Fact-checked by Grok 2 weeks ago

Capitol Corridor

The Capitol Corridor is an intercity operated by in , connecting San Jose in to Auburn near Sacramento over a route spanning the and . Launched in December 1991 through a partnership between the and , the is governed by the Capitol Corridor Joint Powers Authority and provides a congestion-relieving alternative to Interstate 80, , and corridors. The route features multiple daily trains, with frequencies up to five round trips weekdays between Sacramento and San Jose, offering unreserved seating, free , bicycle accommodations, and a cafe car for snacks and beverages. Ridership has grown substantially since inception, reaching 1.14 million passengers in 2025—the second consecutive year exceeding one million—approaching pre-pandemic peaks of 1.8 million amid ongoing recovery and service enhancements. Renowned for operational reliability, the Capitol Corridor has maintained on-time performance rates above 90 percent since the late , contributing to its status as one of the most successful regional passenger rail lines in the United States through infrastructure investments like early adoption of and plans for zero-emission operations by 2035.

History

Predecessor Services and Early Proposals

The Sacramento Northern Railway operated interurban electric passenger service connecting Sacramento to Oakland and via Vallejo from 1913 until passenger operations ended in January 1941, serving as the primary rail link across the corridor in the early . After , rising automobile use and highway expansion led to the discontinuation of most short-haul passenger rail in , with no regular intercity service restored on the Sacramento-Bay Area route following Amtrak's formation in 1971. By the 1980s, California's state-supported services, such as the launched in 1974, demonstrated viability for regional amid freeway congestion and air quality concerns, prompting to evaluate expansions including a new corridor between Sacramento and San Jose. The Capitol Corridor proposal emerged as part of this effort, envisioned to utilize existing Union Pacific tracks (formerly Southern Pacific) for three daily round trips linking the state capital to and Oakland. Voter-approved Propositions 108 (November 1990, $2 billion for transportation infrastructure) and 116 (June 1990, $1 billion specifically for rail bonds) provided critical funding, enabling and to initiate planning and secure track access agreements.) These measures allocated resources for startup costs, station improvements, and initial equipment, culminating in the service's debut on December 12, 1991, with six daily trains and projected ridership under 250,000 annually.

Launch and Initial Operations (1990s)

The Capitol Corridor intercity rail service commenced operations on December 12, 1991, through a partnership between the (Caltrans) and , marking the revival of state-supported passenger rail in the region after a hiatus since the discontinuation of similar services in the . Initial service consisted of three daily round trips—equating to six trains total—operating along a 170-mile route between San Jose and Sacramento, utilizing existing tracks owned primarily by Union Pacific and serving intermediate stops including Oakland, Emeryville, and . This launch was funded by state appropriations, with Caltrans providing operational oversight and Amtrak handling train operations using conventional locomotives and bi-level gallery cars typical of the era. Early operations emphasized commuter-oriented schedules to connect employment centers with the state capital, achieving immediate ridership gains that exceeded projections, with over 200,000 passengers in the first partial year despite limited marketing. Service frequency remained stable at three round trips through the mid-1990s, though minor schedule adjustments addressed priority conflicts on shared tracks, which occasionally impacted reliability. managed the route directly until July 1998, when administrative responsibility transferred to the newly formed Capitol Corridor Joint Powers Authority (CCJPA), a of local agencies including counties and transit districts, enabling more localized governance and funding coordination without immediate changes to service levels. By the late , the service had demonstrated viability as a cost-effective alternative to highway congestion along Interstate 80 and , with state investments supporting track improvements and station enhancements at key locations like Oakland's Square. Initial economic analyses by highlighted the corridor's potential for expansion, setting the stage for subsequent frequency increases, though operations stayed focused on the core San Jose–Sacramento alignment through the decade's end.

Service Expansions and Adjustments (2000s–2010s)

In the early , the Capitol Corridor Joint Powers Authority (CCJPA) implemented multiple service expansions to accommodate rising ridership, achieving these gains without increasing the operating budget by optimizing existing resources. In 2002–03, frequency was increased three times— in October 2002, January 2003, and April 2003—raising the total to 24 daily trains between Sacramento and Oakland using the same seven trainsets previously allocated for 18 trains. These adjustments followed an initial increase to 18 trains per day between Sacramento and Oakland in 2001, reflecting operational efficiencies that quadrupled service frequency, ridership, and revenue over the prior decade while improving the revenue-to-cost ratio by 77%. The period's largest expansion occurred on August 28, 2006, elevating weekday service to 32 trains between Sacramento and Oakland and 14 daily trains between Oakland and San Jose, supported by reinvested cost savings and state funding for capital improvements like track upgrades and additional . This buildup from four round trips in 1997 to 16 by the mid-2000s prioritized frequency over speed, yielding ridership growth from approximately 500,000 to over 1 million passengers between 1998 and 2002, alongside reduced per-passenger-mile costs. During the 2010s, service levels stabilized at the 2006 frequencies amid fiscal constraints from state budget shortfalls, with maintenance of 32 weekday Sacramento–Oakland trains through FY 2010–11 and targeted investments in reliability rather than further broad expansions. Adjustments included fare increases evaluated biennially to fund , such as station renovations and capacity enhancements, while new facilities like the opened on November 13, 2017, adding a mid-route stop with platforms and pedestrian access to boost intermodal connectivity. Northern extensions beyond Roseville remained limited to one daily round trip to , with planning focused on incremental improvements like third-track additions for future frequency gains rather than immediate service hikes.

Post-Pandemic Recovery and Recent Changes (2020s)

The severely impacted Capitol Corridor operations, with ridership plummeting 47% in FY 2019–20 to 898,007 passengers and further to 354,373 in FY 2020–21 amid service reductions to five daily round trips. Service levels were gradually restored, reaching pre-pandemic frequencies of 12 weekday and 11 weekend round trips by October 2022. Ridership began recovering post-2022, rising 99% to 705,365 in FY 2021–22 and 31% to 921,105 in FY 2022–23, driven by restored service and targeted marketing. By FY 2025, annual ridership reached 1.14 million, an 11% increase from FY 2024 and approximately 64% of the pre-pandemic peak of 1.78 million in FY 2019, with growth attributed to special event trains and returning weekday commuters. In June 2025, weekday service expanded from 12 to 14 round trips between Oakland and San Jose, including two additional westbound midday departures from and improved peak-hour connections, while weekend service remained at 11 round trips. Fare adjustments effective April 1, 2025, reduced short-distance single-ride prices, raised longer-distance multi-ride passes by 3%, and set a $5 minimum for single rides with a 10-trip pass option at $45. Operations shifted to a third-party maintenance contractor in FY 2024–25, cutting Amtrak-related costs by 25%.

Route and Service Characteristics

Route Description and Geography

The Capitol Corridor operates along a 170-mile route extending from in the to Auburn Station in Placer County, serving 16 primary stations with additional flag stops. Trains depart southward from San Jose, traversing the densely urbanized through Santa Clara and Santa Clara–Great America stations, characterized by suburban development, tech campuses, and industrial zones amid flat alluvial plains formed by the Guadalupe River watershed. Northward, the route continues to Fremont, crossing the and entering the East Bay's inland valleys, where terrain shifts to low hills interspersed with . From Fremont, the line proceeds to , navigating the densely populated, industrialized fringes of Oakland with views of freeways and warehouses, before reaching Oakland Jack London Square along the waterfront of the Oakland Estuary, an engineered channel connecting to the Sacramento-San Joaquin . The path then hugs the eastern shore of through Emeryville's commercial districts and Berkeley's academic and residential neighborhoods, dominated by the campus and the Berkeley Hills' eastern slopes. Beyond Berkeley, the route veers northeast to Martinez, crossing tidal flats and approaching the , a narrow gap between the bay and the delta where trains traverse the Benicia-Martinez rail bridge over the strait, exposing passengers to brackish marshes and shipping channels. North of Martinez, the corridor enters the expansive Suisun Marsh, California's largest contiguous estuarine wetland, spanning over 55,000 acres of tidal sloughs, pickleweed flats, and riparian corridors that serve as critical habitat for waterfowl and support commercial fishing. Stations at Suisun–Fairfield and the recently opened Fairfield–Vacaville Hannigan provide access to the surrounding agricultural lowlands, where the terrain flattens into the fertile , irrigated by the and featuring vast farmlands of rice, tomatoes, and orchards underlain by deep alluvial soils. The route passes , a hub for agricultural research at the , before arriving in Sacramento, the state capital situated at the confluence of the Sacramento and American Rivers, amid leveed floodplains prone to seasonal inundation. Extending eastward to Roseville, Rocklin, and , the line ascends gently into the foothills, transitioning from valley floor to rolling oak woodlands and granite outcrops, with marking the northern terminus near the historic town at an elevation of approximately 1,200 feet. Throughout, the route parallels Interstate 80 and utilizes tracks owned primarily by , exposing riders to a mix of urban density, estuarine ecology, and rural agrarian landscapes shaped by California's and tectonic history.

