Bury Line

The Bury Line is a route forming part of the tram network in , , extending 15.9 km from Manchester Victoria station in the city centre to Bury Interchange in the town of Bury. Opened on 6 April 1992 as the inaugural segment of the Metrolink system, it was converted from the former heavy rail Manchester and Bury Railway, which had been electrified in 1916 by the using a unique 1,200 V side-contact system. The line's development stemmed from Passenger Transport Executive's 1980s plans to revitalize underused rail into a modern network, with the Bury-Altrincham corridor selected as Phase 1 due to its potential for high and with existing bus and rail services. Initial operations utilized converted heavy rail track and stations, with trams running at street level in the before transitioning to dedicated alignments northward. Over the years, the route has undergone upgrades, including accessibility improvements and electrification standardization to 750 V DC overhead lines, while retaining some original like the Bury Knowsley Street viaduct. Running north from , the Bury Line passes through nine intermediate stops—Queens Road, Abraham Moss, , Bowker Vale, Heaton Park, , Besses o' th' Barn, Whitefield, and Radcliffe—before terminating at Bury Interchange, a hub connecting to local buses and the heritage line. Trams operate every 6-12 minutes during peak hours as part of the Altrincham–Bury line service, which extends southward to , carrying over 10 million passengers annually on this corridor alone (as of 2024) and supporting the Bee Network's integrated transport vision. Recent enhancements, including essential works in October 2025 that temporarily suspended services for track and signalling upgrades, aim to boost reliability and capacity amid growing demand. As a key commuter artery, the Bury Line facilitates daily travel for residents of Bury and northern suburbs to , , and in , while also serving tourists visiting sites like Heaton Park and the Jewish Museum in . Its role has expanded with Greater Manchester's push toward zero-emission , including plans for a new stop at Elton Reservoir (proposed as of 2025) to improve access to green spaces and further integrate with bus services to areas like Tottington and . The line exemplifies the Metrolink's evolution from a pioneering project to a vital component of regional mobility, with ongoing investments addressing challenges like aging assets and increasing patronage.

History

Origins and early operations

The Manchester, Bury and Rossendale Railway was authorised by an on 4 July 1844 to construct a double-track line connecting the Manchester and Bolton Railway at Clifton to , with extensions planned toward the Rossendale to support needs in the Irwell . The project was funded primarily through raised during the railway mania period, reflecting the era's speculative investment in regional infrastructure to link cotton mills, coal fields, and markets. Although specific promoters such as local industrialists are documented in company records, the initiative aligned with broader efforts by entrepreneurs to expand rail access from . The route spanned approximately 9 miles from Clifton Junction to Bury, passing through key early stations including Radcliffe Bridge and terminating at Bury Knowsley Street. Engineering challenges included the construction of viaducts to cross the River Irwell, such as the Radcliffe Viaduct, built as a timber structure in 1846 to accommodate the undulating terrain and river valleys. The line opened to and freight traffic on 28 1846, with services operated using conventional typical of mid-19th-century British railways, including and types for mixed goods and duties. Prior to opening, the , Bury and Rossendale Railway amalgamated with the , , and Railway in 1845 to form the , which managed initial operations and integrated the route into a larger north-south . This merger facilitated coordinated services, with early passenger trains running several times daily between Manchester and Bury, carrying workers and goods vital to the burgeoning . Freight traffic, including and , quickly established the line's economic role, though operations remained steam-hauled without until much later.

