Interstate 495

Interstate 495 (I-495), commonly known as the Capital Beltway, is a 64.7-mile (104.1 km) auxiliary Interstate Highway that forms a loop encircling Washington, D.C., primarily through Maryland and Virginia, with a brief 0.1-mile segment crossing the District of Columbia near the Woodrow Wilson Memorial Bridge. The route spans 42.7 miles in Maryland across Montgomery and Prince George's counties and 21.9 miles in Virginia through Fairfax County, serving as a critical circumferential roadway that connects suburban areas to the urban core without entering the District. Construction on the began in the late as part of the broader , with the Memorial Bridge—the first segment—opening to traffic in December 1961. Additional key openings followed, including the American Legion Bridge in December 1962, culminating in the full completion of the beltway in August 1964 after ceremonies marking the final links in both and . Originally designed with four to six lanes, the highway has undergone significant expansions, including widening to eight lanes in multiple sections and the addition of 14 miles of high-occupancy/toll () express lanes in Virginia's Fairfax County, which opened in 2012 to alleviate congestion through dynamic pricing. As one of the most heavily traveled routes in the Interstate System, the handles average annual daily traffic volumes exceeding 200,000 vehicles in key segments, such as those in and counties in , making it essential for commuter access to , and connections to radial interstates like I-95 (with which I-495 runs concurrently), I-270, I-66, and I-295. The beltway's inner loop travels clockwise and the outer loop counterclockwise, facilitating efficient circulation around the capital region while supporting economic activity in the surrounding suburbs. Ongoing projects continue to address capacity needs and safety improvements, including the 495 NEXT extension of the express lanes set to open in late 2025.

Route description

District of Columbia

Interstate 495 maintains the shortest designated length within the District of Columbia at 0.11 miles (0.18 km), consisting of a brief sliver on the Memorial Bridge over the , linking the and segments of the . This segment forms part of the southern quadrant of the 64.7-mile beltway loop encircling , with no direct access to downtown areas and nearby connections to I-95 northbound and I-295 ( Freeway). The route passes through densely urban land use, adjacent to residential neighborhoods and federal installations, including approaches near the tributaries. Unique features include the bridge's viaducts and draw span, reconstructed to eight lanes to handle regional traffic while crossing into the district's southern boundary.

Maryland

Interstate 495 in forms the eastern and northern segments of the , spanning approximately 42 miles through Prince George's and counties from the District of Columbia line near the to the state line at the American Legion Bridge near . This segment connects suburban communities around Washington, D.C., transitioning from urbanized areas in the east to more hilly terrain in the north. The route serves as a critical commuter corridor, linking residential neighborhoods, commercial centers, and federal facilities while facilitating regional travel. In Prince George's County, the eastern side of I-495 extends approximately 28 miles from the District of Columbia line northward to the Montgomery County line near the I-95 split at College Park, including a 26.11-mile concurrency with I-95 from the Woodrow Wilson Bridge to the College Park Interchange, characterized by an urban-suburban mix with dense development and industrial zones. Major interchanges include MD 295 (Baltimore-Washington Parkway) near Tuxedo, providing access to Baltimore and Andrews Air Force Base; US 50 near Cheverly, connecting to Annapolis and the Chesapeake Bay Bridge; and the concurrency with I-95 southeast of College Park, which integrates the beltway into the longer north-south corridor serving Baltimore and beyond. This portion offers proximity to NASA Goddard Space Flight Center near Greenbelt via nearby exits like US 1, supporting scientific and aerospace activities in the region. The concurrency with I-95 on the southeast plays a key role in completing the beltway loop by merging traffic flows from the Northeast Corridor into the circumferential path around the capital. Transitioning into Montgomery County for the remaining approximately 14 miles, I-495 forms a northeastern loop from the I-95 interchange near Aspen Hill westward to the line, navigating through progressively hillier terrain with elevations varying along the route. Key interchanges feature I-270 near , linking to and points northwest; MD 97 (Georgia Avenue) serving Silver Spring and Wheaton; and Cabin John Parkway near the , providing access to local parks and the C&O Canal. The path includes multiple bridges spanning tributaries such as Rock Creek and Cabin John Branch, highlighting the area's wooded, rolling landscape amid suburban growth. This section emphasizes radial connections to inner suburbs while curving around the northern periphery of the District of Columbia.

Virginia

In Virginia, Interstate 495 comprises a 22-mile segment through Fairfax County and the independent city of , traversing the southern and western flanks of the to close the loop around The route enters the state from via the American Legion Memorial Bridge over the near in Fairfax County, then proceeds southward amid suburban development characterized by office parks, residential neighborhoods, and retail centers. It interchanges with the shortly after entry, providing access to and riverfront parks, before curving southeast through areas of dense commercial activity. A prominent feature is the interchange with SR 267 (Dulles Toll Road and Access Road) near Tysons Corner, a major commercial hub with high-rise offices, shopping malls, and employment centers that exemplify the route's integration into Northern Virginia's economic core. Continuing south, I-495 crosses I-66 near Merrifield in a six-lane configuration amid gently rolling terrain and suburban sprawl, then reaches the —commonly called the Mixing Bowl—a sprawling, high-volume junction with I-95, I-395 (Shirley Highway), and SR 110 that serves as a critical convergence for regional traffic. From this point, I-495 joins in concurrency with I-95 for about eight miles eastward through southern Fairfax County and , where the highway widens to eight or ten lanes and passes the highest commercial density along the entire Beltway, including strip malls, industrial parks, and logistics facilities near US 1. The eastern extent features approaches to crossings, including the complex—a multi-span structure carrying twelve lanes that connects to —and proximity to the via nearby ramps and local roads. Throughout, the landscape shifts from wooded suburbs in the west to more urbanized zones in the east, with the segment emphasizing radial connections to inner-suburban destinations while avoiding the dense core of the District of Columbia.

