Fact-checked by Grok 2 weeks ago
References
-
[1]
[PDF] 3. Train Control and Signaling - Transportation Research Board3.3 MOVING-BLOCK. SIGNALING SYSTEMS. Moving-block signaling systems are also called transmission- based or communication-based signaling systems—potentially ...
-
[2]
Real-time railway traffic management under moving-block signallingIn moving-block signalling systems, the fixed block sections are eliminated. Trackside signalling and train detection are replaced by radio-based cab signalling ...
-
[3]
Full Moving Block (FMB) Concept and Requirements Specification ...Aug 20, 2025 · The team worked to develop an FMB Concept of Operations (ConOps) document with a focus on interfacing with alternative broken rail and rollout ...
-
[4]
Moving Block Signalling - POST ParliamentApr 26, 2016 · In moving block signalling, trains are given permission to move to a specific position anywhere on the track, as defined by a computer system.
-
[5]
[PDF] Moving block and traffic management in railway applications2 Moving block in railway signalling. The fixed block concept employs fixed sections each made up of track circuits to detect the presence of trains. The track ...
-
[6]
[PDF] Radio communication for Communications-Based Train Control ...The speed and location of a train is determined using a combination of devices such as speedometers, tachometers, transponders ("balises"), Doppler radar, ...
-
[7]
Exploring the ERTMS/ETCS full moving block specificationApr 10, 2022 · ... moving block railway signalling systems is provided in Sect. 3. The ... braking curve or the dynamic speed profile that determine the ...
-
[8]
[PDF] RTD LRT Signal System Upgrade Options - Amazon AWSJan 25, 2022 · CBTC Moving Block. Trains use GPS and onboard tachometer to determine their position, and track Balise may also be used as a positioning device.
-
[9]
Implementation of Global Navigation Satellite Systems in Railway ...The use of inertial sensors in the process of differential satellite positioning can provide an accuracy of about one meter, which can contribute to more ...
-
[10]
Hybridized-GNSS Approaches to Train Positioning - PMC - NIHSub-metric position accuracy is attainable only by mitigating as much as possible the different sources of uncertainty. An additional fixed GNSS receiver with a ...
-
[11]
New CBTC System for Smart Operation : Hitachi ReviewCBTC is a signalling system using communication between onboard and trackside equipment, using moving blocks and wireless location determination.Features of a CBTC System · Standards Compliance and... · System Architecture
-
[12]
COMPARISON BETWEEN CBTC NETWORK AND LTE-BASEDCBTC is based either on WiFi standard or on a proprietary technology with ISM bands, and GSM-R with the specified frequency bands as shown in Table 1.
-
[13]
[PDF] and Moving-Block Control Systems on North American Freight ...A moving-block system maintains safe train separation by continually comparing the calculated braking distance of a train to the distance to the next train ...Missing: formula | Show results with:formula
-
[14]
Security Analysis for CBTC Systems under Attack–Defense ... - MDPISep 5, 2019 · When the equipment fails or communication is disrupted, the safety mechanism will start the train emergency braking, which may introduce huge ...<|control11|><|separator|>
-
[15]
Virtual Coupling in Railways: A Comprehensive Review - MDPIIn addition, the length of a block can vary from a few hundred meters to several kilometers. ... A safety-oriented dynamic moving block train control system based ...
- [16]
-
[17]
[PDF] Conventional vs CABS vs CBTC Signalling & their Impact to CapacityAs train 9 moves further within block 3, the artificial separation grows. • The trains can be closer together, but the fixed blocks prevent train 8 from moving.
-
[18]
A COMPARISON STUDY OF FIXED AND MOVING-BLOCK ...With the moving-block concept, a train can follow a preceding train at a safe braking distance behind the tail of the train. In this paper, the transient ...
-
[19]
R.0816 Railway braking - The Contact Patch... braking from 100 km/h, a train will need nearly half a kilometre to stop. And if the speed doubles to 200 km/h the stopping distance will increase by a ...
-
[20]
Optimizing rollout strategies for migration to moving block signalingThe shift of rail traffic control from fixed-block operation to moving-block signaling marks a key transition from trackside-systems for train occupation ...
