Hertford Loop line

The Hertford Loop Line is a 24-mile-long (39 km) double-track electrified railway branch of the (ECML) in southern England, diverging northward from station in and rejoining the ECML at in via a circuitous route through and North. It serves as a key commuter corridor, connecting Hertfordshire towns such as North, Bayford, , and Crews Hill to , primarily via the to , with some services extending to London King's Cross during evenings and disruptions. The line features 10 stations, including seven within the (TfL) fare zone, and supports typical off-peak frequencies of two trains per hour to North and four during peaks, operated by Great Northern using Class 717 electric multiple units (as of 2025). Constructed in stages by the Great Northern Railway (GNR) to alleviate overcrowding on the ECML south of , the line originated as a 6-mile branch from (now ) to , opening on 1 April 1871. This initial section included notable engineering features such as high embankments, viaducts over the New River at and Soper's Farm, and tunnels at Ponsbourne and Molewood, though it faced challenges like soil slips in clay areas near Salmons Brook, leading to a 10 mph speed restriction. Extensions followed: Bowes Park station opened in 1880, the line reached on 4 April 1910, a freight-only connection to via a new North station was completed on 4 March 1918, and full passenger services to North with throughout began on 2 June 1924. Electrification at 25 kV AC overhead arrived in 1976, integrating the line into British Rail's suburban network, and services were rerouted from Broad Street to in 1976 following the closure of the former. Today, the route plays a vital role in the franchise, carrying over 10 million passengers annually pre-pandemic (circa 2019) and serving as a diversionary path for ECML trains during disruptions. In May 2025, the portion—including the Hertford Loop—became the first busy UK metro-style corridor to operate without traditional track-side signals, transitioning to the (ETCS) under the £1.4 billion East Coast Digital Programme for enhanced reliability, capacity, and safety.

History

Construction Phases

The origins of the Hertford Loop line trace back to the mid-19th century, when the Great Northern Railway (GNR) proposed the Enfield Branch Railway in 1864–65 to expand connectivity north of London and provide an alternative route to alleviate pressure on the . This proposal was authorized by the Great Northern Railway (Hornsey to Hertford) Act 1865, enabling construction of the initial branch. Construction of the initial section began shortly after authorization, focusing on a double-track alignment from (now station) to Enfield Town. This 5.5-mile segment encountered significant engineering challenges, including the need for high embankments to cross Pymmes and Salmons brooks amid unstable clay soils; the imposed a 10 speed limit over these features to ensure safety. Despite a financial crisis in 1866 that delayed broader plans, the GNR completed the work, and the line opened to passengers on 1 April 1871, marking the first operational phase as a suburban branch. To develop the line into a full loop bypassing the congested main line, the GNR initiated an extension northward in 1905, targeting rural terrain that required careful grading and bridging over local waterways and valleys. This phase added stations at Grange Park and Enfield Chase (initially named Enfield until 1924) and reached , opening on 4 April 1910 as a double-track continuation for both passenger and goods traffic. The extension enhanced relief capacity but remained incomplete, serving primarily as a diversionary route during peak periods. The final construction phase addressed wartime disruptions from , with a single-track goods connection from advancing to Langley Junction by 4 March 1918 to support freight diversion. Full completion came post-war, as the GNR (absorbed into the London and North Eastern Railway in ) doubled the track and built the northern alignment through challenging rural landscapes, including cuttings and embankments in Hertfordshire's wooded countryside. The entire loop was finalized with the opening of the to North section on 2 June 1924, coinciding with the inauguration of the new North station to integrate the route seamlessly with the main line at . This staged development, spanning over five decades, established the Hertford Loop as a vital 24-mile alternative to the .