History

Planning and construction

The planning for Interstate 495, commonly known as the , originated in the early as a circumferential route to encircle , and bypass the planned alignment of Interstate 95 through the capital, addressing anticipated regional traffic growth. This concept was formalized in the 1952 National Capital Park and Planning Commission comprehensive plan and integrated into the national under the , which authorized 41,000 miles of controlled-access highways with 90% federal funding. Key milestones included approvals by the National Capital Park and Planning Commission in 1950, the Maryland-National Capital Park and Planning Commission in 1952, and Fairfax County in 1954, culminating in route designation by the U.S. Bureau of Public Roads in 1957, which oversaw federal interstate compliance. Land acquisition from 1958 to 1960 encountered significant challenges due to urban encroachment in expanding suburbs, bureaucratic delays, and resistance over property rights and right-of-way costs, complicating coordination among , , and District authorities. Groundbreaking for major construction occurred in 1961, marking the transition from planning to physical development under the Interstate program's guidelines. Construction proceeded in phases across jurisdictions, with Maryland segments initiating in 1961, including work near College Park to connect local radials like U.S. Route 1. Virginia construction followed in 1962, prioritizing the complex Springfield interchange to link the beltway with Interstate 95 and other radials. The District of Columbia portion, limited to crossings like the Woodrow Wilson Bridge over the Potomac River, was addressed last due to jurisdictional complexities involving federal oversight, local opposition, and inter-state coordination. The beltway was engineered as a fully controlled-access, divided freeway adhering to American Association of State Highway Officials (AASHO) Interstate standards, featuring six lanes (three in each direction) for most of its 64-mile length, with some rural sections initially at four lanes, and a design speed of 70 mph to accommodate high-volume traffic. The total construction cost reached approximately $189 million in 1960s dollars, covering earthwork, bridges, and pavement without at-grade intersections.

Completion and operations

The Capital Beltway's construction progressed in phases across jurisdictions, with the inner loop opening to traffic in as part of the initial four-lane configuration. The full segment of the beltway was completed in , while the critical interchange with I-95 in College Park was completed in 1971, allowing seamless connection for north-south traffic along the East Coast corridor. In , the west side sections opened progressively from 1962 onward, with the majority of the 22-mile portion finished by , though some interconnecting work extended into the early 1970s to integrate with local routes like VA 193. The District of Columbia's short eastern segment, spanning between the and the Baltimore-Washington Parkway, was finalized in , marking the completion of the physical loop. The entire 64-mile loop was fully operational as a continuous interstate by , . In 1977, the eastern arc was redesignated as I-95 to provide a continuous route for through traffic, replacing the I-495 designation there; I-495 signage was restored concurrently with I-95 on the eastern portion in 1991 to reduce motorist confusion. The beltway received its Interstate 495 designation in 1959 as part of the national numbering system established under the Federal-Aid Highway Act, reflecting its role as an auxiliary loop around the nation's capital. This integrated it with the I-95 concurrency on the eastern side, where through traffic from the Northeast could bypass downtown without entering . Initial signage and exit numbering faced challenges due to the multi-state coordination, with sequential numbering predominant in and ; these were resolved in the 1970s through standardization efforts, including adjustments in following the 1977 I-95 redesignation to align with mile-based conventions where feasible. Upon opening, the beltway provided immediate relief for through traffic avoiding the District of Columbia's congested urban streets, diverting an estimated 30% of interstate vehicles from city arterials in the first year and enabling suburb-to-suburb connectivity that reshaped regional commuting patterns. Early usage established radial commuter flows from and suburbs into federal employment centers, though the 1973 and 1979 oil crises temporarily reduced volumes by up to 15% as fuel prices spiked and carpooling increased. Key operational milestones in the early years included post-opening accident studies in the late and that highlighted elevated crash rates at interchanges, leading to the first comprehensive Safety Study in 1988, which analyzed over 5,000 incidents and recommended geometric improvements like extended merge lanes to address rear-end and sideswipe collisions.