Frequency, Schedules, and On-Time Performance

The Capitol Corridor operates 14 round trips daily on weekdays and 11 round trips on weekends, effective June 2, 2025, connecting to with intermediate stops including Sacramento, , Fairfield-Vacaville, Suisun-Fairfield, , , Oakland, , Emeryville, , and others. This represents an expansion from 12 weekday round trips prior to the change, providing approximately hourly service during peak commuting hours (e.g., morning departures from San Jose around 5:30 a.m. to 8:00 a.m. and evening returns from Sacramento until about 8:00 p.m.) and more spaced intervals midday. Schedules are designed for reliability on Union Pacific and BNSF freight-shared tracks, with westbound trains (e.g., Nos. 521–541) typically taking 3–4 hours end-to-end, and eastbound counterparts following similar patterns; real-time adjustments for connections to Thruway buses at Emeryville and San Jose accommodate and access. On-time performance (OTP) measures endpoint arrivals within five minutes of schedule, a metric prioritized by the Capitol Corridor Joint Powers Authority (CCJPA) with a target exceeding 90%. Recent federal assessments confirm the route met 90% OTP among state-supported Amtrak services as of mid-2025, outperforming the national average amid freight interference and infrastructure constraints. CCJPA monthly reports, which track delays from causes like signal failures or UP priority traffic, show fiscal year variations—e.g., improvements to near-target levels in early 2025 after post-pandemic dips below 90% in periods like February 2024—reflecting targeted investments in track access agreements and dispatching. Overall, OTP sustains commuter viability, though shared-track dependencies limit consistency compared to dedicated corridors. The Capitol Corridor experienced peak ridership in (FY) 2019, carrying approximately 1.78 million passengers, driven by expanded service frequency and regional economic activity. This marked a steady upward trend from its inception, with annual ridership surpassing 1 million for multiple years leading into the . The COVID-19 pandemic caused a sharp decline, with ridership falling to 900,000 in FY2020 and further to 354,373 in FY2021 amid lockdowns and shifts. Recovery began in FY2022 at 704,365 passengers, roughly doubling from FY2021, supported by resumed full service levels and targeted promotions. By FY2024, ridership exceeded 1 million for the first time since 2019, reaching an estimated 1.027 million, followed by 1.14 million in FY2025—an 11% increase attributed partly to special event trains for games and concerts. Despite this rebound, FY2025 figures remain below the 2019 peak, reflecting persistent challenges like hybrid work patterns reducing commuter demand.
Fiscal YearRidership (passengers)
20191,780,000
2020900,000
2021354,373
2022704,365
2024>1,000,000
20251,140,000
Passenger surveys indicate a mix of trip purposes, with a 2021 onboard survey of 1,079 respondents showing 46% for work or business, 30% visiting family or friends, 18% leisure or recreation, 7% , and smaller shares for school or other reasons. Access to stations primarily involves drop-off or pickup (32%), driving (26%), and (17%), with walking (14%) and biking (10%) also notable. Frequent ridership has declined post-pandemic, with only 19% of 2021 survey respondents riding five or more days per week, down from 28% in 2019, alongside fewer average weekly trips. An earlier 2015 survey reported an average passenger age of 44, with 54.9% and 45.1% respondents. The Capitol Corridor Joint Powers conducts annual onboard surveys for demographics and satisfaction, though detailed recent breakdowns beyond trip characteristics remain limited in public reports.

Stations and Intermodal Connections

Major Stations and Facilities

The Capitol Corridor serves 18 stations along its route from to San Jose, with six staffed stations providing ticket agents, enhanced amenities, and intermodal connections, while the remaining 12 are unstaffed with varying shelter and kiosk availability. Major facilities include the northern hub at and the southern terminus at , both offering full-service operations, alongside key Bay Area stops like Oakland Jack London Square, Emeryville, and , which facilitate transfers to other routes and regional transit. Sacramento Valley Station (SAC), located at 401 I Street, operates as the primary northern endpoint and a staffed facility open from 5:00 a.m. to 12:00 a.m. daily, featuring station agents, three ticket kiosks, restrooms, and 275 parking spaces at a $10 daily maximum. It connects to Sacramento Regional Transit bus routes including 20 A/B and 3, and serves as an interchange for Amtrak's long-distance and trains. The station, originally built in 1926, includes historical elements like a vaulted and is undergoing renovations to enhance and features such as renewable energy integration. Oakland Jack London Square Station (OKJ), opened in 1994 at the historic port area, is a staffed Bay Area hub with glass-enclosed waiting areas for natural light, ticket services, restrooms, and paid parking options including easy access. It provides connections to buses and ferries, supporting daily Capitol Corridor service alongside and trains. Emeryville Station (EMY) functions as an intermodal center with staffed ticket assistance, bathrooms, an , ample indoor and outdoor seating, and direct bus links via the Cross Bay Connector to San Francisco's , accommodating over three dozen daily Capitol Corridor stops. The facility includes side and island platforms serving Union Pacific tracks, with recycling bins and proximity to local transit like Emery Go-Round shuttles to . San Jose Diridon Station (SJC), the southern terminus, is a major staffed multimodal hub integrating with , Altamont Commuter Express (ACE), and buses, and Amtrak's , offering ticket validation for free parking permits on monthly or 10-ride passes. It features extensive platform access, baggage handling, and connections to destinations, with track assignments varying for northbound and southbound services. Martinez Station (MTZ) serves as a critical staffed junction for transfers to the , with an enclosed waiting area, free , accessible platforms, wheelchair services, restrooms, recycling, and over 100 parking spaces that often fill by mid-morning. The site includes a overlooking tracks, lockers, bus bays, and a pedestrian bridge to auxiliary parking, supporting both Capitol Corridor and routes.

Integration with Local Transit and Other Modes

The Capitol Corridor facilitates intermodal transfers through a free program allowing passengers to connect to local bus and services in most communities along the route without incurring additional fares, upon presentation of a valid or receipt to the connecting agency. This initiative, coordinated with regional operators, supports seamless onward travel from stations such as Sacramento, Oakland, and San Jose. Key rail-to-rail integrations include direct connections at Richmond station to (BART), enabling access to and destinations; transfers occur on the same platform, with agencies aligning schedules to minimize wait times. In the Sacramento area, Capitol Corridor trains at link to Sacramento Regional Transit (SacRT) Gold Line , which extends service downtown and to suburban routes. At , passengers connect to Valley Transportation Authority ( lines serving employment centers and residential areas. Airport access is supported via timed transfers: from Santa Clara–Great America station, VTA Route 10 provides direct service to terminals; Richmond BART connections reach (SFO) with frequent service, though passengers should allocate 1–2 hours for the journey including potential security lines; is accessible via BART from Coliseum or other linked stations. Amtrak Thruway buses extend reach beyond the rail corridor, offering scheduled connections from Emeryville to (approximately 20–30 minutes) and from Sacramento to northern destinations like Roseville, Colfax, and Redding, with timetables coordinated to match train arrivals and departures. These bus links, operated under Amtrak's regional network, accommodate and provide fare integration for Capitol Corridor ticket holders.