Electrification and Wartime Use

During , the Hertford Loop line served a critical strategic role as a diversionary route for trains, enabling services to circumvent the Digswell Viaduct, which was deemed vulnerable to aerial bombing due to its exposed and prominent location spanning the Mimram Valley. Following the war, the line experienced recovery amid rising commuter demand in the post-war period, particularly from growing suburban populations in and , which prompted to revive earlier electrification plans in the 1960s as part of broader modernization efforts for the Great Northern suburban network. The 1960 scheme specifically included the Hertford Loop as an extension of King's Cross suburban services, aiming to replace aging and operations with electric traction to handle increased passenger volumes more efficiently. Electrification work commenced in April 1973 under British Rail's Eastern Region, focusing on the inner suburban section from via the to , then along the Hertford Loop to Hertford North and —a total of 37.5 route miles. The project converted the line from diesel multiple units to 25 kV AC equipment, integrating it seamlessly with the existing 's infrastructure for through services to London . This phase became operational by late 1976, with the outer suburban extension from King's Cross to Royston via Langley Junction (35.75 route miles) completing the full scheme by spring 1977. Upon completion in 1977, the electrified Hertford Loop was fully incorporated into 's Eastern Region suburban operations, allowing for the introduction of Class 313 electric multiple units and enabling more frequent and reliable services compared to the previous diesel era. Peak-hour frequencies increased to support commuter flows, with the line handling up to 3 trains per hour in each direction during daytime periods, reducing journey times and enhancing capacity without disrupting main line traffic. Specific project details included the installation of standard 25 kV AC systems across double-track alignments, with no publicly detailed cost estimates available from records at the time, though the overall Great Northern was part of a £50 million in Eastern Region during the .

Route and Settlements

Line Path

The Hertford Loop line spans 24 miles (39 km) and forms a curved diversionary loop from the (ECML), diverging northward at Wood Green South Junction in and rejoining the ECML at Langley Junction just south of in . The route starts in the densely built-up suburbs of , transitioning into the more open and then through rural , where it traverses wooded hills and agricultural land. The Hertford Loop functions as a key route parallel to the ECML, offering bi-directional running to facilitate and freight diversions when the main line is blocked, such as during engineering works or incidents. This curvature was incorporated in the route's design to circumvent heavily congested segments of the ECML between and , providing an alternative path for suburban traffic and enhancing overall network resilience.

Stations and Communities Served

The Hertford Loop line serves 11 primary stations, linking densely populated suburban neighborhoods in North London and the London Borough of Enfield with semi-rural and rural communities in Hertfordshire, thereby enabling efficient commuter access to central London terminals such as King's Cross and Moorgate. These stations cater to a diverse range of residents, from urban professionals in areas like Palmers Green and Winchmore Hill to families in quieter locales like Grange Park and Cuffley, fostering regional connectivity that supports local economies through daily travel for work, education, and leisure. The line's role has been particularly vital in promoting housing development, with interwar expansion (1920s–1930s) spurred by improved rail access leading to significant suburban growth in Enfield and surrounding districts, where new estates were built to accommodate London's expanding workforce. The stations are sequenced from south to north, beginning near the divergence at and terminating at Hertford North, with an additional branch extension to . Each station reflects the line's evolution from its phased between 1871 and 1924, serving as hubs for local , , and transport integration. Passenger usage varies, with busier stations handling over 1 million entries and exits annually, underscoring their importance for Hertfordshire's to the capital.
StationOpening DateCommunities Served and Local SignificanceAnnual Entries/Exits (2023–24)
Alexandra Palace1 May 1859Serves the vibrant area around Alexandra Park and Palace, a major cultural and leisure destination attracting visitors for events and tourism; integrates with London Overground for broader access.487,000
Bowes Park1 November 1880Connects the residential neighborhoods of Bowes and Bounds Green, supporting local shopping and community facilities in this multi-ethnic suburban zone.312,000
Palmers Green1 April 1871Anchors the bustling Palmers Green district in Enfield, a key commuter hub near high street retail and schools, facilitating access for over 100,000 local residents.1,028,000
Winchmore Hill1 April 1871Serves the affluent, green suburb of Winchmore Hill, known for its conservation areas and family-oriented amenities, enhancing connectivity to nearby green spaces.842,000
Grange Park4 April 1910Provides rail access to the upscale, low-density Grange Park area, supporting residential commuting and proximity to local parks and independent businesses.218,000
Enfield Chase1 April 1871 (renamed 1924)The busiest station on the line, serving central Enfield's commercial heart with shops, offices, and the Enfield Town branch line; vital for economic activity in this populous borough.1,562,000
Gordon Hill4 April 1910 (renamed 1923)Links the working-class community of Gordon Hill in Enfield, near industrial sites and schools, aiding local employment ties to London.456,000
Cuffley4 April 1910Connects the semi-rural village of Cuffley in Welwyn Hatfield, significant for nearby golf courses, countryside walks, and as a gateway to the Broxbourne Woods; popular with weekend leisure travelers.312,000
Crews Hill4 April 1910Serves the horticultural and agricultural community of Crews Hill, a designated garden area with nurseries; supports local market access and planned housing growth.78,000
Bayford2 June 1924Provides essential transport to the rural hamlet of Bayford in East Hertfordshire, enhancing access to the Lee Valley Regional Park and supporting small-scale farming and tourism.56,000
Hertford North2 June 1924Terminus for the main loop, serving the historic market town of Hertford with its civic center, schools, and retail; a key node for Hertfordshire's administrative and educational links to London.968,862
An extension from Hertford North, the single-track branch to (opened for passengers 2 June 1924), adds one more station serving the village of and surrounding countryside, with 124,000 annual entries and exits as of 2023–24; this spur bolsters rural connectivity, aiding access to local amenities and the broader network. Overall, these stations have driven socio-economic integration, with higher-usage sites like Enfield Chase and Hertford North exemplifying the line's commuter backbone, while lower-usage rural stops like Bayford highlight its role in sustaining peripheral communities.

