Fact-checked by Grok 2 weeks ago

High Five Interchange

The High Five Interchange is a five-level in , , at the junction of Interstate 635 (LBJ Freeway) and U.S. Highway 75 (North Central Expressway), designed to manage one of the busiest highway intersections in the United States. Completed in December 2005—13 months ahead of schedule—at a cost of $288 million, it spans 3.4 miles and features 43 permanent bridges, making it the first five-level in and one of the tallest interchanges worldwide, with the highest ramps 90 feet above the depressed U.S. 75 lanes, reaching a total height of approximately 120 feet. Construction on the project began in January 2002 as part of a broader effort by the Texas Department of Transportation (TxDOT) to enhance mobility in the Dallas-Fort Worth metroplex, addressing severe congestion from approximately 500,000 vehicles per day through the interchange area. The design incorporates eight main lanes on U.S. 75 and ten main lanes plus four dedicated barrier-separated high-occupancy vehicle (HOV) lanes on I-635, along with a reversible HOV ramp connecting the two highways, significantly improving traffic flow, safety, and air quality while providing better local access via underlying roads and enhanced pedestrian trails. Recognized for its engineering innovation, the interchange received the American Public Works Association's Public Works Project of the Year award in 2006 and accolades from the Associated General Contractors of , highlighting its role in accommodating future growth in one of Texas's most populous regions. Its vertical stacking—allowing direct connections without traffic signals—exemplifies advanced freeway design principles, reducing travel times and supporting in northern .

Overview

Location and Context

The High Five Interchange is situated at the intersection of U.S. Highway 75, known as the North Central Expressway, and Interstate 635, designated as the (LBJ) Freeway, in northeastern , . This strategic location positions it as a pivotal node within the Dallas highway network, facilitating seamless transitions between major arterial routes in the region. The interchange lies within the expansive Dallas-Fort Worth metroplex, one of the fastest-growing metropolitan areas in the United States, with a exceeding 8 million residents as of recent estimates. It integrates into the metroplex's radial and circumferential highway system, where U.S. 75 serves as a primary north-south corridor connecting to northern suburbs, and I-635 functions as an east-west beltway encircling the city. This setup enhances regional connectivity, providing direct access to nearby communities such as Richardson and Plano to the north along U.S. 75, and Garland to the east via I-635, supporting commuter flows across the urban-suburban divide. Prior to its , the featured a three-level constructed in the mid-1960s, which had become notorious for severe and bottlenecks amid rising demands. The replaced this outdated structure to address these issues, designed as a critical link between north-south and east-west travel corridors to handle over 500,000 vehicles daily. This five-level stack design underscores its role in managing high-volume in a rapidly expanding environment.

Design Overview

The High Five Interchange represents a pioneering five-level stack design, marking the first such configuration constructed in the United States at the of Interstate 635 (I-635) and U.S. Highway 75 (US 75) in , . This multi-tiered layout dedicates each level to specific traffic movements, with the bottom level accommodating the mainline of US 75 (northbound and southbound), the second level handling frontage roads, the third level supporting I-635 mainline traffic (eastbound and westbound), and the upper two levels reserved for direct connection ramps that facilitate seamless transitions between the highways. For instance, the topmost level includes ramps such as the one connecting northbound US 75 to eastbound I-635, ensuring dedicated paths for high-volume directional flows without interference from crossing traffic. Central to the interchange's efficiency is its complete separation of traffic streams through direct, high-speed ramps, which eliminate the weaving patterns common in simpler interchanges and allow for continuous movement at freeway speeds. The mainlines support up to eight lanes in each direction on US 75 and ten lanes plus four barrier-separated high-occupancy vehicle (HOV) lanes on I-635, enabling the structure to manage complex intersections involving multiple entry and exit points while minimizing merge conflicts. However, as of November , the I-635 HOV lanes through the interchange are closed for as part of the I-635 East and are scheduled to reopen later in as managed TEXpress Lanes. This design philosophy prioritizes uninterrupted flow for the primary north-south and east-west corridors, with auxiliary components like a reversible HOV ramp further optimizing peak-hour usage. From an , the interchange forms a distinctive "high five" silhouette, with its elevated ramps and stacked bridges resembling outstretched fingers converging at the core junction. The overall structure spans approximately 3.4 miles along I-635, encompassing a compact for the stack itself while integrating extensive frontage roads and retaining walls across the site. Engineered to handle over 500,000 vehicles per day, the was developed to alleviate the severe bottlenecks of the prior cloverleaf design, which featured inefficient 4:1 ramp merges that narrowed lanes and caused significant delays. By providing expanded capacity and direct connectivity, it supports projected growth in one of the nation's busiest urban corridors, reducing congestion and enhancing regional mobility.