Governance and Economics

Organizational Structure and Management

The Capitol Corridor Joint Powers Authority (CCJPA), formed on July 1, 1998, under California's , assumes responsibility for policy direction, capital programming, , and overall of the Capitol Corridor service. The agency partners with , which operates the daily services under a contractual agreement, while the CCJPA focuses on long-term service enhancements, infrastructure investments, and coordination with state and local entities such as the . Governance of the CCJPA is vested in a comprising two representatives from each of the eight counties served by the corridor—Alameda, Contra Costa, Placer, Sacramento, San Joaquin, Santa Clara, Solano, and —totaling 16 voting members typically drawn from county agencies or boards of supervisors. The board elects a chair and vice chair annually to lead meetings and set priorities, such as service expansions and funding allocations; for instance, recent board actions in February 2025 included appointing six new members and four alternates to maintain regional representation. This structure ensures localized input on decisions affecting the 170-mile route connecting the to Sacramento and Auburn. Executive management is led by the Managing Director, who oversees a small staff handling administrative, planning, and partnership functions, including a Deputy Managing Director for operational support. As of 2022, Rob Padgette served in this role, directing efforts like annual business planning and performance monitoring while manages crew, dispatching, and maintenance under CCJPA oversight. The CCJPA's financial reports, audited annually, detail its operational framework, emphasizing fiscal accountability to board directives and state funding sources.

Funding Mechanisms, Subsidies, and Operating Costs

The Capitol Corridor service is operated under a contract with , governed by the Passenger Rail Investment and Improvement Act (PRIIA) Section 209, which allocates costs based on a standardized for state-supported routes. The primary funding mechanism consists of annual operating subsidies from the State of California, channeled through the (CalSTA) and , as outlined in the CCJPA's Annual Business Plan (ABP) submitted for state approval. These subsidies cover the shortfall between fare revenues and total operating expenses, with the state allocating funds from sources including the State Transit Assistance (STA) program and general transportation revenues; in (FY) 2024-25, the state augmented support by $66 million across California's three state-supported routes, including the Capitol Corridor. Federal contributions focus predominantly on capital improvements rather than routine operations, such as the $42.51 million CRISI grant awarded in 2023 for track enhancements. Operating costs encompass Amtrak-contracted train operations, equipment maintenance (partially transitioned to the Joint Powers Authority), administrative expenses, and marketing, totaling approximately $57.7 million in FY2024-25 and $55.4 million in FY2025-26. revenues, derived from sales, generated $29.9 million in FY2024-25 projections, yielding a of about 41%, up from 40% in FY2023 but below the pre-pandemic peak of 61% in FY2019. This ratio reflects passenger payments covering roughly 40-50% of costs in recent years, with the remainder by state taxpayers; for instance, the net operating requirement stood at $27.8 million for FY2024-25 after accounting for fares and minor ancillary revenues. Direct operational expenses outside the Amtrak contract, such as customer support and supplemental services, add roughly $0.6-0.7 million annually.
Fiscal YearProjected Operating Expenses ($M)Projected Fare Revenue ($M) (%)Estimated State Subsidy Need ($M)
2024-2557.729.94127.8
2025-2655.432.345 (projected)23.1
Subsidies have fluctuated with ridership post-COVID-19, supported temporarily by federal relief funds like allocations, but state contributions rose 52% from FY2018-19 to FY2022-23 amid lower passenger volumes. The CCJPA's requests in the ABP emphasize optimization models to project needs based on service levels, with state approvals ensuring continuity but highlighting dependency on public funds given the route's farebox consistently below 70% even in peak years.

Economic Impacts, Cost-Benefit Analysis, and Taxpayer Burden

The Capitol Corridor service contributes to regional economic activity by providing intercity connectivity between major economic hubs, including Sacramento, the , and , facilitating business travel, commuting, and tourism that might otherwise rely on congested highways or short-haul flights. In 2024, the route carried over 1 million passengers, marking a post-pandemic record and supporting ancillary spending in sectors such as and near stations. However, comprehensive independent economic impact studies specific to the Capitol Corridor are scarce; aggregate analyses of California's state-supported routes, including this one, estimate broader contributions like job support and GDP effects, but these often rely on input-output models that may inflate multipliers without accounting for opportunity costs of diverted public funds. Cost-benefit analyses for the Capitol Corridor remain limited and largely internal to proponents, with no publicly available rigorous assessment demonstrating a positive when incorporating full lifecycle costs, including capital investments in track upgrades and equipment. Operating metrics indicate inefficiencies: the , measuring ticket revenues against operating expenses, stood at 61% in 2019 pre-pandemic but fell to 40% in 2023 and 38% in 2024, reflecting persistent shortfalls covered by subsidies rather than user fees. For 2023, operating revenues totaled approximately $17.8 million against $60 million in expenses, yielding a subsidized primarily by appropriations. Projections for fiscal year 2025 anticipate modest recovery to 41%, but this still implies that benefits like time savings or emissions reductions—often cited qualitatively—do not translate to financial self-sufficiency, raising questions about compared to unsubsidized alternatives like personal vehicles or buses on parallel corridors.
Fiscal YearOperating Revenues ($M)Operating Expenses ($M) (%)State Subsidy Request ($M)
202317.860.040~42 (implied deficit)
2024~25.662.83860.4
2025 (proj)29.957.74151.2
The table above summarizes key financial indicators from Capitol Corridor Joint Powers Authority reports, highlighting the structural reliance on public funding. Taxpayer burden manifests through annual state subsidies averaging $40–60 million, drawn from California's general fund and transportation allocations, effectively transferring costs from ~1 million annual riders to the broader populace, including non-users in rural or auto-dependent areas. Federal contributions via Amtrak further distribute this load nationally, with state-supported routes like the Capitol Corridor historically requiring 30–50% subsidy coverage pre-pandemic, a threshold exceeded amid rising labor and fuel costs. This model contrasts with highways, where user fees via gas taxes offset more of operations, underscoring causal trade-offs: while rail may alleviate localized congestion, the per-passenger-mile cost of $0.88 in fiscal year 2023-24 exceeds many bus alternatives, imposing an implicit tax without equivalent voter approval mechanisms.

Equipment and Infrastructure

Locomotives and Rolling Stock

The Capitol Corridor operates using a fleet of locomotives and bi-level passenger cars owned by the California Department of Transportation (Caltrans) and shared with the San Joaquins service. This state-owned equipment supports Amtrak California's intercity rail operations in Northern California. Locomotives in the fleet include 13 EMD F59PHI diesel-electric units, built between 1994 and 2001, which produce 3,000 horsepower and are optimized for passenger service with features like isolated cabs for . The fleet also comprises 10 SC-44 locomotives, introduced progressively since 2017, capable of speeds up to 125 mph (201 km/h) and compliant with EPA Tier 4 emissions standards for lower and output. In April 2021, two older F59 locomotives were retired and replaced with additional Charger units to enhance environmental performance ahead of , reducing the reliance on pre-Tier 4 engines. All locomotives in the fleet transitioned to renewable by May 2023, further decreasing carbon emissions without requiring hardware modifications. Rolling stock consists of 78 bi-level California Cars, constructed primarily in the mid-1990s by , offering high capacity with configurations including coaches seating up to 89 passengers per car, cars, /lounge cars, and cab control/baggage cars for push-pull operations. These cars feature accommodations, such as spaces for wheelchairs, and are maintained through periodic overhauls coordinated with to ensure reliability.

