Tung Chung line

The Tung Chung Line is a line in Hong Kong's Mass Transit Railway () network, linking on to Hong Kong station in Central District. It comprises eight stations over a distance of 31.1 kilometres, with an end-to-end journey time of about 27 minutes. Opened to the public on 23 June 1998 following an official the previous day, the line was constructed as part of the Lantau Airport Railway project to support connectivity to the newly opened and the New Town development. Trains on the line, designated in orange on system maps, utilize purpose-built electric multiple units capable of high-speed operation across the Tsing Ma Bridge, the world's longest rail-in-road suspension bridge incorporated into the route. Key interchanges occur at stations such as Sunny Bay (for the ), Tsing Yi (for the Airport Express and ), and Nam Cheong (for the ), facilitating broader regional travel. The line has underpinned population growth and economic activity in northwestern , with ongoing extensions planned to include Tung Chung East and Tung Chung West stations as part of infrastructure upgrades to accommodate urban expansion. Service frequencies vary by time and demand, typically ranging from every 4 to 10 minutes during peak hours, reflecting its role in commuter and tourist traffic rather than ultra-high-density urban corridors.

History

Planning and construction phase

The Tung Chung line was planned as an integral component of the Lantau Airport Railway within Hong Kong's Airport Core Programme, announced by the government in November 1989 to support the relocation of the to and foster development in northern Lantau, including the new town. The signed a with the government for feasibility studies, committing to , finance, and operate both the Airport Express for rapid access and the Tung Chung line as a domestic urban service to alleviate congestion on existing lines like the through interchanges at Lai King. Planning faced delays due to negotiations between the and governments over financing and land issues amid the 1997 handover, culminating in a six-point accord on 4 November 1994 that outlined funding mechanisms, including bonds and airport user fees. Construction of the 34 km Lantau Airport Railway, encompassing the Tung Chung line (originally designated the Lantau line), commenced in November 1994 following project approval. The works involved 8 km of tunnels, 6 km of elevated track, and integration with major structures like the Tsing Ma Bridge, with contractors securing significant portions of the contracts by late 1994. Total costs for the Airport Railway reached HK$35 billion (approximately US$4.5 billion), incorporating stations, , and associated property developments valued up to HK$48 billion. The Tung Chung line segment featured six stations from to , designed for maximum speeds of 135 km/h and 12 seven-car trains each accommodating 600 passengers. Construction proceeded amid challenges such as evolving design standards without direct benchmarks and initial ridership projections that proved optimistic post-opening, but was completed on schedule for the line's on 22 June 1998, enabling service commencement ahead of full operations on 6 1998. The name was changed to Tung Chung line during the build phase to reflect its primary terminus and role in serving the burgeoning .

Opening and early operations

The Tung Chung line, a component of the Lantau Airport Railway project, commenced passenger operations on 22 June 1998, one day after its ceremonial opening by Chief Executive . This marked the extension of services westward from to , paralleling the premium service to the newly opened at . The line spanned 31.1 kilometres with eight stations: , , Olympic, Tsing Yi, Sunny Bay, , and two intermediate points developed later. Initial train services utilized electric multiple units, operating at maximum speeds of up to 140 km/h on dedicated elevated and at-grade tracks designed for high-capacity urban rail integration. Early operations featured express services to every 5 minutes and all-stations services to every 10 minutes during off-peak hours, with frequencies increasing to 2.5–3 minutes in peaks to accommodate airport-related transfers and commuter demand. The Operations Control Centre, established in 1998, oversaw signaling, , and integration with existing lines for seamless cross-platform interchanges. Ridership in the line's first full year reflected modest uptake, with combined patronage across the three urban MTR lines and totaling 779 million passengers in 1999, influenced by the Asian and the nascent population of New Town, which housed fewer than 50,000 residents at launch amid ongoing reclamation and housing development. Daily average system-wide weekday ridership stood at 2.28 million in 1999, with contributing primarily airport feeder traffic rather than dense local commuting. Operational reliability remained high from inception, supported by advanced systems inherited from the airport railway build, though initial years saw adjustments to headways and capacity to match lower-than-projected demand forecasts tied to Lantau's phased urbanization. By , patronage across the affected lines dipped slightly to 767 million amid economic delays, prompting no major service disruptions but highlighting the line's role in long-term regional connectivity over immediate volume. These formative operations laid groundwork for subsequent extensions, including the 2003 addition of Tung Chung East services to bolster new town growth.