History

Planning and Development

The planning for the High Five Interchange originated in the early amid growing at the existing three-level connecting US Highway 75 (North Central Expressway) and Interstate 635 ( Freeway) in , Texas. The (TxDOT) initiated traffic studies to address the interchange's functional obsolescence, where severe congestion occurred during peak periods due to the rapid expansion of the Dallas metropolitan area. An environmental assessment completed in 1993 projected a significant increase in traffic volumes by 2010, highlighting the need for major reconstruction to accommodate projected daily volumes exceeding 400,000 vehicles. Key milestones in the pre-construction phase included the completion of environmental reviews and design evaluations throughout the . TxDOT advanced the project through an environmental impact process, culminating in approvals that cleared the way for detailed . By 2000, the final design was selected, opting for a five-level to provide fully directional ramps and eliminate weaving movements, over alternatives such as expanded four-level configurations or turbine-style designs that were deemed less efficient for high-volume traffic. This choice balanced spatial constraints in the urban setting with long-term capacity needs. Funding for the project totaled approximately $261 million, drawn primarily from federal sources under the (ISTEA) and subsequent programs, supplemented by state contributions through TxDOT's budget allocations. Local input from city helped integrate the project with broader urban development goals, ensuring alignment with regional mobility priorities. Stakeholder collaboration was central to the , involving TxDOT as the lead agency, the (FHWA) for oversight and federal approvals, and regional bodies like the North Central Texas Council of Governments (NCTCOG) to incorporate growth projections and infrastructure limits. This partnership facilitated consensus on design and , addressing urban expansion while minimizing disruptions to surrounding communities.

Construction Process

Construction of the High Five Interchange commenced with groundbreaking in January 2002, marking the start of a major reconstruction effort at the intersection of Interstate 635 and U.S. Highway 75 in , . The project proceeded through key phases, including initial foundation and substructure work in 2002–2003, followed by the erection of ramps and bridges in 2003–2004, and concluding with final paving and surface improvements in 2004–2005. Funded primarily through federal and state transportation allocations managed by the , the work was executed under a design-bid-build framework to upgrade the existing three-level interchange into a five-level stack configuration. The primary contractor, Zachry Construction Corporation, employed advanced methods such as an on-site yard to fabricate segments for the 43 bridges, enabling efficient assembly and reducing on-site labor demands. Over 1,000 workers contributed to the effort, coordinating complex logistics amid ongoing traffic volumes exceeding 250,000 vehicles daily. Key challenges included minimizing disruptions to commuters through carefully phased detours and traffic management, as well as addressing soil conditions in , where required stabilization techniques like deep foundations and mechanically stabilized earth walls for structural integrity. Despite potential setbacks from material costs and weather, the project finished ahead of schedule, opening fully on December 18, 2005—13 months early compared to the original 60-month timeline. The final cost reached $261 million, reflecting adjustments for inflation in materials and minor design modifications during execution.