Operations

Daily Passenger Services

The daily passenger services on the Hertford Loop line are operated by Great Northern, a brand of (as of November 2025), which has managed these routes since September 2014. The franchise is scheduled to transfer to public ownership on 31 May 2026, with submitting a business case to take over the services, including the Hertford Loop. These services primarily serve commuters traveling between Hertfordshire towns and , forming a key part of the suburban network. Core services run half-hourly during off-peak periods (as of 2025) and up to four trains per hour (tph) during peak hours, with routes typically operating from Hertford North or to London or King's Cross, and some extending northward to . Off-peak frequencies maintain two tph, supporting regular local travel without the intensity of rush-hour demand. These operations integrate seamlessly with the , allowing through services from the Loop to connect directly into London's underground network via , enhancing accessibility for inner-city commuters. Typical journey times from Hertford North to average around 52 minutes, providing efficient access to the financial district. The consists of Class 717 Desiro City electric multiple units, introduced into service in October 2019 to replace older Class 313 trains, offering improved reliability and passenger amenities. Each 6-car unit accommodates up to 943 passengers, including 362 seats, with features such as , , and power sockets to support daily commuting needs.

Diversions and Special Uses

The Hertford Loop line serves primarily as a diversionary route for the (ECML) during disruptions, including engineering works and issues affecting key structures like the Digswell Viaduct. This role is integral to Network Rail's contingency planning, enabling rerouting of services to maintain connectivity between and northern destinations while the main line is blocked. For instance, signal failures or planned maintenance on the ECML have historically prompted diversions through the loop, minimizing broader network impacts. Occasional long-distance expresses operated by () or are routed via the Hertford Loop during major blockades, such as those for infrastructure upgrades. These services typically run non-stop through loop stations like Hertford North, but are subject to the route's maximum line speed of 75 mph, which imposes extended journey times compared to the faster ECML. Freight operations on the Hertford Loop are limited, reflecting its primary focus on passenger services, but it accommodates occasional paths for aggregates, maintenance trains, and other cargo to alleviate pressure on the congested ECML south of . The route supports up to two standard freight paths daily, often utilizing bi-directional running on its two-track layout to integrate with suburban timetables. Capacity constraints arise from the mix of speeds, frequent stopping patterns, and like bay platforms at Gordon Hill and Hertford North, which facilitate turnbacks but limit simultaneous diversionary and local operations.

