Fact-checked by Grok 2 weeks ago

Moorgate station

Moorgate station is a major interchange station in the , located on adjacent to the street of the same name, serving both and services in Transport for London's Zone 1. Opened on 23 December 1865 as Moorgate Street by the , it was the eastern terminus of the line's first extension from Farringdon, initially providing surface-level platforms for commuter and freight traffic into the financial district. Over the subsequent decades, the station expanded significantly to accommodate the growing Underground network, with the City & South London Railway (now part of the ) adding deep-level platforms in February 1900, marking one of the earliest deep-tube connections. The Hammersmith & City, Circle, and lines also terminate or pass through its sub-surface platforms, while services on the connect to destinations including , Hertford North, and . The station's complex layout includes disused tunnels and tracks from over 160 years of redesigns, reflecting its evolution from a freight terminal to a key hub for business travelers. Moorgate gained tragic notoriety due to the 28 February 1975 tube crash on the , when a southbound failed to stop and collided with a dead-end , killing 43 people and injuring 74 in the deadliest peacetime incident on the London Underground. The cause remains undetermined, but the event prompted major safety reforms, including reduced speed limits approaching terminus platforms and the introduction of the "Moorgate protection" system in 1978, which automatically applies brakes if a driver does not respond to signals. Today, the station features modern facilities such as escalators, step-free access to some platforms, and connections to nearby developments like the at Liverpool Street via integrated entrances.

Location and layout

Geographical position

Moorgate station is situated in the , at the northern end of Moorgate street, directly north of and adjacent to the arts and residential complex. Its postcode is EC2Y 9AE, placing it within the heart of London's financial district. The station's geographical coordinates are approximately 51°31′06″N 00°05′19″W. The station integrates closely with street-level features along , featuring multiple entrances that facilitate pedestrian flow into the surrounding high-density commercial environment. It lies in proximity to prominent financial landmarks, including the , roughly 600 metres to the west. This positioning supports seamless access for commuters and visitors navigating the area's dense network of offices and institutions. Moorgate station's location reflects the broader historical urban development of the as a global commercial center, where transport infrastructure has historically enabled the growth of business clusters by providing vital links to the expanding . The area's evolution from medieval gates to modern hubs has positioned the station as a key gateway for daily workforce influx. In terms of rail connectivity, the station is adjacent to Liverpool Street to the east and to the south, forming part of the intensive interchange network.

Platform configuration

Moorgate station is configured across multiple levels to accommodate both deep-level and sub-surface rail services. The deep-level platforms serving the Northern line are situated approximately 20 metres below ground level, connected via escalators and stairs from the ticket hall. These platforms feature side-by-side tracks with adjacent platforms for northbound and southbound services, facilitating efficient passenger flow. In contrast, the sub-surface platforms for the Metropolitan, Circle, and Hammersmith & City lines are located closer to the surface, at a shallower depth of around 5-10 metres, and support through-running and terminating trains. The station has eight platforms. Sub-surface platforms 1 (eastbound) and 2 (westbound) serve the , , and & City lines. Deep-level platforms 7 (southbound) and 8 (northbound) serve the , while platforms 9 and 10 serve Great Northern services on the . Sub-surface platforms 5 and 6 have been disused for passenger services since 2009. The layout includes island platforms on the sub-surface level for shared use by multiple lines, with cross-passages linking opposite platforms and dedicated emergency exits at both ends to ensure safe evacuation. Spanning approximately in length, the station's footprint integrates escalators, lifts, and staircases between levels for vertical circulation, alongside basic amenities such as ticket barriers at the and limited waiting areas on each level. Recent upgrades have introduced step-free access via lifts to the deep-level platforms (restored in 2025), improving connectivity with the adjacent at Liverpool Street.

History

Origins and opening (1861–1900)