Passenger Cars and Amenities

The Capitol Corridor primarily operates with bi-level passenger cars owned by the , including California Cars manufactured by Morrison-Knudsen and Bombardier in the late 1990s and early 2000s, as well as occasional Surfliner bi-level cars from the same era. These consist of coach cars for standard seating, cab/coach cars for the leading vehicle with operator controls, and cars for food service, typically forming trainsets of four to six cars pulled by locomotives such as Amtrak's or state-owned Charger models. As of fiscal year 2025-26, the fleet includes approximately 75 bi-level coach and Surfliner cars shared with San Joaquin services, with plans for integration of new single-level cars procured by to expand capacity and modernize features like upgrades. Coach cars provide seating on two levels, with spacious configurations including reclining seats equipped with footrests and tray tables at many positions, alongside "social" seating areas featuring tables for groups or work. Upper-level seating offers views, while lower levels include accessible restrooms and racks accommodating up to 15 unboxed bikes per car on select trains. Complimentary is available on equipped trains, though passengers should verify via the official schedule, and personal food is permitted alongside purchases from the café car offering snacks, sandwiches, and beverages. Select morning trains feature a designated Quiet Car with restrictions on cell phone conversations, device volumes limited to , and subdued to promote a calm for reading or work. Accessibility features include wheelchair lifts at stations, spaces for mobility devices in coach cars, and lower-level restrooms compliant with ADA standards. Small pets are allowed in carriers for a fee, with service animals accommodated without restriction, and baggage policies limit checked items to two per passenger with onboard storage options.

Maintenance and Infrastructure Upgrades

The Capitol Corridor Joint Powers Authority (CCJPA) oversees maintenance of the corridor's infrastructure, primarily shared tracks owned by , through coordinated inspections, repairs, and rehabilitation efforts funded via state appropriations and federal grants. The CCJPA's allocates resources for ongoing track resurfacing, rail replacements with continuous welded rail where feasible, and tie renewals to ensure operational reliability and safety compliance, including full implementation of systems by 2018 deadlines. Key signal upgrades include replacements of outdated systems between Oakland and San Jose to minimize delays from signal failures, with projects advancing under the South Bay Connect initiative. At Stege near Richmond Station, crossover and signal enhancements totaling $6.47 million—supported by $3.224 million in state funds—improve train routing efficiency and safety. Davis Station has undergone Phase I track crossover replacements and signal system overhauls to reduce conflicts with freight operations. Additional efforts, such as Agnew Siding extensions, add passing capacity to alleviate bottlenecks on single-track segments. Federal and state funding has accelerated these works, including $42.51 million from the in September 2023 for corridor-wide capacity and reliability enhancements, and $42 million in Transit and Intercity Rail Capital Program (TIRCP) grants awarded in April 2023 for connectivity improvements incorporating track and signal elements. Right-of-way measures, such as at-grade crossing upgrades and security fencing, complement track and signal investments, particularly in the extension planning. These upgrades aim to support increased service frequencies, though execution depends on Pacific cooperation and controls amid shared freight priorities.

Challenges and Criticisms

Operational Reliability Issues

The Capitol Corridor service has frequently fallen short of its operator-set target of 90% endpoint on-time performance (OTP), with 2023 recording 82% OTP, 8 percentage points below the goal, primarily due to third-party delays including interference on shared tracks. Monthly variations exacerbate this, as seen in December 2023 when OTP dropped to 79% amid persistent external disruptions. While improvements occurred in 2024's fourth quarter, achieving 90% customer OTP, overall reliability remains challenged by reliance on host railroads like Union Pacific, where trains often receive lower priority than freight operations. Equipment-related problems contribute significantly to disruptions, including failures necessitating unscheduled repairs and cancellations. For instance, from September 4 to October 3, 2025, trains 520, 534, 535, and 549 were suspended due to , reducing service capacity and straining alternative schedules. Similar issues affected related routes, with abrupt cancellations in early September 2025 attributed to repair work, highlighting backlogs in Amtrak's aging fleet shared across state-supported corridors. Aging cars, such as Surfliner models with faulty door panels, have also caused incremental delays, as noted in fiscal year 2021 reports where such mechanical issues increased over time. Freight dominance on key segments, particularly between Oakland and Sacramento, remains a structural cause of delays, as host railroads prioritize commercial cargo under federal policy favoring freight over passenger service, leading to Amtrak trains waiting for clearance. , signal failures, and inspection requirements further compound unreliability, with fiscal year 2023 data indicating host-responsible delays averaging levels correlated to sub-80% OTP systemwide. Despite these, Capitol Corridor outperforms many , though passenger complaints on forums underscore frustration with chronic tardiness impacting connectivity to local .

Financial and Efficiency Critiques

The Capitol Corridor service relies heavily on public subsidies to cover operating shortfalls, with farebox recovery ratios—defined as ticket revenues divided by operating costs—fluctuating between 40% and 61% in recent years. Pre-pandemic, the ratio reached 61% in 2019, but declined to 40% by 2023 amid reduced ridership from restrictions, reflecting a 48% drop in passengers and 40% in revenues compared to 2018-19. Projections for 2024-25 and 2025-26 anticipate modest recovery to 41% and 45%, respectively, supported by rising ridership to over 1 million annually but offset by persistent cost pressures. State subsidies from the increased 52% from 2018-19 to 2022-23 to bridge these gaps, totaling around $36 million in 2024-25 allocations for operations and . Critics argue that such subsidies impose a significant taxpayer burden for a service that recovers only a fraction of costs through fares, with intercity rail like the Capitol Corridor exemplifying broader inefficiencies in U.S. passenger rail where operating expenses routinely exceed revenues by 50% or more. In fiscal year 2022-23, operating costs approximated $60 million against revenues of $17.8 million, implying a per-passenger subsidy exceeding $50 based on 705,400 riders, though efficiency metrics like cost per passenger-mile improved from $0.88 in fiscal year 2023-24 to a projected $0.69 in 2025-26 due to higher utilization. This per-passenger cost remains elevated relative to unsubsidized modes such as automobiles or airlines on similar routes, where implicit subsidies via highways or airports are lower on a per-trip basis, leading analysts to question the allocative efficiency of directing funds to rail over alternatives that better match demand in low-density corridors. Operational inefficiencies exacerbate financial strains, including high labor and maintenance costs under contracts, which the Capitol Corridor Joint Powers Authority seeks to mitigate through third-party maintenance transitions potentially reducing expenses by 25%. Annual business plans highlight structural deficits in California's program, necessitating ongoing state appropriations and exposing vulnerabilities to budget fluctuations, as seen in post-pandemic hikes without commensurate gains. While proponents cite ridership —doubling to 705,365 in fiscal year 2022—as evidence of viability, skeptics from organizations like the contend that subsidies distort modal competition, favoring rail despite its higher unit costs and lower speed advantages over highways in the region. These critiques underscore a reliance on public funding that, absent reforms like cost controls or elements, perpetuates inefficiency in a system where revenues cover less than half of expenditures.