Infrastructure

Track and Electrification

The Hertford Loop line consists of double track throughout its length, laid to the standard gauge of 1,435 mm (4 ft 8½ in). Electrification of the line was completed using 25 kV 50 Hz AC overhead line equipment (OHLE) on 8 November 1976 as part of the broader East Coast Main Line suburban electrification scheme. The OHLE supplies power to electric multiple units operating commuter services, with recent structure renewals addressing risks from aging components to enhance system reliability. Maintenance of the track and electrification adheres to Network Rail's standards for the London North Eastern Route, including periodic inspections and interventions to support consistent performance. In July 2023, engineers renewed sections of track and OHLE along the line, including between Enfield and Hertford North, to reduce delays and improve operational reliability. As of November 2025, these structures continue to support the European Train Control System (ETCS) implementation under the East Coast Digital Programme without reported physical issues.

Tunnels, Viaducts, and Bridges

The Hertford Loop line features several significant structures, including tunnels and viaducts, designed to navigate the varied terrain between and . These elements were constructed primarily during the early as part of the Great Northern Railway's extension to provide an alternative route to the . The structures employ traditional materials like and , reflecting the practices of the era. Ponsbourne Tunnel, the longest on the line at 2,684 yards (2,454 meters), is located between and Bayford stations. began in 1905 and was completed by 1918, with the tunnel serving as the final major hand-dug railway tunnel in eastern . It is brick-lined throughout, supporting double-track operations, and was integral to the line's completion for passenger services in 1924. Molewood Tunnel, measuring 333 meters (364 yards), is situated near , approximately half a mile south of Hertford North station. Opened in 1924 alongside the northern section of the loop, it facilitates the line's passage through local geology close to the River Beane. The line includes several to cross valleys and watercourses. Viaduct, spanning 14 chains (about 281 meters) with brick arches, carries the route over the River Lea just south of Hertford North. Hornsmill Viaduct, located near , supports the line over the River Lea with a multi-arch design. Further south, Sopers Farm Viaduct (6 chains) crosses Northaw Brook between Crews Hill and , constructed between 1906 and 1910 using brick and concrete. Rendlesham Viaduct (7 chains), with 14 arches of concrete faced in brick, spans Turkey Brook near Gordon Hill and was built from 1907 to 1910. Numerous minor bridges handle road and stream crossings, particularly in , such as those over Holtwhite's Hill and Windmill Hill, ensuring seamless integration with local infrastructure. Maintenance of these structures involves periodic inspections, intensified following 2023 upgrades that renewed track and overhead equipment along the loop to enhance reliability. No major structural failures have been reported in recent assessments.

Signalling and Modernization

Traditional Signalling Systems

The traditional signalling on the evolved significantly during the as part of the broader and resignalling of the East Coast Main Line's suburban routes. Prior to this, the line primarily relied on semaphore signals, a mechanical system common across British railways since the mid-19th century. With the completion of 25 kV AC between London King's Cross and in 1977, the infrastructure was upgraded to three- and four-aspect colour-light signals, which provided clearer indications for higher-speed and more frequent services. These colour-light signals replaced the older semaphores, enabling better visibility and integration with the electric multiple units introduced on the route. Signalling control for the Hertford Loop was centralized at King's Cross Power Signal Box from its commissioning in until April 2021, when it was transferred to the Rail Operating Centre. It encompassed the route from through the loop to . This power signal box (PSB) managed the and route-setting for the entire suburban section, including the loop's and rejoining points, using a relay-based system typical of mid-20th-century installations. The setup allowed for efficient handling of passenger and occasional freight movements on the double-track loop. Key safety features of the traditional system include the absolute block method, which ensures only one occupies a block section at a time to prevent collisions, supplemented by the Automatic Warning System (AWS). AWS, introduced across main lines from 1956, alerts drivers to signal aspects via an in-cab and , with acknowledgement required to silence it; failure to do so applies the brakes. While Automatic Train Protection (ATP) was an earlier overlay in some areas, the loop primarily relies on AWS for driver aids within the absolute block framework. The signalling layout features multiple colour-light signals along the 24-mile loop, with critical junctions at Wood Green North (near , where the loop diverges from the ) and Langley Junction (where it rejoins south of ). These junctions employ electro-pneumatic point operation for reliable switching under PSB control, supporting bidirectional running on the otherwise double-track alignment. Reliability challenges, such as signal failures contributing to delays, prompted renewals in 2023 focused on track, signalling, and upgrades between key points. These interventions, including replacement of ageing components, aimed to enhance overall system performance and reduce service disruptions for passengers on the loop and connecting .

