送品質の向上を目指して取り組みを進め ... 3 対象踏切数 41踏切. 4 その他 現在進めている東岸和田駅付近の高架 ...
  18. [18]
    開いてもわずか3秒で警報機が鳴り始める「開かずの踏切」ピーク ...
    Nov 22, 2021 · JR西日本の管内で「開かずの踏切」が最も多いのがJR阪和線で、5年前のデータでは、17か所のうち9か所が堺市内です。堺市は、高架化はまず南海本線から ...
  19. [19]
    JR西日本 - ⊂ATS-Wi⊃
    Mar 31, 2006 · 全線P型のATS-P形設置路線以外の全ての路線にATS-SW形が設置されて ... 阪和線 (日根野~和歌山) ※2006(平成18)年3月6日着工. 平成22年度末(2011 ...
  20. [20]
    [PDF] 鉄道運行管理システム(事例) - Hitachihyoron
    運行管理システムおよび司令員支援装置・ダイヤ作成装置・保守管理装置の組. み ... 継電連動. PR. CRT. 贋. 図4. 阪和線運行管理システムの構成. ある。 42. 駅. 線. 一件.
  21. [21]
    天王寺駅11番・14番のりばへのホーム柵整備着手 - JR西日本
    May 18, 2023 · ~駅のホームの安全性向上にむけて~ (1)三ノ宮駅全のりばへのホーム柵設置完了(2)明石駅1番・2番、天王寺駅11番・14番のりばへのホーム柵整備着手.
  22. [22]
    JR西、地震対策の進捗状況を公表 早期警報システムを4月から運用
    Mar 25, 2019 · 同社では1995年に発生した阪神淡路大震災以降、耐震補強対策、列車の線路からの逸脱防止対策、地震発生時の列車走行の安全確保を目的とした工事を順次進め ...
  23. [23]
    JR西日本、走行するだけで線路検査 - 日本経済新聞
    May 10, 2017 · JR西日本 10日、走行するだけで線路を検査できる車両を導入すると発表した。車両下部のカメラが線路の表面や金具を撮影し、画像分析から修理が必要か自動 ...
  24. [24]
    [PDF] 鉄道安全報告書 2015 - JR西日本
    信号機は、軌道回路などと連動. し、赤、黄、青などの点灯で列車に. 停止、進行などを伝えます。定期的な. 点検で、確実に動作することを確認. しています。 □信号設備の ...
  25. [25]
    The Limited Express Kuroshio from Shin-Osaka, bound for ...
    Saturday & Sunday Timetable. Please note that the times for some Kuroshio services are slightly different at the weekend. Train, Shin-Osaka, Tennoji, Hineno ...
  26. [26]
    Train Review: JR Limited Express Kuroshio 3 from Osaka Tennoji to ...
    Oct 11, 2023 · The Limited Express Kuroshio skirts around the Kii Peninsula on a coastal route, so a tsunami is quite possible to hit the Limited Express ...Osaka Tennōji Station · Hineno Station · Wakayama Station
  27. [27]
  28. [28]
    Haruka Express: Osaka & Kyoto Airport Transfer | JRailPass
    Apr 25, 2025 · The Limited Express Haruka is the only direct train service from Kansai Airport to Kyoto Station. The one-way trip takes around 1hour and 15 minutes.Missing: Rinkai | Show results with:Rinkai
  29. [29]
    Haruka Express Train - Japan Experience
    Feb 15, 2023 · The Haruka is a Limited Express train operated by JR West that runs from Kyoto Station to Kansai International Airport (KIX) in Osaka Prefecture.
  30. [30]
    KUROSHIO CYCLE | Train Information
    6 of Limited Express KUROSHIO running between Shirahama and Shingu Stations on the Kinokuni Line can be used at a standard fare and reserved seat express train ...
  31. [31]
    Route Maps and Timetables | West Japan Railway Company
    Check information on your destinations and along the train lines using the map to find the best travel route. Search by Route. Timetable & Route Finder. Route ...