Major renovations

In the , significant widening projects addressed growing traffic demands on the portion of Interstate 495, particularly in Fairfax County. Between 1991 and 1992, the Virginia Department of Transportation (VDOT) expanded the roadway to eight lanes over a five-mile stretch from the I-270 spur to Virginia State Route 193 (Georgetown Pike), including the widening of the American Legion Bridge to ten lanes to accommodate merge and movements. These efforts built on earlier expansions, adding in high-volume areas near Tysons Corner and reducing initial bottlenecks. In , pavement rehabilitation efforts commenced in the mid-1990s as part of ongoing maintenance to preserve the aging infrastructure, with resurfacing projects targeting sections like the outer loop from I-270 to Seminary Road to enhance ride quality and durability. During the 2000s, VDOT initiated planning for high-occupancy vehicle (HOV) lanes on I-495, evolving into high-occupancy toll (HOT) lane conversions to manage congestion more dynamically. Early assessments in the decade evaluated options for adding HOV infrastructure along the , culminating in the approval of a twelve-lane in 2005 for a fourteen-mile from the to VA-193. By the 2010s, these plans advanced with the reconstruction of key interchanges, including the Tysons Corner area, where VDOT restructured connections to I-66 and the to improve traffic flow and support under Fairfax County's Tysons Master . Engineering enhancements during these renovations focused on capacity and structural integrity. The HOT lanes project added two lanes in each direction—totaling four new managed lanes—while reconstructing existing general-purpose lanes over the fourteen-mile Virginia segment, incorporating upgrades to over fifty bridges and overpasses valued at more than $260 million in replacements. Seismic retrofits were integrated into major bridge work, notably for the Woodrow Wilson Memorial Bridge as part of its replacement, addressing potential vulnerabilities in the region's . The Virginia segments experienced cost escalations, with the overall HOT lanes initiative reaching approximately $2.1 billion by completion in 2012, reflecting expanded scope including ramps and interchanges. These renovations yielded measurable improvements in and . Post-project evaluations noted enhanced safety ratings due to modernized interchanges and barriers, while targeted fixes at legacy bottlenecks, such as the interchange in , reduced crash risks through ramp realignments and operational upgrades completed in the early 1990s. Overall, the additions alleviated pressure at high-volume points like Tysons Corner, contributing to smoother traffic progression without introducing new long-term disruptions.

Traffic and operations

Congestion issues

Interstate 495, known as the , experiences severe , particularly during peak hours, due to its role as the primary circumferential route around the metropolitan area. Peak congestion zones include the , which carries approximately 200,000 vehicles per day and serves as a major bottleneck crossing the , as well as the interchanges at Tysons Corner (near I-66) and (near I-95/I-395), where merging traffic exacerbates delays. During rush hours, average speeds in these areas often drop to 20-30 mph, with the broader metro area recording peak speeds of 25 mph in 2024. The primary causes of congestion on I-495 stem from rapid regional and the highway's limited capacity relative to demand, with few parallel routes available to distribute traffic. The metropolitan area's population has more than doubled from about 2.9 million in 1970 to an estimated 6.4 million as of , driving increased commuting and freight volumes that exceed the Beltway's design capacity in key segments. This growth, combined with the lack of alternative circumferential pathways, results in recurring bottlenecks, particularly where I-495 intersects radial interstates like I-95 and I-270. Recent metrics highlight the intensity of congestion, with the 2024 INRIX Global Traffic Scorecard ranking the Washington metro area ninth worst in the United States for urban congestion, where drivers lose an average of 62 hours annually to delays at a cost of $1,110 per driver. On I-495 specifically, the 2023 Travel Time Index (TTI) stood at 1.41, indicating 41% longer travel times during peaks compared to free-flow conditions, with about 20% of miles congested during morning rush hours—a 400% increase from 2020 levels. These figures underscore I-495's status as one of the nation's most congested urban interstates, with bottlenecks like the I-495 clockwise at I-270 spur lasting an average of two hours and extending up to 7 miles. Congestion trends on I-495 have worsened since the , with travel times on segments like the inner loop from I-66 to I-270 increasing 35% and the outer loop from I-95 to I-66 rising 76% between 2013 and 2023, despite prior widening projects. The caused a temporary dip, reducing the regional TTI to 1.17 in 2020 from 1.48 in 2019 due to lower travel demand, but volumes rebounded sharply, with 2023-2024 levels slightly exceeding pre-pandemic norms and PM peak congestion matching 2019 figures. This rebound, driven by returning commuters, has sustained high reliability challenges, as measured by a 27% increase in the Planning Time Index for evening peaks from 2020 to 2023.

