Fact-checked by Grok 2 weeks ago

Tees Transporter Bridge

The Tees Transporter Bridge is a Grade II* listed transporter bridge spanning the River Tees between in and Port Clarence in , . Completed in , it consists of two 225-foot steel lattice towers connected by a 570-foot overhead span, from which a gondola suspended by wire ropes carries up to nine cars and 200 passengers (originally designed for six vehicles and 600 people) across the 850-foot total length, positioned 160 feet above the water to accommodate shipping traffic below. The bridge's construction was authorized by an in 1907, with design work led by G. C. Imbault of the Bridge and Engineering Company and fabrication and erection handled by Sir William Arrol & Co. of , , at a total cost of £90,000. It utilized 3,500 tons of for the and 10,000 cubic yards of concrete for the foundations, anchored by 16 wire cables, and was powered by a 30-horsepower driving the overhead rails. Opened on October 17, 1911, by , it replaced an inefficient ferry service dating back to 1840 and facilitated industrial transport in the busy port area during the early . As one of only three surviving transporter bridges in the —alongside those at and —and among the twelve remaining examples worldwide, the Tees Transporter Bridge represents a rare and innovative engineering solution to crossing wide waterways without obstructing navigation, embodying Teesside's industrial and the principles pioneered in the late . Designated a Grade II* listed building in 1985 for its architectural and historical importance, it sustained damage from enemy action during but was repaired and continued operations until 2019, when safety concerns led to its closure for structural assessments and restoration. In November 2025, it was added to Historic England's at due to ongoing deterioration. A visitor centre remains open, offering exhibits on its history, while full reopening is anticipated after a multi-year restoration project funded through heritage grants.

Physical Description

Structure and Dimensions

The Tees Transporter Bridge consists of a cantilevered structure spanning 850 feet (260 m) in total length across the River Tees, with an overall span of 570 feet (174 m) between the centers of its . The towers, each comprising pairs of tapering supports, rise to a of 225 feet ( m) above high water and are anchored on caissons embedded in the riverbed. This design provides a vertical clearance of 160 feet (49 m) beneath the catwalk at high , accommodating traffic on the . The bridge's framework is primarily constructed from plated and riveted , with woven steel wire ropes for , totaling approximately 2,600 tons of steelwork in the main girders and towers, plus an additional 600 tons in the caisson foundations. These materials were chosen for their strength and durability in the corrosive estuarine environment, forming a robust overhead from which the is suspended. Among surviving transporter bridges worldwide, the Tees example stands out for its scale, holding the distinction as the longest at 850 feet (260 m) total length, exceeding other examples such as the with its 646-foot (197 m) span.

Gondola and Operating Mechanism

The gondola of the Tees Transporter Bridge serves as the primary transport element, functioning as a suspended platform that ferries vehicles and pedestrians across the River Tees while preserving clearance for maritime traffic below. This transporter design enables the bridge to span the waterway without the need for a high-level roadway or frequent openings, effectively acting as an aerial ferry that minimizes disruption to river navigation. The gondola is suspended approximately 160 feet (49 m) above the river by a system of steel cables connected to bogies that roll along the bottom chord of the overhead truss girder. These bogies are propelled by two operating cables extending from a machine house on the south side of the bridge to the truss span, allowing the gondola to traverse the full length of the structure. The platform has a capacity for up to 200 passengers when used solely for pedestrians or 9 cars when configured for vehicular transport. Power for the operating mechanism is provided by two 60-horsepower (45 kW) WEG electric motors housed in the machine house, with only one motor required for standard operations to pull the cables and move the bogies along the . The system achieves a crossing time of approximately 90 seconds for the 850-foot (260 m) span, ensuring efficient transit while maintaining stability through the cable suspension. Operations are suspended during high winds exceeding gale force 6 (around 39-46 mph or 63-74 km/h) to ensure safety. Over its history, the mechanism has undergone significant upgrades to sustain reliability, including a major refurbishment in that replaced the original 1911-era electric motors and drive system with modern WEG W22 motors after nearly a century of service, enhancing power and operational efficiency. Additional improvements, such as a £2.6 million renovation in 2014, incorporated new glass panel sidings for better visibility while preserving the original aesthetic. These enhancements underscore the focus on durability and safety in the bridge's unique suspended transport system.