  32. [32]
    Introduction of Kansai-Airport Express “HARUKA” and Kansai ...
    Direct access to Osaka(Umeda, Tennoji)! Connects with Kishiuji Rapid Service between Osaka and Hineno. Please make sure you get on the right train.Missing: Hanwa | Show results with:Hanwa
  33. [33]
    [PDF] 1.大阪環状線から阪和線・大和路線へ直通する快速を増発します。
    Jan 15, 2015 · これに より、同時間帯の阪和線・大和路線へ直通する快速がそれぞれ 1 時間あたり 4 本に増加し、概ね 15 分間 隔での運転となることで、大阪環状線から ...
  34. [34]
    JR Hanwa Line(Tennoji-Wakayama) for ... - Japan Travel by NAVITIME
    The JR Hanwa Line from Tennoji to Wakayama/Kansai Airport includes local, rapid, and section rapid trains. For example, a local train at 5:11 and a rapid at 5: ...Missing: commuter | Show results with:commuter
  35. [35]
    [PDF] 【主な内容】 - JR西日本
    Dec 19, 2014 · 夕通勤時間帯(16〜20 時台)の大阪環状線から直通する関空/紀州路快速を1時間あたり3〜4. 本から4本に増発し、あわせて 17〜20 時台の天王寺駅の発車時刻を ...
  36. [36]
    阪和線の鉄道人身事故統計
    2010年01月以降 153件 の鉄道人身事故が発生しています ; 2025/10/17 21:52, 阪和線, 鳳駅 ; 2025/10/02 18:01, 阪和線, 山中渓駅 ; 2025/09/24 13:30, 阪和線, 津久野駅〜鳳 ...
  37. [37]
    [PDF] JR Line Route Map JR線 近畿エリア路線図 - JR西日本
    JR Line Route Map JR線 近畿エリア路線図. JRA Hokuriku Line. Biwako Line. 北陸線 ... JRR Hanwa Line. JR. S. Kansai-airport Line. JRT Wakayama Line. JR. U Man-yō ...
  38. [38]
    JR Hanwa Line(Otori-Higashihagoromo) | Japan Travel by NAVITIME
    The JR Hanwa Line(Otori-Higashihagoromo) is a railroad line in the Osaka, Japan. You can check the list of all 2 stations on the JR Hanwa ...
  39. [39]
    路線を延ばしたら妨害に!? 阪和線の「ミニ支線」はどこを目指した ...
    Dec 31, 2024 · この時に支線も合わせて国有化され、山手羽衣駅は「東羽衣」駅に改名されたのです。 東羽衣と命名されたのは、南海本線の羽衣駅の東にあるからで、現在 ...
  40. [40]
    Detailed Station or terminal information | RakuRaku Odekake-net
    【Hagoromo Line】 Higashi-Hagoromo 【 West Japan Railway Company】. Basic information. Address: 大阪府高石市東羽衣1丁目18番地49; Tel: 0570-00-2486 ...Missing: Branch length
  41. [41]
    東羽衣駅(JR西日本)の乗降客数の統計
    このページでは、JR西日本東羽衣駅の乗降客数の統計データを示しています。 政府が公開する統計データによると、JR西日本東羽衣駅の1日の平均乗降客数は1万0036人となっ ...
  42. [42]
    [PDF] 2023 年度区間別平均通過人員(輸送密度)について - JR西日本
    Aug 2, 2024 · 鳳~東羽衣. 1.7. 10,532. 10,094. 紀勢線. 新宮~和歌山市. 204.0. 4,119 ... (注)1.「平均通過人員」は、ご利用されるお客様の1日1kmあたりの人数 ...
  43. [43]
    JR West 223 series - The Red List of Trains in Japan
    The 223 series is a type of suburban train in Kansai Region, and the most numerous train that JR West currently owns. There are two, four, six and eight ...