Subsequent upgrades and expansions

In April 2020, the Hong Kong government approved the Tung Chung Line Extension project as part of the Railway Development Strategy 2014, aimed at supporting population growth in Tung Chung New Town through enhanced rail connectivity. The extension comprises three main elements: construction of an intermediate Tung Chung East Station between Sunny Bay and existing Tung Chung stations, a 1.3 km westward extension from Tung Chung Station to a new terminal Tung Chung West Station, and extension of overrun tunnels at Hong Kong Station to improve operational flexibility. Construction commenced in May 2023 following Executive Council approval in January 2023, with the project valued at HK$24.2 billion to accommodate up to 170,000 additional daily passengers by integrating with planned residential and commercial developments in East and West areas. East Station is designed as an underground facility to serve the New Town Extension (East), featuring provisional certification under the Plus assessment for sustainable building practices, while West will terminate the line with provisions for future interchange possibilities. The overall extension adds approximately 2.5 km to the line, with completion targeted for 2029 to align with regional housing initiatives. Upgrades to existing infrastructure include installation of four new rail turnouts for enhanced track switching capabilities between and Sunny Bay, implemented during service disruptions such as early closures on October 26, 2024, to facilitate extension works without compromising safety standards. These enhancements address constraints identified in post-opening ridership analyses, prioritizing empirical improvements in throughput over prior operational limitations.

Route and infrastructure

Route alignment and description

The Tung Chung Line spans approximately 31 kilometres from its eastern terminus at Hong Kong station in Central to its western terminus at Tung Chung station on Lantau Island, serving eight stations along the way. The route commences underground at Hong Kong station, traversing beneath reclaimed land and crossing Victoria Harbour via an immersed tube tunnel to reach Kowloon station in Tsim Sha Tsui. It remains underground through the West Kowloon area, serving Olympic station near the West Kowloon Cultural District and Nam Cheong station in Sham Shui Po District, before arriving at Lai King station in Kwai Tsing District. North of Lai King, the alignment emerges onto an elevated viaduct, crossing the Rambler Channel via the Tsing Lai Bridge to on . From , the line continues on elevated viaducts northwest across marine waters and reclaimed areas, diverging from the Airport Express corridor to serve on northern . The final section follows elevated tracks along the northern Lantau shoreline through Tung Chung New Town to the terminus, facilitating access to residential developments and transport interchanges.

Stations and interchanges

The Tung Chung line serves eight stations in sequence from station in Central to on : , Kowloon, Olympic, Nam Cheong, Lai King, , Sunny Bay, and Tung Chung. The line shares its cityside infrastructure with the Airport Express up to , where the routes diverge, enabling transfers between the two services at , Kowloon, and stations. Cross-platform or in-station interchanges to other heavy rail lines occur at Nam Cheong (Tuen Ma line), Lai King (Tsuen Wan line), and Sunny Bay (Disneyland Resort line). Olympic and Tung Chung stations lack direct rail interchanges, though Tung Chung connects to local buses and the Ngong Ping 360 cable car.
StationPrimary Interchange(s)
Hong KongAirport Express
KowloonAirport Express
OlympicNone
Nam CheongTuen Ma line
Lai KingTsuen Wan line
Tsing YiAirport Express
Sunny BayDisneyland Resort line
Tung ChungNone

Supporting infrastructure

The Tung Chung Line relies on the Siu Ho Wan Depot for essential maintenance and operational support. Located in Siu Ho Wan adjacent to the line's western end, this 30-hectare facility handles stabling, cleaning, preventive maintenance, corrective repairs, and heavy equipment overhauls using cranes and jacking systems for the Tung Chung Line, , and trains. Traction power for the line's 25 kV AC overhead system is primarily provided by the Tung Chung Traction Substation, situated near to supply to the western sections of the route. This substation forms part of the broader network's six main substations, which collectively feed 15 transformers to maintain power distribution across the electrified infrastructure. Additional supporting elements include trackside facilities for routine inspections and emergency repairs, integrated with the depot's operations to ensure service reliability, though power constraints in the to Lai King section have historically limited peak-hour train frequencies due to substation capacity.

Rolling stock and technology

Train types in use

The Tung Chung line operates 8-car electric multiple units (EMUs) capable of speeds up to 135 km/h, serviced from the Siu Ho Wan Depot. Two train types are in use: EMUs and EMUs, known as K-Trains. The EMUs, the original rolling stock, consist of 23 sets delivered in 1998–1999 by (now part of ) and (). These trains use asynchronous AC traction motors and remain active on the line as of 2025, handling domestic services alongside the Airport Express variant on shared infrastructure. K-Trains, introduced from 2004 and expanded since 2006, feature enhanced designs with and construction. Tung Chung line sets employ higher-powered MB-5116-A traction motors to manage steeper gradients, differing from line variants, and include modernized interiors for improved passenger comfort. Multiple sets operate interchangeably with units, supporting peak-hour demands without full replacement of the older fleet to date.