Design and Construction

Planning and Proposals (1872–1902)

The need for a reliable crossing over the River Tees between on the south bank and Port Clarence on the north arose from the rapid industrialization of in the late , driven by the discovery of deposits and the establishment of and chemical works that employed thousands of workers daily. 's population exploded from fewer than 100 residents in 1830 to over 90,000 by 1901, fueled by these industries, while Port Clarence hosted key facilities like the Clarence Iron Works from 1852 onward, making the existing ferry service inadequate for transporting workers, goods, and raw materials. In 1873, Charles Smith, manager of the Hartlepool Iron Works, proposed the first scheme for a —termed a "bridge "—spanning 650 feet with a clearance of 150 feet to allow ship passage, aiming to provide an efficient aerial crossing without obstructing navigation. The Corporation rejected this initial plan due to concerns from shipping interests that even a high-clearance structure could pose risks to river traffic on the busy Tees, which was vital for exporting iron and . By the , renewed pressure for a fixed crossing led to proposals for tunnels or high-level bridges, but these were dismissed primarily on cost grounds, as they would require extensive engineering and disruption to the growing port activities. The Tees Conservancy Commissioners, established in to oversee river navigation and , advocated caution in all schemes to protect commercial shipping, which had increased dramatically with Teesside's industrial output. During the 1890s, engineering studies shifted toward the transporter concept, drawing inspiration from continental examples like Spain's Vizcaya Transporter Bridge in , completed in 1893 by Palacio Elissague, and France's Rochefort-Martrou Bridge, opened in 1900 by Ferdinand Arnodin, both of which demonstrated the design's effectiveness for wide rivers with heavy traffic. These precedents highlighted the transporter's advantages in minimizing interference with shipping while supporting industrial transport needs. In 1902, after evaluating options through cost-benefit assessments emphasizing economic benefits for local industries, the selected the transporter bridge , securing initial of £68,000 for the (equivalent to about £10 million in 2023 values). The was authorized by the (Transporter Bridge) 1907 (7 Edw. 7. c. xx), which mandated a minimum clearance of 160 feet above high to protect . This decision paved the way for parliamentary approval and , addressing the long-standing demand for a non-disruptive crossing essential to Teesside's economic vitality.

Engineering and Building (1902–1911)

The engineering and design of the Tees Transporter Bridge were led by Georges Camille Imbault, a consulting engineer with the Cleveland Bridge and Engineering Co., who developed a distinctive double cantilever truss structure unique among transporter bridges of the era. The firm served as advising engineers, appointed in 1906, while the construction contract was awarded in 1907 to Sir William Arrol & Co. of Glasgow after competitive tendering, selected for their lowest bid among six submissions. This team approach ensured the bridge's steel framework could support the suspended gondola while maintaining a clear height of 160 feet (49 meters) above the River Tees to accommodate shipping traffic, as mandated by the 1907 Middlesbrough and Port Clarence Transporter Bridge Act. Construction commenced in July 1909, with initial efforts focused on the foundations amid the challenging estuarine conditions of the River Tees. The soft, waterlogged soil necessitated the use of pneumatic caissons to excavate down to , reaching depths of up to 90 feet (27 meters) below high water on the Port Clarence side and 70 feet (21 meters) on the side; these were filled with concrete and topped with masonry bases to provide stable support for the towers. Steel fabrication occurred locally at the Cleveland Bridge works in , where the lattice girders and arms were assembled before erection, minimizing transport logistics across the industrialized region. The towers, each rising 225 feet (69 meters) high, and the 850-foot (260-meter) main span were completed by mid-1911, employing skilled riveters and erectors in a workforce drawn from local firms. Key innovations included the bridge's articulated mid-span , which allowed for and structural flexibility without compromising the 's path, and the integration of two 60-horsepower electric motors to power the traveling mechanism along overhead rails, with one typically sufficient for operation. Pre-opening trials in September verified the system's reliability, with the successfully traversing the span under load. The project concluded with the official opening on 17 October by , at a total cost of £68,026 6s 8d, reflecting efficient execution despite material demands in the pre-World War I industrial landscape.