-
[21]
Railway signalling systems - GB989723A - Google Patents989723. Track circuit signalling system. WESTINGHOUSE BRAKE & SIGNAL CO. Ltd. Nov. 6, 1961 [Nov. 15, 1960], No. 39153/60. Heading B7N.
-
[22]
NoneSummary of each segment:
-
[23]
The £10bn rail crash | Transport - The GuardianApr 1, 2004 · They still have a protective block of space around them, but it moves along with the train, and shrinks or grows according to how fast it and ...
-
[24]
[PDF] An Assessment of the Business Case for Communications-Based ...Communications Based Train Control. IRSE News 166, April. FEDERAL TRANSIT ADMINISTRATION 185. Page 195. U.S. Department of Transportation. Federal Transit ...
-
[25]
Vancouver SkyTrain—A Proven Success StoryDuring peak hours, the service headway averages 150 seconds, and is 5 minutes or better at other times. Each car is designed to accommodate 36 seated and 45 ...
-
[26]
A literature review of Artificial Intelligence applications in railway ...In this paper, we present a systematic literature review of the current state-of-the-art of AI in railway transport.Missing: post- | Show results with:post-
-
[27]
A learning model predictive control applied to moving block in ...Sep 25, 2025 · A learning model predictive control applied to moving block in railway systems for safe and energy-efficient operations: a metro line case study.Missing: integration positioning 2010
-
[28]
[PDF] 5G agile scheduler for low latency communication - NokiaThis white paper focuses on the radio network innovations that facilitate Ultra-Reliable Low Latency Communication (URLLC) in 5G networks. Systems for the ...<|separator|>
-
[29]
[PDF] B COMMISSION REGULATION (EU) 2016/919 of 27 May ... - EUR-LexMar 11, 2020 · This regulation sets the technical specification for interoperability (TSI) for the control-command and signalling (CCS) subsystems of the EU ...
-
[30]
European Train Control System - WikipediaThe European Train Control System (ETCS) is a train protection system designed to replace the many incompatible systems used by European railways
-
[31]
Urban signalling: Urbalis CBTC range - AlstomUrbalis signalling technology is already integrated into 190 metro lines worldwide, including 67 driverless lines in 32 countries, safely carrying millions of ...
-
[32]
Using CBTC as an energy-saving tool - Siemens Mobility GlobalTGMT – Driving efficiency. CBTC enables 43% energy-saving train operation while ensuring capacity, reliability and passenger comfort.
-
[33]
Green CBTC Project: 8% Energy Savings for NSEWL TrainsNov 17, 2024 · Hitachi Rail and SMRT said the next-generation Green CBTC project has achieved an additional eight per cent energy savings for NSEWL trains.
-
[34]
What is CBTC? (IEEE 1474.1)Apr 24, 2015 · A CBTC system is able to determine the accurate location of a train, independent of track circuits, using a bi-directional communication link while keeping the ...
-
[35]
[PDF] Rail Communications-Based Train Control (CBTC) and Safety - CiscoA modern railway signaling system called “Communications-based train control (CBTC)” was introduced in the mid-1980s with the objective to achieve maximum ...
-
[36]
Grades of Automation — CBTC SolutionsAug 28, 2022 · GoA 4 – Unattended Train Operation (UTO). In order to achieve a GoA level, the system must implement a set of minimum mandatory functions ...
-
[37]
Use of 2.4 GHz frequency band for Communications Based Train ...The increasing deployment of CBTC by public transit agencies that use a data communications systems based in the 2.4 GHz ISM band has raised the concern of RF ...
-
[38]
What is Positional Uncertainty in CBTC Applications?Apr 26, 2016 · Positional uncertainty is important when the train has to align at the platform where the stopping accuracy is between +/-25cm to +/- 50cm. But ...
-
[39]
A Solution to Ensure Correctness of Movement Authority - IEEE XploreOct 20, 2020 · In the CBTC system, movement authority is the lifeline. Calculation error of movement authority can lead to vehicle destruction and cause ...
-
[40]
Communications Based Train Control - Rail EngineerMay 8, 2014 · Many countries have deployed CBTC systems. One of the first was Canada with the Vancouver SkyTrain. Since the opening of the 1986 Expo Line, ...Missing: commercial | Show results with:commercial
-
[41]
Communications Based Train Control (CBTC) - Siemens MobilityThey can achieve headways of 90 seconds or less by combining the real moving-block principle of train separation with continuous, bi-directional communication ...
