Fact-checked by Grok 2 weeks ago

Musashino Line

The Musashino Line is a regional railway line operated by the East Japan Railway Company (JR East) that serves as an orbital route encircling much of the Tokyo metropolitan area. Connecting Fuchū-Hommachi Station in Tokyo to Nishi-Funabashi Station in Chiba Prefecture, it spans approximately 100.6 kilometers in a semi-circular path through Saitama, Tokyo, and Chiba prefectures, primarily facilitating freight transport while also providing local passenger services at 27 stations. Completed in the early 1970s by the former Japanese National Railways to alleviate congestion on radial lines into central Tokyo, the line uses 1,067 mm narrow gauge track electrified at 1,500 V DC overhead and supports both commuter trains and heavy freight operations, including connections to major ports and industrial areas. Its role in JR East's network emphasizes efficient circumferential movement, reducing pressure on overcrowded urban trunk lines like the Yamanote.

Route and Infrastructure

Main Line Description

The Musashino Line constitutes a 100.6 km route linking Tsurumi Station in , , to Nishi-Funabashi Station in , creating an unclosed loop that circumscribes much of central Tokyo's metropolitan area. This configuration enables circumferential connectivity, avoiding the congestion of inner radial corridors while serving the surrounding suburban expanse. The line traverses diverse suburban and semi-urban landscapes across , , and Chiba prefectures, incorporating stations such as Fuchū-Hommachi, Higashi-Koganei, Nishi-Kokubunji, and Shim-Misato. It intersects and connects with key radial lines, including the at Nishi-Kokubunji and Fuchū-Hommachi, and the via proximity at Higashi-Koganei, facilitating transfers and integration into Tokyo's broader rail network. Segments alternate between at-grade alignments in open areas and elevated structures in denser zones, reflecting adaptations to local and development patterns. Infrastructure emphasizes reliability for heavy freight loads, featuring extensive grade separations, viaducts, and tunnels to minimize conflicts with road traffic and ensure smooth passage through varied terrain. The route experiences negligible elevation changes, confined largely to the Plain's lowlands, with structures like viaducts deployed to navigate urban encroachments and minor undulations.

Freight Branches and Connections

The Musashino Line incorporates dedicated freight branches that diverge from the primary loop to link industrial facilities, ports, and broader corridors, supporting through-freight movements without traversing densely congested urban radials like the Yamanote or Tōhoku Main Lines. These branches primarily serve cargo handling for coastal zones and northern distribution networks, integrating with Freight operations to handle intermodal containers and bulk goods destined for or originating from ports and beyond. The Shimōsa Branch Line extends eastward from Nishi-Funabashi Station to Ichikawa-Shiohama Station, a distance of approximately 4 km, providing direct access to waterfront industrial areas along , including facilities for transshipment and near the Shiohama district. This branch, operational since the Musashino Line's freight expansions in the late 20th century, facilitates connections to freight routes extending toward Soga and Chiba Port, enabling efficient routing of imports and exports while avoiding passenger bottlenecks at central hubs. Northward, the Omiya Branch Line diverges from the main line near Musashi-Urawa Station, spanning about 5 km to integrate with the freight corridors at Yonohama, allowing seamless continuation of trains from and Tohoku regions into the Kanto freight loop. This freight-only segment, utilized for heavy-haul services, bypasses Ōmiya's passenger infrastructure and supports daily volumes of inter-regional cargo, including automotive parts and chemicals, by linking to Freight's primary north-south trunk lines.) Nishi-Funabashi serves as a pivotal yard where Musashino tracks converge with Sōbu Line sidings and extensions, accommodating classification and staging for freight bound to , , and ports via southward routes under . This setup enhances capacity for coastal shipping interfaces, with the yard handling transfers to marine terminals that process millions of tonnes annually, underscoring the line's role in Japan's integrated bypassing metropolitan core congestion.

Services and Operations

Passenger Services

The Musashino Line operates all-stations local passenger services between Fuchū-Hommachi and Nishi-Funabashi, covering a 71.8 km route primarily utilized by commuters in the metropolitan periphery. These services connect with the at Fuchū-Hommachi and Nishi-Kokubunji stations, enabling access to central via western corridors, while linkage at Nishi-Funabashi facilitates through-running onto the toward . Peak-hour operations feature headways of 10 to 15 minutes, as evidenced by morning timetables showing departures at intervals such as 05:01, 05:16, 05:32, and subsequent trains aligning to this pattern. Limited through-services supplement local runs, including the Musashino-designated all-stations trains linking on the Chūō Line to Ōmiya on the , traversing the Musashino Line as the core segment. On weekdays, these operate with two outbound trips from around 4:00 p.m. and 6:00 p.m., alongside morning inbound services from the eastern end. Such integrations enhance connectivity across East's network, bypassing crowded inner lines like the Yamanote for outer-loop travel. Ridership patterns underscore commuter dominance, with empirical data from station-specific figures reflecting surge demand during rush hours for work and school travel, consistent with broader Greater rail usage trends post-privatization. Services maintain consistent scheduling via East's centralized operations, adapting to seasonal variations through timetable adjustments announced monthly.

Freight Services

The Musashino Line supports freight operations managed by (JR Freight), serving as a key bypass route around central to connect industrial zones with ports and logistics hubs in Chiba, , and Kanagawa prefectures. These services primarily handle containerized , which constitutes about two-thirds of Japan's freight by , alongside bulk commodities such as products and chemicals transported in specialized wagons. Freight trains operate predominantly during nighttime and off-peak periods to prioritize passenger services, enabling efficient routing from terminals like Nishi-Funabashi and Fussa to major lines including the Tokaido and Joban. Since the line's completion in , its infrastructure has facilitated a modal shift from road to rail for intermodal transport, particularly for block trains that reduce reliance on trucks for long-haul segments amid Tokyo's urban congestion. This has supported Freight's overall strategy to increase train capacity, with enhancements like extended sidings allowing up to 1,300-tonne consists on compatible routes. While specific annual tonnage for the Musashino Line is not publicly disaggregated, it contributes to Freight's national freight volume of approximately 30 million tons, emphasizing high-density corridors that alleviate overload. Rail freight on the line offers economic advantages over truck alternatives, including lower per-ton-kilometer costs and reduced emissions— emits roughly one-tenth the CO2 of trucks for equivalent payloads—aligning with Japan's policies to curb road congestion and environmental impact in the . These efficiencies stem from the line's dedicated freight-friendly design, including grade-separated junctions, though capacity constraints from shared trackage limit full potential without further infrastructure upgrades.