Operational History

Service and Usage (1911–1990s)

The Tees Transporter Bridge entered service on 17 October , immediately becoming a vital artery for cross-river travel in the industrial heartland of . The , attended by thousands of spectators, featured making the inaugural gondola crossing, replacing the unreliable and hazardous steam ferry that had previously served the route. In its early years, the bridge facilitated the daily movement of workers, vehicles, and goods between and Port Clarence, supporting the expansion of local industries such as and ; for instance, it enabled efficient access to newly developed facilities like Dent’s Wharf, a 520-foot quay extension completed in . Usage peaked during the amid booming industrial activity, with over 5 million passengers crossing annually in 1919 alone, underscoring the bridge's central role in transporting commuters and freight for the region's steel, chemical, and sectors. The , capable of carrying up to 860 passengers or nine vehicles per trip, operated on a frequent schedule to handle this demand, often including trams and loaded lorries essential to wartime preparation and postwar recovery. Notable anecdotes from this era include a worker slipping during the very first official crossing but escaping unharmed, highlighting the novelty and occasional perils of the system. During , the bridge served a strategic function by transporting essential workers to munitions factories, foundries, and furnaces producing materials for the , maintaining operations even after sustaining bomb damage to its in 1940. Repairs were swiftly undertaken without reported casualties, allowing continued service amid air raids on Teesside's industrial targets. Postwar, usage began to decline by the 1960s as reduced cross-river traffic and new fixed road bridges, such as the opened in 1934, offered faster alternatives; by the 1980s, the bridge had shifted toward primarily pedestrian and occasional tourist crossings, with annual passenger numbers dropping significantly from their earlier peaks. One poignant anecdote involves a local couple who met on the bridge in 1946 and remained married for 62 years, illustrating its enduring place in community life.

Maintenance and Peak Activity (1990s–2019)

Following its transfer to public ownership in 1996, the Tees Transporter Bridge has been managed by , with joint oversight from Borough Council, and maintenance funded through a combination of toll revenues and external grants. Significant refurbishment efforts in the late and focused on updating aging infrastructure to ensure continued operation. In May 2010, the bridge underwent a major electrical overhaul, replacing the original electric motors and drive system with modern equivalents to prepare for its centenary celebrations; this work, carried out by Deritend, addressed longstanding mechanical wear while preserving the structure's historical integrity. In 2011, a £2.6 million grant from the Heritage Lottery Fund supported comprehensive renovations, including structural repairs, repainting, and enhancements to the to combat corrosion from environmental exposure and road salt. Further gondola refurbishments in 2014, as part of the same project, involved deck replacements and corrosion treatments using rope-access techniques to treat affected steel components, extending the bridge's usability. During the and , the bridge experienced a revival as a key , shifting from primary transport utility to a draw with the opening of a dedicated visitor centre in 2000 and the introduction of guided tours offering access to the upper walkway and gondola rides. These initiatives, bolstered by the 2011 Heritage Lottery Fund upgrades that improved visitor facilities, highlighted the bridge's engineering significance and drew growing public interest, particularly around its centenary in 2011. However, operational challenges mounted in the 2010s due to the structure's advancing age, with increasing downtime from mechanical failures and maintenance needs. Post-2010 overhaul faults led to temporary closures, such as a technical issue in July 2010 and a six-day shutdown in September 2011 for repairs. By 2015, the ongoing £2.6 million project encountered delays from unexpected issues and extensive rust damage, underscoring the cumulative effects of over a century of service. Routine inspections intensified in the late 2010s, revealing stress in structural elements, including concerns, which contributed to escalating downtime. The bridge's last full operational crossing occurred in August 2019, after which it was shuttered indefinitely following a critical that identified risks requiring immediate intervention.