Management measures

The Virginia Department of Transportation (VDOT) and the Department of Transportation State Highway Administration (MDSHA) employ comprehensive systems on Interstate 495 to monitor and respond to disruptions such as breakdowns and accidents. VDOT operates Safety Service Patrols that provide 24/7 coverage along key segments of I-495 in , including the 11-mile stretch from Exit 52 to the American Legion Bridge, assisting with debris removal, tire changes, and traffic control to minimize delays. In , the Coordinated Highways Action Response Team (CHART) conducts real-time monitoring using over 1,000 traffic cameras and dynamic message signs (DMS) to detect incidents and alert response teams, which operate emergency patrols in partnership with local for rapid clearance. These joint efforts between VDOT and MDSHA, including shared camera access through regional workstations, enable coordinated responses that reduce incident duration and secondary crashes on the shared corridor. High-occupancy vehicle (HOV) policies on I-495 promote carpooling to alleviate congestion in designated lanes. In , HOV-3 lanes require a minimum of three occupants per vehicle during restricted hours, with drivers using Flex transponders setting them to HOV mode for free access in express lanes; enforcement combines police patrols and overhead camera systems that detect occupancy violations. These cameras, enhanced with advanced detection technology installed starting in , flash alerts for potential violators, supporting consistent compliance since initial HOV enforcement measures in the . In , HOV-2+ lanes on segments of I-495 similarly mandate two or more occupants, enforced through visual checks and verification to encourage multi-occupant travel. HOV usage varies but can represent a significant portion of peak-hour , with carpools accounting for around 7% of express lane trips in earlier assessments, though free access incentives have boosted participation in recent years. Routine maintenance on I-495 ensures integrity and seasonal preparedness across jurisdictions. MDSHA follows annual resurfacing schedules, including a 2025 project on approximately nine miles of I-95/I-495 in Prince George's County, which involves milling, paving, and shoulder repairs to extend roadway life and improve ride quality, with completion expected by year's end weather permitting. VDOT conducts similar periodic resurfacing and inspections under its maintenance program, prioritizing high-volume routes like I-495. Both agencies implement snow and ice protocols, deploying over 2,800 pieces of equipment in —including plows, salt trucks, and 78 road sensors for real-time weather monitoring—and VDOT's comparable winter operations to treat routes preemptively and clear accumulations within hours of storms. Safety initiatives on I-495 focus on behavioral and technological interventions to lower risks. Variable speed limits (VSL), introduced on a 7.5-mile section of I-495 in in July 2008, dynamically adjust posted speeds based on traffic and work zone conditions via , contributing to overall VSL effectiveness in reducing potential by 8 to 30% through smoother flow and fewer speed variances. Post-2020 enhancements, including expanded VSL integration with incident detection, align with regional trends showing reductions of about 15% on managed highways amid improved enforcement and awareness. Public awareness campaigns, such as VDOT and Transurban's 2025 driver initiative along I-495 construction zones and MDSHA's "Be the Driver" program targeting distracted and impaired driving, use billboards, , and radio ads to promote cautious behaviors and work zone vigilance. These efforts emphasize merging safely and maintaining following distances, particularly in congestion hotspots like the area. Additionally, the 495 Express Lanes Northern Extension opened on November 22, 2025, extending the existing express lanes by 2.5 miles to help mitigate congestion.

Improvements and future plans

Woodrow Wilson Bridge replacement

The replacement project originated in the late 1980s amid growing traffic demands on the original 1961 six-lane , which carried Interstate 95 across the and frequently caused bottlenecks due to its frequent openings for maritime traffic. The (FHWA) initiated planning in 1989, leading to a draft in 1991 that evaluated five alternatives for a 12-lane expansion, followed by a final in 1997 and a supplemental version in 2000. The selected design featured two parallel bascule bridges to replace the aging structure, with construction commencing in fall 2000 at an estimated total cost of $2.4 billion, shared among federal, , and governments. The project encompassed not only the bridge but also 7.5 miles of approach roads in and to integrate seamlessly with the . Engineering challenges centered on creating a resilient 1.4-mile-long pair of draw spans over the Potomac, including a 175-foot-wide navigation channel requiring a double-leaf bascule —the largest movable spans in the United States at the time. The design incorporated V-shaped piers for aesthetic and , variable-depth plate girders for the curved approaches, and a 70-foot vertical clearance to minimize vessel delays, reducing annual bridge openings from approximately 260 to 65. To address the region's low seismic activity and risks along , the foundations utilized deep cylindrical steel piles up to 200 feet long, embedded in challenging alluvial soils, with seismic soil-foundation interaction analyses ensuring stability during potential earthquakes. Integration with and approaches involved widening interchanges and adding full shoulders, enhancing connectivity for the concurrent I-95 route. Construction progressed in phases, with the outer loop spans opening to traffic in June 2006 and the inner loop in December 2008, marking full completion of the main bridge components ahead of schedule and under budget at $2.357 billion. The project faced significant delays from environmental lawsuits, including a 2001 challenge by the National Wilderness Institute alleging violations of the , which was resolved after protracted litigation stemming from earlier 1998-1999 disputes over impacts and community concerns. While no construction worker fatalities were reported, the complex work in soft soils and over water required innovative geotechnical solutions, such as optimized pile driving to achieve required capacities. The replacement substantially alleviated congestion at this critical Beltway chokepoint, enabling smoother flow for over 250,000 daily vehicles and facilitating the extension of I-95 concurrency across the Potomac as part of the broader interstate system. By 2025, the structure continues to perform reliably, with minor ongoing enhancements to the integrated pedestrian and bicycle trail—a 3.5-mile path connecting Alexandria, Virginia, to Oxon Hill, Maryland—focusing on maintenance and accessibility improvements to support non-motorized travel.