Engineering and Features

Structural Design

The High Five Interchange comprises 43 permanent bridges, consisting of 13 mainline flyovers and 30 directional ramps, forming a complex five-level stack configuration that separates conflicting traffic movements vertically. The structure reaches a maximum height of 90 feet at its highest points, providing clearance for lower-level roadways and minimizing interference with surface traffic. Construction utilizes piers and girders for the primary load-bearing elements, with segments produced on-site to facilitate efficient assembly of the elevated decks. The ramps feature curved geometries with superelevation to accommodate high-speed turns, incorporating radii up to 1,500 feet for smoother vehicle transitions and reduced lateral forces. Load-bearing design accounts for seismic category B conditions prevalent in the Dallas area, as well as wind loads up to 90 mph, ensuring structural integrity under dynamic forces. Expansion joints are integrated throughout to manage thermal movements resulting from Texas's variable climate, allowing for contraction and expansion without compromising stability. Safety features include continuous lighting along the ramps and bridges for enhanced , integrated systems to mitigate hydroplaning risks during heavy rainfall, and barriers that separate elevated roadways from pedestrian and non-motorized paths below. These elements collectively support the interchange's role in handling over 500,000 daily vehicles while prioritizing durability and user protection.

Innovations and Specifications

The High Five Interchange stands as the first five-level stack interchange constructed in Dallas, revolutionizing urban freeway connectivity by enabling complete free-flow operations across all directions without any at-grade intersections or traffic signals. This design innovation eliminates bottlenecks inherent in traditional three- or four-level stacks, accommodating over 500,000 vehicles daily through seamless vertical separation of mainlines and ramps. The structure's pioneering configuration stacks the north-south U.S. 75 mainline at the lowest level, followed by east-west I-635, direct connector ramps, high-occupancy vehicle (HOV) lanes, and frontage roads at the uppermost level, with the highest ramps reaching 90 feet above the depressed U.S. 75 lanes. Key specifications include 8 travel lanes on U.S. 75 and 10 on I-635, supplemented by 4 barrier-separated HOV lanes and 1 reversible HOV lane on I-635, all featuring 12-foot lane widths plus shoulders for enhanced safety and capacity. Ramp designs incorporate variable span lengths up to 300 feet across five major segmental ramps, optimized through advanced computer modeling techniques such as simulation to minimize conflicts and ensure geometric efficiency. Signage systems integrate fiber-optic for real-time updates, connected via extensive cable networks to support intelligent transportation systems (ITS) for dynamic information dissemination to drivers. Environmental integrations prioritize , with noise barriers designed to mitigate sound impacts—incorporating artistic elements reflective of community values—and stormwater retention features that capture runoff to prevent , fully compliant with U.S. Environmental Protection Agency (EPA) standards for protection. These measures reduce emissions by promoting higher-speed continuous travel and include enhanced bike paths along adjacent creeks. Maintenance innovations feature built-in inspection platforms on bridges for routine access and modular precast segmental ramp sections, facilitating easier repairs and potential future expansions without major disruptions.

Impact and Legacy

Traffic and Economic Effects

Since its opening in 2005, the High Five Interchange has substantially alleviated at the junction of Interstate 635 and U.S. Highway 75, transforming a that previously caused severe delays. Traffic counts for the original interchange were about 202,000 vehicles per day in 1986, but volumes had grown to over 500,000 by the early . The reconstruction increased the facility's capacity, allowing it to handle over 500,000 vehicles per day on average while maintaining improved flow compared to the pre-project conditions. This enhancement aligns with the interchange's original design goals to support high-volume traffic in a growing urban corridor, resulting in more reliable peak-hour operations without proportional increases in delays. Economically, the interchange has bolstered commercial development in surrounding neighborhoods by providing better connectivity to employment and centers, reinforcing the Dallas-Fort Worth region's status as a key logistics hub. Property values near the project area have risen in tandem with these improvements, contributing to broader urban expansion. Additionally, the facility's role in streamlining commuter routes has supported regional GDP growth, with the Dallas-Fort Worth metro area's economy benefiting from reduced travel inefficiencies that facilitate workforce mobility to major business districts. The interchange has been integrated into the larger LBJ Express project, which added managed lanes on I-635, further improving capacity and economic accessibility as of the . Long-term evaluations by the highlight sustained safety gains, including fewer incidents due to the stack design's separation of conflicting movements, alongside ongoing reductions in emissions from smoother traffic patterns. These outcomes have helped address residual on adjacent arterials by distributing flows more evenly across the network.