Moorgate station originated as part of the Metropolitan Railway's expansion plans to connect London's growing northern suburbs with the financial district, receiving parliamentary approval for construction in 1861. The station, initially named Street, opened on 23 December 1865 as the eastern terminus of the , extending the world's first underground railway from its previous endpoint at Farringdon Street. This extension, spanning about 0.75 miles, addressed severe surface congestion in the during the mid-19th-century industrial boom by providing direct underground access for commuters and limited freight to key commercial areas. The initial setup featured a surface-level with a single serving the double-track line, constructed with mixed-gauge rails to accommodate both the Metropolitan's 4 ft 8½ in tracks and potential broad-gauge (7 ft) operations compatible with Great Western Railway equipment. By 1869, following the nationwide phase-out of broad gauge under the Regulating the Gauge of Railways Act 1846, the tracks at Moorgate were fully converted to , streamlining operations exclusively for . The station's surface buildings, designed in a utilitarian style typical of early architecture, included brick facades with iron-framed canopies and modest entrance pavilions along Moorgate Street, reflecting the era's emphasis on functional integration with the urban streetscape. Moorgate played a pivotal role in serving the City of London's freight and passenger needs amid rapid industrialization, facilitating the transport of goods from northern lines and enabling daily commutes for office workers in the expanding financial sector. Key developments included the opening of the adjacent "Widened Lines" on 1 July 1866, providing additional tracks parallel to the for integration with Great Northern Railway services, which extended northward to King's Cross by February 1868 and boosted overall capacity to handle up to 200 trains per day by the 1880s. These enhancements solidified Moorgate's position as a vital gateway for traffic into the City until the close of the century.

Development and expansions (1900–1950)

In the early 1900s, Moorgate station underwent significant expansion with the arrival of new underground lines designed to alleviate surface congestion in the . The extended its service northward, opening a new deep-level station at Moorgate on 25 February 1900, which replaced the inadequate original terminus at King William Street and provided additional platforms for growing commuter traffic. This was followed by the opening of the Great Northern & City Railway on 14 February 1904, introducing a deep tube line from to Moorgate with platforms sized for mainline rolling stock, marking one of the first electric underground railways in powered by a 575-volt DC system. These additions enhanced connectivity, allowing electric shuttle services that boosted daily passenger volumes as the City expanded financially. The 1920s brought further modernization amid rising demand, particularly for the services terminating at . Electrification efforts intensified, with the introduction of 20 new electric locomotives in 1922–1923, each equipped with four 300-horsepower motors to haul longer trains on the extended network reaching by 1925. Concurrently, reconstruction of the City and South London line, closed between Euston and from August 1922, included platform extensions to support through services and increased capacity; the northern section reopened on 20 April 1924 with trains to , and the full line resumed on 1 1924. These upgrades reflected broader trends, transitioning from steam to electric multiple units and reducing journey times for suburban commuters. The formation of the London Passenger Transport Board in 1933 centralized control over Moorgate's operations, integrating the Great Northern & City Railway into the as the "Northern City branch" and standardizing fares and services across the . Passenger numbers grew steadily through the , peaking at pre-war levels around 1939 as economic recovery drew more workers to the , though exact figures varied by line with the Northern City services handling thousands daily. During , Moorgate served as an air-raid shelter for civilians, like many stations, accommodating thousands during despite government hesitations on using tubes for this purpose. The station sustained minor bomb damage, including severe impacts to the platforms in 1940 and 1941 that temporarily halted Widened Lines services from 16 October 1940 until repairs in 1946, yet operations largely continued with adaptations for wartime resilience.

Modern era and upgrades (1950–present)

In the 1970s, Moorgate station underwent significant operational changes amid a broader decline in usage. The 1975 on the resulted in 43 deaths and led to widespread safety investigations and improvements across the London Underground, including the introduction of driver safety devices. In November 1976, withdrew peak-hour suburban services to the station's surface platforms via the Widened Lines, diverting them to the underground to rationalize operations and prepare for future developments like the project; this shift marked the end of above-ground passenger services at Moorgate for several decades. During the 1980s and 1990s, the station was incorporated into British Rail's sector, which managed commuter services on the until privatisation in 1996. Minor refurbishments were carried out, including updates to platform lighting, signage, and seating on the underground levels to enhance passenger experience amid growing traffic. These efforts maintained functionality but were limited in scope compared to later upgrades. The 2000s and 2010s saw integrated into broader rail modernization initiatives, including considerations under the to expand capacity on the Widened Lines. However, the Moorgate branch closed in March 2009, with the final Thameslink service departing on 20 March, allowing for platform extensions at Farringdon to accommodate 12-car trains. In response to the Railways (Safety Case) Regulations 2003 and subsequent safety directives, platform edge barriers and improved lighting were installed to reduce risks at the train-platform interface. Recent upgrades have focused on and . On 5 July 2021, the refurbished entrance reopened after a decade of closure for works, featuring lifts for step-free access to the , & City, and platforms, along with expanded gatelines and information screens. The line's opening on 24 May 2022 enhanced links to , boosting overall usage; recorded 41 million tube entries and exits at in 2024, while figures showed 8.23 million entries and exits for the year ending March 2024. As of 2025, ongoing maintenance includes the completion of landscaping at in spring 2025, featuring new pathways, planters, and sustainable greening to improve the public realm around the station.