Closure and Current Status

Shutdown and Safety Issues (2019–2020)

In spring 2019, an by engineering consultants identified issues with the bridge's cord angles, prompting further scrutiny. A subsequent July 2019 report highlighted serious safety concerns, leading to a site visit by Atkins engineers in August. On August 5, 2019, closed the bridge to all traffic and pedestrians after Atkins recommended immediate shutdown until a special could assess structural integrity. Key findings from the inspections revealed significant deterioration, including partially detached bracing angles that rendered the structure unsafe for any use. Additional concerns included outdated wire ropes, wheels, and motors, along with loose cross members—some of which had fallen into the River Tees—and anchor points in poor condition. An confirmed years of ineffective management and a lack of qualified staff, exacerbating and overall , with the bridge deemed unfit for . Regulatory actions followed swiftly, with the council cordoning off the site and prohibiting access to mitigate immediate risks. By December 2020, the council approved £655,000 for urgent repairs to stabilize the structure, though operations remained suspended pending full assessments. Demolition was not pursued, given the bridge's Grade II* listed status, shifting focus to preservation options. The closure had notable economic repercussions, particularly for local tourism, as the bridge had previously attracted visitors and generated approximately £71,000 in annual income against £120,000 in operating costs. Prior maintenance efforts in the 2010s had delayed major issues but ultimately failed to prevent the shutdown due to inconsistent oversight.

Preservation and Restoration Efforts (2020–present)

Following the bridge's closure in 2019 due to safety concerns, preservation efforts gained momentum in the early 2020s, with Mayor publicly vowing in November 2023 to save and revive the structure, emphasizing its role as a regional icon. This commitment marked a shift toward coordinated regional action, involving and the (TVCA) to assess and plan . By early 2024, structural assessments revealed the bridge was at risk of catastrophic collapse, prompting urgent feasibility studies and engineering reports to guide conservation. A significant funding milestone came in January 2024 when the TVCA Cabinet allocated £30 million specifically for restoration work aimed at returning the bridge to full operational use as a transport link. This investment, drawn from broader transport budgets including a £978 million settlement for the Tees Valley region, focused on essential repairs to the towers, cables, and gondola mechanisms while prioritizing safety and heritage integrity. However, local leaders noted that this amount addressed transport functionality but would require additional heritage-specific funding to fully restore the Grade II* listed structure. As of November 2025, design and preparatory work is advancing under Council's oversight, with a principal designer appointed to develop detailed repair plans expected to take 12–18 months. Enhanced digital monitoring systems have been installed to track structural movements in , aiding ongoing stability investigations. The bridge's addition to Historic England's 2025 Heritage at in November 2025—listing its condition as "very bad" with high vulnerability—has opened doors to further public and private funding opportunities, as the designation signals priority for conservation grants. Ongoing stability investigations and enhanced monitoring continue, though the gondola remains non-operational and the full timeline depends on securing the remaining funds. Key challenges include the estimated total repair costs exceeding £60 million, far surpassing the initial allocation and necessitating multi-source financing from , funds, and private donors. Environmental and material assessments are addressing , over-stressed components, and historical layers, while ensuring with standards without altering the original engineering. Community through council updates and heritage consultations continues to shape options, balancing transport revival with potential. Future prospects include a tender process for a principal once full is confirmed, with construction projected to span 3–5 years, potentially restoring operations by the early 2030s if momentum sustains. Innovations under consideration involve integrating sustainable technologies, such as energy-efficient controls, to modernize operations while preserving the 1911 mechanisms.