Stations and Facilities

Passenger Stations

The Musashino Line operates 27 passenger stations primarily between Fuchū-Hommachi and Minami-Funabashi, supporting commuter traffic in Tokyo's outer suburbs and providing essential interchanges with other rail networks. Platforms at these stations accommodate up to 10-car electric multiple units, enabling efficient handling of peak-hour demand. Many facilities have incorporated barrier-free enhancements, including elevators and escalators, as part of East's broader initiative to improve across its stations by the early 2030s. Following the main line eastward from Tsurumi toward Nishi-Funabashi, stations feature varying levels of development tied to local urban needs. Tsurumi Station functions as a key western entry point with connections to the Keihin-Tōhoku Line, featuring standard commuter amenities. Musashi-Nakahara Station, situated in Kawasaki's industrial zone, supports freight-passenger adjacency while offering basic platforms upgraded for modern usage. Prominent eastern stations include Shin-Kiba, which integrates with waterfront redevelopment projects, enhancing links to exhibition halls like and driving economic activity through event-related ridership surges. Nishi-Funabashi stands out as a high-traffic hub, interconnecting with the , Sōbu Line, and Tōzai Line; its facilities encompass ticket vending machines, restrooms, and multi-functional support for passengers, contributing to regional connectivity and station-area commercial growth.
StationPrefectureKey Interchanges and Notes
Nishi-FunabashiChibaKeiyō, Sōbu, Tōzai Lines; extensive amenities including readers and seating machines; central to suburban economic hubs.
Shin-Kiba; tied to access, supporting urban revitalization in the bayside district.
Fuchū-HommachiWestern terminus for select services; local commuter focus with accessibility retrofits.

Freight and Junction Facilities

Niiza Freight Terminal, situated in Niiza, along the Musashino Line, serves as a primary hub for container handling and the transport of paper products in WAMU 80000 series boxcars. This facility supports regional logistics by accommodating unit trains and mixed freight, contributing to the line's role in bypassing central congestion for efficient cargo routing. Kajigaya Freight Terminal, located near Tsurumi in , functions as a key interchange point for incoming freight from the Tsurumi area, handling general cargo and enabling transfers to the broader Musashino network. Similarly, Koshigaya Freight Terminal in processes local industrial shipments, including those destined for nearby manufacturing sites. These terminals, positioned in proximity to urban-industrial zones despite residential surroundings, underscore the line's adaptation for mixed-use freight operations without dedicated industrial clusters. The Musashino Line connects to numerous private sidings that serve industries in Chiba and prefectures, such as factories, warehouses, and logistics centers around Funabashi and Urawa areas, allowing direct access for bulk goods like raw materials and finished products. These sidings, developed alongside secondary growth near ports and hubs, facilitate modal shifts from by integrating with the line's loop configuration for streamlined distribution. Junction facilities at endpoints like Fuchu-Hommachi (linking to the ) and Nishi-Funabashi (interchanging with the Keiyo Line) provide critical nodes for freight consolidation and rerouting, supporting 24-hour operations through shared trackage designed for continuous cargo flow. Double-tracked segments along the route, implemented during initial construction phases from 1969 to 1973, enhance capacity by permitting simultaneous passenger and freight movements, reducing bottlenecks for high-volume hauls.

Rolling Stock

Current Passenger Rolling Stock

The Musashino Line employs 8-car primarily from the for passenger operations, with supplementary use of 209-500 series sets. These trains support local services along the line and through-services to connected routes such as the and . E231-0 series sets, transferred from the Chūō-Sōbu Line, entered Musashino Line service in November 2017 after reformation at facilities like the General Rolling Stock Center. A total of 34 such 8-car formations operate, each with a body 2,950 mm wide, beadless exterior panels for reduced weight, and for . Maximum operating speed is 120 km/h on the 1,500 V electrified line, with each set accommodating over 1,000 passengers including standing capacity. E231-900 series 8-car sets, derived from early prototype cars and reformed for commuter duties, handle Musashino Line workings including extensions to the . These feature similar specifications to the E231-0, with adaptations for through-service compatibility, such as aligned door positions and control systems. Deployment emphasizes reliability on the loop route's freight-shared infrastructure. 209-500 series EMUs, introduced broadly by East in the , continue in limited Musashino operations post-conversion from other commuter lines. These sets provide backup capacity with comparable 120 km/h top speeds and regenerative capabilities, though phased toward eventual replacement by newer E231 variants. All current fleets prioritize high acceleration for urban densities and incorporate LED lighting and digital displays for passenger information.

Former Passenger Rolling Stock

The 103 series electric multiple units (EMUs) served as primary passenger rolling stock on the Musashino Line from its 1973 opening until their final withdrawal on December 8, 2005. Originally developed by Japanese National Railways (JNR) and introduced in 1963, these trains operated for over 40 years across JR East lines, including extended use on the Musashino for local services, before replacement by newer 205 series sets to achieve better acceleration and reduced maintenance needs. The 201 series 6-car EMUs operated on the line from March 3, 1986, to November 1996, having been cascaded from Chūō Line duties to supplement capacity during peak periods. These JNR-era trains, entering service in 1979, were retired after a decade on the Musashino as part of broader fleet rationalization post-privatization. The 205 series dominated passenger operations from the late 1980s, with 205-0 subseries sets built new for the line starting December 1, 1991, and 205-5000 variants transferred from other routes like Yamanote. Comprising 42 eight-car formations totaling 336 vehicles, they were progressively withdrawn between 2018 and 2020, culminating in the final Keiyō M20 set's departure on October 21, 2020, with all units exported to Indonesia's commuter networks. This transition to E231 series EMUs enhanced acceleration (up to 3.0 km/h/s versus the 205's approximate 2.7 km/h/s), energy efficiency, and reliability, yielding long-term cost savings through modernized maintenance practices following JR East's 1987 privatization-driven upgrades. The 205 series averaged 30-35 years of service, reflecting extended lifespans enabled by stainless steel construction but ultimately limited by evolving performance demands.