-
[42]
Urbalis Fluence: train-centric CBTC - AlstomUrbalis Fluence is a modernised solution that builds upon the documented success of Alstom's Urbalis™ signalling technology already integrated into 190 metro ...Missing: Siemens Trainguard MT
-
[43]
IEEE 1474.1-2025 - IEEE SAJun 13, 2025 · This standard establishes a set of performance and functional requirements necessary for enhancing performance, availability, operations, and train protection ...
-
[44]
[PDF] Train Master - Transmission Based Train Control ModuleJul 1, 2013 · TBTC is a computer based signalling system that is different to the normal conventional system as it does not have: • fixed lineside signals. • ...Missing: components | Show results with:components
-
[45]
Muni ATCS Replacement Under Way with Hitachi Rail SelTrac ...Feb 13, 2025 · Also known as TBTC (transmission-based train control), Muni's ATCS ... inductive-loop technology, was installed in the subway portion ...
-
[46]
The Rise of Automated Metro Systems? A French Return on ...Jan 5, 2012 · The first automated metros were light, which means they were of relatively small size (breadth and length of trains). In October 1998, as Matra ...
-
[47]
Paris metro Line 14 extended north and south - Railway GazetteJun 25, 2024 · The line should be extended north to St-Denis-Pleyel and south to Orly airport, as part of the Grand Paris Express automated metro programme.Missing: Matra | Show results with:Matra
-
[48]
Communication-Based Train Control (CBTC) Systems With ...Aug 6, 2025 · ... train protection system. The French word balise is used to distinguish these beacons from other kinds of beacons. A Eurobalise is a specific ...Missing: TBTC | Show results with:TBTC
-
[49]
ETCS Levels and Modes - Mobility and TransportIn these modes, the onboard ETCS equipment is responsible for train protection (always ensuring that the maximum permitted speed and the end of movement ...
-
[50]
[PDF] ERTMS/ETCS LevelsERTMS/ETCS Level 3 has been merged into ERTMS/ETCS. Level 2 with the CCS TSI 2023. Therefore, it is no longer a differentiator for specific functionalities, ...
-
[51]
[PDF] ERTMS/ETCS LEVELSLevel 2 fixed block / moving block, formerly Level 3 which has been merged into Level 2 with the CCS TSI 2023, enhances ETCS' potential. This enhancement ...
-
[52]
ERTMS - Groupe SNCFMar 12, 2024 · With Level 3, we'll have a 'moving block' system. Headway between trains will depend not only on the geography of the line, but also on the ...
-
[53]
ERTMS Unpacked: Technical Implementation and Operational ...Jun 30, 2025 · GSM-R (Global System for Mobile Communications – Rail): A dedicated digital radio system providing a secure and reliable voice and data bearer ...
-
[54]
Exclusive ETCS operation begins in Czechia - Railway PROJan 14, 2025 · Czechia intends to deploy the ETCS on the entire TEN-T network by 2030 representing almost 5,200 km of lines. The procedure for gradually ...Missing: kilometers | Show results with:kilometers
-
[55]
Italy Expands ETCS Deployment Across 1400 Kilometers of TrackAug 5, 2025 · Italy has deployed ETCS on 1400 km of railway lines, expanding the system from high-speed routes to conventional tracks under the PNRR plan.
-
[56]
ETCS Implementation on HSL Zuid: Challenges and Technical - UICDec 6, 2012 · signalled headway: 180 s<br />. - Max. capacity: 20 train sets per h/d<br />. (800 passengers each)<br />. 16,000 passengers per hour/directi ...<|separator|>
-
[57]
The UNISIG Steering Committee (SC) - UNIFELeading the development of ETCS and ATO technical specifications under the guidance of ERA, the recognized authority for ERTMS.
-
[58]
[PDF] B COMMISSION DECISION of 30 May 2002 concerning the ...Jan 24, 2013 · The TSI relating to the 'control-command and signalling' subsystem of the trans-European high-speed rail system referred to in Article 6(1) of.
-
[59]
Technical Specifications for Interoperability (TSIs)This TSI concerns the energy subsystem and covers all fixed installations necessary to achieve interoperability that are required to supply traction energy to a ...