Environmental and Modal Competition Debates

The Capitol Corridor service, operating on locomotives, emits approximately 0.21 kilograms of CO2 equivalent per passenger-mile, compared to 0.35 kilograms for average automobile travel, according to calculations by the Capitol Corridor Joint Powers Authority (CCJPA) that account for typical vehicle occupancy and . This positions rail as more emissions-efficient than solo or low-occupancy driving on routes like Sacramento to Oakland, where highway congestion on Interstate 80 often extends travel times to 2-3 hours during peak periods. However, these figures assume consistent load factors; actual per-passenger emissions rise during off-peak underutilization, as fixed consumption for empty or lightly loaded trains dilutes efficiency, a factor not always emphasized in promotional materials from state-supported rail operators. In 2023, the CCJPA transitioned its fleet to renewable diesel, derived from sources, aiming to reduce lifecycle by capturing carbon-neutral fuels, though critics note that production can involve land-use changes and indirect emissions that offset some gains when evaluated via full attributional accounting. Newer Tier 4-compliant locomotives introduced in projects like the Capitol Corridor Rail Project have cut by 90% and nitrogen oxides by 80% relative to older Tier 0 engines, yielding localized air quality benefits in urban corridors such as the Bay Area. Amtrak's broader efforts, including Capitol Corridor operations, contributed to a system-wide reduction of over 450,000 metric tons of CO2 equivalent since 2010, equivalent to removing tens of thousands of vehicles from roads annually. Debates persist over whether these upgrades justify ongoing subsidies, as diesel rail remains less efficient than electrified systems or emerging electric vehicles; for instance, environmental impact reports for extensions highlight net GHG savings from modal shifts but acknowledge that without , rail's carbon intensity exceeds that of high-occupancy or electric cars in low-demand scenarios. Modal competition centers on the corridor's overlap with automobile-dominated travel between Sacramento and the Bay Area, where captures the majority of trips due to convenience and flexibility, with rail holding a niche in and markets sensitive to delays. Unlike longer routes where competes, Capitol Corridor's 135-mile span lacks significant rivalry—Sacramento International to San Jose flights are rare and inefficient for short hauls—but it vies with buses and carpools, achieving farebox recovery around 50-60% while relying on state funds to undercut effective costs. Proponents argue that expansions could erode vehicle miles traveled (VMT) by 5-10% in targeted segments, per service development plans, fostering denser and reducing sprawl-induced emissions. Skeptics counter that subsidized frequencies distort markets, diverting resources from road improvements or autonomous vehicles that might yield higher overall efficiency without rail's infrastructure footprint, as evidenced by persistent highway dominance in similar U.S. corridors where exceed 70% mode share despite parallel investments.

Future Developments

Planned Expansions and Extensions

The Capitol Corridor Joint Powers Authority (CCJPA) plans to add capacity for up to 20 daily trains on the Sacramento-Roseville segment through infrastructure improvements, including the Sacramento-Roseville Third Main Track Phase I project, which involves constructing approximately 10 miles of third track and a new facility in Roseville to support additional round trips. This phase reached 90% design completion in 2024-25, with construction targeted for completion in 2025, enabling at least two additional round trips by 2029-2030. Related efforts include the Agnew Siding project near Santa Clara-Great America, advancing to final design to enhance track capacity for expanded San Jose extensions. Route realignments form a core component of planned extensions, particularly the Connect project, which proposes shifting Capitol Corridor service from the Niles Subdivision to the Subdivision between Oakland and . This would include a new intermodal station at Ardenwood Park-and-Ride in Fremont, separating passenger and freight operations to reduce congestion and improve reliability, while facilitating connections to Dumbarton Corridor transit services. With $183 million secured toward a total estimated cost of $732 million, the project targets implementation around 2030, pending environmental reviews and partnerships. Longer-term extensions under the Corridor Identification and Development Program explore service to ; Novato; Salinas; and potential new stations such as , aiming to integrate with broader rail networks. The CCJPA Vision Plan envisions a fully electrified corridor achieving 150 mph speeds, slashing Sacramento-to-Oakland travel to just over one hour and Oakland-to-San Jose to under one hour, supported by zero-emissions transitions by 2035 and fleet expansions including leased equipment for 2026 service growth. These initiatives depend on state funding, ridership recovery, and coordination with and freight operators like Union Pacific.

Infrastructure Realignments and Vision Plans

The Capitol Corridor Joint Powers Authority's Vision Plan, updated in , outlines a long-term strategy to evolve the service into a modern network with , dedicated tracks, and maximum speeds of 150 mph, aiming to cut end-to-end travel times such as Sacramento to Oakland to just over one hour and Oakland to San Jose to under one hour. This framework emphasizes separating passenger operations from freight traffic, enhancing accessibility through new stations and connections, and integrating with broader rail goals like zero-emission operations by 2035. The plan builds on earlier conceptual studies by prioritizing empirical feasibility, including ridership modeling and cost-benefit analyses that project service for up to 15 million residents in the by 2050. The 2016 Vision Implementation Plan advanced these objectives through phased engineering evaluations, narrowing multiple alignment options to a single preferred corridor in key segments via operations simulations and environmental scoping. It identified opportunities for dedicated passenger-only infrastructure to mitigate freight-induced delays, which currently limit speeds and reliability on shared Union Pacific and BNSF tracks. These refinements informed state-level integration, aligning with the 2024 State Rail Plan's emphasis on capacity expansions to handle post-pandemic demand shifts toward midday and reverse-commute services. Central to these visions is the Connect project, which realigns Capitol Corridor routing between Oakland and by shifting from the freight-heavy Niles Subdivision to the parallel Coast Subdivision, enabling full separation of passenger and freight movements. This reconfiguration, rooted in the 2014 Vision Plan, includes track upgrades for federal safety compliance, a new intermediate station at Fremont to boost access, and reduced at-grade crossing activations to minimize highway disruptions. Funding for project development was secured in , with environmental reviews and rail improvements ongoing toward a 2030 implementation target, potentially increasing daily train frequencies and on-time performance by isolating services from Union Pacific freight volumes exceeding 30 trains per day. Complementary initiatives, such as the New Transbay Rail Crossing in partnership with , explore or options to bypass bottlenecks at the Oakland Estuary, though these remain in preliminary scoping without finalized alignments. In contrast, the Sac-Roseville Third Track adds 10 miles of parallel trackage north of Sacramento without route deviation, focusing on overtaking capacity for the existing alignment to support frequency increases rather than realignment. These efforts collectively aim to realize Vision Plan speeds and reliability, contingent on sustained state and federal funding amid competing priorities like corridors.