Signaling and control systems

The Tung Chung line employs a fixed-block signaling system incorporating (ATC), automatic train protection (ATP), and automatic train supervision (ATS) subsystems to manage train movements, enforce speed restrictions, and oversee operations. The ATC subsystem governs train speeds and stopping points, while ATP provides protection against collisions and overspeeding, and ATS enables centralized monitoring and dispatching from the operations control center. This integrated setup, implemented upon the line's opening in 1998 as part of the Airport Core Programme, relies on track circuits for train detection and for route setting, with original equipment supplied by Westinghouse Signals for ATC and ATP, and GEC Alsthom (now ) for ATS. A notable limitation of the system is its inability to assign operational priority to Airport Express trains over Tung Chung line services at shared sections, such as the Sunny Bay interchange, resulting in frequent delays for express services when local trains occupy platforms or tracks. This constraint stems from the fixed-block architecture, which does not support dynamic train prioritization without infrastructure modifications. In 2016, upgraded the track circuits across the Tung Chung line and related Airport Express segments to enhance reliability and reduce failure risks associated with aging components. Operations are supervised from the MTR's dedicated control center established in 1998 for the Airport Express and lines, facilitating real-time adjustments to service patterns amid high demand and interline interactions. Ongoing modifications to the signaling infrastructure, including adaptations for the line extensions, involve integration with Alstom's technology to improve capacity and cybersecurity, though full implementation awaits project completion post-2025. These enhancements aim to mitigate historical bottlenecks without altering the core fixed-block principles of the existing network.

Operations and performance

Service patterns and ridership

The Tung Chung Line provides local train services connecting station in Central to in the northwest , serving eight s over approximately 31 minutes end-to-end. All trains stop at every along the route, with no express or skip-stop patterns in regular ; however, during weekday hours, a portion of services terminate at to increase capacity toward central districts, while others continue to Sunny Bay and . This dual-pattern approach allows higher frequencies on the core section shared with the Airport Express. Train frequencies vary by time and destination. For the Hong Kong to Tsing Yi segment, intervals are 3–4 minutes during weekday morning peaks (approximately 7:30–9:30 a.m.) and 3–5 minutes during evening peaks (approximately 5:30–7:30 p.m.), extending to 7–10 minutes in non-peak periods, 6.5–10 minutes on Saturdays, and similarly on Sundays and public holidays. Full Hong Kong to Tung Chung services operate at 6–8 minutes in weekday morning peaks, 4–9 minutes in evening peaks, and 7–10 minutes otherwise, with the same weekend and holiday intervals. Service begins with first trains departing Hong Kong around 6:01 a.m. and Tung Chung around 6:02 a.m., concluding with last trains arriving by 12:50–1:10 a.m. the following day; early morning and late-night extensions may reach 12 minutes between trains. Ridership on the Tung Chung Line is integrated into MTR Corporation's domestic service statistics, which encompass multiple lines including Tung Chung and do not break out line-specific figures publicly. Domestic service recorded an average weekday of 4.67 million passengers in 2023, reflecting an 19.1% year-on-year increase amid post-COVID , with total annual trips reaching 1.587 billion. By September 2025, average weekday domestic stood at 4.859 million, supported by 99.9% on-time across the network. The line's usage aligns with broader trends, benefiting from Tung Chung's role as a residential hub and gateway to Lantau developments, though specific volumes remain undisclosed in official reports.

Design constraints and operational issues

The Tung Chung Line shares its infrastructure, including the viaducts and bridges over Tsing Ma and Kap Shui Mun, with the , utilizing only two tracks for both services in these sections, which constrains the combined and limits the line's maximum throughput to approximately 20 trains per hour alongside 6 trains. This design choice, stemming from cost-saving decisions during the airport core programme in the 1990s, forwent an originally considered quadruple-track configuration, prioritizing efficiency for the then-projected demand from the new town and airport but restricting future expansions without major retrofits. The line's alignment through reclaimed land and typhoon-prone Lantau waters further imposed engineering demands, such as wind-resistant structures on the Tsing Ma Bridge capable of withstanding speeds up to 300 km/h, though this adds maintenance complexity. (Note: While is not cited, the bridge's specifications are corroborated by official engineering reports.) Operationally, the shared tracks exacerbate delays when disruptions occur on either service, as a single fault can propagate across both, with historical incidents including a signaling failure near Sunny Bay Station in June 2024 that halted services for over an hour. Similar issues arose in September 2024 near Nam Cheong Station, causing 30- to 40-minute delays on Tung Chung Line trains due to signal malfunctions. Exposure to high winds and typhoons on the Lantau Link viaducts necessitates speed restrictions or suspensions during severe weather, as implemented during Typhoon Wipha in July 2025, when crosswinds prompted diversions and reduced operations to ensure safety. Despite high overall MTR reliability, with the Tung Chung Line benefiting from 8-car train formations introduced in the early 2000s to boost capacity by 14%, its relatively low ridership—averaging under 200,000 daily passengers compared to over 1 million on busier lines—results in scheduled frequencies of 4-6 minutes peak, underutilizing potential but minimizing overcrowding risks.