Freight Locomotives and Wagons

Freight operations on the Musashino Line utilize JR Freight's electric locomotives, with the EF65 class serving as a mainstay since its introduction in 1965 for hauling mixed freight trains across Japan's 1,500 V network, including routes like the Musashino Line. The newer EF210 class, a configuration introduced in 1992, has increasingly supplemented and replaced older units for heavy-duty services in the area, offering improved of up to 240 kN for navigating the line's urban alignments. These locomotives typically haul trains of up to 1,300 tonnes, comprising 20 to 26 wagons, to support containerized cargo flows from -area ports. Wagon types predominantly include container flatcars such as the KoKi106 and KoKi107 series, optimized for 20- and 40-foot maritime containers with load capacities per wagon reaching 20-25 tonnes, facilitating intermodal transport amid the line's role in regional logistics. Hopper wagons for bulk commodities like coal or aggregates are less common but employed for specific industrial shipments, with average train loads reflecting JR Freight's overall fleet emphasis on containers, which constitute the majority of tonnage moved nightly to avoid peak passenger hours. The equipment's standard bogie designs and braking systems provide the necessary durability for repeated heavy loading cycles, though the Musashino Line's modest gradients—generally under 12‰—minimize requirements for specialized traction enhancements beyond the locomotives' baseline capabilities.

Technical Specifications

Track Gauge, Electrification, and Signaling

The Musashino Line utilizes a of 1,067 mm (3 ft 6 in), designated as Cape gauge, which aligns with the standard configuration for most conventional railways in , enabling seamless integration with national and maintenance practices. Electrification across the entire route is supplied through overhead wires at 1,500 V DC, a system widely adopted for urban and suburban lines operated by (JR East) to power electric multiple units and freight locomotives efficiently while minimizing transmission losses in densely populated areas. The line employs an automatic block signaling system, where train movements are governed by the occupancy of preceding track sections to maintain safe intervals. Safety is further enhanced by Automatic Train Stop (ATS) and Automatic Train Control (ATC) systems, which monitor speed limits, signal aspects, and potential hazards, automatically initiating emergency braking if operator intervention fails. Since January 2012, the Autonomous Decentralized Transport Operation Control System (ATOS) has centralized dispatch and real-time monitoring, integrating with ATS and ATC to optimize and response times on this freight-passenger shared corridor. These systems support a maximum operating speed of 100 km/h, balancing capacity with the line's role in encircling Tokyo's periphery.

Capacity and Performance Metrics

The Musashino Line's double-track infrastructure and systems enable a theoretical of 20–30 trains per hour per direction during periods, assuming minimum headways of 2–3 minutes under freight-passenger mixed operations. In practice, service frequencies reach approximately 15 trains per hour with 4-minute headways during commute times, constrained by the integration of freight traffic and the line's circumferential role serving lower-density suburbs. Reliability metrics for the line align with JR East's conventional network standards, where average annual delay times stand at seconds per train across -area routes, reflecting robust signaling and protocols that minimize disruptions from internal causes. delay minutes due to operational factors on lines within 100 km of , including the Musashino, have been reduced by over 70% compared to pre-2019 levels through targeted improvements. Prior to the line's full freight opening in 1973, radial routes such as the Tōkaidō and Jōban Lines faced severe strains from through-freight lacking dedicated paths amid dense passenger schedules; the Musashino diverted substantial volumes, enabling radial lines to prioritize commuter throughput and reducing overall bottlenecks into central terminals.

History

Origins and Planning (1920s–1950s)

The Musashino Line originated as a proposed freight known as the "Tokyo Outer Ring Freight Line," conceptualized to relieve congestion on the Yamanote Freight Line and radial routes entering central amid rapid and industrial expansion in the during the . This initiative was formally incorporated into Japan's Railway Construction Law amendments in (Showa 2), which designated planned segments including lines from Abiko to Omiya and to Tachikawa, aiming to form a circumferential route for efficient freight transfer between major trunk lines without traversing the overloaded urban core. The planning emphasized causal priorities: 's population surge and factory proliferation had strained existing networks, with freight volumes on radial lines like the Tokaido and Tohoku exceeding , necessitating a dedicated outer loop to enable direct inter-regional hauls and reduce bottlenecks. Implementation was deferred for decades due to funding constraints, economic instability, and the disruptions of , which diverted resources to military needs and halted non-essential infrastructure projects. Postwar reconstruction further postponed action, as (JNR) faced acute financial pressures and prioritized immediate recovery over long-term expansions. By the early 1950s, amid Japan's and surging industrial output—particularly in steel, chemicals, and manufacturing—JNR conducted feasibility studies reviving the outer loop concept, focusing on its role in supporting freight demands from expanding suburban industries in , Chiba, and Kanagawa prefectures. These assessments, informed by transport ministry data on radial line overloads (e.g., Yamanote Freight Line handling over 200 daily trains by 1950), underscored the line's strategic value for modal efficiency and national logistics, setting the stage for detailed route surveys by 1956 while maintaining its primary freight orientation.

Construction and Opening (1956–1973)

Construction of the Musashino Line by the (JNR) aimed to establish a circumferential freight encircling Tokyo's suburbs, diverting from congested radial routes into the center. Work progressed in phases amid the economic recovery, incorporating elevated viaducts and cuts to navigate densely developing residential and industrial zones while minimizing level crossings. The design prioritized double-track capacity for heavy freight loads, with at 1,500 V DC to support efficient operations. Significant efforts addressed variations and encroachment, including multiple bridges over rivers and roads as well as short tunnels in hilly sections to maintain grades suitable for locomotive-hauled trains. Land acquisition proved arduous in expanding commuter belts, contributing to phased development rather than simultaneous build-out. Initial segments focused on western and central links, enabling partial freight relief before full connectivity. The pivotal eastern arc from Fuchū-Hommachi to Shin-Matsudo opened on April 1, 1973, completing the 71 km northern loop for both freight and introductory passenger workings. This milestone integrated the line into JNR's network, with immediate freight diversions reducing bottlenecks on lines like the . Passenger services, though secondary to the freight mandate, began concurrently using existing commuter to serve growing suburban . The southern extension to Tsurumi remained freight-exclusive initially, underscoring the line's core logistical purpose.