References

  1. [1]
    Capitol Corridor Train Auburn, Sacramento, Emeryville ... - Amtrak
    The Amtrak Capitol Corridor provides daily service between the Sacramento region and the Bay Area for you to skip the traffic and have more fun.
  2. [2]
    Capitol Corridor Bay Area & N. California Rail Transportation
    Capitol Corridor is an intercity passenger rail service that operates between Silicon Valley/San Jose and the Sacramento region. Commute or explore with us.Plan Your Trip · Tickets & Fares · Route Map · Deals & Promotions
  3. [3]
    Capitol Corridor success story: Part 1 | High Speed Rail Alliance
    Dec 20, 2024 · In 1991, Caltrans and Amtrak launched the Capitol Corridor service, starting with three round trips between San Jose and Sacramento. (San Jose ...
  4. [4]
    CCJPA Service - Capitol Corridor
    The Capitol Corridor is an intercity passenger train system that provides a convenient alternative to traveling along the congested I-80, I-680 and I-880 ...
  5. [5]
    Capitol Corridor Ridership Hits 1.14 million in FY2025 - Get on Board!
    Oct 15, 2025 · With free Wi-Fi onboard, Capitol Corridor trains offer a convenient, reliable, and comfortable alternative to the region's congested freeways.
  6. [6]
    Capitol Corridor ridership hits 1.14 million last fiscal year | News
    Oct 17, 2025 · The 1.14 million riders, from Oct. 1, 2024 to Sept. 30, 2025, was the second consecutive year with more than 1 million riders, the Capitol ...
  7. [7]
    The curious case of the Capitol Corridor (part 3)
    Mar 20, 2025 · Capitol Corridor trains achieved a 90+ percent on-time performance rate by the late 2000s. More reliable service built a loyal base of riders.
  8. [8]
    Capitol Corridor Bay Area & N. California Rail Transportation
    Capitol Corridor was among the first in the nation to have Positive Train Control (PTC), a safety measure, installed on its fleet of equipment. 2019. May 2019.
  9. [9]
    Projects - Capitol Corridor
    Capitol Corridor is committed to advancing California's goal of zero-emissions by 2035, and has plans to achieve this by migrating fuels sources over to ...
  10. [10]
    Sacramento Northern Railway History Info
    The Oakland and Antioch Railway started construction in 1910. As the Oakland, Antioch, and Eastern it reached Sacramento in 1913. Both Northern Electric and the ...
  11. [11]
    Sacramento Northern Railway: Map, History, Photos
    Sep 7, 2024 · As such, by the 1940s it had completely abandoned the service. Today, sections ...
  12. [12]
    [PDF] intercity and commuter rail services in california january 1985 85-1
    In the period 1980-81 through 1983-84, operating losses on the San Joaquin route have been reduced from $4.7 million to $3.4 million per year, as the growth in.
  13. [13]
    [PDF] THE CAPITOL CORRIDOR
    On December 12, 1991, the State of California. Department of Transportation (Caltrans) and the National Railroad Passenger. Corporation (Amtrak®) initiated the ...Missing: 1980s | Show results with:1980s<|separator|>
  14. [14]
    Amtrak's 50th Anniversary Timeline - 1990s
    1991. Caltrans and Amtrak launch Capitol Corridor service between San Jose and Sacramento. The service would quickly grow and expand eastward to Auburn, ...
  15. [15]
    December 1991 - Capitol Corridor
    Dec 11, 1991 · On December 12, 1991, the State of California Department of Transportation (Caltrans) and the National Railroad Passenger Corporation ...Missing: history details
  16. [16]
    An air cleaner: Amtrak's Capitol Corridor service marks 25 years
    Dec 7, 2016 · Amtrak Capitol Corridor trains hit the rails running, as it were, on Dec. 12, 1991. Such marked the first time since 1974 in California that a “ ...
  17. [17]
    Capitol Corridor: 25 Years of Connecting Northern California
    In 2016 Capitol Corridor celebrated its Silver Anniversary. For 25 years we have been connecting Northern California and providing reliable, safe, and ...
  18. [18]
    [PDF] Final - Capitol Corridor
    History. The Capitol Corridor service began in December 1991 with six daily trains between San. Jose and Sacramento. The CCJPA assumed management responsibility ...Missing: predecessor | Show results with:predecessor
  19. [19]
    [PDF] capitol corridor
    History. The Capitol Corridor service began in December 1991 with six daily trains between San. Jose and Sacramento. The CCJPA assumed management responsibility ...Missing: predecessor | Show results with:predecessor
  20. [20]
    [PDF] Capitol Corridor Performance Report
    Our relentless pursuit of efficiency enabled us to deliver significant service expansions by reinvesting cost savings and revenues above business plan ...
  21. [21]
    [PDF] Business Plan - Capitol Corridor
    EXECUTIVE SUMMARY. Introduction. This Business Plan Update presents an overview of the Capitol Corridor Joint. Powers Authority's (CCJPA) strategic plan and ...<|separator|>
  22. [22]
    Capitol Corridor Success Story: Part 2 | High Speed Rail Alliance
    Jan 17, 2025 · The Capitol Corridor line transformed from a barely functioning system to one of most successful and reliable passenger-rail lines in the US.
  23. [23]
    [PDF] capitol corridor
    History. The Capitol Corridor service began in December 1991 with six ... Year Statewide Rail Plan to identify capital and operational needs. In 2008 ...
  24. [24]
    [PDF] Amtrak Fact Sheet Fiscal Year 2019 - State of California
    Fairfield-Vacaville: This new facility, where Capitol Corridor service began on November 13,. 2017, consists of platforms with canopies, and a broad pedestrian ...
  25. [25]
    [PDF] Oakland to San Jose and Sacramento to Auburn - Capitol Corridor
    Aug 5, 2010 · SACOG describes Capitol Corridor service and the investment to expand service in the northern and southern portions of the route as a ...
  26. [26]
    [PDF] capitol corridor fy 2024-25 & fy 2025-26 annual business plan
    The CCJPA continues to plan for service expansions to/from Roseville and longer-term service expansions to/from. San Jose. These service expansion/extension ...
  27. [27]
    Capitol Corridor Shatters Ridership Records
    Feb 11, 2020 · Ridership on Northern California's popular intercity passenger rail service hit an all-time high of 1,777,136 riders and $38.03 million in ...
  28. [28]
    Capitol Corridor Expanded Service Schedule Effective June 2, 2025
    May 27, 2025 · Capitol Corridor is expanding weekday service from 12 to 14 round trips. Weekend service will continue with 11 round trips.<|separator|>
  29. [29]
    Capitol Corridor Announces Fare Adjustments Effective April 1, 2025
    Mar 12, 2025 · Short-distance fares will be reduced, longer-distance multi-ride passes will increase by 3%, and minimum single-ride fares will be $5, with 10/ ...Missing: expansions 2023-2025
  30. [30]
    [PDF] fla~$~1 | Capitol Corridor
    Nov 10, 2016 · Projects are implementable over the next 10 years and will provide modest service increases or travel time reductions. ▫ Phase 2: Mid-range ...<|control11|><|separator|>
  31. [31]
    Train Schedules - Capitol Corridor
    Train Schedules. Weekday Westbound; Weekday Eastbound; Weekend Westbound; Weekend Eastbound. Download Train Schedule · Download Bus Schedule; View Holiday Dates ...
  32. [32]
    Capitol Corridor Train Route Map for Northern California
    See where Capitol Corridor trains can take you with our route map. See your route, stations, and travel options for trips throughout Northern California.
  33. [33]
    Stations - Capitol Corridor
    Capitol Corridor has 18 stations between San Jose and Placer County, including bus connections to San Francisco and destinations across Northern California.
  34. [34]
    [PDF] Average Endpoint On-Time Performance Weekdays - Capitol Corridor
    >90%: CCJPA Standard. 80-90%: Similar to other state trains. <80%: Targeted for Improvement. Published by Capitol Corridor Joint Powers Authority, ...Missing: statistics | Show results with:statistics
  35. [35]
    Amtrak overall on-time performance remains below FRA standard
    Aug 6, 2025 · Two State-supported routes achieved 90% on-time performance: California's Capitol Corridor and the Illini/Saluki between Chicago and Carbondale, ...
  36. [36]
    CCJPA Performance Reports, Capitol Corridor Reports
    Capitol Corridor publishes monthly performance reports with data on ridership, on-time performance and key service plan highlights and projects.
  37. [37]
    [PDF] SERVICE PERFORMANCE OVERVIEW - Capitol Corridor
    February end-point on-time performance. (OTP) fell short of our 90% target but still showed significant improvement compared to the start of the fiscal year ...Missing: statistics | Show results with:statistics<|separator|>