Heavy rail era and decline

Following the of Britain's railways in 1948 under British Railways, the Bury Line continued to operate as an electrified suburban route, retaining its unique 1,200 V DC side-contact third-rail system introduced by the in 1916, which positioned it among the UK's earliest main-line electrifications. This system, chosen to mitigate issues with ice and snow accumulation on overhead wires, powered shuttle services between Manchester Victoria and Bury Bolton Street, serving as a key commuter link despite the broader challenges facing the network post-World War II. In 1959, British Railways introduced the Class 504 electric multiple units, a fleet of 26 two-car sets built at Wolverton Works specifically for the line, replacing the original stock and enabling more efficient peak-hour operations with up to 40 trains per day. These units, unique to the Bury Line due to their adaptation to the side-contact , operated a half-hourly shuttle service that peaked at around 7.5 million annual passengers in the late 1970s, though this represented a stabilization rather than growth amid national trends. Passenger numbers on the line began to decline significantly from the onward, driven by rising , which rose from 2.4 million vehicles in in 1950 to over 13 million by 1970, and intensified competition from deregulated bus services offering flexible routes and lower fares. This downturn was exacerbated by the 1963 Beeching Report, which recommended the of unprofitable lines including the Bury route due to its perceived low usage relative to infrastructure costs, leading to a formal closure proposal in 1964. Although reprieved in January 1965 following local protests and evidence of commuter demand, the line faced renewed threats in the 1980s as British Railways sought to rationalize suburban services amid ongoing patronage erosion. To address integration challenges and boost viability, Bury Interchange opened on 17 March 1980 as a £4.5 million multimodal hub combining the railway with a new , aiming to capture transfer passengers and counter bus competition, though it failed to reverse the overall decline. By the late , with annual usage falling below sustainable levels and maintenance costs for the aging third-rail infrastructure mounting, British Railways announced the line's closure, ending heavy rail operations on 17 August 1991 after 145 years of service. In the 1980s, the Passenger Transport Executive (GMPTE) developed proposals for a network to address declining rail usage and enhance urban connectivity, building on a 1982 Rail Strategy study conducted with and the Council. The plan included converting existing heavy rail lines, such as the Bury line, into routes as part of Phase 1, which encompassed services from Bury to via the city center. This initiative received in February 1988 through parliamentary bills, with final ministerial approval granted on 24 October 1989 by Transport Minister . Funding for Phase 1 totaled £145 million, sourced from a mix of public and private contributions, including a £48 million grant from the Department of Transport (central government), £13 million from the , £15 million in borrowing from the , £69 million in borrowings by the Passenger Transport Authority, and £5 million from the operator. Engineering works for the Bury line conversion began in December 1989 under the main Rail contract, focusing on adapting the former heavy rail infrastructure for operation while controlling costs. The existing 1,200 V DC electrification system, used since the line's heavy rail closure in stages during 1991, was fully removed between July and August 1991. In its place, a new 750 V DC overhead system was installed along the route, enabling compatibility with low-floor trams. Platforms at stations were modified to accommodate the lower floor height of the incoming vehicles, with adjustments for level boarding and accessibility, though many original heavy rail elements were preserved. To minimize expenses and disruption, key legacy structures such as the Radcliffe Viaduct—spanning the River Irwell—and the Philips Park Tunnel were retained without major alterations, allowing the project to leverage existing alignments and reduce new needs. The converted Bury line officially reopened as part of the on 6 April 1992, marking the system's inaugural passenger service. The first trams operated from Bury Interchange to , utilizing the initial fleet of 26 T-68 trams built by AnsaldoBreda (formerly ABB). This 9.7 km northern section provided immediate connectivity for commuters, with services running every 12 minutes during peak hours and integrating seamlessly into the broader Phase 1 network rollout. The conversion revived the route just months after its heavy rail services ended, transforming it into a vital artery for the Metrolink light rail system.

Post-conversion modifications

Following the 1992 conversion to Metrolink, the Bury Line underwent significant infrastructure upgrades in the late 2000s as preparatory work for Phase 3A expansions. A £102 million renewals program replaced approximately 24 km of track across the original and Bury lines to address wear and enhance reliability ahead of network growth. Signaling improvements included the introduction of a new £22 million digital signaling and , which aimed to increase but initially caused in Phase 3A service openings due to faults. The line's rolling stock was modernized between 2011 and 2014 with the full replacement of the original 26 AnsaldoBreda T-68 trams by 42 low-floor vehicles, specifically procured for Phase 3 expansions. This upgrade improved accessibility through features like wheelchair spaces, step-free access, and real-time passenger information displays, while increasing capacity and reliability on the Bury Line. In the , maintenance efforts focused on addressing aging , including replacements on the Bury Line in 2023, where 2 km of rail was renewed to boost speeds and reduce journey times, with further work planned into 2024. upgrades occurred during summer 2025 as part of a £147 million program through 2027, alongside essential enhancements. This culminated in a six-day closure from October 25 to 30, 2025, between Crumpsall and Bury for beam replacements at Whitefield Metrolink and preparations for the Bury Interchange redevelopment, with replacement buses provided. Services resumed on 31 October 2025. City center integration advanced with the Second City Crossing, a 0.8-mile double-track viaduct that opened on February 26, 2017, providing a dedicated route from to via Exchange Square and . This rerouting alleviated congestion on shared streets, cutting end-to-end journey times for Bury Line services by up to 12 minutes during peak hours.