Recognition and Awards

The High Five Interchange received the American Public Works Association's Public Works Project of the Year award in 2006, recognizing its innovative transportation infrastructure in the category for projects exceeding $100 million. Additionally, the engineering firm Engineers was honored with the Eminent Conceptor Award from the American Council of Engineering Companies of for its contributions to the project's groundbreaking design. The interchange has garnered significant media attention for its engineering complexity. In 2009, Popular Mechanics featured it in its list of "The World's 18 Strangest Roadways," highlighting its towering structure equivalent to a 12-story building and intricate ramp system. It was also profiled in a 2008 episode of the History Channel's Modern Marvels series titled "Superhighways," which described the five-level stack as a notable example of advanced roadway . The structure's nickname, "High Five," derives from the visual resemblance of its five stacked levels to an outstretched hand offering a , a moniker that has permeated public discourse since its completion in 2005. This branding has contributed to its cultural significance, positioning it as a local landmark and occasional tourist draw, with viewpoints along nearby routes allowing visitors to observe its scale. In professional circles, the High Five Interchange serves as a benchmark for multi-level urban freeway design, frequently cited in case studies by the American Association of and Transportation Officials for its effective handling of high-volume traffic through vertical stacking and public-private partnerships. Its success has informed subsequent interchange reconstructions in densely populated areas, emphasizing efficient space utilization and innovative construction techniques.

