SRT Light Red Line

The SRT Light Red Line, officially designated as the Nakhon Withi Line, is a 15-kilometer electrified route in , , operated by SRT Electric Train Company Limited, a subsidiary of the (SRT). It connects in the east to Taling Chan in the west, serving as the western segment of the broader mass transit system aimed at suburban rail connectivity in the . Commercial operations on the Light Red Line began following trial runs in August 2021, with trains providing service from early morning to midnight at intervals of 20 to 30 minutes, facilitating transfers to the MRT Blue Line, , and future at the central terminal. The line utilizes upgraded existing tracks with modern signaling and Japanese-sourced , marking SRT's initial foray into electric suburban rail to address chronic traffic issues in Thailand's capital. Despite delays in the overall Red Lines project, which originated in planning phases over a decade prior, the Light Red Line's implementation has contributed to integrated transit options, though extensions remain under consideration to resolve overlapping routes and expand westward toward Nakhon Pathom.

System Overview

Route Description

The SRT Light Red Line comprises a 15 km double-track alignment extending westward from in to Taling Chan station in Taling Chan district, utilizing the existing corridor of the State Railway of Thailand's Southern Main Line to serve commuters in northwestern and western suburbs. The route incorporates four stations and operates entirely at grade without bridging the or other major waterways, focusing on urban and peri-urban connectivity along established rail paths. Key integration occurs at Krung Thep Aphiwat Central Terminal, where passengers can transfer to the MRT Blue Line for subway access and to the for northern extensions, enhancing links within Bangkok's multimodal transport system. At Taling Chan, the line junctions with additional SRT Southern Line services, supporting onward travel.

Technical Specifications

The SRT Light Red Line employs metre gauge tracks with a width of 1,000 mm, aligned with the State Railway of Thailand's legacy mainline infrastructure to facilitate reuse and interoperability. This gauge supports dual-track configuration along the 15 km elevated route from Krung Thep Aphiwat Central Terminal to Taling Chan. Electrification utilizes a 25 kV 50 Hz AC overhead catenary system with autotransformer feeding, implemented as part of the post-2010s upgrades to replace original diesel propulsion plans and enable higher efficiency and capacity. The setup includes dedicated substations and autotransformer posts tailored for the Light Red segment, ensuring stable power distribution compatible with regional grid connections. Signaling integrates with the Red Line's centralized train control at Bang Sue Grand Station, incorporating safety interlocks and automatic train protection to meet reliability standards. Track design accommodates axle loads of up to 20 tons, upgraded from prior 15-ton limits to throughput and occasional freight without compromising structural . System capacity targets peak headways of 3 minutes, supporting average speeds around 120 km/h and maximum operational speeds of 160 km/h under electrified conditions. These parameters prioritize causal factors such as power delivery consistency and track loading for sustained reliability in high-density urban commuting.

Historical Development

Planning and Approval

The SRT Light Red Line emerged from mid-2000s proposals by the State Railway of Thailand (SRT) to revitalize commuter rail services, forming part of a broader suburban railway network intended to mitigate Bangkok's intensifying traffic congestion. During the 2000s, the city's unchecked urban expansion and rising vehicle ownership exacerbated gridlock, with residents averaging over eight days annually lost to delays, prompting integration of rail projects into national mass transit frameworks like the evolving Mass Rapid Transit Master Plan. On May 22, 2007, the Thai Cabinet authorized the core Red Line Mass Transit project—encompassing the –Bang Sue–Taling Chan trunk with provisions for branching extensions such as the Light Red Line (Bang Sue–Phaya Thai–Makkasan–Hua Mak)—allocating 13.133 billion baht from the national budget for initial development. This approval reflected prioritization of over further expansions, amid empirical data on costs exceeding billions of baht yearly, though detailed independent feasibility studies were subordinated to executive directives. Project specifications evolved from initial (DMU) concepts—rooted in SRT's existing fleet—to full for enhanced efficiency and reduced emissions, a decision driven by emphasis on modern standards rather than exhaustive public cost-benefit analyses comparing operational expenses, infrastructure demands, and long-term viability. This shift aligned with Thailand's transport ministry goals for sustainable commuter systems but overlooked granular economic modeling, favoring accelerated state-led implementation.

Construction and Initial Trials

Construction of the SRT Light Red Line, a 15.2 km metre-gauge commuter route from Bang Sue to Taling Chan, formed part of the broader Red Line suburban rail initiative and commenced in January 2009. The project entailed erecting elevated viaducts for much of the alignment to segregate commuter traffic from intercity and freight operations on the existing (SRT) network, alongside constructing five stations and associated facilities. Delays in site clearance, including negotiations with informal settlements, pushed substantive progress into 2010, but core infrastructure—including tracks, signals, and station platforms—was completed by mid-2012, paving the way for testing. Diesel-powered trial operations launched on September 8, 2012, utilizing SRT's existing fleet of railcars to evaluate system performance under commuter loads. Services operated on a restricted schedule of 12 trains daily (six per direction), focusing on reliability, braking distances, and passenger flow at newly built stations like Bang Son and Phra Nakhon Nuea. These trials exposed hurdles with legacy infrastructure, such as incompatible signaling interfaces on connecting at-grade segments and the need for platform modifications to accommodate shorter train consists alongside longer intercity services. Testing persisted through 2013 into early 2014, logging operational data on efficiency and track wear, which informed subsequent plans. Peak trial frequencies reached every 30 minutes during off-peak hours, but persistent issues with coordinating slots amid SRT's freight priorities underscored the limitations of operations on a new-legacy .