Incidents and accidents

1975 Moorgate tube crash

The occurred on 28 February 1975 at 8:46 a.m., when a southbound train on the collided with a dead-end concrete wall at the end of platform 9, traveling at approximately 35 mph (56 km/h). The six-car 1938 Tube Stock train, carrying around 300 passengers, had departed from the previous station, , just moments earlier and passed through clear signals without slowing. The impact crushed the front three carriages, telescoping the first two and partially the third, resulting in 43 fatalities—including the driver, Leslie Newson—and 74 injuries requiring hospital treatment; it remains the deadliest peacetime accident in history. The sequence of events unfolded rapidly over the short distance from to . The train, scheduled as the 8:38 a.m. service originating from Drayton Park, was taken over by driver Newson at , where he departed on time at 8:46 a.m. Eyewitness accounts and post-accident analysis confirmed that Newson made no attempt to brake, apply the emergency system, or protect himself, maintaining an upright position in the cab as the train accelerated through the station approach. No faults were found in the train's braking system, track, or signaling, which had displayed a allowing unrestricted entry. The overrun into the 20-meter (66 ft) dead-end tunnel beyond the platform buffers caused catastrophic deceleration, with the leading carriage compressing to just 15 cm (6 in) in height. The primary cause was identified as driver error, with Newson failing to respond to the need to stop despite the terminal's configuration requiring deceleration from the prior 15 mph (24 km/h) approach limit. Investigations could not conclusively determine why, though possibilities included a sudden medical episode—such as a transient loss of consciousness—or deliberate inaction suggestive of , as Newson had no history of impairment and showed no signs of struggle post-impact. Contributing factors included the absence of automatic protection (ATP) on the , which lacked systems to enforce speed limits or halt overruns at dead-end platforms, unlike more modern lines. The official in 1975 returned a of , emphasizing human factors over mechanical failure. Rescue efforts commenced within minutes of the crash at 8:48 a.m., coordinated by the London Fire Brigade, , and London Transport staff under challenging conditions of darkness, dust, and extreme heat 20 meters (66 ft) . Over 1,300 firefighters, 240 officers, 80 personnel, 16 doctors, and volunteers participated in the operation, which lasted six days; they used cutting tools to extricate trapped survivors, including one case requiring on-site to free a victim. The last survivor was rescued after 13 hours and 19 minutes, at 10:05 p.m., while the final body was recovered on 4 March at 8:00 p.m., marking the end of body recovery efforts. The formal inquiry report, published in March 1976 by the Department of the Environment, highlighted the vulnerability of stations and recommended urgent safety enhancements. These included mandatory installation of ATP to automatically apply brakes on driver inaction, staff-only barriers at dead-end platforms to prevent public access during overruns, and a reduced approach of 10 mph (16 km/h). The reforms led to the rollout of the "Moorgate Protection" system across the network by 1978, incorporating signaling and train-stop devices, significantly improving terminal safety protocols. On 28 February 2025, the 50th anniversary was marked by a remembrance service at the Moor Place memorial in the , organized jointly by the London Fire Brigade, , emergency services, survivors, and victims' families. Firefighters from and Dowgate stations joined in reading the names of the 43 deceased, observing a , and laying floral tributes, honoring both the victims and the responders' heroism.

Other incidents

In the decades following the major 1975 incident, Moorgate station has experienced several minor disruptions related to signalling and issues. For instance, an electricity supply failure between Moorgate and in November 2025 halted train services temporarily, causing widespread delays on the Great Northern line until resolved later that day. Similar technical faults have occasionally affected operations, though none have resulted in injuries. A notable safety event occurred in August 2016 when a broke out on the tracks at , prompting a full evacuation of the station and disruption to services. Four fire engines responded to the , which was brought under control without , but the incident highlighted ongoing challenges with management during alerts. Another evacuation took place in August 2023 due to a activation, further underscoring the station's history of emergency responses to potential hazards. More recent safety concerns have involved passenger incidents. On September 9, 2025, launched an investigation into an on an at the station, releasing CCTV images of a described as a white male in his 30s; the victim was unharmed, but the event raised awareness of personal safety risks in busy transit areas. In December 2023, a man was stabbed near Moorgate station following a dispute over fouling, leading to temporary restrictions on pedestrian access around the entrances, though the assault was unrelated to station operations and no arrests were reported at the time. Post-2020, the station and surrounding area have seen a rise in reports, coinciding with the return of office workers after restrictions. High-profile cases include on a branch near in May 2024, linked to pro-Palestine protests, and red paint attacks on the offices adjacent to the station in October 2025, part of a broader wave targeting financial institutions. These incidents, while not directly impacting rail services, have occasionally prompted enhanced security measures around station entrances. Safety enhancements implemented after 1975, such as improved driver training and barrier systems, have helped mitigate risks from such disruptions.