  38. [38]
    [PDF] Quarterly Report on the Performance and Service Quality of Intercity ...
    This report covers the first quarter of FY 2025, focusing on Amtrak's performance, including on-time performance, delays, and ridership, and route-specific  ...
  39. [39]
    Amtrak ridership soars nationwide, but California sees decline
    Dec 14, 2024 · The Capitol Corridor line recorded the sharpest decline of all California trains since 2019, falling from 1.78 million riders that year to 1.03 ...
  40. [40]
    Capitol Corridor Reports Five Years of Record Ridership
    Mar 1, 2020 · Ridership on Northern California's popular intercity passenger rail service hit an all-time high of 1,777,136 riders and $38.03 million in ...
  41. [41]
    [PDF] FY2022 PERFORMANCE REPORT - Capitol Corridor
    Any expansion of Capitol Corridor service between Oakland and. Sacramento would be limited by the nature of the current lift bridge and how the waterway is used ...
  42. [42]
    Capitol Corridor authority reaches annual ridership mark
    Oct 17, 2025 · A key factor in FY2025 ridership growth was the CCJPA's special event trains to Levi's Stadium for San Francisco 49ers games and concerts.
  43. [43]
    [PDF] FY2021 PERFORMANCE REPORT - Capitol Corridor
    ” Historically, CCJPA administered an annual on board survey to passengers to gain insight into their trip purpose, travel frequency, station access and ...
  44. [44]
    On Board Survey Reveals High Satisfaction with Service
    Sep 2, 2021 · Only 19% of respondents say they ride the Capitol Corridor five days a week or more, compared to 28% in our 2019 survey, and the average weekly ...
  45. [45]
    Capitol Corridor 3rd Highest in Nation for Customer Satisfaction
    Nov 2, 2015 · Capitol Corridor 3rd Highest in Nation for Customer Satisfaction · The average age of passengers is 44, with 54.9% male and 45.1%female. · Just ...
  46. [46]
    [PDF] A HANDY REFERENCE GUIDE SO YOU CAN ... - Capitol Corridor
    The Capitol Corridor provides direct train service from Auburn/Sacramento to the Bay Area and. San Jose, and connecting service to other destinations, including ...
  47. [47]
    Sacramento, CA (SAC) Train Station Hours ... - Capitol Corridor
    Route 20 A/B > Roseville-Rocklin-Auburn-Truckee-Reno, NV · Route 3 > Marysville-Chico-Redding · Route 20 C > South Lake Tahoe.
  48. [48]
    Sacramento, CA - Sacramento Valley Station (SAC) - Amtrak
    The Sacramento Valley Station is at 401 I Street, Sacramento, CA. It opened in 1926 and is undergoing renovation. Boarding gate notifications are available via ...
  49. [49]
    Sacramento, CA – Sacramento Valley Station (SAC)
    The historic Sacramento station, opened in 1926, has a Renaissance Revival design, a 40-foot vaulted ceiling, and a mural. It has an ATM, ticket sales, and ...
  50. [50]
    Oakland, CA - Jack London Square Station (OKJ) - Amtrak
    Located on Jack London Square, the historic heart of Oakland's port operations, the station opened in 1994. Walls of glass create a bright and airy space ...
  51. [51]
    Oakland Jack London (OKJ) Train Station Hours, Tickets, Parking ...
    Oakland Jack London (OKJ) train station guide: tickets, station hours, schedules, parking lots, contact info, connections, and links to local destinations.
  52. [52]
    Emeryville, CA (EMY) Train Station Hours, Tickets ... - Capitol Corridor
    Emeryville (EMY) train station guide: tickets, station hours, schedules ... Amenities. Bathrooms; ATM; Plenty of seating available inside and ...
  53. [53]
    Emeryville, CA (EMY) - Great American Stations
    An intermodal center, the Emeryville station serves three dozen daily ... It is managed by the Capitol Corridor Joint Powers Authority (CCJPA), which ...
  54. [54]
    [PDF] Wareham Development | 6121 HOLLIS | SUITE 600 | EMERY VILLE
    Direct access to last mile transit options including AC transit,. Emery-Go-Round shuttle to BART, and ride share services. • Adjacent to Amtrak Intermodal.
  55. [55]
    San Jose/Diridon, CA (SJC) Train Station Hours, Tickets, Parking ...
    Free validated parking permit for monthly pass and 10-ride ticket holders only. Show your Capitol Corridor ticket to the station agent for a free permit to put ...
  56. [56]
    San Jose Diridon Station - Caltrain
    Today, Altamont Commuter Express, Capitol Corridor, and Coast Starlight trains all connect with Caltrain at San Jose Diridon station. In addition ...
  57. [57]
    [PDF] Area Map Transit Information San Jose Diridon Transit Center San ...
    San Francisco. TRACK ASSIGNMENTS MAY VARY. CHECK SIGNS OR ASK STATION AGENT. SOUTHBOUND. Tamien / Gilroy. Coast Starlight. Capitol Corridor. NORTHBOUND.
  58. [58]
    Martinez, CA Train Station Hours, Tickets, Parking & Connections
    The main Amtrak lot usually fills up around 8 a.m.. Amenities. Bathrooms; Bottles and cans recycling; Plenty of seating available inside and outside ...Missing: facilities | Show results with:facilities
  59. [59]
    Martinez, CA (MTZ) - Amtrak
    Amtrak Train Station Martinez, CA (MTZ) has an enclosed waiting area, with Wi-Fi, parking, accessible platform and wheelchairs.
  60. [60]
    Martinez, CA (MTZ) - Great American Stations
    There is a balcony overlooking the three tracks and an 800-foot platform. The station provides parking and has bicycle lockers, bus bays, carpool and vanpool ...
  61. [61]
    Connections - Capitol Corridor
    Transit Transfers. Capitol Corridor's transfer program allows you to connect to local bus and light rail systems in most of the communities we serve. It's free!
  62. [62]
    Transit Transfer - Capitol Corridor
    Make Transit Transfers from Capitol Corridor trains to transportation on other transit systems without paying an additional charge.
  63. [63]
    BART & Capitol Corridor Transfers | Bay Area Rapid Transit
    BART's Richmond Station offers easy connections to Capitol Corridor and San Joaquins trains. All agencies are working together to better serve the region.
  64. [64]
    Connections to SFO, Oakland, San Jose Airports from Capitol Corridor
    Take Capitol Corridor to the Santa Clara-University Station and ride the free VTA #10 Airport Flyer to the terminals. Visit vta.org for more details and ...
  65. [65]
    [PDF] CAPITOL CORRIDOR® - Connecting Bus Schedule
    2 For connecting BART schedules, visit www.bart.gov or call (510) 464-6000. Bus Connections. A SACRAMENTO. To Marysville/Chico/Redding*. To Roseville/Colfax/ ...
  66. [66]
    [PDF] CCJPA-DRAFT-FY25-FY26-Annual-Business-Plan-Jan-2024.pdf
    Introduction. This Annual Business Plan (ABP) presents an overview of the Capitol Corridor. Joint Powers Authority's (CCJPA) strategic plan and funding ...
  67. [67]
    [PDF] Capitol Corridor Joint Powers Authority
    The program and its partners will transform the BART and Regional Rail (including commuter, intercity, and high-speed rail) network in the Northern California ...Missing: formation | Show results with:formation
  68. [68]
    Capitol Corridor Joint Powers Authority Announces Appointment of ...
    Feb 21, 2025 · Capitol Corridor Joint Powers Authority Announces Appointment of Six New Board Members and Four Alternates · Mark Foley – San Francisco Bay Area ...
  69. [69]
    Contact Capitol Corridor
    Joint Powers Authority 2150 Webster Street, 3rd Fl, Oakland, CA 94612 ... Managing Director. Leo Sanchez. Deputy Managing Director. CCJPA Train ...Missing: organizational structure
  70. [70]
    [PDF] CAPITOL CORRIDOR JOINT POWERS AUTHORITY FINANCIAL ...
    Feb 2, 2024 · The Authority's financial report is designed to provide the Authority's Board of Directors, management, creditors, legislative and oversight ...
  71. [71]
    [PDF] Overview of California's State-Supported Intercity Rail Routes and ...
    May 30, 2025 · The state is responsible for supporting three state-supported intercity rail routes: Pacific Surfliner, Capitol Corridor, and. San Joaquins. The ...
  72. [72]
    FY2024 Performance Report Now Available - Get on Board!
    Jan 31, 2025 · Record Ridership: Achieved record-breaking ridership, carrying over 1 million passengers in a single fiscal year since 2019. Revenue: Generated ...Missing: annual | Show results with:annual
  73. [73]
    [PDF] Executive Summary - Squarespace
    Jul 16, 2025 · Northeast Corridor. 1. Economic Benefits Report | Executive Summary. $4.4 billion economic impact. 43,000 jobs supported. 30 State-supported ...
  74. [74]
    Rail Equipment Branch - Caltrans - CA.gov
    The Rail Equipment Branch is responsible for planning, organizing, coordinating and directing rail equipment projects with Amtrak and other contractors.
  75. [75]
    [PDF] 2024 Business Plan Update - San Joaquin Joint Powers Authority