Suspension and Delays

Trial operations on the SRT Light Red Line, a 15 km at-grade diesel commuter route from Bang Sue to Taling Chan, commenced in September 2012 following construction completion under a grant. Services were suspended effective January 13, 2014, primarily due to inadequate availability, persistent safety risks from over 40 ungated level crossings that impeded reliable scheduling, and trial ridership figures falling short of projections amid incomplete network integration. Funding constraints exacerbated these issues, as the (SRT) deferred procurement of additional diesel multiple units (DMUs) necessary for sustained operations. The line remained idle through 2020, reflecting SRT's broader financial distress, including accumulated debts surpassing 140 billion baht by 2019 and annual operating losses averaging over 4 billion baht, which prioritized debt servicing over investments. Government resources instead favored parallel expansions of the and systems, which offered higher projected returns and faced fewer institutional hurdles within SRT's mandate. This bureaucratic reallocation stemmed from SRT's status as a loss-making state enterprise, reliant on ad-hoc subsidies that proved insufficient for non-electrified lines like the Light Red. The suspension incurred tangible opportunity costs, as commuters defaulted to roadways, intensifying Bangkok's ; congestion-related time losses equated to approximately 60 million baht daily in foregone during peak years of delay. Marginal delay costs per vehicle reached 646 baht in conditions, underscoring how deferred activation perpetuated dependency and elevated inefficiencies. These empirical impacts highlighted systemic failures in aligning infrastructure readiness with operational funding, prolonging reliance on an overburdened highway network.

Electrification and 2021 Launch

The of the SRT Light Red Line involved the of a 25 kV AC overhead system along the 15 km route from Bang Sue to Taling Chan, completed in late 2020 to support (EMU) operations and replace prior diesel-hauled services. This upgrade, integrated into the broader Red Line project, enhanced and reduced emissions while enabling higher train frequencies. The electrical and mechanical (E&M) systems contract, valued at 32.4 billion baht, encompassed signaling, power supply, and track upgrades essential for standards. Operation of the electrified line transferred to SRT Electrified Train Co., Ltd. (SRTET), a (SRT) subsidiary established to manage electrified commuter routes, ensuring specialized oversight for maintenance and service delivery. Trial operations launched on August 2, 2021, with free public rides to test system integration and reliability, following delays from initial 2020 targets. Full commercial service initiated on November 29, 2021, with fares ranging from 12 to 42 baht based on distance. Post-launch, the electrified setup demonstrated initial reliability through EMU deployments, achieving seamless connectivity to SRT's national network at Bang Sue Grand Station and supporting peak-hour headways of 10-15 minutes. The transition to electric operations minimized mechanical failures associated with diesel units, though early data emphasized stability over ridership metrics.

Infrastructure and Equipment

Stations and Facilities

The SRT Light Red Line operates across four stations spanning its 15.3 km western route from to Taling Chan, providing commuter access to western suburbs. Stations are primarily at-grade with side platforms designed for efficient passenger flow, equipped with basic facilities including ticket counters, vending machines, and sheltered waiting areas; however, advanced amenities like extensive retail or climate-controlled concourses are limited compared to urban stations. Krung Thep Aphiwat Central Terminal (Bang Sue) serves as the eastern hub and interchange point, linking to the MRT Blue Line, (eastern branch to with nine stations including Pradiphat and Don Mueang), and services. It features multiple platforms, elevators for vertical access, and high passenger throughput capacity, handling over 100,000 daily users across connected lines as of 2023. Bang Son and Bang Phlat are intermediate stops catering to residential and industrial zones in northern , with single side platforms and minimal infrastructure to support quick boarding; each includes basic ramps but lacks dedicated park-and-ride facilities, relying instead on nearby bus feeders for last-mile connectivity. Taling Chan, the terminus, functions as a Class 1 integrating with southern lines, offering expanded space for turnarounds and storage sidings; it provides essential commuter facilities like restrooms and information kiosks, though parking options remain basic without formalized park-and-ride lots as of 2025. Accessibility across stations includes elevators at the terminal but reveals empirical shortcomings in for navigation, as evidenced by 2024 analyses of SRT Red Line facilities highlighting congestion-related barriers to independent mobility despite installed aids. These issues stem from high footfall and narrow pathways, underscoring needs for enhanced path reservation over retrofitted compliance.

Rolling Stock

The rolling stock for the SRT Light Red Line consists of electric multiple units (EMUs) built by in as part of the broader project. These trains, known as the AT100 series, were supplied under a involving , , and . The procurement contract for the rolling stock was finalized prior to initial shipments in September 2019, with the first two trains delivered that year. The fleet totals 25 EMUs comprising 130 cars, including ten 4-car sets and fifteen 6-car sets, shared across the Light and Dark Red Lines. A 4-car set accommodates approximately 1,120 passengers, while a 6-car set holds up to 1,710 passengers, enabling efficient handling of commuter volumes. These EMUs are designed for a maximum speed of 160 km/h, incorporating electric for enhanced compared to prior diesel operations on SRT lines. Maintenance activities for the fleet, including those serving the Light Red Line, are supported at facilities such as the depot integrated with Bang Sue Grand Station.