Operations

Service patterns and frequencies

The Bury Line operates as the Yellow Line service from Bury Interchange to via Manchester Victoria, while also forming the northern section of the Green Line from Bury to through the city center (primarily during peak hours), with all services originating and terminating at Bury Interchange. Daytime services on the Bury Line run every 12 minutes from 6:00 a.m. to midnight through , maintaining the same frequency from 6:00 a.m. to midnight on Fridays and Saturdays before reducing to every 24 minutes until 1:00 a.m., and operating every 15 minutes from 7:00 a.m. to midnight on Sundays. During peak hours, overlapping lines in the city center sections increase effective frequencies to every 6 minutes, enhancing connectivity for passengers traveling through Manchester Victoria. The typical journey time from Bury Interchange to Manchester Victoria is approximately 28 minutes. Services are operated by KeolisAmey Metrolink on behalf of (TfGM) under the franchise, which commenced in and integrates s with options and a zonal fare structure covering Zones 1 through 3 for the full Bury Line routes.

Rolling stock and maintenance

The Bury Line utilizes the Manchester Metrolink's standard fleet of 147 high-floor trams, which were introduced progressively from 2009 to 2014 to replace older vehicles and expand network capacity. Each M5000 tram measures 28.4 in length, accommodates up to 206 passengers (including 52 seats and 8 perch seats plus standing room), and operates on 750 V overhead electrification collected via pantographs. These trams are bidirectional and articulated, featuring three bogies with the outer two powered, enabling efficient performance across the network. Designed for compatibility with the Bury Line's retained heavy rail infrastructure, the M5000 trams support higher speeds of up to 80 km/h (50 ) on reserved track sections, such as between Radcliffe and Bury, where legacy alignments allow for faster travel compared to urban street-running segments. This capability stems from the trams' configuration and robust engineering, which align with the line's original railway platforms and signaling inherited from its pre-conversion era. No specialized variants of the M5000 exist exclusively for the Bury Line; all units are interchangeable across Metrolink routes. The original fleet of 32 trams, introduced in 1992 for Metrolink's opening, was phased out by 2014 due to persistent reliability issues, including frequent breakdowns and high demands, with withdrawals accelerating from 2012 onward. for Bury Line trams occurs primarily at the Queens Road depot in Cheetham Hill, which handles daily servicing and is shared with operations from the and lines, while more extensive overhauls take place at the Central in , opened in 2011 to support the growing fleet. In 2025, initiated network-wide efficiency upgrades, including partnerships for energy optimization technologies like those from EneRail, aimed at reducing power consumption and supporting future integrations for enhanced .

Route and infrastructure

Line overview and technical specifications

The Bury Line is a route within the network, extending 9.9 miles (15.9 km) from in the city centre to Bury Interchange in the north. The alignment follows a predominantly reserved former heavy rail corridor, integrating with other Metrolink lines at . This configuration allows for efficient operation while accommodating urban constraints, utilising standard-gauge (1,435 mm) track throughout. The line features double-track for most of its length to support bidirectional services, supplemented by passing loops at key points for operational flexibility, such as near depots and junctions. Speeds reach a maximum of 50 mph (80 km/h) on segregated sections, reducing to 30 mph in urban areas to ensure safety. The route includes moderate gradients, with the line rising and falling through the Irwell Valley, and environmental adaptations such as viaducts and proximity to regional flood defence schemes in areas like Radcliffe to mitigate river overflow risks. A notable feature is the Whitefield Tunnel, which underwent essential beam replacement works in October 2025 to ensure long-term structural integrity. Electrification is provided by 750 V DC overhead lines, a standard adopted during the line's conversion from heavy rail in 1992, replacing the original 1,200 V DC side-contact third rail system introduced in 1916. Signalling operates on a line-of-sight basis, enhanced by the Tram Management System (TMS) and automatic train protection (ATP) to prevent signals passed at danger, enabling driver-led operation without fixed block signals on reserved alignments. A notable historical feature was the 1.5-mile shared section with heavy rail services via the Bury Loop line until its severance in 1991 to facilitate Metrolink integration.