References

  1. [1]
    DALLAS HIGH FIVE INTERCHANGE | Zachry Construction
    The $288 million Dallas High Five Interchange project was a five-level interchange at the intersection of US 75 and IH 635, two of the busiest highways in ...
  2. [2]
    "High Five" Interchange | Featured Projects - ARS Engineers, Inc.
    The High Five Interchange was the first five-level stack freeway interchange ever built in the City of Dallas.
  3. [3]
    Project: Dallas High Five Interchange - View Case Study | AASHTO
    Completed at a cost of $261 million in 2005, the Dallas High Five interchange is the first five-level interchange in Dallas stretching 3.4 miles east and west ...
  4. [4]
    [PDF] Dallas' First Five Level Interchange
    Dallas High Five will allow for 8 lanes of travel on U.S. 75. • Dallas High Five will have 10 lanes of travel and 4 Dedicated Barrier-Separated. HOV Lanes on I- ...
  5. [5]
    Innovative Strategies on Dallas High Five Project - ResearchGate
    Aug 6, 2025 · The $262.9 million Dallas High Five project is reconstructing the busiest freeway interchange in the largest metropolitan area in Texas.<|control11|><|separator|>
  6. [6]
    The fastest-growing city in the U.S. is in Texas, and it's not the one ...
    May 15, 2025 · Five of the country's fastest-growing cities and towns, including Princeton, are in the Dallas-Fort Worth region. North Texas is the fastest- ...
  7. [7]
    Interstate 635 West Texas - AARoads
    The Dallas High Five Interchange, where IH 635 and US 75 come together in north Dallas, is next along the LBJ Freeway west. U.S. 75 (Central Expressway) joins ...
  8. [8]
    Dallas-Fort Worth leads all metro areas in population growth - NBC 5
    Mar 14, 2024 · The DFW Metroplex surpassed 8 million residents between 2022 and 2023, adding 152598 residents for a total population of 8100037.
  9. [9]
    INNOVATIVE STRATEGIES ON DALLAS HIGH FIVE PROJECT - TRID
    Johnson Freeway) is being reconstructed to replace the existing three-level partial cloverleaf interchange built in the mid-1960s. It was the single largest ...
  10. [10]
    Why Are Texas Interchanges Texas So Tall? - Practical Engineering
    Aug 20, 2024 · This is the Dallas High Five, one of the tallest highway interchanges in the world. It gets its name from the fact that there are five different levels of ...
  11. [11]
    [PDF] LBJ-IH 635 Managed Lanes - Texas (Public Private Partnership)
    Oct 19, 2010 · Dallas High Five interchange provided a barrier separated managed HOV system with 12 ft lanes from east of Preston Road to west of ...
  12. [12]
    [PDF] Concept of Operations for the US-75 Integrated Corridor in Dallas ...
    Apr 30, 2008 · ... square miles. The. City of Dallas municipal agency employs over ... High-Five Interchange. The DalTrans TMC, opened in December 2007, is ...
  13. [13]
    [PDF] NCHRP Synthesis 413 – Techniques for Effective Highway ...
    High Five Interchange construction, in 2004. Photograph courtesy of. Raul ... During the Environmental Impact Study process, a five-year period, the ...
  14. [14]
    Dallas High Five Interchange honored - Roads and Bridges
    Jun 29, 2006 · It was completed 13 months ahead of its original 60-month construction schedule and replaces an outdated three-level modified partial cloverleaf ...<|control11|><|separator|>
  15. [15]
    2025- Interchange | Klio
    Apr 29, 2025 · The High Five Interchange is the height of a 12-story building, made up of 43 bridges; its highest flyover ramps hang 100 feet in the air.
  16. [16]
    [PDF] 4D CAD FOR HIGHWAY CONSTRUCTION PROJECTS
    This hypothesis was tested in a case study project on the high five interchange in Dallas, Texas. ... The bridge abutments employ a mechanically stabilized earth ...
  17. [17]
    ASBI Construction Practices Handbook For Concrete Segmental ...
    Rating 5.0 (11) handbook) permits the use of concrete segmental spans of more than 1,500 feet. ... used in 2002 in construction of the Dallas High Five Interchange is shown in ...<|separator|>
  18. [18]
    [PDF] Anchorage Requirements for Grouted Vertical-Duct Connectors in ...
    The Dallas High Five Interchange project (Figure 3.15) at the intersection of Interstate Highway ... Grade B or C – expansion per ASTM C 1107. Modulus of ...Missing: category | Show results with:category
  19. [19]
    [PDF] New Construction Expansion Joint Systems - DS Brown
    Steelflex® Modular Expansion Joint System with a total movement range larger than the anticipated structural movement. ... High Five Interchange Dallas, TX.Missing: Texas | Show results with:Texas
  20. [20]
    [PDF] Final Report - University Transportation Center for Mobility (UTCM)
    Aug 14, 2003 · IH 35W/IH 30 Interchange Improvements: Final Environmental Impact Statement. Project 2 – North Central Expressway/High Five Interchange, Dallas, ...Missing: category | Show results with:category
  21. [21]
    DALLAS HIGH FIVE SEGMENTAL RAMPS - Epoxy Interest Group
    Total Cost: $100+ million; Date Opened: May 2004; Traffic: 500,000 vehicles ... The ramps are part of an overall upgrade of the LBJ/Central Expressway Interchange ...
  22. [22]
    [PDF] The DFW Interstate Highway System: Backbone of Inland Logistics
    By 2050, the corridor's population is projected to reach 11.6 million, and its GDP will increase to $1.6 trillion. » I-30 Serves as a crucial east-west ...
  23. [23]
    The World's 18 Strangest Roadways: Gallery - Popular Mechanics
    Dec 17, 2009 · The World's 18 Strangest Roadways: Gallery. The most direct path ... 16: The High Five Interchange. this image is not available Media ...
  24. [24]
    Watch Modern Marvels Season 14 Episode 4 | HISTORY Channel
    Take a ride atop the High-Five, a 12-story, five-level interchange that's become the latest Dallas tourist attraction. Then it's off to China's 28,000-mile ...