  44. [44]
    JR西日本 阪和線系統 2025年3月改正ダイヤ運用表 | 鉄道運用Hub
    Mar 15, 2025 · JR西日本 阪和線系統 2025年3月15日改正版の平日・土休日ダイヤ車両運用表です。
  45. [45]
    EMU 225 Series: Rapid Train to the Suburb of Osaka
    Dec 11, 2014 · It was launched in 2011 on the Tokaido (the 225-0 series) and Hanwa (the 225-5000 series) lines. The greatest characteristic of the 225 series ...
  46. [46]
    JR West 225 Series - All About Japanese Trains
    The body is constructed of stainless steel, while the driver's cabs are regular steel. Passenger seating is entirely crosswise. Similar to the 321 Series ...
  47. [47]
    287 series - Wikipedia
    The 287 series (287系, 287-kei) is a DC electric multiple unit (EMU) train type operated by West Japan Railway Company (JR-West) in Japan on limited express ...Design · Formations · 6-car Kuroshio/Mahoroba sets · 3-car Kuroshio/Mahoroba...
  48. [48]
    阪和電気鉄道モヨ100形電動制御車 - FC2
    モヨ100型電動制御車は、車体形状は車体長20000m、車体幅2810mmで、正面貫通路、貫通幌付きの2扉両運転台車で、扉間にシートピッチ1830mmの固定クロスシートが10組、車端部 ...
  49. [49]
    阪和電鉄モヨ100シリーズ(1/150 Nゲージ金属キット)
    ”阪和形電車”は、高速運転に備えた特徴的な車両が多く、モヨ100は、大出力高速電車として、当時の私鉄を代表する名車として記憶されています。 国鉄客車3両を連結し、白浜 ...
  50. [50]
    阪和電気鉄道 車両1 - FC2
    ○阪和電気鉄道→南海鉄道山手線→国鉄阪和線 1944年5月1日買収 <車両解説 前篇 ... クハ6220~6223、クハ6230~6231になった。1959年改番では、クモハ20・クハ ...
  51. [51]
    JNR Class EF15 - Locomotive Wiki - Fandom
    The JNR Class EF15 is a Japanese DC electric locomotive operated by the Japanese National Railways from 1947 to November 1986.
  52. [52]
    阪和電気鉄道モヨ100形 - 「原鉄道模型博物館」のすべて - 朝日新聞
    阪和電気鉄道モヨ100形 - 「原鉄道模型博物館」のすべて.
  53. [53]
    中川浩一の阪和線の歴史
    阪和線を構成する路線を建設したのは、大正15(1926)年4月24日に設立し、最初の路線を昭和4(1929)年7月18日に開業した阪和電気鉄道であった。 開業は二度にかけて行われ、 ...
  54. [54]
    シリーズ「阪和電鉄開通90周年記念 和泉に電車がやってきた」 第1回
    Jun 11, 2020 · 阪和電鉄は工事の進んだ区間から開業することになります。 昭和4年(1929)7月18日、阪和天王寺(現在の天王寺)から和泉府中までの本線と、鳳から阪和浜寺( ...
  55. [55]
    [PDF] 阪和線の変遷と向ヶ丘
    大正 15 年に阪和電気鉄道株式会社が創立された。このときの. 「創立趣意書」に、泉州方面の物資輸送と並んで、沿線の住宅開. 発がその目的とされていたことは注目に値する ...
  56. [56]
    【羽衣線】阪和線羽衣支線(大阪府堺市~高石市。2009年訪問)
    Aug 4, 2014 · 羽衣線は、東羽衣駅付近に広がっていた大阪湾の浜寺海岸への行楽輸送を目的に前身の阪和電気鉄道によって1929年に開業しました。
  57. [57]
    阪和線
    線区データ. 本線. 営業キロ, 61.3km. 駅数, 35駅. 全線開通, 1930年(昭和5年)6月16日. 線路, 全線複線・全線電化. 羽衣線. 営業キロ, 1.7km. 駅数, 2駅.