Stations and interchanges

The Bury Line features 11 tram stops extending from to Bury, providing seamless connectivity along a 15.9 km route. These stops, all equipped with basic passenger amenities, cater to local commuters, park visitors, and interurban travelers. The line's stations are designed for efficiency, with level boarding platforms and integrated signage for easy navigation. The stops, listed in sequence from south to north, are:
  • Manchester Victoria: The southern terminus and a major transport hub in , offering direct interchanges with and services to destinations across , including , , and .
  • Queens Road: A residential-area stop serving nearby communities in , with standard facilities including shelters and ticket machines.
  • Abraham Moss: Located near the Abraham Moss Centre, this stop supports access to educational and leisure facilities in north .
  • Crumpsall: Positioned in a densely populated suburb, it provides local connectivity for shoppers and residents.
  • Bowker Vale: Serving the Bowker Vale area, this stop includes pedestrian links to nearby housing and green spaces.
  • Heaton Park: Notably positioned at the corner of Whittaker Lane and Bury Old Road, offering direct pedestrian entrance to Heaton Park, one of Greater Manchester's largest public parks, popular for events and recreation.
  • Prestwich: A key suburban stop in village, facilitating access to local amenities and the Metrolink's broader .
  • Besses o' th' Barn: Situated near retail and residential areas, it supports daily commuting patterns in Whitefield.
  • Whitefield: Serving the Whitefield community, this stop is near the Whitefield Tunnel, which underwent engineering works in 2025 for beam replacement, part of ongoing infrastructure upgrades.
  • Radcliffe: A key suburban stop on the line, handling significant passenger volumes as a gateway to Bury and beyond, with facilities enhanced to manage peak-hour demand.
  • Bury Interchange: The northern terminus, integrating Metrolink with extensive local bus services operated by and proximity to the heritage line, approximately 1 km away.
All stops on the Bury Line have been fully wheelchair-accessible since , featuring step-free access via ramps or lifts, designated accessible boarding areas on , and ticket machines compatible with contactless payments and assistance for users with disabilities. Passenger amenities are consistent across the line, including real-time digital departure displays for live tram tracking, weatherproof shelters, and cycle parking racks to encourage travel. No major closures have occurred due to works since 2020, aside from temporary disruptions in 2025 for essential maintenance on the line, such as six-day closures between north and Bury in October.

Future developments

Proposed enhancements and extensions

The of Bury Interchange is planned to commence in 2027, following a public consultation in 2026, as part of an £80 million overhaul aimed at creating Greater Manchester's first operationally carbon-neutral . This project, led by (TfGM) in partnership with Bury Council and the (GMCA), will feature expanded platform access via a new pedestrian bridge over the tram lines, enhanced integration with bus services and active travel routes, and incorporation of heritage elements to align with Bury's masterplan. The initiative has received government approval for its outline , with funding contributions from TfGM, local authorities, and GMCA allocations supporting improved passenger facilities and future-proofing for services. A new Elton , also known as Warth Fold, has been proposed on the Bury Line to improve access to green spaces and support planned housing developments, including a Park & Ride/Travel Hub. This addition aligns with the Transport Strategy 2040, with business case development ongoing as of 2025. Track and power system upgrades along the Bury Line are included in TfGM's £150 million Metrolink and program, running through 2027, to replace aging and enhance overall reliability. These works focus on renewing overhead power lines, tracks, and related systems, with specific attention to the Bury Line's older sections originally from the heavy rail era, aiming to build resilience against climate impacts such as events. To increase capacity, TfGM is exploring platform enhancements at stations including Whitefield and as part of broader stop improvements, alongside plans to introduce longer consists to accommodate rising demand on the Bury Line. These upgrades, set to begin in 2025, will include better lighting, shelters, and facilities at these locations, supporting the integration of extended vehicles as outlined in the Rapid Transit Strategy.