Express toll lanes

The 495 Express Lanes in originated from planning efforts in the early 2000s by the (VDOT) to alleviate chronic congestion on the . In 2002, a proposed adding four high-occupancy () lanes, which VDOT approved, leading to a public-private partnership finalized in 2007 between VDOT, Fluor-Lane for design and construction, and for financing and operations. Construction commenced in 2008, and the 14-mile southern segment—from the to the Dulles Toll Road—opened to traffic on November 17, 2012, more than a month ahead of schedule. These lanes employ dynamic tolling to ensure speeds remain at or above 45 , with rates varying by demand and typically ranging from $0.20 to $1.25 per mile during peak periods. Vehicles with three or more occupants (HOV-3+), motorcycles, and buses qualify for free access using an Flex transponder set to HOV mode, promoting carpooling and transit use. handles daily operations, including toll collection and maintenance, under VDOT's oversight, while the concession agreement spans 85 years. To further expand capacity, the 495 NEXT project initiated construction in March 2022, adding a 2.5-mile northern extension of the express lanes from the Dulles Toll Road to the . This segment is scheduled to open on November 22, 2025—earlier than anticipated—offering improved connections to key commuter routes and new travel options amid growing regional demand. Full project completion, including auxiliary bridges and multi-use paths, is for mid-2026. In 2025, VDOT proposed the I-495 Southside Express Lanes Study to add approximately 11 miles of toll lanes on the southern portion of the Beltway in , aiming to address ongoing congestion through managed lanes. In , the Department of Transportation (MDOT) explored lanes for the eastern portion of I-495 during the as part of a broader managed lanes study spanning about 20 miles from the area toward the I-270 interchange. The initiative was shelved in 2017 amid and environmental concerns but revived under Governor in 2021, integrated into plans for I-495 and I-270 widening with dynamic tolling to fund improvements like the American Legion Bridge replacement. However, the proposal faced setbacks, including partial scaling back in 2021 and stalled private partnerships by 2022; in October 2025, it was excluded from the Board's long-term regional plan and placed on indefinite hold pending secured and consensus. As of 2025, operational data from the lanes demonstrate their effectiveness in congestion management, with express users achieving up to 50% travel time reductions during peaks compared to general-purpose lanes, and buses saving more than 20 minutes per trip on average. Overall, the system has reduced rates by 20% while handling increased volumes, underscoring the value of managed lanes in high-demand corridors.

Other projects

In the 2010s, the undertook reconstruction efforts at the College Park interchange where I-95 weaves into I-495, aiming to improve traffic flow and safety through ramp enhancements and partial rebuilds. Similarly, in Tysons Corner, , land use planning and acquisitions in the facilitated integration of the Silver Line Metro stations with I-495, including coordinated development around the Tysons Corner station to enhance multimodal connectivity without direct modifications. Pavement rehabilitation and safety enhancements have been key focuses in recent years. In Maryland, the State Highway Administration initiated a resurfacing project in 2024 covering approximately nine miles of I-95/I-495 from near the I-95 junction to MD 5 (Branch Avenue) in Prince George's County, including milling, overlay, and shoulder repairs, with completion expected in 2025. In Virginia, the 2020s saw the addition of new and upgraded noise barriers along I-495 as part of the 495 Express Lanes Northern Extension (495 NEXT) project, protecting adjacent neighborhoods from traffic noise with walls designed to meet or exceed previous standards. Environmental mitigation efforts have accompanied infrastructure expansions on I-495. Post-widening projects for the express lanes included restorations, such as compensatory at sites like Godwin Marsh and along the Beltway East corridor, where created wetlands filter stormwater runoff and enhance for local . The 495 NEXT initiative incorporates about four miles of new shared-use and paths connecting communities along the corridor, with full completion anticipated by mid-2026. Additionally, upgraded stormwater management systems have been installed to improve in streams like Scotts Run, reducing from runoff through enhanced and restoration measures. Recent completions include guardrail replacements across both and segments in 2024-2025, addressing deterioration and improving crash safety; for instance, Virginia's 495 NEXT project involved ongoing barrier and guardrail installations along the extended lanes. Over $100 million has been invested in minor bridge deck replacements and repairs during the 2020s, including work on structures like the bridges and various overpasses, as part of broader preservation programs to extend without major reconstructions.

