Southern Cross Cable

The Southern Cross Cable Network (SCCN) is a trans-Pacific system providing international connectivity between , , , , and the . Operational since November 2000, the network comprises approximately 30,500 kilometers of cable, including 28,900 kilometers of segments, configured in a protected triple-ring for enhanced and reliability across nine stations. Owned and operated by Bermuda-registered Southern Cross Cables Limited, a historically including major stakeholders such as (50%), Optus (40%), and (10%), the system supports capacities ranging from initial 1.28 Tbps to a capacity of 18 Tbps with 13.4 Tbps active by the end of 2023. Successive upgrades, including integration of 40G and higher technologies, have enabled it to handle a substantial share of trans-Pacific , underscoring its role as a backbone for data exchange between and global networks. Notable achievements include recent demonstrations of cutting-edge capabilities, such as the world's first 1 Tb/s transmission in collaboration with , contributing to overall network capacities exceeding 100 Tb/s when accounting for extensions like Southern Cross NEXT. While the system has experienced occasional disruptions from cable damages—incidents typical of —its design emphasizes , and claims of unauthorized access have been firmly denied by operators. Ongoing expansions, such as the planned SX Tasman Express cable, aim to further bolster intra-regional connectivity.

History

Conception and Early Development

The Southern Cross Cable Network was conceived in 1996 amid accelerating adoption in and , which exceeded the capacity of existing satellite and indirect cable links to international backbones. This growth necessitated a dedicated trans-Pacific to enhance and reduce for data traffic to the . In 1997, Telecom New Zealand (now ), Optus, and MFS Globenet (later acquired by WorldCom) formalized an agreement to sponsor and develop the project, establishing Southern Cross Cables Limited as an independent Bermuda-registered entity to own and operate the system. The consortium's structure allocated ownership shares—initially 50% to Telecom New Zealand, 40% to , and 10% to MFS—to pool resources for the estimated $1.2 billion investment. By July 1997, the partners publicly committed to the initiative, designating it the Southern Cross Cable Network as the high-capacity fiber-optic link from and to , bypassing reliance on congested Asian routes. Early planning focused on route optimization via and to minimize propagation delay, with initial designs targeting 120 Gbit/s capacity using dense technology. Regulatory milestones included securing a U.S. landing in 1998 for the Southern Cross system, granted to MFS Communications as the U.S. landing party, enabling progression to engineering and procurement phases. These steps addressed geopolitical and environmental permitting across multiple jurisdictions, culminating in contracts for manufacture and laying vessels by late 1998.

Construction and Initial Deployment

The Southern Cross Cable Network was constructed by Southern Cross Cables Limited, an independent entity formed in 1997 by a of operators including , Networks (Australia), and WorldCom () to develop a dedicated trans-Pacific system linking to . Contracts for the supply of , repeaters, and terminal equipment were awarded to Alcatel Submarine Networks and , enabling the deployment of dense (DWDM) technology with an initial configuration of 16 wavelengths at 2.5 Gbps each per fiber pair. Cable laying operations commenced in early July 1999, starting with the first landing at Clovelly Beach in , , which initiated a six-month intensive phase of marine installation across the Pacific. Subsequent key landings included Takapuna Beach in , , on September 5, 1999, executed by the cable-laying vessel CS Innovator, followed by the completion of the New Zealand-to-Hawaii segment by October 1999 using multiple specialized ships. The project spanned 19 months overall, employing seven cable-laying vessels to install approximately 28,900 km of and 1,600 km of terrestrial segments, forming a resilient ring topology with branches to , , and other Pacific locations before terminating in Hawaii and . The network achieved ready-for-service status on November 15, 2000, marking the initial commercial deployment of the system and providing enhanced international capacity between , , and the at a time of rapid growth. A second cable segment entered service in January 2001, further bolstering redundancy and capacity.

Operational Milestones

The Southern Cross Cable Network achieved ready-for-service status on November 15, 2000, marking the initial operationalization of its primary submarine segments connecting , , , and the . The network's two core cables were commissioned sequentially, with the first entering full service in November 2000 and the second in January 2001, enabling initial backhaul capacities in the range of hundreds of gigabits per second across the transpacific route. Subsequent capacity enhancements began in the late , culminating in a major completed in April 2010 that elevated the total network lit capacity to 1.2 terabits per second (Tbps) through improved 10 Gbps transmission technologies. In 2012, further modifications incorporated 40G and 100G coherent optics, boosting lit capacity to 2.6 Tbps by integrating Ciena's 6500 Packet Optical Platforms across both cables. By 2017, the network introduced elastic bandwidth services, allowing dynamic provisioning of transpacific connectivity via automated optical transport. The deployment of the Southern Cross NEXT cable represented a pivotal expansion, with construction commencing post-2020 and the system entering service in the second quarter of 2022 as the network's third transpacific route, completed amid global disruptions. This addition supported a potential system capacity exceeding 10 Tbps initially, with the overall network reaching 18 Tbps potential and 13.4 Tbps active lit capacity by the end of 2023. In July 2022, operators achieved the world's longest single-span 400 GbE transmission on a Southern Cross segment, enhancing reliability over extended distances. Ongoing advancements continued into 2025, with the network demonstrating the first 1 Tb/s transmission across the Pacific Ocean in January, utilizing Ciena's GeoMesh Extreme and WaveLogic 6 Extreme (WL6e) technologies, followed by volume deployment across segments starting in the first quarter. The system's design life has been extended beyond 2025, sustaining its role as a critical conduit for Oceania-U.S. data traffic. Notable disruptions include a November 2012 fault on a core cable, which temporarily impaired services in until repairs were effected.