Infrastructure

Tracks and signalling

Moorgate station's track layout includes six sub-surface platforms (1–6) serving the Circle, Hammersmith & City, and lines (with platforms 3–4 and 5–6 currently in use; 1–2 disused), two deep tube tracks for the on platforms 7 and 8, and two dedicated deep tube tracks for the on platforms 9 and 10. The tracks are electrified at 630 V using a fourth rail system. The employs 25 kV AC overhead electrification from to Drayton Park and 750 V third rail from Drayton Park to Moorgate. Electrification of the Metropolitan line, which includes the sub-surface tracks at Moorgate, was introduced in 1905 with electric multiple units operating most services by 1907. The Northern City Line was electrified from its opening in 1904, initially using a fourth rail DC system before conversion to third rail. Signalling on the Northern line tracks has utilized a modified Communications-Based Train Control (CBTC) system since its full implementation in 2020, enabling automatic train operation and improved headways. Traditional semaphore signals on the Underground lines were converted to colour-light signalling by the 1990s. The Northern City Line National Rail tracks now operate under European Train Control System (ETCS) Level 2 digital signalling, with all lineside signals removed in May 2025 to create Britain's first signal-free commuter railway. The station connects to the City Widened Lines, a former route linking to station that carried services until its closure in 2009 to facilitate platform extensions at Farringdon. This disconnection supported upgrades for longer 12-car trains and enhanced core section capacity. With recent signalling enhancements, the station supports up to 30 trains per hour per line, including compatibility improvements from the that boosted overall network capacity to 24 trains per hour through sections. As of November 2025, has submitted a business case to the to assume operation of services, potentially integrating them with the London Underground network.

Entrances and accessibility

Moorgate station provides access through multiple entrances to accommodate its high volume of users. The original entrance is located on Moorgate Street, serving both and services. A second major entrance on , which had been closed since 2011 for refurbishment works related to the , reopened in July 2021 with enhanced facilities including a wider 65-metre ticket hall, six new ticket vending machines, and customer screens. Additionally, an underground passageway connects Moorgate to , facilitating seamless interchange for passengers. Step-free access to all platforms (Northern line, Circle, Hammersmith & City, Metropolitan, and ) was completed by 2022 through the installation of lifts connecting street level. Interchange to platforms at Liverpool Street is step-free via connected passageways. This upgrade ensures compliance with the UK's by providing inclusive access for wheelchair users and those with mobility impairments. The lifts form part of a multi-level system designed to serve the station's complex layout without stairs or escalators in key paths. The station operates two ticket halls at different levels, featuring a extended gateline for efficient passenger flow and supporting options introduced network-wide by in September 2014. This allows users to and out using bank cards or mobile devices, reducing queues at traditional ticket machines. To support diverse passengers, Moorgate incorporates key features such as along platform edges to guide visually impaired users, automated audio announcements for station information and train arrivals, and designated spaces on all serving platforms. These provisions align with 's broader standards, enhancing safety and navigation for disabled travelers. In 2023/2024, the station accommodated over 8 million National Rail entries and exits, contributing to its role as a major hub handling approximately 27 million total passengers annually when including Underground usage.

Services

London Underground services

Moorgate station is served by four London Underground lines in Travelcard Zone 1: the Circle line (yellow), Hammersmith & City line (pink), Metropolitan line (magenta), and Northern line (black). These lines provide connectivity across central London and beyond, with the sub-surface Circle, Hammersmith & City, and Metropolitan lines sharing platforms for their services through the City of London. The deep-level Northern line operates on its City branch, linking Moorgate directly to key northern destinations. All services at the station are operated by (TfL), which has managed the London Underground network since its formation in 2000 and full operational control by 2003. Platform 7 serves northbound trains toward King's Cross St. Pancras and beyond, while platform 8 serves southbound services toward via . The remaining sub-surface platforms accommodate the Circle, & City, and lines, with eastbound services typically heading toward or Barking and westbound toward or . Combined train frequencies across these lines total 24–30 trains per hour during peak periods (Monday to Friday, 06:30–09:30 and 16:00–19:00), providing high-capacity service for commuters, and reduce to 12–20 trains per hour off-peak. Notable journey times include approximately 2 minutes to Liverpool Street on the sub-surface lines and about 10 minutes to King's Cross St. Pancras on the .