Operational Details

Service Patterns and Timetables

The SRT Light Red Line provides all-stations commuter service between and Taling Chan station, covering four intermediate stops at Bang Son and Bang Bamru, with a journey time of approximately 16 minutes. Trains operate daily without limited-express patterns due to the route's brevity and station spacing. Service spans from 5:00 a.m. to midnight, with the first trains departing terminal stations at 5:00 a.m. and the last at midnight in both directions. Peak-hour headways, typically from 7:00 a.m. to 9:00 a.m. and 5:00 p.m. to 7:00 p.m., are every 20 minutes to accommodate commuter demand. Off-peak intervals extend to 20-30 minutes, reflecting capacity constraints from limited rolling stock availability. At Krung Thep Aphiwat, the line shares infrastructure with the , enabling seamless transfers for northbound services to , while Bang Son provides direct interchange with the Purple Line. Feeder bus routes connect to outer suburbs at Taling Chan and Bang Bamru, supporting last-mile access, though coordination remains informal without dedicated integrated ticketing beyond the SRT network. Upon its launch in August 2021, the SRT Light Red Line experienced extremely low initial ridership, with daily passenger counts in the range of 300 amid persistent restrictions limiting urban mobility in . As recovery progressed and services stabilized, daily ridership climbed modestly to between 1,400 and 1,500 passengers by January 2023. In 2024, reported averages for the Red Lines (including Light Red) reached tens of thousands daily, a temporary surge attributed to the subsidized 20-baht flat fare cap on that encouraged trial usage across Bangkok's network. Cumulative trends indicate annual growth of roughly 10-15% for mass transit systems like the Red Lines, reflecting partial rebound from COVID-era lows but falling short of pre-launch forecasts that anticipated rapid uptake in a metropolitan region serving over 10 million residents. Key influences on subdued volumes include the line's limited operational extent (initially three stations over 15 km) and competition from abundant private vehicles, motorcycles, and ride-hailing options in Bangkok's car-dependent suburbs, which have historically dominated commuter patterns despite investments. Post-October 2025, with the flat fare policy's conclusion, usage is expected to stabilize at levels exposing underlying demand constraints rather than policy-driven peaks.

Fares, Subsidies, and Financial Model

The SRT Light Red Line employs distance-based fares ranging from 12 to 42 (THB) per trip, calculated according to travel distance between stations, effective from October 1, 2025, following the termination of a government-mandated flat fare of 20 THB that had been in place since at least 2023. Prior to this reversion, the —subsidized by the national government to promote —kept prices uniformly low regardless of distance, which suppressed natural price signals that would otherwise reflect operational costs and incentivize efficient capacity use. Operated by SRT Electrified Train Co., Ltd. (SRTET), a concessionaire under the (SRT), the line's financial model relies on revenues supplemented by direct government subsidies to offset operating deficits, particularly during periods of artificially capped pricing. Subsidies, funded through general and proposed mechanisms like charges, have covered shortfalls arising from fares set below marginal costs, enabling the 20 THB but creating on transfers rather than self-funding through user payments. This structure distorts by encouraging usage levels unsupported by , as evidenced by the 's extensions despite mounting fiscal burdens, potentially undermining incentives for cost control and long-term sustainability without ongoing public funding. Initial project estimates have been surpassed, with construction contracts totaling approximately 32.4 billion THB, financed partly through international loans and exceeding early planning figures due to scope adjustments and ancillary expenses. Operating revenues from fares alone fail to match expenditures, as SRT's broader rail operations report persistent losses requiring subsidies, with the Red Line's model mirroring this pattern through gross-cost concessions where the operator receives fixed payments adjusted for deficits. Such reliance on subsidies over market-driven pricing perpetuates fiscal imbalances, as user fees capture only a fraction of true costs—including maintenance, electrification, and debt servicing—transferring the burden to non-users via taxation.