Technical Specifications

Network Topology

The Southern Cross Cable Network features a protected with diverse north and south trans-Pacific routes connecting , , , , and the , enabling self-healing capabilities through redundant paths. This design incorporates nine primary cable landing stations: two in ( and in ), two in ( and ), one in (), two in ( and ), and two on the ( in and in ), plus a terrestrial access point in . Key segments include three fiber pairs along the Sydney-to-Hawaii routes (both northern and southern variants) and four fiber pairs from to the US West Coast, providing high-capacity transmission with protection against single-point failures. An additional three fiber pairs support inter-island connectivity between Kahe Point and Spencer Beach. The network spans approximately 28,900 km of and 1,600 km of terrestrial fiber, forming interconnected rings that facilitate traffic rerouting in case of faults. This configuration supports low-latency paths, such as 140.44 ms between and the US West Coast, achieved through optimized segment lengths like 2,276 km for shorter Australian segments and up to 8,002 km for longer Pacific crossings. Branching units enable connections to intermediate points like , enhancing regional access without compromising the main trunk integrity.

Submarine Segments

The submarine segments of the Southern Cross Cable Network span approximately 28,900 kilometers across the Pacific Ocean, forming a protected ring topology that links , , , , and the . These segments utilize diverse north and south routes for redundancy, incorporating around 500 optical spaced 40-70 kilometers apart to amplify signals over long distances. The core transpacific segments connect , , to Spencer Beach, Hawaii, with three fiber pairs per cable, followed by segments from Hawaii to U.S. landing points at , and Nedonna Beach, , utilizing four fiber pairs for enhanced capacity. Additional branches extend to (Whenuapai and ) and (), while a Hawaii inter-island segment links Kahe Point to Spencer Beach with three fiber pairs. This configuration ensures fault-tolerant paths, with the network's dual-cable design providing protection against single-point failures. Key submarine spans include:
SegmentLength (km)Fiber PairsRound-Trip Latency (ms)
A2,276322.76
C8,002380.02
D4,135441.35
F4,538445.38
G15,828358.28
G23,543335.43
I45834.58
These spans correspond to branched and mainline routes, enabling low-latency connectivity with an end-to-end of about 140 milliseconds from to the U.S. . The network's three-cable , including recent additions like Southern Cross NEXT, maintains this segmental structure while expanding overall capacity, though core submarine routes remain anchored in the original transpacific design operational since 2000.

Terrestrial Segments

The terrestrial segments of the Southern Cross Cable consist of land-based fiber optic cables totaling approximately 4,300 kilometers, which interconnect submarine stations with inland points of presence, data centers, and other nodes while enabling route in a protected ring topology. These segments support the network's overall exceeding 100 Tb/s by providing redundant paths that mitigate single-point failures, with routed across dual stations per major location to ensure . Expansions, including those from the Southern Cross NEXT upgrade commissioned in July 2022, have increased terrestrial infrastructure to accommodate growing demand for low-latency trans-Pacific connectivity. In Australia, terrestrial links primarily connect the paired landing stations at Alexandria and Brookvale in Sydney, New South Wales, both operated by Optus, facilitating short-haul diversity and extensions to carrier hotels like Equinix via dedicated land routes. New Zealand's segments link the Takapuna and Whenuapai stations near Auckland, forming a local ring for protected routing between beach manholes and urban infrastructure. In the United States, longer terrestrial routes connect landings at Morro Bay, California, and Nedonna Beach, Oregon (with PoPs in Hillsboro), spanning coastal paths to close the ring and integrate with West Coast backbones. Hawaii features similar dual-station terrestrial connections, while Fiji relies on a single landing with minimal land extension. These segments employ dense (DWDM) systems, such as Ciena's WaveLogic technology, for high-bit-rate transmission integrated seamlessly with fibers, historically supporting 10 Gbps per wavelength and evolving to 400 GbE and 1 Tb/s capabilities. Prior estimates from pegged terrestrial length at 1,600 km, underscoring subsequent build-outs for enhanced resilience. Monitoring employs distributed fiber sensing from FiberSense across over 450 km of combined terrestrial and shore-end segments for detection of faults, digs, and vibrations, with 24/7 coverage specifically on New Zealand's inter-station terrestrial links since August 2024 to address exposure risks.