ERTMS Trials and Digital Upgrades

The (ERTMS) Level 2 trials on the Hertford Loop were conducted between 2017 and 2021 at the ERTMS National Integration Facility (ENIF), utilizing an 8.9 km section of the line south of . These trials employed Class 313 electric multiple unit 313121, which had been converted into a mobile laboratory train by in collaboration with , to test bi-directional working and cab-based signalling under (ETCS) Baseline 3 standards. The facility, established on the double-track loop, enabled integration testing of trackside and onboard components from multiple suppliers, demonstrating high compatibility and paving the way for broader ETCS deployment across the UK network. As part of the £1.4 billion , initiated in 2017 and accelerated in 2020, the Hertford Loop was designated as an initial "no-signals" corridor. Lineside signals were removed in 2025 to enable full ETCS Level 2 integration without traditional visual aids. This configuration relies on continuous radio communication via and transponders for precise train positioning and movement authority, marking the first such implementation on a busy commuter route since the 2011 pilot. The programme aims to overlay digital signalling on the southern , with the Hertford Loop serving as a for seamless transitions between conventional and ETCS-equipped sections. As of November 2025, the Hertford Loop operates without traditional track-side signals, following the Northern City Line's implementation in May 2025. Between 2023 and 2025, preparatory upgrades focused on enhancing digital readiness, including signal and track renewals along key segments of the Hertford Loop to support ETCS infrastructure. These works, carried out during planned closures such as in July 2023, involved replacing ageing signalling assets and improving overhead line equipment, alongside enhancements to the radio system for reliable train-to-ground data transmission. With the rollout completed by late 2025, the upgrades enable initial semi-automated operations in controlled environments. The ECDP upgrades on the Hertford Loop are expected to yield significant operational benefits, including up to a 20% increase in through optimised headways and reduced block lengths, as well as lower maintenance costs by eliminating lineside signal infrastructure. However, challenges include retrofitting tunnels—such as the two on the loop—for installation, where limited space and heritage constraints necessitate specialised to ensure reliable ETCS positioning without compromising structural integrity. These modifications are critical for maintaining in low-visibility conditions and supporting bi-directional running. Looking ahead, the Hertford Loop's ETCS implementation will integrate with the broader ECML by 2030, forming a unified digital corridor from London King's Cross to Stoke Tunnel near , enabling higher line speeds of up to 140 mph for compatible trains and advanced features like signalling. This phased expansion will enhance with freight and services, contributing to national goals for a more resilient and efficient rail network.