References

  1. [1]
    Part VII - Miscellaneous Interstate Facts | FHWA
    ... Capital Beltway is a 65-mile loop around our Nation's Capital. Length: Maryland, 42.7 miles. Virginia, 21.9 miles. Washington, DC, 0.1 miles. Total, 64.7 miles ...<|control11|><|separator|>
  2. [2]
  3. [3]
    Exit numbers | Virginia Department of Transportation
    Nov 7, 2024 · Interstate 495 in Virginia runs 22 miles from the Washington, DC line with Alexandria to the Maryland line near Bethesda. It's part of the Capital Beltway.<|control11|><|separator|>
  4. [4]
    Rex Whitton Photo Gallery - Interstate System - Highway History
    In Maryland, the final link in I-495, the Capital Beltway, was opened after ceremonies on August 17, 1964. Ribbon cutters (l. to r) are Rex Whitton, ...
  5. [5]
    Rex Whitton Photo Gallery - Interstate System - Highway History
    On April 2, 1964, Administrator Rex Whitton participates in the dedication of I-495, the Capital Beltway from U.S. 1 to the Shirley Highway-the last segment ...
  6. [6]
    Capital Beltway High Occupancy Toll (HOT) Lanes (I-495)
    The Capital Beltway HOT Lanes project is a public-private partnership adding 14 miles of new lanes, HOV lanes, and dynamic tolling, the first in Virginia.
  7. [7]
    [PDF] Traffic Volume Maps Introduction
    The Maryland Traffic Volume Maps depict the Annual Average Daily Traffic (AADT) at various locations on Maryland's roadways by county. ... BELTWAY. CAPITAL.
  8. [8]
    An Initial Assessment of Freight Bottlenecks on Highways - Appendix A
    Tables A.1, A.2, and A.3 list the top 25 highway interchange bottlenecks, ranking them in descending order of annual truck hours of delay for all trucks.
  9. [9]
    Traffic Analysis Tools Volume IX - FHWA Office of Operations
    Feb 1, 2017 · The Woodrow Wilson Bridge reconstruction project affected several miles of major roads and interchanges in two states including I-95/I-495 ...<|control11|><|separator|>
  10. [10]
    Interstate 495 Maryland / Virginia
    A heavily traveled commuter route, I-495 connects a number of suburban communities across both Northern Virginia, Montgomery County and Prince Georges County, ...
  11. [11]
    Interstate Brief | Federal Highway Administration
    Aug 16, 2013 · This report attempts to explore the diversity of the Interstate system by State and route, by focusing on a few data attributes that reflect its extent, usage, ...
  12. [12]
    Roads and Highways in Maryland - MDOT SHA <span><meta ...
    The Maryland portion of the Capital Beltway (I-495 and I-95) is 42.09 miles. I-495, including portions in the District of Columbia and Virginia, is 64.7 miles ...<|control11|><|separator|>
  13. [13]
    I-495 - MDRoads
    It's eight lanes throughout the Maryland portion now except between I-270 and I-270 Spur in the northwest. Part of what became the Capital Beltway was ...
  14. [14]
    I-95/495 North - Capital Beltway Outer Loop Maryland - AARoads
    The upcoming exchange between I-495 and I-95 was originally going to include connections with the continuation of I-95 south into the District of Columbia, to ...
  15. [15]
    Interstate 495 - Capital Beltway Maryland - AARoads
    Feb 7, 2023 · Interstate 495 follows the course of Rock Creek between the east end of I-270 and Forest Glen. 1960s maps, such as the 1965 Rand McNally ...
  16. [16]
    Interstate 495 in Virginia - Roads to the Future
    Interstate 495 in Virginia is the 22.06-mile-long freeway from the District of Columbia border (Potomac River) in the City of Alexandria to the Maryland border.
  17. [17]
    Interstate 495 / Capital Beltway - Inner Loop Virginia - AARoads
    Jun 27, 2020 · Interstate 495 in Northern Virginia travels north from the Springfield Interchange to Annandale, Tysons, McLean and the American Legion ...
  18. [18]
    I-95/495 North - Outer Loop Virginia - AARoads
    I-95/495 combine along the Capital Beltway in Northern Virginia east from the Springfield Interchange to Alexandria and the Woodrow Wilson Bridge.
  19. [19]
    Capital Beltway History
    Aug 20, 2007 · The Capital Beltway is the 64-mile-long Interstate freeway that encircles Washington, D.C., passing through Virginia and Maryland, ...
  20. [20]
    National Interstate and Defense Highways Act (1956)
    Feb 8, 2022 · In the act, the interstate system was expanded to 41,000 miles. To construct the network, $25 billion was authorized for fiscal years 1957 ...
  21. [21]
    [PDF] Part 2: Official Challenges to the DC Freeways
    I-95 diverted from I-70S in the vicinity of Michigan Avenue/Queen's Chapel Road and continued to a link with I-95 at the Capital Beltway. For western ...
  22. [22]
    Capital Beltway (I-495 and I-95) - DCRoads.net
    Descriptive history and current conditions on the Capital Beltway (I-495) around Washington, DC (Maryland and Virginia).
  23. [23]
    A Brief History of the Capital Beltway - Preservation Maryland
    Aug 17, 2016 · On August 17, 1964 Maryland Governor J. Millard Tawes cut the ribbon to officially open the final stretch of the just-completed Capital Beltway, I-495.
  24. [24]
    Interstate 495 / Capital Beltway Virginia - AARoads
    I-495 is the Capital Beltway encircling Washington, DC through Northern Virginia and Montgomery and Prince Georges Counties in Maryland.
  25. [25]
    Sixty Years of the Beltway: The National Capital Planning ...
    Jul 21, 2024 · By 1959, a concrete proposal for more than 300 miles of new roads started to reshape the National Capital Region, including the Capital Beltway ...Missing: 1958-1960 encroachment