National Rail services

Moorgate station serves as the southern terminus for commuter services on the , operated by Great Northern under the franchise. These services provide direct access to the financial district, connecting to destinations in , including , Letchworth Garden City, , and , via the north of . The platforms at are numbered 9 and 10, located on a deep-level loop that was originally constructed as part of the early 20th-century Great Northern & City Railway but integrated into the network in 1976. These platforms handle all inbound and outbound trains, with the infrastructure maintained for full operational use despite periodic engineering works. While passenger services have continued without long-term suspension, the line supports occasional shuttle operations during disruptions on the broader network. Services typically run to , , , and intermediate stops, with a current peak frequency of up to 10 trains per hour utilizing 19 train units. Off-peak services operate at around 4 trains per hour, though is collaborating with the to increase peak capacity to 12 trains per hour and standardize off-peak at 4 trains per hour by December 2026. The rolling stock consists of Class 717 electric multiple units, a fleet of 25 two-car trains introduced in 2019 and fully upgraded to Level 2 by October 2025 in partnership with . This upgrade enables driver-only operation without lineside signals, marking the as the UK's first signals-free commuter railway following the removal of all trackside signals in May 2025. As part of the wider operations, the integrates with the network for through services beyond , though it remains distinct in its routing to . In October 2025, submitted a to the proposing to assume operations of the line, potentially enhancing integration with the London Underground and networks.

Elizabeth line connection

Moorgate station provides interchange access to the through a direct, step-free walking link to the platforms, which opened in May 2022 as part of the line's central section launch. The route involves a approximately 5-minute walk via escalators and passageways from the platforms at Moorgate to the platforms. This connection facilitates seamless transfers without needing to exit the paid area, enhancing accessibility for passengers. The services accessible via this link operate on the purple route, running from Reading and in the west through to Shenfield in the east, with Moorgate-Liverpool Street classified in Zone 1. Peak frequencies reach up to 24 trains per hour in the core section, providing high-capacity travel every 2.5 minutes between key stations like and . However, Moorgate itself has no dedicated platforms; all services are boarded at the adjacent . The interchange has contributed to rising passenger usage at , aligning with the Elizabeth line's continued growth, with over 546 million total journeys recorded by May 2025. Fares are fully integrated into the system, allowing use of cards, contactless payments, and Travelcards for combined journeys.