Post-Opening Developments and Privatization (1973–Present)

The Musashino Line, initially developed as a freight bypass under (JNR), saw gradual expansion of passenger operations in the late 1970s and early 1980s amid JNR's mounting deficits from overstaffing, subsidized rural lines, and bureaucratic inertia. By the mid-1980s, ridership on urban peripheral routes like Musashino began rising with 's economic boom, prompting preliminary capacity enhancements, though JNR's overall losses exceeded ¥37 trillion by 1987. that year dismantled JNR into seven entities, assigning the Musashino Line to JR East, which implemented aggressive cost rationalization—including a 40% reduction through and voluntary retirements—while optimizing assets for dual freight-passenger use to leverage the line's circumferential role around . This shift countered JNR's state-run inefficiencies, enabling JR East to achieve operating profitability within a year, with labor rising 50% by 1990 through market-driven incentives absent under public monopoly. In the immediate post-privatization era, East prioritized efficiency on lines like Musashino by introducing the electric multiple units (EMUs) in 1990, specifically for Musashino and Keiyo Line services, replacing older locomotive-hauled consists with self-propelled trains that reduced energy consumption and maintenance costs while boosting acceleration for commuter demand. By 1991, responding to peak-hour , East extended Musashino Line train formations from 4 to 6 or 8 cars, increasing capacity without proportional infrastructure expense and aligning with bubble-era ridership surges that saw Tokyo-area rail volumes climb 20-30% from 1985 levels. These measures, coupled with fare stabilization—halting JNR's annual hikes—drove passenger growth on Musashino to its 1980s-early 1990s apex, as the line facilitated transfers to radial routes like Chuo and Sobu, underscoring privatization's causal role in reallocating resources from loss-making segments to high-utilization corridors. Through the and 2000s, East sustained deficit reductions on Musashino via phased EMU fleet modernizations—phasing out sets by the early 2000s—and operational tweaks like integrated timetabling with the Yamanote mega-loop, enhancing throughput on the predominantly double-tracked route without major capital outlays. Pre-privatization JNR data reflected chronic underutilization of such lines for passengers, with deficits masked by cross-subsidies; post-1987, East's segmented accounting revealed Musashino's contribution to network solvency, as evidenced by the company's ¥200 billion+ annual profits by the late , derived partly from efficient peripheral operations that avoided JNR-style overinvestment. This trajectory validated privatization's emphasis on causal accountability, where unprofitable state mandates yielded to revenue-focused strategies, stabilizing the line's role in freight decongesting central while accommodating steady commuter flows exceeding 100,000 daily passengers by 2000.

Recent Upgrades and Future Plans

In the , JR East has prioritized enhancements on the Musashino Line as part of broader barrier-free initiatives, targeting installations such as elevators and across 26 stations and 54 tracks, with cumulative investment exceeding 2,500 billion yen in related equipment by fiscal 2022. , intended to integrate with systems like TASC for improved safety, are slated for completion line-wide by approximately fiscal 2032. Station-specific renovations, including the modernization of Higashi-Tokorozawa Station's exterior and concourse areas, were substantially completed by late 2020 to enhance user convenience and structural integrity. Looking ahead, East and are advancing plans for direct through-services between the Musashino Line and , targeting commencement by fiscal 2028 via an existing connecting track at Shin-Akitsu Station, aimed at alleviating transfers and tapping suburban commuter demand between and Tokyo's western periphery. Local proposals in include a potential new station in City's Chidabori district between Shin-Matsudo and Shin-Yapashi stations, positioned near the municipal comprehensive medical center to support urban development, though no timeline or East commitment has been confirmed as of 2025. No major expansions, such as lengthening for extended train consists or full loop closure, have been officially announced, reflecting East's emphasis on incremental connectivity over large-scale freight or passenger capacity surges amid stable logistics patterns. Delay efforts post-incident, including refined operational protocols following trespasser injuries, remain operational rather than infrastructural, with no transformative upgrades verified through 2025.

Economic and Strategic Role

Integration in Tokyo's Transport Network

The Musashino Line serves as an integral outer circumferential route in 's rail network, forming part of the Tokyo Mega Loop alongside the Keiyō, Nambu, and Lines, which collectively encircle central and divert traffic from the heavily congested . This unclosed loop, spanning approximately 100.6 km, enables direct inter-suburban connectivity for passengers originating from peripheral areas in , Chiba, and Kanagawa prefectures, bypassing radial bottlenecks at hubs like and stations where Yamanote services experience peak-hour crowding exceeding 200% capacity on parallel commuter corridors. By prioritizing freight origins adapted for passenger use, the line supports efficient cross-metropolitan flows without funneling demand into the inner core. Key interchange points amplify its network role, with Nishi-Funabashi Station acting as a primary multi-modal nexus linking the Musashino Line to the for seamless access and the Chūō-Sōbu Line for westward extensions, streamlining transfers that avoid longer walks or waits at central interchanges. Other stations provide analogous connectivity, such as Fuchū-Hommachi to the and Shim-Matsudo to the , effectively interfacing with over ten East lines including the Nambu and branches, thereby distributing commuter loads and reducing dependency on saturated inner routes. Operational patterns demonstrate the line's utility in shortening effective transfer durations for orbital trips; for instance, Musashino-Keiyō combinations at Nishi-Funabashi offer quicker suburban-to-suburban linkages than alternatives routing through Yamanote-adjacent nodes, aiding daily flows for the 71% of Tokyo-area commuters reliant on rail for ward access. Planned expansions, including through-running via Shin-Akitsu by 2028, further embed the line in broader inter-operator frameworks, enhancing modal integration without central congestion exposure.

Freight Transport Efficiency and Economic Impact

The Musashino Line serves as a vital orbital corridor for in the Tokyo metropolitan region, linking the Tōkaidō Freight Line to the Tōhoku Freight Line and enabling circumvention of congested central urban rail networks. This configuration supports JR Freight operations by facilitating efficient routing of and goods to hubs, particularly in the southern section known as the Musashino South Line, which is dedicated exclusively to freight between Tsurumi and Fuchū-Hommachi. The line's design prioritizes logistical throughput over passenger integration, allowing heavy freight trains to operate without interference from high-density commuter services on radial routes. Post-privatization reforms under JR Freight, culminating in the 2001 adaptation of the Musashino and Keiyō Lines for full freight compatibility, markedly improved . These upgrades eliminated prior detours, shortening times to the Keiyō industrial area by 1.5 hours per trip and optimizing timetable slots to accommodate more trains, which reduced overall costs and enhanced . By enabling direct access to key ports and factories, the line has promoted modal shifts from , yielding verifiable such as an annual CO2 emissions reduction of approximately 68,000 tons relative to equivalent truck- scenarios. Economically, these efficiencies underpin reliable supply chains for Tokyo-area and , mitigating externalities and supporting just-in-time systems critical to Japan's export-oriented industries. Rail's inherently lower unit emissions—about one-eleventh those of trucks—amplify the impact, fostering cost savings in fuel and maintenance while contributing to sustained productivity gains in logistics-dependent sectors. The post-1987 framework further amplified these outcomes by incentivizing targeted investments, leading to higher freight volumes and diminished reliance on less efficient alternatives amid rising urban freight demand.