References

  1. [1]
    East Coast Mainline Routes & Branches Part 2: The Hertford Loop ...
    Sep 29, 2013 · The Hertford Loop consists of three stations outside the TfL area (including Hertford North), and a further seven within it. The loop then joins ...
  2. [2]
    Train Timetables | Timetable for Rail Network - Great Northern
    Find train times for your route and download timetables and maps for all Great Northern services.
  3. [3]
    The railway that transformed Enfield
    May 24, 2021 · Great Northern Railway (GNR) opened its new branch line from Wood Green to Enfield on 1st April 1871, just over 150 years ago.
  4. [4]
    Discover Hertford Online | History | The Railway
    Nov 15, 2020 · Hertford North station was opened in 1924 following the completion of the loop off the Great Northen line from Alexandra Palace to Stevenage.
  5. [5]
    North London rail line becomes first in UK without track-side signals
    May 20, 2025 · A commuter rail line in North London has become the first in the UK to operate without track-side signals following successful weekend engineering work.
  6. [6]
    Great Northern Railway - Graces Guide
    Nov 3, 2023 · 1848 The first section of line was opened on 1 March 1848 and was the Louth to Grimsby section of the East Lincolnshire Railway, which although ...
  7. [7]
    Disused Stations:Hertford North Station (1st site)
    May 21, 2017 · The station was renamed Hertford North on 1st July 1923, but its days were numbered as a new Hertford North station was opened on 2nd June 1924 ...Missing: phases | Show results with:phases
  8. [8]
    Hertford Loop Line | The Anonymous Widower | Page 2
    Sep 12, 2016 · The Hertford Loop Line is the only diversion past the bottleneck of the Digswell Viaduct. Both ends of the line are grade-separated. The ...
  9. [9]
    Cambridge - Its Railways and Station - Disused Stations
    Apr 7, 2019 · The 1960 scheme embraced electrification of the King's Cross suburban route as far as Cambridge and including the Hertford loop.<|control11|><|separator|>
  10. [10]
    RAILWAYS (ELECTRIFICATION) (Hansard, 31 January 1975)
    Jan 31, 1975 · In April 1973, British Rail announced the start of work on electrification on the Eastern Region's Great Northern suburban services, to be ...
  11. [11]
    Electrification dates - Railway Codes
    This list, originally compiled by Martin Baumann, attempts to document all dates when Britain's railways were electrified (and, in some cases, de-electrified ...
  12. [12]
    Hertford Loop line - Wikipedia
    The Hertford Loop is a branch of the East Coast Main Line, part of the Northern City Line commuter route to London for Hertford and other Hertfordshire towns.History · Operations · Infrastructure · ERTMS trials on the Hertford...
  13. [13]
    Hertford Loop Line - UK Transport Wiki - Fandom
    The Hertford Loop Line is a branch of the East Coast Main Line, providing a commuter route to London for Hertford and other Hertfordshire towns
  14. [14]
    [PDF] East Coast Main Line Route Study Technical Appendices
    Jan 18, 2018 · Hertford Loop and the GN/GE route between Peterborough and. Doncaster via Lincoln. The East Coast Route Study area accommodates a number of.
  15. [15]
    [PDF] CP5 Enhancements Delivery Plan | Railfuture
    • Bi-directional signalling between Didcot North and Aynho Junction. ... Note - the upgrade of traction power supplies on the Hertford Loop is not required for ...<|control11|><|separator|>
  16. [16]
    [PDF] HIIS Transport Report 2009 - Hertsmere Borough Council
    Hertford Loop services. Generally quieter periods ... between Finsbury Park and Potters Bar. ... through the county to avoid congestion at other locations within ...
  17. [17]
    [PDF] DRAFT INFRASTRUCTURE DELIVERY PLAN - Enfield Council
    New enhancements will be required along the rail network in the Upper Lee Valley (e.g. Hertford loop line) and on other suburban routes to support the planned ...
  18. [18]
    [PDF] A414 Corridor Strategy - Hertfordshire County Council
    Coast Main Line, Hertford Loop and Hertford East branch line. ... southbound lanes at the junction and increased length of northbound left filter into College ...
  19. [19]
    Estimates of station usage: April 2023 to March 2024 - GOV.UK
    Estimates of station usage: April 2023 to March 2024. Annual estimates of the number of entries/exits and interchanges at each station in Great Britain.