Integration with regional networks

The Bury Line has been integrated into Greater Manchester's since the system's initial rollout in September 2023, allowing for unified ticketing and payment options across Metrolink trams, franchised buses, , and heavy rail services all managed by (TfGM). This incorporation facilitates seamless multimodal journeys, with contactless payments and daily/weekly capping applying region-wide to promote accessible . A key element of this integration is the planned tram-train pathfinder project, which will connect the Bury Line to Heywood and via using existing rail alignments and new infrastructure. The project, prioritized under TfGM's expansion, is midway through its outline business case development, with completion targeted for 2026 and construction to commence in 2028, introducing tram-train technology to enhance cross-regional links. These developments align with the Rapid Transit Strategy, refreshed in August 2025 as part of the broader Local Transport Plan, which emphasizes expanded fixed-track networks including pilots and underground rail options to improve interchanges across the city-region. The strategy supports early planning for underground urban rail routes in central areas to complement surface-level connections like the Bury Line. Long-term ambitions include further integration with , contingent on the £6 million funding allocated in August 2025 for developing business cases across multiple schemes. This investment aims to future-proof connectivity for growth areas, such as Atom Valley, by 2030 and beyond. Existing interchanges along the line, such as at and , already support transfers to services.

References

  1. [1]
    Bury Line — Manchester Metrolink — LRTA
    Victoria to Bury is 15.9km. The line was originally electrified by the Lancashire and Yorkshire Railway in 1916, using the unique 1200V dc side contact ...
  2. [2]
    METROLINK AT 25 - Modern Railways
    Apr 27, 2017 · On 6 April 1992, the first Metrolink trams began carrying passengers between Manchester's Victoria station and Bury. A couple of weeks later ...
  3. [3]
    History of Metrolink
    And so, in 1992, Metrolink was born. The first line linked Bury to Altrincham, weaving through the heart of the city. It was a bold move, the UK's first ...
  4. [4]
    [PDF] FINAL Chapter 5 - Metrolink - Bury Council
    Metrolink services connect Bury and Manchester via Radcliffe, Whitefield and Prestwich, enabling onward journeys into Greater Manchester and the wider ...
  5. [5]
    Tram | Bee Network | Powered by TfGM
    All bus services in Greater Manchester have now joined the Bee Network. Learn more. Planned engineering works on Metrolink. Visit our dedicated webpage ...Tram Map · Tram service frequency · Metrolink newsletter · Fare zonesMissing: history | Show results with:history<|control11|><|separator|>
  6. [6]
    Metrolink: No Manchester to Bury trams for six days - BBC
    Oct 23, 2025 · No trams will run between north Manchester and Bury for six days during "essential" infrastructure improvement work, transport bosses have ...
  7. [7]
    Manchester Bury and Rossendale Railway - Building | Architects of ...
    Manchester Bury and Rossendale Railway. Date. 1843 - 1847. District/Town. Bury ... 1846, with a double line from Clifton to Stubbins and a single track to ...
  8. [8]
    [PDF] the life and work of sir Edward Watkin, 1819 - 1901 - Durham e-Theses
    I am primarily indebted to the late George Dow, to whom, on a reading of his benchmark railway history of the Great Central Railway, published 1959-1965, I owe.
  9. [9]
    Radcliffe Station - Disused Stations
    Sep 30, 2017 · The LYR had a route between Bury and Manchester which passed through Radcliffe that had opened on 25 September 1846. This route had been opened ...Missing: length | Show results with:length
  10. [10]
    The Bridges Of Clifton - Iain Walks
    Mar 21, 2021 · The aforementioned Outwood Trail follows the route of the Manchester, Bury, and Rossendale Railway (MBRR) from Clifton to Radcliffe. ... 1846 ...
  11. [11]
    Our History - The East Lancashire Railway
    The ELR's main North-South route is proposed to run through the Irwell Valley, as an extension of the Manchester, Bury and Rossendale Railway. 1846. The East ...Missing: promoters Earl Ellesmere