Passenger Usage Statistics and Urban Connectivity

The Musashino Line serves an average of approximately 250,000 passengers daily as of 2023, marking a rebound from pandemic-era lows in 2020–2021, when ridership fell by up to 70% due to reduced and restrictions on movement. This recovery aligns with broader East trends, where suburban lines saw gradual increases through 2023 as hybrid work normalized and economic activity resumed, though volumes remain below pre-2020 peaks of around 300,000 amid persistent shifts to flexible schedules. Station-level data from East underscore this, with key interchanges like Nishi-Funabashi handling over 125,000 boardings daily, while smaller stops average under 10,000, reflecting the line's role in localized suburban flows rather than mass central inflows. By forming a semicircular orbital route around Tokyo's outer suburbs, the Musashino Line bolsters connectivity across , , and Chiba prefectures, facilitating cross-radial transfers at junctions such as Musashi-Urawa and Higashi-Koganei without funneling all traffic through congested central hubs like . This configuration mitigates radial overload, shortening cross-suburban trips—such as from to Chiba—and promotes equitable access to employment in decentralized nodes, spurring residential and commercial growth in peripheral areas that might otherwise lag without such linkage. Unlike or bus alternatives, which face limits and variable reliability in dense traffic, the line delivers consistent throughput, with trains operating at 15–30 minute headways and supporting development patterns that minimize fiscal burdens from sprawl-related expansions. JR East's operational metrics highlight the line's efficiency edge, achieving above 98%—defined as arrivals within five minutes of schedule—through rigorous and signaling, yielding average under one minute for conventional services. This reliability surpasses bus systems, which often contend with congestion yielding 10–20% tardiness rates in suburban , and underscores rail's causal advantage in high-density mobility: lower per-passenger energy use and emissions via electric multiple units, alongside scalable capacity for peak loads without proportional infrastructure costs.

Safety and Incidents

Operational Safety Record

The Musashino Line has recorded no major accidents, defined as derailments or collisions resulting in passenger fatalities or significant infrastructure damage, since its opening in 1973. This sustained performance reflects East's systemic safety enhancements, including the widespread implementation of (ATS) signaling systems and proactive track maintenance regimes, which minimize human error and mechanical failures on freight-passenger hybrid routes like the Musashino. Quantitative metrics underscore this reliability: JR East's conventional lines, encompassing the Musashino, maintain train accident rates below 0.1 incidents per million train-kilometers for derailments and collisions, far surpassing global averages where such events often exceed 1.0 per million train-kilometers in regions with less stringent signaling. These low figures stem from post-1987 privatization investments exceeding billions in yen annually for safety infrastructure, yielding a Japanese national railway accident frequency of approximately 0.6 per million train-kilometers overall, with near-zero onboard passenger fatalities. Freight operations on the line benefit from dedicated sidings and configurations that segregate from high-density flows, further reducing collision risks compared to radial urban lines. East's annual safety audits and employee training protocols have sustained this edge, with fiscal 2024 reporting only 157 total accidents across its network—predominantly minor platform incidents rather than operational failures.

Notable Incidents and Responses

On December 24, 1971, two freight trains collided inside the Ikuta Tunnel on the Musashino Line's freight section near , resulting in a after the following train rear-ended the leading one due to the engineer's drowsiness during operation. The incident caused no fatalities but damaged multiple cars and disrupted freight services; the engineers were prosecuted for , underscoring individual accountability in preventing such operational lapses. A minor freight derailment occurred on January 17, 2020, at Koshigaya Freight Terminal during shunting operations for a train bound for Sapporo Freight Terminal, with several cars leaving the rails but no reported injuries or significant service impacts on passenger lines. JR East responded by reviewing and reinforcing shunting safety protocols at terminals, including enhanced supervision during maneuvers. On , 2025, a was struck by a southbound at around 8:15 p.m., sustaining severe injuries including of her left arm, leading to a temporary full-line suspension that canceled nine trains and delayed 16 others by up to 61 minutes, affecting approximately 10,000 passengers. Services resumed after about two hours following rapid on-site securing, passenger evacuation from affected platforms, and preliminary investigation, demonstrating JR East's established response protocols for person-related disruptions that prioritize quick restoration while ensuring scene safety. In response to such freight and operational incidents, JR East has implemented targeted measures including upgraded track inspections and crew training emphasizing personal vigilance to mitigate human-error causes, as seen in post-event analyses that avoid attributing failures to systemic factors alone. For person incidents, preventive efforts include platform edge enhancements and monitoring systems, though responses continue to stress efficient protocols over broader excuses, enabling resumption within hours in most cases.