  20. [20]
    [PDF] ELP-REG19-Consult-Chapters-3-15-Planning.pdf - Enfield Council
    Enfield is home to a diverse array of communities and the Borough's cultural character is a product of its neighbourhoods, town centres, green and blue spaces, ...
  21. [21]
    [PDF] HAVE YOUR SAY Enfield's Local Plan EVIDENCE BASE
    Hertford Loop railway line, with most of the retail premises located in two ... local services serving an important community function. Page 81. Town ...
  22. [22]
    [PDF] URBAN TRANSPORT PLAN - Hertfordshire County Council
    Both of these schools serve a significant local population and access to them could be improved to encourage and promote access by modes other than the ...
  23. [23]
    [PDF] Crews Hill Placemaking study 2023 - Enfield Council
    Oct 26, 2023 · The study supports the Draft Local Plan by developing a spatial framework to inform policies and support the strategic allocation at Crews Hill.
  24. [24]
    [PDF] Hertford and Ware Urban Transport Plan
    Passenger Information (RTPI), better waiting areas at Hertford bus station, improved access to rail stations and intelligent systems to improve traffic flow.
  25. [25]
    About us | Great Northern Railway
    Great Northern became a part of Govia Thameslink Railway in 2014. Our rail services now operate on the southern side of Britain's East Coast Main Line, with ...Missing: Loop | Show results with:Loop
  26. [26]
    Govia Thameslink next rail firm to be nationalised – as TfL eyes up ...
    Oct 1, 2025 · ... frequencies will need to increase from the current service on the Hertford Loop Line of two trains per hour at off-peak and four at peak times.
  27. [27]
    New trains help boost Great Northern and Thameslink rail services
    Feb 12, 2025 · However, Hertford Loop Line services during off-peak times will remain at two per hour, despite repeated calls to restore the pre-pandemic ...Missing: frequencies operator rolling stock
  28. [28]
    Trains Hertford North to Moorgate | Train Tickets & Times
    Find out all about journey length, times and fares before booking your train tickets from Hertford North to Moorgate on our website.Missing: Loop | Show results with:Loop
  29. [29]
    GTR class 717 EMUs enter service - International Railway Journal
    Oct 2, 2018 · BRITISH train operator Govia Thameslink Railway (GTR) operated the first preview passenger services of the new £240m, 25 six-car class 717 ...
  30. [30]
    Great Northern Class 717 EMUs unveiled | News - Railway Gazette
    May 3, 2018 · Total capacity is 943 passenger per unit, with 362 seats including 64 priority and 15 tip-up seats; there are no seat-back tables. There are ...
  31. [31]
    [PDF] Network Rail ECML Capacity Options Report 11 September 2014
    Sep 11, 2014 · The Hertford Loop is two-tracked throughout with bay platforms at Gordon Hill and Hertford. North for terminating services. The Hertford Loop ...
  32. [32]
    Changes to train times - LNER
    Here you'll find all the planned engineering work scheduled to impact LNER services over the next 12 weeks.
  33. [33]
    Planned Changes to Train Times | Thameslink
    Trains between London stations and Cambridge / Peterborough will divert non-stop via Hertford North, with extended journey times. Check before you travel ...
  34. [34]
    [PDF] England's Economic Heartland Rail Study Phase 1
    along the Hertford Loop line and of the 75ph maximum line speed. As Hertford North is based on a loop off the East Coast Main Line, even local journeys to ...
  35. [35]
    [PDF] Possible Enhancements to Rail Network - GOV.UK
    Network Rail has been asked by the Department for Transport (DfT) to conduct a high level study into the interventions required to deliver a step-change in ...
  36. [36]
    [PDF] London North Eastern & East Midlands Route - Network Rail
    The plan aims for efficient delivery, 15% train service growth, and a 9.9% reduction in service failures, with multi-million pound investments.
  37. [37]
    Plan ahead: Reliability boosting upgrades are set for the Hertford ...
    Jul 18, 2023 · Passengers can look forward to smoother, more reliable journeys as major work gets underway on the Hertford Loop line and Northern City Line ...<|separator|>
  38. [38]
    Ponsbourne Tunnel - Graces Guide