Landing and Access Points

The Southern Cross Cable Network terminates at cable landing stations (CLS) in key locations , enabling interconnection with terrestrial networks and providing redundant paths. These stations facilitate the from to land-based , supporting high-capacity data traffic between endpoints. The network's design includes multiple landings per major region to enhance reliability through diverse routing. In , the primary landing points are located in the area, : Alexandria and Brookvale. Both utilize facilities owned by , serving as shore-end access for the eastern Australian segment. New Zealand's access points are and Whenuapai, situated near , which connect the southern trans-Pacific segments to local networks. A single landing station operates in Suva, Fiji, acting as an intermediate access hub for regional connectivity. In Hawaii, the network links to Kahe Point on Oahu Island, operated by Pacific Light Cable Landing Inc., and Spencer Beach on Hawaii Island, managed by Hawaiian Telcom, supporting inter-island and transpacific extensions. The mainland connection centers on , where the cable integrates with North American backbone infrastructure, with the landing utilizing nearby coastal facilities such as Nedonna Beach.
Country/RegionLanding StationsOperator/Notes
Alexandria, NSW; Brookvale, NSW facilities; area redundancy
; Whenuapai vicinity; dual paths
Intermediate hub
Hawaii (USA)Kahe Point (); Spencer Beach (Big Island)Hawaiian Telcom/; inter-island link
USA MainlandConnects to Nedonna Beach landing; primary access

Capacity and Upgrades

Original Capacity and Technology

The Southern Cross Cable Network, upon entering service on 29 August 2000, initially delivered 120 Gbps of fully protected capacity across its trans-Pacific topology, utilizing dense wavelength-division multiplexing (DWDM) technology with 2.5 Gbps wavelengths. This configuration supported synchronous digital hierarchy (SDH) framing for reliable data transmission, enabling high-availability connectivity between landing points in , , , , and . The system's design emphasized redundancy through a self-healing architecture, where traffic could reroute automatically in the event of a fiber pair failure, ensuring the protected capacity remained operational. Each of the three pairs in the original was engineered to carry 40 Gbps per pair, achieved via wavelengths at 2.5 Gbps each, providing a total unprotected capacity of 240 Gbps across the network. The submarine segments employed standard compliant with G.652 specifications, optimized for low over long distances, with optical amplifiers spaced approximately every 50-70 km to maintain without electrical regeneration in most sections. utilized loose-tube designs with armoring for protection against underwater hazards, fabricated by Alcatel Submarine Networks and , reflecting early-2000s advancements in undersea manufacturing that prioritized scalability for future wavelength upgrades. This initial setup marked a significant leap from prior trans-Pacific systems like TAT-12/13, which operated at lower capacities in the tens of Gbps , by leveraging DWDM to multiply effective throughput on existing .

Southern Cross NEXT Implementation

The Southern Cross NEXT (SX NEXT) represents an expansion of the Southern Cross cable ecosystem, comprising a 15,840 km system linking ; ; and , with branching units extending connectivity to Pacific Island nations including , , and . commenced in 2019 following route surveys and contractual agreements, with Alcatel Submarine Networks (ASN) selected as the primary supplier for the open cable design in April of that year. The project, valued at approximately $350 million, aimed to deliver an initial capacity of 72 terabits per second (Tbps), integrating advanced optical technologies to support hyperscale data demands. Implementation proceeded amid global supply chain disruptions from the , yet achieved completion in just over two years, marking the third express route in the Southern Cross network. Key milestones included U.S. (FCC) approval for the , landing station in July 2020, enabling terrestrial integration at Equinix's LA4 for low-latency provisioning. Pioneer Consulting handled route positioning and engineering services, ensuring optimal seabed paths while minimizing environmental risks through pre-lay surveys. The cable employed branching units for regional extensions, providing inaugural international fiber links to and , thereby enhancing Pacific resilience without requiring separate infrastructure. Technological rollout featured Ciena's GeoMesh Extreme networking and WaveLogic 5 Extreme (WL5e) coherent optics, enabling the world's longest single-span 400 Gigabit Ethernet (GbE) service across transpacific distances. This configuration supported seamless integration with existing Southern Cross routes, boosting overall ecosystem capacity by roughly 500% to approximately 100 Tbps and doubling direct Australia-New Zealand-U.S. bandwidth. Power efficiency improvements exceeded 600% per bit transmitted, achieved through advanced modulation and reduced regeneration needs. Full readiness for service (RFS) was declared on July 7, 2022, following marine installation and testing phases that validated latency under 130 milliseconds round-trip between endpoints. Subsequent enhancements, including Ciena's WaveLogic 6 Extreme (WL6e) trials in 2025, have demonstrated 1 Tbps per wavelength capabilities over the cable's longest segments, with volume deployment initiated in Q1 2025.

Recent and Planned Enhancements

In January 2025, Southern Cross Cable Network achieved the world's first error-free 1 Tb/s transmission across the Pacific on its live production network between and , utilizing Ciena's WaveLogic 6 Extreme coherent optics. This demonstration highlighted the potential for higher channel speeds on existing , with volume deployment of the technology planned to commence in the first quarter of 2025 across transpacific segments and other network parts to boost overall capacity and efficiency. By the end of 2023, the network's total system capacity stood at 18 Tbps, with 13.4 Tbps in active use, reflecting incremental upgrades to prior fiber pairs following the Southern Cross NEXT rollout. These enhancements build on advancements, enabling greater lit capacity without new cable lays, though demand projections suggest further wavelength upgrades within 18 to 36 months using emerging 40 Gbps or higher technologies. In June 2025, Southern Cross signed a supply contract with Alcatel Submarine Networks and OMS Group for the SX Tasman Express, a new express submarine cable system linking Sydney and Auckland with an initial design capacity of 400 Tbps across 16 fiber pairs, slated for operational readiness in 2028. This project aims to address intra-regional bottlenecks between Australia and New Zealand, incorporating space division multiplexing for enhanced scalability and resilience, while integrating with the broader Southern Cross ecosystem for transpacific extensions.