Cultural and Historical Significance

Local Impact and Community Role

The Tees Transporter Bridge played a crucial role in integrating communities across the River Tees, serving as an essential link for workers commuting between the shipyards, factories, and foundries of on the south bank and in on the north bank. By replacing unreliable and overcrowded steam ferries, it enabled efficient daily crossings for thousands of laborers during the peak of Teesside's industrial era, thereby strengthening social and familial ties between the two sides of the river. This connectivity not only facilitated workforce mobility but also contributed to the region's economic vitality by allowing seamless movement of personnel essential to the burgeoning iron, steel, and chemical industries. Economically, the bridge bolstered Teesside's industrial boom by transporting goods and materials across the without obstructing shipping lanes, supporting the expansion of local businesses such as wharves and warehouses that handled global trade. For instance, its system carried vehicles, passengers, and cargo, directly aiding the prosperity of sectors like steel production, which defined the area's economic landscape until the late . In the post-industrial period, the structure transitioned into a community asset, hosting markets and interpretive events at its visitor centre to celebrate regional and attract local engagement. Socially, the bridge became embedded in local as a symbol of pride, fostering festivals, including the Transporter Bridge Carnival held during its 2011 centenary celebrations, and accommodating school trips that educated generations on 's engineering legacy. During its 2011 centenary celebrations, events including free access to the visitor centre and discounted crossings drew participation, highlighting its role in and pride. Oral histories from former operators and users, preserved through projects, recount personal experiences of daily crossings that influenced migration patterns, with many workers relocating to for jobs accessible via the bridge, evoking a shared sense of amid highs and declines. In recent years, the bridge's closure since 2019 has spurred modern community campaigns for its reopening, involving local schools through educational outreach, businesses via funding partnerships, and residents in advocacy efforts led by cross-party political figures. In November 2025, it was added to Historic England's Heritage at Risk Register 2025, the only site in North East England added that year, intensifying campaigns for its preservation. These initiatives emphasize restoring the structure as a living connection point, with calls from local MPs underscoring its enduring role in community cohesion and economic regeneration.

Recognition and Legacy

The Tees Transporter Bridge was designated a Grade II* listed building on 21 June 1985 by , recognizing its exceptional historical and architectural importance as a rare example of early 20th-century design. It stands as one of three surviving in the , alongside those in and , highlighting its status among a globally dwindling number of such structures built to facilitate industrial river crossings without obstructing shipping. The bridge has garnered significant cultural recognition through its appearances in media, including documentaries such as Transporter Bridges of the World (2021), which explores its engineering alongside international counterparts, and television features like the Tyne Tees Television series Your Heritage: The River Tees (1962), which documents its role in regional history. In 2015, it was commemorated on a set of first-class postage stamps celebrating iconic British bridges, underscoring its national emblematic value. A limited-edition 9ct was also issued in 2013 to mark the bridge's centenary, further embedding it in commemorative . In terms of professional accolades, the bridge received the ' Heritage Plaque in December 1993, the organization's highest honor for engineering excellence, acknowledging its innovative construction and enduring functionality. It forms a key segment of the Groundworks Heritage Trail in , an urban route that connects industrial landmarks along the River Tees, promoting public appreciation of Teesside's engineering heritage. Globally, the Tees Transporter Bridge exemplifies early 20th-century advancements in , particularly the transporter mechanism developed to address tall ship masts on busy waterways, influencing designs in and beyond during the industrial era. Its gondola system, which minimizes river obstruction while enabling vehicular and pedestrian transit, resonates in contemporary discussions on low-impact, sustainable infrastructure alternatives to expansive fixed bridges. Centennial celebrations in 2011 drew thousands of visitors through events including concerts, interactive light displays, and bungee jumps from the structure, culminating in a major refurbishment funded to preserve its legacy. A joint bid for World Heritage status was initiated in 2011 with other transporter bridges, though it was unsuccessful. attachments have amplified these efforts, fostering a sense of shared identity that extends the bridge's influence beyond engineering circles.