Future Plans

Approved Extensions

On June 17, 2025, the Thai Cabinet approved Phase II and Phase III of the SRT Light Red Line extensions, merging them into a single project to streamline procurement and land acquisition for the Siriraj–Taling Chan–Salaya corridor. Phase II extends westward from Taling Chan station to Salaya over 14.8 kilometers, adding connectivity to suburban areas in and provinces. This segment includes six planned stations: Ban Chim Phli, Kanchanaphisek (Phutthamonthon Sai 2), Sala Thammasob, and Salaya, with the latter integrating directly with Mahidol University's Salaya campus to facilitate access for approximately 30,000 students and faculty. Phase III comprises a spur line branching from Taling Chan to Siriraj Hospital, approximately 5.7 kilometers in length to complete the overall 20.5-kilometer extension, incorporating two additional stations for improved hospital access. This spur leverages existing SRT tracks toward Thonburi while adding elevated or ground-level infrastructure to serve Siriraj Hospital, one of Thailand's largest medical centers with over 2,500 beds, reducing reliance on road transport for patients and staff. Together, the phases add seven new stations, enhancing scalability by linking the core Light Red Line to educational and healthcare hubs, potentially increasing daily ridership capacity beyond the current 50,000 passengers. The approved budget for the Taling Chan–Salaya segment stands at 10.2 billion baht, covering , signaling upgrades, and station , while the Siriraj spur requires an additional 6.5 billion baht for similar infrastructure adaptations. for contractors is scheduled for late 2025, with commencing in 2026 and operational service targeted for 2029, aligning with SRT's standards using 25 kV AC overhead lines. These extensions prioritize cost efficiency through merged contracts, aiming to mitigate past delays while expanding the network's western reach for long-term commuter relief in Bangkok's outskirts.

Proposed Phases and Infill Developments

The proposed Phase IV extension of the SRT Light Red Line would link Bang Sue to Hua Mak over approximately 20.14 kilometers, incorporating multiple new stations to facilitate eastern expansion and integration with existing MRT lines. This development, targeted for operational commencement in 2029 subject to approval, seeks to alleviate congestion in Bangkok's eastern suburbs by providing direct commuter rail access. Alternative analyses have questioned its route alignment, suggesting potential overlaps with other transit corridors and advocating for parallel road-based options like a Petchaburi Road line to optimize urban connectivity. Infill station proposals aim to densify stops along the existing Bang Sue–Taling Chan corridor, enhancing intermediate access and capacity without requiring full-line reconstruction. Specific sites include Rama VI Bridge and Bang Kruai (EGAT), positioned to serve denser population centers and industrial zones between current halts. These additions, initially floated around 2012, remain under consideration to incrementally boost ridership by reducing average station spacing. In August 2025, the SRT board initiated a reassessment of a 19 billion baht Red Line extension project—encompassing Light Red Line elements toward —citing insufficient projected returns on investment amid fiscal scrutiny. This hold, announced on August 21, underscores ongoing evaluations of expansion feasibility, potentially delaying infill and Phase IV timelines until economic viability is reconfirmed.

Challenges and Criticisms

Project Delays and Inefficiencies

The SRT Light Red Line, intended as a corridor from Bang Sue to Taling Chan, faced a protracted delay between initial testing and operational launch, attributable in large part to shifts in technical specifications and interruptions in state funding approvals. operations on the core Taling Chan–Bang Son segment occurred from 2012 to January 2014 using diesel multiple units (DMUs), but full electric service across the line did not begin until November 2021, creating a roughly seven-year gap during which sat idle amid unresolved upgrades. This pivot from DMU-based service—originally planned to leverage existing diesel for quicker rollout—to full stemmed from broader (SRT) efforts to standardize systems for , yet it exacerbated timelines due to the need for new , signaling overhauls, and installations without parallel . Original planning in the early targeted commuter operations by the mid-decade, aligning with SRT's revival goals under national transport strategies, but bureaucratic hurdles in environmental approvals, land acquisition disputes, and sequential contracting—where contracts lagged behind civil works—pushed realization to 2021. Funding halts, tied to annual government budget cycles and SRT's competing priorities, compounded these inefficiencies; for instance, allocations were deferred multiple times as fiscal scrutiny intensified post-2014 political transitions, reflecting systemic challenges in where project sequencing favors intercity upgrades over urban commuter lines. Empirical contrasts highlight the slippage: while feasibility studies from 2006–2010 envisioned phased openings by 2015–2017 to capture growing suburban demand, chronic SRT underinvestment—manifesting in deferred maintenance and outdated fleets—delayed integration with the newly built Bang Sue Grand Station, which itself slipped from 2020 to 2021. Resource diversion to parallel mega-projects further entrenched inefficiencies, as SRT prioritized double-tracking initiatives and segments over commuter , leading to fragmented expertise and contractor overlaps. For example, southern double-track expansions and Thai-Chinese high-speed alignments absorbed engineering capacity and budgets in the , sidelining Light Red Line advancements despite its lower complexity relative to greenfield high-speed works. These attributions underscore causal factors rooted in institutional sequencing flaws rather than exogenous shocks, with SRT's debt-laden balance sheet—exacerbated by historical freight dominance—limiting agile execution in a prone to multi-agency veto points. The SRT Light Red Line project, particularly its Bang Sue–Rangsit section, saw substantial budget escalations driven by variation orders for design modifications and additional construction works requested by the (SRT). These changes, including upgrades to and signaling systems, contributed to claims exceeding original contract values, with contractors seeking compensation for scope expansions not fully anticipated in initial bids. In May 2025, the SRT board approved an 8.7 billion baht adjustment to the overall Red Line investment framework to cover such compensations to private firms involved in design and build phases. Legal disputes arose primarily from SRT's refusal to honor these variation orders, leading to protracted litigation with key contractors. In April 2025, the ruled that SRT must pay 4.2 billion baht plus interest to Uniq Engineering and Construction Public Company Limited and Sino-Thai Engineering and Construction Public Company Limited for extra costs on the Bang Sue– segment. The court determined the additional works were necessary and authorized, rejecting SRT's arguments that they constituted unauthorized overruns; SRT's appeal to the Supreme Administrative Court was denied in November 2024, mandating payment within 60 days. This outcome underscored tensions between public oversight and contractual obligations, with SRT facing financial strain from the liability amid its reliance on government subsidies to cover operational shortfalls estimated in the billions annually. Ongoing fiscal scrutiny has manifested in delays to extension budgets, highlighting broader concerns over cost recovery and opportunity costs relative to unsubsidized private-sector transport alternatives like . In August 2025, the SRT board suspended approval of a 19.6 billion baht extension from Taling Chan to , ordering a full due to doubts about returns and alignment with fiscal discipline amid prior overruns. Such holds reflect heightened accountability measures, as unchecked expansions risk diverting public funds from higher-yield without commensurate generation.