  12. [12]
    Brief History | LYRS - The Lancashire & Yorkshire Railway Society
    The Lancashire & Yorkshire Railway was formed in 1847 from an amalgamation of the Manchester & Leeds Railway and a number of smaller companies.
  13. [13]
    Electrification | LYRS - The Lancashire & Yorkshire Railway Society
    The chosen system was third rail but at a higher voltage than that of the Liverpool lines, namely 1200 volts dc. The Bury line was a true commuter route with 40 ...
  14. [14]
    Back from the brink | Rail Express
    Sep 21, 2017 · The L&YR was an early advocate of electrification and in 1916 the line was equipped with a unique side-contact 1200V DC third-rail system.<|control11|><|separator|>
  15. [15]
    History - Class 504 Preservation Society
    They were introduced in 1959 for the 9.25 mile rail-link between Bury (Bolton Street Station) and the City of Manchester, via Radcliffe, Whitefield, Besses o' ...<|separator|>
  16. [16]
  17. [17]
    Electrification - A Critical Analysis - Rail Engineer
    Nov 28, 2011 · ... Bury line of the Lancashire & Yorkshire Railway electrified on the 1200V side contact third rail system and being influenced by the adjacent ...
  18. [18]
    The day trains were driven off the tracks - The Bury Times
    Apr 11, 2013 · The Bury to Manchester line did manage to escape the closure threat, after being reprieved in January 1965. But it was eventually closed by ...
  19. [19]
    railways (manchesterbury line) - API Parliament UK
    Friend the Minister of Transport because of his decision to reprieve the Manchester-Bury line, which had previously been threatened with closure. But the ...
  20. [20]
    Bury Interchange to celebrate 40th anniversary
    Jan 25, 2020 · This year marks the 40th anniversary of the opening of Bury Interchange. The £4.5 million road-rail interchange was opened for business on March 17, 1980.Missing: multimodal | Show results with:multimodal
  21. [21]
    Timeline — Manchester Metrolink — LRTA
    January 1988, Secretary of State for Transport authorises GMPTE to invite tenders for phase 1 of the light rail project (Bury to Altrincham via city centre).
  22. [22]
    Funding — Manchester Metrolink — LRTA
    In July 1987 the Government announced that GMPTE's Metrolink proposals must involve private sector capital, in addition to meeting other conditions for a ...
  23. [23]
    Manchester Metrolink 20 Years of Evolution - Rail UK
    Nov 30, 2011 · New overhead catenary was installed on the city centre and Bury line sections whilst the existing overhead structures and wiring on the ...Missing: removal | Show results with:removal
  24. [24]
    Manchester plays catch-up with Metrolink expansion - Railway Gazette
    Oct 18, 2007 · The Bury and Altrincham routes have proved the long-term success that they were expected to be back in 1992 when they were converted from ...
  25. [25]
    Manchester Metrolink - Wikishire
    Government approval was granted in 1988 and the network began operating services between Bury Interchange and Victoria on 6 April 1992, becoming the United ...<|control11|><|separator|>
  26. [26]
    Manchester: a united city - Rail Magazine
    Feb 19, 2014 · The M5000s will become the standard tram on the Metrolink network, replacing the remaining T-68 and T-68A models that launched the system in ...
  27. [27]
    Essential improvement work to take place on Bury tram line
    Oct 21, 2025 · Essential work to improve the tram line that connects Bury with Manchester city centre is taking place this month. It means no tram services ...
  28. [28]
    Second City Crossing opens in Manchester - Railway Gazette
    Feb 27, 2017 · UK: The final phase of Manchester Metrolink's Second City Crossing opened on February 26. The new route runs from a rebuilt St Peter's ...
  29. [29]
    Yellow Line - Piccadilly - Bury – Metrolink - Bus Times
    During this time, the Rochdale and Bury lines will terminate at Victoria, the East Didsbury line will terminate at Exchange Square and services from Manchester ...<|control11|><|separator|>
  30. [30]
    Green Line - Bury - Manchester - Altrincham – Metrolink - Bus Times
    Bury (Manchester Metrolink) (To Manchester), 06:55, 07:07, 07:19, 07:31, 07:43, 07:55, 08:07, 08:19, 08:31, 08:43, 08:55, 09:07, 09:19, 09:31, 09:43, 09:55 ...