  58. [58]
    阪和線を建設したのは私鉄だった 伝説的なスピード狂「阪和電気 ...
    Dec 31, 2022 · 阪和電気鉄道の特徴といえば、戦前どころか現代でも通用するレベルのスピード志向。当時の日本の鉄道としては非常に高性能な設計の電車を導入し、高速運転 ...Missing: 設立 目的<|control11|><|separator|>
  59. [59]
    阪和電鉄の歴史【阪和線歴史紀行】 - ご昭和ねがいます
    Sep 23, 2025 · 経営者の 矜持 きょうじ がうかがえます。 昭和4年(1929)7月阪和電鉄の開通広告 (『阪和電気鉄道史』より). 昭和4年7月18日、阪和電気鉄道はめでたく開業 ...<|control11|><|separator|>
  60. [60]
    [PDF] 戦前の阪和電鉄及び南海鉄道の 競合的沿線開発に関する研究
    阪和電気 鉄道(現JR阪和線)は紀勢線直通を目的に,南海鉄道(現南海電鉄)の路線の東側に並行する形で、1930年 に大阪(天王寺)~和歌山間に全線開業する.
  61. [61]
    Our footsteps | Nankai Electric Railway Co.,Ltd.
    1940, Nankai Railway and Hanwa Electric Railway merge (Nankai Yamate Line (currently JR West Hanwa Line)). May 1944, Nankai Railway transfers Nankai Yamate ...
  62. [62]
    Transition of Railway Freight Transport in a Competitive Environment
    The Japanese economy grew rapidly from the 1960s to the early 1970s at an annual rate of over 10%. This growth was led mainly by the private sector, ...
  63. [63]
    Japan's Rail Technology Development from 1945 to the Future
    As a result, the government railways began electrifying track (to 1.5 kV DC) that had not been electrified before or during the war (for strategic reasons) and ...Missing: Hanwa | Show results with:Hanwa
  64. [64]
  65. [65]
    JNR Privatization— JR's First 10 Years and Future Perspectives
    At privatization on 1 April 1987, responsibility for settlement of the old debt was assumed by the Japanese National Railways Settlement Corporation (JNRSC) ...
  66. [66]
    JR Kansai Airport Line & Kansai Airport Rapid Service - Osaka Station
    From Tennoji they then follow the Hanwa Line to Hineno Station, and from Hineno they follow the Kansai Airport Line to Kansai Airport. This route is ...
  67. [67]
    [PDF] West Japan RailWay Company
    An average of. 3.95 million passengers use JR-West's Urban Net- work daily (fiscal 2007), mainly for commuting to work or school. Page 5. JR-West 2007 Annual ...
  68. [68]
    Line Symbol / Color and Station Number Usage Guide
    Put these guides to effective use when riding JR-WEST trains. Components of Station Numbers. The line symbol and station number are combined. Ex. : Osaka ...Missing: Hanwa | Show results with:Hanwa
  69. [69]
    JR阪和線・南田辺駅で人身事故 天王寺-日根野間運転見合わせ 線路 ...
    Oct 19, 2025 · JR阪和線・南田辺駅で人身事故 天王寺-日根野間運転見合わせ 線路内にいた人と接触. 2025/10/19 22:53 ... この事故の影響で、阪和線は天王寺-日根野間の ...
  70. [70]
    阪和線の鉄道人身事故一覧
    全153件中1〜10件目を表示しています ; 2025/02/13 15:32, 阪和線, 富木駅〜北信太駅 ; 2025/01/24 16:40, 阪和線, 浅香駅 ; 2024/11/08 08:02, 阪和線, 信太山駅〜和泉府中駅 ...
  71. [71]
    [PDF] JR-West Group Medium-Term Management Plan 2025
    Planned rolling stock updates in each area of western Japan. •. Switch to one-person operations. •. Reduce environmental load by improving rolling stock.Missing: Hineno | Show results with:Hineno