References

  1. [1]
    TRANSPORTER BRIDGE, Non Civil Parish - 1139267
    List entry 1139267. Grade II* Listed Building: Transporter Bridge. May include summary, reasons for designation and history.<|control11|><|separator|>
  2. [2]
    Middlesbrough Transporter Bridge, Cleveland | Educational Images
    Opening on the 17th October 1911, the 850 ft Middlesbrough Transporter Bridge spanned the 470 ft River Tees, superseding the ferry crossing which had ...
  3. [3]
    Tees Transporter Bridge
    The Tees Transporter Bridge is a metal, movable transporter bridge, one of three surviving in the UK, with a main span of 570 feet and a 160-foot cantilever ...
  4. [4]
    Tees Transporter Bridge | Middlesbrough Council
    The Tees Transporter Bridge between Middlesbrough and Port Clarence opened in 1911. It supports a gondola which is intended to carry vehicles and pedestrians ...
  5. [5]
    Transporter Bridge and Visitor Centre - Visit Tees Valley
    The Tees Transporter Bridge has been the area's landmark since opening in 1911. It is the longest working transporter bridge in the world and an iconic symbol ...
  6. [6]
    Novel Transportation Bridge in Great Britain | Scientific American
    The total length of the bridge and approach span is 850 feet, the length of each cantilever g i r de r overhanging on the landward side of the towers is 140 ...Missing: 2760 2700
  7. [7]
    Tees Transporter Bridge - Middlesbrough - Heritage Locations
    The bridge was built by Sir William Arrol & Co. in 1911 under a 1907 Act of Parliament. Teesside has a long tradition of bridge building. Many of the world's ...
  8. [8]
    Tees Transporter Bridge - Facebook
    Jan 25, 2024 · It is 30 feet wide (9 metres), and 76 feet (23metres) above high water level, with an overall length of 339 feet (103 metres). It was ...Yesterday I spent an hour at the Tees Transporter Bridge Visitor ...Another iconic grade II listed bridge in Middlesbrough - FacebookMore results from www.facebook.comMissing: 2760 | Show results with:2760
  9. [9]
    Tees Transporter Bridge - Bridgeinfo.net
    Transport bro. Design, Truss bridge · Length, 259 m. Height, 69 m. Clearance below, 49 m. Longest span, 180 m. See bridge in maps. Tees Transporter Bridge is a ...Missing: materials | Show results with:materials
  10. [10]
    WEG W22 motors give power boost to iconic Middlesbrough ...
    Dec 13, 2010 · WEG W22 motors give power boost to iconic Middlesbrough transporter bridge. The motors were installed for a major overhaul after 100 years of ...
  11. [11]
    Transporter bridge's Gondola revamped in £2.6m project - BBC News
    Aug 24, 2014 · A landmark bridge's distinctive gondola is having a facelift as part of ongoing £2.6m works. The revamp is part of improvements to the Tees ...
  12. [12]
    [PDF] Industry in the Tees Valley
    The Tees Valley is known for iron and steel, shipbuilding, and chemicals. Early industries included agriculture, flour milling, and small scale shipbuilding.Missing: context crossing
  13. [13]
    BBC - Legacies - England - Teesside - Coping with industrial growth
    However, it was coal and iron in the 19th Century that transformed the area from largely uninhabited farmland to one of Victorian Britain's fastest growing ...<|separator|>
  14. [14]
    Middlesbrough Transporter Bridge - Graces Guide
    Aug 19, 2019 · Richardson and Sons, Hartlepool, proposed and designed a transporter bridge, which he called a 'bridge ferry', to cross the River Tees between ...<|separator|>
  15. [15]
    Tees Conservancy Commissioners – 1953 | Picture Stockton Archive
    Sep 17, 2012 · A group of officials for the Tees Conservancy Commission, c1953. In 1852 the Tees Conservancy Commission took over responsibility of the River Tees.Missing: proposals 1890s
  16. [16]
    Transporter Bridges - Amusing Planet
    Dec 23, 2013 · The concept was first mooted in 1872 when Charles Smith, Manager of the Hartlepool Iron Works, proposed a scheme to construct a transporter ...
  17. [17]
    Teesside Bridges: 1. Middlesbrough Transporter Bridge
    Nov 12, 2013 · ... bridge gondola is hung. This is both safe and reduces greatly the amount of temporary containment required when removing existing paintwork.Missing: features | Show results with:features<|control11|><|separator|>