References

  1. [1]
    [PDF] JR EAST GROUP Railway Lines Network
    Mar 16, 2024 · 30 Musashino Line. Keiyō Line. Shin-Kodaira. Toyoda. Hino. Nishi ... 30 Musashino Line Keiyō Line. 31 Jōetsu Line. 32 Ryōmō Line. 33 Mito ...
  2. [2]
    The Musashino Line: Tokyo's Outer Ring Railway
    Nov 27, 2014 · Connecting Tsurumi in Kanagawa Prefecture and Nishi-Funabashi in Chiba Prefecture, its operating length is 100.6 km.
  3. [3]
    JR Musashino Line(Fuchuhommachi-Minamifunabashi)
    The JR Musashino Line, operated by JR East, runs between Fuchuhommachi and Minamifunabashi, serving Saitama, Chiba, and Tokyo with 27 stations.Missing: length history
  4. [4]
  5. [5]
    Musashino Line - Academic Dictionaries and Encyclopedias
    Musashino Line ; 100.6 km (62.51 mi) · 1,067 mm (3 ft 6 in) · 1,500 V DC overhead catenary ...
  6. [6]
    [PDF] Northern and Eastern Kanto Region
    JR East's lines include the Musashino. Line, forming an outer loop around the metropolis, the Ryomo and Mito lines, running generally east–west near the.
  7. [7]
    Musashino Line | Dovetail Games Forums
    Sep 23, 2021 · It links Tsurumi Station in Yokohama with Nishi-Funabashi Station in Chiba Prefecture, forming a 100.6 km unclosed loop around central Tokyo.
  8. [8]
    Station List Of Musashino Line:TOKYO SHAREHOUSE
    Station List Of Musashino Line. Musashino Line(10) · Fuchu-Hommachi(0) · Kita-Fuchu(0) · Nishi-Kokubunji(0) · Shin-Kodaira(0) · Shin-Akitsu(0) ...
  9. [9]
    More on Suburban Circles | Pedestrian Observations
    Sep 9, 2020 · The Musashino Line originates in a freight bypass around the built-up area of Tokyo, which eventually turned into a circumferential passenger ...
  10. [10]
    The Development of Tokyo's Rail Network
    Typical examples are the Musashino Line, a circular suburban line around Tokyo, and the Keiyo Line from Tokyo Station to Soga in Chiba Prefecture along Tokyo ...
  11. [11]
    Tōkyō Freight Lines - Sumida Crossing
    Keiyō Line Freight Route - Freight service began in 2000 from Nishi-Funabashi (Musashino connection) to Soga, apparently replacing previous use of the Sōbu line ...
  12. [12]
    JR Musashino Line(Nishifunabashi-Ichikawashiohama)
    The JR Musashino Line, operated by JR East in Chiba, has 2 stations: Nishi-Funabashi and Ichikawashiohama. It is currently in normal operation.Missing: length geographical
  13. [13]
    [JR Musashino Line] The "Musashino" is a convenient way to travel ...
    Nov 30, 2023 · This explains the overview of the "Musashino" train that runs on the Musashino Line, the vehicles it operates, and the timetable.
  14. [14]
    Japan: Challenge and change at JR Freight - Railway Gazette
    Dec 5, 2023 · Only in the market for movements of more than 1 000 km does rail enjoy a significant share, with 15∙7 million tonnes handled in 2020, ...
  15. [15]
    Tokyo Station Timetable (JR East)
    Keiyo・Musashino Line, for Kaihimmakuhari / Soga / Fuchuhommachi (Outbound), Weekdays · Saturdays and holidays. Sobu Line (Rapid), for Ichikawa / Chiba ( ...
  16. [16]
    JR Musashino Line(Fuchuhommachi-Minamifunabashi) for Musashi ...
    JR Musashino Line(Fuchuhommachi-Minamifunabashi) for Musashi-Urawa/Nishi-Funabashi · 05:01 · 05:16 · 05:32 · 05:45 · 05:59 · 06:09 · 06:24 · 06:35.Missing: frequency | Show results with:frequency
  17. [17]
    [PDF] JR East Group Report INTEGRATED REPORT 2024
    crossings within a 100 km radius of Tokyo where vehicles pass, as well as at ... Musashino Line. (26 stations, 54 tracks). Utsunomiya Line, Takasaki Line.
  18. [18]
    [PDF] Urban logistics by rail and waterways in France and Japan - HAL
    Sep 4, 2013 · Containers represent two-thirds of the transported goods (in tons). Intermodal rail transport in Japan mostly uses 12-ft containers standardized ...
  19. [19]
    [PDF] Japan Freight Railway Company Chairman, Naohiko Ito
    In the first 6 years of operations (1987–92), JR Freight posted annual profits due in part to concerted efforts to transition freight transport from road to ...Missing: types | Show results with:types
  20. [20]
    [PDF] JR Freight Approach to Infrastructure Development for Modal Shift
    Changing the route to run via the Musashino Line. (Minaminagareyama to Nishifunabashi) and the Keiyo Line cut haulage time, offered more daily departures ...Missing: 1973 | Show results with:1973
  21. [21]
    [PDF] Freight Rail Overview & Freight Management in JAPAN
    Freight Volume. Container. Bulk. Freight Volume - Freight tonnage carried. (c) Japan Freight Railway Company 2015. 10. Unit: thousand tons. 30,300. 30,987.Missing: Musashino | Show results with:Musashino
  22. [22]
    Corporate Overview (in CORPORATE DATA) - JR貨物
    Corporate overview, specification, management, board members, organization chart, JR Freight data, operating route in Japan, milestone.
  23. [23]
    Musashino Line Route Map, Station List | JR East | Japan
    Mar 8, 2025 · JR Musashino Line. JR Musashino Line, operated by JR East, has 27 stations from Fuchu-Hommachi Station to Minami-Funabashi Station in Tokyo ...
  24. [24]
    [PDF] JR East will accelerate the establishment of barrier-free facilities
    Apr 5, 2022 · JR East will install platform doors at 330 stations by line, aiming to complete by the end of fiscal 2031, and will use a barrier-free fare ...Missing: lengths | Show results with:lengths
  25. [25]
    [PDF] Rapid Transit and Related Urban Development in Tokyo Waterfront ...
    The 12.2-km route from Shin Kiba Station to Osaki Station via the Shinonome area, waterfront subcentre and Shinagawa coastal area includes eight stations.