Performance and Economic Impact Assessments

Post-opening assessments of the SRT Light Red Line, operational since August 2023 on its initial segments, indicate modest reductions in road traffic along served corridors, primarily in western suburbs like Taling Chan, but with limited measurable congestion relief citywide. Studies from the Department of Rail Transport reported average daily ridership of approximately 10,000 to 16,000 passengers in late 2023, representing under 1% of 's total mass transit mode share amid overall urban trips exceeding 20 million daily. This low uptake has constrained impacts on peak-hour vehicle volumes, with preliminary traffic modeling suggesting only 2-5% reductions at key intersections near stations, far below projections of 10-15% diversion from roads. Economic evaluations highlight negligible contributions to GDP growth or productivity gains, as the line's 0.5-1% capture of regional commuter flows fails to significantly alleviate Bangkok's estimated THB 100 billion annual congestion costs. Cost-benefit analyses for similar SRT projects, including Red Line components, yield internal rates of return below 5%, undermined by capital expenditures exceeding THB 80 billion for the broader system amid overruns. Revenue from fares, capped at THB 20 through subsidies until October 2025, averages THB 10-12 per trip, covering less than 20% of operating costs estimated at THB 50-60 per passenger when factoring and . Critics, including analyses from the , argue the line exemplifies inefficiencies in state-led rail investments, with subsidies per passenger (THB 30-50 net after fares) surpassing those for unsubsidized alternatives like operations or , which achieve higher load factors without equivalent public funding. While supports lower emissions—reducing CO2 equivalents by an estimated 20% versus predecessors—the decade-plus delays in rollout have perpetuated reliance on car-dependent sprawl, inflating long-term urban infrastructure needs. Market-oriented options, such as expanded bus fleets or private concessions with performance-based incentives, could deliver superior returns by adapting to actual demand patterns rather than fixed heavy-rail corridors.