  18. [18]
    Transporter Bridges - Wonders of World Engineering
    Altogether the cables of the Runcorn Transporter Bridge weigh 243 tons and are capable of bearing a tensile stress of 95 tons to the square inch. The ...
  19. [19]
    1911: The Tees Transporter Bridge opens - Port Of Middlesbrough
    Having rejected the proposal of Charles Smith to build an aerial Ferrybridge ... Above: The Transporter Bridge's first official trip, 17 October 1911 (Source: ...Missing: 1872 historical
  20. [20]
    Happy birthday to a transport of delight | Teesside University
    Oct 17, 2011 · Back on October 17th 1911, Queen Victoria's grandson Prince Arthur of Connaught and a host of local dignitaries made the first official crossing ...
  21. [21]
    1939-1945: Second World War - Port Of Middlesbrough
    During the Second World War the iconic Tees Transporter Bridge was one of the many structures that suffered damage as a result of bombings along the river. · The ...
  22. [22]
    Middlesbrough Transporter Bridge celebrates centenary - BBC News
    Oct 12, 2011 · In March 1919, after the Armistice, more than 500,000 passengers used the bridge - a figure that has never been exceeded. Ninety-one-year-old ...
  23. [23]
    The Politics of Bridge Building: The Long Wait for the Tees (Newport ...
    The Tees (Newport) Bridge officially opened in February 1934 to much fanfare and public celebration, the event receiving extensive local, regional and ...
  24. [24]
    Big Blue (Tees Transporter Bridge, Middlesbrough, UK)
    Dec 16, 2015 · In December 1993, the bridge received a Heritage Plaque for engineering excellence from the Institution of Mechanical Engineers.
  25. [25]
    New drive system prepares Middlesbrough bridge for its centenary
    Dec 13, 2010 · In May 2010, the bridge was shut down to allow the original electric motors and drive system to be replaced in time for its centenary ...
  26. [26]
    Ensuring Longevity of Tees Transporter Bridge – deritend.co.uk
    Sep 20, 2019 · Carrying a travelling gondola suspended from the bridge, it can carry 200 people across the river in 90 seconds. It is the second largest ...
  27. [27]
    Middlesbrough's landmark Transporter Bridge gets £2.6m Heritage ...
    May 30, 2011 · The Bridge links Middlesbrough and Port Clarence and is a spectacular landmark on the River Tees. ... the history of the Bridge and the ...
  28. [28]
    Middlesbrough Transporter Bridge to be repainted - BBC News
    Jul 7, 2013 · Middlesbrough's Transporter Bridge is to undergo repairs and be repainted as part of its refurbishment. The work to the Grade II-listed bridge ...
  29. [29]
    Tees Transporter Bridge - Taziker
    The Tees Transporter Bridge connects Middlesbrough to Port Clarence; using a travelling gondola, suspended from the bridge, it can carry 9 cars across the ...
  30. [30]
    Transporter Bridge in Cleveland - What's On In Teesside
    In 2011, to mark the Bridge's centenary, the Heritage Lottery Fund (HLF) confirmed a £2.6m award for refurbishment and upgrade work to the Bridge. The HLF ...
  31. [31]
    Fault closes Middlesbrough's Transporter Bridge - BBC News
    Jul 7, 2010 · A landmark bridge on Teesside has closed as a result of technical difficulties, less than a month after it underwent a major overhaul.
  32. [32]
    Middlesbrough's Transporter Bridge shuts for repairs - BBC News
    Sep 11, 2011 · Middlesbrough's Transporter Bridge, one of only two operating in the UK, has closed for six days for maintenance.
  33. [33]
    Middlesbrough transporter bridge revamp hit by further problems
    Mar 3, 2015 · "The latest problems have been with the electrical wiring and we've also encountered more rust damage than we envisaged. But we're hopeful this ...Missing: 2010s fatigue
  34. [34]
    Transporter Bridge: Council considers stopping vehicle crossing - BBC
    Dec 10, 2020 · The bridge was closed in August 2019 after a safety inspection, with the previous such check carried out in 2011. Safety inspections should ...
  35. [35]
    Foundation issues discovered on 'death risk' Middlesbrough ...
    Aug 9, 2022 · Middlesbrough's troubled Edwardian Tees Transporter Bridge is "sinking", with structural problems considered "much worse than thought", the ...