Ownership and Operations

Ownership Evolution

The Southern Cross Cable Network was established through an agreement in 1997 between , (a subsidiary of ), and MFS Globenet, leading to the formal incorporation of Southern Cross Cables Limited (SCCL), a Bermuda-registered entity, on October 3, 1998. Initial ownership stakes reflected these founding partners, with holding 50%, 40%, and the remaining 10% allocated to MFS Globenet, which was later absorbed into following corporate acquisitions in the telecommunications sector. Ownership adjustments began in the mid-2000s as market dynamics shifted, with stakes gradually realigned to accommodate strategic partners; by the early , the structure stabilized under (50%), Singtel-Optus (40%), and (10%), enabling sustained operations and upgrades without major disruptions. A significant evolution occurred in December 2018, when Corporation acquired a 25% stake, reducing Spark New Zealand's share to approximately 38.12% and Singtel's to 30.49%, while Verizon's interest was adjusted to 6.39%; this transaction, valued at around AUD 89 million, aimed to enhance Telstra's trans-Pacific capacity amid growing data demands. As of 2025, the ownership consortium remains unchanged from the 2018 reconfiguration, with SCCL collectively managing the network's assets, including the original cables and expansions like , under a model emphasizing long-term and shared maintenance responsibilities among these giants. This structure has supported consistent in capacity enhancements, such as the 2023 NEXT cable activation, without reported disputes or further equity shifts.

Construction Partners and Maintenance Practices

The original Southern Cross Cable Network, commissioned in 2000, was designed, manufactured, and constructed by a comprising Alcatel and , under the direction of Southern Cross Cables Limited (SCCL). This partnership leveraged Alcatel's expertise in submarine cable systems and 's contributions to optical transmission technology, enabling the initial deployment of approximately 28,900 km of submarine across trans-Pacific routes. Subsequent expansions and upgrades have involved similar specialized contractors. For the Southern Cross NEXT cable, activated in 2022, Alcatel Submarine Networks (ASN, now part of ) served as the primary system supplier and installer, incorporating selective switching () ROADM for enhanced capacity and flexibility. The more recent SX Tasman Express project, announced in 2025, partners SCCL with ASN for supply and OMS Group for marine installation and maintenance services, focusing on shallow-water capabilities between and . Maintenance practices for the network adhere to International Cable Protection Committee (ICPC) standards, emphasizing proactive monitoring, rapid fault detection, and repair via specialized vessels. SCCL employs () technology through a with FiberSense, deployed since 2024 in to enable real-time detection of disturbances such as digging or seismic activity along cable routes. Repairs typically involve grapple-and-splice operations by contracted cable ships; for example, a 2022 fault on the Tonga extension was addressed by the repair vessel Reliance, restoring service after 20 days at sea. Incidents like a 2019 cut caused by a state contractor's further underscore reliance on redundant ring topology for during repair windows, which can span weeks due to oceanic conditions and logistics.

Reliability and Security

Physical Damage Incidents

The Southern Cross Cable Network has endured limited physical damage to its segments, with documented incidents primarily near landing points rather than in deep ocean waters. On July 29, 2001, the was severed approximately 20 km offshore from during a heavy , halting between and the for 12 to 15 hours until repairs were completed. This event exacerbated connectivity issues, as a was undergoing , and weather-related factors were cited as the cause in subsequent analyses of global submarine disruptions. Terrestrial segments of the network, connecting landing stations to inland infrastructure, have faced more frequent cuts from human activity. In February 2005, a boring machine damaged the fiber-optic link near , on the U.S. side. Three months later, on May 20, 2005, a contractor for ' electricity authority severed another segment near at approximately 1:00 a.m. New Zealand time, requiring about nine hours for repair despite the network's figure-eight redundancy configuration. Anchor drags by vessels have also posed risks near coastal areas, with one incident off impacting the Southern Cross cable alongside the Tasman 2 link, amplifying service disruptions due to overlapping routes. Overall, subsea faults remain infrequent for the core trans-Pacific routes, attributable to armored cable protection and practices, though nearshore and terrestrial vulnerabilities underscore the need for vigilant in high-traffic zones.