-
[60]
[PDF] Evaluating FixEd, virtual, and Moving Block control SyStEMS on a ...More recent research has used commercial railway capacity analysis tools to compare fixed, virtual, and moving block systems over 300 km long corridors, ...
-
[61]
Comparing the Effectiveness of Fixed, Virtual, and Moving Block ...Mar 31, 2023 · Moving blocks were found to have the potential to maintain current average train speed under a 40% increase in train traffic, and that five ...Missing: throughput | Show results with:throughput
-
[62]
[PDF] Canarsie Line Power and Station Improvements New YorkThe Core Capacity project includes traction power improvements that will allow two additional trains per hour, reduce passenger congestion on board trains, and ...
-
[63]
New York City Subway L 14 Street-Canarsie Local on the SubwayNut... expand from 20 trains per hour to 24 trains per hour. The line doesn't see the highest number of trains per hour per individual track on the New York City ...Missing: increase | Show results with:increase
-
[64]
[PDF] Improving Railway Operational Efficiency with Moving Blocks, Train ...On mainline railways in Europe, implementation of European Train Control System. (ETCS) Level 3, a moving block system, has been shown to increase line capacity ...
-
[65]
[PDF] Transit Capacity and Quality of Service Manual (Part C)Equation 3-6 determines the station headway for a moving-block signaling system with a variable safety separation. Moving block train separation safety ...
-
[66]
[PDF] Metrorail Capacity White Paper - WMATANov 11, 2015 · The CBTC system is designed for a 108 second practical headway and a 90 second theoretical headway. The major transfer station at Bloor ...Missing: SkyTrain | Show results with:SkyTrain
-
[67]
[PDF] Rail simulation and the analysis of capacity metricsTheoretical Capacity (tph) = 3600/Headway (seconds) Where Headway is the “minimum time interval between successive trains running at line speed on clear signal ...Missing: formula | Show results with:formula
-
[68]
[PDF] Analysis of minimum train headway on a moving block system by ...minimum train headway could be calculated uniquely under given train-running condition on a moving block system. On a single-step braking, there is a ...Missing: formula | Show results with:formula
-
[69]
[PDF] Safety Requirements and Requirements to Safety Analysis for ...10-9/hr. Core functionality of train control system. Maximum level of safety realistically attainable. Taken to include safety of trackworkers in a protected ...
-
[70]
Rejuvenating the Railway: NSEWL's Six Core Sytems - LTAJul 26, 2024 · With the capability to run at a 100-second headway, compared to 120 seconds before 2018, commuters now enjoy a shorter wait before the next ...2. Power Supply · 3. Track Circuit System · 4. SleepersMissing: Circle ETCS
-
[71]
Circle Line (CCL) - Railway TechnologyOct 13, 2011 · The Circle Line (CCL) is the first fully underground orbital railway line connecting all mass rapid transit (MRT) lines running into Singapore.
-
[72]
Driverless train technology and the London UndergroundMay 31, 2012 · "Johnson pledged to introduce more driverless technologies to London Underground lines to thwart union strikes and improve punctuality.".
-
[73]
[PDF] New Signalling Technology for the Jubilee Line | RisktecOn 23 June 2011, a new signalling technology, known as 'moving block', was quietly enabled on the Jubilee Line of the. London Underground. While passengers.Missing: CBTC implementation 30
-
[74]
[PDF] London Underground World Class Capacity Sub Programme ... - TfLJun 28, 2017 · Benefit realisation was complete in 2011 with introduction of a 30 trains per hour. (tph) peak service. ... of trains per hour (tph) on the ...
-
[75]
Automated trains launched on Paris Line 1 | News - Railway GazetteNov 3, 2011 · ... Line 1, which is the oldest and busiest metro line in Paris, carrying around 725 000 passengers per day. It follows completion of work to ...Missing: 700000 | Show results with:700000
-
[76]
TTC completes new signalling system for Line 1 - Toronto - CBCSep 29, 2022 · The Toronto Transit Commission says upgrades to its signalling system on Line 1 are finally completed and it expects that the improvements will allow trains to ...