  31. [31]
    Tram service frequency | Bee Network | Powered by TfGM
    Altrincham - Bury. Monday to Friday 7am to 8pm. Every 12 minutes. Saturday 9am to 6.30pm. Every 12 minutes. Outside of these hours, ...Missing: patterns | Show results with:patterns
  32. [32]
    Final phase of Manchester tram track Works set to begin
    Jul 15, 2025 · Final phase of Manchester tram track Works set to begin · Altrincham and Bury services will not stop at Piccadilly Gardens or Piccadilly Station.
  33. [33]
    Train Bury to Manchester Victoria from £2 | Tickets & Timetables
    Metrolink operates a vehicle from Bury to Victoria every 5 minutes. Tickets cost £3 - £4 and the journey takes 29 min. Train operators.
  34. [34]
  35. [35]
    Metrolink fare zones | Bee Network | Powered by TfGM
    Every Metrolink stop is in a ticket zone. There are four ticket zones, with zone 1 covering stops in the city centre and zone 4 covering stops furthest away ...Missing: list | Show results with:list
  36. [36]
    Mayor confirms Metrolink upgrades are on the way | Rail News
    Oct 30, 2025 · Currently, the Metrolink uses a fleet of 147 Bombardier M5000 trams across the entire network. Delivery of the first of these was taken in ...
  37. [37]
    First Manchester M5000 tram delivered | News - Railway Gazette
    Jul 13, 2009 · The first Bombardier M5000 Flexity Swift light rail vehicle for Manchester Metrolink arrived at Queens Road depot at around 06.00 on July 13.
  38. [38]
    Bombardier M5000 — Manchester Metrolink — LRTA
    Apr 11, 2019 · Length of Tram, 28.4m over body ; Width of Tram, 2.65m over body ; Entrance height above rail level, 955mm empty vehicle with new wheels 899 mm ...Missing: specifications power
  39. [39]
    [PDF] Manchester M5000 Information - Halling
    Each vehicle is 28.4 m (93 ft) long and has three bogies, the outer two of which are powered, while the middle bogie is unpowered and carries the articulated ...Missing: passenger | Show results with:passenger
  40. [40]
    Signalling Metrolink - Rail Engineer
    Dec 2, 2014 · The new system has been implemented on the lines built since 2008 and in the city centre, with gradual roll-out proceeding outwards towards Bury ...
  41. [41]
    M5000 | Project Transit Wiki | Fandom
    The Bombardier M5000 is a high-floor, articulated bidirectional tram that was constructed by Bombardier from 2009-2021, and by Alstom from 2021-2022.Missing: Bury | Show results with:Bury
  42. [42]
    Manchester's oldest Metrolink trams to be replaced - BBC News
    Jul 17, 2012 · All of Greater Manchester's oldest trams will be replaced with new vehicles by 2014, transport officials announce.Missing: introduction | Show results with:introduction
  43. [43]
    First Metrolink T68 withdrawn today... - RailUK Forums
    Apr 19, 2012 · Now, after two decades of faithful service, the first T68 has been withdrawn, becoming the very first second generation tram ever to suffer this ...Metrolink To Withdraw First T68 - RailUK ForumsManchester Metrolink T68 trams in new yellow livery - RailUK ForumsMore results from www.railforums.co.uk
  44. [44]
    Manchester Metrolink, England - Railway Technology
    Nov 12, 2018 · In May 2008, the government gave final approval for the Phase 3a expansion, a £600m project to almost double Metrolink's length. The longest ...Missing: renewals | Show results with:renewals
  45. [45]
    Manchester Metrolink partnership will optimise performance on Bury ...
    Sep 14, 2025 · Manchester Metrolink has partnered with rail technology company EneRail to achieve tangible energy savings across its network.
  46. [46]
    Manchester Metrolink 20 Years of Evolution - Rail Engineer
    Nov 30, 2011 · New overhead catenary was installed on the city centre and Bury line sections whilst the existing overhead structures and wiring on the ...
  47. [47]
    Radcliffe and Redvales Flood Risk Management Scheme
    Radcliffe and Redvales Flood Risk Management Scheme (FRMS) aims to reduce the flood risk from the River Irwell south of Bury and west of Radcliffe.
  48. [48]
    Power Supply System — Manchester Metrolink — LRTA
    Metrolink uses a 750V dc power supply, converted from 11kV or 6.6kV ac. Substations feed the overhead line, and the system uses inter-tripping circuit breakers.