References

  1. [1]
    Moorgate Underground Station
    ### Key Facts About Moorgate Station
  2. [2]
    Moorgate: Metropolitan maze | London Transport Museum
    Opened in 1865 as Moorgate Street, Moorgate station later formed part of the first extension of the Metropolitan line, paving the way for the 'Deep Tube'.
  3. [3]
    Moorgate Underground Station - Transport for London
    Moorgate Underground Station ... Northern Line: Service will resume later this morning. ... No disruptions. There are no reported disruptions at any . Live arrivals ...
  4. [4]
    Moorgate Underground Station - London - TfL
    Moorgate Underground Station · (Zone 1) · First and last services, timetables and route details · Accessibility information · Station facilities · Other lines ...
  5. [5]
    Moorgate Underground Station - London - TfL
    Live: The station is likely to be quiet. It is likely to get busier. These times are based on recent travel data. Always check before you travel.
  6. [6]
    Moorgate Underground Station - London - TfL
    Last departure towards.. · Aldgate 07:19 · South Kensington 23:49 · Hammersmith (H&C Line) 00:27 · Hammersmith (H&C Line) 00:13 · Chesham 23:07 · Amersham 23:32 ...
  7. [7]
    The 1975 Moorgate tube crash. - London Fire Brigade
    This tragic tube crash in 1975 resulted in the deaths of 43 people, with 74 people injured. It was the worst accident in peacetime on the London Underground.Missing: facts | Show results with:facts
  8. [8]
    Moorgate Station | National Rail
    ### Summary of Moorgate Station
  9. [9]
    London Wall/Moorgate Oval Re-Landscaping Project
    Jun 26, 2025 · The London Wall/Moorgate Oval Re-landscaping project is part of the City of London ... Moorgate station, and introducing additional seating for ...
  10. [10]
    Station locations and platform information - TfL Tech Forum
    Feb 20, 2020 · Station ID (ideally NLC) to planar coordinates, e.g. BNG or UTM ... Moorgate","MOG","910GMRGT",51.51960.09024 "Motspur Park","MOT ...
  11. [11]
    [PDF] MOORGATE - Savills
    17 Moorgate is situated in a prime City location on the west side of Moorgate, within 100 metres of the Bank of England. Bank, Moorgate, St Paul's.
  12. [12]
    Moorgate Station to Bank Underground Station - London - Rome2Rio
    Distance: 2,210 ft; Duration: 2 min. What companies run services between Moorgate Station, Greater London, England and Bank Underground Station, England?
  13. [13]
    [PDF] The City as a Place for People
    Our interviews found that the history and established critical mass of successful businesses form a large part of the City's attraction – an office's address ...Missing: center | Show results with:center
  14. [14]
  15. [15]
    How Deep Is Your Tube Station? | Londonist
    Jul 28, 2023 · ... station platform is 6m below ground level. The coloured dots represent platforms on other tube lines at the same station, which really puts ...
  16. [16]
    Moorgate Station - Disused Stations
    May 21, 2017 · The station was completely rebuilt and extended to six platforms in the 1960's. In recent years peak-hour First Capital Connect trains on the ...
  17. [17]
    Moorgate Station - Subterranea Britannica
    The original stations on the line had island platforms, but the new stations at London Bridge, Bank and Moorgate Street had two station tunnels at the same ...
  18. [18]
    [PDF] BSCU Design and Access Statement Part 1 of 2 - Transport for London
    station at Liverpool Street/Moorgate in 2018. 4.1.20 The combination of all of the above will result in an increase in pedestrian flows in the area ...
  19. [19]
    Print; Baker Street Station on the Metropolitan Railway, 1863 - 1869
    View of broad gauge steam locomotive hauling a train approaching the platform at Baker Street. By 14 March 1869 the last broad guage train had ceased operating ...
  20. [20]
    Metropolitan classes A and B - loco-info.com
    Since initially three-rail track was laid, the line could initially be operated by the broad-gauge metropolitan class of the GWR. However, since the GWR ...
  21. [21]
    Hidden London - Moorgate - A London Inheritance
    Mar 29, 2020 · The line from Finsbury Park to Moorgate opened in 1904, but despite having Parliamentary approval, the extension to Lothbury was stopped soon ...Missing: served | Show results with:served
  22. [22]
    Great Northern and City Railway - Graces Guide
    Sep 19, 2023 · The Great Northern & City Railway was first envisaged in 1891. The initial plan was to connect the GNR - just south of Finsbury Park - with Moorgate, in the ...
  23. [23]
    Collections close up: Metropolitan Railway electric locomotive, 1922
    In 1922-23, Metropolitan-Vickers delivered 20 new locomotives of a new design. Fitted with four 300 horsepower electric motors, one for each axle, these were ...
  24. [24]
    [PDF] Research Guide No 13: A Brief History of the Northern Line - TfL
    The extension opened as far as Moorgate in 1900, Angel in 1901, and Euston. Page 3. Information Governance 2013-01-08. Page 3 of 7 in 1907. The line was also ...
  25. [25]
    [PDF] The Experience of Sheltering in the Tube during WWII - TfL
    A 1924 Government directive had ruled out the use of stations as shelters in the event of air raids but Londoners had other ideas. Many bought tickets for.Missing: Moorgate | Show results with:Moorgate
  26. [26]
    repairing bomb damage at Moorgate station, by Topical Press, 1941