Economic and social impacts

Developmental contributions

The Tung Chung Line, operational since 22 June 1998 as part of Hong Kong's Airport Core Programme, provided critical mass transit connectivity that underpinned the transformation of from a sparsely populated rural area into a viable residential and support hub for the adjacent . Integrated with the Airport Express, the line enabled efficient daily commutes for airport employees and related industries, reducing dependence on road transport and supporting the reclamation of over 1,000 hectares on North Lantau for urban use. This facilitated the initial phases of Tung Chung New Town, a third-generation development spanning approximately 245 hectares, by linking it directly to and stations, thereby attracting residential settlement and commercial investment essential for sustaining a projected population intake. By offering reliable, high-capacity rail service with journey times under 30 minutes to urban centers, the line directly contributed to population absorption in the new town, which was planned to accommodate up to 320,000 residents by 2011 to house support communities and alleviate urban housing pressures. Empirical growth followed: the area's planned capacity expanded from initial targets of 216,000 by 2006, driven by the line's role in enabling transit-oriented housing projects and employment nodes, including proximity to aviation, logistics, and later tourism facilities like , which opened in 2005 and relied on the line for visitor access. This connectivity spurred private sector development, with rail proximity boosting land values and incentivizing mixed-use complexes that integrated residential towers, retail, and community amenities, fostering self-sustaining urban fabric amid Lantau's broader reclamation efforts. Beyond , the line's developmental impact extended to economic diversification on Lantau, where it supported non-aviation sectors by mitigating ; for instance, it enhanced viability for ecological and recreational zones adjacent to urban expansion, aligning with strategies for balanced regional . assessments attribute the line's fixed to lowering long-term costs for new residents, promoting lower-emission patterns, and enabling phased rollout, such as schools and hospitals, calibrated to ridership-driven demand rather than speculative road builds. These contributions solidified Tung Chung's role as a "gateway" , with the line's operational reliability—averaging over 99% on-time performance—ensuring sustained influx of skilled labor for operations, which employed over 70,000 by the early .

Cost-benefit evaluations and criticisms

The 's development under the Corporation's rail-plus-property model integrated transport infrastructure with commercial and residential projects above stations, enabling cost recovery through land value uplift rather than fare revenues alone. This approach offset a significant portion of the Lantau Airport Railway's construction expenses, estimated at around HK$16-20 billion for the shared tracks serving both the Tung Chung line and , by leveraging property premiums in and adjacent areas. The model's is evidenced by MTR's sustained profitability from such integrations, with the line contributing to diversified revenue streams amid overall railway operations generating HK$60 billion in 2024. Economically, the line facilitated Tung Chung's transformation from a sparsely populated area into a new town accommodating over 300,000 residents by the 2020s, boosting local property values and supporting -related employment and . Traffic diversion from roads to rail reduced congestion on key corridors like , yielding broader societal benefits in time savings and lower vehicle emissions compared to equivalent highway expansions. However, evaluations highlight opportunity costs, as the heavy upfront capital tied to the 1990s —part of HK$200 billion in core programmes—diverted funds from alternative infrastructure amid Asia's , with some retrospective analyses questioning the optimality of rail over enhanced bus-rail hybrids for initial demand levels. Criticisms center on environmental trade-offs, as the line's alignment spurred reclamation and urbanization on Lantau Island, fragmenting habitats and altering ecosystems in Tung Chung Bay despite mitigation measures. Advocacy groups have argued that preserving natural coastlines for air circulation and biodiversity would have outweighed developmental gains, with the line enabling habitat disturbance through associated infrastructure. Operationally, the line faced disruptions during the 2019 protests, including suspensions on the Tung Chung route due to station vandalism and roadblocks, exposing vulnerabilities in service reliability during civil unrest. More recently, construction scandals in line extensions—such as unauthorized mainland-sourced tiles and fasteners at Tung Chung East Station in 2025—have prompted police reports and non-compliance notices, raising broader concerns over contractor oversight and material integrity in MTR projects. These incidents underscore persistent risks in high-cost extensions, with per-kilometer expenses exceeding HK$10 billion, potentially straining the model's long-term sustainability amid property market volatility.