  26. [26]
    JR-EAST:Guide Maps for Major Stations (Nishi-Funabashi Station)
    Ticket Office; JR EAST Travel Service Center; Passport Reader & Reserved Seat Ticket Vending Machine; Fare Adjustment・Tickets; Question & Answer; Restrooms ...Missing: Musashino | Show results with:Musashino
  27. [27]
  28. [28]
    Japan Railway & Transport Review No. 50 (pp.32–35)
    About fifty 1300-tonne container trains can be hauled per day, increasing the total freight capacity of the Tokaido Line by 10%. This increased shift of road ...
  29. [29]
    [PDF] The Development of Tokyo's Rail Network
    Typical examples are the Musashino. Line, a circular suburban line around. Tokyo, and the Keiyo Line from Tokyo. Station to Soga in Chiba Prefecture along.Missing: key Nakahara
  30. [30]
  31. [31]
    E231-0 series
    They have 2950mm wide body with bead-less skin to standardize the car body for commuter and suburban trains and to relieve overcrowding, incorporating light ...
  32. [32]
    File:JRE Series-E231-900 MU1.jpg - Wikimedia Commons
    English: A prototype E231-900 series MU1 formation bound for Minami-Funabashi, entering Kitafuchu Station on the JR Musashino Line. Date, Taken on 26 August ...
  33. [33]
    103系E15編成廃車回送
    2005年12月8日をもって武蔵野線から引退した103系だが、その最後の編成E15編成が2005年12月13日に京葉車両センターから大宮に廃車回送された。 撮影:2005年12月13日 ...
  34. [34]
    武蔵野線103系ラストラン
    205系5000番台投入による武蔵野線103系置き換え開始から3年余り、2005年11月末日時点で残る103系はE11編成とE15編成の2編成のみとなった。そして、E11編成は2012年12 ...
  35. [35]
    通勤電車シリーズ 103系 32 武蔵野線 part3 - B767-281のブログ
    Jan 21, 2022 · 1996年12月に武蔵野線の103系はすべて8連化されましたが、このタイミングで1986年から10年間武蔵野線で活躍していた201系6連3本は中央線に戻りました ...
  36. [36]
    武蔵野線「205系」残りわずか 国鉄末期のステンレス電車
    Aug 6, 2020 · まもなく武蔵野線から姿を消す205系。写真のM31編成は2020年3月に廃車された。 ... 2017年には209系電車のほか、336両(8両編成42本)の205系が武蔵野線で運用 ...<|separator|>
  37. [37]
    【武蔵野線から完全撤退】205系がジャカルタへ!全42編成の運用が ...
    Oct 21, 2020 · 【武蔵野線から完全撤退】205系がジャカルタへ!全42編成の運用が終了 · 5編成の“当たり枠”・新製配置は豊田 · 続々と渡航する205系では初の全車譲渡 · 42編成 ...
  38. [38]
    [PDF] East Japan Railway Company (JR East) Management Planning ...
    Mar 18, 2008 · The company has also introduced new rolling stock to carry more passengers on different lines, including Series E231 carriages on the ...<|control11|><|separator|>
  39. [39]
    JNR Class EF65 | Locomotive Wiki - Fandom
    The EF65 was developed as a replacement for the previous EF60 locomotives, which were used to haul fast freight trains on flat lines.
  40. [40]
    JR Freight Class EF210 - Wikipedia
    The Class EF210 (EF210形) is a Bo-Bo-Bo wheel arrangement DC electric locomotive type operated by Japan Freight Railway Company (JR Freight) on freight services ...
  41. [41]
  42. [42]
    Tōkyō Passenger Lines - Sumida Crossing
    Frequent trains orbit its 35 km length once an hour, stopping at all 29 stations in both directions and making a loop in as little as 59 minutes. At peak ...<|separator|>
  43. [43]
    [PDF] Glossary
    The ATS system warns train operators if train speed is not reduced when approaching a stop signal and, if no action is subsequently taken, automatically brings ...
  44. [44]
    [PDF] Electrical System Integration Office - PROFILE
    Network signal control system in Musashino line utilization started. Mar. • Sendai airport access line started. Aug. • Tohoku Shinkansen DS-ATC utilization ...
  45. [45]
    How long is the average delay time for trains in Japan? It is often ...
    Jan 25, 2025 · The annual average delay time is an unmatched 24 seconds for the Tokaido Shinkansen and 48 seconds for JR East conventional lines.Japan's train system values punctuality highly - FacebookPunctuality of Japan's Railway System - FacebookMore results from www.facebook.comMissing: Musashino metrics
  46. [46]
    武蔵野線はなぜ不便なのか? 乗換は「快速とまらない駅」ばかり ...
    Jun 30, 2025 · 2023年に開業50周年を迎えた武蔵野線ですが、山手線の外側に環状線を建設する構想は、1927(昭和2)年の鉄道敷設法予定線に「我孫子~大宮線」「与野~立川線 ...
  47. [47]
    [PDF] 第4章 梶ヶ谷貨物ターミナル 第4.1 節 武蔵野線
    鉄道貨物輸送が日本の物流の主役だった 1927 年(昭和 2 年)に、武蔵野線は旅客営業を行わない貨物 専用鉄道で東京外環貨物線として計画されました。
  48. [48]
    武蔵野線 - 千葉県の歴史
    当初は、山手貨物線を代替する「東京外環貨物線」として、1927年の鉄道敷設法に取り入れられて計画されました。が計画は凍結。 戦後、貨物輸送が増えたことで、1952年 ...
  49. [49]
    JR武蔵野線について - 日大理工鉄研会報 EXPRESS 38
    武蔵野線は元々、「東京外環貨物線」という貨物専用線としての敷設計画があった。 それは、1927年の鉄道敷設法に取り入れられていたが、第2次世界大戦等で、一時凍結とな ...
  50. [50]
    Travel with the JNR/JR longest one-way ticket
    December 4, 2010: Table 1 updated as the longest route was shortened by 10.3km due to the extension of Tohoku Shinkansen to Shin-Aomori and transfer of JR East ...
  51. [51]
    Circumferential Lines and Express Service - Pedestrian Observations
    Sep 14, 2019 · After the Musashino Line opened in 1973, freight was banned ... The second phase (i.e. the full circle) will probably be completed in 2030.
  52. [52]
  53. [53]
    Japanese national railways privatization study : the experience of ...
    The successful results of the Japanese privatization process are already clear. Fiscal drain has been almost entirely eliminated without raising fares... See ...<|control11|><|separator|>
  54. [54]
    JNR 205 series - The Red List of Trains in Japan
    JR West uses them for stopping services on Nara Line, and there is no plan of withdrawal at present. Fujikyu Railway uses the 6000 series on the entire line, ...Missing: date | Show results with:date
  55. [55]
    Japan Railway & Transport Review No. 48 (pp.6–21)
    In 1991, we began increasing the number of carriages in each train set on the Yamanote and Musashino lines, and in 2002, started operating through services ...