  36. [36]
    [PDF] Transporter Bridge - Middlesbrough Council
    Dec 22, 2020 · 42.6m long cantilever spans, both of which are tied into the ground below via tensioned cables and ground anchorages to prevent them from ...Missing: specifications | Show results with:specifications
  37. [37]
    Transporter Bridge was 'in dangerous state of repair' before closure
    Dec 12, 2020 · The 109-year-old bridge was shut in August 2019 after serious safety concerns came to light. And a stark audit report by the council has ...
  38. [38]
    Mayor Vows To Save And Revive Broken Transporter Bridge
    Nov 29, 2023 · Tees Valley Mayor Ben Houchen has vowed to save Middlesbrough's iconic Tees Transporter Bridge and end its uncertain future.<|separator|>
  39. [39]
  40. [40]
    The Tees Transporter Bridge - Tees Valley Combined Authority
    Safety concerns have seen the bridge closed since 2019. A package of interventions will be required to bring the bridge back to full operational use. Timeline.
  41. [41]
  42. [42]
    Mayor warns £30m won't fix Transporter Bridge - Tees Business
    Aug 26, 2025 · While £30m has been allocated for the project, those funds must be used to enable transport functionality, not purely heritage work. “That money ...Missing: 2020-2025 | Show results with:2020-2025<|control11|><|separator|>
  43. [43]
  44. [44]
  45. [45]
    Tees Transporter Bridge | Co-Curate
    Locally the bridge is nicknamed 'The Tranny'. The bridge is Grade II* listed on the National Heritage List for England.Missing: significance | Show results with:significance
  46. [46]
    Teesside's bridge-building heritage and the Tees Transporter Bridge ...
    The Tees Transporter Bridge symbolizes Teesside's industrial identity, integral since its 1911 opening. ... The bridge serves as a platform for memory and ...
  47. [47]
    Cross-party support to re-open iconic Tees transporter bridge
    Nov 30, 2023 · Plans to reopen the landmark Middlesbrough transporter bridge have committed to on Teesside, with both current mayor Ben Houchen and Labour mayoral candidate ...Missing: local schools
  48. [48]
  49. [49]
    Geek's Guide to Britain: Newport Transporter - The Register
    Oct 1, 2021 · The second is the Tees Transporter Bridge in Middlesbrough, which ... mph or 39-49kph).
  50. [50]
    Transporter Bridges of the World - YouTube
    Apr 18, 2021 · new international collaborative film showcasing the Transporter Bridges ... Dr Tosh Warwick, Deputy Chair of the Tees Transporter Bridge ...
  51. [51]
    YOUR HERITAGE: THE RIVER TEES - Yorkshire Film Archive
    Summary The final of a three part Tyne Tees Television documentary presented by Mike Neville, in which he journeys down the Tees.
  52. [52]
  53. [53]
    Transporter centenary is celebrated in gold coin - Teesside Live
    May 21, 2013 · A limited edition 9ct gold coin has been presented to Middlesbrough Council to celebrate the centenary of the Transporter Bridge.Missing: stamps | Show results with:stamps
  54. [54]
    [PDF] Groundworks Heritage Trail Guide Middlesbrough
    An urban trail that includes the. Tees Barrage, Newport Bridge, and ends at the iconic Tees Transporter Bridge. Highlights. 5. Completed in 1995, the Tees.
  55. [55]
    Transporter Bridges - Google Sightseeing
    Sep 4, 2014 · In the late 19th and early 20th centuries, almost two dozen transporter bridges were built around the world. They feature a high gantry - tall ...Missing: engineering significance
  56. [56]
    Transported | Capacify - WordPress.com
    Jan 12, 2015 · Tees Transporter Bridge, Middlesbrough. Boasting a massive 49m ... approach ramps if road traffic were to ascend and descend. So what do ...Missing: length | Show results with:length<|control11|><|separator|>
  57. [57]
    Middlesbrough's Transporter Bridge celebrates centenary - BBC News
    Oct 17, 2011 · Designed by Darlington-based Cleveland Bridge & Engineering Co, the bridge cost £87,316 to build. The Grade II-listed Transporter Bridge, ...Missing: £68000 1902
  58. [58]
    Transporter Bridge bids for prestigious UNESCO title - Teesside Live
    Feb 28, 2011 · Teesside's Transporter Bridge could join the ranks of the Statue of Liberty, the Eiffel Tower and the Great Wall of China as a World Heritage Site.