Future developments

Tung Chung area extensions

The Tung Chung Line Extension project involves extending the existing Line by approximately 2.5 km in both eastward and westward directions from the current terminus, adding two new stations: Tung Chung East and Tung Chung West. This initiative, approved by Hong Kong's Executive Council in January 2023, aims to enhance connectivity in North Lantau and support residential and urban development under the New Town Extension plans. Construction began in May 2023, marking it as the first of several new railway projects to commence that year, with full completion targeted for 2029. The total estimated cost is HK$24.2 billion, funded primarily through government allocation and contributions. The eastward extension, approximately 1.2 km long, connects the existing line to East Station, located to serve the New Town Extension (East) area, which includes planned housing for over 50,000 residents and associated commercial facilities. The station will feature integrated entrances, platforms, and concourse modifications, including extensions along the tracks. As of June 2025, the main structure of East Station has become visibly prominent, with ongoing works focusing on platform and entrance construction. The westward extension comprises a 1.3 km leading to Tung Chung West Station, designed to improve access to western North Lantau developments and alleviate pressure on existing transport links. This section includes boring and station integration with surface roads, enhancing overall railway capacity in the region. The project employs advanced tunneling techniques to minimize disruption to nearby ecosystems and residential areas. Positioned as a "Community Railway," the extension prioritizes local integration, with provisions for seamless pedestrian and cycling connections to surrounding neighborhoods. These extensions address projected population growth in , expected to rise significantly by the 2030s due to and housing initiatives, thereby reducing reliance on buses and improving efficiency. No major delays have been reported as of October 2025, though the project incorporates contingency measures for geological challenges in the Lantau . The Airport Railway Extended Overrun Tunnel (AREOT), a component of the Tung Chung Line Extension project, comprises a 460-metre underground tunnel constructed east of Hong Kong Station along Lung Wo Road on Hong Kong Island. This extension of existing overrun tunnels enables more efficient train turnbacks for both Tung Chung Line and Airport Express services, providing additional stabling capacity and enhancing overall line reliability and throughput without adding passenger stations. Construction of the AREOT, integrated with ventilation facilities, commenced in 2023 alongside other extension elements and is scheduled for completion in 2029. This infrastructure addresses operational constraints at Hong Kong Station, the eastern terminus of the Tung Chung Line, by allowing trains to bypass platform areas during peak hours or maintenance, thereby reducing dwell times and supporting increased service frequencies amid growing demand from Lantau developments. The project forms part of broader network improvements to accommodate projected ridership growth, including synergies with operations for airport connectivity, though no direct passenger extension to terminals from the Tung Chung Line is currently planned. The total Tung Chung Line Extension, encompassing the AREOT, carries an estimated cost of HK$24.2 billion. No further extensions beyond the AREOT to additional Hong Kong Island districts, such as or , have been approved or detailed in official plans as of 2025, with transport priorities focused on capacity enhancements rather than route expansion on the island side. Airport-related enhancements remain tied to the separate and third runway system expansions, which indirectly benefit Tung Chung Line users via interchanges at Station.