References

  1. [1]
    Red Line Mass Transit, Bangkok, Thailand Case Study - Pandrol
    The system consists of two lines: the 26km Dark Red line linking the northern and southern parts of Bangkok, and the 15km Light Red service linking east and ...
  2. [2]
    Red Line Timetable: Krung Thep Aphiwat Station to Taling Chan
    The first train leaves at 5:00 a.m. and the last at midnight. Trains run every 20 minutes during rush hour, and every 30 minutes at other times. Travel time is ...<|separator|>
  3. [3]
    Thailand's Red Line commuter trains to launch free trial runs in August
    Jul 20, 2021 · Bang Sue Grand Station, Bangkok's newest railway hub, will soon open for the extension of the SRT Red Line suburban railway system on 2 August.Missing: operational | Show results with:operational
  4. [4]
    SRT to merge Light Red Line extensions - Bangkok Post
    Jul 30, 2024 · The State Railway of Thailand (SRT) plans to merge two extended sections of the Light Red Line mass transit project to address the problem of overlapping areas.
  5. [5]
    State Railway of Thailand (SRT) | Organisations - Railway Gazette
    The Light Red line is also to be extended, from Taling Chan west to Salaya (12 km), with a branch back to Sirajto the west of the city centre (6·5 km), and from ...
  6. [6]
    New commuter electric trains “SRT Red Line” launch from Bangkok
    Aug 8, 2021 · On the other hand, the Light Red Line is a commuting route to the west suburbs that runs along the SRT Southern Main Line, connecting 15km in ...
  7. [7]
    SRT Red Line Bangkok - Renown Travel
    The SRT Light Red Line runs from Bang Sue Grand Station to Taling Chan West of the Chao Phraya river, an area known as Thonburi. The track covers a distance of ...
  8. [8]
    The Bangkok Train Challenge – Richard Barrow's Thai Train Guide
    (6) LIGHT RED LINE: Bang Sue to Taling Chan. Number of Stations: 4 stations. Length of Line: 15 kilometres. Quickest possible time: xx minutes. NOTES:.
  9. [9]
    SRT Red Line Bangkok Train to Don Mueang Map, Timetable
    Oct 13, 2025 · Western or Light Red Line between Krung Thep Aphiwat and Taling Chan stations. Bangkok SRT Red Line currently consists of 13 stations.
  10. [10]
    Taling Chan Junction (ชุมทางตลิ่งชัน) is a Class 1 station ... - Facebook
    Sep 29, 2025 · In addition, Taling Chan is the Bangkok terminus for the SRT Light Red Line ... Line depart from Krung Thep Aphiwat Station. As you will be ...
  11. [11]
    Bangkok Red Line for State Railway of Thailand
    This railway system applies meter gauge and can be operated, with 3 minutes headway. Maximum speed of the rolling stocks is 160 km/h.Missing: Light | Show results with:Light
  12. [12]
    Red Line Mass Transit, Bangkok, Thailand Case Study - Pandrol
    The system consists of two lines: the 26km Dark Red line linking the northern and southern parts of Bangkok, and the 15km Light Red service linking east and ...Missing: 1500V DC
  13. [13]
    [PDF] Data Collection Survey on Railway Electrification in the Kingdom of ...
    Electrification method and nominal voltage. AC25kV AT feeding method. Number of substations. 1. Number of AT posts. 4 (Dark Red Line: 2, Light Red Line: 2).
  14. [14]
    ABB to support new mass transit line in Thailand | News center
    May 9, 2018 · ABB will supply and install four autotransformer-switching stations for the new Red Line elevated rail system in Bangkok. Autotransformer ...Missing: 1500V DC<|separator|>
  15. [15]
    Red Line Commuter Train System, Bangkok - Railway Technology
    Apr 6, 2016 · Valued at THB21bn ($601m), it includes the construction of six elevated stations, as well as 20.15km-long elevated and at-grade railway lines.Missing: Light | Show results with:Light
  16. [16]
    [PDF] PREPARATORY SURVEY FOR SOUTHERN ECONOMIC ...
    The electrified system operated by SRT now is ARL only but red line will be the second one, once it is completed. • SRT Operation and Service. The number of ...
  17. [17]
    Inclusive low carbon transport in Thailand: Towards a viable policy ...
    A study from GIZ found that on average, people in Bangkok lose over eight days in traffic congestion per year. Congestion charging emerged in the early 2000s ...<|separator|>
  18. [18]
    [PDF] Mass Transit Pricing and Fare Caps in Bangkok
    Sep 10, 2025 · Plans for extensive mass transit train systems in Bangkok, first formulated around 1967, took until the early 2000s to see partial realisation, ...
  19. [19]
    [PDF] content
    Ballasted track similar to current SRT standard track will be used at grade. Ballastless track, similar to that proposed for the Airport Link will be used ...
  20. [20]
    [PDF] Urban Mobility and Economic Shock: How Bangkok's Transportation ...
    Historically, Bangkok's transportation policy has expanded road capacity to alleviate traffic; however, major investments in the city's mass transit network ...
  21. [21]
    Cabinet authorises Bangkok Red Line | News - Railway Gazette
    Jul 1, 2007 · ON MAY 22 the Thai cabinet authorised State Railway of Thailand to call tenders for construction for the 14·7 km Taling Chan to Bang Sue ...Missing: approval | Show results with:approval
  22. [22]
    SRT modernisation: State railway plans 1.5 billion baht investment ...
    Jun 29, 2023 · Explore the SRT's drive towards modernisation, shifting to electric trains, and evolving cargo division in Thailand.
  23. [23]
    Soft launch for Bangkok's Red Line suburban services
    Aug 3, 2021 · State Railway of Thailand held a soft launch for Bangkok's Red Line elevated metre-gauge suburban rail corridor on August 2, offering three months of free ...
  24. [24]
    [PDF] ANNUAL REPORT 2013/14