Surveillance and Interception Activities

In September 2014, documents leaked by revealed that New Zealand's (GCSB) had developed the program, which involved installing cable access equipment at the Southern Cross Cable's landing station in to intercept flowing to and from . The program, initiated around 2012, enabled the filtering and collection of metadata and content from the cable, which handles approximately 90% of 's international data traffic, primarily for sharing with partners including the (NSA). Australian telecommunications providers involved in operating the cable's Sydney landing point similarly facilitated interception capabilities for domestic intelligence agencies, as disclosed in subsequent reports on cooperation between telcos and spy agencies. These arrangements were part of broader efforts to access trans-Pacific data flows, with the NSA reportedly tapping the cable system to monitor communications between , , and the . New Zealand Prime Minister John Key acknowledged in September 2014 that Snowden's claims about Speargun's access to the cable "may well be right," but emphasized that interceptions were targeted at foreign intelligence threats under legal warrants, not indiscriminate mass surveillance of citizens. Official denials from GCSB and partner agencies maintained that any data collection complied with national laws, such as New Zealand's Intelligence and Security Act, and focused on counter-terrorism and foreign espionage rather than bulk domestic spying. No independent verification of the extent or specifics of interception volumes has been publicly released, though the leaks indicated upstream collection points integrated into the cable's infrastructure for real-time filtering.

Strategic and Economic Impact

Provision of Trans-Pacific Connectivity

The Southern Cross Cable Network delivers trans-Pacific connectivity via a series of fiber-optic cables connecting key landing points in (Sydney), (Auckland), (Nausori), and the (Los Angeles, California, and Hillsboro, Oregon). This southern route spans approximately 45,000 kilometers of , providing lower compared to northern transpacific paths by avoiding congestion-prone Asian hubs. The system supports direct, high-capacity data transmission essential for services between and . Following upgrades, including the activation of the Southern Cross NEXT cable in 2022, the network's total lit capacity exceeds 100 terabits per second (Tbps), enabling resilient bandwidth for diverse applications such as , financial trading, and video streaming. This expansion has increased transpacific capacity by over 500% in recent years, addressing surging demand for US-West Coast to /New Zealand traffic. The cables incorporate branching units to extend connectivity to Pacific Island nations like Tokelau and , enhancing regional access to global networks. By offering protected, diverse routing with multiple fiber pairs and advanced technology, the Southern Cross system minimizes downtime and supports low-latency interconnections for data centers, including links to major cloud providers like . It carries a significant share of international for its connected regions, with the NEXT cable specifically designed as an express route optimizing data-center-to-data-center flows between Sydney, Auckland, and Los Angeles. This infrastructure underpins economic ties by facilitating secure, high-speed data exchange critical for trade, telecommunications, and digital services across the Pacific.

Geopolitical and Security Role

The Southern Cross Cable serves as a critical conduit for secure trans-Pacific communications between the and its allies, and , underpinning intelligence-sharing, military coordination, and economic interdependence in the . Operational since 2000, it handles a substantial portion of data traffic vital to these nations' defense postures, with disruptions potentially isolating and from U.S.-linked networks during conflicts. This linkage aligns with broader allied efforts to counterbalance influence from adversarial powers, such as , whose expanding naval capabilities raise concerns over cable in contested maritime domains. Intelligence operations have leveraged the cable extensively, as evidenced by 2014 disclosures from indicating that Australia's Defence Signals Directorate and New Zealand's established interception points at cable landing stations in and . These taps, implemented between 2012 and 2013, facilitated collection on communications transiting to and from the U.S., integrating into the Five Eyes framework for . Such activities highlight the cable's dual-use nature, enabling both civilian connectivity and state surveillance while raising questions about and foreign under Bermuda-based ownership regulated by U.S. authorities. Security vulnerabilities stem from the cable's exposure on the and at landing points, making it susceptible to intentional damage by state actors amid geopolitical tensions, as noted in analyses of tactics. U.S. assessments warn that severing the Southern Cross system could cripple business transactions and command-and-control functions, underscoring its role as a strategic chokepoint. Mitigation includes U.S. licensing requirements, Department of assurances, and multilateral commitments, such as the 2024 New York Joint Statement by the U.S., , and partners emphasizing resilient infrastructure to safeguard against disruptions with implications.