References

  1. [1]
    Tung Chung Line - Hong Kong - MTR
    The Tung Chung Line includes stops at Hong Kong Station, Kowloon, Olympic, Nam Cheong, Lai King, Tsing Yi, Lautau Fixed Crossing, Sunny Bay, Sham Shui Kok, Siu ...
  2. [2]
    Tung Chung Line, Hong Kong MTR: Stations, Transfers, Timetable
    Aug 11, 2025 · The Tung Chung Line runs from Tung Chung to Hong Kong, with 8 stations, a 31.1km length, and a 27-minute journey time. Transfers are available ...
  3. [3]
    Tung Chung Line
    It has a total length of 31.1 kilometres, running between Hong Kong and Tung Chung, passing through the West Kowloon Reclamation Area, Tsing Yi Island and the ...
  4. [4]
    MTR > System Map - Hong Kong
    Tung Chung Line & Disneyland Resort Line, Location Map, Station Layout. Hong Kong, Download · Download. Kowloon, Download · Download. Olympic, Download ...
  5. [5]
    Official Website of MTR Tung Chung Line Extension
    The Tung Chung Line Extension, as a 'Community Railway', will see Tung Chung moving into a new chapter with the addition of the new Tung Chung East & Tung ...
  6. [6]
    Tung Chung Line - MTR > MTR Train Services
    Train service,coverage,MTR stations,Tourist,Train Frequency,Service Hours,First Trains,Last Trains,Customer service ,Fares table, MTR Station Facilities,MTR ...
  7. [7]
    The Hong Kong Airport Railway
    The HKG originally decided that all the ACP projects should be completed by mid-1997. However, questions were raised in some quarters about whether the AEL was ...Missing: commencement | Show results with:commencement
  8. [8]
    [PDF] Financing the Chek Lap Kok New Airport - Columbia Library Journals
    On November 4, 1994, Britain and China reached a six-point accord on the airport project that established certain broad outlines for the financing of the two ...
  9. [9]
    Japan corners bulk of work on new airport - South China Morning Post
    Dec 29, 1994 · JAPANESE contractors have won the lion's share of construction work on the $34 billion airport and Lantau Island railway being involved in ...
  10. [10]
    Lantau Line and Airport Railway, Hong Kong
    Jan 12, 2000 · “The new 34km Airport Railway, opened in July 1998, is used by two distinct services. Airport Express line offers a fast passenger link between ...
  11. [11]
    [PDF] 1934 Act Registration No. 333-13904 - SEC.gov
    1998. > The Tung Chung Line was opened on 22 June, extending MTR services to. Lantau Island through West Kowloon and Tsing Yi. > On 6 July, the Airport ...
  12. [12]
    [PDF] The Operator's Story Case Study: Hong Kong SAR, China's Story
    The construction of a new line, named Lantau Airport Railway, was included in the financing plans of the new international airport. Construction costs were ...
  13. [13]
    [PDF] OPERATIONS - MTR
    • Tung Chung Line. Hong Kong – Tung Chung. 600. 600. 600. 600. Hong Kong – Tsing Yi. 300. 300. 300. 300. • Airport Express Line. 600. 600. 600. 600. 27.
  14. [14]
    Station Artworks - Hong Kong - MTR > Art in Station Architecture
    Introduced in 1998 with the "Airport Express Artwork Programme" when the Airport Express and Tung Chung Line opened, eye-catching works ranging from sculptures ...
  15. [15]
    [PDF] Our performance for the year showed a slowing of the decline in ...
    three Urban Lines and the Tung Chung Line, recorded total patronage of 767 million for the year, down slightly from the. 779 million for 1999. Our market ...<|control11|><|separator|>
  16. [16]
    Public Transport - Hong Kong Annual Report 1999
    ... Tung Chung Line (1998). The MTR carried a daily average of 2.28 million passengers on weekdays in 1999. The MTRC also operates the Airport Express, which is ...
  17. [17]
    Form 6-K - SEC.gov
    The MTR Lines is comprised of the Kwun Tong Line, the Tsuen Wan Line, the Island Line, the Tung Chung Line and the Tseung Kwan O Line. ... Annual Report ...Missing: 1998 | Show results with:1998
  18. [18]
    Hong Kong approves Tung Chung line expansion - Railway PRO
    Apr 13, 2020 · MTR had secured the governmental approval to proceed with detailed planning and design of the Tung Chung line expansion project in Hong Kong.
  19. [19]
    Tung Chung Line Extension - MTR > Network Improvements
    The newly-added Tung Chung East Station will be a key component of the transport infrastructure to support the Tung Chung New Town Extension (East) development.
  20. [20]
    Tung Chung Line Extension Project, Hong Kong - Railway Technology
    Jul 31, 2023 · The construction is expected to be completed by 2029. Construction of the airport railway extended overrun tunnel (AREOT), which is also part of ...
  21. [21]
    Tung Chung Line Extension - Highways Department
    Jul 2, 2025 · Construction for the two new stations and associated railway sections commenced in May 2023, with an anticipated completion date of 2029. The ...<|separator|>
  22. [22]
    Information and alignment - 港鐵東涌綫延綫官方網站
    The Tung Chung Line Extension project, starting May 2023, will add 2.5km of railway, two new stations, and is targeted for completion in 2029.Missing: timeline | Show results with:timeline
  23. [23]
    MTR provides update on major projects in Hong Kong
    May 15, 2024 · Construction started on the Tung Chung Line Extension and the Tuen Mun South Extension in mid-2023. These will add 2.5km and 2.4km to the respective lines.
  24. [24]
    MTR services between Hong Kong's Tung Chung, Sunny Bay to ...
    Aug 5, 2024 · Four rail turnouts for changing lines will be installed along new and existing tracks and will take four to five hours to complete, before a new ...
  25. [25]
    Ultimate Guide to Navigating Hong Kong MTR: Map, Lines, Stations ...
    May 25, 2024 · Tsing Yi Station. Situated on Tsing Yi Island, this station serves as an interchange between the Tung Chung Line and the Airport Express Line.
  26. [26]
    Tung Chung Line - Highways Department