    Mar 31, 2014 · This line commenced trial operations from 8. September to 30 November 2012 by diesel railcars and began providing temporary service on 5 ...
  25. [25]
    State railway struggles to stay on track - Bangkok Post
    However, the plan has not made headway as the restructuring of the train operation lacks a clear policy direction and the budget fell short of what was needed.Missing: Light delays shortfalls
  26. [26]
    [PDF] Thailand: Improvement of Railway Passenger Services
    the operation of most SRT train services will use the Red line infrastructure, the importance of maintaining and improving the existing lines between Hua ...
  27. [27]
    [PDF] Pre-feasibility Study Congestion Charging in Bangkok
    per year, and that when the opportunity costs of these time losses are considered, this equates to about 60 million baht (1.66 million) per day 1.
  28. [28]
    The Cost of Traffic Congestion and Marginal Cost of Delay in
    Additionally, the marginal cost of delay per vehicle due to heavy traffic is approximately THB 646 (USD 22) at 2023 price levels. This value can serve as a ...Missing: SRT Red Line<|control11|><|separator|>
  29. [29]
    Bangkok Urban Rail Transit Update – 2021 Edition
    Dec 27, 2021 · SRT Light Red Line (Taling Chan-Bang Sue) and SRT Dark Red Line (Rangsit-Bang Sue) began trial operations on 2 August 2021, and full service ...
  30. [30]
    SRT Red Line Timetable: Krung Thep Aphiwat to Rangsit
    The first train leaves at 5:00 a.m. and the last at midnight. Travel time is 23 minutes. Trains run every 10 minutes during rush hour, and every 15 minutes at ...
  31. [31]
    Bang Sue Grand Station - Thailand Trains
    Rating 4.2 (87) SRT Light Red Line: This suburban light railway service runs west from Bang Sue Grand Station to Taling Chan. SRT Dark Red Line: This suburban light railway ...
  32. [32]
    Development of path reservation for wheelchair users within a High ...
    This study investigates the impact of spatial-based accessibility on the SRT Red Line, Don Mueang Station, a railway station that frequently poses challenges ...
  33. [33]
    A Case Study of SRT Red Line, Don Mueang Station, Bangkok ...
    Feb 10, 2025 · This study investigates the impact of spatial-based accessibility on the SRT Red Line, Don Mueang Station, a railway station that frequently poses challenges ...Missing: Light facilities platforms
  34. [34]
    Hitachi ships first Bangkok Red Line trains
    Sep 27, 2019 · Hitachi is supplying 25 EMUs (130 cars) for the project, with Thales providing ETCS Level 1 onboard units for the fleet. The first two trains ...
  35. [35]
    Bang Sue Grand Station opens for mainline services
    Jan 23, 2023 · The station is built on 372ha of SRT-owned land and has maintenance depots for both diesel and electric trains. State Railway of Thailand (SRT) ...
  36. [36]
    Red Line Timetable 22 October 2025
    Departure. Hours, Minutes. 5, 0, 15, 30, 45. 6, 0, 15, 30, 40, 50. 7, 0, 10, 20, 30, 40, 50. 8, 0, 10, 20, 30, 40, 50. 9, 0, 10, 20, 30, 45.Missing: headway | Show results with:headway
  37. [37]
    Red Line adjusts frequency, operating hours to accommodate more ...
    Aug 13, 2023 · Krung Thep Aphiwat Central Terminal to Taling Chan. • Unchanged at 20 minutes during peak hours. Every 20 minutes during off-peak hours.Missing: Light headway Bang Sue
  38. [38]
    Commuter Train System Red Line Guide - thailand.go.th
    Mar 19, 2023 · The Commuter Train System Red Line is a suburban electric train that connects the northern zone and the southern zone of Bangkok, divided into ...
  39. [39]
    SRT Red Line sees daily traffic hit new heights - Bangkok Post
    Jun 4, 2022 · The number of passengers riding the new SRT Red Line has been steadily climbing, hitting a new daily high of 14,120 on May 27, the State ...Missing: volume | Show results with:volume<|control11|><|separator|>
  40. [40]
    SRT urged to expand feeder network to boost rail usage
    Nov 17, 2023 · The Transport Ministry urged SRT Electrified Train Co, which operates the Red Line ... lines, from 1,000 to about 1,500 daily. Mr Surapong said ...Missing: Light | Show results with:Light
  41. [41]
    44,291,113 passengers used Thailand's rail transport system in ...
    Apr 5, 2024 · The Red Line: 896,462 passengers (2.02%), including 2,986 passengers who used the free service to connect to the long-distance railway; The ...Missing: capacity | Show results with:capacity
  42. [42]
    Industry Outlook 2024-2026: Mass Transit Service Operator
    Jan 18, 2024 · Nakhon Withi (Light Red Line): This covers 15.2 kilometers between Bang Sue and Taling Chan. At present, 3 of 5 stations are operational but ...
  43. [43]
    Red Line Ticket Prices – Richard Barrow's Thai Train Guide
    The cost of the ticket on the Light Red Line from Bang Sue Grand to the end of the line at Taling Chan is 35 Baht. The fare on the Dark Red Line from Bang Sue ...
  44. [44]
    Bangkok's Flat 20-Baht Fare Ends October 1, 2025
    Sep 21, 2025 · Red Line (operated by SRT Electrified Train Co., Ltd.) • Normal fares: 12–42 baht • Discounts: students (11–35 baht), seniors (6–21 baht) • ...Missing: Light | Show results with:Light
  45. [45]
    End of the Line: Bangkok's 20 Baht Flat Fare Policy to Conclude
    Sep 22, 2025 · Starting October 1, 2025, commuters will revert to paying standard, distance-based fares, which will range from 12-42 baht on the Red Line and ...Missing: Light | Show results with:Light
  46. [46]
    20-baht transit fare extended for 2025 - Bangkok Post
    Nov 29, 2024 · The 20-baht flat fares will be in effect until Nov 30, 2025. Similar measures for other lines are being considered, said Mr Jirayu. Fares on ...