  26. [26]
    The Beltway Turns 50: Stuff You Didn't Know About Washington's ...
    Aug 14, 2014 · Fifty years ago, on August 17, 1964, the final piece of the Capital Beltway was opened to traffic, forever changing the Washington region in ...
  27. [27]
    [PDF] Virginia Department of Transportation History of Roads
    The first major interstate route to be completed fully was Interstate 495, the Virginia portion of a beltway circling the. District of Columbia, with its ...
  28. [28]
    [PDF] Case Studies and Annotated Bibliography of Truck Accident ...
    Accident Update," Unpublished Report, Virginia DOT, Richmond, VA., February. 1989. 13. Capital Beltway Safety Study with Truck Accident Update for 1988.
  29. [29]
    Capital Beltway (I-495 and I-95) - Roads to the Future
    The Capital Beltway is the 64-mile-long Interstate freeway that encircles Washington, D.C., passing through Virginia and Maryland, carrying the Interstate I-495 ...Missing: length route
  30. [30]
    AWARDS — F.O. DAY Co.
    Brigham & Day Paving Co., Inc. Quality Asphalt Paving Award Maryland Asphalt Paving Conference Resurfacing of I-95, from Rt. 5 to Rt. 214.<|separator|>
  31. [31]
    Evolution of Second Generation Pricing Projects: Case Studies
    May 15, 2020 · In response, the Virginia Department of Transportation (VDOT) initiated a large planning process along I-495 focused on adding HOV lanes. During ...
  32. [32]
    [PDF] Chapter 527 Submittal to VDOT for Tysons Corner Plan Amendment
    It is located at the confluence of Interstate 495 (the Capital Beltway) with the Dulles Airport Access and Toll. Roads, Route 7 and Route 123. Tysons Corner ...
  33. [33]
    S. Rept. 104-86 - NATIONAL HIGHWAY SYSTEM DESIGNATION ...
    ... Interstate 495 at the present location of the Woodrow Wilson Memorial Bridge. ... seismic retrofit of the bridge made available after the date of the expenditure.
  34. [34]
    REMOVING THE RAMP: REASON AND RIGHT ARE ON OUR SIDE
    Jan 9, 1993 · The SHA says the project will "improve the safety operations of the I-495/Connecticut Avenue interchange and considerably reduce safety problems ...
  35. [35]
    I-495 Capital Beltway HOT Lanes, Fairfax County, VA | Build America
    Sep 9, 2014 · The $2 billion I-495 Capital Beltway High-Occupancy Toll (HOT) Lanes project expanded and improved a 14-mile section the I-495 Capital Beltway in Fairfax ...<|control11|><|separator|>
  36. [36]
    Regional Roadway Projects | City of Alexandria, VA
    Jun 23, 2025 · This southern section of the Capital Beltway ... Information on the project can be found on the I-495 Southside Express Lane Project Website.
  37. [37]
    scorecard-city-2024
    ### Key Congestion Metrics for Washington DC (2024 INRIX Global Traffic Scorecard)
  38. [38]
    [PDF] 2024 congestion management process (cmp) technical report
    ... backup of traffic on the on-ramp. o Ramp meters are used inside the Capital Beltway (I-495) in Virginia on I-66 and I-395, as well as on I-270 in Maryland.
  39. [39]
    Washington DC Metro Area Population (1950-2025) - Macrotrends
    Chart and table of population level and growth rate for the Washington DC metro area from 1950 to 2025 ... 1970, 2,488,000. 1969, 2,423,000. 1968, 2,348,000.
  40. [40]
    [PDF] VDOT Traffic Operations Division Safety Service Patrol Program ...
    I-495 (495-1). 7 days a week 24 hours a day. I-495 Exit 43-54. (American Legion Bridge). (11 miles). I-495 (495-2). 7 days a week 24 hours a day. I-495 Exit 52- ...
  41. [41]
    CHART Traffic Incident Management
    The Coordinated Highways Action Response Team (CHART) Emergency Patrols operate in partnership with the Maryland State Highway Administration (MDOT SHA), ...Missing: 495 DMS
  42. [42]
    Live Traffic Cameras - Maryland's CHART
    Maryland Department of Transportation Coordinated Highways Action Response Team ... DMS 8839) opens in new window. Baltimore I-95 SOUTH AT I-95 SOUTH ...Missing: management | Show results with:management
  43. [43]
    [PDF] Best Practices for Border Bridge Incident Management
    Jan 3, 2007 · The Maryland State Police and VDOT NOVA STC currently have CHART workstations that allow them to view MDSHA cameras. Additionally ...
  44. [44]
    HOV lanes - Virginia Department of Transportation
    Jul 22, 2025 · During HOV-restricted periods, HOV-2 lanes require a minimum of two people per passenger vehicle and HOV-3 lanes have a minimum of three. Some vehicles have ...
  45. [45]
    Roadside cameras can tell if someone is driving without 3 ... - WJLA
    Nov 16, 2020 · Driving in the Express lanes with less than three people in the car with the HOV ON option on your E-ZPass is against the law. Violators can be ...Missing: usage | Show results with:usage
  46. [46]
    HOV violators beware: New technology in Northern Va. express ...
    Nov 16, 2020 · Drivers in Northern Virginia with E-ZPass Flex can use the express lanes for free if they set the device to HOV ON and there are three or more ...Missing: requirement usage
  47. [47]
    High Occupancy Vehicle (HOV) Lanes
    The HOV lanes are HOV 2+, meaning two or more people must occupy the vehicle. · An occupant is any person who occupies one seat in the vehicle (i.e. pregnant ...Missing: usage | Show results with:usage
  48. [48]
    495 Express Lanes usage increases - WJLA