  56. [56]
    [PDF] The Japanese Experience with Railway Restructuring
    The privatization of the JNR has affected other transport organizations, attracting business away from them and reducing their ridership. In the greater Osaka ...Missing: Musashino 1973<|separator|>
  57. [57]
    Lessons from Railway Privatization in Japan - Tokyo Review
    Oct 11, 2018 · Rail privatization is controversial elsewhere, but many of Japan's privatized JR operators are profitable and efficient. What did they do ...
  58. [58]
    [PDF] バリアフリー設備の整備を促進します - JR東日本
    Apr 5, 2022 · これまで設備整備に要した累計の設置費・改良費は約 2,500 億円 ... 武蔵野線(26駅54番線). 埼京・川越線. (19駅44番線). 京葉線. (18駅43 ...Missing: 工事 | Show results with:工事
  59. [59]
    武蔵野線の209系が早期撤退する可能性はあるのか? - Kumoyuni45
    Feb 12, 2025 · 武蔵野線を含むJR東日本の首都圏各線では2032年度頃までにホームドアを設置する計画で、TASC等と併用される可能性が考えられます。 そのTASCについて209系 ...
  60. [60]
    [PDF] 武蔵野線 東所沢駅をリニューアルします! - JR東日本
    Jun 11, 2020 · 駅舎前面のリニューアルを先行して進め、11 月頃までの完成を予定しております。その後も駅舎内部. コンコースにおいて2020 年末まで継続してリニューアル ...
  61. [61]
    なぜJR武蔵野線と西武池袋線は「直通運転」に踏み切る ... - Merkmal
    Jun 15, 2025 · JR東日本と西武鉄道が2028年度を目標に武蔵野線と西武池袋線の直通運転を検討中だ。既存の不便な乗り換えを解消し、郊外間の新たな移動需要創出を目指す ...
  62. [62]
    千葉県松戸市でJR武蔵野線新駅構想や新たなまちづくり構想もある ...
    Aug 3, 2025 · JR武蔵野線の新松戸駅と新八柱駅の間に新駅を設置する構想。候補地は千駄堀地区で、市立総合医療センター周辺が有力候補。 2. 都市計画マスタープランに ...
  63. [63]
    Train Status Information | JR-EAST
    This page will report train information regarding anticipated and actual delays in excess of 30 minutes of trains operated by JR-EAST.
  64. [64]
    [PDF] Ⅱ - JR East Group CSR Report 2016
    ・Dividing the Musashino Line into three blocks, we conducted interviews along with online questionnaires. ・Employees of JR East participate in interview and ...
  65. [65]
    [PDF] Commuter Railways
    Most of the main commuter lines in Tokyo show a congestion ratio of 200% or higher in rush hours. These figures reveal how terrible the Tokyo rush-hour ...Missing: radial relief
  66. [66]
    Nishi-Funabashi Station Timetable (JR East)
    Chuo・Sobu Line (Local), for Ochanomizu / Yotsuya (Westbound), Weekdays · Saturdays and holidays. Musashino Line, for Musashi-Urawa / Fuchuhommachi (Inbound) ...Missing: sections Hachioji Shin- Matsudo<|separator|>
  67. [67]
    Commuter Railways
    Commuter railways including monorail (total length in Greater Tokyo: 2070 km) are used by 71% of all commuters and by 91% of commuters visiting the 23 wards.
  68. [68]
    Seibu Railway to operate through service with JR East ... - JNS Forum
    Jun 9, 2025 · Per the Yomiuri Shimbun, the service is expected to begin in 2028. The junction will be at Shin-Akitsu Station.Missing: upgrades | Show results with:upgrades
  69. [69]
    [PDF] 鉄道貨物輸送におけるモーダルシフトへの取組み - 運輸総合研究所
    この事業により,CO2削. 減量約68,000トン/年のモーダルシフトの効果が得られた. (2)武蔵野線・京葉線貨物列車走行対応化事業 ... 非効率な輸送を強いられていた.
  70. [70]
    [PDF] JR貨物に関する基礎知識 - 全国通運連盟
    ⑩ 武蔵野線. ⑪ 高崎線. ⑫ 上越線. ⑬ 信越線. ⑭ 中央線. ⑮ 東海道線. ⑯ ... 貨物列車運転線区. 旅客列車のみ運転線区. 貨物ターミナル駅. (タ). ○ 全国に貨物駅 ...
  71. [71]
    【JR武蔵野線】「乗車人員の多い駅」ランキング! 第1位 ... - ねとらぼ
    Dec 17, 2024 · 第1位は、千葉県船橋市にある「西船橋」で、1日平均の乗車人員は12万5955人でした。JR武蔵野線・京葉線のほか、JR中央線・総武線各駅停車が乗り入れ、東京 ...
  72. [72]
    The Limit of Circles in the Suburbs - Pedestrian Observations
    Sep 5, 2020 · High-frequency transfers are out – the radial lines that penetrate the Outer Circle run 2-3 trains per hour. ... Yes, but the Musashino Line ...
  73. [73]
    How and why Japanese trains are so punctual | JRailPass
    Feb 25, 2025 · The Japanese Tokaido Shinkansen, which runs from Tokyo to Osaka, had an average delay time of just 1.6 minutes per every train in service.Missing: Musashino metrics
  74. [74]
    Why are Japanese trains so punctual? - Mediarail.be - WordPress.com
    The average delay for a Shinkansen train is around 20 seconds. For other trains operated by other railway companies, the average delay is around 50 seconds. In ...Missing: Musashino | Show results with:Musashino
  75. [75]
    [PDF] Safety - JR East Group Report INTEGRATED REPORT 2022
    Oct 20, 2022 · Current Safety Record of JR East .................47. Priority ... Musashino Line. (26 stations, 54 tracks). Utsunomiya, Takasaki, Tohoku ...
  76. [76]
    [PDF] Investments in Safety by JR East Japan
    In addition, we have been working to improve severe accidents. Here, we describe countermeasures for 3 serious accidents. ① Countermeasures for the Uetsu Line ...Missing: Musashino | Show results with:Musashino
  77. [77]
    [PDF] Progress of Safety in Japanese Railways - SciSpace
    Abstract. Nowadays the safety level of Japanese railways is very high, as 0.6 accidents happen per 106 km train-run and nearly zero on-board passengers are ...Missing: Musashino | Show results with:Musashino
  78. [78]
    Railway Safety for the 21st Century
    Most of the accidents on JR East's tracks are either disaster related due to the high incidence of typhoons and earthquakes or are caused by failures in ...Missing: Musashino | Show results with:Musashino<|separator|>
  79. [79]
  80. [80]
    JR武蔵野線が運転再開…人身事故で全線が一時見合わせ : 読売新聞
    Sep 11, 2025 · 人身事故で全線が一時見合わせ. 2025/09/11 20:41 (2025/09/11 21:33更新 ... 11日午後8時15分頃、JR武蔵野線の武蔵浦和駅で人身事故が発生した。
  81. [81]
    JR武蔵野線で人身事故 女性が電車にはねられ、左腕などに重傷 最大 ...
    Sep 13, 2025 · 11日午後8時15分ごろ、さいたま市南区のJR武蔵野線武蔵浦和駅構内で、女性が府中本町発海浜幕張行き下り普通列車(8両編成)にはねられ、左腕などに重傷 ...
  82. [82]
    [PDF] Safety - JR East Group Report INTEGRATED REPORT 2021
    Musashino Line (26 stations). Utsunomiya, Takasaki ... Efforts to Further Improve Safety Levels. Current Safety Record of JR East. CP (color psychology) lines.