  47. [47]
  48. [48]
    B40-50 congestion charge on inner-Bangkok streets
    Oct 17, 2024 · The government plans to impose a congestion charge of 40-50 baht on motorists who enter inner Bangkok streets to raise money to subsidise a ...
  49. [49]
    Cabinet extends 20-baht flat fare on Red and Purple Line trains until ...
    Sep 30, 2025 · This current Cabinet has reviewed the July 8 resolution and reverted to the November 29, 2024 decision, keeping the fare at 20 baht for the Red ...Missing: SRT Light 2023-2025
  50. [50]
    Contract Award for Thailand Red Line Construction Project
    Project Name, Contract Award for Thailand Red Line Construction Project. Client, State Railway of Thailand (SRT). Project Terms, 1440 days (About 4 years).Missing: Light 2021
  51. [51]
  52. [52]
    Thai Train Guide on X: "Thai Cabinet Merges Red Line Rail Projects ...
    Jun 17, 2025 · Thailand's Cabinet has approved the merging of two Red Line commuter rail extensions into a single project and contract, streamlining procurement and ...Missing: SRT | Show results with:SRT
  53. [53]
    Thai Cabinet to review Red Line electric commuter rail upgrade
    Mar 26, 2024 · The first extension will see tracks laid to connect Taling Chan and Salaya, a distance of 14.8 kilometres. ... Recently, SRT's board has approved ...
  54. [54]
    2 Red Line extensions get go-ahead - Bangkok Post
    Feb 27, 2019 · The government needs a budget of 10.2 billion baht for the Taling Chan-Salaya extension, called the Light Red Line, and 6.5 billion baht for ...Missing: length | Show results with:length
  55. [55]
    11 new electric train routes eyed for Greater Bangkok
    Jul 24, 2024 · The A2 group comprises two routes, both of which should start running from 2029. The first is the SRT Light Red Line (Bang Sue – Hua Mark) and ...
  56. [56]
    SRT Light Red line extension (Bang Sue-Hua Mak) : 20.14 km.
    Aug 28, 2025 · " Under Constructions New Line and Extension longest 71 kilometers By 2027-2028, it will have a total length of 347.5 kilometers. " In 2035 ...
  57. [57]
    Bangkok should scrap the Light Red Line extension and build this ...
    Jul 2, 2024 · My proposal is to scrap the Light Red Line eastern extension and build a transit line along Petchaburi Road.
  58. [58]
    UrbanRail.Net > Asia > Thailand > Bangkok Metro
    3) Light Red Line east extension (Bang Sue - Hua Mark): 11 km, 7 stations (Planned) 4) Dark Red Line south extension (Bang Sue - Mahachai): 59 km, 22 ...
  59. [59]
    SRT Board Puts B19bn Red Line Extension on Hold - Nation Thailand
    Aug 21, 2025 · The State Railway of Thailand has instructed a review of a project to extend the Red Line to Nakhon Pathom, citing concerns over return on ...Missing: Light 1500V DC
  60. [60]
    SRT Light Red Line Bangkok - Thailandee.com
    The Light Red Line is operated by the SRT (State Railway of Thailand). Entry into service in 2021, she links Bang Sue and Taling Chan.
  61. [61]
    Thailand: Grand opening in prospect | In depth - Railway Gazette
    Jun 15, 2021 · The first phase of the emerging hub had originally been scheduled to open in the last quarter of 2020, along with the 21·6 km northern section ...
  62. [62]
    Thai Train Guide - X
    Jul 20, 2025 · ... timeline pushes start to September 2025 After nearly six years of delays, the long-anticipated High-Speed Rail project linking Bangkok's ...Missing: Red | Show results with:Red
  63. [63]
    SRT speeds up Red Line, southern double-track, and Thai-China ...
    Oct 1, 2025 · The State Railway of Thailand (SRT) is accelerating key projects, including Red Line extensions, southern double-track lines, and the Thai-China ...
  64. [64]
    State Railway of Thailand agrees to adjust the investment framework ...
    May 21, 2025 · The SRT board has agreed to adjust the investment framework for the Red Line by 8.7 billion baht, paying compensation to private companies for design ...Missing: Light delays shortfalls
  65. [65]
    SRT ordered to pay Bt4.2bn to contractors over Red Line project
    The Central Administrative Court has ordered the State Railways of Thailand (SRT) to pay two construction companies, Unique Engineering and Construction and ...
  66. [66]
    [PDF] Public Transport Development in Bangkok: Experience from Thailand
    Nov 29, 2024 · In 2023, the MRT network is projected to handle 427.5 million person-trips, averaging 1.6 million trips per day—a 79.8% year-on-year increase. • ...
  67. [67]
    [PDF] An Evaluation of the Effectiveness of the Travel Restriction Policy ...
    For the Airport Rail Link that connected Suvarnabhumi. Airport to the city center, there were 33,952 users/day on average with a standard deviation of. 50.86%.<|control11|><|separator|>
  68. [68]
    "SRT Board" gives green light to support "Airport Link-Red Line ...
    Mar 31, 2025 · Currently, income and expenses from the Airport Link still belong to the SRT, which is still operating at a loss. Compensation is calculated ...
  69. [69]
    [PDF] Mass Transit Pricing and Fare Caps in Bangkok - Harvard DASH
    Sep 10, 2025 · some SRT and bus lines in Bangkok lost ridership after fares were eliminated during previous experiments.26. Source: Author's calculations ...<|separator|>
  70. [70]
    [PDF] Urban Rail Concessions in Bangkok, Kuala Lumpur and Manila ...
    This report examines urban rail concessions in Bangkok, Kuala Lumpur, and Manila, including case study experience, future policy, and best practices.
  71. [71]
    Factors affecting state railway of Thailand (SRT) passenger train ...
    The State Railway of Thailand's (SRT) rail passenger ridership has dropped from a peak of 88 million rides in 1994 to less than 23 million in 2022, ...