    Jan 11, 2013 · Drivers in carpools of three or more can use the lanes for free. But only 7 percent of the traffic on the toll lanes comes from carpoolers or ...
  49. [49]
    State Highway Administration Begins I-95/I-495 (Capital Beltway ...
    The project includes resurfacing improvements to all ramps at the MD 414 (St. Barnabas Road) and MD 5 (Branch Avenue) interchanges. Weather permitting, the ...Missing: seismic | Show results with:seismic<|separator|>
  50. [50]
    State Highway Administration Prepares for Upcoming Winter Season
    78 non-invasive road sensors to monitor snow, ice thickness and temperature; 105 mobile weather sensors transforming maintenance vehicles ...
  51. [51]
    A variable speed limit system used to regulate traffic flow through ...
    A variable speed limit system used to regulate traffic flow through work zones on a 7.5 mile section of I-495 saved motorists approximately 267 vehicle-hours ...Missing: average | Show results with:average
  52. [52]
    VDOT and Transurban Launch Safety Campaign as Crews Work to ...
    Sep 3, 2025 · The awareness campaign emphasizes to drivers that active roadway construction and hundreds of workers are directly adjacent to Beltway traffic.Missing: initiatives MDOT
  53. [53]
    Serious About Safety - MDOT - Maryland Department of Transportation
    Driver Behavior and Public Awareness Campaigns. "Be the Driver" Public Awareness Campaign · Impaired Driving Prevention Program · Distracted Driving Prevention ...Missing: 495 VDOT
  54. [54]
    About | Express Lanes
    495 Express Lanes Timeline. Early 2000s: VDOT begins planning a highway expansion to address traffic on the Capital Beltway in Virginia. Community members don't ...Missing: conversion | Show results with:conversion
  55. [55]
    Frequently Asked Questions About the 495 Express Lanes
    Nov 16, 2012 · The goal is to have traffic on the road travel close to 55 miles per hour, even in rush hour. ... They end at the I-95/I-495 merge, near ...<|separator|>
  56. [56]
  57. [57]
    North America | Transurban Group
    The 495 Express Lanes opened to traffic in November 2012. Ownership. The lanes are 50% Transurban owned. More information. Visit the Express Lanes website for ...<|separator|>
  58. [58]
  59. [59]
    Express Lanes: Home
    October 30, 2025. New 495 Express Lanes Extension To Open in Late November. The 495 Express Lanes Extension will expand the Lanes by 2.5 miles through the ...
  60. [60]
    I-495 and I-270 Managed Lanes Study - Montgomery Planning Board
    That would add four total high-occupancy toll lanes—two HOT managed lanes in each direction of I-495 from the south side of the American Legion Bridge (ALB) to ...
  61. [61]
    Board's reversal revives Maryland plan for toll lanes on part of ...
    Jul 26, 2021 · The governor's proposal to widen both highways with toll lanes had suffered an unexpected blow June 16, when the board removed it from a ...
  62. [62]
    MDOT Removes Large Stretch of Capital Beltway From Toll-Lane Plan
    May 12, 2021 · The new alterative focuses solely on building a new American Legion Bridge and adding two high occupancy toll lanes in each direction.
  63. [63]
    DC metro region leaders exclude I-495 express lanes project from ...
    Washington, D.C. metropolitan region leaders on Wednesday voted unanimously to exclude the I-495 Southside Express Lanes construction ...Missing: 2024 INRIX
  64. [64]
    I-495 Express Lanes Virginia Complete Guide: Capital Beltway HOT ...
    Length: 14 miles (expanding to 16.5 miles with Northern Extension) ... Check 495NEXT.vdot.virginia.gov for current lane closures and alternate routes.
  65. [65]
    495 Express Lanes Transform Travel in Northern Virginia - IBTTA
    ... Lane Construction. They opened more than a month early – on November 17, 2012 – after four years of construction that included the replacement of more than ...
  66. [66]
    495 Express Lanes Northern Extension (495 NEXT)
    Work began in March 2022 and the new Express Lanes are anticipated to open in late 2025, with the full job completed in 2026. BENEFITS/POSITIVE ASPECTS TO ...
  67. [67]
  68. [68]
    Tysons Plan Timeline - Fairfax County
    Tysons Land Use Task Force. In 2004, 20 proposals for redevelopment in Tysons were submitted to the county in anticipation of the future Silver Line stations.
  69. [69]
    New 495 Express Lanes Extension To Open in Late November
    Oct 30, 2025 · Work to finish several of these features including the shared-use path and new Beltway bridges at Georgetown Pike will continue into 2026. Lane ...
  70. [70]
    [PDF] Godwin Marsh and Beltway East Stormwater Management Wetland ...
    The Godwin Marsh and Beltway East projects created wetlands to enhance wildlife habitat, reduce pollution, and filter runoff, intercepting storm drain flows.
  71. [71]
    About | 495 Express Lanes Northern Extension
    Sep 19, 2025 · The project will extend the 495 Express Lanes by 2.5 miles from the Dulles Corridor interchange to the George Washington Memorial Parkway near ...
  72. [72]
    All News Releases | 495 Express Lanes Northern Extension
    ... Interstate 495 between the Dulles Corridor and the George Washington Memorial Parkway in Fairfax County. Governor Youngkin was joined by Virginia Secretary ...
  73. [73]
    [PDF] Express Lanes 495 Northern Extension Project
    May 31, 2025 · 1.1 below, the Project will extend along Interstate 495 (I-495) from the current northern terminus of the. 495 Express Lanes near Lewinsville ...