    Repair work, following severe bomb damage, on the Metropolitan line at Moorgate station. A train of flat wagons, containing rails and sleepers, ...<|separator|>
  27. [27]
    Moorgate Tube crash (1975) | London Underground, Cause, & Deaths
    Sep 23, 2025 · The Moorgate Tube crash on February 28, 1975, remains the deadliest in the history of the London Underground, killing 43 people.
  28. [28]
    Widening the horizons… - Rail Magazine
    Oct 19, 2018 · These curves opened in 1863 and closed in 1977, following the withdrawal of inner suburban passenger services to Moorgate in 1976. The trains ...
  29. [29]
    Kings Cross York Road - London - Disused Stations
    Jul 2, 2017 · Kings Cross York Road was closed on 8th November 1976 services to and from Moorgate were diverted via the Northern City Line although the ...
  30. [30]
    Network SouthEast - Wikipedia
    Network SouthEast (NSE) was one of the three passenger sectors of British Rail created in 1982. NSE mainly operated commuter rail trains within Greater LondonHistory · Network Railcard · Modernisation · Privatisation
  31. [31]
    The last Thameslink train from Moorgate - ianVisits
    Mar 18, 2009 · The final scheduled service from Moorgate leaves on Friday, March 20, at 19:06. A countdown clock at the head of platforms 5 and 6 at Moorgate ...
  32. [32]
    Thameslink to close its Moorgate branch line - Evening Standard
    The Thameslink branch line into Moorgate will close permanently from next March. The move, the first closure of a main line into the capital in memory.
  33. [33]
    The Railways (Safety Case) (Amendment) Regulations 2003
    1.—(1) These Regulations may be cited as the Railways (Safety Case) (Amendment) Regulations 2003 and shall come into force on 1st April ...Missing: platform | Show results with:platform
  34. [34]
    New modern ticket hall with step-free access opens at Moorgate as ...
    Jul 5, 2021 · The new entrance is more spacious at 65 metres wide, with a longer gateline, six new ticket vending machines and customer information screens.
  35. [35]
    Thameslink Programme, London - Railway Technology
    May 13, 2013 · The scope of the project includes better signalling, new stations, tracks and trains, improvement of existing tracks and longer platforms. The ...
  36. [36]
    Anorak corner (tube edition) - diamond geezer
    Oct 12, 2025 · Hurrah, it's that time of year again when TfL silently updates its spreadsheet of annual passenger entry/exit totals at every tube station.
  37. [37]
    RailwayData | Moorgate Station - The Railway Data Centre
    In 2023/2024, Moorgate had 8,228,538 entries and exits, making it the 54th most used, out of 2,581 stations in Great Britain. 54/2581. It ranked 183rd busiest ( ...
  38. [38]
    [PDF] Report on the Accident that occurred on 28th February 1975 at ...
    Feb 28, 1975 · A 6-car train of 1938 Tube Stock failed to slow down on approach to the station, overran No. 9 platform at speed, and came into heavy collision ...
  39. [39]
    Moorgate…the unresolved tragedy - Rail Magazine
    Newson was killed, along with 42 passengers. A further 74 passengers were injured and needed treatment in hospital. Forty years on, the site of the incident ...
  40. [40]
    Report On The Accident That Occurred On 28th February 1975 At ...
    The Moorgate tube crash led to changes in the way tube services were operated into terminus stations. This document was published on 4th March 1976.
  41. [41]
    Firefighters mark 50 years since the Moorgate Tube Crash
    Feb 28, 2025 · Firefighters have joined Transport for London, emergency service partners and the families of survivors to mark 50 years since the Moorgate ...
  42. [42]
    Service marks 50 years since Moorgate Tube crash - BBC
    Feb 28, 2025 · Commemorations have taken place to mark 50 years since the Moorgate Tube crash which killed 43 people and left 74 injured. The London Fire ...
  43. [43]
  44. [44]
    Moorgate station fire: Station evacuated after blaze breaks out
    Aug 18, 2016 · Moorgate Tube station was evacuated on Thursday morning after a fire broke out on the train tracks at Moorgate train station. Four fire engines ...Missing: overcrowding alert 2003
  45. [45]
    Moorgate Emergency Evacuation 17 Aug - RailUK Forums
    Aug 17, 2023 · Train 2F67 which is due in to Moorgate at 22:06 is showing delayed due to a fire alarm at a station. I'd imagine that could be the reason ...Missing: 2003 | Show results with:2003
  46. [46]
    Moorgate Underground: Search after woman upskirted by man
    Sep 27, 2025 · Police have released a picture of a man they would like to speak to after a man upskirted a woman in central London.
  47. [47]
    Moorgate: Man stabbed in the City after row about dog fouling
    Dec 29, 2023 · Detectives have released CCTV images of a thug suspected of stabbing a man for telling him off about his dog fouling the street near ...
  48. [48]
    Barclays branch in Moorgate cordoned off after graffiti sprayed on ...
    Feb 20, 2024 · Barclays branch in Moorgate cordoned off after graffiti sprayed on windows. A message sprayed on the front of the bank appeared to say ...Missing: 2020 | Show results with:2020
  49. [49]
    Legal & General London office windows smashed and doused in ...
    Oct 14, 2025 · Moorgate office has red paint splattered and windows smashed. ... Palestine Action took responsibility for the vandalism of the ...Missing: station 2020