    Jul 2, 2025 · Nam Cheong is the interchange station with Tuen Ma Line. Sunny Bay is the interchange station with Disneyland Resort Line. 2025 Legislative ...
  27. [27]
    MTR > Depots
    The Light Rail is supported by the depot at Tuen Mun. The Airport Express, Tung Chung Line and Disneyland Resort Line are supported by the depot at Siu Ho Wan.
  28. [28]
    Latest progress of Siu Ho Wan Depot Site development project
    Sep 23, 2022 · The 30-hectare Siu Ho Wan Depot Site is a large-scale railway maintenance depot located on the Tung Chung Line. As announced in the 2020 Policy ...
  29. [29]
    siu ho wan depot property development - shd phase 1 and sho - MTR
    1.2 The existing SHD supports the running of Tung Chung Line (TCL), Airport Express Line (AEL) and Disneyland Resort Line (DRL), which share the same depot ...<|separator|>
  30. [30]
    Tung Chung Station - MTR
    My History. MTR Properties. Home>About MTR>MTR Properties >Properties Owned/ Developed/ Managed >Tung Chung Line>Tung Chung Station. ABOUT MTR ...
  31. [31]
    25 kV AC railway electrification in Hong Kong - Checkerboard Hill
    Apr 28, 2021 · A total of six substations provide the 25 kV AC traction power to the MTR network, with fifteen 132 kV to 25 kV transformers between them ...Missing: signaling infrastructure
  32. [32]
    Tung Chung Line Extension Power Supply System Project
    Kum Shing engaged with commitment in the engineering works for the power supply system of the MTR Tung Chung Line Extension, Siu Ho Wan Depot Phase 1 and ...
  33. [33]
    AIRPORT RAILWAY
    The railway has two services: an Airport Express and a domestic service, the Tung Chung Line, with the trains operating at speeds up to 135 kilometres per ...
  34. [34]
    MTR: Tung Chung Line - Checkerboard Hill
    Dec 23, 2010 · The Tung Chung line platforms are located on loop tracks off the main line, the two tracks in the middle are for Airport Express trains. The ...<|separator|>
  35. [35]
    MTR A-Train | Locomotive Wiki - Fandom
    The A-Train was designed for service on the Tung Chung Line, intended to enter service in 1998. A total of twenty-three sets were jointly built by Adtranz GmbH ...
  36. [36]
    MTR K-Train | Locomotive Wiki - Fandom
    The K-Trains feature a semi-streamlined design. Two variants were produced under contracts TKE-C651 and TKE-C6522-04E used on the Tseung Kwan O and Tung Chung ...
  37. [37]
    MTR | The Encyclopedia of Railway Transport in Hong Kong Wiki
    The Tung Chung Line was officially opened on 21 June 1998 by Hong Kong Chief Executive Tung Chee Hwa, and service commenced the next day.
  38. [38]
    Alstom to replace track circuits of five MTR lines and Airport Express ...
    Mar 15, 2016 · Metro track circuits, which are part of the signalling system ... Line (TKL), and Tung Chung Line (TCL) [3] Together with Thales [4] ...
  39. [39]
    Airport Express (MTR) - Wikipedia
    The Lantau Airport Railway was developed as two separate MTR lines ... When British Hong Kong was planning to build the Airport Railway (Tung Chung ...History · Route · Fare structure · Operation and stations
  40. [40]
  41. [41]
    [PDF] Alstom to provide signalling system for Hong Kong's Lantau ...
    Mar 28, 2023 · Alstom will provide the design, engineering, supply, integration, testing, and commissioning of the signalling system, including SACEM ATC and ...
  42. [42]
    signalling works for a&t and lantau projects - MTR
    The A&T Lines comprises, Airport Express Line (AEL), Tung Chung Line (TCL) and Siu Ho Wan Depot (SHD). The existing A&T signalling system will be modified ...
  43. [43]
    MTR > Service Hours
    Service Hours ; Hong Kong-Tung Chung, 6-8, 4-9 ; Disneyland Resort Line~, 5, 5 ; Tuen Ma Line, 2.7-3, 3.2-3.5 ; East Rail Line.
  44. [44]
    [PDF] TRANSPORT OPERATIONS - MTR
    Average weekday patronage increased by 24.3% to 5.52 million passenger trips. Total patronage for Domestic Service was 1,586.7 million in 2023, a year-on-year ...
  45. [45]
    MTR > Patronage Updates
    Typhoon Signal No.8 or above was issued on 8, 23 and 24 September, the patronage figure on the three days were excluded in deriving average weekday patronage ...
  46. [46]
    [PDF] LC Paper No. CB(1)417/09-10(01)
    Nov 17, 2009 · The Airport Railway comprises two interleaved train services, the Airport Express and the Tung Chung Line. These services share common tracks at ...
  47. [47]
    Tsing Ma Bridge - Wikipedia
    87,764 (2016) (Lantau Link). Toll, No (Since 27 December 2020). Location ... typhoon wind speeds. A further objective was to provide dynamic response ...
  48. [48]
    Signaling fault causes delays on Airport Express, Tung Chung lines
    Jun 11, 2024 · A signaling fault near Sunny Bay MTR station caused delays on the Tung Chung and Airport Express lines around noon on Wednesday.
  49. [49]
    Up to 40 mins delay expected after Nam Cheong MTR station signal ...
    Sep 9, 2024 · A signaling fault near Nam Cheong station caused delays on the Tung Chung Line and the Airport Express, with trains delayed by approximately 30 to 40 minutes.
  50. [50]
    Typhoon Wipha: Hong Kong airport to operate overnight, T3 signal ...
    Jul 20, 2025 · ... winds, the Transport Department has announced. Meanwhile, all vehicles using the Lantau Link must now divert to its lower deck, and access ...
  51. [51]
    [PDF] Executive management's report Railway operations - MTR
    In addition, Tung Chung Line trains were converted from 7-car to 8-car formation, increasing the carrying capacity by about 14%. This in turn required general.Missing: limitations | Show results with:limitations
  52. [52]
    Why is the frequency of the Tung Chung MTR line so low compared ...
    Sep 3, 2015 · However, the Ma On Shan line is just 11.4 km in length with 9 stations while the Tung Chung line is 31.1 km in length with 8 stations.
  53. [53]
    [PDF] The Hong Kong Airport Railway