References

  1. [1]
    Southern Cross - Submarine Networks
    The Southern Cross Cable Network is a protected ring network with 9 landing stations, almost 30,500 km long, and has two traffic paths.Missing: optic | Show results with:optic
  2. [2]
    Southern Cross Cable Network (SCCN) - Submarine Cable Map
    TeleGeography's comprehensive and regularly updated interactive map of the world's major submarine cable systems and landing stations.
  3. [3]
    Ownership Structure of Southern Cross Cables - Submarine Networks
    Jul 22, 2021 · Southern Cross Cables Limited (SCCL) was owned by Spark NZ (50%), Singtel-Optus (40%) and Verizon Business (10%).
  4. [4]
    [PDF] PUBLIC NOTICE - Federal Communications Commission
    Jul 26, 2024 · The Southern Cross 1&2 system has a design capacity of 18 Tbps, with an active capacity of 13.4 Tbps. Available capacity (equipped but not ...
  5. [5]
    Southern Cross Cable System Overview - Submarine Networks
    May 31, 2011 · The design capacity of the Southern Cross Cable System was initially 1.28 Tbps, capable of upgrading with 40G technology.
  6. [6]
    Southern Cross Achieves World's First 1 Tb/s Transmission ... - Ciena
    Jan 15, 2025 · The network has around 45,000 kilometers of submarine and 4,300 kilometers of terrestrial fiber optic cables providing over 100 Tb/s of ...
  7. [7]
    Southern Cross plans new Australia-New Zealand subsea cable
    Jun 6, 2025 · A new Australia-New Zealand subsea cable will be built. Dubbed the SX Tasman Express, the project will see involvement from Southern Cross Cables (SCS), ...
  8. [8]
    [PDF] Southern Cross Cable - Nation Dates
    When did Southern Cross first come into existence? The Southem Cross Cable Network was first conceived in 1996 when the uptake of the Internet was occurring ...
  9. [9]
    Southern Cross Cable Network - Crunchbase Company Profile ...
    Southern Cross and its associated companies was formed in 1997, born from an agreement between Telecom New Zealand (now Spark Trading), Optus and MFS Globenet ...
  10. [10]
    Internet in New Zealand Timeline
    ... Internet”. In July Telecom New Zealand, Optus and MFS Globenet (later acquired by WorldCom) agree to sponsor the Southern Cross cable. Telecom announces a 5 ...
  11. [11]
    Optus in Pacific submarine cable plan - AFR
    Oct 4, 1997 · The cable network, named Southern Cross Cable Network, will be the first direct high-capacity cable to North America from Australia and will ...Missing: founding agreement MFS<|separator|>
  12. [12]
    [PDF] PUBLIC NOTICE - Federal Communications Commission
    Nov 1, 2024 · In 1998, the Commission granted a cable landing license for the Southern Cross 1&2 system (then called the Southern Cross cable system) to MFS ...Missing: founding 1997
  13. [13]
    Southern Cross Sets the Pace with Ciena
    Southern Cross Cables Limited was formed in 1997, the result of an initiative between a number of telcos to establish an independent company to build and ...Missing: 1996 | Show results with:1996
  14. [14]
    Southern Cross starts network - The Royal Gazette
    Jul 12, 1999 · Created: Jul 12, 1999 ... Last week the Southern Cross cable landed at Clovelly Beach in Sydney, Australia -- marking the beginning of six months ...
  15. [15]
    Southern Cross Lands At Takapuna | Scoop News
    Sep 5, 1999 · The Southern Cross cable was landed at Takapuna, Auckland today from the cable-laying vessel, CS Innovator. The Innovator now begins laying the ...
  16. [16]
    Southern Cross Makes Fast Work of NZ-Hawaii Link | Scoop News
    The Southern Cross cable now connects New Zealand to Hawaii ... Tuesday, 19 October 1999, 4:47 pm ... Laying of the Auckland-Hawaii link was carried out by three ...
  17. [17]
    [PDF] Southern - Nation Dates
    Southern Cross and its associated companies was formed in 1997, born from an agreement between. Telecom New Zealand (now Spark Trading), Optus and MFS Globenet ...Missing: conception development
  18. [18]
    Southern Cross NEXT Cable Enters Construction Phase
    The Southern Cross Cable Network comprises two submarine communications cables which were first commissioned in November 2000 and January 2001.
  19. [19]
    Southern Cross Confirms The Ready For Service Date - Scoop NZ
    Mar 30, 2000 · Southern Cross today announced that the 29,000km cable network, purpose-built for the Internet, would be Ready For Service (RFS) on 15 November ...
  20. [20]
    Southern Cross Launches 'Elastic' Transoceanic Bandwidth ...
    Jan 10, 2017 · The Southern Cross Cable Network comprises two submarine communications cables which were first commissioned in November 2000 and January 2001, ...Missing: timeline | Show results with:timeline
  21. [21]
    Southern Cross Services Extended to 2025 - SubTel Forum
    The latest capacity upgrade, using improved 10 Gbps (Gigabits per second) transmission, was completed in April 2010 taking total network capacity to 1.2 Tbps ( ...
  22. [22]
    Southern Cross submarine fiber network jumps to 100G | Lightwave
    The new 100G capabilities, added to the network's existing Ciena 6500 Packet Optical Platforms, bring the total lit capacity of the two cables to 2.6 Tbps, ...<|separator|>
  23. [23]
    Southern Cross Cable Network Upgrades to Support 100G
    Feb 4, 2012 · The Phase H upgrade using Ciena's 40G coherent optical technologies will increase lit capacity across our network to 2Tbs by Q2 2012, and ...
  24. [24]
    Southern Cross NEXT Submarine Cable Lands In Australia
    The project began in 2017 with an undersea survey which maps the ... About the Southern Cross Cable Network. Modern economies and ...