-
[77]
Not the Same Ol' MTA: Cost of Upgrading Subway Signals is Cut in ...May 15, 2025 · Transportation economist Charles Komanoff said that dropping the cost of CBTC from $50 million per mile to $25 million per mile across the ...Missing: urban metro
-
[78]
Communications-based Train Control (CBTC) Market SizeOct 20, 2025 · The initial installation can exceed $15 million per km, including hardware, software, and labor. Retrofitting older systems with CBTC can be ...
-
[79]
TTC Completes Line 1 ATC - Railway AgeOct 4, 2022 · The system is moving-block, which allows closer train spacing and thus extra capacity, because trains move along within their own “clearance ...
-
[80]
[PDF] Mixed Traffic High Speed Lines Operations HandbookThe main expected advantages of a mixed HSL over an exclusive of passengers are the following: ➢ Shift freight from road to rail and therefore reduce pollution ...
-
[81]
[PDF] ETCS Level 3Level 3 uses train reported position and integrity to determine if it is safe to issue the movement authority. ” The Baseline: ETCS Level 3 uses train reported ...
-
[82]
Alstom digitalises Stuttgart 21Jun 24, 2021 · ETCS Level 3 enables an even further increase in capacity with a simultaneous reduction of track elements (e.g. axle counters).
-
[83]
[PDF] CTCS—Chinese Train Control System - WIT PressWith Level 3, based on radio system, a moving block system is implemented. Now, ETCS is now becoming a reality [4]. It is a very successful solution to railway ...Missing: HSR | Show results with:HSR
-
[84]
East Coast Digital Programme - Network RailWe expect the first trains to operate on the East Coast Main Line using this digital signalling technology by the end of 2025. We plan to complete all ...
-
[85]
[PDF] A Novel GNSS-based Positioning System to Support Railway ...The aim of this thesis is to mitigate the effect of multipath on GNSS code based single point positioning in the railway environment. To achieve this aim, the ...
-
[86]
Estimation and Compensation of Heading Misalignment Angle for ...Nov 2, 2023 · Taking the maximum cross-track error of 0.1 m as the upper bound, the larger the radius of curvature of the track, the longer the distance D ...
-
[87]
[PDF] Location and speed estimation for telematic signalling in railwaysMar 26, 2024 · Further research shows that theoretically a moving block signalling system is capable of achieving a capacity of 44 trains per hour [38].<|control11|><|separator|>
-
[88]
[PDF] Cybersecurity Challenges in Modern Railway Signaling - IJFMRSep 21, 2025 · Vulnerabilities include radio jamming, spoofed emergency stop signals, and man- in-the-middle attacks exploiting weak authentication in legacy ...
-
[89]
[PDF] Safety transmission in railway application – cryptographic approachIn the railway signaling systems the transmission is treated as an important part of safety system according to PN-EN 50159:2011 standard, especially THR value ...
-
[90]
(PDF) Communication security analysis of fully electronic ...Aug 6, 2025 · EN50159 is an important standard in the European railway communication sector, aimed at ensuring the safety, reliability, and efficiency of ...
-
[91]
FTA Report: Metro Trains Ran Stop Signals 68 Times in 4.5 YearsAug 15, 2016 · A new report from the Federal Transit Administration said Metro trains ran through stop signals 68 times in 4 ½ years.
-
[92]
Flushing 7 Train Signals Late and Over Budget - Reinvent AlbanyNov 14, 2018 · CBTC testing was an issue 5 times, and R188 car availability a concern 3 times (though it should be noted that Hurricane Sandy damaged test ...
-
[93]
Benefits and challenges in deploying Communications-Based Train ...Jul 13, 2022 · CBTC system is a continuous, automatic train control system utilizing high-resolution train location determination, independent of track circuits.<|separator|>
-
[94]
Next generation in advanced train control: A smart response ... - HatchJul 18, 2025 · PTC is a fixed-block system that uses GPS, cellular networks, radio signals, and centralized back-office systems to track trains in real-time.
-
[95]
[PDF] Barriers to Innovation and Automation in Railway RegulationFor this reason, in the United States, rail- roads and their regulators will need to take extra precaution before moving to fully automated locomotive control.
-
[96]
Elusive ETCS Level 3 still a long way offLevel 3 will facilitate the introduction of moving block, automatic train operation, autonomous driving, automatic train regulation, IP radio, and satellite ...