    Sep 1, 2018 · Ponsbourne Tunnel on the Hertford Loop of the Great Northern Railway which at 2,648 yards is the longest tunnel in the eastern counties of ...Missing: length construction<|separator|>
  39. [39]
    [PDF] Lumo East Coast Main Line Route Autism Guide
    The two different tunnels are on the Hertford loop. This is a branch of the ... Molewood Tunnel. ½ mile from. Hertford station. 364 yards. 333 metres. 60 ...
  40. [40]
    Soper's Viaduct © Stephen McKay :: Geograph Britain and Ireland
    Apr 6, 2023 · Soper's Viaduct (or Soper's Farm Viaduct) carries the Hertford Loop over the Northaw Brook. The railway was built between 1906 and 1910.
  41. [41]
    Rendelsham railway viaduct. - Layers of London
    It carries the double track Great Northern Railway over the Turkey Brook on its Hertford line. It has fourteen arches built 1907-10 of concrete with brick ...
  42. [42]
    Category:Bridges on the Hertford Loop Line - Wikimedia Commons
    May 26, 2021 · Bragbury End, Bragbury Lane railway bridge - geograph.org.uk - 1601026. · Bridge over Holtwhite's Hill, Enfield - geograph.org.uk - 6401014.
  43. [43]
    Reliability boost for the Hertford Loop line and Northern City Line
    Jul 19, 2023 · Network Rail are working to renew track and signals on the Hertford Loop line and Northern City Line as part of reliability upgrades.Missing: integration | Show results with:integration
  44. [44]
    1970's Railway Resignalling and Electrification | Post War Welwyn ...
    May 12, 2020 · The new signalling control panel temporarily housed in the old SB. It is now located in the relay interlocking room and can be brought into ...
  45. [45]
    ERTMS on the East Coast Main Line - Issuu
    The route equates to the control areas of the King's Cross and Peterborough power boxes which were commissioned in the 1970s. Now nearly 50 years old, ...<|separator|>
  46. [46]
    Train Protection | PRC Rail Consulting Ltd
    Continuous ATP systems allow constant data updates to be transmitted to trains so that the train driver can respond to changes in signal aspects as soon as they ...
  47. [47]
    RailRef Numbering Great Northern Railway - Signalling Record ...
    Wood Green Junction - Langley Junction v Hertford Loop. Up Alignment 4m68c Wood Green Junction GN001 5m30c Bounds Green Down Alignment 5m07c Wood Green Junction ...
  48. [48]
    ERTMS train for Hertford National Integration Facility takes shape
    Jan 21, 2013 · To allow for the operation of HNIF, bi-directional signalling has been installed on the northern section of the Hertford Loop, to allow the down ...Missing: pneumatic | Show results with:pneumatic
  49. [49]
    Unlocking Innovation: The Digital Railway - Rail Engineer
    Sep 1, 2020 · ... trial on the ENIF Hertford loop site. The idea is to independently prove a train's position and that the track ahead is safe to proceed ...
  50. [50]
    East Coast Digital Programme - Network Rail
    We expect the first trains to operate on the East Coast Main Line using this digital signalling technology by the end of 2025. We plan to complete all ...
  51. [51]
    All eyes on the East Coast as digital programme ramps up
    May 20, 2025 · The Hertford Loop will be a no-signals railway from the outset, but the short section north of King's Cross is under consideration. This was ...
  52. [52]
    UK: Momentum builds behind East Coast Digital Programme
    Oct 10, 2024 · ... Programme ... no signals' operation. Biggleswade – Fletton is seen as the most likely option, although the Hertford Loop is also an option.
  53. [53]
    ECDP: An update - Rail Engineer
    Oct 17, 2024 · There is still discussion as to whether this will be Biggleswade to Fletton or the Hertford Loop although the primary aim is the former.
  54. [54]
    What are the benefits? - Mobility and Transport - European Union
    Increased capacity​​ ERTMS makes it possible to reduce the minimum distance or time between trains, which increases the network capacity. The precise scale of ...
  55. [55]
    ERTMS on the East Coast Main Line - Rail Engineer
    Apr 19, 2021 · ETCS will be deployed from King's Cross to Stoke Tunnel, just short of Grantham, a distance of 106 miles on the main line East Coast route.<|separator|>
  56. [56]
    [PDF] Our approach to digital signalling in CP7 | Network Rail
    Mar 31, 2024 · The operational transition to ETCS will continue up the East Coast Main Line in 2025. (Welwyn to Hitchin), with train operators ready to operate ...