  50. [50]
    [PDF] station layout
    Elizabeth Line Moorgate Shaft. Platform Level +3 to. LUL Moorgate Station. PUBLIC LIFT LINK TO. METROPOLITAN LINE. & STREET EXIT. UNDERGROUND. →. Northern Line.
  51. [51]
    LU Northern line goes CBTC - Rail Engineer
    May 8, 2015 · The Northern line has recently been fully equipped and commissioned using the Thales Seltrac CBTC technology with only minimum disruption to the train service.
  52. [52]
    Northern City Line | UK Transport Wiki - Fandom
    25 kV overhead as far south as Drayton Park and 750 V third rail from there to Moorgate. Services are operated by Class 313 electric ...
  53. [53]
    The Metropolitan line | London Transport Museum
    Through the 1920s and 1930s, thousands of homes were built. Gradually Metro-land was electrified, with services to Harrow in 1908 and Rickmansworth in 1924.
  54. [54]
    Launching Britain's first signals-free commuter railway - Network Rail
    May 19, 2025 · The Northern City Line between Finsbury Park and Moorgate has become the first commuter railway in Britain to run without signals beside the track.
  55. [55]
    Main Line ATO Becomes a Reality - Rail Engineer
    Jun 4, 2018 · Lengthening platforms to accommodate 12-car trains;; Closure of the Moorgate spur and train service in 2009 to permit platform lengthening at ...
  56. [56]
    The Ultimate Capacity Of The Moorgate Line
    Dec 1, 2019 · Without doubt all of the parts of the Moorgate Line can handle at least twenty tph and possibly more, once the following conditions are met.
  57. [57]
    [PDF] Thameslink Programme baseline evaluation report - GOV.UK
    Mar 4, 2018 · allowing up to 16 Thameslink tph to pass through the station and up to 24 tph through the core section between Blackfriars and St. Pancras ...
  58. [58]
    Moorgate - Transport for London
    Moorgate: No Step Free Access - Step free access to/from the Elizabeth line is not available via the Broadgate entrance / Liverpool St National Rail ...
  59. [59]
    Moorgate Step-Free Access - Greater London Authority
    Step-free access to Northern Line platforms at Moorgate will be provided via a lift from the new ticket hall to a link tunnel with a second set of lifts.Missing: 2021 | Show results with:2021
  60. [60]
    Elizabeth Line Improvements Offer Step-Free London Underground ...
    Jul 8, 2021 · A refurbished station entrance for Moorgate station on Moorfields is now open, offering step-free access to the Circle, Metropolitan and Hammersmith & City ...
  61. [61]
    [PDF] Step-free Tube guide including DLR; London Overground - TfL
    Help points are located in station entrances and on most platforms. Please allow time for staff to use a boarding or mini ramp. If platforms and trains are ...
  62. [62]
    [PDF] Your accessible transport network - London - TfL
    We are also refurbishing trains on the. Northern line with improved colour contrast, wheelchair spaces, low-level ... Tactile paving installed on Cannon Street ...
  63. [63]
    [PDF] Your accessible transport network - London - TfL
    More than 98 per cent of signalised pedestrian crossings now have tactile rotating cones and/or audible signals, and tactile paving. Page 6. Your accessible ...
  64. [64]
    TfL submits business case to take over Northern City Line to Moorgate
    Oct 15, 2025 · Transport for London has applied to the Department for Transport to take over the Northern City Line into Moorgate.
  65. [65]
    'Signals away' on Northern City Line - Modern Railways
    May 19, 2025 · The London City Line between Finsbury Park and Moorgate now runs exclusively on European Train Control System (ETCS) after the last signals were removed on 17/ ...
  66. [66]
    Lines reopened: disruption between Finsbury Park and Moorgate
    Sep 19, 2025 · Description. Disruption caused by a fault on a train at Moorgate has now ended.
  67. [67]
    Northern City Line has upgraded its entire fleet of 25 Class 717
    Oct 7, 2025 · Govia Thameslink Railway and Siemens Mobility have upgraded all Class 717 trains to ETCS version 3.6.0, improving reliability, safety, ...
  68. [68]
    Elizabeth line to open on 24 May 2022 - Transport for London
    May 24, 2022 · The Elizabeth line will open on 24 May 2022 with full services across the entire route introduced by May 2023.Missing: Moorgate | Show results with:Moorgate
  69. [69]
    The Elizabeth line's longest walks to Tube interchanges ... - MyLondon
    May 12, 2024 · This is because it takes around five minutes to walk from the Elizabeth line platforms to the Northern line platforms at Liverpool Street- ...<|control11|><|separator|>
  70. [70]
  71. [71]
    Elizabeth line: Final stage to be completed with increase in peak ...
    Apr 24, 2023 · Transport for London (TfL) said a train would run roughly every two-and-a-half minutes between Paddington and Whitechapel at peak times.<|separator|>
  72. [72]
    Behind the scenes at Crossrail's Liverpool Street station - ianVisits
    Dec 10, 2019 · Although people will be able to go into the Elizabeth line platforms from Moorgate, that the station is called Liverpool Street is a polite ...
  73. [73]
    Transformational Elizabeth line reaches 500 million passenger ... - TfL
    Jan 10, 2025 · The transformational Elizabeth line reaches 500 million passenger journeys, making it the single busiest railway service in the UK.Missing: Moorgate | Show results with:Moorgate