  25. [25]
    Southern Cross announces world's longest single-span submarine ...
    Jul 11, 2022 · The cable took just over two years to complete during the global pandemic and will become the third route in the Southern Cross network ...Missing: timeline | Show results with:timeline
  26. [26]
    Southern Cross cable hit by an outage - ZDNET
    Nov 8, 2012 · A fault on the Southern Cross subsea cable is impacting services in New Zealand, including those offered by Vocus.Missing: repairs | Show results with:repairs
  27. [27]
    Southern Cross Cable Network Topology and Key Parameters
    Jun 1, 2011 · The Southern Cross Cable Network is almost 30,500 km in length, including 28,900km of submarine cable incorporating around 500 optical repeaters ...
  28. [28]
    Southern Cross Achieves World's First 1 Tb/s Transmission Across ...
    Jan 15, 2025 · The network has around 45,000 kilometers of submarine and 4,300 kilometers of terrestrial fiber optic cables providing over 100 Tb/s of ...
  29. [29]
    [PDF] FiberSense-SCCN-Next-Final-Approved.pdf
    SCCL commissioned the Southern Cross NEXT in July 2022 further enhancing the diversity, latency and capacity options of the network eco-system.
  30. [30]
    FiberSense and Southern Cross Cable Network announce ...
    Sep 12, 2022 · FiberSense and Southern Cross Cable Network announce expanded deployment of Subsea Cable Monitoring Technology. Mark Bowen | 12 September, 2022.
  31. [31]
    Southern Cross and FiberSense launch cable monitoring project in ...
    Aug 8, 2024 · According to its site, it is owned 50 percent by Spark (formerly Telecom New Zealand), 40 percent by SingTel (a Singaporean operator with other ...<|control11|><|separator|>
  32. [32]
    Cable Locations - OFCC
    The network consists of three major sections: 1)AU-North, connecting Fairbanks and communities along the southern pipeline corridor to the network. 2) AU-East, ...
  33. [33]
    SingTel.com - Network & Infrastructure // Submarine Cable Systems
    Originally designed to deliver 120 Gbps of fully protected capacity, Southern Cross was expanded in the first quarter of 2003 to 240 Gbps, with the ...
  34. [34]
    Southern Cross Cable upgrades capacity - Computerworld
    Feb 13, 2001 · SCC said it would initially apply the higher capacity DWDM technology only to its third fibre pair, which is scheduled to be equipped early in ...Missing: SDH | Show results with:SDH<|control11|><|separator|>
  35. [35]
    Southern Cross Cables Limited : Down Under the Sea
    Jun 5, 2023 · The original Southern Cross cable was built in 1999 and was only designed to carry 40Gbps per fibre pair using 2.5Gbps wavelength technology.Missing: history | Show results with:history
  36. [36]
    [PDF] Southern Cross builds subsea networks for island nations across the ...
    22 years ago, when Southern Cross built their 昀椀rst trans-. Paci昀椀c network, the total capacity was 240 gigabits per second across two cables. 240 gigabits ...Missing: 1996 growth<|control11|><|separator|>
  37. [37]
    Southern Cross NEXT Launches! - Ciena
    Jul 7, 2022 · The NEXT cable will provide the first international submarine fibre connections to Tokelau and Kiribati and reinforce Fiji's growing role as a ...
  38. [38]
    Southern Cross taps Pioneer Consulting for NEXT subsea cable ...
    Feb 17, 2021 · With system completion expected in early 2022, the US$350 million Southern Cross NEXT cable will provide 72Tb/s of capacity and will be the ...Missing: timeline | Show results with:timeline
  39. [39]
    Southern Cross Next cable project gets green light for Hermosa ...
    Jul 27, 2020 · The Southern Cross Cable Network currently comprises two submarine communications cables, which were first commissioned in November 2000 and ...Missing: timeline | Show results with:timeline
  40. [40]
    Southern Cross NEXT Hermosa Beach Landing Approved
    Jul 28, 2020 · The upcoming Southern Cross NEXT submarine cable system has received FCC license approval to land in Hermosa Beach, California.Missing: construction timeline
  41. [41]
    Equinix Serves as Gateway for Southern Cross NEXT Subsea Cable ...
    Sep 26, 2023 · SCCL was originally formed in 1997 to establish the Southern Cross Cable Network, a twin submarine cable link between Australasia and the United ...Missing: laying timeline<|separator|>
  42. [42]
    Southern Cross, ASN, and OMS Group Sign SX Tasman Express ...
    Jun 4, 2025 · Southern Cross Cable Limited provides fast, direct, and secure international bandwidth from Australia, New Zealand, and the Pacific to the heart ...<|separator|>
  43. [43]
    pl.net business: Southern Cross Cable 17/11/2000
    Nov 17, 2000 · With just six strands of fibre, the Southern Cross cable has 120 times the capacity of the existing PacRim cable that was laid in 1992. This ...<|separator|>
  44. [44]
    Southern Cross begins building 16000km cable between Australia ...
    Oct 4, 2019 · SCCN was founded in 1997 by Telecom New Zealand, Optus and MFS Globenet. According to its site, it is owned 50 percent by Spark (formerly ...
  45. [45]
    The Southern Cross cable that connects Tonga to the outside world ...
    Feb 22, 2022 · The cable repair ship Reliance took 20-days to repair the fibre ... the cable maintenance ship ...
  46. [46]
    Southern Cross Cable Cut For Second Time In Three Months
    Severed cable blamed for Syrian Internet cut. Categories: Cable Faults & Maintenance · Syria's internet restored after blackout. Categories: Cable Faults & ...
  47. [47]
    Cable cut severs Sydney-US Net connection - ZDNET