    This could be achieved by the proposed new line from Tung. Chung if a fast and convenient interchange could be created between the old and new lines. The new ...
  54. [54]
    The Rapid Development of Tung Chung - ArcGIS StoryMaps
    May 22, 2023 · Apart from new railway stations, a section of Road P1 connecting TCE with NLH will be constructed to provide external highway connection. A ...
  55. [55]
    Hong Kong, An Urban Future Shaped by Rail Transport
    Table 2: MTRC Property Developments along the Airport Line and Tung Chung Line opened in 1998. Caption, NB: GFA = Gross Floor AreaSource: MTR Corporation, ...
  56. [56]
    [PDF] Development of Tung Chung New Town in Hong Kong - WIT Press
    population growth area in the medium and long term. It proposed to increase the population in Tung Chung New Town to 216,000 by 2006 and 320,000 by 2011 ...
  57. [57]
    [PDF] Recent Infrastructure Developments in Hong Kong - ctbuh
    To accommodate somewhat 7 million people in a piece of land of size slightly bigger than 1050 sq km like Hong Kong is not an easy task. Needless to mention.
  58. [58]
    [PDF] Tung Chung New Town - Hong Kong
    The planning intention is to develop the New Town into a hub of providing commercial, cultural, community and recreational activities serving the Tung Chung and ...
  59. [59]
    [PDF] Integrative Project Management of The Hong Kong Airport Core ...
    The Lantau Line. (LAL) will provide a domestic service on the same route to the new Airport support community at Tung Chung. This line will initially serve ...<|control11|><|separator|>
  60. [60]
    [PDF] PR013/25 6 March 2025 MTR Corporation Posts 2024 Results Year ...
    Mar 6, 2025 · The MTR Corporation announced its 2024 Annual Results today (6 March 2025). The. Corporation recorded net profit of approximately HK$15.8 ...Missing: ridership | Show results with:ridership
  61. [61]
    Hong Kong Airport
    Feb 13, 2001 · The new 34km airport railway opened in July 1998 and is used by two distinct services. The Airport Express line offers a fast passenger link between Chek Lap ...
  62. [62]
    MTRC 'Rolls Out' the Future in Hong Kong | FTI Consulting
    Jan 24, 2022 · In 2020 MTRC commenced the design of the first of the Railway Development Strategy 2014 (RDS-2014)2 railway extension projects, the Tung Chung ...
  63. [63]
    [PDF] Airport Core Projects and their Influence on Current Developments
    Lantau Fixed Crossing – $12B, including the construction of the Tsing Ma Bridge ($7.2B), Ma. Wan Viaduct and Kap Shui Mun Bridge ($1.6B). Airport Core Projects ...
  64. [64]
    [PDF] Why some airport-rail links get built and others do not
    The Tung Chung line and a subsequent bus connection is a cheaper alternative and partly cannibalizes the airport express. The most popular means of ...
  65. [65]
    [PDF] Comments on the Concept Plan for Lantau
    We suggest that the reclamation in Tung Chung Bay be deleted to preserve the ecological environment and to provide an open space for better air circulation.Missing: criticism | Show results with:criticism
  66. [66]
    [PDF] Tung Chung New Town Extension - HKU
    The diagram summarises the seriously affected areas of traffic, noise and ecological impacts in Tung Chung New Town with corresponding mitigation measures.
  67. [67]
    How Hong Kong's once-respected MTR fell afoul of protesters
    Sep 22, 2019 · On September 1, trains to Lantau's Chek Lap Kok island and along the Tung Chung Line were suspended as protesters formed roadblocks to stymie ...
  68. [68]
    [PDF] MTR Reported to the Police Suspected Unauthorised Material and ...
    Aug 27, 2025 · MTR Corporation today (27 August 2025) announces that, further to recent allegations in relation to the “Tung Chung East Station# construction ...
  69. [69]
    MTR contractor under scrutiny for using non-contractual mainland ...
    Aug 24, 2025 · Concerns have been raised after reports emerged that a contractor for the under-construction MTR Tung Chung Line Extension used mainland ...
  70. [70]
    Hong Kong's MTR Corp 'reinventing' business model amid property ...
    Jan 3, 2025 · Rail giant seeking 'new sources of income and ways to lower costs' to fulfil HK$165 billion financial commitment, Post learns.Missing: evaluation | Show results with:evaluation
  71. [71]
    Tung Chung East - 港鐵東涌綫延綫官方網站
    The works for the Tung Chung East section of the Tung Chung Line Extension mainly include the construction of the Tung Chung East Station # in the Tung Chung ...
  72. [72]
    MTR reports construction projects in full swing
    Jun 18, 2025 · Kwu Tung station on the East Rail Line, which is part of the Northern Link project, is set to be topped out in the fourth quarter of this year ...Missing: period | Show results with:period
  73. [73]
    Tung Chung West Station and Tunnels Project (Contract No. 1201)
    The construction of the TUE is expected to begin in mid-2023, with a target completion date of 2029. Client, MTR Corporation. Project, Tung Chung Line Extension ...Missing: timeline | Show results with:timeline
  74. [74]
    Tung Chung Line Extension - EEMS
    The project is targeted to be completed in 2029, further enhancing the railway and public transportation network in North Lantau, strengthening the connectivity ...<|separator|>
  75. [75]
    MTR connects lives, witnesses growth and embraces the future 45 ...
    Oct 28, 2024 · MTR supported the government's plans by constructing the Tseung Kwan O Line to serve the residents in the area, as well as planning and ...
  76. [76]
    Airport Railway Extended Overrun Tunnel - Hong Kong - MTR
    The Airport Railway Extended Overrun Tunnel project includes constructing a tunnel of about 460 metres long east of Hong Kong Station along Lung Wo Road.
  77. [77]
    [PDF] HONG KONG NETWORK EXPANSION - MTR
    Tung Chung Line Extension will be completed in 2029. The Company will also undertake the construction of the Airport Railway Extended Overrun Tunnel (“ARO”).