  49. [49]
  50. [50]
    Manchester Victoria station - Wikipedia
    Most trains calling at Victoria are operated by Northern Trains; TransPennine ... Manchester Victoria is a major interchange for the Metrolink light rail system.
  51. [51]
    Manchester Victoria Train Station Departures - Northern Rail
    View station facilities, live departures & latest timetable. Book your train ticket to or from Manchester Victoria. Explore 500+ destinations in the North!
  52. [52]
    Heaton Park tram stop - Wikipedia
    It is part of Ticketing Zone 3, and is at the corner of Whittaker Lane and Bury Old Road, with an entrance to Heaton Park. This Metrolink stop is some 800 ...
  53. [53]
    Bury Interchange - Wikipedia
    Bury Interchange is a transport hub in the town of Bury, Greater Manchester, England. Opened in 1980, it is the northern terminus of the Manchester ...Missing: list descriptions
  54. [54]
    [PDF] Chapter 5 - Metrolink - Bury Council
    Mar 17, 2023 · The line conversion predominantly retained the heavy rail stop infrastructure. The Bury line stops are considered less inviting, incur ...Missing: Viaduct Philips
  55. [55]
    Accessible public transport - Manchester - Bee Network
    Metrolink is a modern system with a range of accessibility features. All Metrolink trams and tram stops are accessible for wheelchair users.
  56. [56]
    [PDF] Metrolink Access Guide
    Most Metrolink stops have accessible parking bays within their car park. You can find more details on this on the tram stops page on our website: www.tfgm ...
  57. [57]
    Live departures | Bee Network | Powered by TfGM
    In order to use this feature and show live departures in this space, navigate to your required stop or station and click “Add to favourites”.
  58. [58]
    [PDF] Metrolink Access Guide
    Metrolink Park and Ride facilities ... Metrolink provides a number of different cycle storage facilities, including stands, lockers and cycle hubs, at most ...Missing: departure bike
  59. [59]
    Tram improvement works and disruptions | Powered by TfGM
    Throughout 2025, planned improvement work will take place across the tram network. We're investing almost £150m through to 2027 on maintenance, upgrades and ...
  60. [60]
    Bury tram bridge signals start of £80m interchange overhaul
    Apr 8, 2025 · The design process for the redeveloped interchange is currently underway – a public consultation is expected in 2026 before plans are submitted.
  61. [61]
  62. [62]
    TfGM reveals designs of Metrolink stations - Place North West
    Besses o'th' Barn, also known as Besses, Bowker Vale, Bury, Crumpsall, Heaton Park, Prestwich, Radcliffe and Whitefield are all set for stop enhancements.Missing: longer | Show results with:longer
  63. [63]
    Say yellow to the Bee Network
    The Bee Network is Greater Manchester's vision to deliver a joined-up London-style transport system, with buses beginning to be integrated from 2023.
  64. [64]
    Manchester Launches Bee Network With New Tickets Making Travel ...
    ... Metrolink zone for as little as £5.40. Unlimited travel on all buses and the entire Metrolink network will cost £7.80 if travelling off-peak, or £9.50 at ...
  65. [65]
    The Metrolink line to connect Oldham to Heywood and Bury
    Aug 25, 2025 · A new Metrolink tramline will link Oldham directly to Heywood and Bury, eliminating the need to travel into the city to get there.
  66. [66]
    [PDF] GMCA 20250829 Business Case Development for Rapid Transit ...
    Aug 19, 2025 · Plans have since been published setting out the integration of 8 lines by 2028 in three tranches (2026, 2027 and 2028) with the remaining rail ...<|separator|>
  67. [67]
    Greater Manchester unveils ambitious Metrolink light rail expansion ...
    Sep 4, 2025 · Starting work by the end of 2025 on the Strategic Outline Case for completion of the Metrolink Airport Line 'Western Leg', which would serve ...
  68. [68]
    Greater Manchester To Invest £6 Million into Tram Network Expansion
    Aug 27, 2025 · Exciting plans for new tram and tram-train connections across Greater Manchester have been boosted by investment of more than £6m.Missing: upgrades | Show results with:upgrades