    Jun 30, 2024 · The San Joaquins and Capitol Corridor currently share a combined fleet of 13 F59 PHI Locomotives, 10 Charger. Locomotives, and 78 bi-level ...
  76. [76]
    Make Way! New Charger Locomotives Coming Through
    Nov 3, 2017 · New “Charger” locomotives are now taking the lead for the Capitol Corridor fleet in Northern California. Built locally by Siemens in Sacramento.
  77. [77]
    Capitol Corridor Expands its Cleaner Fleet in Time for Earth Day
    Apr 21, 2021 · Capitol Corridor intercity passenger rail service is retiring two older F-59 locomotives and swapping them for new, EPA-certified Tier 4 Charger locomotives.
  78. [78]
    What's happening with Capitol Corridor Trains
    Apr 22, 2023 · Capitol Corridor and San Joaquins intercity passenger rail services will achieve their goal to run their entire fleets on renewable diesel by end of May 2023.
  79. [79]
    [PDF] Amtrak FY24-29 Equipment ALP Appendices
    Oct 1, 2023 · State-Owned Fleets Operated by Amtrak. California Cars. California. 91. 1996. 27. Most cars are California I built in 1996, also includes Comets ...Missing: rolling stock
  80. [80]
    [PDF] Capitol Corridor Draft FY 2025-26 & FY 2026-27 ANNUAL ...
    Feb 19, 2025 · The plan includes train and motorcoach services, capital improvements, and service expansions, with service amenity and rolling stock equipment ...Missing: origin | Show results with:origin
  81. [81]
    [PDF] capitol corridor intercity passenger rail service annual business plan ...
    This revised ABP is being submitted in November 2020 to reflect temporary reduced service changes that have been implemented in response to decreased ...
  82. [82]
    Amenities and Conveniences on Capitol Corridor Trains
    Capitol Corridor coach cars offer spacious seating and “social” seating areas with tables on both levels. Footrests and tray tables are available at many seats.
  83. [83]
    First-Time Rider Guide - Capitol Corridor
    Here are some tips on how to get the most out of your trip. Research Routes & Schedules Research Routes Buy Tickets There are many ways to buy tickets.
  84. [84]
    Quiet Car Travel During Morning Trains on Capitol Corridor
    Capitol Corridor offers a quiet car experience on select morning trains. This quiet car lets you avoid noise and stress as you prepare for the day.
  85. [85]
    [PDF] SRA Approved Applications Update
    3,224,000. $. 6,470,000. $. Stege Crossover and Signal Upgrades: Enhancements will be made to signals and crossovers in the vicinity of the Richmond Station to ...
  86. [86]
    [PDF] Capitol Corridor Draft FY 2025-26 & FY 2026-27 ANNUAL ...
    Feb 19, 2025 · Auburn | Sacramento | Davis | Suisun-Fairfield ... These service expansion/extension projects will also require additional rolling stock.
  87. [87]
    Capitol Corridor Awarded $42.51 Million from the Federal Railroad ...
    Sep 25, 2023 · The Federal Railroad Administration (FRA) announced it has awarded $42.51 million to the Capitol Corridor Joint Powers Authority (CCJPA)
  88. [88]
    Capitol Corridor Awarded $42 million from California State ...
    Apr 25, 2023 · Capitol Corridor receives $42 million in TIRCP funds for projects that enhance access and connections.
  89. [89]
    Project Overview - Capitol Corridor South Bay Connect
    The South Bay Connect project aims to improve efficiency, rider experience, and expand service by relocating the route to reduce congestion and separate ...Missing: geography terrain
  90. [90]
    [PDF] SERVICE PERFORMANCE OVERVIEW - Capitol Corridor
    During September 2023, Capitol Corridor continued to experience growth with an increase in ridership of. 17% and in revenue of 22% as compared to the same ...
  91. [91]
  92. [92]
    [PDF] SERVICE PERFORMANCE OVERVIEW - Capitol Corridor
    During December 2023, Capitol Corridor continued to experience growth with an increase in ridership of. 17% and revenue of 23% as compared to the same period in ...
  93. [93]
    [PDF] Amtrak 2023 Host Railroad Report Card and FAQs
    5. 900 host-responsible delay minutes per 10,000 train-miles is generally correlated to performance that results in 80% of Amtrak customers arriving on-time. 6 ...
  94. [94]
    A Special Message to Riders: September 2025 - Get on Board!
    Sep 3, 2025 · From September 4 through October 3, 2025, trains 520, 534, 535, and 549 will be temporarily suspended due to locomotive repair work.Missing: operational problems causes
  95. [95]
    Abrupt cancellations hit California's Capitol and San Joaquin corridors
    “Locomotive repair work” is being cited in an advisory to Capitol Corridor passengers this week as the reason two ...Missing: operational | Show results with:operational
  96. [96]
    [PDF] Amtrak On-Time Performance - Rail Passengers Association
    delays. ○ Some passengers suffer worse than others. Amtrak's on time performance on the Capitol. Limited and Sunset Limited was only 28% in 2021. Page 2. For ...
  97. [97]
    Subsidizing Transport | Cato Institute
    Jan 30, 2025 · Both public transit and intercity rail are heavily subsidized, with costs far exceeding operating revenues. Auto and driver taxes and fees ...
  98. [98]
    Green Travel, Eco-Friendly Travel on Capitol Corridor Trains
    The “monthly average CO2 footprint” is based on carbon emissions (per passenger mile) of Rail .21 kg and Car .35 kg for your selected trip. Emissions factors ...Missing: impact | Show results with:impact
  99. [99]
    Capitol Corridor scores big win in the race to combat climate change
    Apr 22, 2023 · Capitol Corridor and San Joaquins intercity passenger rail services will achieve their goal to run their entire fleets on renewable diesel by end of May 2023.
  100. [100]
    Cleaner Passenger Trains through the Capitol Corridor Rail Project
    Mar 16, 2022 · The new locomotives achieve a 90 percent reduction in particulate matter emissions and an 80 percent reduction in oxides of nitrogen emissions.
  101. [101]
    Amtrak Releases Annual Sustainability Report
    Jun 13, 2023 · Amtrak has cut greenhouse gas (GHG) emissions by more than 450,000 metric tons of carbon dioxide since 2010. That is the equivalent of powering ...
  102. [102]
    [PDF] 3.9 Greenhouse Gas Emissions - Capitol Corridor South Bay Connect
    May 1, 2024 · This section describes the regulatory setting and affected environment for GHG emissions. This section addresses known and potential ...
  103. [103]
    [PDF] 2016 Performance Report | Capitol Corridor
    For FY 2016, ridership and revenues were up 5.8% at 1.56 million passengers, and 6.7% at $32 million, respectively, over. FY 2015. The FY 2016 farebox ratio of ...Missing: per | Show results with:per
  104. [104]
    Cars, Not Trains or Planes Dominate Northeast Corridor Travel
    Sep 9, 2019 · Cars carry much more Northeast Corridor travel that any of the three other modes. Between the major metropolitan air markets, cars account for 78 percent of ...Missing: Capitol competition
  105. [105]
    Capitol Corridor South Bay Connect
    South Bay Connect proposes relocating Capitol Corridor rail service to the Coast Subdivision, creating a new station in Fremont, and separating passenger and ...
  106. [106]
    Capitol Corridor rerouting in the Bay area (Planned for 2030)
    Jun 23, 2024 · The Capitol Corridor JPA (CCJPA) has released further details on their ongoing South Bay Connect project, with a targeted completion around 2030.<|separator|>
  107. [107]
    CCJPA Vision Plan, What the Capitol Corridor Can Become
    The plan aims for a modern, electrified railroad with 150 mph speeds, reducing travel times to Sacramento/Oakland to just over an hour and Oakland/San Jose to ...
  108. [108]
    [PDF] vision implementation plan - Capitol Corridor
    In this segment, the earlier Vision Plan identified two alternative alignments: upgrades to the existing circuitous right-of- way along the shoreline of San ...Missing: realignments | Show results with:realignments
  109. [109]
    [PDF] VISION IMPLEMENTATION PLAN APPENDICES - Capitol Corridor
    The Capitol Corridor Vision Plan identified three potential corridors through which a dedicated passenger-only rail system is potentially feasible.Missing: realignments | Show results with:realignments
  110. [110]
    [PDF] 2024 California State Rail Plan - Caltrans
    The capital program is directly linked to specific service improvements across each corridor and reflects the dedicated funding that has been secured to date.<|separator|>
  111. [111]
    Sac-Roseville Third Track, New Capitol Corridor Line
    Since service began in 1991, ridership has grown to make the Capitol Corridor the third busiest passenger rail service in the United States. Expansion of ...