    Jul 29, 2001 · The Southern Cross undersea cable between Sydney and the US was severed yesterday, leaving Internet traffic grinding to a halt.
  48. [48]
    Southern Cross submarine cable cut off - NZ Herald
    Jul 30, 2001 · The Southern Cross submarine cable snapped 20km from Sydney on Sunday morning during a heavy storm, disrupting services for 12 to 15 hours.
  49. [49]
    [PDF] Economic Impact of Submarine Cable Disruptions
    This is equivalent to 3.6% of Australia's Gross Domestic Product (GDP). The value of the web for the economy is growing by 7% per annum (twice as fast as that.
  50. [50]
    Cable cut for second time in three months | Stuff
    May 20, 2015 · Spokeswoman Rosemay Foot said the cable was repaired in a little under nine hours. Southern Cross' network is configured as a "figure of eight" ...
  51. [51]
    [PDF] SEMAPHORE - International Cable Protection Committee
    Southern Cross cable and the Tasman 2 cable (linking. Australia to New Zealand) as it dragged anchor off. Sydney. Magnifying the impact of this incident, the ...<|separator|>
  52. [52]
    Edward Snowden reveals tapping of major Australia-New Zealand ...
    Sep 15, 2014 · A major undersea telecommunications cable that connects Australia and NZ to North America has been tapped to allow the NSA and its espionage ...
  53. [53]
    John Key says Edward Snowden 'may well be right' about NSA ...
    Sep 17, 2014 · Codenamed Speargun, the program involved installing “cable access” equipment to monitor the Southern Cross cable ... Five Eyes is an ...
  54. [54]
    New Zealand secretly built spying program, report says - CNET
    Sep 15, 2014 · ... Southern Cross cable. Most Internet traffic between New Zealand and the rest of the world crosses that cable. "[M]ass collection from it ...
  55. [55]
    New Zealand spying on Pacific allies for 'Five Eyes' and NSA ...
    Mar 4, 2015 · New Zealand spying on Pacific allies for 'Five Eyes' and NSA, Snowden files show ... Southern Cross cable, New Zealand's primary internet link ...
  56. [56]
    Southern Cross Cable telcos 'partnered' with spy agencies - iTnews
    Nov 27, 2014 · Telcos and network providers on the main cable system connecting Australia and New Zealand to the United States provided interception ...Missing: activities | Show results with:activities
  57. [57]
    Key makes surveillance concessions | RNZ News
    Sep 17, 2014 · Asked if New Zealand or any of the Five Eyes partners had access to the Southern Cross cable - through which New Zealand's electronic ...
  58. [58]
    Southern Cross NEXT - Submarine Networks
    The Southern Cross NEXT is a 15,857 km submarine cable system connecting Sydney, Auckland and Los Angeles, with branching units linking the Pacific Islands ...Missing: construction initial
  59. [59]
    Southern Cross switches on third 400GbE transpacific link
    Jan 17, 2023 · The Next system will boost the capacity of the ecosystem by about 500%, to around 100Tbps, effectively more than doubling Australia and New ...Missing: importance | Show results with:importance
  60. [60]
    Equinix Connects to New Submarine Cable Linking Australia to U.S.
    Sep 26, 2023 · Southern Cross spent about two years installing the new submarine cable network. The company launched the network in July 2022 and began ...
  61. [61]
    Announcement by Southern Cross Cable Network consortium - Singtel
    Oct 1, 2019 · Southern Cross NEXT will provide data connectivity between Sydney, Auckland, and Los Angeles and is scheduled for completion by January 2022.Missing: began | Show results with:began
  62. [62]
    New Zealand Internet Connectivity to AWS | AWS Architecture Blog
    Oct 8, 2019 · Southern Cross B: Takapuna (Auckland, New Zealand) -> Spencer Beach (Hawaii, USA) – 1.2 Tbps. A map of major submarine cables connecting to New ...<|separator|>
  63. [63]
    Information Warfare in the Depths: An Analysis of Global Undersea ...
    According to Commander Michael Matis, U.S. Navy, cutting the Southern Cross cable would severely cripple Australian commercial business transactions and disrupt ...<|control11|><|separator|>
  64. [64]
    NATO's role in enhanced security for critical undersea infrastructure
    Aug 28, 2024 · For Australia and New Zealand, securing the Southern Cross data cable connecting both with the US is a vital aim.<|separator|>
  65. [65]
    Mass Surveillance in NZ: Tapping the South Cross Sea Cable
    Sep 17, 2014 · ... Five Eyes arrangement. Between 2012 and 2013, a metadata surveillance system was created, centred on the Southern Cross cable network. Big ...
  66. [66]
    [PDF] SOUTHERN CROSS CABLES LIMITED
    Jul 21, 2023 · We are regulated by the US Federal Communications Commission, with assurance obligations given to the Department of Homeland Security, and we ...Missing: implications | Show results with:implications
  67. [67]
    Submarine Cable Security at Risk Amid Geopolitical Tensions &amp
    Jul 17, 2025 · The threat of state-sponsored malicious activity targeting submarine cable infrastructure is likely to rise further amid heightened geopolitical tensions.Missing: Southern Cross
  68. [68]
    The New York Joint Statement on the Security and Resilience of ...
    This reliance on undersea cables can, however, present major risks related to important public interests and have national and economic security implications.
  69. [69]
    US and its Allies Issue Joint Statement on the Security and ...
    Oct 7, 2024 · The Joint Statement, proposed by the United States, lays out principles to ensure undersea cable infrastructure is secure, reliable, sustainable and resilient.